of Staircase 3 Back side of Staircase 1 Back side of Staircase 4 4 Ground Floor Key Handing over of 3 Laboratory Area Priority 1 2 3 4 Remarks
Area Handing over on 08-09-2012 Sl No 1 Floor 4th Floor Area Back side of Staircase 1 Back side of Staircase 3 Back side of Staircase 4 Back side of Staircase 2 2 3rd Floor Back side of Staircase 2 Back side of Staircase 4 Following Class rooms 03-008 03-007 03-025 03-032 03-051 03-052 3 2nd Floor 02-056 02-057 Priority Remarks
Area Handing over on 09-09-2012 Sl No 1 2 3 Floor 4th Floor 3rd Floor 2nd Floor Area Back side of Staircase 1 Back side of Staircase 2 Class rooms between staircase No 2 to 3 Class Room 02-056 Class Room 02-057 Priority Remarks
Corridors 1 to 2 2 to 3 3 to 4 1 2
Lift Lobby 3 4
Remarks
Rooms Back side of Staircase Sl No Floor 1 5 6 7 4th Floor 5th Floor 6th Floor NA NA 2 3 4 11-Sep-12 1 to 4
Corridors 1 to 2 2 to 3 3 to 4 1 2
Lift Lobby 3 4
Remarks
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
Handing over Schedule for Service Rooms S no Inspection by H+P 15-Sep-12 15-Sep-12 Inspection by OES 16-Sep-12 16-Sep-12
Floor
Remarks
1 Ground Floor
Below Sitting area - West Regie room Water tank Storage Storage Pump room/ switch room 00-A-741 00-060 00-061 00-062 00-054 13-Sep-12 13-Sep-12 13-Sep-12 13-Sep-12 13-Sep-12 15-Sep-12 15-Sep-12 15-Sep-12 15-Sep-12 15-Sep-12
Below Sitting area - East Storage tank Dancing fountain pump room Regie room 00-057 00-055 00-A-731 15-Sep-12 15-Sep-12 15-Sep-12 16-Sep-12 16-Sep-12 16-Sep-12
UG Pump room
00-058
15-Sep-12
16-Sep-12
00-014
15-Sep-12
16-Sep-12
3 Chiller Compound Chiller Compound Equipment room & cooling tower Chiller compound LV Room 00-A-746 00-A-746 17-Sep-12 16-Sep-12 18-Sep-12 17-Sep-12
4 MEP Housing & Roof MEP Housing south MEP Housing north Roof MEP HVAC Equipment 18-Sep-12 18-Sep-12 18-Sep-12 19-Sep-12 19-Sep-12 19-Sep-12
5 External
12-Sep-12 15-Sep-12
13-Sep-12 16-Sep-12