LEAD TIME TRACKING GM

JAN -2013
Sr No.

SAP PR No

SAP PO NO

Date of
Receipt

1362000023

4502002379

2-Jan-13

2
3

1252000263

4502002521

2-Jan-13

1248000564

Priority

P/NP

NORMAL

Urgent

4502002416

2-Jan-13

Urgent

1248000565 (A) 4502002533

2-Jan-13

Normal

1248000565 (B) 4502002570

2-Jan-13

Normal

1361000008

4502002492

2-Jan-13

Normal

1362000020

4502002224

2-Jan-13

NORMAL

134900024

4502002225

2-Jan-13

NORMAL

1248000575

4502002534

9-Jan-13

NORMAL

10

1263000095

11

1270000025

12

1269000474

13

5401000295

4512000048

4512000052

4502002235/
4502002236

Description

ASTM & TEMA

Instrument junction
NP
Boxes

RFQ sent
Quotation
Quotation
to vendor
sent to
received on
on
Plantsite on

2-Jan-13
2-Jan-13

13-Mar-13

20-Mar-13

27-Mar-13

25-Aug-13

26-Apr-13

20-Jun-13

21-Nov-13

2-Jan-13

13-Mar-13

13-Mar-13

27-Mar-13 29-Mar-13 20-Apr-13

25-Apr-13

4-May-13

8-May-13 EURO: 722.30 ADV

AIR

9-May-13

20-May-13

12-Jun-13

2-Jan-13

13-Feb-13

13-Feb-13

14-Mar-13

14-Mar-13 28-Mar-13 29-Mar-13 18-Apr-13

19-Apr-13Euro: 72,626.00 L/C

Sea

22-Apr-13

3-May-13

13-Dec-13

Air

4-Jan-13

ADOBE ACROBAT X PRO

9-Jan-13

28-Feb-13

28-Feb-13

26-Mar-13

1-Apr-13

24-Jan-13

24-Jan-13

30-Jan-13

11-Jan-13

URGENT

Repair of Turbine Rotor

11 Jan
2013

POTASSIUM NITRITE
KNO2

VSM SERVICES
REQUIRED FOR
INSTALLATION,
COMMISSIONING OF
ELECTRONIC
GOVERNOR OF
SYNTHESIS MACHINE

NP Pressure Gauges

NORMAL

17 Jan
NP Piping fitting for LP Condenser
2013

17

5401000295 4502002265

16-Jan-13

URGENT

18

1267000055

4-Jan-13

NORMAL

POTASSIUM NITRITE
KNO2
Expansion Bellows for
Synthesis

15-Jan-13

17 Jan 2013

Air

22-May-13

20-Mar-13 28-Mar-13 28-Mar-13 28-Mar-13

29-Mar-13 USD: 2,142.00 ADV

Sea

29-Mar-13

L/C

Sea

20-Feb-13

12-Apr-13

30-Apr-13

15-May-13

30-Apr-13

9-Mar-13

26-Mar-13 23-May-13

28-Mar-13 USD: 80.00

Air

28-Mar-13

12-Apr-13

20-Apr-13

USD:
ADV
10,950.00
24-Jan-13 USD: 1,377.25 ADV

Air

24-Jun-13

1252000317

4502002409

29-Jan-13

NORMAL

Spares for Explosimeter

24

1248000589

4502002536

29-Jan-13

Urgent

Spares for Turbine TP29 jan 2013


601/A

29 jan
2013

1-Feb-13

1-Feb-13

11-Feb-13 15-Feb-13 25-Feb-13

26-Feb-13

4-Mar-13

8-Mar-13 USD: 1,725.77 ADV

Air

11-Mar-13

8-Feb-13

8-Feb-13

13-Feb-13

18-Apr-13

25-Apr-13

26-Apr-13EURO: 4476.52 ADV

Air

29-Apr-13

30-Apr-13

8-May-13

25 feb 2013

4-Mar-13

18-Apr-13

9-Apr-13

9-Apr-13

27-May-13

29 jan 2013 28-Feb-13

28-Feb-13

30-Mar-13

29 jan 2013 20-Feb-13

20-Feb-13

25-Feb-13 26-Feb-13 15-Mar-13 26-Feb-13

29 jan 2013 20-Feb-13

20-Feb-13

14-Mar-12 18-Mar-13 25-Mar-13 18-Mar-13 25-Mar-13

NP Pedestal Grinder/Buffer 30 jan 2013

6-Mar-13

6-Mar-13

NP NUTS / BOLTS

30 jan 2013 28-Feb-13

NP Bars

31 jan 2013

17-Apr-13

20-Mar-13

28-Feb-13

14-Mar-13

17-Apr-13

17-May-13 22-May-13

1-Jun-13

3-Apr-13

30-Jan-13

Sea

31-Jul-13

11-Jun-13

27-Jun-13

7-Jun-13

28-Feb-13
28-Jan-13

20-Mar-13

3-May-13

18-Apr-13

20-May-13

14-Jun-13

MR

Date of shipment is 13 Dec 2013.

SDA

Magazine Case

MR

Activation Keys received and sent to IT on 04 Feb 13.

MR

Material shipped on 4-Jul-13


C&F to confirm arrival of material

MS

VSM Services

MR

Technical review received from plant on 30 jan 2013.


Email was sent to plant on 01 Feb 2013 to process the
case through local procurement.
PO was sent to vendor on 08 Feb 13.
Payment will be made after inspection and receipt of
final invoice.

1-Feb-13

11-Apr-13 11-Apr-13

16-Apr-13

19-Apr-13 USD: 1,390.68 ADV

AIR

19-Apr-13

24-Apr-13

31-May-13

8-Jul-13

7-Mar-13

15-Feb-13

15-Feb-13

22-Mar-13 USD: 1,103.80 ADV

Air

25-Mar-13

3-Apr-13

12-Apr-13

10-May-13

27-Mar-13 USD: 2,956.84 ADV

Air

27-Mar-13

12-Apr-13

10-Jul-13

25-Jun-13

22-Mar-13 28-Mar-13 28-Mar-13 28-Mar-13

1-Apr-13 EURO: 2,463.19 ADV

Sea

2-Apr-13

19-Mar-13 25-Mar-13 26-Mar-13 26-Mar-13

27-Mar-13EURO: 4,218.50 L/C

Sea

27-Mar-13

5-Apr-13

10-Jul-13

17-May-13 12-Jun-13

17-Jun-13 EURO: 8799.20 L/C

Sea

18-Jun-13

27-Jun-13

14-Oct-13

13-Jun-13

14-Jun-13

12-Jun-13

24-Jun-13

10-Jun-13

6-Jun-13

PO

MR

VSM Services.

MR

Case sent to Fin Ho for advance payment on 22 May


2013.
OA mail sent to vendor on 22 May 2013.

PO

Material received and send to plantsite on 11 Jun 13.

MR

Date of shipment is 20 Apr 13.


For shipment status email sent to vendor on 27 May
2013.
Last reminder given on 28 Jun 2013.
Material received vide plantsite email dated 24 Apr
2013.
Books received by Proc HO 01 Feb 13.

MR
MS

MR

SDP

MR
MR

Material arrived at LHR.

MS

Date of shipment is 14 Jun 2013.


For shipment status email sent to vendor on 28 Jun 13.

SDP

Revised PR approved on 21 Jun 2013.


Email sent to vendor on 21 Jun 2013 for L/C charges,
DLD, bank detail, port of shipment & validity.
Reminder sent on 25 Jun & 28 Jun 2013.
Telephonic conservation with vendor on 01 Jul 2013.
Vendor will reply within 3 to 4 days.
Reminder sent on 09 Jul & 12 Jul 2013.

CAN

Material dispatched on 5 Mar 13.

Material received and despatched on 7 Jun 13.

24-Apr-13

7-Feb-13

SDA

Material dispatched to plantsite on 7 Jun 13.

Material despatched by C&F to Plantsite on 21 May


2013.
Material shipped on 27-Jun-13
C&F to confirm arrival of material

21-May-13

13-Mar-13

ADV

6-Aug-13

Air

23

Urgent

21-May-13 USD: 8148.70 ADV

12-Mar-13USD: 11,730.00 ADV

POTASSIUM NITRITE
KNO2
APICS BOOKS

NORMAL

18-May-13

1-Mar-13

30-Jan-13

18-Jan-13

26-Feb-13

29-Jan-13

URGENT

4502002668

NORMAL

4502002465

5-Mar-13

EURO:
41,000.00

4-Jul-13

Sea

15-Jan-13EURO: 127,320.00 L/C

27-Feb-13 25-Mar-13 9-May-13

18-Jan-13

1248000579

8-Feb-13

30-Jan-13

1248000588

20-Dec-13 20-Dec-13

ADV

25-Feb-13

4502002316/
2317
4502002292

NP Gland Packings

7-Jan-13

EURO:
7,175.00
EURO:
7,175.00

21-Feb-13

1347000011

NORMAL

7-Feb-13 EURO: 8,316.00 L/C

22 Jan 2013 21-Feb-13

5401000295

29-Jan-13

8-Feb-13

9-May-13

22

4502002466

16-Apr-13

21

1248000582

5-Apr-13

AGRI ZAP

Urgent

9-Jan-13

25-Mar-13

29-Jan-13

Air

NORMAL

4502002454

9-Jan-13 EUR: 13,000.00 L/C

4-Feb-13
4-Jul-13

20-Mar-13
EURO: 113,995.86 L/C

17-Jan-13

1248000592

15-Mar-13

10-Jan-13
21-Jun-13

19-Mar-13

4502002471

Gasket for E-301/ E 302 A/B.


Silver Seal II Paste
NP
Sealant

13-Feb-13

18-Jan-13

7-Feb-13

1349000033

NP

13-Feb-13

9-May-13

20

NORMAL

26-Feb-13 28-Feb-13

29-Jan-13

13-Feb-13

29-Apr-13

NORMAL

4502002512

13-Feb-13

4-Jan-13

Sea

21-Jan-13

Spares for
Carborundum Oil

Internet

7-Jun-13

8-Mar-13

28-Jan-13

4502002418

3-Jan-13 USD: 3,124.75 ADV


26-Apr-13EURO: 2055.00 ADV

22-May-13

22-Jan-13

1248000585

Urgent

23-Apr-13

10-Jan-13

Date of shipment is 21 Nov 13.

22-Jan-13

19

29-Jan-13

17-Apr-13 29-Mar-13 11-Apr-13 22-Apr-13

16-Jan-13

SEALENT FOR
rectification of online
leaking flanges

31

SDA

13-Mar-13

ADV

TAG

Date of shipment is 25 Aug 13.

Air
AIR

3-Jan-13 USD: 272.00

Status

SDP

25-Apr-13EURO: 67878.88 L/C

Total
Period

26-Jun-13

12-Mar-13CHF: 45,146.00 L/C

11 Jan
2013

30

8-May-13

22-Apr-13

Actuator Springs

NORMAL

11-Mar-13

28-Jan-13

30-Apr-13

Files
Closed

MR

1-Mar-13

URGENT

4502002478

25-Apr-13

Materials
RM Karachi Materials
MER
received
Materials received at received
at RM
shipped on Platsite on
on
Karachi on

Date of shipment is 26 Jun 2013.


For shippment status email sent to vendor on 28 Jun 13.

22-Apr-13

11-Jan-13

1267000064

AIR

Materials
shipped on

CD Rom desptached to TD by Proc HO on 30-Apr-13

29

31-Mar-13 28-Mar-13

NORMAL

28

24-Apr-13EURO: 3096.80 ADV

21-Mar-13

15-Jan-13

27

18-Apr-13

27-Feb-13

4502002591

1248000580

18-Apr-13

Air

15-Feb-13 27-Feb-13

1252000295

26

ADV

Date of
Shipment

27-Mar-13 29-Mar-13 20-Apr-13

15

1248000591

26-Feb-13 USD: 354.00

Payment
issued on

9-Jan-13

T/A-2012

25

Technical
Email sent
query
Case
to vendor
received
finalized on
for OA on fron vendor
if

13-Mar-13

NP Complete for blower

28-Jan-13

3-Apr-13

Mode of
Shipment

9-Jan-13

11-Jan-13

4502002442

Value in
Foreign LC / ADV
Currency

13-Mar-13

T/A-2012

17-Jan-13

PO issued
on

2-Jan-13

9-Jan-13

URGENT

25-Mar-13 26-Mar-13 16-Apr-13 26-Mar-13

SERVICES FOR
INSPECTION OF
TAPROGGE SYSTEM

11-Jan-13

Commerci
Complete
al e,ail
response
sent to
received on
vendor on

2-Jan-13

Floating Assembely
Spares for TK-431/432,
tg-702, DSTK -4101 and
LV -42007
Spares for TK-431/432,
P tg-702, DSTK -4101 and
LV -42007
Plug Vlaves for BMR-NG
NP
Compressor
CHEMICAL
P ENGINEERING
MAGAZINE

4512000049

4502002474

23-Jan-13

25-Feb-13

CST signed
by SM-P

1269000191

1361000010

23-Jan-13

4-Feb-13

CST
initiated
on

14

16

4-Feb-13

Receipt of
Tech
Revised PR
Review Revised PR
approved
from
if
on
Plantsite
on

DP

Material shipped on 8-Jul-13


C&F to confirm arrival of material

MS

Material dispatched on 6 Jun 13.

MR

Material despatched by vendor to Lahore airport.


Original documents despatched to Mktg Div on 2-Jul-13

MS

Material shipped on 10 Jun 2013.


C&F to confirm the arrival of material.
Orignal documentd awaited.
In Transit
Shipment date is 10-Jul-13
Date of shipment is 14 Oct 2013
OA mail sent to vendor on 18 Jun 13.

MS
SDA
SDA

30-Jan-13

NORMAL

salt conveyor FD-538531 jan 2013


5389 Gear Boxes

13-Feb-13

13-Feb-13

25-Feb-13

4502002658

30-Jan-13

NORMAL

SPARES FOR ACTUATOR 31 jan 2013

6-Feb-13

6-Feb-13

14-Mar-13 15-Mar-13 25-Apr-13

29-Apr-13

11-Jun-13

12-Jun-13EURO: 3,409.00 ADV

Air

13-Jun-13

1252000306

4502002590

30-Jan-13

Urgent

NP

4-Feb-13

4-Feb-13

11-Feb-13 26-Apr-13

6-May-13

6-May-13

17-May-13

21-May-13EURO: 4413.00 ADV

Air

22-May-13

35

1248000587

4502002588

30-Jan-13

NORMAL

1-Feb-13

1-Feb-13

14-May-13

15-May-13 17-May-13

20-May-13EURO: 34,865.10 L/C

Air

21-May-13

22-May-13

24-May-13

36

1248000584

4502002401

30-Jan-13

NORMAL

13-Feb-13

13-Feb-13

19-Feb-13 20-Feb-13 27-Feb-13

5-Mar-13EURO: 18,605.00 L/C

Air

6-Mar-13

37

1267000066

29-Jan-13

NORMAL

NP Rachet Arbor Press

31 jan 2013

6-Mar-13

6-Mar-13

7-May-13

Seitch Hand Pull Rope


for beilts diverters and
NP
03 Jan 2013
hoppers(Urea Bagging &
Shipping)

6-Feb-13

6-Feb-13

1-Mar-13

22-Feb-13

32

1267000058

33

1252000311

34

38

1252000293

4502002449

3-Jan-13

NORMAL

39

1248000581

4502002483

31-Jan-13

NORMAL

40

1252000312

4502002374

31-Jan-13

41

1252000309

4502002510

31-Jan-13

Packing Ring/O-Ring for


31 jan 2013
control valve
Spares for K-451 A-B/ K31 jan 2013
1101
Spares for Liquid Level
31 jan 2013
Gauges

7-Mar-13 15-Mar-13 5-Mar-13

Screen for Cloths

1 Feb 2013

14-Feb-13

14-Feb-13

NORMAL

Spares for Control

1 Feb 2013

11-Feb-13

11-Feb-13

13-Feb-13

NORMAL

NP

1 Feb 2013

28-Feb-13

28-Feb-13

28-Mar-13

Spares for Bagging


Machine
Spares for Process
NP
Manger

1-Mar-13

4-Mar-13

19-Mar-13 19-Mar-13 19-Mar-13

21-Mar-13 EURO: 832.60 ADV

Air

3-Apr-13 EURO: 4,241.00 ADV

Air

22-Mar-13

28-May-13

16-Sep-13

Date of shipment is 16 Sep 2013.


OA mail sent to vendor on 22 May 2013.

SDA

12-Jun-13

18-Nov-13

Date of shipment is 18 Nov 13.

SDA

Material received and send to plantsite on 11 Jun 13.

MR

CST sent to IA and FIN HO on 10 Jul 2013 for signing.

DP

Material dispatched on 21 May 13.

MR

14-Mar-13 21-May-13

3-Apr-13

13-Jun-13

7-May-13

21-May-13

22-Feb-13 USD: 5,747.04 ADV

Air

25-Feb-13

26-Feb-13

26-Feb-13

18-Mar-13

30-Mar-13

29-Apr-13

15-Apr-13

18-Apr-13EURO: 3,729.60 ADV

Air

18-Apr-13

24-Apr-13

30-May-13

24-Jun-13

31-Jan-13

NORMAL

1 Feb 2013

1-Jul-13

1-Jul-13

12-Jul-13

4502002324

29-Jan-13

NORMAL

BOOKS

7-Feb-13 USD: 217.26

ADV

Air

8-Feb-13

44

1290000005

4502002363

30-Jan-13

Normal

BOOKS

19-Feb-13 USD: 482.50

ADV

Air

20-Feb-13

TAG

PO

20-Feb-13

1226000006

Total PR
RFQ
T/R
REV
DP
PO
SA
SDP
MS
MR
FC

Case sent to Fin Dept for advance payment on 13 Jun 13.


OA mail sent to vendor on 13 Jun 13.

14-Feb-13

1252000294

1
2
3
4
5
6
7
8
9
10
11

4-Sep-13

28-Mar-13 11-Apr-13 11-Apr-13

43

SUMMARY

CAN

24-May-13

42

S/No

Technical review received from plant on 25 feb 2013.


CBD is under process.Vndor quoted price in PKR. So, the
case has been shifted to local section.

21-Mar-13

28-Feb-13
5-Mar-13

7-May-13

11-Jun-13

Material desptached to plantsite on 10 Jul 13 by C&F


Khi.
Material despatched to plantsite on 29 Apr 13 by C&F
Khi.
Material dispatched on 24 Jun 13.
Email was sent to plant on 01 Feb 2013 to process the
case through local procurement.
Payment made on 21 Mar 13 thru CC.
Books will be delivered on 07 May 13.
Books Case

MR
MR
MR

CAN
MR
MR

LEAD TIME TRACKING GM


FEB -2013
Sr No.

SAP PR No

1267000057

1252000307

SAP PO NO

4502002407

Date of
Receipt

Priority

P/NP

1-Feb-13

Urgent

NP

1-Feb-13

NORMAL

Description

Vibration screens for


urea reclaimation

RFQ sent to vendor


on

Quotation
received on

Quotation
sent to
Plantsite on

4 Feb 2013
02 july 2013

6-Mar-13

6-Mar-13

Receipt of
Commerci
Tech
Revised PR
Complete
CST
CST signed
al e,ail
Review Revised PR
approved
response
if
initiated on by SM-P
sent to
from
on
received on
vendor on
Plantsite
on

PO issued
on

Value in Foreign
Currency

LC / ADV

Mode of
Shipment

Email sent
to vendor
for OA on

Technical
query
Case
received
finalized on
fron vendor
if

Payment
issued on

Date of
Shipment

Materials
shipped on

RM
Materials
Karachi
Materials
MER
received
Materials received at received
at RM
shipped Platsite on
on
Karachi on
on

Files
Closed

Total
Period

Status

TAG

28-Jun-13

RFQ Refloated on 02 Jul 2013.

RFQ

Material shipped on 25 Jun 13. C&F to confirm arrival of


material.

MS

Cage for control valve

4-Feb-13

13-Feb-13

13-Feb-13

15-Feb-13

7-Mar-13

EURO: 9,559.00

L/C

Air

4-Jul-13

4-Feb-13

28-Feb-13

28-Feb-13

18-Mar-13

8-May-13

EURO: 3483.50

ADV

Sea

29-May-13

Material shipped 30-Jun-13


C&F to confirm arrival of material

MS

4-Feb-13

1-Mar-13

1-Mar-13

25-Mar-13

8-Apr-13

USD: 27,702.50

L/C

Air

13-May-13

Material received at plantsite.

MR

4-Feb-13

8-Feb-13

8-Feb-13

11-Feb-13

18-Feb-13 USD: 485.00

ADV

Air

2-Apr-13

4-Feb-13

1-Apr-13

1-Apr-13

10-Apr-13

26-Apr-13 USD: 2869.00

ADV

Air

16-Aug-13

7-May-13

1252000308

4502002567

1-Feb-13

NORMAL

Stainless steel Tubes/


NP Instrument Seamless
Steel Tubing

1267000060

4502002490

1-Feb-13

NORMAL

NP

1267000068

4502002360

4-Feb-13

NORMAL

1252000326

4502002572

4-Feb-13

Urgent

1248000594

4502002559

4-Feb-13

NORMAL

1248000598

4502002467

4-Feb-13

Urgent

Demagnetizer for
machinery
P Hoerbiger Repair Kit
Mannetostricitive Level
P
Transmitter
Arnature for handle
NP
angle
Spares for crane Hiab
NP
Foco
Instrument spares for
NP
fermont

4-Feb-13

1-Mar-13

1-Mar-13

11-Apr-13

4-Feb-13

20-Feb-13

20-Feb-13

25-Feb-13

15-Apr-13

24-Apr-13

15-Apr-13

30-Apr-13

2-May-13

2-May-13

EURO:960.90

8-May-13

20-May-13 28-May-13 31-May-13

27-Jun-13

Material dispatched on 17 Apr 13.

MR

Date of shipment is 16 Aug 13.

SDA

ADV

AIR

Material despatched on 27 Jun 13.

MR

27-Mar-13 EURO: 1,405.84

ADV

Air

20-Apr-13

Material dispatched on 28 May 13.

MR

1248000599

4502002497

4-Feb-13

NORMAL

4-Feb-13

13-Mar-13

13-Mar-13

19-Mar-13

15-Apr-13 EUR: 2075.86

ADV

Air

13-May-13

Material dispatched on 28 May 13.

MR

10

1252000310

4502002469

4-Feb-13

NORMAL

NP Air Filter Regulators

4-Feb-13

1-Mar-13

1-Mar-13

6-Mar-13

28-Mar-13 USD: 1,050.40

ADV

Air

25-Apr-13

Material received and send to plantsite on 11 Jun 13.

MR

11

1252000318

4502002628

4-Feb-13

NORMAL

NP Temperature Indicator

4-Feb-13

2-May-13

2-May-13

7-May-13

4-Jun-13

USD: 1894.39

ADV

AIR

18-Jun-13

Material has been shipped.


C&F to confirm arrival of material.

MS

12

1252000321

4502002718

4-Feb-13

NORMAL

NP

Recorder Chart Z Fold


type for Yokogawa

4-Feb-13

16-May-13 16-May-13

1-Jun-13

4-Jul-13

EURO: 320.00

ADV

AIR

1-Aug-13

13

1252000323

4502002697

4-Feb-13

Urgent

NP

Manifold 3-way for


Transmitters

4-Feb-13

27-May-13 27-May-13 29-May-13 19-Apr-13

ADV

AIR

Case sent to Fin dept for advance payment on 05 Jul 13.

14

1252000324

4-Feb-13

Urgent

15

1248000597

4502002528

6-Feb-13

NORMAL

16

1252000320

4502002440

6-Feb-13

Urgent

17

1252000322

4502002602

6-Feb-13

NORMAL

18

1361000002

6-Feb-13

NORMAL

19

1252000303

4502002368

7-Feb-13

Urgent

20

1248000593

4502002554

7-Feb-13

Normal

NP Gasket

21

1248000596

4502002531

7-Feb-13

Normal

NP

22

1252000299

4502002441

7-Feb-13

urgent

23

1252000319

4502002637

7-Feb-13

urgent

24

5401000309

4502002430

25

1280000002

26

1267000067

27
28
29

10-Jul-13

10-Jun-13

3-Jul-13

1-Mar-13

1-Apr-13

25-Apr-13 GBP: 1389.20

ADV

BY SEA

9-May-13

6-Feb-13

6-Mar-13

6-Mar-13

8-Mar-13

20-Mar-13 EURO: 1,707.00

ADV

Air

8-May-13

6-Feb-13

28-Feb-13

28-Feb-13

3-May-13

24-May-13 EURO: 1713.50

ADV

Air

2-Aug-13

NP Cooling Tower Cell

7-Feb-13

24-Apr-13

24-Apr-13

4-Jul-13

8-Feb-13

11-Feb-13

11-Feb-13

13-Feb-13

20-Feb-13 USD: 3,780.00

ADV

Air

4-May-13

8-Feb-13

13-Mar-13

13-Mar-13

19-Apr-13

6-May-13

ADV

Sea

29-Jul-13

8-Feb-13

28-Feb-13

28-Feb-13

01/04/201
3
and
5 Apr 2013

25-Apr-13 EURO: 7248.00

LC

Sea

NP Pressure Gauges

8-Feb-13

1-Mar-13

1-Mar-13

7-Mar-13

20-Mar-13 EURO: 3,477.48

ADV

Air

NP Condensate/ Seal

8-Feb-13

8-May-13

8-May-13

ADV

Air

6-Feb-13

Normal

12-Feb-13

Normal

5401000310

4502002634

12-Feb-13

Normal

1252000300

4502002488

12-Feb-13

Normal
Normal

MansoneILAN Level

Smooth Sheets and


Plates

POTASSIUM NITRITE
KNO2

Energy Management
System
Spares for Rotor

8-Feb-13

26-Feb-13

26-Feb-13

24-May-13 11-Apr-13

23-Apr-13 27-May-13

4-Jun-13

5-Jun-13

5-Jun-13

7-Jun-13

USD: 10644.90

EURO: 3,350.00

25-Feb-13

15-Mar-13 EURO: 108,650.00

9-Mar-13

21-Mar-13 EURO: 57,000.00

PO

Email sent to plantsite for Revision of PR alongwith CBD


& quotation on 05-Jul-13.

REV

In transit. Orignal documents received.


Material despatched to plantsite on 29 Apr 13 by C&F
Khi.

MS

Date of shipment is 2 Aug 13.

SDA
DP

Material Custom cleared and dispatched to plantsite by


TCS on 6 Jun 2013.

MR

Once again case sent to Fin Dept for advance payment


on 6 Jun 2013 as vendor was not accepting L/C.

PO

30-May-13

Material despatched on 24 Jun 13.

MR

19-Jun-13

Date of shipment is 19 Jun 13.


For shipment status email sent to plantsite on 18 Jun 13.
Vendor replied on 21 Jun 13 and informed that the
material will be shipped next week.
Last reminder on 28 Jun 13.

SDP

10-Jul-13

Date of shipment is 10 July 13.

SDA

Sea

25-Jun-13

Material shipped on 31 May 2013.


C&F to confirm the arrival of material.
Plantsite emailed vendor on 11 Jun 13 for the shipment
of remaing 4,000kg.
Vendor informed plantsite that remaing material will be
shipped on 21 Jun 13 and ETA is 18 Jul 13.
Material despatched to plantsite by C&F on 28 Jun 13.

MR

ADV

Air

10-May-13

recevied.

MR

LC

Sea

17-Oct-13

SDA

MR

LC

10-Jun-13

18-Jun-13

17-Apr-13

17-Apr-13

19-Feb-13

19-Feb-13

NP Hydranize Hydrate

12-Feb-13

20-Mar-13

20-Mar-13

7-May-13

USD: 27200.00

LC

Sea

19-Sep-13

NP Pressure Gauge

12-Feb-13

6-Mar-13

6-Mar-13

27-Mar-13

5-Apr-13

EURO: 1,142.78

ADV

Air

17-May-13

Date of shipment is 17-Oct-13


Date of shipment is 19-Sep-13
OA mail sent to vendor on 11 Jun 13.
Material received and despatched on 7 Jun 13.

Indicator, 5-1/2 Digit for


NP
intrinsic safety Barriers

12-Feb-13

6-Mar-13

6-Mar-13

25-Mar-13

1-Apr-13

EURO: 2,348.56

ADV

Air

27-May-13

Material received and send to plantsite on 11 Jun 13.

4502002558

14-Feb-13

Normal

1252000301

4502002451

14-Feb-13

Urgent

NP Pressure Indicator

32

1252000325

14-Feb-13

Urgent

NP

33

1290000005

14-Feb-13

Normal

34

1280000004

4502002380

14-Feb-13

Normal

35

1275000021

4502002529

14-Feb-13

Urgent

NP Spares of Sieve Shaker

Normal

Instrument Cables/
NP
ThermoCouple

Books

JUNCTION BOXES AND


ACCESSORIES
SAP and other Technical
Books
Books

15-Feb-13

17-Apr-13

17-Apr-13

2-May-13

15-Feb-13

6-Mar-13

6-Mar-13

9-Mar-13

15-Feb-13

6-Mar-13

6-Mar-13

7-May-13

USD: 139.94

21-Mar-13 USD: 6,983.00

MR

CST sent to IA and FIN HO on 10 Jul 2013 for signing.

12-Feb-13

1280000003

26-Apr-13 CHF: 108.00

PO

Case sent to Fin dept for advance payment on 27 Jun 13.

12-Feb-13

31

14-Feb-13

27-Jun-13

1-Mar-13

4502002445

4502002675

26-Jun-13 EURO: 1035.00

10-Jun-13

4502002537

1252000298

21-Jun-13

6-Feb-13

30

36

21-Jun-13

4-Feb-13

NP

12-Feb-13

21-Jun-13

NP Pipe Fittings
Instrument for
NP
Weighing & Bagging
Solenoid Valve/
NP
Complete Valve

Normal

4502002479

30-May-13

NP Gas Cylinders

7-Feb-13

1252000297

15-Jun-13

Material shipped on 8-Jul-13


C&F to confirm arrival of material

ADV

Air

ADV

Air

8-May-13

14-May-13 15-May-13 20-Jun-13


13-Jun-13

MR

MS
MR
CAN

15-Feb-13

19-Apr-13

19-Apr-13

BOOKS RECEIVED

MR

15-Feb-13

19-Feb-13

19-Feb-13

25-Feb-13

26-Feb-13 PSTG: 168.95

ADV

Air

12-Mar-13

Books despatched to plantsite on 4 Jun 2013.

MR

15-Feb-13

27-Mar-13

27-Mar-13

19-Apr-13

25-Apr-13 PSTG: 1,701.88

ADV

Air

16-May-13

Material received and despatched on 7 Jun 13.

MR

Case sent to Fin Dept for establishment of LC on 24 Jun


13.
OA mail sent to vendor on 24 Jun 13.

PO

15-Feb-13

13-Mar-13

13-Mar-13

26-Mar-13

Books have been shipped as informed by the venor on


15 May 2013.
Arrived at LHR as informed by C&F on 20 Jun 13.
Material received at plantsite.
Quotation sent to plant on 6 Mar 2013 for technical
review. On receipt of same further action will be
initiated.PR Canecelled by plantsite vide their email
dated 25 MAR 2013.

SDA

30-Mar-13

19-Jun-13 GBP: 5,304.95

LC

SEA

6-Sep-13

18-Feb-13

Normal

Strainer for LS Induction


NP
Line

1286000076

20-Feb-13

Urgent

NP Cobas e411 Analyzer

21-Feb-13

10-Apr-13

10-Apr-13

39

1261000021

20-Feb-13

Normal

NP Filter

21-Feb-13

13-Mar-13

13-Mar-13

5-Jul-13

40

1248000590

4502002552

20-Feb-13

Normal

NP Pipes

21-Feb-13

13-Mar-13

13-Mar-13

16-Apr-13

41

1271000021

4502002382

1-Feb-13

Normal

EC & M Magazine

42

1248000601

4502002422

25-Feb-13

Normal

Element Assy (Gear


Reducer)

37

1267000073

38

43
44

1248000576

4502002578

4502002594

5401000311

25-Feb-13
27-Feb-13

Normal

NP Butterfly Valves

Urgent

Secondary Reformer
NP
Catalyst

45

1248000602

4502002607

27-Feb-13

Urgent

46

1267000082

4502002443

28-Feb-13

Normal

47

1252000315

4502002562

28-Feb-13

Normal

NP Spares for DCS System

48

1271000022

4502002526

28-Feb-13

Normal

NP

49

1252000305

4502002527

28-Feb-13

NORMAL

50

1252000280

NP Fan Blades
P

Balancing Machine

INSTRUMENT
CALIBRATORS
NP Tube Light Fixture

19-Feb-13

13-Mar-13

13-Mar-13

25-Feb-13

26-Feb-13

26-Feb-13

27-Feb-13

25-Feb-13
8-Mar-13

28-Feb-13

Urgent

NP Control Switch Spares

1248000600

4502002642

28-Feb-13

NORMAL

Refactory and
insulatuion material

52

1361000019

4502002561

28-Feb-13

Urgent

Ammonia Converter
Basket

53

1252000316

4502002468

26-Feb-13

Urgent

Capillary type Pressure

54

1248000603

26-Feb-13

Normal

Spares for Pressure


actuated

TAG
Total PR
RFQ
T/R
REV
DP
PO
SA
SDP
MS
MR
FC

EURO: 9906.00

26-Feb-13 USD: 120.00


13-Mar-13 EURO: 8,270.00

20-Mar-13 13-May-13

21-May-13 GBP: 3245.00

SEA

3-Sep-13

LC

Sea

ADV

Air

2-Apr-13

LC

Air

13-May-13

ADV

14-Jun-13

Sea

Material received at plantsite.


Date of shipment is 27 AUG 2013.

27-Aug-13

Technical Correspondance between Vendor & Plantsite /


Enduser till 27 -Jun-13 is in progress.

17-May-13 17-May-13

4-Mar-13

10-Apr-13

10-Apr-13

18-Apr-13

27-May-13 USD: 22,468.00

4-Mar-13

7-Mar-13

7-Mar-13

8-Mar-13

20-Mar-13 EURO: 29,075.00

4-Mar-13

27-Mar-13

27-Mar-13

22-Apr-13

4-Mar-13

3-Apr-13

3-Apr-13

11-Apr-13

4-Mar-13

27-Mar-13

27-Mar-13

9-Apr-13

4-Mar-13

4-Mar-13

27-Feb-13

27-Feb-13

1
2
3
4
5
6
7
8
9
10
11

3-May-13

ADV

23-Apr-13

30-Apr-13

2-May-13

2-May-13

LC

Air

12-Aug-13
11-Jul-13

LC

Sea

ADV

Air

24-Apr-13 GBP: 8339.00

LC

Air

31-Jul-13

24-Apr-13 EUR: 28525.52

LC

Sea

14-Aug-13

7-May-13

EURO: 3093.20

8-May-13 -

27-May-13 14-May-13 30-May-13

Date of shipemt is 12 Aug 13.


LC Amendments are under process with the vendor
dated 12 Jun 13.
Date of shipment is 11 Jul 13.
27-Jun-13

Material recevied and despatched on 7 Jun 13.


Date of Shipment is 7 Jul 2013.
OA Mail sent to vendor on 25 Apr 2013.
Date of shipment is 14 Aug 2013.

TR

CAN
DP

MS
MR
MR
SDA

TR

SDA
SDA

MR
SDA
SDA

3-Apr-13

3-Apr-13

6-Jun-13 -

21-Jun-13

21-Jun-13

26-Jun-13 EUR: 4161.75

ADV

Air

27-Jun-13 -

31 jun 2013

PO
Case was sent to Fin HO on 04 Jul 13 for making adv
payment. OA mail sent to vendor on 04 Jul 13.

51

SUMMARY

20-Mar-13

14-May-13 EURO: 4364

Case sent to Fin dept for advance payment on 27 Jun 13.


OA mail sent to vendor on 27 Jun 13.

4502002698
4502002713

S/No

19-Apr-13

Case sent toi Fin Ho for advance payment on 15 May


2013.
OA mail sent to vendor on 15 May 2013.
Technical Correspondance between Vendor & Plantsite /
Enduser till 11-Jul-13 is in progress.
Due date for technical review is 01-May-13.
Technical acceptance received on 05 Jul 2013.
Email sent to vendor on 09 Jul 2013 that provide revised
quotation as per our request.
Reminder sent on 12 Jul 2013.
Material shipped 30-Jun-13
C&F to confirm arrival of material
Case was sent to Fin HO on 27 Feb 13 for making adv
payment through credit card.

13-May-13 13-May-13 22-May-13 -

1-Mar-13

1-Mar-13

7-Mar-13

1-Mar-13

1-Mar-13

1-Apr-13

23-May-13 27-May-13

7-Jun-13

EURO: 135,258.52

7-May-13

EURO: 2,900,000.00

27-Mar-13

EURO: 2,024.00

LC

Sea

LC

BY SEA

ADV

Air

11-Jun-13

25-Aug-13

Case sent to Fin Ho for establishment of LC on 11 Jun 13.


OA mail sent to vendor on 11 Jun 13.
Draft LC send to vendor on 25 Jun 13.

PO

5-Aug-14

Date of shipment is 5-Aug-14

SDA

Material received and despatched tp plantsite on 7 Jun


13.
Technical review received from plant on 1 Apr 2013.
plant has been requested to contact Local purchase
section because the vendor has quoted pricesin PKR vide
our mail dated 2 Apr 2013. Case being processed
through local.

MR

CAN

LEAD TIME TRACKING GM


MAR -2013
Receipt of
Tech
Revised PR
Review Revised PR
approved
if
from
on
Plantsite
on
14-May-13

CST
initiated
on

SAP PR No

SAP PO NO

1267000088

4502002616

1-Mar-13

NORMAL

NP Wireless Load Cells

5-Mar-13

9-May-13

9-May-13

1361000018

1-Mar-13

NORMAL

NP Sodium Hypochlorite

5-Mar-13

17-Apr-13

17-Apr-13

1252000273

1-Mar-13

NORMAL

NP Governor Type 505

5-Mar-13

10-Apr-13

10-Apr-13

19-Apr-13

1252000314

4502002649

1-Mar-13

NORMAL

5-Mar-13

30-Apr-13

30-Apr-13

23-May-13

1248000608

4502002556

1-Mar-13

URGENT

4-Mar-13

19-Apr-13

19-Apr-13

24-Apr-13

1248000607

4502002613

1-Mar-13

URGENT

4-Mar-13

22-Apr-13

22-Apr-13

25-Apr-13

1248000611

4502002450

1-Mar-13

NORMAL

5-Mar-13

11-Mar-13

11-Mar-13

13-Mar-13

1252000330

4502002480

1-Mar-13

URGENT

Combustible Sensor

4-Mar-13

6-Mar-13

6-Mar-13

9-Mar-13

1-Apr-13

1252000327

4502002548

4-Mar-13

NORMAL

SENSOR REMOTE
OXYGEN

5-Mar-13

6-Mar-13

6-Mar-13

5-Apr-13

2-May-13

P/NP

Description

Spares for Foxbord DCS


System
Sleeve Dryflex(Maag
Type Dryflex28)
Spares for DBZ
Couplings
Spares for pump
assembly

CST signed
by SM-P

Commerci
Complete
al e,ail
response
sent to
received on
vendor on

Sr No.

Priority

RFQ sent to vendor Quotation


on
received on

Quotation
sent to
Plantsite on

Date of
Receipt

PO issued
on

Value in Foreign
Currency

29-May-13 GBP: 1975.91

LC / ADV

Mode of
Shipment

ADV

Sea

Minute sheet sent to MD on 11 Jul 2013 for approval.


10-Jun-13 USD: 32,532.00
26-Apr-13

2-May-13

3-May-13

3-May-13

LC

Air

ADV

Air

21-May-13 USD: 429.78

ADV

Air

21-Mar-13 EURO: 1,150.00

ADV

Air

USD: 1,704.00

ADV

Air

USD: 3408.00

ADV

Air

7-May-13

chf: 694.00

Material desptached to plantsite on 10 Jul 13 by C&F


Khi.

11-Mar-13

3-Apr-13

3-Apr-13

18-Apr-13

19-Jun-13 USD: 15,425.00

LC

Air

NP Pressure Switches

11-Mar-13

3-Apr-13

3-Apr-13

11-Apr-13

NP Liquid Level Controller

11-Mar-13

3-Apr-13

3-Apr-13

15-Apr-13

NP Solenoid Valves

12-Mar-13

10-Apr-13

10-Apr-13

Universal Brush/ Spring


Assemblies

12-Mar-13

17-Apr-13

17-Apr-13

Seal Shaft gear Box

13-Mar-13

19-Mar-13

19-Mar-13

21-Mar-13

2-May-13

EURO: 2508.36

ADV

Air

NP

Spare Hydraulic Oil


Pump

13-Mar-13

19-Mar-13

19-Mar-13

21-Jun-13

9-Jul-13

EURO: 39200.00

LC

SEA

18-Mar-13 USD: 2,897.00

ADV

20-Mar-13 USD: 215.10

Received

1-Apr

1-Apr

19-Apr-13

21-Mar-13

19-Apr-13

19-Apr-13

24-Apr-13

13

1252000334

4502002560

8-Mar-13

NORMAL

14

1252000335

4502002549

8-Mar-13

NORMAL

15

1252000302

11-Mar-13

Urgent

16

1264000015

8-Mar-13

NORMAL

17

1248000614

4502002545

12-Mar-13

NORMAL

18

1267000078

4502002728

13-Mar-13

Normal

NP

Spares for oil Purifiers

WoodWard Current
Pressure

19

1349000048

4502002432

8-Mar-13

NORMAL

SUBSCRIPTION OF 3
USERS ENTERPRISE
LICENSE OF SAP PRESS
WEB SITE

20

1362000035

4502002444

8-Mar-13

NORMAL

HYDROCARBON
PROCESSING MAGAZINE

21

1248000615

4502002584

19-Mar-13

NORMAL

4th Stage Cycliner

22

1248000618

4502002593

19-Mar-13

NORMAL

MECHANICAL SEALS
FOR P-902 A/B

24-Apr-13 15-Apr-13 30-Apr-13

2-May-13

2-May-13

7-May-13

EURO: 1,050.00

ADV

Air

2-May-13

EURO: 1845.84

ADV

Air

Latest Date of shipment is 15 July 2013.


Vendor has been provided revised PO on 20 Jun 13.

SDA

21-May-13 EURO: 1,672.00

ADV

Air

Date of shipment is 13 Aug 2013.

SDA

24-Apr-13

24-Apr-13

3-May-13

10-Jun-13 USD: 7,650.00

LC

SEA

21-Mar-13

17-Apr-13

17-Apr-13

7-May-13

6-Jun-13

EUR: 18070

LC

Air

25

1252000340

4502002726

20-Mar-13

NORMAL

NP Weather Proof Sockets

21-Mar-13

3-Jun-13

3-Jun-13

5-Jun-13

9-Jul-13

EURO: 2342.50

ADV

Air

26

1248000622

4502002632

20-Mar-13

NORMAL

NP Diaphragm Valves

21-Mar-13

17-Apr-13

17-Apr-13

30-Apr-13

6-Jun-13

EURO: 2485.75

ADV

Air

27

1267000079

4502002563

19-Mar-13

NORMAL

Atomizing Air
Compressor

22-Mar-13

24-Apr-13

24-Apr-13

29-Apr-13

8-May-13

EURO: 161,600.00

ADV

Air

Packing for Hydraulic

NORMAL

1267000089

34

1270000010

4502002692

26-Mar-13

Urgent

20-Mar-13

NORMAL

Spares for steam


Turbine

27-Mar-13

8-May-13

8-May-13

22-May-13

27-Mar-13

29-Mar-13

29-Mar-13

5-Apr-13

NP Needle Valves

27-Mar-13

10-Apr-13

10-Apr-13

16-May-13

NP Crank/ Pre_Lube

27-Mar-13

30-May-13 30-May-13

Indentor for Standard


NP
Dial Durometer

27-Mar-13

29-Apr-13

NP Butterfly Control Valves

29-May-13

29-Apr-13

7-May-13
20-Jun-13

TR

Air

21-Mar-13

Urgent

MS
CAN

ADV

Shut Down Control


Valve

26-Mar-13

MR

16-May-13 EURO: 797.19

NP

PO

MR

Urgent

MR

Magazine received and send to Plantsite via TCS on 14


Jun 13.

NORMAL

20-Jun-13

SDP

Internet

19-Mar-13

13-Jun-13

MS

ADV

19-Mar-13

Service Contract for


Maintenance Support of
OTS

11-Jun-13

MR

MR

4502002635

20-May-13

ED
MR

Material received.

4502002651

NORMAL

MS

Internet

4801000059

8-Mar-13

DP
SDA

MR

5401000314

8-May-13

Vendor fail to supply the material as per agreed


specification of the material. Plantsite has requested to
order the material to other vendor vide their email
dated 7-Jul-13
Material despatched on 20 Jun 13.
Material shipped on 4-Jul-13
C&F to confirm arrival of material
PR cancelled by plantsite on 06 May 2013.
Technical Correspondance between Vendor & Plantsite /
Enduser till 12-Jul-13 is in progress.

TR

Material received at plantsite.


Case was sent to Fin HO for LC establishment on 11-Jul13
OA mail sent to vendor on 11-Jul-13

24

33

NP Helium Gas

15-Apr-13

23

26-Mar-13

Material shipped on 22 May 2013.


Arrived at LHR as informed by C&F on 20 Jun 13.
Date of shipment is 30 Jun 13.
OA mail sent to vendor on 30 May 2013.
Material dispatched as 10 May 13 as informed by C&F
on 20 Jun 13.
Material dispatched as 21 May 13 as informed by C&F
on 20 Jun 13.
Material shipped on 20 Jun 13.
C&F to confirm arrival of material.

22-May-13 20-Jun-13

Air

NP

1252000338

2-Jul-13

ADV

NORMAL

32

14-May-13 20-May-13

EURO: 2,200.00

8-Mar-13

Urgent

10-May-13

9-May-13

4502002676

26-Mar-13

8-May-13

30-Apr-13

1252000328

4502002641

Date of shipment is 21 Oct 13.

11-Mar-13

12

1252000337

MR

11-Mar-13

Spares for Pump p-135


NP A-B, P-4307 and P-4322
A/B(OMG)

31

Material despatched on 27 Jun 13.


Technical Correspondance between Vendor & Plantsite /
Enduser till 09-Jul-13 is in progress.

5-Mar-13

URGENT

NORMAL

TAG

Air

4-Mar-13

26-Mar-13

Status

ADV

4502002575

4502002499

Total
Period

EURO: 19807.80

1248000567

1248000616

Files
Closed

3-May-13

11

30

RM
Materials
Karachi
Materials
MER
received
Materials received at received
at RM
shipped Platsite on
on
Karachi on
on

23-Apr-13

NORMAL

4502002690,
4502002691

Materials
shipped on

3-Apr-13

4-Mar-13

1248000612

Date of
Shipment

3-Apr-13

4502002553

29

Payment
issued on

5-Mar-13

1248000610

1272000025

Technical
query
Case
received
finalized on
fron vendor
if

Date of shipment is 31 May 2013.


For shipment status email sent to vendor on 7 Jun 2013.
Last reminder given on 18 Jun 13.
Vendor replied on 18 Jun 13 and informed that they will
update us.
Last reminder given on 28 Jun 13.

10

28

Email sent
to vendor
for OA on

1-Jul-13

EURO: 7887.35

15-Apr-13 EURO: 3,963.31

7-Jun-13

USD: 3676.20

24-Jun-13 USD: 410.00


28-Jun-13

Material shipped on 9-Jul-13


C&F to confirm arrival of material
Case sent to Fin Dept for establishment of LC on 27 Jun
13.
Case was sent to Fin HO for making adv payment on 10Jul-13
OA mail sent to vendor on 10-Jul-13
Date of shipment is 10 July 13
OA mail sent to vendor on 10 Jun 13.

PO

MS
PO
PO
SDA

Date of shipment is 19 Feb 2014.

SDA

Email sent to vendor on 03 May 2013 for Double


Taxation Treaty. Vendor response received on 06 May
2013. Same reply sent to Fin HO on 08 May 2013. Fin HO
provide feedback on vendor reply on 14 May 2013. Proc
HO email sent to plantsite on 14 May 2013 for review.
Reminder sent to plantsite on 16 May, 21 May, 23 May
& 27 May 2013.
Email sent to plantsite on 11 Jun 2013 that provide your
consent on Fin HO email.
Reminder sent on 16 Jun, 24 Jun, 28 Jun, 01 Jul 2013.

DP

Air

Case sent to Fin HO on 01 Jul1 3 for making adv


payment.

PO

ADV

Air

Case was sent to Fin HO on 16 Apr 13 for making adv


payment.
Delivery date provided by the vendor was 19 weeks. So,
as per SBP policy payment was not possible.
Reminder given to Fin Dept on 5 Jun 2013 regarding
payment.

PO

ADV

Air

ADV

ADV

Air

Date of shipment is 10 Jul 13.


OA mail sent to vendor on 10 Jun 13.
Due date for technical review was 27-Jun-13.
Technical Correspondance between Vendor & Plantsite /
Enduser till 28-Jun-13 is in progress.
Material has been shipped on 8 Jul 2013.
C&F to confirm arrival of material.
CST sent to IA and FIN HO on 11 Jul 2013 for signing..

SDA
TR

MS
DP

35
36

1248000628
1252000341

4502002672
4502002599

28-Mar-13
28-Mar-13

NORMAL
NORMAL

37

1248000613

4502002739

28-Mar-13

NORMAL

NP O-rings
NP Pressure Gauges
Belt Conveyor for Urea
NP
Recycle

29-Mar-13
29-Mar-13

8-May-13
24-Apr-13

8-May-13
24-Apr-13

21-May-13
30-Apr-13

29-Mar-13

24-Apr-13

24-Apr-13

7-Jun-13

18-Jun-13 GBP: 1368.51


23-May-13 EURO: 675.77
12-Jul-13

EURO: 7875.00

ADV
ADV

Air
AIR

Shipment date is 26-Jul-13


Date of shipment is 10 July 13.

SDA

LC

SEA

PO is under signing process.

PO
DP

ED

38

1248000627

28-Mar-13

NORMAL

NP Chequered/Smooth

29-Mar-13

24-Apr-13

24-Apr-13

3-Jun-13

CST signed by SM-P on 10 Jul 2013.


Email sent to vendor on 11 Jul 2013 for L/C charges,
DLD, demurrage charges & validity.

39

1264000014

28-Mar-13

NORMAL

NP Metane Gas Analyzer

29-Mar-13

30-May-13 30-May-13

25-Jun-13

Technical acceptance received on 25 Jun 2013.


CST sent to IA and FIN HO on 02 Jul 2013 for signing.

DP

40

1252000343

28-Mar-13

NORMAL

Spare for Bomafa Steam


let

Email sent to plantsite for Revision of PR alongwith CBD


& quotation on 21-Jun-13.
Revised PR was initiated on 21-Jun-2013.
Revised PR is held with Mngr Fin (GM) since 05-Jul-2013
for review.

REV

41

1248000606

28-Mar-13

Urgent

Mech. Seal & Spares

Case was sent to FIN HO on 04 Jul 13 for L/C


establishment. OA mail sent to vendor on 04 Jul 13.

PO

4502002707

SUMMARY

S/No

TAG

1
2
3
4
5
6
7
8
9
10
11

Total PR
RFQ
T/R
REV
DP
PO
SA
SDP
MS
MR
FC

29-Mar-13

29 Mar 2013

4-Jun-13

4-Jun-13

20-Jun-13

18-Apr-13

18-Apr-13

27-May-13

1-Jul-13

USD: 36726.52

LC

Air

LEAD TIME TRACKING GM


APR -2013
SAP PO NO

Date of
Receipt

Priority

P/NP

NP

Sr No.

SAP PR No

1248000605

2-Apr-13

Urgent

1248000629

2-Apr-13

NORMAL

NP Structural Steel

1270000016

2-Apr-13

NORMAL

NP

1365000001

4502002626

2-Apr-13

Urgent

5401000320

4502002663

2-Apr-13

NORMAL

1157000005

4502002484

3-Apr-13

NORMAL

1361000020

2-Apr-13

Urgent

Description

Square/Round/Solid
Bars

Thermowell and
Weldolet for TI-41015

RFQ sent to
vendor on

Quotation
received on

Quotation
sent to
Plantsite on

Receipt of
Tech
Revised PR
Review Revised PR
approved
if
from
on
Plantsite
on

CST
initiated
on

CST signed
by SM-P

Commerci
Complete
al e,ail
response
sent to
received on
vendor on

PO issued
on

Value in Foreign
Currency

Mode of
Shipment

Email sent
to vendor
for OA on

Technical
query
Case
received
finalized on
fron vendor
if

Payment
issued on

Date of
Shipment

Materials
shipped on

RM
Materials
Karachi
Materials
MER
received
Materials received at received
at RM
shipped Platsite on
on
Karachi on
on

Files
Closed

Total
Period

Status

2-Apr-13

15-May-13 15-May-13

2-Apr-13

24-Apr-13

24-Apr-13

Technical acceptance received on 19 Jun 2013.


Email sent to vendor on 21 Jun 2013 for quotation.
Technical Correspondance between Vendor & Plantsite /
Enduser till 08 -Jul-13 is in progress.

11-Jun-13

28-Jun-13

28-Jun-13

Due date for technical review is 28-Jul-13.

19-Jun-13

NP Chemicals

2-Apr-13

8-May-13

8-May-13

15-May-13

3-Jun-13

NP Potassium Carbonate

2-Apr-13

8-May-13

8-May-13

28-May-13

14-Jun-13 USD: 65,520.00

ICIS - PRICING MARKET


OUTLOOK REPORT

Monolithic insulating
joints for BMR-NG
compression Facilities
Phase III (Part-1)

26-Jun-13

NP

LC / ADV

3-Apr-13

GBP: 2800

USD: 3.250.00

ADV

Sea/Air

1-Jul-13

LC

Sea

30-Aug-13

ADV

Air

17-Apr-13

Material shipped on 4-Jul-13


C&F to confirm arrival of material
Case sent to Fin Dept on 19 Jun 13 for establishment of
LC.
OA mail sent o vendor on 19 Jun 13.
Account has been renewed as informed by vendor dated
29 May 2013.

RFQ Refloated to on 25.06.2013.

TAG

DP
TR

TR
MS

PO

MR

RFQ

Case sent to Fin Ho for advance payment on 4 Jun 2013.


OA Mail sent to vendor on 4 Jun 2013.
8

1248000626

1366000006

10

1248000624

11
12

4502002625

9-Apr-13

Normal

NP Round Solid Bars

9-Apr-13

Normal

NP

4502002525

12-Apr-13

Urgent

5401000337

4502002648

12-Apr-13

Normal

1248000625

4502002730

12-Apr-13

Urgent

Scott SCBA with Talk


Around System

Liner Bearing for new


rotor
Vandadium Pentaoxide
NP
Chemical
P

NP Abestos free Cloth

8-May-13

8-May-13

16-May-13

12-Apr-13

8-May-13

8-May-13

24-May-13

16-Apr-13

16-Apr-13

15 Apr 2013
29 Apr 2013
15 Apr 2013
6 May 2013
15 Apr 2013
29 Apr 2013

3-Jun-13

LC

AIR

9/11/2013

10-Jun-13 EURO: 28,200.00

LC

Sea

8-Jul-13

8-May-13

10-Jul-13

ADV

SEA

8-May-13

12-Jun-13

ADV

Air

20-Jun-13

Date of shipment is 20 Jun 2013.


For shippment status email sent to vendor on 28 Jun 13.
Vendor replied on 28 and informed that material is
ready for despatch. However they are waiting for the
collector.

17-Apr-13

17-Apr-13

22-Apr-13

9-May-13

15

1270000045

9-Apr-13

Urgent

TG-701 Control System

19 Apr 2013
10 May 2013

7-May-13

7-May-13

10-Jun-13

25-Jun-13

16

1248000621

18-Apr-13

NORMAL

NP

Spares for Hydraulic


Rough

19 Apr 2013
10 May 2013

15-May-13 15-May-13 29-May-13

NP Hand Held Tachnometer

19 Apr 2013
10 May 2013

23-May-13 23-May-13 29-May-13

19-Apr-13

NORMAL

NP Side Entry System

23-Apr-13
14-May-13

19-Apr-13

NORMAL

NP Books

22-Apr-13
13-May-13

25-Apr-13

NORMAL

21

1267000096

26-Apr-13

Urgent

22

23
24

1267000094

24-Apr-13

1248000633
1248000634

26-Apr-13
4502002686

26-Apr-13

NORMAL

USD: 840.00

ADV

Air

1-Jul-13

DP

Books Case

PO

Email sent to plantsite for Revision of PR alongwith CBD


& quotation on 12-Jun-13.
Reminder sent on 16 Jun & 24 Jun 2013.

TR

23-May-13 23-May-13

TR

29 Apr 2013
20 May 2013

23-May-13 23-May-13

12-Jun-13

Email sent to plantsite for Revision of PR alongwith CBD


& quotation on 02-Jul-13.

REV

29 Apr 2013
20 May 2013

23-May-13 23-May-13

10-Jun-13

Date of shipment is 16 Sep13

SDA

NP Hydraulic Bolt Tensioner


Mineral Fiber Blanket
(Rock Wool)

NP

NORMAL

Check Valve /
NP
Diaphragm Valve

29 Apr 2013
20 May 2013

29 Apr 2013
20 May 2013

26-Apr-13

NORMAL

NP

Fixed Scaffolding
Couper

29 Apr 2013
20 May 2013

Spares for Steam


Turbine

29 Apr 2013
13 May 2013

Normal

3-Jun-13

ED

Technical acceptance received on 28 Jun 2013.


CST sent to IA and FIN HO on 02 Jul 2013 for signing.

Technical Correspondance between Vendor & Plantsite /


Enduser till 11 -Jul-13 is in progress.

1248000631

26-Apr-13

28-Jun-13

Date of shipment is 24 Jul 13.

Technical Correspondance between Vendor & Plantsite /


Enduser till 08 -Jul-13 is in progress.

26

4512000054

24-Jul-13

23-May-13 23-May-13

NP Control Valve Body

1277000169

AIR

29 Apr 2013
13 May 2013

NORMAL

28

4-Jun-13

ADV

DP

NP Pressure Testing Pump

NORMAL

urgent

18-Jun-13 USD: 1141.76

PO

23-May-13 23-May-13

24-Apr-13

26-Apr-13

23-May-13 23-May-13 24-May-13

Technical acceptance received on 10 Jun 2013.


Case in progress.
CST signed by SM-P on 10 Jul 2013.
Email sent to vendor on 11 Jul 2013 for L/C charges,
DLD, demurrage charges & validity.

26 Apr 2013
17 May 2013

1270000062

1248000609

23-May-13 23-May-13

USD: 5,030.00

NP Low Finned Tubes

25

27

SDP

7/11/2013

16 Apr 2013
07 May 2013

1361000016

PO

Courier

Spares for bently


nevada system

20

PO

ADV

4502002624

PO is under signing process.

6/20/2013 USD: 1145.55

NORMAL

1268000036

14-Aug-13

15-May-13

16-Apr-13

19

SDA

SDA

8-May-13

4502002574

CAN

Material shipped on 12-Jul-13


C&F to confirm arrival of material

8-May-13

1252000333

1366000005

GBP: 6152.00

RFQ

Date of shipment is 11 Sep 13.

Case sent to Fin Ho for advance payment on 24 Jun 13.


OA mail sent to vendor on 24 Jun 13.

14

18

PO is to be cancelled for JAC and RFQ will be floated to


other vendors.
RFQ Refloated to varius vender on 10 Jul 2013.

15 Apr 2013
6 May 2013

Normal

NORMAL

10-Jun-13

4/24/2013 EURO: 20075.84

12-Apr-13

18-Apr-13

Sea

17-Apr-13

4502002687

4502002671

ADV

15-May-13 15-May-13 21-May-13

1267000034

1267000061

GBP: 660.00

CASE CLOSED
Plantsite will process this case through Local
Procurement

13

17

NP Spares for Areal Lift

10-Jul-13

Installation &
P Commission of Analysis
work Station
Electrode Assy for
P
Combustion
Junction Boxes /
NP
Weather Proof

29

1252000350

4502002714

29-Apr-13

Normal

30

7990000004

4502002653

29-Apr-13

Normal

31

1362000052

4502002557

30-Apr-13

Urgent

32

1361000015

30-Apr-13

Normal

NP

RENEWAL OF HTRI XIST


SOFTWARE WITH ONE
SINGLE USER
SECURITY KEY
New Freon Condenser E2422

29 Apr 2013
20 May 2013
29 Apr 2013
20 May 2013

03 May 2013
24 May 2013

6-Jun-13

10-Jun-13

20-Jun-13 EURO: 3407.00

ADV

SEA

16-Sep-13

Due date for technical review was 04-Jul-13.


Technical Correspondance between Vendor & Plantsite /
Enduser till 12 -Jul-13 is in progress.

TR

7-Jun-13

Minute sheet sent to MD on 11 Jul 2013 for approval.

DP

9-Jul-13

Email sent to plantsite for Revision of PR alongwith CBD


& quotation on 11-Jul-13.

REV

6-Jun-13

23-May-13 23-May-13
31-May-13 31-May-13

2-May-13

USD: 2,745.00

ADV

7-May-13

7-May-13

27-May-13

2-Jul-13

USD: 2964.70

ADV

Air

10-Sep-13

11-Jun-13 EURO: 2894.50

ADV

Air

7-May-13

ADV

Air

23-May-13 23-May-13 27-May-13

30-May-13 30-May-13

REV

28-Jun-13

USD: 9,240.00

14-May-13

Case sent to Fin Ho for advance payment on 7 May


2013.
OA mail sent to vendor on 7 May 2013.
Case was sent to Fin HO on 04 Jul 13 for making adv
payment.
Material shipped on 2-Jul-13
C&F to confirm arrival of material
Date of shipment is 14 May 2013.
Email sent to vendor for renewal of software on 3 Jun
2013.
For confirmation of software reminder last reminder
given on 7 Jun 2013.
Last reminder given on 28 Jun 13.
CST sent to IA and FIN HO on 05 Jul 2013 for signing..

PO
PO
MS

SDP

DP

SUMMARY

S/No

TAG

1
2
3
4
5
6
7
8
9
10
11

Total PR
RFQ
T/R
REV
DP
PO
SA
SDP
MS
MR
FC

LEAD TIME TRACKING GM


MAY -2013
Sr No.

SAP PR No

7990000003

7990000006

3
4

SAP PO NO

4502002699

1261000028
1270000064

Date of Receipt

Priority

2-May-13

Normal

NP Ball / Gate / Globe Valves

2-May-13

Normal

NP

2-May-13
4502002719

3-May-13

P/NP

Description

CST signed
by SM-P

Commerci
Complete
al e,ail
response
sent to
received on
vendor on

PO issued
on

Value in
Foreign
Currency

LC / ADV

Mode of
Shipment

Email sent
to vendor
for OA on

Technical
query
Case
received
finalized on
fron vendor
if

Payment
issued on

Date of
Shipment

Materials
shipped on

RM
Materials
Karachi
Materials
MER
received
Materials received at received
at RM
shipped Platsite on
on
Karachi on
on

Files
Closed

Total
Period

Status

Email sent to plantsite for Revision of PR alongwith CBD


& quotation on 04-Jul-13.

30-May-13 30-May-13

4-Jun-13

Normal

New BFW Preheater E-501


NP
A

6-May-13

RFQ Floated

RFQ

Normal

Stator Rewedge Kit for 5A2


GE Generators

7-May-13

Case sent to Fin dept for advance payment on 05 Jul 13.


OA mail sent to vendor on 05 Jul 13.

PO

Due date for technical review was 27-Jun-13.


Technical Correspondance between Vendor & Plantsite /
Enduser till 04 -Jul-13 is in progress.

TR

Revised PR approved on 03 Jul 2013.


CST sent to IA and FIN HO on 03 Jul 2013 for signing.

DP

Due date for technical review is 08-Aug-13.

TR

1252000347

3-May-13

Normal

NP

1252000342
(R)
1248000342
(W)

3-May-13

Normal

1248000639

3-May-13

1248000635

10

1248000619

14-Jun-13

14-Jun-13

7-May-13

30-May-13 30-May-13

Temperature Gauges for


DSP

7-May-13

30-May-13 30-May-13

NP

Battery charger and


Battery

7-May-13

11-Jul-13

11-Jul-13

Normal

NP

Nozzle Spray (Spares for


Carbon)

7-May-13

28-Jun-13

28-Jun-13

3-May-13

Normal

NP V-Belts

7-May-13

30-May-13 30-May-13

3-May-13

Normal

NP

7-May-13

30-May-13 30-May-13

3-May-13

Normal

One Year Subscription for


NP Hydrocarbon Enginering
Magazine

13-May-13

Urgent

NP Gas Flow Meter Digital

Gasket-Manhole for Steam


Drum

24-Jun-13

6/26/2013 USD: 4773.00

4-Jul-13

USD: 7999.35

ADV

ADV

AIR

Air

17-Jul-13

1-Aug-13

5-Jun-13

Case sent to Fin dept for advance payment on 27 Jun 13.

Email sent to plantsite for Revision of PR alongwith CBD


& quotation on 10-Jul-13.

8-Jul-13

Revised PR approved on 10 Jun 2013.


CST sent to IA and FIN HO on 11 Jul 2013 for signing..

DP

Email sent to vendor for confirmation regarding


shipment of magazine .
Reminder given on 12 Jun 13 for shipment of magzine.
Vendor replied on 12 Jun and informed that we will
receive magzine in 1 week.
Reminder given on 28 Jun 13.

SDP

DP

9-May-13

EURO: 175.00

ADV

Air

23-May-13

14-May-13

14-Jun-13

14-Jun-13

CST sent to IA and FIN HO on 10 Jul 2013 for signing.

REV
DP

13-May-13

Normal

NP Pressure Gauges

14-May-13

6-Jun-13

6-Jun-13

3-Jul-13

14

1252000348

13-May-13

Normal

NP Solenoid valves

14-May-13

6-Jun-13

6-Jun-13

5-Jul-13

CST sent to IA and FIN HO on 10 Jul 2013 for signing.

16

13-May-13

Normal

NP Pressure gauges for Dsp

14-May-13

6-Jun-13

6-Jun-13

10-Jun-13

1248000640

13-May-13

Normal

NP Cartridge filer for FT - 301

14-May-13

6-Jun-13

6-Jun-13

21-Jun-13

17

1248000638

13-May-13

Normal

NP Gland Packing

18

1248000636

13-May-13

Normal

19

1248000642

20

1252000359

21

1252000363

22

1248000643

23

1252000368

4502002720

4502002731

Gland Packing

NP Power Supply Blades

17-May-13

12-Jun-13

12-Jun-13

16-Jun-13

14-May-13

Normal

NP Temperature Indicator

17-May-13

12-Jun-13

12-Jun-13

16-Jun-13

14-May-13

Urgent

NP

Glass coves for schuch


lighting fixtures

17-May-13

6-Jun-13

6-Jun-13

28-Jun-13

16-May-13

Normal

20-May-13

12-Jun-13

12-Jun-13

19-Jun-13

16-May-13

Normal

20-May-13

12-Jun-13

12-Jun-13

19-Jun-13

1252000369

16-May-13

Normal

25
26

1248000650
1248000649

17-May-13
17-May-13

NORMAL
NORMAL

27

1248000646

17-May-13

NORMAL

28

1252000344

17-May-13

NORMAL

29

1252000364

17-May-13

30
31

1252000361
1275000025

17-May-13
17-May-13

32

1252000332

17-May-13

Urgent

33

1252000329

17-May-13

Urgent

34

1252000366

17-May-13

NORMAL

35

1248000630

20-May-13

Urgent

36

1248000641

20-May-13

NORMAL

37

1248000648

20-May-13

NORMAL

4502002712

4502002704

EURO: 695.45

ADV

Air

13-Sep-13

16-May-13 16-May-13

Normal

24

5-Jul-13

24-Jun-13
14-May-13

14-May-13

NP Steel Wire Rope


Switch Micro Make
NP
Officine
Rosemount Smart
NP
Differental
NP shims (Stainless Steel)
NP Sight Glass for E-141

REV

2-Jul-13

1252000352

4502002723

PO

TR

13

1252000346

REV

Due date for technical review was 27-Jun-13.


Technical Correspondance between Vendor & Plantsite /
Enduser till 27 -Jun-13 is in progress.

Email sent to plantsite for Revision of PR alongwith CBD


& quotation on 05-Jul-13.

15

TAG

6-May-13

NP Thermistatic Valve for DSP

1275000037

CST
initiated
on

Spares for Bag Closing


Machine

Normal

12

Receipt of
Tech
Revised PR
Review Revised PR
approved
if
from
on
Plantsite
on
28-Jun-13

3-May-13

4502002577

Quotation
sent to
Plantsite on

30-May-13 30-May-13

1252000351

1362000060

Quotation
received on

6-May-13

11

RFQ sent to
vendor on

10-Jul-13

USD: 12568.11

LC

Sea

25-Sep-13

DP

Case sent to Fin dept for advance payment on 05 Jul 13.


OA mail sent to vendor on 05 Jul 13.

PO

Revised PR approved on 10 Jul 2013.


CST sent to IA and FIN HO on 10 Jul 2013 for signing.

DP

PO is under signing process.

PO

CST sent to IA and FIN HO on 05 Jul 2013 for signing..

DP

Case was sent to Fin HO on 04 Jul 13 for making adv


payment.
Due date for technical review is 26-Jul-13.
Due date for technical review is 18-Jul-13.

28-Jun-13
20-Jun-13

NP RUBBER IDLER FORME-112

20-May-13

12-Jun-13

12-Jun-13

16-Jun-13

Minute sheet sent to MD on 11 Jul 2013 for approval.

DP

NP Magnetic Pickups

20-May-13

20-Jun-13

20-Jun-13

3-Jul-13

CST sent to IA and FIN HO on 05 Jul 2013 for signing..

DP

NORMAL

NP Speed Sensing Switch

20-May-13

13-Jun-13

13-Jun-13

2-Jul-13

CST sent to IA and FIN HO on 11 Jul 2013 for signing..

DP

NORMAL
NORMAL

NP Masoneilan Level
NP Homogenizer

20-May-13
20-May-13

14-Jul-13
28-Jun-13

14-Jul-13
28-Jun-13

TR
TR

Fisher Control valves

20-May-13

30-May-13 30-May-13

Fisher Control valves

20-May-13

27-Jun-13

27-Jun-13

20-May-13

13-Jun-13

13-Jun-13

Due date for technical review is 01-Aug-13.


Due date for technical review is 26-Jul-13.
Case was sent to FIN HO on 01 Jul 13 for making adv
payment. OA mail sent to vendor on 01 Jul 13.
Due date for technical review is 25-Jul-13.
Technical Correspondance between Vendor & Plantsite /
Enduser till 11 -Jul-13 is in progress.

22-May-13

28-Jun-13

28-Jun-13

Due date for technical review is 19-Jul-13.

TR

22-May-13

28-Jun-13

28-Jun-13

Due date for technical review is 25-Jul-13.

TR

22-May-13

11-Jul-13

11-Jul-13

Due date for technical review is 08-Aug-13.

TR

Natural gas driven


Manway - urea Stripper, E
NP
101
Gasket Manhole for
NP
Carbamate

10-Jul-13

AIR

24-Sep-13

CST signed by SM-P on 02 Jul 2013.


Email sent to vendor on 02 Jul 2013 for bank charges,
bank detail, validity & port of shipment.
Reminder sent on 09 Jul 2013.
Vendor reply received on 11 Jul 2013.
APL & PO in Progress.

13-Jun-13

ADV

SEA

18-Jul-13

TR

28-Jun-13
20-Jun-13

27-Jun-13 USD: 7710.33

ADV

AIR

RFQ

13-Jun-13

USD: 1798.00

ADV

REV

20-May-13
20-May-13

4-Jun-13

2-Jul-13

USD: 826.22

PO

20-May-13

NP Masoneilan Level

19-Jun-13

4-Jul-13

Case was sent to Fin HO for making adv payment on 8Jul-13


Email sent to plantsite for Revision of PR alongwith CBD
& quotation on 26-Jun-13.
Revised PR was initiated on 28-Jun-2013.
Revised PR is held with DM-TS since 02-Jul-2013 for
review.
RFQ Re-floated on 24-Jun-2013.
Technical Correspondance between Vendor & Plantsite /
Enduser till 08 -Jul-13 is in progress.

17-Oct-13

PO
TR
TR

PO
TR
TR

MACHANICAL SEAL for p4103

38

1248000653

20-May-13

NORMAL

39

1248000654

20-May-13

NORMAL

40

1275000033

20-May-13

Urgent

NP

41
42

7990000005
7990000009

20-May-13
20-May-13

NORMAL
NORMAL

NP
NP

43

1248000656

21-May-13

NORMAL

NP

44

1248000657

22-May-13

NORMAL

NP

45

1252000370

24-May-13

NORMAL

NP

46

1252000367

24-May-13

NORMAL

NP Air Filter Regulators

Coupling Hydraulic
Opacity Meter-Emission
Analyzer
NUTS / BOLTS
Quick Lock Coupling
Pillow Blocks / Bearing for
Aux Drive Shafts for K1501 A/B/C
Structural Steel
Indicator pressure /
Temprature

22-May-13

13-Jun-13

13-Jun-13

22-May-13

27-Jun-13

27-Jun-13

Revised PR approved on 10 Jul 2013.


Email sent to vendor on 10 Jul 2013 for L/C charges,
bank detail & validity.
Vendor reply received on 11 Jul 2013.
PO in Progress.
Due date for technical review is 25-Jul-13.

22-May-13

11-Jul-13

11-Jul-13

Due date for technical review is 01-Aug-13.

TR

22-May-13
22-May-13

20-Jun-13
20-Jun-13

20-Jun-13
20-Jun-13

TR
TR

23-May-13

20-Jun-13

20-Jun-13

24-May-13

20-Jun-13

20-Jun-13

27-May-13

14-Jul-13

14-Jul-13

Due date for technical review is 18-Jul-13.


Due date for technical review is 18-Jul-13.
Technical acceptance received on 08 Jul 2013.
Email sent to vendor on 09 Jul 2013 for revised
quotation as per our request.
Due date for technical review is 18-Jul-13.
Technical acceptance received on 12 Jul 2013.
CST and CBD in Progress.

27-May-13

20-Jun-13

20-Jun-13

CST sent to IA and FIN HO on 02 Jul 2013 for signing.

DP
DP

28-Jun-13

DP

TR

DP
TR
DP

47

1252000356

24-May-13

NORMAL

NP Air Filter Regulators

27-May-13

28-Jun-13

28-Jun-13

3-Jul-13

Revised PR approved on 10 Jun 2013.


CST sent to IA and FIN HO on 11 Jul 2013 for signing..

48

1248000645

27-May-13

NORMAL

NP Double Type Gaskets

29-May-13

20-Jun-13

20-Jun-13

9-Jul-13

CST sent to IA and FIN HO on 11 Jul 2013 for signing..

DP

49

1252000371

27-May-13

NORMAL

29-May-13

28-Jun-13

28-Jun-13

Due date for technical review is 26-Jul-13.

TR

50

1252000372

27-May-13

NORMAL

29-May-13

20-Jun-13

20-Jun-13

Due date for technical review is 18-Jul-13.

TR

51

1267000110

27-May-13

NORMAL

NP Electrode for PH Meter


Complete Pneumatic
NP
Positioner
P Syn Turbine TK - 0431

29-May-13

30-May-13 30-May-13 31-May-13

SDA

52

7990000012

28-May-13

Urgent

NP POTASSIUM NITRITE KNO2

30-May-13

20-Jun-13

20-Jun-13

Date of shipment is 20 July 13.


CST signed by SM-P on 10 Jul 2013.
Email sent to vendor on 11 Jul 2013 for L/C charges,
DLD, demurrage charges & validity.

SPARES FOR PORTABLE


NP
IGNITER

30-May-13

14-Jul-13

14-Jul-13

Due date for technical review is 01-Aug-13.

TR

Date of shipment is 10 July 13.


OA mail sent tio vendor on 3 Jun 2013.

SDA

53

4502002629

1270000081

54

1362000062

55
56

29-May-13
4502002623

NORMAL

Revewal of Hydrocarbon
Processing Magazine

29-May-13

NORMAL

1261000020

30-May-13

NORMAL

NP Globe / check valves

1261000033

30-May-13

NORMAL

NP Compelete Valve Assy

57

1248000668

30-May-13

NORMAL

NP Pressure Swithches

58

7980000001

30-May-13

NORMAL

NP

59

1248000658

31-May-13

Urgent

60

1248000660

31-May-13

NORMAL

61
62

1252000376

31-May-13

1252000377

31-May-13

SUMMARY

S/No

TAG

1
2
3
4
5
6
7
8
9
10
11

Total PR
RFQ
T/R
REV
DP
PO
SA
SDP
MS
MR
FC

NORMAL
NORMAL

Gasket Flat Ring For Y Type


Stainer

NP Greases
NP PSV AT D/S
LUBRICATING FLUIDS &
NP LAPING LIQUIDS FOR
LAPING MACHINES
Motor Driven Barrel Pump
NP
For OIL Transfer

31 May 2013
31 May 2013

31 May 2013

31 May 2013

31 May 2013
31 May 2013
31 May 2013
31 May 2013

4-Jun-13

3-Jun-13

EURO: 3153.89

USD: 215.10

ADV

ADV

AIR

Air

3-Sep-13

17-Jun-13

DP

28-Jun-13

28-Jun-13

Due date for technical review is 26-Jul-13.

TR

28-Jun-13

28-Jun-13

Due date for technical review is 26-Jul-13.

TR

27-Jun-13

27-Jun-13

8-Jul-13

Technical acceptance received on 08 Jul 2013.


Email sent to vendor on 09 Jul 2013 for freight charges.
Reminder sent on 12 Jul 2013.

DP

4-Jul-13

4-Jul-13

10-Jul-13

Technical acceptance received on 08 Jul 2013.


Email sent to vendor on 09 Jul 2013 for freight charges.
Reminder sent on 12 Jul 2013.

DP

4-Jul-13

4-Jul-13

Due date for technical review is 25-Jul-13.

TR

11-Jul-13

11-Jul-13

Due date for technical review is 08-Aug-13.

TR

27-Jun-13

27-Jun-13

Due date for technical review is 25-Jul-13.

TR

27-Jun-13

27-Jun-13

Due date for technical review is 25-Jul-13.

TR

LEAD TIME TRACKING GM


JUN -2013
SAP PO NO

Date of
Receipt

Priority

Sr No.

SAP PR No

1251000385

28-Jun-13

NORMAL

1248000669

3-Jun-13

NORMAL

1248000665

3-Jun-13

NORMAL

1248000664

3-Jun-13

T/A-2013

1248000662

3-Jun-13

T/A-2013

1270000076

3-Jun-13

Urgent

NP

1252000373

3-Jun-13

NORMAL

7980000000

3-Jun-13

NORMAL

1252000375

3-Jun-13

10

5401000341

11
12
13

4502002685

P/NP

Description

Spares for Maoneilan


p
Valves
NP Stick Lubricant
Sealant for Leaking
P through Flanges / Pipe
Fittings
Nut, Head Bolts / Stud,
NP
Nut Cover

Quotation
sent to
Plantsite on

5-Jun-13

27-Jun-13

27-Jun-13

5-Jun-13

12-Jun-13

12-Jun-13

5-Jun-13

14-Jun-13

14-Jun-13

RFQ sent to vendor on

Receipt of
Tech
Revised PR
Review Revised PR
approved
if
from
on
Plantsite
on

CST
initiated
on

CST signed
by SM-P

Commerci
Complete
al e,ail
response
sent to
received on
vendor on

PO issued
on

Value in Foreign
Mode of
LC / ADV
Currency
Shipment

Email sent
to vendor
for OA on

Technical
query
Case
received
finalized on
fron vendor
if

Payment
issued on

Date of
Shipment

1-Jul-13

Materials
shipped on

RM
Materials
Karachi
Materials
MER
received
Materials received at received
at RM
shipped Platsite on
on
Karachi on
on

Files
Closed

Total
Period

Status

RFQ Floated

14-Jun-13

6/20/2013 USD: 9230.00

ADV

AIR

4-Jul-13

10-Jul-13

TAG

RFQ

Due date for technical review is 25-Jul-13.

TR

Material shipped on 5-Jul-13


C&F to confirm arrival of material

MS

Due date for technical review is 01-Aug-13.

TR

5-Jun-13

27-Jun-13

27-Jun-13

CST sent to IA and FIN HO on 11 Jul 2013 for signing..

DP

High Pressure Orifice


Plates

5-Jun-13

14-Jul-13

14-Jul-13

Due date for technical review is 25-Jul-13.

TR

Valve - Solenoids Assy.

10-Jun-13

14-Jun-13

14-Jun-13

Due date for technical review is 12-Jul-13.

TR

NP Bolck / Globe Valves

5-Jun-13

4-Jul-13

4-Jul-13

Due date for technical review is 01-Aug-13.

TR

NORMAL

NP Portable Analyzer Spare

5-Jun-13

4-Jul-13

4-Jul-13

Due date for technical review is 01-Aug-13.

3-Jun-13

NORMAL

NP Trisodium Phosphate

5-Jun-13

1248000647

3-Jun-13

NORMAL

NP Gaskets / O-Rings

5-Jun-13

7990000007
1252000360

4-Jun-13
4-Jun-13

NORMAL
NORMAL

6-Jun-13
6-Jun-13

4-Jul-13
11-Jul-13

4-Jul-13
11-Jul-13

14

1252000365

4-Jun-13

NORMAL

6-Jun-13

4-Jul-13

4-Jul-13

15

1248000652

4-Jun-13

NORMAL

6-Jun-13

14-Jun-13

14-Jun-13

16

1252000374

4-Jun-13

NORMAL

NP Plates
NP Instrument Cables
Complete Unit Amplifier
NP
/ Valve
Spares for Pulsation
p
Damper
Worm Wheel for Angle
p
Valve

Due date passed. Reminder sent to vendor on 04 Jul


2013.
Due date passed. Reminder sent to vendor on 04 Jul
2013.
Due date for technical review is 01-Aug-13.
Due date for technical review is 08-Aug-13.

17

1267000127

4-Jun-13

NORMAL

NP Hydraulic Bolt Tensioner

6-Jun-13

4502002729

NP Asbestos Free Rope

Quotation
received on

3-Jul-13

10-Jul-13

EURO: 2440

ADV

AIR

21-Aug-13

6-Jun-13
4-Jul-13

4-Jul-13

TR

Technical acceptance received on 04 Jul 2013.


Email sent to vendor on 04 Jul 2013 for freight charges.
Reminder sent on 10 Jul & 12 Jul 2013.

DP

1361000022

4-Jun-13

Urgent

NP

20

1363000074

4-Jun-13

Urgent

21

1252000353

11-Jun-13

NORMAL

22

1361000024

11-Jun-13

Urgent

NP Steel stractural meterial

14-Jun-13

23

1361000025

11-Jun-13

Urgent

14-Jun-13

11-Jul-13

11-Jul-13

24

1361000026

11-Jun-13

NORMAL

NP Pipe Fitting & gaskets


Pipe Fitting & gaskets
NP
for urea process

case sent to Fin Dept for establishment of LC on 28 Jun


13.
Due date passed. Reminder sent to vendor on 04 Jul
2013.
Due date passed. Reminder sent to vendor on 04 Jul
2013.
Due date for technical review is 08-Aug-13.

14-Jun-13

11-Jul-13

11-Jul-13

Due date for technical review is 08-Aug-13.

25

1270000086

13-Jun-13

NORMAL

26

1271000037

13-Jun-13

NORMAL

NP

1269000859
27
28

1268000038
1252000380

29
30

7980000002

17-Jun-13

Urgent

17-Jun-13

NORMAL

19-Jun-13

NORMAL

17-Jun-13

NORMAL

NP Gate and Globe Valves

19-Jun-13

NORMAL

Square/Round/Solid /
NP
Hollow /Bars

17-Jun-13
20-Jun-13

NORMAL
Normal

17-Jun-13

urgent

31

7980000010

32
33

1248000651
1252000354

4502002738

34

1269000859

4502002684

35

7990000002

21-Jun-13

NORMAL

36

7980000003

21-Jun-13

NORMAL

37

7990000013

21-Jun-13

Urgent

38

1248000671

21-Jun-13

NORMAL

39

1252000379

21-Jun-13

NORMAL

40

7990000015

24-Jun-13

NORMAL

41

7990000014

24-Jun-13

NORMAL

42

1248000670

24-Jun-13

NORMAL

43

1248000623

26-Jun-13

Urgent

4502002741

Pressure Switches /
Gauges

Due date for technical review is 01-Aug-13.

19

Pressure Calibration
(Replacement)
Inspection and
P Assembly of ID Fan
Turbine
NP Books

4-Jul-13

RFQ

NP LP Circulation Pump

Locking & Locking Hasps

4-Jul-13

Due date passed. Reminder sent to vendor on 04 Jul


2013.

Urgent

Spares for DCS System

6-Jun-13

4-Jul-13

TR
PO

4-Jun-13

28-Jun-13

Due date for technical review is 25-Jul-13.


26-Jun-13 USD: 25500.00

14-Jun-13

RFQ
RFQ

TR
TR

RFQ Floated

RFQ

18-Jun-13

RFQ Floated

RFQ

PO is under signing process.

PO

Due date for technical review is 08-Aug-13.


Email sent to plantsite for Revision of PR alongwith CBD
& quotation on 02-jUL-13.

TR
REV

18-Jun-13

11-Jul-13

11-Jul-13

20-Jun-13

24-Jun-13

24-Jun-13

20-Jun-13 USD: 29,417.00

18-Jun-13

11-Jul-13

11-Jul-13

Due date for technical review is 08-Aug-13.

TR

Technical acceptance received on 08 Jul 2013.


Email sent to vendor on 09 Jul 2013 for freight charges.

DP

28-Jun-13

19-Jun-13

27-Jun-13

27-Jun-13

8-Jul-13

18-Jun-13
21-Jun-13

25-Jun-13

25-Jun-13

3-Jul-13

NP vanadium pentaoxide
SPARES FOR STEAM
TURBINE
SLEEVE FOR VALVE
p
BODY
NP Potassium Carbonate
COOLING WATER
P TREATMENT
CHEMICALS
New manifold for
P
ammonia feed
Cartridge filter lube oil
NP
for Dstk/k

TR
PO

14-Jun-13

p Spares for Dimister


NP Instrument Spares
Inspection and
p Assembly of ID Fan
Turbine
COMPRESSION TUBE
NP
FITTINGS
FLAT ALUMINIUM
NP
SHEET ROLL

LC

TR
TR

PO is under signing process.

1361000021

4512000056

28-Jun-13

RFQ

Due date for technical review is 01-Aug-13.

18

Ammonia Reflux Pumps


P-523
Installation of VibroPriller

6-Jun-13

TR
RFQ

11-Jul-13

EURO: 7350.00

LC

SEA

29-Sep-13

PO is under signing process.


RFQ Floated

RFQ

Shipment date is 1-Aug-13

SDA

24-Jun-13

RFQ Floated

RFQ

24-Jun-13

RFQ Floated

RFQ

24-Jun-13

RFQ Floated

RFQ

24-Jun-13

RFQ Floated

RFQ

20-Jun-13

20-Jun-13

24-Jun-13

11-Jul-13

USD: 29,417

LC

SEA

1-Aug-13

11-Jul-13

Due date for technical review is 08-Aug-13.

24-Jun-13
8-Jul-13

12-Jul-13

USD: 545,789.40

LC

SEA

30-Aug-13

PO

TR

RFQ Floated

RFQ

PO is under signing process.

PO

24-Jun-13

2-Jul-13

2-Jul-13

24-Jun-13

27-Jun-13

27-Jun-13

Due date for technical review is 25-Jul-13.

TR

26-Jun-13

11-Jul-13

11-Jul-13

Due date for technical review is 08-Aug-13.

TR

SUMMARY

S/No

TAG

1
2
3
4
5
6
7
8
9
10
11

Total PR