Professional Documents
Culture Documents
UPGRADE_<BUSINESS PROCESS>_DOC VERSION AGS Project Manager: She Pasumbal TIP Project Manager: Lilibeth Baldevarona Document Version History Ver. No. 0.1 0.2 Ver. Date 24-Apr-13 25-Apr-13 Prepared By She Pasumbal Leo Carpio Description Initial Draft Added test scenarios Project ID: Document Version No: Document Version Date: Prepared By:
Instructions to use[read before using the Template] Worksheet Name - Test_Case and Test Report
Worksheet Name - Test_Summary 1. The "Test_Summary" worksheet summarizes the test results for all the test iterations 2. This is an auto populated sheet hence PL DO NOT MODIFY ANY CELLS Screen Shots
Important Notes: 1. Do not change the worksheet names 2. Please go through the cell comments for additional help in filling
EDS Restricted
Instructions to use[read before using the Template] Worksheet Name - Test_Case and Test Report 1. The Test_Case and Test Report worksheet is a single master worksheet which contains all the test cases to be tested and the test report. Results of separate test iterations upto 5 iterations can be documented in the same worksheet. If additional test iterations are required, then the user needs to copy the sections to proceed.
Worksheet Name - Test_Summary 1. The "Test_Summary" worksheet summarizes the test results for all the test iterations 2. This is an auto populated sheet hence PL DO NOT MODIFY ANY CELLS Screen Shots Add the screen shots which provide the changed UI to help customer get a view of the changes made. This is most applicable while preparing unit test cases Important Notes: 1. Do not change the worksheet names 2. Please go through the cell comments for additional help in filling 3. Please do not leave the cells blank where ever there is a drop down value required. This will otherwise impact the results in the summary sheet 4. Please do not enter any data in the "Greyed Out" cells, this will otherwise impact the results in the 5. If the Test Case to be executed has been selected as "Yes", please ensure that the "Test Status" and "Severity" have been filled correctly. This will otherwise impact the results in the test summary sheet.
EDS Restricted
Test Cases
BSM No.
Module Name
(if applicable)
Test Case ID
Description
Transaction Code
Pre-Conditions
FIGL09
FI
F.16
EDS Restricted
Expected Result
Priority (H, M, L)
EDS Restricted
F.16
SM37
F.07
Test Summary
Test Iteration Number Test Status Total Test Pass Fail cases Fatal Major Minor planned for execution Total Not On-Going No Tested Data Test Coverage Status (in %) Total Test % Complete cases % Pass per executed Iteration
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0.00% 0.00%
100.00% 80.00% 60.00% 40.00% 20.00% 0.00% Test Iteration 1 Test Iteration 2 (RETEST)
% Pass (Overall) % Pass per Iteration
EDS Restricted
#DIV/0! #DIV/0!
% Pass (Over-
EDS Restricted
Defect ID.
Test Case ID
Priority
Description of Issue
Raised by
EDS Restricted
EDS Restricted
Status
Issue/Clarification History
EDS Restricted