Professional Documents
Culture Documents
September 2006
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
The document is based on the AFCEE Statement of Requirements (SOR) section provided with AFCEE Task Orders. The Statements of Requirements are at times silent as to the specific requirements regarding codes and standards, and for this reason, the document contains all applicable industry standards and references for the specific requirement, as well as the International Building Code and Iraqi specifications for the requirement. The information contained in this document is provided in a format consistent with each SOR Section. For ease of reference, this document is also organized with the SOR specifications arranged by Construction Specification Institute (CSI) Master Format numbering sequence. Deviations from the International Buidling Code or other applicable referenced standard, specification or code must be submitted in writing to the Contracting Officers Representative (COR) at least 14 days in advance of planned implementation. The request for deviation must include a precise explanation for each requirement as to why the IBC or other specifications is not applicable, practical, or not achievable. This document and the specifications contained in it will be used by AFCEE Iraq Contracting Officer's Representatives and AFCEE Iraq Title II Quality Assurance to ensure contractual compliance and to evaluate construction methods, materials and workmanship for compliance with contractual requirments.
Page 2 of 40
REFERENCE DOCUMENTS
Following is a list of documents referred to in this guide specifications. For convenience, these documents have been posted on the VIAP-Iraq website under the AFCEE Interim Iraqi Construction Standards. For information contact AFCEE Iraq Quality Assurance Program Manager, Bill Johnson at wjohnson@viap.org. AFCEE Interim Iraqi Construction Standards - Civil Work Specifications. Developed in cooperation with the University of Technology - Baghdad. AFCEE Interim Iraqi Construction Standards - Electrical Services Specifications. Developed in cooperation with the University of Technology - Baghdad. General Technical Conditions and Specifications. Book -1 / 2; Specification of Materials; Workmanship of Civil Engineering Works; Second Edition. Al Fao General Engineering Company. Iraqi Building Code Requirements for Reinforced Concrete. Code 1/ 1987 Building Research Centre; Scientific Research Council. Iraqi Ministry of Housing and Construction - Technical Specification, Book 4: Mechanical Works_General. 1993. Iraqi Ministry of Housing and Construction - General and Technical Specifications of the Sanitary Works. Ministry of Higher Education and Scientific Research Architectural, Structural, Electrical, Mechanical, and Sanitary Specifications; University of Technology, Consulting Engineering Office.
ABBREVIATIONS
AFCEE Air Force Center for Environmental Excellence AIICS AFCEE Interim Iraqi Construction Standards CSI SOR Construction Specifications Insitute Master Format 2004 AFCEE Iraq Statement of Requirements
Page 3 of 40
Page 4 of 40
VIAP Iraq
Statement of Requirements Definition Completely remove all debris, rubble, and trash in each building. Completely remove all damaged floor tiles, ceiling tiles, window casements, doorframes, mechanical ductwork, straps, hangers, inserts, electrical boxes, and devices. Repair all walls, ceilings, overheads, and floors. Eliminate ceiling tile except where absolutely necessary Eliminate dropped ceilings except where absolutely necessary for chase development of enveloping equipment (Exception: Those areas where mandated by HVAC loads such as a DFAC). Repair all damage to exterior and interior walls. Seal all open cracks on interior and exterior walls. Repair all concrete awnings. Remove all loose materials and patch to match existing building surface. Repair any supporting structure as required. Clean and repair all tarred joints in the roofing slabs. Reseal all joints and make watertight. Test water tightness of roofing and wall openings. Where possible, eliminate parapets from building vertices. Consider steel trussed roofs vs. poured roofs where procurement and cost of steel permits. Enclose or fill in all existing openings in the walls, floors and ceilings with structurally stable material. All openings in the roof structure and exterior wall shall be made watertight. Remove and replace all damaged interior doors. Remove and replace all damaged exterior doors with insulated steel doors and frames. All necessary hardware, including locks, will be included for all doors. Ensure all doorframes are flush with the wall and seams are sealed. Paint all interior doors and frames. Install wooden doors and door frames at all interior door locations. Ensure all doorframes are flush with the wall and seams are sealed. Paint all interior doors and frames. Install wooden doors and door frames at all interior door locations. Paint all interior doors and frames. Install wooden doors and door frames at all interior door locations. Mechanical room doors shall not have glass but will have a grated vent. Main entrance door shall be steel and reinforced. All steel doors shall have steel frames. Paint all steel doors and frames with the same system as specified for metal above. All doors, frames, and hardware shall be commercial / institutional grade capable of withstanding heavy use.
Construction Specifications Institute # Description Removal and Salvage of Construction Material Demolition, Building Demolition
Code #
Code Description
Iraqi Specification AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications
Specification Description General, Destruction of Establishments General, Destruction of Establishments General, Destruction of Establishments General, Destruction of Establishments General, Destruction Establishments General, Destruction Establishments General, Destruction Establishments General, Destruction Establishments Movement Joints, Laitance removal of of of of
02 01 80 N/A 02 01 80
Section 3403 Additions, Alterations and Repairs N/A Customer Requirement Section 3403 Additions, Alterations and Repairs Section 3403 Additions, Repairs Section 3403 Additions, Repairs Section 3403 Additions, Repairs Section 3403 Additions, Repairs Section 3403 Additions, Repairs Alterations and Alterations and Alterations and Alterations and Alterations and
2-1
2-1
02 01 80 02 01 80 02 01 80 02 01 80 02 01 80
Maintenance of Facility Remediation Maintenance of Facility Remediation Maintenance of Facility Remediation Maintenance of Facility Remediation Maintenance of Facility Remediation
AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications Iraq Building Code Requirements for Reinforced Concrete AFCEE IICS - Civil Work Specifications
2.00.11
05 44 00
IBC
Section 2308 Conventional Light Frame Construction Section 3403 Additions, Alterations and Repairs Section 3403 Additions, Alterations and Repairs Section 1008 Doors, Gates, Turnstiles
2.00.12
02 01 80
IBC
2-1
2.00.13 2.00.13.01
06 48 13 08 13 00
IBC IBC
AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications
2.00.13.02
08 14 00
Wood Doors
IBC
Chapter 16.16
2.00.13.03
06 48 16
IBC
Chapter 16.16
09 91 23 08 14 00 08 91 26 08 11 00 08 11 00 09 91 13 08 10 00
Interior Painting Wood Doors Door Louvers Metal Doors and Frames Metal Doors and Frames Exterior Painting Doors and Frames
Section 1008 Doors, Gates, Turnstiles Section 1008 Doors, Gates, Turnstiles Section 1008 Doors, Gates, Turnstiles Section 1008 Doors, Gates, Turnstiles Section 1008 Doors, Gates, Turnstiles Section 805 Decorations and Trim Section 1008 Doors, Gates, Turnstiles
AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications
Chapter 16.16 Chapter 16.16 Chapter 16.16 Chapter 16.16 Chapter 16.16
Doors and Windows Doors and Windows Doors and Windows Doors and Windows Doors and Windows
Chapter 16.16
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 5 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Statement of Requirements Definition Perimeter Wall: At each base the ECP shall meet Coalition Force Protection Standards for vehicle and personnel entrance. Provide new guard towers and security fencing as required. Contractor is to coordinate with the MITT team on site in order to meet the location requirements. Guard towers shall be spaced no more than 300 meters apart Electrical Work: Renovate the existing and/or install a new and complete building electrical power and lighting system to include all wiring. Panels Breakers Switches Outlets
Code CFPS
Code #
Code Description
2.2. 2.2.01
26 00 00 26 05 19
Electrical Low-Voltage Electrical Power Conductors and Cables Electrical Panel board Schedule Enclosed Switches and Circuit Breakers Wiring Devices Wiring Devices
NEC NEC
N/A N/A Article 300 & Conductors for General 310 Wiring and Wiring Methods Article 408 Switchboards and Panel boards Article 240 Over current Protection Article 404 Switches Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes Article 342, Intermediate Metal 344, 358, Conduit/Rigid Metal Conduit; 353, 365 Electrical Metallic Tubing; Rigid Nonmatallic Conduit; High Density Polyethylene Conduit; Electrical Nonmetalic Tubing Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps Article 406 Receptacles, Cord Connectors, and Attachment Plugs (Caps) Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes Article 300 & Conductors for General 310 Wiring and Wiring Methods
AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Specifications AFCEE IICS - Electrical Specifications AFCEE IICS - Electrical Specifications AFCEE IICS - Electrical Specifications N/A Services Services Services Services
Section 3
26 06 20.16 26 28 16 26 27 26 26 27 26
Distribution Board Miniature and Molded Case Circuit Breakers Installation, Sockets and Switches Socket Outlets
2.2.01 05
Junction boxes
26 27 26
Wiring Devices
NEC
2.2.01 06
Connectors
26 05 33
Raceway and Boxes for Electrical Systems Raceway and Boxes for Electrical Systems
NEC
N/A
2.2.01 07
Conduit
26 05 33
NEC
Section 3.1.5
2.2.01 08
Fixtures
26 51 13
NEC
AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications N/A
Section 5.1
Lighting Fixtures
2.2.01 09
2.2.01 10
Fluorescent lights shall be mounted on walls (near full wall height) vs. ceiling mounted. Steel conduit shall be exposed instead of embedded placement Install lights in each room and at least four (4) electrical outlets. Minimum of one (1) outlet per wall that is 2m long or longer, space receptacles at 2m maximum spacing. All outlets in bathrooms, kitchens, and other wet locations shall be waterproof type. Complete the interior and exterior electrical system with commercial/institutional grade wiring and fixtures using International Electric Code. This is to include tracing any existing electrical wires and/or providing new wiring. Installation of all switches. Lights with cover
26 51 13
NEC
Section 5.1
Lighting Fixtures
26 06 20.26
NEC
2.2.02
26 51 13
NEC
N/A
2.2.03
26 05 19
NEC
Section 3
2.2.03 01 2.2.03 02
26 27 26 26 51 13
NEC NEC
Article 404 Switches AFCEE IICS - Electrical Services Specifications Article 410 luminaries (lighting fixtures), AFCEE IICS - Electrical Services Lamp holders and Lamps Specifications Article 422 Appliance N/A
2.2.03 03
Ceiling fans
N/A
N/A
NEC
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 6 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Code #
Code Description
Iraqi Specification AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications N/A AFCEE IICS - Electrical Services Specifications
Breakers Main panels The contractor shall provide main distribution panel for the generator. The completed system will be connected into the generated electrical power distribution system. The Contractor shall be responsible for trenching and laying underground cable at least 1 meter deep from the buildings to the main distribution panel, with a minimum of 90 cm depth. The building electrical lines shall be in metal conduit for exposed installation. Cable trays Each wire shall be numbered at the terminal points with a permanent numbering system. The contractor shall provide a communications site infrastructure for telephone as integral part of the infrastructure plan. The contractor shall provide computer systems as an integral part of the infrastructure plan. For facilities traditionally earmarked for computer systems. The contractor shall develop provisions for LAN network with consideration provided for Wireless Computer Networks. The contractor shall include the electrical outlets in hidden but accessible locations to power the duct-node computer networks like those found in hotels and office buildings. Perimeter & Exterior Lights
26 28 16 26 06 20.16 26 06 20.16 26 10 00 26 05 43
Enclosed Switches and Circuit Breakers Electrical Panel board Schedule Electrical Panel board Schedule Medium-Voltage Electrical Distribution Underground Ducts and Raceway for Electrical Systems Raceway and Boxes for Electrical System
Article 440 Air-Conditioning and Refrigerating Equipment Article 406 Receptacles, Cord Connectors, and Attachment Plugs (Caps) Article 240 Over current Protection Article 408 Switchboards and Panel boards Article 408 Switchboards and Panel boards Article 110 Requirements for Electrical Installation Article 300 Underground Installation section 300.50 Article 342/344
Miniature and Molded Case Circuit Breakers Main L.V. Switchboard Main L.V. Switchboard
Section 3.1.11
Cables Laid Direct in the Ground Support and Fixing for Cable
2.2.06
26 05 33
NEC
Intermediate Metal AFCEE IICS - Electrical Services Conduit/Rigid Metal Conduit Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications N/A
Section 3.1.5
2.2.06 01 2.2.06 02
26 05 36 26 05 19
Cable Trays for Electrical Systems Low-Voltage Electrical Power Conductors and Cables Voice Communications
NEC NEC
Article 392 Cable Trays Article 200 Use and Identification of Grounded Conductors Article 800 Communications Circuits
2.2.07
27 30 00
NEC
Section 3.12 & 3.13.1 Heavy Duty Cable Tray & Suspend Tray Section 3.1.10 & 3.7 Identification of Cables & Cable Core Identification Section 7.1.2 Telephone System
2.2.07 01
27 20 00
Data Communications
NEC
2.2.07 02
27 20 00
Data Communications
NEC
N/A
2.2.07 03
27 20 00
Data Communications
NEC
N/A
2.2.1
26 50 00
Lighting
NEC
2.2.1 01
2.2.1 02
2.2.1 03
The contractor shall provide appropriate security lighting to all building entries, exit ways, building perimeters (1 per corner), and courtyard areas. Exterior lighting system shall provide sufficient lighting in all areas commonly used at night in accordance with ground illumination requirements of the NEC Utilize area lights mounted on building exteriors vs. polemounted lighting wherever feasible. Power Distribution The Contractor shall provide the electrical power distribution system in accordance with the International Building Code Electrical Standards. The Contractor shall provide for the connection of electrical system into the existing Iraqi National local sub-station, if possible. The contractor shall plan and install a complete electrical distribution system for the area. The electrical system shall be connected to all buildings requiring electrical service.
26 55 53
Security Lighting
NEC
26 56 00
Exterior Lighting
NEC
26 56 00
Exterior Lighting
NEC
2.2.2 2.2.2.01
26 10 00 N/A
NEC NEC
Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps Article 110 Requirements for Electrical Installation Article 110 Requirements for Electrical Installation Article 110 Requirements for Electrical Installation Article 110 Requirements for Electrical Installation Article 110 Requirements for Electrical Installation
AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications N/A AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications N/A
Section 5.1
Lighting Fixtures
Section 5.1
Lighting Fixtures
Section 5.1
Lighting Fixtures
Section 5.1
Lighting Fixtures
Section 0
General Requirements
2.2.2.02
N/A
N/A
NEC
Section 1.1
2.2.2.03 2.2.2.04
26 10 00 26 10 00
NEC NEC
Section 0
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 7 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Statement of Requirements Definition Install switching panels, transformer and ring gears for each location to facilitate proper electrical distribution to each of the buildings. Install electrical cable from the distribution panel to the main breakers in each building and tent. General The contractor shall provide connection of electrical system into the existing Iraqi National local sub-station, if possible. The power connection shall be installed in combination with and through an automatic transfer switch to the Electrical Power Generation Plant The Electrical Power Generation Plant shall be designed as the primary power generation system. Therefore, provide redundant power generation with the largest generator out of service. It is the intent to utilize the national power grid as a redundant electrical supply in addition to the Electrical Power Generation Plant. Criteria The contractor's plan shall provide continuous power through an underground or aerial electrical distribution system. The electrical system shall complete with all required transformers. (400V to11KV step-up and local step-down transformer) High voltage and low voltage cable
Code NEC
Code #
Code Description
Iraqi Specification AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications N/A
2.2.2.06
26 05 19
Low-Voltage Electrical Power Conductors and Cables Medium-Voltage Electrical Distribution Automatic Transfer Switch
NEC
Article 450 Transformer and Transformer Vaults (Including secondary ties) Article 300 & Conductors for General 310 Wiring and Wiring Methods Article 110 Requirements for Electrical Installation Article 700 Emergency System
Section 3
2.2.3 2.2.3.01
26 10 00 26 36 23
NEC NEC
Section 0
General Requirements
2.2.3.01 01
26 10 13
NEC
Section 10
2.2.4 2.2.4.01
N/A 26 05 43
N/A Underground Ducts and Raceway for Electrical Systems Meduim Voltage Transformers
N/A NEC
N/A AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications N/A
Section 3.1.11
2.2.4.01 01
26 12 00
NEC
2.2.4.01 02
26 05 13
Medium-Voltage Cables
NEC
Article 450 Transformer and Transformer Vaults (Including secondary ties) Article 300 & Conductors for General 310 Wiring and Wiring Methods Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes Article 490 Equipment Over 600Volts, Nominal Article 300 & Conductors for General 310 Wiring and Wiring Methods Article 490 Equipment Over 600Volts, Nominal Article 490 Equipment Over 600Volts, Nominal Article 430 Motors, Motor Circuits and Controllers Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps
Section 1.3
Section 3
2.2.4.01 03
Manholes
26 05 43
NEC
2.2.4.01 04
Junction boxes
26 27 26
NEC
N/A
2.2.4.01 05 2.2.4.01 06
Connectors Conductors
N/A 26 05 13.16
N/A Medium-Voltage, Single- and MultiConductor Medium-Voltage Circuit Protection Devices Medium-Voltage Fuses Medium-Voltage Circuit Protection Devices Exterior Lighting
NEC NEC
N/A AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications N/A AFCEE IICS - Electrical Services Specifications Section 3.13 High Tension Cable
26 18 00 26 18 16 26 18 00 26 56 00
Fused Switchgear and Isolators Fused Switchgear and Isolators Lighting Fixtures
Section 5.1
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 8 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Statement of Requirements Definition The contractor shall conduct a complete site investigation and field check in order to fully research and document the existing electrical street and motor pool lighting system. The contractor shall map out all existing conditions. With this information, the contractor shall provide a complete plan illustrating all existing and proposed new work for the complete renovation of the installations street and motor pool lighting system. Construction shall not be started until the plan is approved. The contractor shall complete all work associated with the plan in order to provide a complete and comprehensive street and motor pool lighting system. Sanitary Work Renovate the existing and/or install a new and complete building sanitary sewer system to include all piping, fittings, hangers, straps, flanges, traps, vents, drains and fixtures. Piping
Code NEC
Code #
Code Description
Iraqi Specification
Article 410 Luminaries (lighting AFCEE IICS - Electrical Services fixtures), Lamp holders and Specifications Lamps
2.3. 2.3.00.1
22 13 16
IPC
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works
Chapter 9
Building Drainage and Sanitary Fittings Building Drainage and Sanitary Fittings Drainage and Vent Pipes
2.3.2
22 13 16
IPC
2.3.2.1
Waste lines from toilets will be a minimum of 100mm diameter and slope a minimum of 2%. Lateral lines from the building to the sewer mains will slope at a minimum of 2%. Fittings
23 13 16
IPC
2.3.2.2 2.3.3
24 13 16 22 05 16
Sanitary Waste and Vent Piping Expansion Fittings and Loops for Plumbing Hangers and Support for Plumbing Piping and Equipment Hangers and Support for Plumbing Piping and Equipment Backwater Valves
IPC IPC
2.3.4 2.3.5
Hangers Straps
22 05 29 23 05 29
IPC IPC
2.3.6
Valves
22 13 19.33
IPC
Drains Floor drains shall be provided in each room that contains a water source Floor drains shall be provided in the mechanical equipment and toilet rooms as required. Drains shall be located near urinals or toilet partitions in toilet rooms In mechanical rooms, floor drains will be installed in such away to ensure positive slope to the drains, floor drains shall be provided to avoid running drain piping long distances above or over the floor. Install p-traps at all applicable locations
Sanitary Drains Sanitary Drains Sanitary Drains Sanitary Drains Sanitary Drains
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Section 704 Drainage Piping Installation AL-FAO General Engineering Company General Technical Conditions and Specifications Section 704 Drainage Piping Installation AL-FAO GEC - General Technical Conditions and Specifications Section 702.4 Fittings Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Table 308.5 Hanger Spacing AL-FAO GEC - General Technical Conditions and Specifications Section 308 Piping Support Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Section 715 Backwater Valves Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications Section 1002 Trap Requirements Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works -
Chapter 9
Section 3.2.3.12
Section 7.1
Section 3.2.11.15 Section 3.2.11.15 Section 3.2.11.15 Section 3.2.11.15 Section 3.2.11.15
Floor Drains Floor Drains Floor Drains Floor Drains Floor Drains
2.3.7.5
N/A
N/A
IPC
Section 9.3
Sanitary Fittings
2.3.8
Faucets
22 42 39
IPC
Section 9.4
Sanitary Fittings
2.3.9
Vent system
07 72 23
Relief Vents
IPC
Section 6
Pipe Work, Fittings and Installation Plumbing Fixtures Main Supply Distribution
2.3.10 2.3.11
Plumbing Fixtures Domestic and cold water shall be provided in the facilities to serve the water heater usage and plumbing fixtures provided for the facility.
22 40 00 22 11 13
IPC IPC
Chapter 4 Chapter 6
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 9 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Statement of Requirements Definition Water service to each facility shall enter the building in a mechanical, storage, or similar type space. Isolation valves shall be installed at each facility and to separate latrine/shower area. All water piping shall be routed parallel to the building lines. Insulation shall be provided where required to control sweating of pipes. Domestic water shall be distributed by means of schedule 40 galvanized steel pipe or suitable high pressure PVC equivalent. Note: the contractor shall provide galvanized Schedule 40 plumbing for sinks, showers, and toilets. The hot water shall be generated by electric water heaters
Code IPC
Code # Chapter 6
Code Description Water Supply and Distribution Water Supply and Distribution Piping Insulation
Iraqi Specification Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications
2.3.13 2.3.14
24 11 13 22 07 19
IPC IPC
2.3.15
22 11 13
IPC
Section 3.3.2
2.3.16
22 33 00
IPC
Chapter 5
Water Heaters
2.3.17
2.3.18
The storage unit shall be typically located inside the mechanical room, storage room, janitor room or similar type space. Floor drain shall be provided in each room that contains a water source. Floor drains shall be provided in the mechanical equipment and toilet room as required. Install showers to include all piping, faucets, drains and concrete or tile work. Shower pan shall be lowered so all water on shower floor will run into the shower pan. Install Eastern style toilets and sinks (provision of concrete trough in barracks for the feet/hand wash/laundry). Include all piping and hardware to make the units functional. Provide foot wash stations in all places where there are showers Provide sanitary sprayer and hose assembly at each toilet.
23 33 00
IPC
24 13 19.13
Sanitary Drains
IPC
Iraq Ministry of Housing & Construction Section 11.2 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 11.6 and 11.7 General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Section 3.2.11.15 Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications Section 3.2.11.8
Cold and Hot Water Distribution Electric Storage Water Heater Floor Drains
2.3.19
22 41 23
IPC
Showers
2.3.20
22 42 13
IPC
Section 3.2.11.5
2.3.20.1
N/A
NA
N/A
N/A
N/A
N/A
2.3.21
N/A
N/A
IPC
N/A
N/A
Latrine and shower walls, from floor to ceiling, shall receive ceramic tile. Provide tile base on all walls. All the joints shall be grouted and sealed to prevent water migration into the walls. Shower units shall include a changing space and privacy enclosure. Latrine stalls shall receive a swinging door with barrel bolt closure. Hose connects with appropriate piping shall be provided in each latrine/shower facility. Water Supply & Distribution:
09 30 13 09 30 00 32 01 19.61 10 21 16 10 26 19.16 22 45 36
Ceramic Tiling Tiling Sealing of Joints in Rigid Paving Shower and Dressing Compartments Shower Doors Hand-held Emergency Drench Hoses
Section Showers 1210.3 Section Walls 1210.2 Section 705 Joints Section 417 Showers Section Bathroom Accessories 2606.9 Section 424.4 Hose Connected Outlets
Finishing of Walls and Ceilings Construction Works Finishing of Walls and Ceilings Showers Showers N/A
2.4.
22 11 00
IPC
Chapter 6
Water Supply and Distribution Water Supply and Distribution Water Supply and Distribution Manholes
Section 11
2.4.1
The CONTRACTOR shall repair and renovate the existing water supply and distribution system and provide a new water supply and distribution system where required. The main headers leaving the primary water pumping plant shall be at least two (2) pipe sizes oversized and have blind flanges located at tees near both ends of future expansion zones. Fabricate and install covers or access hatches at all manholes, and electric hand holes.
22 11 13
IPC
Chapter 6
Section 1
Water Supply Main, Distribution, Service Pipes and Equipments General and Technical Specification of the Sanitary Work. Main Supply Distribution
2.4.1.2.1
N/A
N/A
IPC
Chapter 6
Section 11.1
2.4.1.2.2
33 39 13
IPC
Section 708.3.6
Section 3.1.23
Manholes
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 10 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Construction Specifications Institute # Description Sanitary Utility Sewerage Manholes, Frames and Covers Sanitary Utility Sewerage Manholes, Frames and Covers Sanitary Utility Sewerage Manholes, Frames and Covers Sanitary Utility Sewerage Manholes, Frames and Covers Water Utility Distribution Valves
Code IPC
Iraqi Specification Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works
Sanitary sewer and water system valve manhole covers shall be round cast iron. Recess and grout all concrete manhole caps. Add fill dirt to within 2 centimeters on the top of concrete manhole cap and grade to slope away from manhole. Add fill dirt to cover an area of 2 meters around all sides of manhole. Service connections to individual building connections requiring water service shall be 1.5 meters outside each building, and shall have an isolation valve in a separate service box with accessible actuator. Pipe Bedding
33 39 13 33 39 13 33 39 13
Section Manholes 708.3.6 Section Concrete Masonry 2105.2.2.1.2 Section Fill Material J107.4 Section 606 Installation of Building Water Distribution System Section 306 Trenching, Excavation and Backfill Section 306 Trenching, Excavation and Backfill
2.4.1.2.7
33 12 16
IPC
Section 3.1.28
2.4.1.3
31 23 23.13
Backfill
IPC
Section 10.3
2.4.1.3.1
2.4.1.3.10
The CONTRACTOR will ensure that the following criteria are met when planning and installing the new, and renovating the existing underground water supply and distribution system: CONTRACTOR shall provide bedding material to level out any irregularities. Water supply mains sizes shall be calculated according to maximum daily future flows. Compaction shall attain 95 percent maximum density for cohesionless soils, and 90 percent maximum density for cohesive soils. This is based on a Standard Proctor, ASTM D698. Maximum size of aggregate should be not more than 8 millimeters per 100 millimeters (1 inch per foot) of pipe diameter, or 75 millimeters (3 inches) maximum. Selected aggregate shall consist of well-graded sand, gravel, crushed gravel, crushed stone. The Contractor shall ensure that the water supply and distribution system conform to International Plumbing Code. The Contractor shall provide a new water supply and distribution system as needed. The Contractor shall inspect all existing underground water piping for defects. The Contractor shall repair all damaged and defective underground water piping as necessary. After completion of a section of water supply pipe the Contractor shall provide a static pressure test of the system. Any leaks shall be repaired and the section shall be retested prior to backfilling the trench covering the pipe. The Contractor will plan the overall water supply and distribution system for the base population which will vary with each facility. The CONTRACTOR shall inspect all existing underground water piping and manholes for damage and defects. The CONTRACTOR shall repair all damaged and defective underground water piping as necessary. After completion of a water section, the CONTRACTOR shall provide a static pressure test of the system. Any leaks shall be repaired and the section shall be retested.
31 23 23.13
Backfill
IPC
Section 10.3
34 06 10
IPC
Section 604 Design of Building Water Distribution System Section J107.5 Section J107.4 Compaction
Section 11.1
2.4.1.3.2
32 23 23.23
Compaction
IBC
Section 3.1.8
Backfilling of Trenches
2.4.1.3.3
31 05 16
IBC
Fill Material
Section 10.5
Backfilling of Trenches
2.4.1.3.4
01 41 00
Regulatory Requirements
IPC
2.4.1.3.5
22 11 00
IPC
33 01 30.16 33 01 30.71 01 43 26
TV Inspection of Sewer Pipelines Rehabilitation of Sewer Utilities Testing and Inspecting Agency Qualifications
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Chapter 6 Water Supply and Iraq Ministry of Housing & Construction General and Technical Specifications of Distribution the Sanitary Works Section 312 Tests and Inspections AL-FAO GEC - General Technical Conditions and Specifications Section 703.4 Existing Building Sewers and AL-FAO GEC - General Technical drains Conditions and Specifications Section 312 Tests and Inspections Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Chapter 6 Water Supply and Distribution Section 604 Design of Building Water Distribution System Chapter 6 Water Supply and Distribution Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works
Section 1
Section 1
General and Technical Specification of the Sanitary Work. General and Technical Specification of the Sanitary Work. Existing Service Existing Service Cold Water Systems
2.4.1.3.9
33 06 10
IPC
Section 2.1
General Requirements
2.4.2
23 11 13
IPC
Section 2.1
General Requirements
2.4.3
01 43 26
IPC
Section 2.3
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 11 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Code IPC
Code #
Code Description
Iraqi Specification AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications
2.4.4.1
2.5. 2.5.1
Domestic water shall be distributed by means of standard weight (schedule 40) galvanized steel pipe that is installed underground with a minimum of 80cm coverage of compacted soil. Waste Water Disposal: The Contractor shall plan and construct a gravity waste water collection and treatment system. All sewerage lift stations are to be fenced and accessible only to Contractor tasked with maintenance of the WWCS The Contractor shall ensure that the sanitary sewer system conforms to International Plumbing Code. The Contractor shall plan for a gravity sanitary sewer system. Where gravity flow is not practical, the system shall consist of a series of holding tanks. The holding tanks will not be placed at or in front of any entrance. The Contractor shall plan for a non-mechanical waste water treatment plant where practical, if gravity sewer to the Municipal facilities is not available. After completion of a section of sewer the Contractor shall provide a static pressure test of the system. Any leaks shall be repaired and the section shall be retested prior to backfilling of the trench. The Contractor will plan the overall sanitary sewer collection system for the base population with a requirement rate of 300 liters per person per day and the wastewater treatment plant at 200 liters per person per day. The Contractor shall complete all work in order to provide a complete and comprehensive sanitary sewer collection system. The Contractor is responsible for all planning and construction aspects for a complete sanitary sewer collection system. Pipe shall be installed from the holding tanks to the facility exterior to allow removal of product without entering the compound. Cleanouts will be provided at each building. Site Storm Water Management System The CONTRACTOR shall conduct a complete site investigation and field check in order to fully research and document the existing site storm water management and drainage system. The CONTRACTOR shall map out all existing conditions. With this information, CONTRACTOR shall plan an overall comprehensive site storm water management and drainage plan. The CONTRACTOR shall incorporate the existing storm water management system, if applicable, into the new plan in order to ensure that the entire installation is provided with the most efficient drainage system available and that redundant work is not performed. Grade all areas to provide a uniform sloping surface. Provide fill material as needed to raise grade elevations in built up areas. Fill low areas, unused ditches, and holes.
23 11 13
IPC
Table 605.3, Piping Materials Table 605.4 and 605.5 Table 605.3, Piping Materials Table 605.4 and 605.5 Section 701.4 Sewage Treatment
Section 3.1.10
Pipe work
44 41 13
IPC
N/A
N/A
N/A
2.5.2
33 32 13
IPC
N/A
N/A
N/A
2.5.3
01 41 00
Regulatory Requirements
IPC
Chapter 7
Sanitary Drainage
2.5.4
44 41 13
IPC
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works N/A
Section 9.1
Section 9.2
Building Soil, Waste, Vent and Rain Water Pipe work. Drainage Pump Stations
2.5.5
44 41 13
IPC
N/A
N/A
2.5.6
01 43 26
Testing and Inspecting Agency Qualifications Schedules for Sanitary Sewerage Utilities
IPC
AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications
Section 3.1.21
2.5.7
33 06 30
IPC
Section 3.1.1
2.5.8
33 06 30
IPC
Chapter 7
Sanitary Drainage
2.5.9
33 06 30
IPC
Chapter 7
Sanitary Drainage
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works
Section 9.1
Section 9.1
Building Soil, Waste, Vent and Rain Water Pipe work. Building Soil, Waste, Vent and Rain Water Pipe work. Pipe Cleanouts
22 05 75
IPC
Section 3.2.11.12
22 14 00
IPC
Section 9.1
Building Soil, Waste, Vent and Rain Water Pipe work. Building Soil, Waste, Vent and Rain Water Pipe work. Existing Service
2.6.2
22 14 00
IBC
Section 1803 Excavation, Grading and Fill Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Chapter 11 Storm Drainage AL-FAO GEC - General Technical Conditions and Specifications
Section 9.1
2.6.3
22 14 00
IPC
Section 3.1.5
2.6.4 2.6.5
31 22 00 31 23 23
Grading Fill
IBC IBC
Section 1803 Excavation, Grading and Fill AL-FAO GEC - General Technical Conditions and Specifications Section J107 Fill AL-FAO GEC - General Technical Conditions and Specifications
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 12 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Statement of Requirements Definition Areas around facilities shall be graded to slope away from buildings and facilities in order to provide storm water drainage. Provide storm water management basins or pond areas away from developed areas for storm water detention. Soil fill shall be compacted to 90% of the maximum density in unpaved areas and 95% maximum density in paved areas determined by the Standard Proctor Method, ASTM D 698. Minimum extent of grading shall be 300 meters from any facility. Plumbing The CONTRACTOR shall plan and construct domestic cold water systems and the succeeding plumbing work in accordance with International Plumbing Code. Hot water systems
Code IBC
Code #
Code Description
Iraqi Specification
Section 1803 Excavation, Grading and Fill AL-FAO GEC - General Technical Conditions and Specifications Chapter 11 Storm Drainage Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications
2.6.7
33 47 26
IPC
Section 10.5
Backfilling of Trenches
2.6.8
32 23 23.23
Compaction
IBC
Section J107.5
Compaction
Section 3.1.8
Backfilling of Trenches
2.7. 2.7.1
01 41 00
Regulatory Requirements
IPC
Chapter 6
AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works N/A
Section 3.2.1
Scope of Work
2.7.1.1
22 11 13
IPC
Section 11.2
Cold and Hot Water Distribution Cold and Hot Water Distribution N/A Piping Thermal Insulation
2.7.1.1.1
Hot water shall be provided for the facility to supply 49C (120F) hot water to fixtures and outlets requiring hot water. Hot water of a higher temperature shall be provided only where required for special use or process. Hot water piping shall be routed parallel to the building lines and concealed within finished rooms. All hot water piping shall be insulated.
22 11 13
IPC
Section 11.2
22 11 13 22 11 13 22 07 19
Facility Water Distribution Piping Facility Water Distribution Piping Plumbing Piping Insulation
2.7.1.2
22 13 00
IPC
2.7.1.3 2.7.1.4
22 13 13 22 13 16
IPC IPC
2.7.1.5
44 42 49
IPC
Fuel oil storage and distribution Sub-Contractors Qualifications The plumbing systems shall be executed by a plumbing specialist sub-contractor experienced in the plan and construction of these types of systems. All materials and equipment shall be standard product of a manufacturer regularly engaged in the manufacture of the product and shall duplicate items that have been in satisfactory use for at least two (2) years prior to bid opening. Plumbing Systems Requirements Compressed Air Systems: Compressed air shall be provided using a packaged aircooled electric motor driven compressor ASME rated receiver air cooler moisture separator to remove moisture and oil.
23 13 00
IMC
AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Chapter 7 Sanitary Drainage Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications Chapter 9 Vents Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Section 1003 Interceptors and Separators Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Chapter 13 Fuel Oil Piping and Storage N/A
Water Supply and Distribution Water Supply and Distribution Section 607 Hot Water Supply System Chapter 6
Chapter 6
Section 8
Section 9.1
Building Soil, Waste, Vent and Rain Water Pipe work. Floor Drains Pipe Work, Fittings and Installation Manholes, Inspection Chambers and Gullies N/A
Section 10.6
N/A
01 43 23
Installer Qualifications
IPC
2.7.3
01 43 13
Manufacturer Qualification
IPC
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications
Section 2.1
General Requirements
Section 3.2.1.8
Scope of Work
Compressed-Air Systems for Laboratory and Healthcare Facilities Gas Compressors N/A N/A N/A
Section 1003 Pressure Vessels Section 1003 Pressure Vessels Section 1003 Pressure Vessels Section 1003 Pressure Vessels Section 1003 Pressure Vessels
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 13 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Statement of Requirements Definition Compressed air system shall be capable of operation up to 1380 KPa (200 psig) maximum for 862 KPa (125 psig) normal units. High-pressure system (above 1380 KPa) shall be provided to supply compressed air to equipment where required. Provide an engine driven air compressor where needed for operation during electrical power outages. The air distribution system shall be provided with necessary regulator valves to maintain desired pressure. Criteria The CONTRACTOR will plan the overall water supply and distribution system for the base population. Provide water pressure of 1.5 bars to the highest point in each building. Plumbing Fixtures
Construction Specifications Institute # Description Compressed-Air Systems for Laboratory and Healthcare Facilities Compressed-Air Systems for Laboratory and Healthcare Facilities Piston Gas Compressors Compressed-Air Systems for Laboratory and Healthcare Facilities N/A Facility Water Distribution Piping
Code IMC
Code #
Iraqi Specification
Specification Description
2.7.4.01.06
22 61 00
IMC
N/A
N/A
N/A
2.7.4.01.07 2.7.4.01.08
43 12 16 22 61 00
IMC IMC
N/A N/A
N/A N/A
N/A N/A
2.7.4.1 2.7.4.1.1
N/A 22 11 13
IPC IPC
Section 604 Design of Building Water Distribution System Section 604 Design of Building Water Distribution System Section 604 Design of Building Water Distribution System Section 402 Fixture Materials
2.7.4.1.2
22 11 13
IPC
2.7.4.2
22 40 00
Plumbing Fixtures
IPC
Eastern Water Closet with flush tank assembly Enameled cast iron, recessed floor mounted. Install p-traps at all water closet locations. Lavatories
22 41 13 22 41 13 N/A 22 41 16
Residential Water Closets, Urinals and Bidets Residential Water Closets, Urinals and Bidets N/A Residential Lavatories and Sinks
Section 420 Water Closets Section 402 Fixture Materials Section 1002 Trap Requirements Section 416 Lavatories
2.7.4.3.1
2.7.4.3.2
Enameled cast iron, wall or counter mounted. Brass fittings provided for water supplies. In addition to lavatories, a combination foot and hand washing station will be provided. This should be a concrete trough assembly covered with ceramic tile. Install p-traps at all sink locations.
22 41 16
IPC
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications
N/A
N/A
N/A
N/A
Section 9.3
Sanitary Fittings
Section 9.3
Sanitary Fittings
N/A
N/A
IPC
Section 9.3
Sanitary Fittings
2.7.4.4
Mop Sink
22 41 16
IPC
Section 9.3
Sanitary Fittings
2.7.4.4.1
2.7.4.4.2
Floor mounted enameled cast iron with copper alloy rim guard. Provide hot and cold-water valves with manual mixing. Faucet handles shall be copper alloy. Install p-traps at all sink locations
22 41 16
IPC
Section 9.3
Sanitary Fittings
N/A
N/A
IPC
Section 9.3
Sanitary Fittings
2.7.4.5 2.7.4.5.1
Shower Showerhead and faucet handles shall be copper alloy. Provide for manual mixing with hot and cold-water valves. Shower head riser pipe shall be schedule 40 galvanized steel. Emergency Shower
22 41 23 22 41 23
Residential Showers Receptors and Basin Residential Showers Receptors and Basin Residential Showers Receptors and Basin Emergency Showers
IPC IPC
Section 417 Showers Section 424 Faucets and other Fixture Fittings Section 605 Materials Joints and Connections Section 411 Emergency Showers and Eyewash Stations Section 411 Emergency Showers and Eyewash Stations
Showers Showers
2.7.4.5.2
22 41 23
IPC
2.7.4.6
22 45 13
IPC
2.7.4.6.1
22 45 16
Eyewash Equipment
IPC
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works
N/A
N/A
N/A
N/A
N/A
N/A
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 14 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Statement of Requirements Definition Provide in Vehicle Maintenance Building and in other facilities where required. Service Sink
Code IPC
Code Description
Iraqi Specification -
Specification Description
2.7.4.7
22 41 16
IPC
Section 418
2.7.4.7.1
2.7.4.7.2
Standard trap type, enameled cast iron. Service sinks provided in maintenance areas shall be metallic, and in battery rooms acid resistant. Install p-traps at all sink locations
22 41 16
IPC
Section 418
N/A
N/A
IPC
Section 1002
2.7.4.8
Grease Interceptor
44 42 49
Water Treatment Oil/Grease Interceptors Water Treatment Oil/Grease Interceptors Concrete Curing Sanitary Drains Sanitary Drains
IPC
Section 1003
2.7.4.8.1
Steel construction, manual cleaning type with removable checker-plate cover, complete with flow control valve. Concrete shall have 21 MPa (3045 psi) as a specified minimum compressive strength in 28 days. Floor or Shower Drain Cast iron construction with galvanized body, integral seepage pan, and adjustable perforated or slotted chromium plated bronze, nickel-bronze or nickel brass strainer consisting of a grate and threaded collar. Install p-traps at all drain locations
44 42 49
IPC
Section 1003
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Sinks Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Sinks Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Trap Requirements Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Interceptors and Separators Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Interceptors and Separators
Section 3.2.9
Service Sinks
Section 3.2.9
Service Sinks
Section 9.3
Sanitary Fittings
Section 10.6
03 39 00 22 13 19.13 22 13 19.13
Minimum Specified Tables 1904.2.2(2) Compressive Strength Section 412 Floor and Trench Drains Section 412 Floor and Trench Drains
Iraq Building Code Requirements for Reinforced Concrete AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works
2.7.4.9.2
N/A
N/A
IPC
Section 9.3
Sanitary Fittings
Provide vent line between last p-trap inside building and locate away from all entrances for the building Trench Drain Cast iron construction with galvanized body, integral seepage pan, and adjustable perforated or slotted chromium plated bronze, nickel-bronze, or nickel brass strainer consisting of a grate and threaded collar. Hose Bibs
07 72 23 22 14 26.19 22 14 26.19
Chapter 9
Vents
Section 412 Floor and Trench Drains Section 412 Floor and Trench Drains
2.7.4.12
N/A
N/A
IPC
Section Hose Connections 608.15.4.2 Section Hose Connections 608.15.4.2 Section 606.4 Valve Identification
N/A
N/A
2.7.4.12.1
N/A
N/A
IPC
N/A
N/A
2.7.4.12.2
N/A
N/A
IPC
N/A
N/A
2.7.5 2.7.5.1
22 33 00
IPC
Chapter 5
Water Heaters
- Section 11.6 and 11.7 Electric water Storage Heaters Section 11.2 Cold and Hot Water Distribution Cold and Hot Water Distribution Cold and Hot Water Distribution N/A
2.7.5.1.1
22 33 00
IPC
Chapter 5
Water Heaters
2.7.5.1.2
The unit shall be located inside a mechanical room, storage room, toilet/janitor room or similar type locked space. The unit shall be of the commercially available tank type having low or medium watt density electric heating elements. Gas (natural or liquid propane) powered hot water generators shall be provided to satisfy large hot water requirements when economically justifiable and practical.
22 33 00
IPC
Chapter 5
Water Heaters
Section 11.2
2.7.5.1.3
22 33 00
IPC
Chapter 5
Water Heaters
Section 11.2
2.7.5.1.4
22 34 30
IPC
N/A
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 15 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Statement of Requirements Definition All installed water heaters shall have a pressure relief valve installed. Booster Pumps
Code IPC
Code #
Code Description
Iraqi Specification
Specification Description Electric water Storage Heaters Cold Water Service Boosting Plant Cold Water Service Boosting Plant N/A
2.7.5.2
22 11 23.13
IPC
Section 606.5 Water Pressure Booster Systems Section 606.5.1 Water Pressure Booster Systems Required
2.7.5.2.1
2.7.6 2.7.6.1
In the event that the water distribution system is not sufficient to provide building pressure, then booster pumps with hydro-pneumatic tanks shall be installed. Special Plumbing System Contractor shall plan and construct compressor air storage and distribution. Waste-oil collection and storage
22 11 23.13
IPC
Iraq Ministry of Housing & Construction - Section 11.6 and 11.7 General and Technical Specifications of the Sanitary Works Section 11.5 Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction Section 11.5 General and Technical Specifications of the Sanitary Works N/A
22 15 00
General Service Packaged Air Compressors and Receivers Water Treatment Oil/Grease Interceptors Facility Fuel Systems
IPC
2.7.6.2
44 42 49
IPC
2.7.6.3
2.7.6.4
Fuel-oil storage and distribution plumbing systems that are required for full performance of equipment and other operations in the Power Plant Sewage Treatment Facility
23 10 00
IPC
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Section 1003 Interceptors and Separators Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Chapter 13 Fuel Oil Piping and Storage N/A
Section 10.6
N/A
44 42 00
IPC
2.7.7.1
2.7.7.2
Special Waste Testing and Commissioning Waste or hazardous drainage from battery repair/charging areas shall be treated prior to entering the sites general waste drainage system. After completing the work, the Contractor shall demonstrate that all plumbing systems operate to fully satisfy the function for which these systems have been designed. All drainage piping shall be acid resistant
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General -
Section 10.6
Section 10.6
01 43 26
IPC
Section 2.3
22 13 13
IPC
N/A
N/A
2.7.7.2
2.7.7.3
The Contractor shall include tests for interlocks, safety cutouts and other protective devices to demonstrate safe operation Smaller battery rooms shall have waste treated using acid neutralizing tank. Fully flush and sanitize system prior to final acceptance.
01 45 23
IPC
Section 2.3
23 13 13.13
Double wall Steel, Underground Storage tanks Code Required Special Inspector Classifications Double wall Steel, Underground Storage tanks Testing and Inspecting Services
IPC
Chapter 8
Indirect/Special Waste
N/A
N/A
2.7.7.3
01 43 29
IPC
Section 2.2
2.7.7.4
Waste oil storage tanks shall be provided for collection of waste oil in the power plant Pressures test all lines for leaks.
23 13 13.13
IPC
Chapter 8
Indirect/Special Waste
N/A
N/A
2.7.7.4
01 45 23
IPC
Section 2.3
2.7.7.5
Waste oil storage tank shall be underground double-wall fiberglass or double-wall steel. MECHANICAL WORK: Heating Ventilating Air Conditioning:
23 13 13.23
Glass-Fiber Reinforced Plastic, Underground Fuel-Oil storage Tanks HEATING, VENTILATING, AND AIRCONDITIONING (HVAC) HVAC
IPC
Chapter 8
Indirect/Special Waste
N/A
N/A
2.8. 2.8.00.1
23 00 00 23 00 00
IMC IMC Chapter 4, 5, Ventilation, Exhaust 6, 11 Systems, Duct Systems, Refrigeration Chapter 4 Ventilation
4.2.14
Package Air Conditioner Unit Centrifugal Power Supply Fan Package Air Conditioner Unit
2.8.00.01.01
Ventilation fans,
23 34 00
HVAC Fans
IMC
4.2.64
2.8.00.01.02
23 81 13
IMC
4.2.14
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 16 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Code IMC
Code #
Code Description
Iraqi Specification Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General
Chapter 11 Refrigeration
2.8.01.04
Air-handling units,
23 30 00
IMC
Chapter 6
Duct Systems
4.2.13 g
Evaporator and Condenser Fans Evaporator and Condenser coils Refrigerant pipe work
2.8.01.05
Coils,
23 82 16
Air Coils
IMC
Chapter 11 Refrigeration
4.2.13 f
2.8.01.06
Piping,
23 23 00
Refrigerant Piping
IMC
Chapter 11 Refrigeration
4.2.18 h
2.8.01.07
Exhaust fans,
23 34 00
HVAC Fans
IMC
Chapter 5
Exhaust System
4.2.63
2.8.01.08
Grills,
23 37 13
IMC
4.2.45
2.8.01.09
Registers,
23 37 13
IMC
4.2.43
2.8.01.10
Ductwork,
23 32 00
IMC
Chapter 6
Duct Systems
4.2.40
2.8.01.11
Hangers,
23 32 00
IMC
Chapter 6
Duct Systems
4.2.47
Connections to Ductwork
2.8.01.12
Straps,
23 32 00
IMC
Chapter 6
Duct Systems
4.2.47
Connections to Ductwork
2.8.01.13
Fasteners,
23 32 00
IMC
Chapter 6
Duct Systems
4.2.47
Connections to Ductwork
2.8.02.01
The Contractor shall plan, supply, fabricate and install new ventilation system. The Contractor shall plan, supply, fabricate and install new heating systems. Ventilators and Heaters,
23 82 23
Unit Ventilators
IMC
Chapter 4
Ventilation
4.2.61
2.8.02.02
23 82 39
Unit Heaters
IMC
4.2.14 i
2.8.03
23 82 00
IMC
Section 920 Heating and Cooling Load Calculations Section 920 Unit Heaters
4.2.14 i
Heaters
2.8.03.01
Heating systems,
23 83 00
IMC
4.2.14 i
Heaters
2.8.03.02
Baseboard heaters,
23 83 13
IMC
4.2.14 i
Heaters
2.8.03.03
Resistance heaters in the A/C units may be substituted for electric baseboard heaters, ceiling fans,
23 83 33
IMC
4.2.14 i
Heaters
2.8.03.04
23 34 00
HVAC Fans
IMC
4.2.61
Fans-Propeller Type (Wall Mounted) Package Air Conditioner Unit Centrifugal Roof Exhauster Heaters
2.8.03.05
Air conditioning,
23 81 16
Room Air-Conditioners
IMC
Section 312 Heating and Cooling Load Calculations Chapter 5 Exhaust System
4.2.14
2.8.03.06
23 34 00
HVAC Fans
IMC
4.2.63
2.8.03.07
Electric heaters,
23 82 39
Unit Heaters
IMC
4.2.14 i
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 17 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Code IMC
Code #
Code Description
Iraqi Specification Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General
Specification Description Package Air Conditioner Unit Package Air Conditioner Unit Package Air Conditioner Unit Package Air Conditioner Unit Fans-Propeller Type (Wall Mounted)
Section 312 Heating and Cooling Load Calculations Section 312 Heating and Cooling Load Calculations Section 312 Heating and Cooling Load Calculations Specific appliances, fireplaces and solid fuel burning equipment Chapter 4, 5 Ventilation and Exhaust Systems Chapter 9
2.8.04
23 81 00
IMC
4.2.14
2.8.04.01
Air Conditioners shall be window mounted type, shall be manually operated and enclosed in a protective vandal proof steel cage and mounted out of high traffic areas. Heat pumps shall be of the window mounted type, manually operated and enclosed in a protective vandal proof steel cage and mounted out of high traffic areas. Exhaust and Ventilation:
23 81 16
Room Air-Conditioners
IMC
4.2.14
2.8.04.02
23 81 43
IMC
4.2.14
2.8.1
23 30 00
IMC
4.2.61
N/A N/A 23 40 00
IMC
2.8.1.2.01.01
23 41 00
IMC
2.8.1.2.01.02
32 35 13
IMC
2.8.1.2.01.03
Wall intakes,
23 37 00
IMC
2.8.1.2.01.04
Roof hoods,
23 38 00
Ventilation Hoods
IMC
2.8.1.2.01.05
2.8.1.2.02
50mm thick permanent washable metal mesh type filters as first stage for filtration of dust. Medium efficiency (30 percent, as defined by ASHRAE 52 Dust Spot Efficiency Criteria) filters, the 50 mm (2 inch) thick disposable panel type, shall be the second. VENTILATION AND EXHAUST FANS:
23 43 13
IMC
Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Section 605 Air Filters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Section 401.6 Outdoor opening protection Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Section 605 Air Filters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General Section 503 Ventilations rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General
4.2.60
Air Filters
4.2.60
Air Filters
4.2.62 e
Bird Screen
4.2.52 b
4.2.54
4.2.60
Air Filters
23 34 00
HVAC Fans
IMC
4.2.64
2.8.1.2.02.01
2.8.1.2.02.02
All fans used for ventilation and pressurization shall be selected for required performance and for minimum noise level. Unit mounted supply and exhaust fans shall be centrifugal forward curved, backward inclined, or airfoil fans with non-overloading characteristics of high efficiency and quiet running plan. Gravity dampers,
23 34 16
IMC
Chapter 4
Ventilation
4.2.64
23 33 13
Dampers
IMC
Section Ventilation [B]513.10.4 Section 506.3.2.4 Section 506.3.3 Chapter 5 Vibration isolation
2.8.1.2.02.03
Vibration isolators,
23 37 23
IMC
2.8.1.2.02.04 2.8.1.2.02.05
External lubricators, accessories and controls necessary for specified sequence of operation. Administrative Areas: 34 CMH/person (20 CFM/person) with air conditioning; 37 CMH/m2 (2 CFM/Ft2) of floor area.
23 37 23 23 37 23
IMC IMC
Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General N/A Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General
4.2.61f
Dampers
4.2.64f
Vibration Isolation
N/A 4.2.63h
N/A Controls
2.8.1.2.03
23 34 16
IMC
[F]502.5.2
4.2.64 b
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 18 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Statement of Requirements Definition Toilet and Wash Areas: Exhaust ventilation at 37 CMH/m2 (2 CFM/Ft2) of floor area. Or 85 CMH/Water Closet or Urinal. Kitchen Hood Exhaust and Make-up air: As required and as per Kitchen plan specialist and equipment supplier requirements. Minimum requirements include requirements. Minimum requirements include hoods with exhaust fans and fire extinguishers over each cooking area Electrical/Mechanical rooms: Mechanical ventilation sufficient to limit space temperature and to remove heat given out by operating equipment, 37 CMH/M2. Maintenance Shops: Maintenance Shops and similar spaces that use solvents and oils shall be provided with mechanical exhaust air systems. The systems shall consist of centrifugal fan, ductwork, exhaust grille, and interlock controls. These type spaces shall not return exhaust air to any split system unit or ventilation system. Centrifugal fan,
Code IMC
Code # [F]502.5.2
Iraqi Specification
2.8.1.2.05
23 38 13
IMC
Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Section 506 Commercial Kitchen Hood Iraq Ministry of Housing & Construction Ventilation system ducts and Technical Specification Book 4: exhaust equipment Mechanical Works_General
4.2.54
2.8.1.2.06
23 34 16
IMC
[F]502.5.2
2.8.1.2.07
23 34 16
IMC
503
Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General
4.2.64 b
4.2.63
2.8.1.2.07.01
23 34 16
IMC
Chapter 4
Ventilation
2.8.1.2.07.02
Ductwork,
23 31 00
IMC
Chapter 6
Duct Systems
2.8.1.2.07.03
Exhaust grille,
23 37 13
IMC
2.8.1.2.07.04
Interlock controls,
23 33 00
IMC
2.8.1.2.08
2.8.1.2.08.01
Central Diesel Generator Facility: Per the calculations of the plan ENGINEER and approval of the COR. The facility shall be provided with mechanical exhaust air systems. The system shall consist of centrifugal fan, Ductwork,
23 35 00
IMC
502.1.1
Exhaust Location
Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General
4.2.64
4.2.40
4.2.52
4.2.41e
4.2.63
23 33 00
IMC
Chapter 6
Duct Systems
4.2.40
2.8.1.2.08.02
Exhaust grille,
23 33 00
IMC
Chapter 6
Duct Systems
4.2.52
2.8.1.2.08.03
Interlock,
23 33 00
IMC
4.2.41e
2.8.1.2.09
2.8.1.3 2.8.1.3.01
Barracks: Air conditioning for officers and Senior NCO's only. Ceiling fans and adequate room ventilation for Junior NCO (jundis). Specific Requirements: Install ceiling fans in all rooms, with vibration mounts or hook-type suspension. To reduce sand and dirt migration, outside air intakes shall be located as high as possible within architectural constraints. The intakes shall be sized so that free air velocities are below 2.5 m/s (500 fpm). All fans used for ventilation and pressurization shall be selected for required performance and for minimum noise level. Unit mounted supply and exhaust fans shall be centrifugal forward curved, backward inclined, or airfoil fans with non-overloading characteristics of high efficiency and quiet running plan. Power Generation:
23 34 23
IMC
4.2.61
Fans-Propeller Type (Wall Mounted) Fans-Propeller Type (Wall Mounted) Air Filters
23 34 23
IMC
[F]502.5.2
4.2.61
2.8.1.3.02
23 41 00
IMC
605.3
4.2.60
2.8.1.3.03
23 34 16
IMC
[F]502.5.2
4.2.66
2.8.2
26 10 00
NEC
N/A
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 19 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Statement of Requirements Definition Fire Prevention: A minimum of one (1), 8 kg or greater, fire extinguisher per 100 square meters shall be provided. All fire extinguishers shall be mounted to the wall or placed in existing cabinets. Fire extinguishers shall be of the ABC type. Install commercial grade, hard wired electric and battery powered smoke alarms in all rooms and hallways. Install emergency exit signs, in Arabic with international symbols, over primary fire exit routes. Install commercial grade, hard wired electric and battery powered smoke alarms in all rooms and hallways. Non-load bearing shall be reinforced with 15 cm x 15 cm 12 gauge wire mesh or larger. A broom type finish is expected unless otherwise requested. Expansion or control joints shall be placed in the concrete for a maximum slab size of approximately 3 m x 3 m. All block and brick walls, both solid and hollow core shall be placed with mortar on all surfaces in contact with adjacent block or brick. Placing the mortar after the block is positioned in place is unacceptable. Finished Flooring: All finished flooring shall be of terrazzo tile except for food preparation areas and bathroom floors. All food preparation and bathroom finished floors shall be of glazed ceramic tile finish. The project includes all structures, buildings and systems as required for the installation. Submit all manufacturers documentation, training manuals and training procedures, quality control, safety, security, and environmental protection procedures to the Contracting Officers Representative (COR). At time of negotiations, the Contractor and COR will determine number and type of copies of each submittal required. The Contractor will submit these items at a time determined by the COR and the submission will be documented on the Contractors schedule. All submittals shall include a cover letter to the COR on or before the date indicated in the Contractors schedule. Submit reports as required by the COR on all project related issues to the COR. Submit the following to COR and Title II for review and approval: Preventive Maintenance Plan: The Contractor shall prepare a Preventive Maintenance Plan and submit it to the COR for review and approval. This plan shall identify manufacturers information and recommendations for preventive maintenance on all new equipment installed under this contract. Training Manuals: The Contractor will be responsible for providing a minimum 3 hours of training on each (1) HVAC, (2) Electrical, (3) Generator, (4) Plumbing, and (5) Fire Alarm systems. The Contractor shall provide Training Manuals for the components of these systems in English and Arabic. COR Submittals:
Code IBC
Code #
Code Description
Iraqi Specification
3.2.01
21 21 00
IBC
3.2.02
28 31 46
IBC
3.2.03
26 53 00
Exit Signs
IBC
Chapter 10
3.2.1
28 31 00
IBC
Chapter 9
3.3.02
03 22 00
ASTM
A 185-1
3.3.03 3.3.04
03 25 36 07 95 00
IBC IBC
Section 804
Ministry of Higher Education and Scientific Research - Electrical Specifications Carbon Dioxide Ministry of Higher Education and Extinguishing Systems Scientific Research - Electrical Specifications Smoke Alarms Ministry of Higher Education and Scientific Research - Electrical Specifications Means of Egress Ministry of Higher Education and Scientific Research - Electrical Specifications Fire Protection Systems Ministry of Higher Education and Scientific Research - Electrical Specifications Specification for Steel Iraq Building Code Requirements for Welded Reinforcement, Plain Reinforced Concrete Concrete Interior Floor Finish AFCEE IICS - Civil Work Specifications
41.1
41.6
Smoke Detectors
N/A
N/A
41
Fire Detection and Extinguishing System Shrinkage and Temperature Reinforcement Movement Joints
5.10.2,5.10.4
N/A 4.5.1
Section 1906 Formwork, Embedded Pipes Iraq Building Code Requirements for and Construction Joints Reinforced Concrete Section 2103,2104 Masonry Construction Material AFCEE IICS - Civil Work Specifications
3.3.05
04 20 00
Unit Masonry
IBC
Chapter 6
Mortar
3.4.00.01
09 66 13
IBC
Chapter 12.12
04 21 16 N/A 01 33 00
Chapter 12.13
1-9
5.1.
01 78 23.19
IBC
1-10
5.2.
01 79 00
IBC
N/A
N/A
N/A
5.3.
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 20 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Statement of Requirements (SOR) Section 5.3.01 5.3.02 5.3.03 5.3.04 6.00.00 6.01.
Statement of Requirements Definition Submit the following to the COR for review and approval: Construction Inspection Reports Testing and Inspection Reports Coordination Memoranda PLANNING STANDARDS: The Contractor must adhere to the International Building Code, International Electrical Code, International Mechanical Code, International Plumbing Code, International Fire Code and in any other standards specifically cited herein as applicable. The Contractor must provide copies of all specifications, calculations and manuals used. All calculations, standards and correspondence shall be in English The Contractor shall provide all site assessments and work plans with calculations and CADD drawings (where applicable). Provide as-built drawings, training manuals, warranties, preventive maintenance plans and operations and maintenance manuals, in English and Arabic. Provide 2 copies of legible operation and maintenance manuals for all new equipments, finishes, fixtures and hardware bound and cataloged in CSI format on A4 sized paper. Follow "single manufacturer" premise for generators, pumps, valves, compressors, electrical components, etc. where possible for utility plants and critical infrastructure elements (WTPs, WWTPs, Power Plants, etc.) The contractor shall develop provisions for Wireless Computer Networks; consider including electrical outlets in hidden but accessible locations to power the duct-node computer networks like those found in hotels and office buildings. Explore opportunities to make manhole covers inaccessible to vehicle traffic or protect with bollards. The Contractor shall provide catalog cuts, supplier data, test reports and other information required by the COR during construction. Submittals shall clearly show that the materials or equipments supplied meet or exceed the specifications and project requirements. Concrete Requirements: CONSTRUCTION DRAWINGS: Provide shop drawings or a detailed Scope of Work for approval before construction proceeds. As-built drawings must reflect full details of items built. All buildings will be planned, designed, renovated, or constructed according to requirements and specifications. Iraqi standards or any other acceptable standards shall be implemented. Eastern and Western-style fixtures will be required and installed where indicated on construction drawings. All concrete shall have a minimum 28 day compressive strength of 21 MPa (3000 psi). Reinforce slabs with 15 cm x 15 cm 12 gauge steel wire mesh or larger. A broom type finish is expected unless otherwise requested.
Construction Specifications Institute # Description Code-Required Procedures Code-Required Procedures Code-Required Procedures Code-Required Procedures Special Inspections and Special Inspections and Special Inspections and Special Inspections and
Code # N/A
Iraqi Specification
Specification Description
Section 1704 Special Inspection Section 1715 Material and Testing Standards Section 106 Construction Documents
AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications
General, Planning the Site General, Planning the Site General, Planning the Site General, Standard Specifications
01 41 00
Regulatory Requirements
IBC
1-7
6.02.
01 33 23
IBC
SEC 106
Construction Documents
1-9, 1-10
6.03.
N/A
Customer Requirement
N/A
N/A
Customer Requirement
N/A
N/A
N/A
6.04.
27 21 33
NES
N/A
N/A
N/A
6.06. 6.07.
N/A 01 33 00
N/A IBC
N/A
Customer Requirement
N/A 1-10
7.1. 7.00.01
01 33 23
IBC
1-10
7.00.02
N/A
N/A
N/A
Customer Requirement
1-7
7.1.01 7.1.02
03 31 00 03 22 00
IBC ASTM
7.1.03
03 25 36
IBC
Section 1905 Concrete Quality, Mixing and Placing A 185-1 Specification for Steel Welded Reinforcement, Plain Concrete Section 804 Interior Floor Finish
Iraq Building Code Requirements for Reinforced Concrete Iraq Building Code Requirements for Reinforced Concrete AFCEE IICS - Civil Work Specifications
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 21 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
VIAP Iraq
Statement of Requirements Definition The concrete shall be free from excessive voids or cracks when poured and be wetted sufficiently to avoid stress cracking due to excessive moisture loss. Provide test cylinders or cubes for every 20 cubic meter of concrete placed. Compact soils on foundation to 95% maximum density determined by the Standard Proctor Method, ASTM D 698 before concrete is poured. Place expansion or control joints in the concrete for a maximum slab size of 3 meters x 3 meters.
Code IBC
Code #
Code Description
Iraqi Specification
Section 1905 Concrete Quality, Mixing and Iraq Building Code Requirements for Placing Reinforced Concrete Section 1903, Specification for tests and 1905.6.2.3 Materials J107.5 Compaction Iraq Building Code Requirements for Reinforced Concrete AFCEE IICS - Civil Work Specifications
7.1.05
03 39 00
Concrete Curing
IBC
2.2.5, 2.4.1
Proportioning of Concrete Chapter 2, Digging Lengthened trenches for general services. Compaction) Movement Joints
7.1.06
32 11 16
IBC
6-2, 6-3
7.1.07
07 95 00
Expansion Control
IBC
1905.10.7
Construction Joints
4.5.1
IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.
Page 22 of 40
Versar 2006 VIAP 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.
Submit all manufacturers documentation, training Submittal Procedures manuals and training procedures, quality control, safety, security, and environmental protection procedures to the Contracting Officers Representative (COR). At time of negotiations, the Contractor and COR will determine number and type of copies of each submittal required. The Contractor will submit these items at a time determined by the COR and the submission will be documented on the Contractors schedule. All submittals shall include a cover letter to the COR on or before the date indicated in the Contractors schedule. Submit reports as required by the COR on all project related issues to the COR. Submit the following to COR and Title II for review and approval: Submittal Procedures The Contractor shall provide catalog cuts, supplier data, test reports and other information required by the COR during construction. Submittals shall clearly show that the materials or equipments supplied meet or exceed the specifications and project requirements. The Contractor shall provide all site assessments and work Shop Drawings, Product Data and plans with calculations and CADD drawings (where Samples applicable). Provide as-built drawings, training manuals, warranties, preventive maintenance plans and operations and maintenance manuals, in English and Arabic. Provide 2 copies of legible operation and maintenance manuals for all new equipments, finishes, fixtures and hardware bound and cataloged in CSI format on A4 sized paper. CONSTRUCTION DRAWINGS: Provide shop drawings or a Shop Drawings, Product Data and Samples detailed Scope of Work for approval before construction proceeds. As-built drawings must reflect full details of items built. All installed water heaters shall have a pressure relief Governmental Safety Requirements valve installed. The Contractor shall ensure that the water supply and distribution system conform to International Plumbing Code. The Contractor shall ensure that the sanitary sewer system conforms to International Plumbing Code. Regulatory Requirements
IBC
01 33 00
6.07.
IBC
1-10
01 33 23
6.02.
IBC
SEC 106
Construction Documents
1-9, 1-10
01 33 23
7.00.01
IBC
1-10
General, Sample of Material and Works Electric water Storage Heaters General and Technical Specification of the Sanitary Work. Building Soil, Waste, Vent and Rain Water Pipe work. Scope of Work
01 35 26
2.7.5.1.5
IPC
Relief valve
01 41 00
2.4.1.3.4
IPC
01 41 00
2.5.3
Regulatory Requirements
IPC
Chapter 7
01 41 00
2.7.1
01 41 00
6.01.
The CONTRACTOR shall plan and construct domestic cold Regulatory Requirements water systems and the succeeding plumbing work in accordance with International Plumbing Code. The Contractor must adhere to the International Building Regulatory Requirements Code, International Electrical Code, International Mechanical Code, International Plumbing Code, International Fire Code and in any other standards specifically cited herein as applicable. The Contractor must provide copies of all specifications, calculations and manuals used. All calculations, standards and correspondence shall be in English
IPC
Chapter 6
Iraq Ministry of Housing & Construction - Section 11.6 and 11.7 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 1 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 9.1 General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Section 3.2.1 Conditions and Specifications AFCEE IICS - Civil Work Specifications 1-7
IBC
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 23 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
01 43 23
2.7.2.1
01 43 26
2.4.1.3.8
01 43 26
2.4.3
All materials and equipment shall be standard product of a manufacturer regularly engaged in the manufacture of the product and shall duplicate items that have been in satisfactory use for at least two (2) years prior to bid opening. The plumbing systems shall be executed by a plumbing specialist sub-contractor experienced in the plan and construction of these types of systems. After completion of a section of water supply pipe the Contractor shall provide a static pressure test of the system. Any leaks shall be repaired and the section shall be retested prior to backfilling the trench covering the pipe. After completion of a water section, the CONTRACTOR shall provide a static pressure test of the system. Any leaks shall be repaired and the section shall be retested. After completion of a section of sewer the Contractor shall provide a static pressure test of the system. Any leaks shall be repaired and the section shall be retested prior to backfilling of the trench. After completing the work, the Contractor shall demonstrate that all plumbing systems operate to fully satisfy the function for which these systems have been designed. Fully flush and sanitize system prior to final acceptance.
IPC
Installer Qualifications
IPC
IPC
Iraq Ministry of Housing & Construction - Section 2.1 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 2.3 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 2.3 General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications
General Requirements
Testing and Inspecting Agency Qualifications Testing and Inspecting Agency Qualifications Testing and Inspecting Agency Qualifications Code Required Special Inspector Classifications
IPC
01 43 26
2.5.6
IPC
Section 3.1.21 Testing Gravity Sewers and Manholes Cold Water Systems
01 43 26
2.7.7.1
IPC
Iraq Ministry of Housing & Construction - Section 2.3 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 2.2 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 2.3 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 2.3 General and Technical Specifications of the Sanitary Works N/A N/A AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications 4-1 to 4-5 1-7 1-7 1-10
01 43 29
2.7.7.3
IPC
01 45 23
2.7.7.2
01 45 23
2.7.7.4
Testing and Inspecting Services The Contractor shall include tests for interlocks, safety cutouts and other protective devices to demonstrate safe operation Pressures test all lines for leaks. Testing and Inspecting Services
IPC
IPC
01 45 33 01 45 33 01 45 33 01 45 33 01 78 23.19
01 79 00
5.2.
02 01 80
2.00.03
Submit the following to the COR for review and approval: Code-Required Special Inspections and Procedures Construction Inspection Reports Code-Required Special Inspections and Procedures Testing and Inspection Reports Code-Required Special Inspections and Procedures Coordination Memoranda Code-Required Special Inspections and Procedures Preventive Maintenance Plan: The Contractor shall Preventive Maintenance Instruction prepare a Preventive Maintenance Plan and submit it to the COR for review and approval. This plan shall identify manufacturers information and recommendations for preventive maintenance on all new equipment installed under this contract. Training Manuals: The Contractor will be responsible for Demonstration and Training providing a minimum 3 hours of training on each (1) HVAC, (2) Electrical, (3) Generator, (4) Plumbing, and (5) Fire Alarm systems. The Contractor shall provide Training Manuals for the components of these systems in English and Arabic. Repair all walls, ceilings, overheads, and floors. Maintenance of Facility Remediation
N/A
Customer Requirement
N/A General, Planning the Site General, Planning the Site General, Planning the Site General, Sample of Material and Works
Section 1704 Special Inspection Section 1715 Material and Testing Standards Section 106 Construction Documents Section 106 Construction Documents
IBC
N/A
N/A
N/A
IBC
2-1
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 24 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
02 01 80 02 01 80 02 01 80 02 01 80 02 01 80
Eliminate dropped ceilings except where absolutely necessary for chase development of enveloping equipment (Exception: Those areas where mandated by HVAC loads such as a DFAC). Repair all damage to exterior and interior walls. Seal all open cracks on interior and exterior walls. Repair all concrete awnings. Remove all loose materials and patch to match existing building surface. Repair any supporting structure as required. Clean and repair all tarred joints in the roofing slabs. Reseal all joints and make watertight. Test water tightness of roofing and wall openings. Enclose or fill in all existing openings in the walls, floors and ceilings with structurally stable material. All openings in the roof structure and exterior wall shall be made watertight. Completely remove all damaged floor tiles, ceiling tiles, window casements, doorframes, mechanical ductwork, straps, hangers, inserts, electrical boxes, and devices. Completely remove all debris, rubble, and trash in each building. Non-load bearing shall be reinforced with 15 cm x 15 cm 12 gauge wire mesh or larger. Reinforce slabs with 15 cm x 15 cm 12 gauge steel wire mesh or larger. A broom type finish is expected unless otherwise requested. A broom type finish is expected unless otherwise requested. All concrete shall have a minimum 28 day compressive strength of 21 MPa (3000 psi). Concrete shall have 21 MPa (3045 psi) as a specified minimum compressive strength in 28 days. The concrete shall be free from excessive voids or cracks when poured and be wetted sufficiently to avoid stress cracking due to excessive moisture loss. Provide test cylinders or cubes for every 20 cubic meter of concrete placed. All block and brick walls, both solid and hollow core shall be placed with mortar on all surfaces in contact with adjacent block or brick. Placing the mortar after the block is positioned in place is unacceptable. All food preparation and bathroom finished floors shall be of glazed ceramic tile finish. Where possible, eliminate parapets from building vertices. Consider steel trussed roofs vs. poured roofs where procurement and cost of steel permits. Remove and replace all damaged interior doors.
IBC
Section 3403 Additions, Alterations and Repairs Section 3403 Additions, Repairs Section 3403 Additions, Repairs Section 3403 Additions, Repairs Section 3403 Additions, Repairs Section 3403 Additions, Repairs Alterations and Alterations and Alterations and Alterations and Alterations and
Maintenance of Facility Remediation Maintenance of Facility Remediation Maintenance of Facility Remediation Maintenance of Facility Remediation Maintenance of Facility Remediation
AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications Iraq Building Code Requirements for Reinforced Concrete AFCEE IICS - Civil Work Specifications
General, Destruction Establishments 2-1 General, Destruction Establishments 2-1 General, Destruction Establishments 2-1 General, Destruction Establishments 4.5, 4.4.5 and Movement Joints, 4.4.6 Laitance removal 2-1
2-1
02 01 80
2.00.12
IBC
02 41 16.13
2.00.02
IBC
2-1
02 42 00 03 22 00
2.00.01 3.3.02
IBC ASTM
03 22 00
7.1.02
ASTM
03 25 36 03 25 36 03 31 00 03 39 00 03 39 00
Grooved Concrete Finish Grooved Concrete Finish Structural Concrete Concrete Curing Concrete Curing
Section 3403 Additions, Alterations and Repairs A 185-1 Specification for Steel Welded Reinforcement, Plain Concrete A 185-1 Specification for Steel Welded Reinforcement, Plain Concrete Section 804 Interior Floor Finish Section 804 Interior Floor Finish Section 1905 Concrete Quality, Mixing and Placing Tables Minimum Specified 1904.2.2(2) Compressive Strength Section 1905 Concrete Quality, Mixing and Placing Section 1903, 1905.6.2.3 Section 2103,2104 Specification for tests and Materials Masonry Construction Material
AFCEE IICS - Civil Work Specifications Iraq Building Code Requirements for Reinforced Concrete Iraq Building Code Requirements for Reinforced Concrete AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications Iraq Building Code Requirements for Reinforced Concrete Iraq Building Code Requirements for Reinforced Concrete Iraq Building Code Requirements for Reinforced Concrete Iraq Building Code Requirements for Reinforced Concrete AFCEE IICS - Civil Work Specifications
General, Destruction of Establishments 5.10.2,5.10.4 Shrinkage and Temperature Reinforcement 5.10.2,5.10.4 Shrinkage and Temperature Reinforcement N/A
2-1
2.1.6 (Table Grade of Concrete 2.1) 2.1.6 (Table Grade of Concrete 2.1) 2.3.3a, 3.2 to Exposure Conditions 3.4 2.2.5, 2.4.1 Proportioning of Concrete Mortar
03 39 00
7.1.05
Concrete Curing
IBC
04 20 00
3.3.05
Unit Masonry
IBC
Chapter 6
04 21 16 05 44 00
3.4.00.02 2.00.11
IBC IBC
Section 804 Interior Floor Finish Section 2308 Conventional Light Frame Construction Section 3403 Additions, Alterations and Repairs
AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications
06 48 13
2.00.13
IBC
2-1
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 25 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
07 72 23
2.3.9
Ensure all doorframes are flush with the wall and seams are sealed. Paint all interior doors and frames. Install wooden doors and door frames at all interior door locations. Vent system
IBC
Relief Vents
IPC
07 72 23 07 95 00
2.7.4.10 3.3.04
Provide vent line between last p-trap inside building and Relief Vents locate away from all entrances for the building Expansion or control joints shall be placed in the concrete Expansion Control for a maximum slab size of approximately 3 m x 3 m. Place expansion or control joints in the concrete for a maximum slab size of 3 meters x 3 meters. All doors, frames, and hardware shall be commercial / institutional grade capable of withstanding heavy use. Main entrance door shall be steel and reinforced. All steel doors shall have steel frames. Remove and replace all damaged exterior doors with insulated steel doors and frames. All necessary hardware, including locks, will be included for all doors. Ensure all doorframes are flush with the wall and seams are sealed. Paint all interior doors and frames. Install wooden doors and door frames at all interior door locations. Install wooden doors and door frames at all interior door locations. Mechanical room doors shall not have glass but will have a grated vent. Provide tile base on all walls. Latrine and shower walls, from floor to ceiling, shall receive ceramic tile. Finished Flooring: All finished flooring shall be of terrazzo tile except for food preparation areas and bathroom floors. Paint all steel doors and frames with the same system as specified for metal above. Paint all interior doors and frames. Expansion Control Doors and Frames Metal Doors and Frames Metal Doors and Frames Metal Doors
IPC IBC
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Chapter 9 Vents AL-FAO GEC - General Technical Conditions and Specifications Section 1906 Formwork, Embedded Pipes Iraq Building Code Requirements for and Construction Joints Reinforced Concrete 1905.10.7 Construction Joints Iraq Building Code Requirements for Reinforced Concrete AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications
Chapter 9
Vents
Section 6
07 95 00 08 10 00 08 11 00 08 11 00 08 13 00
4.5.1
Movement Joints
Section 1008 Doors, Gates, Turnstiles Section 1008 Doors, Gates, Turnstiles Section 1008 Doors, Gates, Turnstiles Section 1008 Doors, Gates, Turnstiles
Chapter 16.16 Doors and Windows Chapter 16.16 Doors and Windows Chapter 16.16 Doors and Windows Chapter 16.16 Doors and Windows
08 14 00
2.00.13.02
Wood Doors
IBC
08 14 00 08 91 26 09 30 00 09 30 13 09 66 13
Wood Doors Door Louvers Tiling Ceramic Tiling Portland Cement Terrazzo Flooring
Section 1008 Doors, Gates, Turnstiles Section 1008 Doors, Gates, Turnstiles Section Walls 1210.2 Section Showers 1210.3 Section 804 Interior Floor Finish
AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications
Chapter 16.16 Doors and Windows Chapter 16.16 Doors and Windows Chapter 7 Chapter 11 Construction Works
09 91 13 09 91 23 10 21 16 10 26 19.16 21 20 00
Section 805 Decorations and Trim Section 1008 Doors, Gates, Turnstiles Section 417 Showers Section Bathroom Accessories 2606.9 Section 906 Portable Fire Extinguishers
AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows Showers Showers Halon 1301 Cylinders
Shower units shall include a changing space and privacy Shower and Dressing Compartments enclosure. Latrine stalls shall receive a swinging door with barrel bolt Shower Doors closure. Fire Prevention: A minimum of one (1), 8 kg or greater, Fire Extinguishing Systems fire extinguisher per 100 square meters shall be provided. All fire extinguishers shall be mounted to the wall or placed in existing cabinets. Fire extinguishers shall be of the ABC type. Water heaters Carbon-Dioxide Fire-Extinguishing Systems Electric Domestic Water Heaters
21 21 00
3.2.01
IBC
Section 902 Carbon Dioxide [F] Extinguishing Systems Chapter 5 Water Heaters
22 33 00
2.7.5.1
IPC
AL-FAO GEC - General Technical Section Conditions and Specifications 3.2.11.8 AL-FAO GEC - General Technical Section Conditions and Specifications 3.2.11.8 41.1 Ministry of Higher Education and Scientific Research - Electrical Specifications Ministry of Higher Education and 41.1 Scientific Research - Electrical Specifications Iraq Ministry of Housing & Construction - Section 11.6 and 11.7 General and Technical Specifications of the Sanitary Works
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 26 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
The hot water shall be generated by electric water heater. Electric Domestic Water Heaters
IPC
Chapter 5
Water Heaters
22 33 00
2.7.5.1.2
22 33 00
2.7.5.1.3
22 05 16
2.3.3
The unit shall be located inside a mechanical room, storage room, toilet/janitor room or similar type locked space. The unit shall be of the commercially available tank type having low or medium watt density electric heating elements. Fittings
IPC
Chapter 5
Water Heaters
IPC
Chapter 5
Water Heaters
Expansion Fittings and Loops for Plumbing Hangers and Support for Plumbing Piping and Equipment Facility Drainage Piping Cleanouts 22 07 19 Plumbing Piping Insulation
IPC
Section 702.4
Fittings
22 05 29 22 05 75 22 07 19
Hangers Cleanouts will be provided at each building. Insulation shall be provided where required to control sweating of pipes. All hot water piping shall be insulated.
Table 308.5 Hanger Spacing Section 708 Cleanouts Section 607.2.1 Piping Insulation
22 07 19
2.7.1.1.4
IPC
22 11 00
2.4.
IPC
Chapter 6
Water Supply and Distribution Water Supply and Distribution Water Supply and Distribution
22 11 00
2.4.1.3.5
The Contractor shall provide a new water supply and distribution system as needed.
IPC
Chapter 6
22 11 13
2.3.11
22 11 13
2.3.15
Domestic and cold water shall be provided in the facilities Facility Water Distribution Piping to serve the water heater usage and plumbing fixtures provided for the facility. Domestic water shall be distributed by means of schedule Facility Water Distribution Piping 40 galvanized steel pipe or suitable high pressure PVC equivalent. Note: the contractor shall provide galvanized Schedule 40 plumbing for sinks, showers, and toilets. The CONTRACTOR shall repair and renovate the existing water supply and distribution system and provide a new water supply and distribution system where required. Piping Materials Facility Water Distribution Piping
IPC
Chapter 6
IPC
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications
- Section 11.2
- Section 11.2
- Section 9.3
Section 3.2.4.3 Piping Section 3.2.11.12 Section 8 Pipe Cleanouts Thermal Insulation
Section 8
Thermal Insulation
Section 11
Section 1
- Section 11.1
Water Supply Main, Distribution, Service Pipes and Equipments General and Technical Specification of the Sanitary Work. Main Supply Distribution
22 11 13
2.4.1
IPC
Chapter 6
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications
Section 1
22 11 13
2.4.4
IPC
22 11 13
2.7.1.1
IPC
Table 605.3, Piping Materials Table 605.4 and 605.5 Section 607 Hot Water Supply System
22 11 13
2.7.1.1.1
22 11 13 22 11 13 22 11 13
Hot water shall be provided for the facility to supply 49C (120F) hot water to fixtures and outlets requiring hot water. Hot water of a higher temperature shall be provided only where required for special use or process. Hot water piping shall be routed parallel to the building lines and concealed within finished rooms. The CONTRACTOR will plan the overall water supply and distribution system for the base population.
IPC
Facility Water Distribution Piping Facility Water Distribution Piping Facility Water Distribution Piping
Water Supply and Distribution Chapter 6 Water Supply and Distribution Section 604 Design of Building Water Distribution System
Chapter 6
Iraq Ministry of Housing & Construction - Section 11.2 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 11.2 General and Technical Specifications of the Sanitary Works N/A N/A
Cold and Hot Water Distribution Cold and Hot Water Distribution N/A
AL-FAO GEC - General Technical Section 3.2.4.2 Piping Conditions and Specifications N/A N/A Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 27 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
Provide water pressure of 1.5 bars to the highest point in Facility Water Distribution Piping each building. Booster Pumps Domestic Water Packaged Booster Pump Domestic Water Packaged Booster Pump Facility Sanitary Sewerage
IPC
Section 604 Design of Building Water Distribution System Section 606.5 Section 606.5.1 Chapter 7 Water Pressure Booster Systems Water Pressure Booster Systems Required Sanitary Drainage
22 11 23.13
2.7.5.2
IPC
22 11 23.13
2.7.5.2.1
22 13 00
2.7.1.2
In the event that the water distribution system is not sufficient to provide building pressure, then booster pumps with hydro-pneumatic tanks shall be installed. Sanitary waste system.
IPC
IPC
22 13 13 22 13 13
2.7.1.3 2.7.7.2
IPC IPC
22 13 16
2.3.00.1
22 13 16
2.3.2
Renovate the existing and/or install a new and complete Sanitary Waste and Vent Piping building sanitary sewer system to include all piping, fittings, hangers, straps, flanges, traps, vents, drains and fixtures. Piping Sanitary Waste and Vent Piping
IPC
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works
- Section 11.5
Cold Water Service Boosting Plant Cold Water Service Boosting Plant Building Soil, Waste, Vent and Rain Water Pipe work. Floor Drains N/A
- Section 11.5
- Section 9.1
Chapter 9
Building Drainage and Sanitary Fittings Building Drainage and Sanitary Fittings Pipe Work, Fittings and Installation Floor Drains Floor Drains Floor Drains
IPC
22 13 16
2.7.1.4
Vent system
IPC
Chapter 9
Vents
Drains Floor or Shower Drain Cast iron construction with galvanized body, integral seepage pan, and adjustable perforated or slotted chromium plated bronze, nickel-bronze or nickel brass strainer consisting of a grate and threaded collar. Valves
Section 412 Floor and Trench Drains Section 412 Floor and Trench Drains Section 412 Floor and Trench Drains
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications
Chapter 9
Section 6
22 13 19.33
2.3.6
Backwater Valves
IPC
22 14 00
2.6.1
22 14 00
2.6.2
22 14 00
2.6.3
22 14 26.19 22 14 26.19
2.7.4.11 2.7.4.11.1
The CONTRACTOR shall conduct a complete site investigation and field check in order to fully research and document the existing site storm water management and drainage system. The CONTRACTOR shall map out all existing conditions. With this information, CONTRACTOR shall plan an overall comprehensive site storm water management and drainage plan. The CONTRACTOR shall incorporate the existing storm water management system, if applicable, into the new plan in order to ensure that the entire installation is provided with the most efficient drainage system available and that redundant work is not performed. Trench Drain Cast iron construction with galvanized body, integral seepage pan, and adjustable perforated or slotted chromium plated bronze, nickel-bronze, or nickel brass strainer consisting of a grate and threaded collar.
IPC
Iraq Ministry of Housing & Construction - Section 7.1 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 9.1 General and Technical Specifications of the Sanitary Works
Building Soil, Waste, Vent and Rain Water Pipe work. Building Soil, Waste, Vent and Rain Water Pipe work.
IBC
Section 1803 Excavation, Grading and Fill Iraq Ministry of Housing & Construction - Section 9.1 General and Technical Specifications of the Sanitary Works Chapter 11 Storm Drainage AL-FAO GEC - General Technical Conditions and Specifications
IPC
IPC IPC
Section 412 Floor and Trench Drains Section 412 Floor and Trench Drains
AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 28 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
Contractor shall plan and construct compressor air storage and distribution.
IPC
22 33 00
2.3.16
The hot water shall be generated by electric water heaters Electric Domestic Water Heaters
IPC
22 34 30
2.7.5.1.4
Gas (natural or liquid propane) powered hot water Residential Gas Domestic Water Heaters generators shall be provided to satisfy large hot water requirements when economically justifiable and practical. Plumbing Fixtures Plumbing Fixtures Plumbing Fixtures Plumbing Fixtures
IPC
N/A Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 11.2 General and Technical Specifications of the Sanitary Works N/A Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications
22 40 00 22 40 00
2.3.10 2.7.4.2
IPC IPC
Chapter 4
22 41 13 22 41 13 22 41 16
Eastern Water Closet with flush tank assembly Enameled cast iron, recessed floor mounted. Lavatories
Residential Water Closets, Urinals and Bidets Residential Water Closets, Urinals and Bidets Residential Lavatories and Sinks
Section 420 Water Closets Section 402 Fixture Materials Section 416 Lavatories
Section 3.2.11 Plumbing Fixtures Section 3.2.11 Plumbing Fixtures - Section 9.3 Sanitary Fittings
22 41 16
2.7.4.3.1
22 41 16
2.7.4.4
Enameled cast iron, wall or counter mounted. Brass fittings provided for water supplies. In addition to lavatories, a combination foot and hand washing station will be provided. This should be a concrete trough assembly covered with ceramic tile. Mop Sink
IPC
- Section 9.3
Sanitary Fittings
IPC
- Section 9.3
Sanitary Fittings
22 41 16
2.7.4.4.1
22 41 16
2.7.4.7
Floor mounted enameled cast iron with copper alloy rim guard. Provide hot and cold-water valves with manual mixing. Faucet handles shall be copper alloy. Service Sink
IPC
- Section 9.3
Sanitary Fittings
IPC
22 41 16
2.7.4.7.1
22 41 23 22 41 23
2.7.4.5 2.7.4.5.1
Residential Showers Receptors and Basin Showerhead and faucet handles shall be copper alloy. Residential Showers Receptors and Provide for manual mixing with hot and cold-water valves. Basin Shower head riser pipe shall be schedule 40 galvanized steel. Install showers to include all piping, faucets, drains and concrete or tile work. Shower pan shall be lowered so all water on shower floor will run into the shower pan. Install Eastern style toilets and sinks (provision of concrete trough in barracks for the feet/hand wash/laundry). Include all piping and hardware to make the units functional. Faucets Residential Showers Receptors and Basin Residential Shower Receptors and Basin
Standard trap type, enameled cast iron. Service sinks provided in maintenance areas shall be metallic, and in battery rooms acid resistant. Shower
IPC
IPC IPC
Section 417 Showers Section 424 Faucets and other Fixture Fittings Section 605 Materials Joints and Connections Section 417 Showers
Showers Showers
22 41 23
2.7.4.5.2
IPC
22 41 23
2.3.19
IPC
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications
N/A
Showers
22 42 13
2.3.20
Commercial Water Closets, Urinals and Bidets Commercial Faucets Supplies, and Trim
IPC
22 42 39
2.3.8
IPC
Iraq Ministry of Housing & Construction - Section 9.4 General and Technical Specifications of the Sanitary Works
Sanitary Fittings
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 29 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
Emergency Shower
IPC
Section 411 Emergency Showers and Eyewash Stations Section 411 Emergency Showers and Eyewash Stations N/A N/A
22 45 16
2.7.4.6.1
Eyewash Equipment
IPC
22 45 33
2.7.4.6.2
IPC
22 45 36
2.3.24
Hose connects with appropriate piping shall be provided in Hand-held Emergency Drench Hoses each latrine/shower facility. Compressed-Air Systems for Laboratory and Healthcare Facilities Compressed air system shall be capable of operation up to Compressed-Air Systems for Laboratory 1380 KPa (200 psig) maximum for 862 KPa (125 psig) and Healthcare Facilities normal units. High-pressure system (above 1380 KPa) shall be provided Compressed-Air Systems for Laboratory to supply compressed air to equipment where required. and Healthcare Facilities The air distribution system shall be provided with necessary regulator valves to maintain desired pressure. MECHANICAL WORK: Heating Ventilating Air Conditioning: Compressed-Air Systems for Laboratory and Healthcare Facilities HEATING, VENTILATING, AND AIRCONDITIONING (HVAC) HVAC Compressed Air Systems:
IPC
Section 424.4
22 61 00 22 61 00
2.7.4.00.1 2.7.4.01.05
IMC IMC
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works N/A N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A
N/A N/A
22 61 00
2.7.4.01.06
IMC
N/A
N/A
N/A
22 61 00
2.7.4.01.08
IMC
N/A
N/A
N/A
23 00 00 23 00 00
2.8. 2.8.00.1
IMC IMC Chapter 4, 5, Ventilation, Exhaust 6, 11 Systems, Duct Systems, Refrigeration Section 308 Piping Support Iraq Ministry of Housing & Construction 4.2.14 Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction - Section 6.2 General and Technical Specifications of the Sanitary Works Chapter 13 Fuel Oil Piping and Storage N/A N/A Package Air Conditioner Unit Pipe Supports
23 05 29
2.3.5
Straps
IPC
23 10 00
2.7.6.3
23 11 13
2.3.12
23 11 13
2.4.2
Facility Fuel Systems Fuel-oil storage and distribution plumbing systems that are required for full performance of equipment and other operations in the Power Plant Water service to each facility shall enter the building in a Facility Water Distribution Piping mechanical, storage, or similar type space. Isolation valves shall be installed at each facility and to separate latrine/shower area. The CONTRACTOR shall inspect all existing underground Facility Water Distribution Piping water piping and manholes for damage and defects. The CONTRACTOR shall repair all damaged and defective underground water piping as necessary. Domestic water shall be distributed by means of standard Facility Water Distribution Piping weight (schedule 40) galvanized steel pipe that is installed underground with a minimum of 80cm coverage of compacted soil. Fuel oil storage and distribution Facility Fuel Storage Tanks Smaller battery rooms shall have waste treated using acid Double wall Steel, Underground Storage neutralizing tank. tanks Waste oil storage tanks shall be provided for collection of Double wall Steel, Underground Storage waste oil in the power plant tanks
IPC
N/A
IPC
Chapter 6
Iraq Ministry of Housing & Construction - Section 11.1 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 2.1 General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications
IPC
Chapter 6
General Requirements
23 11 13
2.4.4.1
IPC
23 13 00 23 13 13.13
2.7.1.6 2.7.7.3
IMC IPC
Chapter 13 Fuel Oil Piping and Storage N/A Chapter 8 Indirect/Special Waste Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works
N/A N/A
N/A N/A
23 13 13.13
2.7.7.4
IPC
Chapter 8
Indirect/Special Waste
N/A
N/A
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 30 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
Waste oil storage tank shall be underground double-wall fiberglass or double-wall steel. Waste lines from toilets will be a minimum of 100mm diameter and slope a minimum of 2%. Floor drains shall be provided in each room that contains a water source Piping,
IPC
Chapter 8
23 13 16
2.3.2.1
IPC
Section 704
23 13 19.13 23 23 00
2.3.7.1 2.8.01.06
IPC IMC
23 30 00
2.8.01.04
Air-handling units,
IMC
Chapter 6
23 30 00
2.8.1
IMC
Chapter 4, 5
23 31 00
2.8.1.2.07.02
Ductwork,
IMC
Chapter 6
23 32 00
2.8.01.10
Ductwork,
IMC
Chapter 6
23 32 00
2.8.01.11
Hangers,
IMC
Chapter 6
23 32 00
2.8.01.12
Straps,
IMC
Chapter 6
23 32 00
2.8.01.13
Fasteners,
IMC
Chapter 6
23 33 00
2.3.17
23 33 00
2.8.1.2.07.04
The storage unit shall be typically located inside the mechanical room, storage room, janitor room or similar type space. Interlock controls,
IPC
IMC
23 33 00
2.8.1.2.08.01
Ductwork,
IMC
Chapter 6
23 33 00
2.8.1.2.08.02
Exhaust grille,
IMC
Chapter 6
23 33 00
2.8.1.2.08.03
Interlock,
IMC
23 33 13
2.8.1.2.02.02
Gravity dampers,
Dampers
IMC
23 34 00
2.8.00.01.01
Ventilation fans,
HVAC Fans
IMC
23 34 00
2.8.01.07
Exhaust fans,
HVAC Fans
IMC
Chapter 5
N/A Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Section Drainage Piping Installation AL-FAO General Engineering Company 3.2.3.12 General Technical Conditions and Specifications Section Floor and Trench Drains AL-FAO GEC - General Technical 3.2.11.15 Conditions and Specifications Refrigeration Iraq Ministry of Housing & Construction 4.2.18 h Technical Specification Book 4: Mechanical Works General Duct Systems Iraq Ministry of Housing & Construction 4.2.13 g Technical Specification Book 4: Mechanical Works General Ventilation and Exhaust Iraq Ministry of Housing & Construction 4.2.61 Systems Technical Specification Book 4: Mechanical Works General Duct Systems Iraq Ministry of Housing & Construction 4.2.40 Technical Specification Book 4: Mechanical Works General 4.2.40 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Duct Systems Iraq Ministry of Housing & Construction 4.2.47 Technical Specification Book 4: Mechanical Works General 4.2.47 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General 4.2.47 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Location Iraq Ministry of Housing & Construction - Section 11.6 and 11.7 General and Technical Specifications of the Sanitary Works Duct Systems Iraq Ministry of Housing & Construction 4.2.41e Technical Specification Book 4: Mechanical Works General Duct Systems Iraq Ministry of Housing & Construction 4.2.40 Technical Specification Book 4: Mechanical Works General Duct Systems Iraq Ministry of Housing & Construction 4.2.52 Technical Specification Book 4: Mechanical Works General Flexible Air Connectors Iraq Ministry of Housing & Construction 4.2.41e Technical Specification Book 4: Mechanical Works General 4.2.61f Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Ventilation Iraq Ministry of Housing & Construction 4.2.64 Technical Specification Book 4: Mechanical Works General Exhaust System Iraq Ministry of Housing & Construction 4.2.63 Technical Specification Book 4: Mechanical Works General Indirect/Special Waste
Evaporator and Condenser Fans Fans-Propeller Type (Wall Mounted) Low Velocity Ductwork
Connections to Ductwork Connections to Ductwork Connections to Ductwork Electric Storage Water Heater Flexible Connections
Dampers
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 31 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
ceiling fans,
IMC
Exhaust System
23 34 00
2.8.03.06
HVAC Fans
IMC
Exhaust System
23 34 00
2.8.1.2.02
HVAC Fans
IMC
23 34 16
2.8.1.2.02.01
23 34 16
2.8.1.2.03
23 34 16
2.8.1.2.04
23 34 16
2.8.1.2.06
23 34 16
2.8.1.2.07
All fans used for ventilation and pressurization shall be selected for required performance and for minimum noise level. Unit mounted supply and exhaust fans shall be centrifugal forward curved, backward inclined, or airfoil fans with non-overloading characteristics of high efficiency and quiet running plan. Administrative Areas: 34 CMH/person (20 CFM/person) with air conditioning; 37 CMH/m2 (2 CFM/Ft2) of floor area. Toilet and Wash Areas: Exhaust ventilation at 37 CMH/m2 (2 CFM/Ft2) of floor area. Or 85 CMH/Water Closet or Urinal. Electrical/Mechanical rooms: Mechanical ventilation sufficient to limit space temperature and to remove heat given out by operating equipment, 37 CMH/M2. Maintenance Shops: Maintenance Shops and similar spaces that use solvents and oils shall be provided with mechanical exhaust air systems. The systems shall consist of centrifugal fan, ductwork, exhaust grille, and interlock controls. These type spaces shall not return exhaust air to any split system unit or ventilation system. Centrifugal fan,
IMC
Chapter 4
Ventilation
Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General
4.2.63
4.2.64
4.2.64
IMC
IMC
IMC
IMC
503
Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General
4.2.64 b
Centrifugal Power Supply Fan/Capacity Centrifugal Power Supply Fan/Capacity Centrifugal Power Supply Fan/Capacity Centrifugal Roof Exhauster
4.2.64 b
4.2.64 b
4.2.63
23 34 16
2.8.1.2.07.01
IMC
Chapter 4
Ventilation
23 34 16
2.8.1.3.03
23 34 23
2.8.1.2.09
23 34 23
2.8.1.3.01
Centrifugal HVAC Fans All fans used for ventilation and pressurization shall be selected for required performance and for minimum noise level. Unit mounted supply and exhaust fans shall be centrifugal forward curved, backward inclined, or airfoil fans with non-overloading characteristics of high efficiency and quiet running plan. HVAC Power Ventilators Barracks: Air conditioning for officers and Senior NCO's only. Ceiling fans and adequate room ventilation for Junior NCO (jundis). Install ceiling fans in all rooms, with vibration mounts or HVAC Power Ventilators hook-type suspension. Central Diesel Generator Facility: Per the calculations of the plan ENGINEER and approval of the COR. The facility shall be provided with mechanical exhaust air systems. The system shall consist of centrifugal fan, Wall intakes, Special Exhaust Systems
IMC
Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General
4.2.64
4.2.66
IMC
IMC
23 35 00
2.8.1.2.08
IMC
502.1.1
Exhaust Location
Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General
4.2.61
Fans-Propeller Type (Wall Mounted) Fans-Propeller Type (Wall Mounted) Centrifugal Roof Exhauster Fresh air (Roof intakes)
4.2.61
4.2.63
23 37 00
2.8.1.2.01.03
IMC
Chapter 4
Ventilation
4.2.52 b
23 37 13
2.8.01.08
Grills,
IMC
Section 603.17
4.2.45
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 32 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
23 82 00
2.8.03
Heat pumps shall be of the window mounted type, manually operated and enclosed in a protective vandal proof steel cage and mounted out of high traffic areas. Ventilators and Heaters,
IMC
IMC
Specific appliances, fireplaces and solid fuel burning equipment Section 920 Heating and Cooling Load Calculations Section 312
Chapter 9
23 82 00
2.8.03.08
IMC
23 82 16
2.8.01.05
Coils,
Air Coils
IMC
Chapter 11
23 82 23
2.8.02.01
The Contractor shall plan, supply, fabricate and install new Unit Ventilators ventilation system. The Contractor shall plan, supply, fabricate and install new Unit Heaters heating systems. Electric heaters, Unit Heaters
IMC
Chapter 4
23 82 39
2.8.02.02
IMC
Section 920
23 82 39
2.8.03.07
IMC
Section 920
23 83 00
2.8.03.01
Heating systems,
IMC
Section 920
23 83 13
2.8.03.02
Baseboard heaters,
IMC
Section 920
23 83 33
2.8.03.03
Resistance heaters in the A/C units may be substituted for Electric Radiant Heaters electric baseboard heaters, All water piping shall be routed parallel to the building lines. Lateral lines from the building to the sewer mains will slope at a minimum of 2%. Floor drains shall be provided in the mechanical equipment and toilet rooms as required. Floor drain shall be provided in each room that contains a water source. Floor drains shall be provided in the mechanical equipment and toilet room as required. Drains shall be located near urinals or toilet partitions in toilet rooms Electrical Work: High voltage and low voltage cable Facility Water Distribution Piping Sanitary Waste and Vent Piping Sanitary Drains Sanitary Drains
IMC
Section 920
24 11 13 24 13 16 24 13 19.13 24 13 19.13
Iraq Ministry of Housing & Construction 4.2.14 Technical Specification Book 4: Mechanical Works General Iraq Ministry of Housing & Construction 4.2.14 i Technical Specification Book 4: Mechanical Works General Heating and Cooling Load Iraq Ministry of Housing & Construction 4.2.14 Calculations Technical Specification Book 4: Mechanical Works General Refrigeration Iraq Ministry of Housing & Construction 4.2.13 f Technical Specification Book 4: Mechanical Works General Ventilation Iraq Ministry of Housing & Construction 4.2.61 Technical Specification Book 4: Mechanical Works General Unit Heaters Iraq Ministry of Housing & Construction 4.2.14 i Technical Specification Book 4: Mechanical Works General 4.2.14 i Unit Heaters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Unit Heaters Iraq Ministry of Housing & Construction 4.2.14 i Technical Specification Book 4: Mechanical Works General Unit Heaters Iraq Ministry of Housing & Construction 4.2.14 i Technical Specification Book 4: Mechanical Works General Unit Heaters Iraq Ministry of Housing & Construction 4.2.14 i Technical Specification Book 4: Mechanical Works General Section 3.2.4.2 Water Supply and AL-FAO GEC - General Technical Distribution Conditions and Specifications Drainage Piping Installation AL-FAO GEC - General Technical Section Conditions and Specifications 3.2.3.12 Floor and Trench Drains AL-FAO GEC - General Technical Section Conditions and Specifications 3.2.11.15 Floor and Trench Drains AL-FAO GEC - General Technical Section Conditions and Specifications 3.2.11.15 AL-FAO GEC - General Technical Conditions and Specifications Section 3.2.11.15 Section 3
Package Air Conditioner Unit Evaporator and Condenser coils Fans-Propeller Type (Wall Mounted) Heaters
Heaters
Heaters
Heaters
Heaters
25 13 19.13 26 00 00 26 05 13
Floor Drains
N/A N/A Article 300 & Conductors for General AFCEE IICS - Electrical Services 310 Wiring and Wiring Methods Specifications Article 300 & Conductors for General AFCEE IICS - Electrical Services 310 Wiring and Wiring Methods Specifications Article 300 & Conductors for General AFCEE IICS - Electrical Services 310 Wiring and Wiring Methods Specifications Article 300 & Conductors for General AFCEE IICS - Electrical Services 310 Wiring and Wiring Methods Specifications
26 05 13.16
2.2.4.01 06
Conductors
Medium-Voltage, Single- and MultiConductor Low-Voltage Electrical Power Conductors and Cables Low-Voltage Electrical Power Conductors and Cables
NEC
Section 3.13
26 05 19
2.2.01
26 05 19
2.2.03
Renovate the existing and/or install a new and complete building electrical power and lighting system to include all wiring. Complete the interior and exterior electrical system with commercial/institutional grade wiring and fixtures using International Electric Code. This is to include tracing any existing electrical wires and/or providing new wiring.
NEC
Section 3
NEC
Section 3
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 33 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
Each wire shall be numbered at the terminal points with a Low-Voltage Electrical Power permanent numbering system. Conductors and Cables Install electrical cable from the distribution panel to the main breakers in each building and tent. Connectors Low-Voltage Electrical Power Conductors and Cables Raceway and Boxes for Electrical Systems Raceway and Boxes for Electrical Systems
NEC
26 05 19
2.2.2.06
NEC
Article 300 & Conductors for General AFCEE IICS - Electrical Services 310 Wiring and Wiring Methods Specifications N/A Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes Article 342, Intermediate Metal AFCEE IICS - Electrical Services 344, 358, Conduit/Rigid Metal Specifications 353, 365 Conduit; Electrical Metallic Tubing; Rigid Nonmatallic Conduit; High Density Polyethylene Conduit; Electrical Nonmetalic Tubing Article 342/344 Intermediate Metal AFCEE IICS - Electrical Services Conduit/Rigid Metal Conduit Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications N/A
Section 3.1.10 Identification of Cables & 3.7 & Cable Core Identification Section 3 Cables and Wires
26 05 33
2.2.01 06
NEC
26 05 33
2.2.01 07
Conduit
NEC
26 05 33
2.2.06
The building electrical lines shall be in metal conduit for exposed installation. Cable trays The Contractor shall be responsible for trenching and laying underground cable at least 1 meter deep from the buildings to the main distribution panel, with a minimum of 90 cm depth. The contractor's plan shall provide continuous power through an underground or aerial electrical distribution system. Manholes
Raceway and Boxes for Electrical System Cable Trays for Electrical Systems Underground Ducts and Raceway for Electrical Systems Underground Ducts and Raceway for Electrical Systems Underground Ducts and Raceway for Electrical Systems Electrical Panel board Schedule Electrical Panel board Schedule Electrical Panel board Schedule Wiring Device Schedule
NEC
Section 3.1.5 Support and Fixing for Cable Section 3.12 & Heavy Duty Cable Tray 3.13.1 & Suspend Tray Section 3.1.11 Cables Laid Direct in the Ground Section 3.1.11 Cables Laid Direct in the Ground
26 05 36 26 05 43
2.2.06 01 2.2.05
NEC NEC
Article 392 Cable Trays Article 300 Underground Installation section 300.50 Article 300 Wiring Methods
26 05 43
2.2.4.01
NEC
26 05 43
2.2.4.01 03
NEC
Panels Main panels The contractor shall provide main distribution panel for the generator. Install lights in each room and at least four (4) electrical outlets. Minimum of one (1) outlet per wall that is 2m long or longer, space receptacles at 2m maximum spacing. Electrical outlets
Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes Article 408 Switchboards and Panel boards Article 408 Switchboards and Panel boards Article 408 Switchboards and Panel boards Article 406 Receptacles, Cord Connectors, and Attachment Plugs (Caps) Article 406 Receptacles, Cord Connectors, and Attachment Plugs (Caps) Article 110 Requirements for Electrical Installation Article 110 Requirements for Electrical Installation Article 110 Requirements for Electrical Installation Article 110 Requirements for Electrical Installation Article 110 Requirements for Electrical Installation
AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications N/A
Section 2.4
Distribution Board
Section 2.1.1 Main L.V. Switchboard Section 2.1.1 Main L.V. Switchboard
26 06 20.26
2.2.03 05
NEC
AFCEE IICS - Electrical Services Specifications N/A N/A AFCEE IICS - Electrical Services Specifications N/A AFCEE IICS - Electrical Services Specifications
Section 4.11
Socket Outlets
26 10 00 26 10 00 26 10 00 26 10 00 26 10 00
The completed system will be connected into the generated electrical power distribution system. Power Distribution The contractor shall plan and install a complete electrical distribution system for the area. The electrical system shall be connected to all buildings requiring electrical service. General
Medium-Voltage Electrical Distribution Medium-Voltage Electrical Distribution Medium-Voltage Electrical Distribution Medium-Voltage Electrical Distribution Medium-Voltage Electrical Distribution
Section 0
General Requirements
Section 0
General Requirements
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 34 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
Power Generation: The Electrical Power Generation Plant shall be designed as the primary power generation system. Therefore, provide redundant power generation with the largest generator out of service. It is the intent to utilize the national power grid as a redundant electrical supply in addition to the Electrical Power Generation Plant. Install switching panels, transformer and ring gears for each location to facilitate proper electrical distribution to each of the buildings. The electrical system shall complete with all required transformers. (400V to11KV step-up and local step-down transformer) In mechanical rooms, floor drains will be installed in such away to ensure positive slope to the drains, floor drains shall be provided to avoid running drain piping long distances above or over the floor. Switches Overloads Fuses Switches Outlets
NEC NEC
Article 110 Requirements for Electrical N/A Installation Article 490 Equipment Over 600Volts, AFCEE IICS - Electrical Services Nominal Specifications
Section 10
26 12 00
2.2.2.05
Medium-Voltage Transformer
NEC
26 12 00
2.2.4.01 01
NEC
26 13 19.13
2.3.7.4
Sanitary Drains
IPC
Article 450 Transformer and Transformer Vaults (Including secondary ties) Article 450 Transformer and Transformer Vaults (Including secondary ties) Section 412 Floor and Trench Drains
AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AL-FAO GEC - General Technical Conditions and Specifications AFCEE IICS - Electrical Services Specifications N/A AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications N/A
Section 1.3
Power Transformer
Section 1.3
Power Transformer
Floor Drains
26 18 00 26 18 00 26 18 16 26 27 26 26 27 26
Medium-Voltage Circuit Protection Devices Medium-Voltage Circuit Protection Devices Medium-Voltage Fuses Wiring Devices Wiring Devices
Article 490 Equipment Over 600Volts, Nominal Article 430 Motors, Motor Circuits and Controllers Article 490 Equipment Over 600Volts, Nominal Article 404 Switches Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes Article 404 Switches Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes Article 240 Over current Protection Article 240 Over current Protection Article 700 Emergency System
Fused Switchgear and Isolators Fused Switchgear and Isolators Installation, Sockets and Switches Socket Outlets
26 27 26
2.2.01 05
Junction boxes
Wiring Devices
NEC
26 27 26 26 27 26
2.2.03 01 2.2.4.01 04
NEC NEC
Section 4
26 28 16 26 28 16 26 36 23
Breakers Breakers
Enclosed Switches and Circuit Breakers Enclosed Switches and Circuit Breakers
26 50 00
2.2.1
The contractor shall provide connection of electrical Automatic Transfer Switch system into the existing Iraqi National local sub-station, if possible. The power connection shall be installed in combination with and through an automatic transfer switch to the Electrical Power Generation Plant Perimeter & Exterior Lights Lighting
AFCEE IICS - Electrical Services Specifications AFCEE IICS - Electrical Services Specifications N/A
Miniature and Molded Case Circuit Breakers Miniature and Molded Case Circuit Breakers
NEC
26 51 13
2.2.01 08
Fixtures
NEC
AFCEE IICS - Electrical Services Article 410 Luminaries (lighting fixtures), Lamp holders and Specifications Lamps AFCEE IICS - Electrical Services Article 410 Luminaries (lighting fixtures), Lamp holders and Specifications Lamps
Section 5.1
Lighting Fixtures
Section 5.1
Lighting Fixtures
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 35 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
26 51 13
2.2.02
Fluorescent lights shall be mounted on walls (near full wall Interior Lighting Fixtures height) vs. ceiling mounted. Steel conduit shall be exposed instead of embedded placement All outlets in bathrooms, kitchens, and other wet locations Interior Lighting Fixtures shall be waterproof type. Lights with cover Interior Lighting Fixtures
NEC
NEC
26 51 13
2.2.03 02
NEC
26 53 00
3.2.03
Install emergency exit signs, in Arabic with international symbols, over primary fire exit routes. The contractor shall provide appropriate security lighting to all building entries, exit ways, building perimeters (1 per corner), and courtyard areas. Exterior lighting system shall provide sufficient lighting in all areas commonly used at night in accordance with ground illumination requirements of the NEC Utilize area lights mounted on building exteriors vs. polemounted lighting wherever feasible. Street and Motor Pool Lighting System.
Exit Signs
IBC
Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes Article 410 luminaries (lighting fixtures), Lamp holders and Lamps Chapter 10 Means of Egress
Section 5.1
Lighting Fixtures
26 55 53
2.2.1 01
Security Lighting
NEC
Article 410
26 56 00
2.2.1 02
Exterior Lighting
NEC
Article 410
26 56 00
2.2.1 03
Exterior Lighting
NEC
Article 410
26 56 00
2.2.5
Exterior Lighting
NEC
Article 410
26 56 00
2.2.5.01
The contractor shall conduct a complete site investigation Exterior Lighting and field check in order to fully research and document the existing electrical street and motor pool lighting system. The contractor shall map out all existing conditions. With this information, the contractor shall provide a complete plan illustrating all existing and proposed new work for the complete renovation of the installations street and motor pool lighting system. Construction shall not be started until the plan is approved. The contractor shall complete all work associated with the plan in order to provide a complete and comprehensive street and motor pool lighting system. Data Communications The contractor shall provide computer systems as an integral part of the infrastructure plan. For facilities traditionally earmarked for computer systems. The contractor shall develop provisions for LAN network Data Communications with consideration provided for Wireless Computer Networks. The contractor shall include the electrical outlets in hidden Data Communications but accessible locations to power the duct-node computer networks like those found in hotels and office buildings. Data Communication s Wireless Access The contractor shall develop provisions for Wireless Computer Networks; consider including electrical outlets Point in hidden but accessible locations to power the duct-node computer networks like those found in hotels and office buildings. Voice Communications The contractor shall provide a communications site infrastructure for telephone as integral part of the infrastructure plan.
NEC
Article 410
Ministry of Higher Education and Scientific Research - Electrical Specifications Luminaries (lighting AFCEE IICS - Electrical Services fixtures), Lamp holders and Specifications Lamps Luminaries (lighting AFCEE IICS - Electrical Services fixtures), Lamp holders and Specifications Lamps AFCEE IICS - Electrical Services Luminaries (lighting fixtures), Lamp holders and Specifications Lamps AFCEE IICS - Electrical Services Luminaries (lighting fixtures), Lamp holders and Specifications Lamps Luminaries (lighting AFCEE IICS - Electrical Services fixtures), Lamp holders and Specifications Lamps
N/A
N/A
Section 5.1
Lighting Fixtures
Section 5.1
Lighting Fixtures
Section 5.1
Lighting Fixtures
Section 5.1
Lighting Fixtures
Section 5.1
Lighting Fixtures
27 20 00
2.2.07 01
NEC
N/A
27 20 00
2.2.07 02
NEC
N/A
27 20 00
2.2.07 03
NEC
N/A
27 21 33
6.04.
NES
N/A
N/A
N/A
27 30 00
2.2.07
NEC
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 36 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
Install commercial grade, hard wired electric and battery powered smoke alarms in all rooms and hallways. Install commercial grade, hard wired electric and battery powered smoke alarms in all rooms and hallways.
IBC
Chapter 9
28 31 46
3.2.02
IBC
31 05 16
2.4.1.3.3
31 22 00 31 22 00
2.6.4 2.6.6
Aggregate for earthwork Maximum size of aggregate should be not more than 8 millimeters per 100 millimeters (1 inch per foot) of pipe diameter, or 75 millimeters (3 inches) maximum. Selected aggregate shall consist of well-graded sand, gravel, crushed gravel, crushed stone. Grade all areas to provide a uniform sloping surface. Grading Areas around facilities shall be graded to slope away from Grading buildings and facilities in order to provide storm water drainage. Provide fill material as needed to raise grade elevations in Fill built up areas. Fill low areas, unused ditches, and holes. Pipe Bedding Backfill
IBC
Section J107.4
Fill Material
41 Ministry of Higher Education and Scientific Research - Electrical Specifications 41.6 Ministry of Higher Education and Scientific Research - Electrical Specifications Iraq Ministry of Housing & Construction - Section 10.5 General and Technical Specifications of the Sanitary Works
Backfilling of Trenches
IBC IBC
Section 1803 Excavation, Grading and Fill AL-FAO GEC - General Technical Conditions and Specifications Section 1803 Excavation, Grading and Fill AL-FAO GEC - General Technical Conditions and Specifications Section J107 Fill AL-FAO GEC - General Technical Conditions and Specifications
Section 3.1.3.3 Clearing and Grading of Site Section 3.2.1.4 Scope of Work
31 23 23
2.6.5
IBC
Section 3.1.3.3 Clearing and Grading of Site Bedding and Laying of Pipes Bedding and Laying of Pipes
31 23 23.13
2.4.1.3
IPC
Section 306 Trenching, Excavation and Backfill Section 306 Trenching, Excavation and Backfill
31 23 23.13
2.4.1.3.1
32 01 19.61 32 11 16
2.3.22.2 7.1.06
Backfill The CONTRACTOR will ensure that the following criteria are met when planning and installing the new, and renovating the existing underground water supply and distribution system: CONTRACTOR shall provide bedding material to level out any irregularities. All the joints shall be grouted and sealed to prevent water Sealing of Joints in Rigid Paving migration into the walls. Compact soils on foundation to 95% maximum density Sub base Course determined by the Standard Proctor Method, ASTM D 698 before concrete is poured. Compaction shall attain 95 percent maximum density for cohesionless soils, and 90 percent maximum density for cohesive soils. This is based on a Standard Proctor, ASTM D698. Soil fill shall be compacted to 90% of the maximum density in unpaved areas and 95% maximum density in paved areas determined by the Standard Proctor Method, ASTM D 698. Minimum extent of grading shall be 300 meters from any facility. Perimeter Wall: At each base the ECP shall meet Coalition Force Protection Standards for vehicle and personnel entrance. Provide new guard towers and security fencing as required. Contractor is to coordinate with the MITT team on site in order to meet the location requirements. Guard towers shall be spaced no more than 300 meters apart Weatherproof louvers with a bird screen, Compaction
IPC
Iraq Ministry of Housing & Construction - Section 10.3 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 10.3 General and Technical Specifications of the Sanitary Works AFCEE IICS - Civil Work Specifications AFCEE IICS - Civil Work Specifications Chapter 11
IPC IBC
32 23 23.23
2.4.1.3.2
IBC
Compaction
AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications
Finishing of Walls and Ceilings 6-2, 6-3 Chapter 2, Digging Lengthened trenches for general services. Compaction) Section 3.1.8 Backfilling of Trenches
32 23 23.23
2.6.8
Compaction
IBC
Compaction
32 31 00
2.1.
CFPS
3-4
32 35 13
2.8.1.2.01.02
IMC
33 01 30.16 33 01 30.71
2.4.1.3.6 2.4.1.3.7
The Contractor shall inspect all existing underground water piping for defects. The Contractor shall repair all damaged and defective underground water piping as necessary.
IPC IPC
Outdoor opening protection Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General Section 312 Tests and Inspections AL-FAO GEC - General Technical Conditions and Specifications Section Existing Building Sewers AL-FAO GEC - General Technical 703.4 and drains Conditions and Specifications
Section 401.6
4.2.62 e
Bird Screen
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 37 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
33 06 30
2.5.7
33 06 30
2.5.8
33 06 30
2.5.9
33 12 16
2.4.1.2.7
33 32 13
2.5.2
The Contractor will plan the overall water supply and distribution system for the base population which will vary with each facility. The Contractor will plan the overall sanitary sewer collection system for the base population with a requirement rate of 300 liters per person per day and the wastewater treatment plant at 200 liters per person per day. The Contractor shall complete all work in order to provide a complete and comprehensive sanitary sewer collection system. The Contractor is responsible for all planning and construction aspects for a complete sanitary sewer collection system. Pipe shall be installed from the holding tanks to the facility exterior to allow removal of product without entering the compound. Service connections to individual building connections requiring water service shall be 1.5 meters outside each building, and shall have an isolation valve in a separate service box with accessible actuator. All sewerage lift stations are to be fenced and accessible only to Contractor tasked with maintenance of the WWCS Fabricate and install covers or access hatches at all manholes, and electric hand holes. Cisterns
IPC
Section 604 Design of Building Water Distribution System Section 710 Drainage System Sizing
IPC
Iraq Ministry of Housing & Construction - Section 2.1 General Requirements General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Section 3.1.1 General Notes Conditions and Specifications
Schedules for Sanitary Sewerage Utilities Schedules for Sanitary Sewerage Utilities
IPC
Chapter 7
Sanitary Drainage
IPC
Chapter 7
Sanitary Drainage
Iraq Ministry of Housing & Construction - Section 9.1 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 9.1 General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications N/A
Building Soil, Waste, Vent and Rain Water Pipe work. Building Soil, Waste, Vent and Rain Water Pipe work.
IPC
Section 606 Installation of Building Water Distribution System Section 701.4 Section 708.3.6 Section 606.5.3 Sewage Treatment
IPC
N/A
N/A
33 39 13 33 39 13
2.4.1.2.2 2.4.1.2.3
Sanitary Utility Sewerage Manholes, Frames and Covers Sanitary Utility Sewerage Manholes, Frames and Covers
IPC IPC
Manholes Covers
33 39 13 33 39 13 33 39 13
Sanitary sewer and water system valve manhole covers shall be round cast iron. Recess and grout all concrete manhole caps.
33 47 26
2.6.7
Sanitary Utility Sewerage Manholes, Frames and Covers Sanitary Utility Sewerage Manholes, Frames and Covers Add fill dirt to within 2 centimeters on the top of concrete Sanitary Utility Sewerage Manholes, manhole cap and grade to slope away from manhole. Add Frames and Covers fill dirt to cover an area of 2 meters around all sides of manhole. Provide storm water management basins or pond areas Storm Water Drainage Reservoir away from developed areas for storm water detention.
Section Manholes 708.3.6 Section Concrete Masonry 2105.2.2.1.2 Section Fill Material J107.4 Chapter 11 Storm Drainage
AL-FAO GEC - General Technical Conditions and Specifications Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications AL-FAO GEC - General Technical Conditions and Specifications
IPC
34 06 10
2.4.1.3.10
Water supply mains sizes shall be calculated according to Schedules for Water Utilities maximum daily future flows. Compressed air shall be provided using a packaged aircooled electric motor driven compressor Provide an engine driven air compressor where needed for operation during electrical power outages. Waste or hazardous drainage from battery repair/charging areas shall be treated prior to entering the sites general waste drainage system. The Contractor shall plan and construct a gravity waste water collection and treatment system. The Contractor shall plan for a gravity sanitary sewer system. Where gravity flow is not practical, the system shall consist of a series of holding tanks. The holding tanks will not be placed at or in front of any entrance. Gas Compressors Piston Gas Compressors Packaged Water Treatment Plant
IPC
Section 604 Design of Building Water Distribution System Section 1003 Pressure Vessels Section 1003 Pressure Vessels Chapter 8 Indirect/Special Waste
43 12 00 43 12 16 44 41 13
Iraq Ministry of Housing & Construction - Section 10.5 General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction - Section 11.1 General and Technical Specifications of the Sanitary Works N/A N/A N/A N/A
Backfilling of Trenches
N/A N/A Manholes, Inspection Chambers and Gullies N/A Drainage Pump Stations
44 41 13 44 41 13
2.5.1 2.5.4
IPC IPC
Iraq Ministry of Housing & Construction - Section 10.6 General and Technical Specifications of the Sanitary Works N/A N/A Iraq Ministry of Housing & Construction - Section 9.2 General and Technical Specifications of the Sanitary Works
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 38 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
44 42 49
2.7.1.5
Packaged Water Treatment Plant The Contractor shall plan for a non-mechanical waste water treatment plant where practical, if gravity sewer to the Municipal facilities is not available. Waste oil collection and storage. Water Treatment Oil/Grease Interceptors Grease Interceptor Water Treatment Oil/Grease Interceptors Water Treatment Oil/Grease Interceptors Water Treatment Equipment
IPC
Section 701.4
Sewage Treatment
N/A
IPC
44 42 49
2.7.4.8
IPC
44 42 49
2.7.4.8.1
Steel construction, manual cleaning type with removable checker-plate cover, complete with flow control valve. Sewage Treatment Facility
IPC
Section 1003 Interceptors and Separators Iraq Ministry of Housing & Construction - Section 10.6 General and Technical Specifications of the Sanitary Works Section 1003 Interceptors and Separators Iraq Ministry of Housing & Construction - Section 10.6 General and Technical Specifications of the Sanitary Works Section 1003 Interceptors and Separators
Manholes, Inspection Chambers and Gullies Manholes, Inspection Chambers and Gullies
44 42 00
2.7.6.4
IPC
44 42 49
2.7.6.2
IPC
N/A
2.2.2.02
Eliminate ceiling tile except where absolutely necessary Ceiling fans The Contractor shall provide the electrical power distribution system in accordance with the International Building Code Electrical Standards. The Contractor shall provide for the connection of electrical system into the existing Iraqi National local substation, if possible. Criteria Connectors Install p-traps at all applicable locations
Iraq Ministry of Housing & Construction - Section 10.6 General and Technical Specifications of the Sanitary Works Section 1003 Interceptors and Separators Iraq Ministry of Housing & Construction - Section 10.6 General and Technical Specifications of the Sanitary Works N/A Customer Requirement Article 422 Appliance N/A Article 110 Requirements for Electrical AFCEE IICS - Electrical Services Section 0 Installation Specifications Section 701.4 Sewage Treatment Article 110 Requirements for Electrical AFCEE IICS - Electrical Services Installation Specifications N/A N/A Article 490 Equipment Over 600Volts, Nominal Section 1002 Trap Requirements N/A N/A Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works N/A N/A N/A - Section 9.3 Section 1.1
Manholes, Inspection Chambers and Gullies Manholes, Inspection Chambers and Gullies
General Requirements
N/A
NEC
Sanitary Fittings
N/A
2.3.20.1
Provide foot wash stations in all places where there are showers
N/A
NA
N/A
N/A
N/A
N/A
N/A
2.3.21
IPC
N/A
N/A
N/A
2.4.1.2.1
The main headers leaving the primary water pumping plant shall be at least two (2) pipe sizes oversized and have blind flanges located at tees near both the ends of future expansion zones. ASME rated receiver air cooler moisture separator to remove moisture and oil. Criteria Install p-traps at all water closet locations. Install p-traps at all sink locations.
N/A
IPC
- Section 11.1
Section 1003 Pressure Vessels Section 1003 Pressure Vessels Section 1003 Pressure Vessels Section 604 Design of Building Water Distribution System Section 1002 Trap Requirements Section 1002 Trap Requirements
AL-FAO GEC - General Technical Section 3.2.11 Plumbing Fixtures Conditions and Specifications Iraq Ministry of Housing & Construction - Section 9.3 Sanitary Fittings General and Technical Specifications of the Sanitary Works
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 39 of 40
Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.
IPC
N/A
2.7.4.7.2
N/A
IPC
N/A
2.7.4.9.2
N/A
IPC
N/A
2.7.4.12
Hose Bibs
N/A
IPC
Section Hose Connections 608.15.4.2 Section Hose Connections 608.15.4.2 Section 606.4 N/A N/A Valve Identification
N/A
2.7.4.12.1
N/A
IPC
N/A
2.7.4.12.2
N/A
IPC
N/A N/A
4.01. 6.03.
N/A N/A
6.06. 7.00.02
The project includes all structures, buildings and systems as required for the installation. Follow "single manufacturer" premise for generators, pumps, valves, compressors, electrical components, etc. where possible for utility plants and critical infrastructure elements (WTPs, WWTPs, Power Plants, etc.) Explore opportunities to make manhole covers inaccessible to vehicle traffic or protect with bollards. All buildings will be planned, designed, renovated, or constructed according to requirements and specifications. Iraqi standards or any other acceptable standards shall be implemented. Eastern and Western-style fixtures will be required and installed where indicated on construction drawings.
N/A N/A
Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works Iraq Ministry of Housing & Construction General and Technical Specifications of the Sanitary Works N/A
- Section 9.3
Sanitary Fittings
- Section 9.3
Sanitary Fittings
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A
N/A N/A
N/A 1-7
IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material.
Page 40 of 40