You are on page 1of 196

HERVE HERVE BARON BARON

The execution of a Complex Project A guided tour

2013 Herv Baron

HERVE BARON

The actors

The suppliers

The COMPANY Client

The EPC Contractor

2013 Herv Baron

The sub-contractors

HERVE BARON

The phases

Sanction

Sanction

Conceptual evaluation + Pre-Project By COMPANY

2013 Herv Baron

Basic Engineering By ENGINEERING

Project Execution by EPC CONTRACTOR

HERVE BARON Design

Procurement

Manufacturing

Shipping

Installation

Construction & erection

Inspection & tests

Hand-over

2013 Herv Baron

HERVE BARON

The multiple sides of a Project

Project Control

PROJECT

Human Resources Management

2013 Herv Baron

HERVE BARON
Ho!e o""ice (#aris)
#ro$ect !anage!ent Detail Engineering (part) #rocure!ent

The multiple sites of a Project


Engineering Sub-Contractor (India)
Detail Engineering (part)

Shipyard (Korea)
Hull Engineering & Fabrication

Satellite o""ice
Detail Engineering (part)

Fabrication yard (%igeria)&


Fabrication (part)

2013 Herv Baron

'""shore (%igeria)&
Installation( co!!issioning( start-up

Shipyards (Singapore & Malaysia)


opsides Fabrication & Integration

HERVE BARON

Project

Engineering

Procurement

Construction

2013 Herv Baron

HERVE BARON

Project

Engineering

Procurement

Construction

2013 Herv Baron

HERVE BARON
Process facilities: Feedstock and products flow Feedstock composition Battery limit conditions Equipment Spare

The facilities design basis


Infrastructure:
Pressure (bar) 50 45 40 35 30 25 20

Administrative and technical buildings Control room Access road Site fencing, gates, check point

Performance: Products specifications Energy efficiency, emissions

15 10 5 0 -85 -80 -75 -70 -65 -60 -55

Design criteria: % of over design

Environment data: Min/max temperature Rain/snow fall Wind Geological conditions


2013 Herv Baron

Utilities: Electric power supply Other utilities

Systems: Process control Fire/gas alarm Public address, LAN, PABX Applicable codes and standards: International standards Local rules

HERVE BARON

Engineering in the Project

Design basis: - Functional requirements - Client specifications - Design codes

Documents for Construction: Construction drawings & specifications Documents for Purchase: bill of quantity & specification
2013 Herv Baron

Engineering

HERVE BARON

Project

Engineering

Procurement

Construction

Instruments& Control

Layout & Piping

Process

Electrical

Equipment

Civil

Safety

2013 Herv Baron

HERVE BARON

Project

Engineering

Procurement

Construction

Instruments& Control

Layout & Piping

Process

Electrical

Equipment

Civil

Safety

2013 Herv Baron

HERVE BARON

Process simulations

2013 Herv Baron

HERVE BARON

Thermodynamic calculations

Heat & Material balance

2013 Herv Baron

Process Flow Diagram (PFD)

HERVE BARON

Equipment list

2013 Herv Baron

HERVE BARON

Equipment duty

2013 Herv Baron

HERVE BARON

Process data sheet

2013 Herv Baron

HERVE BARON

Process Flow Diagram (PFD)

2013 Herv Baron

HERVE BARON

Piping & Instrumentation Diagram (P&ID)

2013 Herv Baron

HERVE BARON

Piping & Instrumentation Diagram (P&ID)

2013 Herv Baron

HERVE BARON

Process control

2013 Herv Baron

HERVE BARON

Emergency shut down

2013 Herv Baron

HERVE BARON

Emergency relief

2013 Herv Baron

HERVE BARON

Operating manual

2013 Herv Baron

HERVE BARON

Project

Engineering

Procurement

Construction

Instruments& Control

Layout & Piping

Process

Electrical

Equipment

Civil

Safety

2013 Herv Baron

HERVE BARON

Rotating machinery

2013 Herv Baron

HERVE BARON

Pressure vessels

2013 Herv Baron

HERVE BARON

Heat exchangers

2013 Herv Baron

HERVE BARON

Packages, Fired Equipment

2013 Herv Baron

HERVE BARON

Process data sheet Mechanical data sheet

2013 Herv Baron

HERVE BARON

Material Requisition

2013 Herv Baron

2013 Herv Baron

HERVE BARON

HERVE BARON

Project

Engineering

Procurement

Construction

Instruments& Control

Layout & Piping

Process

Electrical

Equipment

Civil

Safety

2013 Herv Baron

2013 Herv Baron

HERVE BARON

HERVE BARON

Fire fighting

2013 Herv Baron

HERVE BARON

Passive fire protection

2013 Herv Baron

HERVE BARON

Fire & Gas detection layout

2013 Herv Baron

HERVE BARON

Environmental Impact Assessment

2013 Herv Baron

HERVE BARON

Project

Engineering

Procurement

Construction

Instruments& Control

Layout & Piping

Process

Electrical

Equipment

Civil

Safety

2013 Herv Baron

2013 Herv Baron

HERVE BARON

2013 Herv Baron

HERVE BARON

2013 Herv Baron

HERVE BARON

2013 Herv Baron

HERVE BARON

HERVE BARON

2013 Herv Baron

Equipment supporting structures

HERVE BARON

2013 Herv Baron

Piping supporting structures (pipe-racks)

HERVE BARON

2013 Herv Baron

Structural design

2013 Herv Baron

HERVE BARON

HERVE BARON

Structural drawings

2013 Herv Baron

2013 Herv Baron

HERVE BARON

HERVE BARON

Architectural drawings

2013 Herv Baron

Equipment layout drawing

2013 Herv Baron

HERVE BARON

HERVE BARON

Project

Engineering

Procurement

Construction

Instruments& Control

Layout & Piping

Process

Electrical

Equipment

Civil

Safety

2013 Herv Baron

2013 Herv Baron

HERVE BARON

HERVE BARON

Layout/ principles

2013 Herv Baron

HERVE BARON

Layout/consideration for all networks

2013 Herv Baron

HERVE BARON

General Plot Plan

2013 Herv Baron

HERVE BARON

Piping Layout drawing


2013 Herv Baron

HERVE BARON

3D modelling

2013 Herv Baron

HERVE BARON

3D model clash check

3D model review
2013 Herv Baron

2013 Herv Baron

HERVE BARON

HERVE BARON
ANSI B31.8 (for gas pipelines and compressor stations)

Piping Design

2013 Herv Baron

HERVE BARON
ANSI B31.8 (for gas pipelines and compressor stations)

Piping Design

2013 Herv Baron

HERVE BARON

Thickness (mm) Number of passes

2013 Herv Baron

2013 Herv Baron

HERVE BARON

2013 Herv Baron

HERVE BARON

2013 Herv Baron

HERVE BARON

2013 Herv Baron

HERVE BARON

HERVE BARON

Isometric drawing

2013 Herv Baron

HERVE Piping BARON

Pre-fabrication

2013 Herv Baron

HERVE BARON

Piping General Arrangement drawing

2013 Herv Baron

2013 Herv Baron

HERVE BARON

HERVE BARON

Standard Pipe Support drawings

2013 Herv Baron

2013 Herv Baron

HERVE BARON

HERVE BARON

Material Selection

2013 Herv Baron

HERVE BARON

Material Specification

2013 Herv Baron

HERVE BARON

Material Specification

2013 Herv Baron

HERVE BARON

Project

Engineering

Procurement

Construction

Instruments& Control

Layout & Piping

Process

Electrical

Equipment

Civil

Safety

2013 Herv Baron

2013 Herv Baron

HERVE BARON

HERVE BARON

Instrument data sheet

2013 Herv Baron

HERVE BARON

2013 Herv Baron

Process Control System

HERVE BARON

System architecture drawing

2013 Herv Baron

HERVE BARON

Mechanical Equipment Control

2013 Herv Baron

HERVE BARON

The instrumentation hardware


Instrument room
Marshalling cabinet Controller cabinet

Control room

VDU

PT

JB

Process line LAN Secondary cable Multi cable

CPU

2013 Herv Baron

HERVE BARON

2013 Herv Baron

Building detail drawing/ Telecom and PAGA layout

HERVE BARON

Cable routing drawings

2013 Herv Baron

Cable list

HERVE BARON

2013 Herv Baron

Cable routing inside technical room

HERVE BARON

Project

Engineering

Procurement

Construction

Instruments& Control

Layout & Piping

Process

Electrical

Equipment

Civil

Safety

2013 Herv Baron

HERVE BARON

2013 Herv Baron

Electrical consumer list

HERVE BARON

Electrical Load Summary


2013 Herv Baron

2013 Herv Baron

HERVE BARON

HERVE BARON

General One Line Diagram

2013 Herv Baron

HERVE BARON
Generators

Single line diagram

Switchgear

Transformer

2013 Herv Baron

HERVE BARON

Electrical equipment layout

2013 Herv Baron

HERVE BARON

Electrical Control System

2013 Herv Baron

HERVE BARON

#rocess design
#FDs H&M balance

2013 Herv Baron

HERVE BARON

#rocess design
#FDs H&M balance

Process data sheet

Equipment specification

)otating #ressure *essels Fired e+uip!ent Heat e,changers #ac-ages etc.

2013 Herv Baron

HERVE BARON

#rocess design
#FDs H&M balance #&IDs

2013 Herv Baron

HERVE BARON

#rocess design
#FDs H&M balance #&IDs

#iping Instru!entation

Process data sheet

Equipment specification

)otating #ressure *essels Fired e+uip!ent Heat e,changers #ac-ages etc.

Vendor drawings

/ayout Ci*il Electrical


2013 Herv Baron

HERVE BARON

#rocess design
#FDs H&M balance #&IDs

#iping Instru!entation

Process data sheet

Equipment specification

)otating #ressure *essels Fired e+uip!ent Heat e,changers #ac-ages etc.

Vendor drawings

/ayout Ci*il Electrical


2013 Herv Baron

HERVE BARON

Electrical Instru!entation & Control #rocess Ci*il

/ayout

0endor
#iping

2013 Herv Baron

HERVE BARON

What the Vendor supplied

What Engineering designed

2013 Herv Baron

HERVE BARON

Field Engineering

2013 Herv Baron

HERVE BARON

Interested and wanting to know more on Engineering?

2013 Herv Baron

A unique synthesis for the busy Project professional 200 pages, 250 illustrations

HERVE BARON

Project

Engineering

Procurement

Construction

2013 Herv Baron

HERVE BARON

Procurement

2013 Herv Baron

HERVE BARON

Procurement / Steps

Inquiry (Call for Tender) Short listing Bid analysis Clarifications Negotiations Purchase Order Expediting Inspection
2013 Herv Baron

Delivery Warranty Period

HERVE BARON

Procurement / Supplier selection criteria Technical Compliance Price Qualification of supplier Schedule Load of workshop References References with final Client Financial situation
2013 Herv Baron

Annual turn-over Internal feed-back

HERVE BARON

Procurement

2013 Herv Baron

HERVE BARON

Expediting

2013 Herv Baron

HERVE BARON

Expediting

2013 Herv Baron

HERVE BARON

Inspection

2013 Herv Baron

HERVE BARON

Inspection

2013 Herv Baron

2013 Herv Baron

HERVE BARON

Shipping

2013 Herv Baron

HERVE BARON

Shipping

2013 Herv Baron

HERVE BARON

Shipping

HERVE BARON

Project

Engineering

Procurement

Construction

2013 Herv Baron

HERVE BARON

Earthworks

2013 Herv Baron

2013 Herv Baron

HERVE BARON

Pipeline

2013 Herv Baron

HERVE BARON

Pipeline

2013 Herv Baron

HERVE BARON

Roads

2013 Herv Baron

HERVE BARON

Buildings

HERVE BARON

Civil Works

Sand Aggregate

Cement Admixtures
2013 Herv Baron

HERVE BARON

Civil Works

2013 Herv Baron

HERVE BARON

Civil Works

2013 Herv Baron

HERVE BARON

Civil Works

2013 Herv Baron

HERVE BARON

Civil Works

2013 Herv Baron

HERVE BARON

Civil Works

2013 Herv Baron

HERVE BARON

Pre-fabrication

2013 Herv Baron

2013 Herv Baron

HERVE BARON

Erection

HERVE BARON

Underground networks

2013 Herv Baron

HERVE BARON

Plant erection

2013 Herv Baron

HERVE BARON

Steel structure erection

2013 Herv Baron

HERVE BARON

Equipment installation

2013 Herv Baron

HERVE BARON

Equipment installation

2013 Herv Baron

HERVE BARON

Piping Pre-fabrication

2013 Herv Baron

HERVE BARON

Piping erection

2013 Herv Baron

HERVE BARON

Piping erection

2013 Herv Baron

HERVE BARON

Field Instrumentation Installation

2013 Herv Baron

HERVE BARON

Electrical equipment connection

2013 Herv Baron

HERVE BARON

Cable pulling

2013 Herv Baron

HERVE BARON

Arrangement of Technical rooms

2013 Herv Baron

HERVE BARON

Cable connections

2013 Herv Baron

HERVE BARON

Other Systems Field Equipment Installation

2013 Herv Baron

HERVE BARON

Control room consoles installation

2013 Herv Baron

2013 Herv Baron

HERVE BARON

Testing

HERVE BARON

Commissioning
Han)over System

Sub-System 'ocument (o")er

!ircuit

%"ect %&ui

#ec$ %&ui Instrument Loo

Junction Box

Instrument !ab"e

Instrument *a+

2013 Herv Baron

HERVE BARON

The multiple sides of a Project

Project Control

PROJECT

Human Resources Management

2013 Herv Baron

HERVE BARON

Project Organisation

Project Manager

Engineering Manager

Procurement Manager

Site Manager

Project Control Manager

Project Engineers

Discipline Engineers

Purchasers

Expediters

Inspectors

Construction Manager

Contract Manager

Scheduling Manager

Cost Control

Process

Construction Superintendent

Civil

Construction supervisor

Instrumentation

Construction superintendent

Electrical

Construction supervisor
2013 Herv Baron

Equipment

HERVE BARON

Project procedures

2013 Herv Baron

HERVE BARON

Project temporary facilities

2013 Herv Baron

HERVE BARON

Project temporary facilities

2013 Herv Baron

HERVE BARON

Project temporary facilities

2013 Herv Baron

HERVE BARON

Project temporary facilities

2013 Herv Baron

HERVE BARON

Project temporary facilities

2013 Herv Baron

HERVE BARON

Construction Procedures

2013 Herv Baron

2013 Herv Baron

HERVE BARON

HERVE BARON

Quality Control

2013 Herv Baron

HERVE BARON

Quality Control

Temperature Slump

Sampling

2013 Herv Baron

HERVE BARON

Quality Control

2013 Herv Baron

HERVE BARON

Cost Control

2013 Herv Baron

2013 Herv Baron

HERVE BARON

Insurance

HERVE BARON

Contracts

,-.,-.,urc$ase .r)ers %,! Sub-!ontracts #ain !ontract Sub

,-.-

2013 Herv Baron

Sub

HERVE BARON

Contracts Terms and Conditions Price Schedule Performance guarantees Technical basis Specifications, codes & stds
2013 Herv Baron

%,!

#ain !ontract

HERVE BARON

Contracts

E
2013 Herv Baron

HERVE BARON

Contracts

E P
2013 Herv Baron

HERVE BARON

Contracts

E P C
2013 Herv Baron

HERVE BARON

Contracts

2013 Herv Baron

+ x%

HERVE BARON

Construction contracts

Civil

2013 Herv Baron

HERVE BARON

Construction contracts

Mechanical

2013 Herv Baron

HERVE BARON

Construction contracts

E&I

2013 Herv Baron

HERVE BARON

Construction contracts

General Contractor
2013 Herv Baron

HERVE BARON

Contracts Terms and Conditions

%,!

#ain !ontract

'bligations o" the 1 parties


2013 Herv Baron

/i!it o" liability #enalties in case o" bad per"or!ance Con"lict resolution

HERVE BARON

Quality Assurance (QA)

2013 Herv Baron

HERVE BARON

Quality Assurance (QA)

2013 Herv Baron

HERVE BARON

Quality Assurance (QA)

Email

Email vs Technical Query

2013 Herv Baron

HERVE BARON

Quality Assurance (QA)

Email

Unformal/Unrecoverable! Email vs Technical Query Formal/Recoverable!

2013 Herv Baron

HERVE BARON

Quality Assurance (QA)

Email

Unformal/Unrecoverable! Email vs Technical Query Formal/Recoverable!


Think of somebody trying to find out what was CPY decision in 3 years time...

2013 Herv Baron

HERVE BARON

Quality Assurance (QA)

2013 Herv Baron

HERVE BARON

Document Control
Document code 1 2 3 4 5 6 7 8 9 Installation drawings Detail drawings Diagrams Lists Bill of Quantities Isometrics Calculation notes Specifications Data sheets Requisitions Discipline code A C E G J K M P S V W Instrumentation & Control Civil engineering Electrical Project general documents Mechanical Safety Piping & Layout Processes Steel Structures Vessels Heat exchangers Materials Welding
2013 Herv Baron

HERVE BARON

Document Control

2013 Herv Baron

HERVE BARON

Document Control
Client Documents submitted to client Approval/ Comments

Engineering

Documents submission

Comments

2013 Herv Baron

Vendors

HERVE BARON

Electronic Document Management System

Center 1 Sr. Mgmt

Intranet / Internet

Center 2 Sr. Mgmt

Correspondence etc.

Electronic Docu!ent Manage!ent Syste!


Breakdown structures Reports Interfaces Projects

Engineering docu!ents

2013 Herv Baron

Intranet / Internet
Satellite Engineering Center

0endor docu!ents
Construction Site

HERVE BARON

Interface Management

2013 Herv Baron

HERVE BARON

Scheduling 5 4

MONTH 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 PROJECT SCHEDULE PLANT START-UP PIPING PRE-FABRICATION & INSTALLATION X X X X X X X X X X PIPING MATERIAL & DRAWINGS AT SITE PIPING MATERIAL MANUFACTURING & SHIPPING X X X X X X PURCHASE OF PIPING MATERIAL TECHNICAL & COMMERCIAL CLARIFICATIONS X X CALL FOR TENDER FOR PIPING MATERIAL PREPARE PIPING MATERIAL TAKE-OFF X PIPING ROUTING STUDIES X X X PIPING & INSTRUMENTATION DIAGRAMS (PIDs)

2 3

4 2

5
2013 Herv Baron

HERVE BARON

Scheduling

2013 Herv Baron

HERVE BARON

Progress Monitoring How would you measure progress?

2013 Herv Baron

HERVE BARON

Progress Monitoring

2013 Herv Baron

HERVE BARON

Progress Monitoring

2013 Herv Baron

HERVE BARON

Progress Monitoring

2013 Herv Baron

HERVE BARON

IT

oday& 4D o!orro5& 4D & data

23 years ago& 1D

2013 Herv Baron

2013 Herv Baron

HERVE BARON

IT

2013 Herv Baron

HERVE BARON

Safety

HERVE BARON

Safety

Guard Rail System with Toe Boards

Planking

Runner

Bearer

Cross Bracing

Post

2013 Herv Baron

Sill

Longitudinal Brace

2013 Herv Baron

HERVE BARON

Safety

HERVE BARON

Human resources / career path


Graduate Engineer, 25 years old

Process Engineer

3-5 yrs

Project Engineer

5 yrs

Engineering Manager/ Deputy Project Manager

5-7 yrs

Project Manager

40-45 yrs old


2013 Herv Baron

Note: the career pattern shown here is a very fast track one to the PM position... One would enjoy oneself just as well taking more time!

HERVE BARON

Beyond this presentation Share my new developments Find my other on-line and classroom training

http://www.toblog.fr/en/baron.html

2013 Herv Baron

You might also like