QUOTATION NO: 2013/156

RENOVATION COST QUOTATION MAGNA VILLE CONDOMINIUM MRS. ZIE No. 1 Details of work Plaster Ceiling - Dining Hall - Living room - Front room area - Yard area (to cover piping) - Kitchen area - Master bedroom - Bedroom 1 - Bedroom 2 - Dropdown curtain QTY 10,000.00 1 1 1 1 1 1 1 1 1 Price Total note with wiring and lightings (T5 & downlights) 1 layer of flat ceiling + Light Box Squared 1 layer of flat ceiling + Light Box Squared flat ceiling + round downlight flat ceiling + round downlight flat ceiling + manhole + round downlight flat ceiling + round downlight flat ceiling + round downlight flat ceiling + round downlight Light box with t5 lighting

2,800.00 2,800.00 400.00 400.00 850.00 850.00 850.00 800.00 250.00 TOTAL

2,800.00 2,800.00 400.00 400.00 850.00 850.00 850.00 800.00 250.00 10,000.00

No. 2

Details of work Tile flooring works Areas - Dining Hall - Living room - Front room area - Kitchen area Works to be done - dismantling of existing flooring & skirting - floor levelling - installation of floor tiles - workmanship - installation of floor tiles - tiles only

QTY

Price

Total

note

870 870 870 870

2.30 2.00 5.50 7.00 TOTAL

2,001.00 hacking and garbage clearence 1,740.00 4,785.00 labour and all materials 6,090.00 2x2 gred A tiles (2 types for hall and kitchen) 14,616.00

No. 3

Details of work Kitchen kabinet - tiling and plumbing works - Hacking wall tiles - wall levelling - Wall Tiles - materials - workmanship - General plumbing works - Hacking for kitchen hood hose - Hood hose & hose cap 6" - Brick wall to cover window installation of Kitchen kabinet - Table top concrete - Base Unit - melamin material - Wall unit (Full Height) - melamin material

QTY 65 65 65 65 1 1 1 1

Price 2.50 2.00 7.00 5.50 550.00 350.00 180.00 200.00

Total

note

162.50 130.00 455.00 357.50 550.00 350.00 180.00 200.00

Hacking & clearence fancy tiles labour and all materials water inlets and outlets - all piping works hacking and replastering supply and installation

17 17 19

180.00 120 170

3,060.00 with 2x2 gred A tiles (or GRANITE top) 2,040.00 3,230.00

- End panel for fridge Accessories - Double bowl sink - Double water tab - Superino - Dish Rack - plate dryer - Pull out basket - Pull out bottle rack - Built in handle - 3 tier Drawer (normal runner) - soft close - ZANUSSI Hob & Hood - Chimney design

1 1 1 1 1 1 1 1 1 1

500.00 180.00 145.00 180.00 200.00 180.00 0.00 0.00 0.00 1,550.00

500.00 full covered tall unit 180.00 145.00 180.00 200.00 180.00 0.00 0.00 0.00 1,550.00 13,650.00

Supply and Installation Supply and Installation FOC FOC FOC Supply and Installation

TOTAL

No. 4

General works painting works - paint materials - ceiling painting - workmanship - wall painting - workmanship - Door frame painting - workmanship General wiring works - new power point - new power point - new oven point - new cooker hood point - new aircond point - light point - installation of fancy lighting - installation of ceiling Aircond works - Hall area - Installation - 1.5hp cooper piping - Master Bedroom - Installation - 1hp cooper piping

QTY 1 1 1 5

Price

Total 850.00 800.00 1,300.00 400.00

note

850.00 800.00 1,300.00 80.00

Nippon easy wash - maximum 3 colours whole house ceiling paint whole house wall painting door frames for all doors with paint

8 4 1 1 1 3 5 6

80.00 40.00 120.00 80.00 120.00 60.00 25.00 40.00

640.00 direct DB 160.00 looping from existing 120.00 80.00 120.00 180.00 125.00 240.00

1 35

220.00 18.00

220.00 owner to provide aircond 630.00

1 35

200.00 16.00

200.00 owner to provide aircond 560.00

Rorobin - Garbage tank - cleaning and clearence of unit 3 1

180.00 200.00 TOTAL

540.00 200.00 vroom clean - clearance of the unit 7,365.00

No. 1 2 3 4

Final Price Plaster Ceiling Tile flooring works Kitchen kabinet & tiling and plumbing works General works

TOTAL 10000 14616 13650 7365

TOTAL ROUNDING GRAND TOTAL

45631 131 45500

payment

stages of payment

1st 2nd 3rd 4th 5th

to be paid upon quotation confirmation to be paid upon the delivery of construction materials to be paid upon 40% completion of jobs to be paid upon 70% completion of jobs to be paid upon completion of jobs

amount 5,000.00 15,000.00 13,000.00 11,000.00 1,500.00 45,500.00

estimated period upon confirmation within 2-3 days after receiving the 1st payment within 1 week after receiving 2nd payment within 1-2 weeks after receiving the 3rd payment within 1-2 weeks after receiving the 4th payment estimated period of works to be completed: 4 - 6 weeks