CONSTRUCTION OF AUDITORIUM BUILDING

SYNOPSIS

Objective of the project : The main objective of the project is plan,section,elevation,design,and estimate of an auditorium building.

to prepare a

Brief methodology :the construction of an auditorium building is to be build on the area of 30*35 m approximately. The auditorium building is quite essential for te students wit more comport. Building consists of stage,dressing room,foyer,offstage,store room,conference hall,step,toilet(gents &ladies),the basement will be in RRmasonry,BW in CM 1:6 is provided the structural components are designed as per IS 456-2000 and IS 875-1987(part 2).detailing is followed for the structure elements as per SP 16,NBC and IS 875 (part 2)1987 concrete grade M20 and steel HYSD Bars of grade Fe415 is used.

CONSTRUCTION OF TENNIS STADIUM


SYNOPSIS

Objective of the project :The main objective of the project is to prepare a plan,design,estimate for proposed tennis stadium.

Brief methodology :the stadium is apporxi600 sq.m.it as dressing room,a rest room,a office room,a store room, a toilet room for both. The work will be in first class bricks work in C.M 1:6 and the foundation will be P.C.C. 1:4:4:8 mix.all the construction will be in R:C:C works will be plastered with CM 1:4 MIX and colour washed. The wooden doors,glassed windows ventilators are to be provided.the structural components like columns,beams,walls, etc are analysed and designed as per IS 875-1987 and IS 456-2000.The duration of the pjt can be arrived by using netwk analysis.the facilities in construction can be improved without causing any destruction to the environment.detailing is followed for the structural elements are as per S P:16,NBC,and IS 875 PART2.necessary electrification and ventilation are to be provplay grd will be cement concreate and synthetic.

CONSTRUTION OF SEPTIC TANK FOR A COLONY


SYNOPSIS

Objective of the project : The main objective of the project is to prepare a plan, design, and estimate of a septic tank.

Brief methodology :The plan area of the tank is of 25 m2 approx,.. The construct of septic tank for colony is merely essential for genuine leading life of people in the village. Septic tank is proposed with soak pit,bottom of the tank with cement concrete of 1:2:4 mix at a depth of 5m.below the gd level .undergd wall will be in brick wk with cm 1:4 mix.concrete baffle,iron footsteps,distribution chamber,stone ware tee of be proposed.plastering will be of CM 1:4 mix design is based on limit state method.the chart model may be prepared.

CONSTRUTION OF A PRIMARY HEALTH CENTER

SYNOPSIS

Objective of the project : The main objective of the project is to prepare a plan, design, and estimate for a CONSTRUTION OF A PRIMARY HEALTH CENTER at kamanery.

Brief methodology :the primary hece. Building is essential for all patients to get treatment.the area of building is 500m approm., A framed structure is proposed with R.C.C Footing,colum &beam.reception hall,store room,treatment rm with 5 beds,a delivery rm,a dispensary room&toilet. The cement concrete 1:4:8 mix.the masonry footing will be in cement mortar 1:5 for all walls.all the walls includes basement will be plastered smooth with cement mortar 1:4 externally& 1:6 interof 12mm thick.