SCHEDULE OF DAYWORKS

SCHEDULE OF BASIC PRICES

PRODEL CONSULTANTS LTD

TO BE COMPLETED BY TENDERERS In accordance with Clause 11(4) (c) of the Conditions of Contract, the Contractor shall be paid daywork rates for extra work that cannot properly be measured and valued, and the Contractor is to insert, in the space provided, the percentage addition that he re uires to be added!deducted to the basic rates and costs of labour, materials and plant as detailed hereunder"# If the Contractor intends to use and expects to be paid for plant for dayworks before so doing he must agree with the $rchitect!%&'& the si(e and amount of plant to be used, having regards to the work in hand& )nder no circumstances will the Contractor be paid for plant in excess of re uirements unless mitigating circumstances warrant the $rchitect!%&'& prior approval& Labour and Material *he Contractor is to state below the percentage addition to +,* costs to cover supervision, all other operating costs, tool money, small tools and profit& +o further addition to net cost of labour and materials will be made whatsoever& *he net cost of labour shall be calculated at the basic rates for the district in which the -orks will be carried out contained in the latest edition of .Conditions of %ervice for /uilding and Civil ,ngineering Contractors in +igeria and current at the time and date of the *ender and shall apply to productive labour only &&&&&&&&&&0 to be added to the net cost of labour as before described& $lternatively, the Contractor may indicate below his maximum all#in rates for labour including the above percentage addition& 1abourers $rtisans (non trade tested) $rtisans (trade tested) per day per day per day

*he net cost of materials shall be calculated at the cost delivered to site after deducting all discounts& -here materials delivered ex#Contractor2s store, no payment will be made for the Contractor2s transport to site and such materials will be paid for at reasonable market rates for materials delivered from a supplier directly to site& -here a fluctuation clause applies the net cost shall be calculated at the basic rates inserted by the Contractor for those materials included in the appropriate appendix& &&&&&&&&&&0 to be added to the net cost of materials as below described& PLANT *he Contractor is to state the percentage addition to or deduction from the rates contained in the latest edition of the 2schedule of dayworks carried out incidental to Contract -ork2 published by the 3ederation of /uilding and Civil ,ngineering Contractor in +igeria& 3or this Contractor such rates are to include fuel and maintenance and apply t plant belonging to the Contractor or hired, whether already on the site or not& 4ayment will only be made for working time, unless the standing time is as a result of a written instruction by the $rchitect!%&' &&&&&&&&&&0 to be added to the rates for plant as before described&

CBN TERTIARY INTERVENTION AT CROSS RIVERS STATE UNIVERSITY OF SCIENCE AND TECH (2012)

You might also like