Professional Documents
Culture Documents
Deviation data MD(M) TVD(M) 245 245 265 264 292 291 342 341 X mas tree Data RKB from MSL wellhead depth from RKB 33.3 93.4
PVT Data
508 537 682 711 845 874 932 961 990 1019 1048 1077 1106 1135 1164 1193 1222 1251 1280 1309 1338 1367 1396 1425 1455 1484 1513 1542 1571 1600 1629 1658 1687 1716 1745 1756 1767 1787 1789 1792 1795 1805 1814 1824 1834 1843 1853 1863 1872 1882 1892 1901 1911 1921 1930
507 536 681 710 844 873 931 960 988 1017 1045 1073 1101 1127 1154 1180 1207 1232 1257 1281 1304 1326 1347 1366 1384 1400 1414 1428 1441 1454 1468 1482 1496 1510 1524 1529 1534 1543 1544 1545 1546 1546 1545 1544 1544 1543 1543 1542 1542 1541 1540 1539 1539 1538 1538
35.521 Standing 1.017 Beal+ Chew 32000 ppm carr et al 691 sm3/sm3 2.80%
Reservoir Data layer Pressure 998 psig layer temp 208 F mid Perf(MD) 1930 m Test Pressure 544 psig Test Rate 531 stb/day
Temperature Model T Seawater 80 F Tatmosphere 90 F T at Gauge 168 F T Outlet 168 F Start for WH End from WH 0 77.6 m 77.6 m
77.6 m
2.441 2.875
Reservoir Data layer Pressure layer temp mid Perf(MD) Test Pressure Test Rate
Pressure psia 1821 1415 1215 815 615 415 Saturation Pressure (psia) Temperature (deg F) GOR (SCF/STB)
OVF Factor bbl/stb 1.44 1.383 1.356 1.303 1.277 1.252 1821 210 655 weight(lbs/ft)
PVT Tuning Solution GOR Oil Viscosity scf/stb cp 655.7229 507.0002 428 287 214 130
equipment Data SSV exp Joint X Over Tubing-1 Tubing-2 casing Mid perf GLV Data GLV-1 GLV-2 GLV-3 GLV-4
Depth MD (m) 164 2025 2044 2044 2344 2596 2596 MD(m) 689 1326 1746 2011
OD (inch)
3.5 2.875 7
9.3 6.3 26
Gas Lift Parameters casing Pressure injection Gas Gravity valve Diff pressure Lift Gas injection rate
Port Size 12 16 16 24
DEVIATION SURVEY Measured Depth (m) 0 120 150 170 200 250 330 350 360 380 400 420 450 480 500 530 570 1151 1162
Test Date
True Vertival Depth (m) 0 120 150 170 199.9 249.5 328.8 348.4 358.2 377.6 396.9 416 444.3 472.5 491.1 518.6 554.7 1076.2 1086.1
Choke THP
0.721 (sp. gravity) 9000 (ppm) 1.0052 sp grav EQUIPMENT OD (in) 1017 1135 995 1013.3 1017 4.5 10.75
Label Tubing Casing Restriction SSS Valve Restriction Jet Pump Data NT Oil Master PF Pump Depth
MD (m)
Oil Rate
Gas Rate
Water Rate
Water Cut
PF Pressure
PF Rate
Liquid
GVF
Wellflow
64th 88 88 88
% 95 95 95
ReO Example - 1
Manifold to be constructed
Source 1 Production-300 m3/day GOR- 150 sm3/sm3 WC-50% Pipwline-8km-8"-WF HP Separator 16 Kg/cm2
Gas
Gas
Liquid Gas Source 2 Production-300 m3/day GOR- 150 sm3/sm3 WC-50% Pipe Line-6km-8"-WF
MP Separator 6 kg/cm2
Compressor
Gas
Liquid
Compressor
Water Tank
ReO Example - 2
Sub sheet Unmanned Platform 1- Naturally Flowing Well Head 1 Downcomer Air 20m Downcomer Water 60m Seabed 3 Km 3 Km Pipeline
Sub sheet - Field Manifold 1-Riser to be constructed with 6 Km pipeline to Process Platform
Gas Processing Platform HP and MP Gas will be compressed at 16 kg/cm2 and will go to sales Gas (100000 m3/day) and remaining gas will go to unmanned platform 2 for Gas lifter well
Sub sheet Unmanned Platform 2- Gas Lifted Well Head 2 Downcomer Air 20m Downcomer Water 60m Seabed 3 Km
Sub sheet Process Platform-Riser to be constructed FM1-Riser-Heater Treater at 60 degC, HP separator at 10 kg/cm2, gas will go to gas platform and liquid will go to MP separator System. FM2-Riser-Heater Treater at 70 degC, MP separator at 6 kg/cm2(gas will go to compressor then to Gas platform. Liquid will go to LP separator) Sub sheet - Field Manifold 2-Riser & downcomer to be constructed with 4 Km pipeline to Process Platform LP separator at 2 kg/cm2, gas will flare and oil with be pumped to tank and water will be pumped to tank
Sub sheet Unmanned Platform 3 - Source(Temp 30 deg C, Production 500 m3/day, GOR 500, WC 40 %) Downcomer Air 20m Downcomer Water 60m Seabed 3 Km
Sub sheet Unmanned Platform 4 - Source Source (Temp 30 deg C, Production 500 m3/day, GOR 500, WC 40 %) Downcomer Air 20m Downcomer Water 60m Seabed 3 Km
3 Km Pipeline