You are on page 1of 11

MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY

PROJECT Number
Client : Contractor: Contract & Project Name : Project Contact Person (i.e PM / PE / etc..) Design Engineer # 1 Design Engineer # 2 Design Engineer # 3

Contractor Shop Drawings Submittal Log


Page

Approval & Signature


Project Director Site Representative

Sequen 2nd Ap 1st Ap.

Report Date

RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE

YES / NO

REV.

Document Specification or B.O.Q

Item No.

Rev. No.

Sub. Sequence No. (Or Teansmittal Number)

Shop Drawing Description

Action Code: A = Approved as Submitted B = Approved as Noted C = Not Approved D = For Information
APPOINTED DES Eng DES#1, or 2 or 3 Planned Sub. Date Date Returned Submitted By A/E Action Approval Needed By Required On Site

Notes

Building Management System BM-01 R2 BM-02 R2 BM-03 R2 etc .. .. 1 2 3 .. .. 0

213417364.xls.ms_officeBMS

DSP-qf-PRJ-02 Rev.1

MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY

PROJECT Number
Client : Contractor: Contract & Project Name : Project Contact Person (i.e PM / PE / etc..) Design Engineer # 1 Design Engineer # 2 Design Engineer # 3

Contractor Shop Drawings Submittal Log


Page

Approval & Signature


Project Director Site Representative

Sequen 2nd Ap 1st Ap.

Report Date

RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE

YES / NO

REV.

Document Specification or B.O.Q

Item No.

Rev. No.

Sub. Sequence No. (Or Teansmittal Number)

Shop Drawing Description

Action Code: A = Approved as Submitted B = Approved as Noted C = Not Approved D = For Information
APPOINTED DES Eng DES#1, or 2 or 3 Planned Sub. Date Date Returned Submitted By A/E Action Approval Needed By Required On Site

Notes

Security & Access Control SA-01 R1 SA-02 R1 SA-03 R1 etc .. .. 1 2 3 .. .. 0

213417364.xls.ms_office

DSP-qf-PRJ-02 Rev.1

MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY

PROJECT Number
Client : Contractor: Contract & Project Name : Project Contact Person (i.e PM / PE / etc..) Design Engineer # 1 Design Engineer # 2 Design Engineer # 3

Contractor Shop Drawings Submittal Log


Page

Approval & Signature


Project Director Site Representative

Sequen 2nd Ap 1st Ap.

Report Date

RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE

YES / NO

REV.

Document Specification or B.O.Q

Item No.

Rev. No.

Sub. Sequence No. (Or Teansmittal Number)

Shop Drawing Description

Action Code: A = Approved as Submitted B = Approved as Noted C = Not Approved D = For Information
APPOINTED DES Eng DES#1, or 2 or 3 Planned Sub. Date Date Returned Submitted By A/E Action Approval Needed By Required On Site

Notes

Telecommunication S-03 R2 T-01 R1 T-02 R1 etc .. .. 1 2 3 .. .. 0

213417364.xls.ms_office

DSP-qf-PRJ-02 Rev.1

MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY

PROJECT Number
Client : Contractor: Contract & Project Name : Project Contact Person (i.e PM / PE / etc..) Design Engineer # 1 Design Engineer # 2 Design Engineer # 3

Contractor Shop Drawings Submittal Log


Page

Approval & Signature


Project Director Site Representative

Sequen 2nd Ap 1st Ap.

Report Date

RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE

YES / NO

REV.

Document Specification or B.O.Q

Item No.

Rev. No.

Sub. Sequence No. (Or Teansmittal Number)

Shop Drawing Description

Action Code: A = Approved as Submitted B = Approved as Noted C = Not Approved D = For Information
APPOINTED DES Eng DES#1, or 2 or 3 Planned Sub. Date Date Returned Submitted By A/E Action Approval Needed By Required On Site

Notes

Voice Alarm VA-01 R1 VA-02 R1 VA-03 R1 etc .. .. 1 2 3 .. .. 0

213417364.xls.ms_office

DSP-qf-PRJ-02 Rev.1

MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY

PROJECT Number
Client : Contractor: Contract & Project Name : Project Contact Person (i.e PM / PE / etc..) Design Engineer # 1 Design Engineer # 2 Design Engineer # 3

Contractor Shop Drawings Submittal Log


Page

Approval & Signature


Project Director Site Representative

Sequen 2nd Ap 1st Ap.

Report Date

RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE

YES / NO

REV.

Document Specification or B.O.Q

Item No.

Rev. No.

Sub. Sequence No. (Or Teansmittal Number)

Shop Drawing Description

Action Code: A = Approved as Submitted B = Approved as Noted C = Not Approved D = For Information
APPOINTED DES Eng DES#1, or 2 or 3 Planned Sub. Date Date Submitted Returned By A/E Action Approval Needed By Required On Site

Notes

QRD-OP-08

MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY

PROJECT Number
Client : Contractor: Contract & Project Name : Project Contact Person (i.e PM / PE / etc..) Design Engineer # 1 Design Engineer # 2 Design Engineer # 3

Contractor Shop Drawings Submittal Log


Page

Approval & Signature


Project Director Site Representative

Sequen 2nd Ap 1st Ap.

Report Date

RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE

YES / NO

REV.

Document Specification or B.O.Q

Item No.

Rev. No.

Sub. Sequence No. (Or Teansmittal Number)

Shop Drawing Description

Action Code: A = Approved as Submitted B = Approved as Noted C = Not Approved D = For Information
APPOINTED DES Eng DES#1, or 2 or 3 Planned Sub. Date Date Returned Submitted By A/E Action Approval Needed By Required On Site

Notes

Electrical E-00 E-01 R1 E-02 R1 etc .. .. 1 2 3 .. .. 0 ESD-00

213417364.xls.ms_office

DSP-qf-PRJ-02 Rev.1

MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY

PROJECT Number
Client : Contractor: Contract & Project Name : Project Contact Person (i.e PM / PE / etc..) Design Engineer # 1 Design Engineer # 2 Design Engineer # 3

Contractor Shop Drawings Submittal Log


Page

Approval & Signature


Project Director Site Representative

Sequen 2nd Ap 1st Ap.

Report Date

RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE

YES / NO

REV.

Document Specification or B.O.Q

Item No.

Rev. No.

Sub. Sequence No. (Or Teansmittal Number)

Shop Drawing Description

Action Code: A = Approved as Submitted B = Approved as Noted C = Not Approved D = For Information
APPOINTED DES Eng DES#1, or 2 or 3 Planned Sub. Date Date Returned Submitted By A/E Action Approval Needed By Required On Site

Notes

Fire Fighting FF-01 R1 FF-02 R1 FF-03 R1 etc .. .. 1 2 3 .. .. 0

213417364.xls.ms_office

DSP-qf-PRJ-02 Rev.1

MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY

PROJECT Number
Client : Contractor: Contract & Project Name : Project Contact Person (i.e PM / PE / etc..) Design Engineer # 1 Design Engineer # 2 Design Engineer # 3

Contractor Shop Drawings Submittal Log


Page

Approval & Signature


Project Director Site Representative

Sequen 2nd Ap 1st Ap.

Report Date

RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE

YES / NO

REV.

Document Specification or B.O.Q

Item No.

Rev. No.

Sub. Sequence No. (Or Teansmittal Number)

Shop Drawing Description

Action Code: A = Approved as Submitted B = Approved as Noted C = Not Approved D = For Information
APPOINTED DES Eng DES#1, or 2 or 3 Planned Sub. Date Date Returned Submitted By A/E Action Approval Needed By Required On Site

Notes

Drainage (Foul & waste Water) S-01 R2 DR-01 R2 DR-02 R1 etc .. .. 1 2 3 .. .. 0

213417364.xls.ms_office

DSP-qf-PRJ-02 Rev.1

MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY

PROJECT Number
Client : Contractor: Contract & Project Name : Project Contact Person (i.e PM / PE / etc..) Design Engineer # 1 Design Engineer # 2 Design Engineer # 3

Contractor Shop Drawings Submittal Log


Page

Approval & Signature


Project Director Site Representative

Sequen 2nd Ap 1st Ap.

Report Date

RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE

YES / NO

REV.

Document Specification or B.O.Q

Item No.

Rev. No.

Sub. Sequence No. (Or Teansmittal Number)

Shop Drawing Description

Action Code: A = Approved as Submitted B = Approved as Noted C = Not Approved D = For Information
APPOINTED DES Eng DES#1, or 2 or 3 Planned Sub. Date Date Returned Submitted By A/E Action Approval Needed By Required On Site

Notes

Cold & Hot Water Supply S-0 R1 PL-01 R2 PL-02 R2 etc .. .. 1 2 3 .. .. 0

213417364.xls.ms_office

DSP-qf-PRJ-02 Rev.1

MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY

PROJECT Number
Client : Contractor: Contract & Project Name : Project Contact Person (i.e PM / PE / etc..) Design Engineer # 1 Design Engineer # 2 Design Engineer # 3

Contractor Shop Drawings Submittal Log


Page

Approval & Signature


Project Director Site Representative

Sequen 2nd Ap 1st Ap.

Report Date

RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE

YES / NO

REV.

Document Specification or B.O.Q

Item No.

Rev. No.

Sub. Sequence No. (Or Teansmittal Number)

Shop Drawing Description

Action Code: A = Approved as Submitted B = Approved as Noted C = Not Approved D = For Information
APPOINTED DES Eng DES#1, or 2 or 3 Planned Sub. Date Date Returned Submitted By A/E Action Approval Needed By Required On Site

Notes

Lighting Protection LP-01 R1 LP-02 R1 LP-03 R1 LP-04 R2 1 2 3 4 .. .. 0

213417364.xls.ms_office

DSP-qf-PRJ-02 Rev.1

MATHAHER EL TATWEER FOR CONSTRUCTION COMPANY

PROJECT Number
Client : Contractor: Contract & Project Name : Project Contact Person (i.e PM / PE / etc..) Design Engineer # 1 Design Engineer # 2 Design Engineer # 3

Contractor Shop Drawings Submittal Log


Page

Approval & Signature


Project Director Site Representative

Sequen 2nd Ap 1st Ap.

Report Date

RELEASED FOR FINAL APPROVAL BY THE CLIENT OR HIS REPRESENTATIVE

YES / NO

REV.

Document Specification or B.O.Q

Item No.

Rev. No.

Sub. Sequence No. (Or Teansmittal Number)

Shop Drawing Description

Action Code: A = Approved as Submitted B = Approved as Noted C = Not Approved D = For Information
APPOINTED DES Eng DES#1, or 2 or 3 Planned Sub. Date Date Returned Submitted By A/E Action Approval Needed By Required On Site

Notes

Air Conditioning & Ventilation AC-01 - 1 Of 2 R3 AC-02 - 2 Of 2 R2 AC-02 R3 etc .. .. 1 2 3 .. .. 0

213417364.xls.ms_office

DSP-qf-PRJ-02 Rev.1

You might also like