Oracle Primavera P6

Project Management

Reference Manual
Version 7.0

Copyright 1999-2009 Oracle and/or its affiliates. All rights reserved.


The Programs (which include both the software and documentation) contain proprietary information; they are
provided under a license agreement containing restrictions on use and disclosure and are also protected by
copyright, patent, and other intellectual and industrial property laws. Reverse engineering, disassembly, or
decompilation of the Programs, except to the extent required to obtain interoperability with other independently
created software or as specified by law, is prohibited.
The information contained in this document is subject to change without notice. If you find any problems in the
documentation, please report them to us in writing. This document is not warranted to be error-free. Except as
may be expressly permitted in your license agreement for these Programs, no part of these Programs may be
reproduced or transmitted in any form or by any means, electronic or mechanical, for any purpose.
If the Programs are delivered to the United States Government or anyone licensing or using the Programs on
behalf of the United States Government, the following notice is applicable:
U.S. GOVERNMENT RIGHTS Programs, software, databases, and related documentation and technical data
delivered to U.S. Government customers are commercial computer software or commercial technical data
pursuant to the applicable Federal Acquisition Regulation and agency-specific supplemental regulations. As
such, use, duplication, disclosure, modification, and adaptation of the Programs, including documentation and
technical data, shall be subject to the licensing restrictions set forth in the applicable Oracle license agreement,
and, to the extent applicable, the additional rights set forth in FAR 52.227-19, Commercial Computer Software-Restricted Rights (June 1987). Oracle USA, Inc., 500 Oracle Parkway, Redwood City, CA 94065.
The Programs are not intended for use in any nuclear, aviation, mass transit, medical, or other inherently
dangerous applications. It shall be the licensee's responsibility to take all appropriate fail-safe, backup,
redundancy and other measures to ensure the safe use of such applications if the Programs are used for such
purposes, and we disclaim liability for any damages caused by such use of the Programs.
Oracle, JD Edwards, PeopleSoft, and Siebel are registered trademarks of Oracle Corporation and/or its affiliates.
Other names may be trademarks of their respective owners.
The Programs may provide links to Web sites and access to content, products, and services from third parties.
Oracle is not responsible for the availability of, or any content provided on, third-party Web sites. You bear all
risks associated with the use of such content. If you choose to purchase any products or services from a third
party, the relationship is directly between you and the third party. Oracle is not responsible for: (a) the quality of
third-party products or services; or (b) fulfilling any of the terms of the agreement with the third party, including
delivery of products or services and warranty obligations related to purchased products or services. Oracle is not
responsible for any loss or damage of any sort that you may incur from dealing with any third party.
To view the P6 Commercial Notices and Disclosures for Documentation, go to the
\Documentation\<language>\Notices and Disclosures folder of the P6 physical media or download.

Table of Contents
Preface.............................................................................................................11
What is Oracle Primavera P6? ...........................................................................................12
Using Documentation and Help.........................................................................................15
Where to Get Support ........................................................................................................18

Part 1: Overview and Configuration


Understanding Project Management ...........................................................21
Why Use Project Portfolio Management? .........................................................................22
Your Role in the Organization ...........................................................................................23
Project Management Process Overview.............................................................................26
Planning, Controlling, and Managing Projects ..................................................................28

Quick Tour......................................................................................................31
Getting Started ...................................................................................................................32
Selecting a Language .........................................................................................................35
The Workspace...................................................................................................................36
What Is a Layout? ..............................................................................................................39
Customizing Displays ........................................................................................................41
Sample Layouts..................................................................................................................42
Using Wizards....................................................................................................................43

Setting User Preferences................................................................................45


Formatting Time Units.......................................................................................................46
Formatting Dates................................................................................................................47
Setting Currency Symbols .................................................................................................47
Setting Mail Preferences ....................................................................................................48
Implementing Wizards .......................................................................................................49
Setting Startup, Group, Sort, and Column Defaults...........................................................49
Changing Your Password ...................................................................................................51
Setting Profile and Spreadsheet Data Options ...................................................................52
Setting Calculation Options for Resource and Role Assignments.....................................54
Selecting Startup Filters.....................................................................................................56

Table of Contents

Part 2: Structuring Projects


Setting Up the Enterprise Project Structure ...............................................59
Enterprise Project Structure Overview.............................................................................. 60
Setting Up the Enterprise Project Structure ...................................................................... 66
Adding a New Project to the EPS ..................................................................................... 67
Using Project Architect ..................................................................................................... 69
Working with the Enterprise Project Structure ................................................................. 75
Defining Enterprise Project Structure Details................................................................... 79

Setting Up the Organizational Breakdown Structure ................................87


The Organizational Breakdown Structure (OBS) ............................................................. 88
Viewing an OBS................................................................................................................ 91
Setting Up an OBS ............................................................................................................ 93
Editing OBS Elements ...................................................................................................... 96

Defining Resources and Roles.......................................................................97


Resources Overview.......................................................................................................... 98
Viewing and Adding Resources ........................................................................................ 99
Defining Resource Shifts ................................................................................................ 106
Defining and Assigning Resource Codes and Values ..................................................... 107
Setting Up Roles ............................................................................................................. 109
Assigning Roles to Resources......................................................................................... 113
Defining Custom Resource Curves ................................................................................. 115

Reviewing Work Breakdown Structures ...................................................119


The Work Breakdown Structure (WBS) ......................................................................... 120
Viewing a WBS............................................................................................................... 122
Grouping by WBS Path................................................................................................... 124
Adding WBS Elements and Assigning Properties .......................................................... 125
Using WBS Milestones ................................................................................................... 128
Assigning WBS Category Values.................................................................................... 130
Defining Earned Value Settings for Specific WBS Elements ......................................... 131
Assigning Estimation Weights to WBS Elements .......................................................... 133

Defining Budgets ..........................................................................................137


Top-Down Budgeting...................................................................................................... 138
Establishing Budgets....................................................................................................... 140
Establishing a Monthly Spending Plan ........................................................................... 141
Tracking Budget Changes ............................................................................................... 142
Establishing Funding....................................................................................................... 143
Tracking and Analyzing Budgets.................................................................................... 146

Establishing Project Codes..........................................................................147


Defining and Assigning Project Codes ........................................................................... 148
Grouping, Summarizing, and Filtering by Codes ........................................................... 152

Primavera - Project Management

Table of Contents

Working with User-Defined Fields .............................................................157


Creating User-Defined Fields ..........................................................................................158
Working with User-Defined Fields ..................................................................................160
Working with Indicators...................................................................................................162

Creating Calendars ......................................................................................165


Adding Calendars.............................................................................................................166
Modifying Calendars .......................................................................................................167

Part 3: Implementing the Schedule


Establishing Activity Codes ........................................................................175
Creating Activity Codes and Values ................................................................................176
Grouping and Summarizing by Codes.............................................................................180

Working with Activities ...............................................................................183


Activities Overview .........................................................................................................184
Adding Activities .............................................................................................................185
Copying and Pasting Activities........................................................................................187
Defining General Activity Information............................................................................188
Defining Schedule Information........................................................................................191
Establishing Relationships ...............................................................................................195
Displaying Activity Details for Assignments ..................................................................199
Assigning Resources and Roles .......................................................................................200
Assigning Resource Curves to Resource or Role Assignments.......................................203
Manually Planning Future Period Assignments ..............................................................204
Assigning Activity Codes and Adding Expenses ............................................................210
Viewing Activity Feedback and Resource Notes.............................................................211
Assigning Work Products and Documents.......................................................................212
Adding Steps....................................................................................................................213
Creating and Assigning Activity Step Templates ............................................................215
Viewing Activity Summaries ...........................................................................................218
Viewing Contract Management Documents ....................................................................218
Using Global Change .......................................................................................................219
Renumbering Activity IDs ...............................................................................................223

Working with Cost Accounts and Project Expenses.................................227


Cost Account and Expense Overview..............................................................................228
Setting Up a Cost Account Structure ...............................................................................228
Adding Expenses and Entering Cost Information ...........................................................231
Defining Expense Details.................................................................................................235
Analyzing Costs ...............................................................................................................236

Performing Top-Down Estimation .............................................................239

Primavera - Project Management

Table of Contents

Performing Top-down Estimation................................................................................... 240


Applying Saved Top-Down Estimates To a Project ........................................................ 244

Part 4: Managing the Schedule


Managing Baselines .....................................................................................247
Creating and Maintaining Baselines ............................................................................... 248
Assigning Baselines to Projects ...................................................................................... 252
Comparing Current and Baseline Schedules................................................................... 253
Updating Baselines ......................................................................................................... 255

Updating, Scheduling, and Leveling...........................................................259


The Update Process......................................................................................................... 260
Choosing a Method of Updating ..................................................................................... 262
Highlighting Activities for Updating .............................................................................. 265
Updating Progress for Spotlighted Activities ................................................................. 266
Estimating Progress Automatically................................................................................. 267
Updating Using Progress Reporter ................................................................................. 269
Updating Activities Manually ......................................................................................... 274
Interrupting Activity Progress......................................................................................... 279
Applying Actuals ............................................................................................................ 280
Storing Period Performance (Past Period Actuals) ......................................................... 282
Scheduling Projects......................................................................................................... 285
Leveling Resources ......................................................................................................... 289
Recalculating Resource and Role Assignment Costs ..................................................... 293
Managing Resource Assignments ................................................................................... 295

Summarizing Projects .................................................................................297


Setting Summarization Options ...................................................................................... 298
Summarizing Project Data .............................................................................................. 299

Project Issues and Thresholds ....................................................................307


Adding Issues.................................................................................................................. 308
Assigning Tracking Layouts to Issues ............................................................................ 310
Using the Issue Navigator ............................................................................................... 311
Adding Thresholds .......................................................................................................... 312
Threshold Parameter Definitions .................................................................................... 314
Monitoring Thresholds.................................................................................................... 318
Assigning Tracking Layouts to Thresholds .................................................................... 318

Managing Risks............................................................................................319
Adding Risks................................................................................................................... 320
Calculating Exposure Values .......................................................................................... 321
Calculating a Risks Impact ............................................................................................ 322

Primavera - Project Management

Table of Contents

Creating and Deleting Risk Types ...................................................................................323


Customizing Risk Layouts...............................................................................................324

Maintaining a Projects Document Library ..............................................325


Viewing a Document Library and Adding/Deleting Work Products and Documents .....326
Specifying Document Location References.....................................................................327
Assigning Work Products and Documents.......................................................................328

Tracking Projects .........................................................................................329


Creating Tracking Layouts...............................................................................................330
Working with Tracking Layouts ......................................................................................332
Customizing Tracking Layouts ........................................................................................333
Grouping, Sorting, and Filtering Tracking Layouts.........................................................334

Comparing Projects .....................................................................................337


Overview ..........................................................................................................................338
Comparing Projects/Baselines .........................................................................................338

Creating and Using Reflections ..................................................................343


Reflection Overview ........................................................................................................344
Creating and Using Reflections .......................................................................................345
Reflection Guidelines.......................................................................................................347

Checking Projects In and Out.....................................................................349


Managing Remote Projects ..............................................................................................350
Checking Out Projects .....................................................................................................351
Checking In Projects ........................................................................................................352

Part 5: Customizing Projects


Working with Layouts .................................................................................357
Layout Examples .............................................................................................................358
Creating, Opening, and Saving Layouts ..........................................................................363
Exporting and Importing Layouts....................................................................................364
Copying Data to External Applications ...........................................................................365

Grouping, Sorting, and Filtering ................................................................367


Grouping Data..................................................................................................................368
Sorting Data .....................................................................................................................372
Filtering Data ...................................................................................................................373

Customizing Layouts ...................................................................................377


Modifying Columns .........................................................................................................378
Adjusting the Timescale...................................................................................................380
Formatting Gantt Charts...................................................................................................382
Formatting Activity Network Layouts .............................................................................390
Modifying Resource and Activity Usage Profiles ...........................................................393

Primavera - Project Management

Table of Contents

Customizing Reports ...................................................................................401


Reports Overview............................................................................................................ 402
Opening Reports ............................................................................................................. 403
Using Report Groups ...................................................................................................... 404
Creating and Modifying Reports..................................................................................... 404
Using the Report Editor .................................................................................................. 406
Adding Data Sources and Rows to Reports .................................................................... 410
Adding Text Cells to Reports .......................................................................................... 414
Sorting Report Data Sources........................................................................................... 422
Customizing a Report with the Report Editor................................................................. 423
Setting Up Batch Reports................................................................................................ 431

Printing Layouts and Reports.....................................................................433


Defining Page Settings .................................................................................................... 434
Previewing Layouts and Reports..................................................................................... 437
Printing Layouts and Reports.......................................................................................... 438
Publishing Layouts and Reports in HTML Format......................................................... 439

Publishing a Project On the Web ...............................................................441


Project Web Site Overview ............................................................................................. 442
Publishing a Project Web Site ......................................................................................... 444
Customizing the Appearance of a Project Web Site ....................................................... 446
Publishing Activity and Tracking Layouts...................................................................... 447

Part 6: Importing and Exporting Data


Linking the Project Management and Contract Management Modules 451
Linking PM and CM Modules ........................................................................................ 452
Linking PM and CM Projects ......................................................................................... 453
Importing CM Data into a PM Module Project .............................................................. 455

Transferring Data to Other Project Management Module Users ...........457


Exporting Projects........................................................................................................... 458
Exporting Roles or Resources......................................................................................... 463
Importing Projects........................................................................................................... 464
Importing Roles or Resources......................................................................................... 480

Transferring Data Using Microsoft Project Files......................................485


Exporting Projects........................................................................................................... 486
Exporting Resources ....................................................................................................... 491
Importing Projects from Microsoft Project ..................................................................... 493
Importing Resources from Microsoft Project ................................................................. 499

Transferring Data Using Microsoft Excel Files.........................................501


Exporting Project Data to Microsoft Excel..................................................................... 502
Updating Project Data in Microsoft Excel ...................................................................... 505
Importing Projects from Microsoft Excel ....................................................................... 507

Primavera - Project Management

Table of Contents

Transferring P3 and P6 Data ......................................................................511


Exporting Projects to P3 ..................................................................................................512
Importing Projects from P3..............................................................................................519

Transferring Data to Oracle Primavera Contractor Users......................543


Exporting Projects............................................................................................................544
Exporting Resources ........................................................................................................546

Index..............................................................................................................547

Primavera - Project Management