You are on page 1of 18

LEGENDS

LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

PLAN A
6

301
MK05-03247A

DOWN CONDUCTOR 305


MK05-03251K

AIR TERMINATION ROD

BRIDGE

302

AVE

MK05-03248K

09M

MK05-08857K 306
MK05-03252N

5-049

TI

307
MK05-03253X

OVERHEAD

M EN

MK0

LINE

303
MK05-03249N

C LE

PLAN B
EX

UND AR Y

306A

308
MK05-03254L

BOTTOM SLOPE

BOTTOM SLOPE

BOTTOM SLOPE

/ BO

LINE

304
MK05-03250A

MK05-08857K

309
MK05-03255C

EXTG

R OA

TOP SLOPE

TOP SLOPE

D RE SE

TOP SLOPE

B'

RV E

600

TG

310
MK05-03256M

10 0

FALL

NEW
2679 3000

COVERED
CEMENT 3000

WALKWAY
SCREED 3000 3000 1679

10

Extg lamppost to be repositioned


3000

New covered drain with slabs to match extg drain width and to be connected to extg drain New covered linkway to detail

2000

REFER TO WD/001/04
N

EXTG SUBSTATION

Extg footpath to be deleted

EXTG DRIVEWAY A
New covered drain with gs flat gratings to match extg drain width and to be connected to extg drain

LOCATION PLAN
SCALE 1:2000

A'
F A LL

New 2.8m wide alum composite panel covered linkway to match extg

PLAN A
SCALE 1:200

500

2 3 00

BLK 301

Detail 1
500 2300 5
FALL

New 4mm thk alum composite panel roof

HEIGHT TO BE VERIFIED ON SITE

EXTG OVERHEAD BRIDGE

New gs column to PE's detail

DL OVERE C G T X E

Y INKWA

4mm thk alum composite panel roof with protection system according to authorities requirement

SLOPE

SECTION B-B
SCALE 1:50

EXTG DRIVEWAY
S LO PE

ROOF PLAN A
SCALE 1:200

New 4mm thk alum composite panel covered linkway to match extg
2800 500 2300 5

New 4mm thk alum composite panel roof to match extg

SLOPE

EXTG COVERED LINKWAY

NEW COVERED WALKWAY

New gs C section to PE's detail Gs tapered T-beam to PE's detail New gs C section to PE's detail Gs tapered T-beam to PE's detail
50

BLK 301

MIN. 2400

New gs column to PE's detail

NEW COVERED WALKWAY

400

5mm thk G.I flat bar bracket with 1.5mm thk color bond(bended)

Alum composite panel U channel

SECTION A-A
SCALE 1:50

DETAIL 1
SCALE 1:10

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

Extg 3 palm trees to be fell

LE M

EXTG

K0

FALL

EN

ED COVER

TI

5-

AY LINKW
3000
171

04

63

4P

AV E

TURF

MK05-08724N

E X TG A TH FOOTP

FO OT

309A MSCP

3000
2220

PA TH

FOR TENDER

2207 3000 3000 3000


2092

LEGENDS
LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

DOWN CONDUCTOR AIR TERMINATION ROD

BOTTOM SLO PE

TOP SLOPE

18133
7 SPANS NEW GS COLUMNS @ 3M C/C MAX

BOTTOM SLOPE

BOTTOM SLOPE

E X TG

8 SP

A NS

NEW

646 GS C O LU MNS @3 MC

21

Extg palm tree to be fell


TOP SLOPE

FOR TENDER
TOP SLOPE

A FOOTP

500

/C M

AX

TOP SLOPE

TH

A'
13 SPANS NEW GS CO LUMNS @ 3M

C'
405

37282

C/C MAX

15941
GS CO S NEW 6 S PA N LUMNS

/C MA @ 3M C

2.6M

CEMENT

NEW
SCREED

FOOTPATH

A
New wide covered drain with gs flat grating to match extg drain width and to be connected to extg drain New 2.8m wide alum composite panel covered linkway to match extg

C
EXTG
Extg tree to be fell Extg footpath to be deleted Extg palm tree to be fell

EXTG SUBSTATION

AY LINKW

BLK 304 BLK 303

Extg tree to be fell

PLAN B
SCALE 1:200

SLOPE

SLO

PE

SLOPE

SLO PE

EXTG

4mm thk alum composite panel roof with protection system according to authorities requirement

EXTG SUBSTATION

AY LINKW

BLK 304 ROOF PLAN B


SCALE 1:200

BLK 303
N

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

Extg linkway
500 2300

LEGENDS
LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

DETAIL 2

DOWN CONDUCTOR AIR TERMINATION ROD

HEIGHT TO BE VERIFIED ON SITE

4mm thk alum composite flashing

NEW COVERED WALKWAY

EXTG COVERED LINKWAY

SECTION C-C
SCALE 1:50

EXTG OVERHEAD BRIDGE

DETAIL 2
SCALE 1:10
BOTTOM SLOPE

FOR TENDER

TOP SLOPE

600
3000

L VERED O C G T EX

Y INKWA

3000
2220

1679

2000

2679

3000

3000

3000

3000

3000

To install new DB to nearest HDB's switchroom (location to be verified on site)

ELECTRICAL PLAN B
SCALE 1:200

2207 3000

BLK 301

3000 3000
2092

500

2 3 00

SINGLE LINE DIAGRAM (PLAN A)

SINGLE LINE DIAGRAM (PLAN B)

BOTTOM SLO PE

To install new DB to nearest HDB's switchroom (location to be verified on site)


TOP SLOPE

18133
7 SPANS NEW GS COLUMNS @ 3M C/C MAX

BOTTOM SLOPE

BOTTOM SLOPE

8 SP

A NS

NEW

646 GS C O LU MNS @3 MC

21

With new light fittings mounted on each columns with alternate circuits
TOP SLOPE

TOP SLOPE

/C M

AX

TOP SLOPE

13 SPANS

NEW GS CO LUMNS @ 3M

37282

C/C MAX

15941
MN S COLU NEW G S N A P 6S

S @ 3M

C/C MA

2.6M

NEW

FOOTPATH

EXTG SUBSTATION

BLK 304
N

BLK 303 ELECTRICAL PLAN A


SCALE 1:200

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

LEGENDS

EX

TG

LIGHTNING ALUMINUM TAPE

225

MM

DOWN CONDUCTOR C/W EARTHING POINT

DI A

.S

DOWN CONDUCTOR

EW

ER

L IN

AIR TERMINATION ROD

4800

A'
7000

Extg drain grating to be lowered and slab over(Hatched) New 3.8m ht alum composite panel drop-off porch

9546

2 extg loading/unloading lots to be relocated

Extg reserved & NP lots to be relocated

SLOPE

Extg road kerb to be realigned

5000

1050 Extg signage to be repositioned

4900

1050

2500

30
FALL

Extg footpath to be deleted New 230mm wide covered drain with gs flat grating to be connected to extg drain

600

1000

3200

3200

811

A
New drain to be concealed

BLK 310
N

BLK 310 ROOF PLAN


SCALE 1:100

BLK 310
N

BLK 310 PLAN


SCALE 1:100

New 4mm thk alum composite panel drop-off porch 4000 1000 New 4mm thk alum composite panel covered linkway to match extg New gs C section to PE's detail

EX TG

New 3.1m wide alum composite panel covered linkway

CO VE RE

1 new reserved & NP, 2 new loading/unloading lots to replace relocated lots

2 7

Extg tree to be fell New ramp (G 1:12)

4mm thk alum composite panel roof with protection system according to authorities requirement

FALL

SLOPE

Extg tree to be fell and 2 new trees to be replaced

LIN KW AY

SLOPE

0 00 R9

'NP' LOT

FOR TENDER

BLK 310

5 New 3.8m ht alum composite panel drop-off porch

Extg covered linkway

7000

3800

Gs tapered T-beam to PE's detail MIN 2000 2700

5000

'NP' LOT

New gs column to PE's detail

Extg drop to be topped up with rc

NEW DROP-OFF PORCH

NEW COVERED WALKWAY


FALL

2600 2500 New 3.1m wide alum composite panel covered linkway

To install new DB to nearest HDB's switchroom (location to be verified on site)

SECTION A
1000 3200 3200

600

SCALE 1:50

BLK 310
N

BLK 310 ELECTRICAL PLAN


SCALE 1:100

SINGLE LINE DIAGRAM FOR BLK 310

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

LEGENDS
LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

DOWN CONDUCTOR AIR TERMINATION ROD

2478

873

PROPOSED LINKWAY

873

2478

New 230mm wide covered drain with gs flat grating to be connected to extg sump

FOR TENDER
2400 To install new DB to nearest HDB's switch room (location to be verified on site)

300

BLK 629 PLAN


N

SCALE 1:100
N

LOCATION PLAN
SCALE 1:2000

New 4mm thk alum composite drop panel flashing

To install new DB to nearest HDB's switch room (location to be verified on site)

BLK 629 ELECTRICAL PLAN


SCALE 1:100
4mm thk alum composite panel roof with protection system according to authorities requirement
SLOPE

LIGHT FITTING SPECIFICATIONS


SYMBOL IMAGES DIMENSION DESCRIPTION
1 x 18W LED (MINIMUM 1,800 LUMENS) SURFACE MOUNTED 4' ALUMINIUM LIGHT FITTING WITH MIRROR LOUVRE C/W LAMP AND BUILT-IN DRIVER, SIMILAR TO AEROLITE ASP41LED OR APPROVED EQUIVALENT.

2700

BLK 629 ROOF PLAN


N

SCALE 1:100

New 4mm thk alum composite drop panel flashing New 4mm thk alum composite panel covered linkway

300

2400

New gs column to PE's detail

2380

NEW COVERED WALKWAY


FINISHES TO BE MADE GOOD

New 230mm wide drain covered with slab to be connected to extg sump

2400

SINGLE LINE DIAGRAM (AT BLK 629) SECTION A-A


SCALE 1:50

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

LEGENDS
LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

DOWN CONDUCTOR AIR TERMINATION ROD

230mm new covered drain with gs flat grating to be joined to ext'g drain

FOR TENDER

Extg tree to be fell

New 5m wide alum composite panel high link over new hump

New 3m wide alum composite panel covered linkway

New light fittings refer to WD/001/10

New 5m wide alum composite panel high link over new hump

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

FOR TENDER

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

FOR TENDER

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

FOR TENDER

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

LEGENDS
LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

DOWN CONDUCTOR AIR TERMINATION ROD

FOR TENDER

Ext'g walkway to be extend to 3m width

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

LEGENDS
LIGHTNING ALUMINUM TAPE DOWN CONDUCTOR C/W EARTHING POINT

DOWN CONDUCTOR AIR TERMINATION ROD

Ext'g walkway to be extend to 3m width

Ext'g walkway to be extend to 3m width New gs column to PE's detail

PDF created with FinePrint pdfFactory Pro trial version http://www.pdffactory.com

SU NS

BL

P
K 11 4

TENDER DRAWING
BLK 115
FEBRUARY 21, 2014

CLEMENTI ARCADE

BL

SUNS

11

ET

WAY
BL K 11 2

P
14
BLK 111
BL

LE

ME

P PROPOSED ROOF CANOPY "3"


BLK 103

I T N

. T S

10

BL K

BL

BLK 102
10 1

BL K

NEA SOUTH WEST REGIONAL OFFICE


BL
SU
DR IVE

10

BL

10

9A

NS ET

SU NS ET

VIE

30 7

SU N

SE

NEIGHBOURHOOD
BLK 118

WA

SU

NS ET

AD

TE R

BLK 111

BLK 116

SU

EN

BL

TI

P
EM
11

BL
RO AD

NS

BLK 115
4

LA N

LK

CLEMENTI ARCADE

BL

SUNS

11

30

ET

RO

ET

WAY
BL K 11 2

P
T.

CL

EM

CL

EN

TI

14

BLK 111

E CL

I NT ME

BLK 103

AD

BL K

BLK 102
10 1

BL

EM EN

P
BL K 10 9

EN

TI

P
K

B 10 LK 7A

B 10LK 8

4 P PROPOSED ROOF CANOPY "3"

BL

10

BL

SUNSET WAY RESIDENCE SU NS ET 10 5 WA Y

BLK 110

RO

EAST LODGE CLEMENTI


PA

10 9A

BL K

SU
30 7

AV

NEA SOUTH WEST REGIONAL OFFICE

10 6
BL K

CL

NS

ET

BL

LA N

30

U E

EAST LODGE CLEMENTI

EN

TI

AV

EN

EN

POLICE KINS TRAINING CAMP

TI

P
CL
BL K

AQUATIC SCIENCE CTR

LE

BL

EM

37

2
K BL 33

37 3

AV

LE

EN

TI EN UE 4

BL

37 4

CLEMENTI CC

34 1

BL K

34

LOCATION PLAN
N
SCALE: 1 : 5000

BL

ULU

PANDAN

RO

AD

P
N
0 10 SCALE:

AQUATIC SCIENCE CTR

SITE PLAN
20 30 40 50M 1 : 1000

CL

EM

10 6

BL

EN

TI

B 10 LK 7A

BL 10 K 8

RO

AD

SUNSET WAY RESIDENCE SU NS ET 10 5 WA

BLK 110

SU EI NG UL U
PA UL U
BL

AN ND PA

RK

SU NG EI
PA ND AN PA UL U
BL K 33 9

K 9 33

ND

UL U PA ND
RK CO NN EC TO R
9

CO

CLE

CLE

AN

AN

R TO EC NN

MEN TI ROA D

T MEN I ROA D

TENDER DRAWING FEBRUARY 21, 2014

BLK 104

BLK 104

B
Ext'g Linkway

B
Ext'g Linkway
2 3 4 5M 1 : 100

PLAN OF ROOF CANOPY "3"


N
0 1 2 3 4 5M

ROOF PLAN OF ROOF CANOPY "3"


N
0 1 SCALE:

SCALE:

1 : 100

BLK 104

BLK 104

Ext'g Linkway

SECTION-ELEVATION A-A
0 1 2 3 4 5M SCALE: 1 : 100

SECTION-ELEVATION B-B
0 1 2 3 4 5M SCALE: 1 : 100

Y A W SE A J N
612

613

632 B

BT. PANJANG RING ROA D

535

P
613A MSCP

TENDER DRAWING
FEBRUARY 21, 2014

53

P
537A MSCP

611

538

WEST VIEW PRIMARY SCHOOL


610

P
611A MSCP

537

BRIGHT HILL EVERGREEN HOME


AN-LE

SEN JA D ROA
MEMORIAL HALL
SENJA SO KA CTR

540

609
608

539

SENJA (BP13)

P
541A MSCP
54 1

BT

607

P
630

SE

A J N

D A O

. PA NJ

UP PE R

AN

631

A NJ SE

AD RO

65

65

62

651

P
651A MSCP

PROPOSED SMALL P PAVILION "4"


AH TIM
606

601

603A MSCP

P
603

RIN

545

BT

P
625A MSCP 625B 629B 622 624 623

JELAPANG (BP12)

SE NJ

P
621

AD RO
RI NG
1 53

A LK

0 62

619

52

627

62
626

61

7 61

61

P
BT .

J AN

7A

AN

602

P
529A MSCP

JE LA

RO

SENJA CENTRE
628
616

PA

P P
616A MSCP
61

NG

P
615A MSCP

533A MSCP
3

53

RD

P
633 C
633
632 B

53

AD

SE

A NJ
612

BT. PANJANG RING

WA

535

P
613A MSCP

ROA

614
613

PANGSHAN GR
53 6

4 53

CA

P
537A MSCP
538

611

RO

WEST VIEW PRIMARY SCHOOL


610

BT. PANJANG NEIGHBOURHOOD PARK 5


540

537

L NA

P
611A MSCP
609

604 605

BRIGHT HILL EVERGREEN HOME


AN-LE

SEN JA ROA D

AD

539

608

54 2

SENJA (BP13)

P
541A MSCP
54 1

MEMORIAL HALL
SENJA SO KA CTR
607

N SE

JA

RO

AD

. T B
CA L A N

BT . PA NJ

54 3

JUNCTION 10

UP PE R . BT

AN

PROPOSED SMALL P PAVILION "4"


606

603A MSCP

P
603
602

544

SENJACASHEW CC

604 605

BT
L NA CA

. P

ANG ANJ

ROAD

JUNCTION 10
SITE PLAN
N
0 10 20 30 40 50M SCALE: 1 : 1000

601

G RIN G
545

544

TIM AH
CA

RO AD

RO AD

LOCATION PLAN
SCALE: 1 : 5000

NA L

BT. PANJANG PLAZA

TENDER DRAWING
FEBRUARY 21, 2014

B
11 1.7 3

BO UN

BO
DA RY LIN

UN DA RY

E/

LIN

E/

CANAL
A

CANAL
A

PLAN OF SMALL PAVILION "4"


N
0 1 2 3 4 5M

ROOF PLAN OF SMALL PAVILION "4"


N
0 1 2 3 4 5M SCALE: 1 : 100

SCALE:

1 : 100

111.73

111.73

SECTION-ELEVATION A-A
SCALE: 1:100

SECTION-ELEVATION B-B
SCALE: 1:100

622

0 62

619

R
7 1 6

G N I
1 53

TENDER DRAWING
FEBRUARY 21, 2014

62

626

61 8

61

N A P
BT .

G N JA

7A

PA LA JE

SENJA CENTRE
628

P P
616A MSCP 615A MSCP
61 3

NG

616

533A MSCP
3 3 5

RD

P
633 D

BT. PANJANG RING ROA D

614

PANGSHAN GR
535

53 4

Y A W SE A J N
612

P
613A MSCP

613

53

P
537A MSCP

611

538

P
BT. PANJANG NEIGHBOURHOOD PARK 5

WEST VIEW PRIMARY SCHOOL


610

P
611A MSCP

537

JA SEN

540

630

631

JA EN

AD RO

0 65

65

9 62

651

P
651A MSCP

P
625A MSCP 625B 629B 622
0 62

JELAPANG (BP12)

SE NJ

624

623

P
621

AD RO
RI NG
1 53

A LK

619

52

609
P
53 2

539

627

62
626

61

61

7 61

N PA

JA

7A

NG

BT

SENJA CENTRE
628
616

529A MSCP

P P
616A MSCP

61

P
615A MSCP

533A MSCP

BRIGHT HILL EVERGREEN HOME


AN-LE

D ROA

608

54

JE LA

PA NG RD

P
633 C
633
632 B

53

D
614

WA NJ SE A

535

P
613A MSCP

BT. PANJANG RING ROA D

PANGSHAN GR
53 6

SENJA (BP13)

P
541A MSCP
54 1

4 53

613

P
537A MSCP
538

612

611

P
BT. PANJANG NEIGHBOURHOOD PARK 5

WEST VIEW PRIMARY SCHOOL


610

P
611A MSCP
609

540

BRIGHT HILL EVERGREEN HOME


AN-LE

608

54 2

MEMORIAL HALL
SENJA SO KA CTR
SENJACASHEW CC
54 3

PROPOSED BFA RAMP "5"


607

537
539

SEN JA ROA D
MEMORIAL HALL
SENJA SO KA CTR

. BT

54

SENJA (BP13)

P
541A MSCP
54 1

PROPOSED BFA RAMP "5"


607

A NJ SE
R

D OA

P
BT . TIM AH

603A MSCP

P
603

544

606

604 605

B
CA L NA

JAN PAN T.

AD G RO

SE
N
0 10 20

A J N

D A O

BT . AN NJ PA

JUNCTION 10

UP PE

601

NJ PA

G RIN G
602
545

544

RO AD

P UP

NA CA

RO AD

LOCATION PLAN
N
SCALE: 1 : 5000

AN

BT. PANJANG PLAZA

601

ER BT . TIM AH AD RO

SITE PLAN
30 40 50M SCALE: 1 : 1000

RIN G RO AD

TENDER DRAWING
FEBRUARY 21, 2014

SECTION A - A
SCALE: 1:100

PLAN OF BFA RAMP '5'


SCALE: 1 : 100

TENDER DRAWING FEBRUARY 21, 2014

COLUMN DETAIL

DETAIL "E" SCALE: 1 : 20

SEE DETAIL "E"

TYPICAL RAMP RAILING DETAIL BETWEEN HIGH & LOW WALL


SCALE: 1 : 50

TYPICAL RAMP RAILING DETAIL FOR RAMPS WITH LEVEL MORE THAN 1.00m HEIGHT
SCALE: 1 : 50

TYPICAL RAMP RAILING DETAIL FOR RAMPS WITH LEVEL LESS THAN 1.00m HEIGHT
SCALE: 1 : 50

TYPICAL DETAIL OF STAINLESS STEEL HANDRAIL TO RAMP ABUTTING A LOW WALL


SCALE: 1 : 50

PLAN
SCALE: 1 : 50

TYPICAL RAMP DETAIL


TYPICAL LINKWAY RAMP FLOOR FINISH
SCALE: 1 : 50

TYPICAL DETAIL OF STAINLESS STEEL HANDRAIL TO RAMP ABUTTING A HIGH WALL


SCALE: 1 : 50