CRUDE OIL WASHING CHECK LIST

Company Forms and Check Lists

Date : 03.04.01 Rev.No : 2 Prep. : MGV App. : CAP Section : 05 Page : 1 of 2

BEFORE C.O.W.
DATE :____________________________________________ # 1 2 3 4 5 6 7 8 9 10 11 12 CHECKING PROCEDURE Has terminal been notified? Are oxygen analysers tested and working satisfactorily? Is the tank washing pipeline system isolated from water heater and engine room? Are all hydrant valves on tank washing machines shut? Are all valves to fixed tank washing line blanked? Have tank cleaning lines been pressurized to maximum working pressure and leakages repaired? Have drive units for fixed tank washing machines been tested? Have pressure gauges been checked? Has the communication system been checked and tested? Has the organization plan been drawn up and posted, with duties and responsibilities defined? Have the discharge/crude oil wash operation plans been drawn up and posted? Note: This plan must be signed by the Master and Chief Officer. In cases where the Terminal has a standard radio Check List, has this been completed and transmitted? PORT: ____________________________ CHECK REMARK

DURING C.O.W.
# 1 2 3 4 5 6 7 8 9 10 CHECKING PROCEDURE Is the quality of inert gas being delivered frequently checked and recorded? Are all deck lines and machines being frequently checked for leaks? Is crude oil washing in progress in designated cargo tanks only? Is the pressure in the tank wash line as specified in the COW manual? Are cycle times of tank washing machines as specified in the COW manual? Are the washing machines in operation, together with their drive units, if applicable, frequently checked and are they working properly? Is a responsible person stationed and continuously on deck? Will trim be satisfactory when bottom washing is in progress as specified in the COW manual? Will a recommended tank draining method be followed? Have ullage gauge floats been raised and housed in tanks being crude oil washed?
Ver1

CHECK

REMARK

C:\FORMS\05_0004.PDF

MT LADON

CRUDE OIL WASHING CHECK LIST


Company Forms and Check Lists

Date : 03.04.01 Rev.No : 2 Prep. : MGV App. : CAP Section : 05 Page : 2 of 2

11

Is the level in the holding tank for tank washings frequently checked to prevent any possibility of an overflow?

AFTER C.O.W.
# 1 2 3 4 CHECKING PROCEDURE Are all valves between discharge lines and tank wash lines closed? Has tank wash line been drained of crude oil? Are all valves to washing machines closed? Are cargo pumps, tanks and pipelines properly drained as specified in the COW manual? CHECK REMARK

Duty Officer

Chief Officer

_________________________
Signature

_________________________
Signature

INSTRUCTIONS : To be filled in every time you perform C.O.W, operation and to be retained in the relevant voyage file.