Shannon Graup

March 20th, 2014


GISC9305 D3
Mike Wallace CET, OLS OLIP
Professor
Niagara College
135 Taylor Road
Niagara-on-the-Lake, ON
L0S 1J0

Dear Mr. Wallace,


Re: GISC9305-D3 AutoCAD Source Drawing Queries / Report
Please accept this letter as my formal submission of deliverable 3, AutoCAD Source Drawing
Queries / Report for GISC9305 CAD and GIS.
During this project a number of tasks were completed in AutoCAD Map 3D 2014 to determine
the costs of re-lining and replacing sanitary sewer pipes in Springfield, Oregon. Different query
types and modes were utilized during this project. The queries were created to isolate different
pipe types and sizes and to determine the length of the sewer pipes.
After completing the project work in AutoCAD Map 3D 2014 it was determined that the total cost
to re-line and replace the concrete and clay sanitary sewer pipes in Springfield, Oregon is
$245,676.57.
If you have any questions regarding the project please feel free to contact me by phone (647921-4930) or e-mail (shannon.graup@gmail.com) at your convenience. I look forward to
receiving your feedback and suggestions.

Sincerely,

Shannon Graup BAH


GIS GM Candidate
S.G
Enclosures
1) Technical Memorandum: AutoCAD Source Drawing Queries / Report

Technical Memorandum: AutoCAD Source Drawing Queries / Report


Shannon Graup
shannon.graup@gmail.com

Project:

Springfield, Oregon

Client:

Mike Wallace CET, OLS OLIP

Subject:

AutoCAD Source Drawing Queries / Report

Date:

March 20th, 2014

1.0

Prepared By: Shannon Graup BAH, GISGM Candidate

GISC9305 D3

Introduction

This technical memorandum outlines the steps and procedures completed to determine the
costs of a sanitary sewer maintenance program taken from the project terms of reference
(Wallace, 2014). After inspection of the sanitary sewer pipes it was determined by professionals
that all concrete sewers in the city require re-lining and all the vitreous clay sewers require
complete replacement. Sewers made of PVC do not require any maintenance.

1.1

Project Goal

The goal in completing this project is to determine the costs to the city to re-line and replace the
sanitary sewers. Costs of re-lining and replacing sewers per foot have been provided for the
analysis of the city sanitary sewer pipes.

1.2

Study Area

The study area for this project is a portion of Springfield, Oregon. A small subset of sanitary
sewer pipes in the city must be re-lined and replaced. Springfield is located east of Eugene,
Oregon. Figure 1 shows the study area for this project.

Data Source: Google Maps

Figure 1: Springfield, Oregon, United States

Mar. 20, 2014

Page | 1

Technical Memorandum: AutoCAD Source Drawing Queries / Report


Shannon Graup
shannon.graup@gmail.com

2.0

Methodology

There were a number of steps completed in AutoCAD Map 3D 2014 during this project to
complete the project goal of determining the costs to Springfield to re-line and replace a portion
of the concrete and clay pipes.

2.1

Creating Drive Alias & Connecting Source Drawings

The first step beginning this project was to open a new AutoCAD drawing template and create a
drive alias for the source drawings. A drive alias is created to show AutoCAD where the source
drawings are located. Once the drive alias is set source drawings can be connected and
activated.

2.2

Query Type

There are four types of queries that can be used in AutoCAD; location, data, property and SQL.
During this project query types location and data were utilized to create outputs containing the
desired results.

2.2.1 Location Queries


There are a number of different types of location query conditions. This determines what
location of the input data will be selected. For this project a location condition of all was
chosen. Other location conditions include buffer fence, circle, point or window. Location
queries were used during this project to isolate and export the entire road network and
tax lots in the specific area of interest in Springfield, Oregon. Location queries were also
used in conjunction with the data queries to produce the sewer pipe outputs.

2.2.2 Data Queries


Data queries were used in conjunction with location queries during the project to isolate
sanitary sewer pipes by material and size. Object data of size and material were used to
query out different sewer pipes and different pipe sizes. The three different pipe types
(concrete, clay and PVC) were isolated from one another using the object data material.
The concrete pipes were queried into three different outputs with pipe sizes 6 8, 10
12, and 15 18, while the clay pipes were queried into five different outputs with pipe
sizes of 6, 8, 10, 12, and 15. These queries were completed using the sewer pipe
object data size.

Mar. 20, 2014

Page | 2

Technical Memorandum: AutoCAD Source Drawing Queries / Report


Shannon Graup
shannon.graup@gmail.com

2.3

Query Mode

There are three query modes available in AutoCAD; preview, drawing and report. All three
query modes were tested throughout the completion of this project, but the main uses were of
the drawing and report modes. The preview query mode is used to test a query before drawing
it and creating the final output layer.

2.3.1 Drawing
The drawing query mode was used to produce all of the output layers of the concrete,
clay and PVC sewer pipes, as well as the roads and tax lots. This query mode draws the
query outputs to the specific settings set in the query. The layer name can be given, and
all layer properties can be set including colour, linetype and line weight.

2.3.2 Report
Report query mode was also used during this project to produce outputs containing the
lengths of pipes to be re-lined and replaced. For each of the queries used to produce the
individual size outputs for the concrete and clay sewer pipes a report query was
produced with the length of each pipe. These lengths were then inputted into a Microsoft
excel worksheet to calculate the costs of re-lining and replacing the concrete and clay
pipes.

3.0

Findings

After completing the different drawing queries to produce layers of each individual pipe type and
size a final output map was created in ArcGIS Desktop Software ArcMap 10.1. ArcMap software
was used to create the final map instead of AutoCAD Map 3D because there are problems
creating a legend in AutoCAD software. Exporting each of the sewer pipe layers into a shapefile
and creating a final map in Arc created a better final output for the project. A map showing the
different sanitary sewer pipes in Springfield, Oregon can be seen in Figure 2.

Mar. 20, 2014

Page | 3

Technical Memorandum: AutoCAD Source Drawing Queries / Report


Shannon Graup
shannon.graup@gmail.com

Figure 2: Sanitary Sewer Pipe Lines, Springfield, Oregon

Mar. 20, 2014

Page | 4

Technical Memorandum: AutoCAD Source Drawing Queries / Report


Shannon Graup
shannon.graup@gmail.com
The report queries were used to determine the costs of re-lining and replacing the concrete and
clay sewer pipes in Springfield. The entire excel sheet containing the pipe lengths and costs can
be found in Appendix 2. The costs for re-lining and replacing the pipes can be seen below in
Table 1.
Table 1: Costs for Re-lining and Replacing Sanitary Sewer Pipes

Concrete re-lining

Clay replacing

Pipe size

Cost per foot

Pipe Size

Cost per foot

6 8
10 12
15 18

$2
$3
$5

6
8
10
12
15

$22
$25
$27
$33
$38

The total cost to re-line the concrete pipes and replace the clay pipes is $245,676.57. The cost
for re-lining the concrete pipes in the city is $67,551.36. The costs for concrete pipes broken
down into pipe sizes of 6 8, 10 12, and 15 18 are $28,801.61, $18,065.74, and
$20,684.01 respectively. The cost for replacing clay pipes in the city is $178,125.22. The cost to
replace clay pipes by sizes of 6, 8, 10, 12, and 15 are $2,603.26, $102,802.92, $25,674.70,
$6,897.67, and $40,146.66 respectively.

4.0

Conclusion and Recommendations

After completing queries to produce drawing layers of pipe types and sizes and reports showing
the pipe lengths, the total cost to re-line and replace the sewer pipes in Springfield is
$245,676.57. Appendix 1 shows a map of the entire study area located in Springfield, Oregon
with city tax lots and streets shown with the sanitary sewer system. The costs broken down into
pipe type and sizes can be found in Appendix 2. It is recommended that construction should
begin on the pipe type found to be in worst condition, and that construction on only one pipe
type should be ongoing at once. Once either the concrete or clay pipes are re-lined or replaced
construction on the other type can begin.

5.0

Bibliography

Wallace, M. (2014). Terms of Reference for Deliverable 9305-D3: Source Drawing Queries /
Report.

Mar. 20, 2014

Page | 5

Technical Memorandum: AutoCAD Source Drawing Queries / Report


Shannon Graup
shannon.graup@gmail.com

Appendix 1: Map of Springfield, Oregon Area

Mar. 20, 2014

Page | 6

Technical Memorandum: AutoCAD Source Drawing Queries / Report


Shannon Graup
shannon.graup@gmail.com

Appendix 2: Sanitary Sewer Pipe Length's and Costs


PipeMaterial

PipeSize

PipeLength

Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete

6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"

246.3645155
113.7000722
38.62194771
8.466588384
86.23725033
23.49343118
14.80546065
35.01451888
138.2852294
40.31128874
30.14962686
30.52820689
15.1220568
81.61494961
37.56543065
36.39041744
24.16609195
137.4627222
151.6795047
56.66126673
107.9816759
66.72093351
33.77269358
51.00188019
55.40859463
68.64885566
59.75418016
53.31101885
47.83974802
91.54861938
99.40321926
40.46950785
267.421126
29.69522497
52.13510919
69.05940285
188.1100095

Mar. 20, 2014

CostPerFt
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

TotalCost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

492.73
227.40
77.24
16.93
172.47
46.99
29.61
70.03
276.57
80.62
60.30
61.06
30.24
163.23
75.13
72.78
48.33
274.93
303.36
113.32
215.96
133.44
67.55
102.00
110.82
137.30
119.51
106.62
95.68
183.10
198.81
80.94
534.84
59.39
104.27
138.12
376.22

Page | 7

Technical Memorandum: AutoCAD Source Drawing Queries / Report


Shannon Graup
shannon.graup@gmail.com
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
PipeMaterial

6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
PipeSize

32.95606225
21.13147564
95.68912537
55.91780638
53.62559128
10.23633704
238.6655047
150.9162086
22.70776769
PipeLength

$
$
$
$
$
$
$
$
$

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
CostPerFt

$
$
$
$
$
$
$
$
$

65.91
42.26
191.38
111.84
107.25
20.47
477.33
301.83
45.42
TotalCost

Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete

6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"

242.4004955
69.43658638
54.0794803
24.74081421
245.61517
59.94370976
129.627399
41.76122604
33.25185552
26.53801294
48.12203052
245.2005903
17.93689579
38.54667261
231.7911796
123.4376326
106.8938997
20.09975124
83.39126187
126.8264285
188.2246616
187.6189952
274.3427595
68.31501427
118.0221705
110.6350694
257.0194784
84.60761652
30.63462717
37.09018379

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

484.80
138.87
108.16
49.48
491.23
119.89
259.25
83.52
66.50
53.08
96.24
490.40
35.87
77.09
463.58
246.88
213.79
40.20
166.78
253.65
376.45
375.24
548.69
136.63
236.04
221.27
514.04
169.22
61.27
74.18

Mar. 20, 2014

Page | 8

Technical Memorandum: AutoCAD Source Drawing Queries / Report


Shannon Graup
shannon.graup@gmail.com
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
PipeMaterial

6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
PipeSize

36.2248113
114.3406127
198.6673905
167.7994993
36.43426081
80.66491727
68.6926572
46.12744532
153.316634
136.4757748
43.54986845
31.81310638
19.64605591
400.2811512
100.0449899
153.0028576
PipeLength

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
CostPerFt

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

72.45
228.68
397.33
335.60
72.87
161.33
137.39
92.25
306.63
272.95
87.10
63.63
39.29
800.56
200.09
306.01
TotalCost

Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete

6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"

30.14962686
42
179.9417555
26.301949
72.93923765
336.7305002
209.960019
70.82227052
31.14720086
140.6943379
125.4822728
63.35322247
274.8836201
32.64281064
39.12950854
258.9098402
144.3294658
239.1103319
138.8120075
49.30881157
69.92091561
46.29351799
66.45017085

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

60.30
84.00
359.88
52.60
145.88
673.46
419.92
141.64
62.29
281.39
250.96
126.71
549.77
65.29
78.26
517.82
288.66
478.22
277.62
98.62
139.84
92.59
132.90

Mar. 20, 2014

Page | 9

Technical Memorandum: AutoCAD Source Drawing Queries / Report


Shannon Graup
shannon.graup@gmail.com
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete

6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"
6" - 8"

217.6825279
238.0607934
82.64156386
146.3907426
66.84160937
280.7498115
279.7703621
283.587856
342.2130692
38.84854845
54.9260839
186.319162
118.0298374
227.4284773
39.01640876
102.8821702
18.14199145
116.6728566
36.2062752
27.59907135
35.06626469
105.4130403
142.9998348

PipeMaterial

PipeSize

PipeLength

Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete

10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"

77.68939675
48.92208438
203.0511438
144.6658328
61.98259751
70.0285656
60.07495318
255.8149201
130.4625768
73.00179563
272.2318997
340.0313198
685.7555542
290.6947852
70.00714249

Mar. 20, 2014

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
Total
CostPerFt

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

435.37
476.12
165.28
292.78
133.68
561.50
559.54
567.18
684.43
77.70
109.85
372.64
236.06
454.86
78.03
205.76
36.28
233.35
72.41
55.20
70.13
210.83
286.00
28,801.61
TotalCost

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

233.07
146.77
609.15
434.00
185.95
210.09
180.22
767.44
391.39
219.01
816.70
1,020.09
2,057.27
872.08
210.02
Page | 10

Technical Memorandum: AutoCAD Source Drawing Queries / Report


Shannon Graup
shannon.graup@gmail.com
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete

10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"
10" - 12"

301.6542946
247.8003598
322.1362175
90.00555538
354.8922744
260.3771602
243.6472861
380.0328933
400.3601332
346.289058
46.83147686
75.13826473
80.77139461
87.56381255

$
$
$
$
$
$
$
$
$
$
$
$
$
$

Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete

15" - 18"
15" - 18"
15" - 18"
15" - 18"
15" - 18"
15" - 18"
15" - 18"
15" - 18"
15" - 18"
15" - 18"
15" - 18"
15" - 18"
15" - 18"
15" - 18"
15" - 18"

93.17188417
240.8754865
91.31533421
344.2898247
329.758274
384.2668344
410.487515
363.5006427
297.5163861
363.2409669
348.2944157
297.6995129
203.9828424
316.4718874
51.92920219

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

PipeMaterial

PipeSize

PipeLength

Clay

6"

118.3301964

Clay
Clay
Clay
Clay
Clay

8"
8"
8"
8"
8"

155.8768791
289.8827349
304.3385074
368.2427901
247.8456989

$
$
$
$
$

Mar. 20, 2014

3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
Total
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
Total
Con Total
CostPerFt

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

904.96
743.40
966.41
270.02
1,064.68
781.13
730.94
1,140.10
1,201.08
1,038.87
140.49
225.41
242.31
262.69
18,065.74
465.86
1,204.38
456.58
1,721.45
1,648.79
1,921.33
2,052.44
1,817.50
1,487.58
1,816.20
1,741.47
1,488.50
1,019.91
1,582.36
259.65
20,684.01
67,551.36
TotalCost

22.00
Total
25.00
25.00
25.00
25.00
25.00

$
$
$
$
$
$
$

2,603.26
2,603.26
3,896.92
7,247.07
7,608.46
9,206.07
6,196.14
Page | 11

Technical Memorandum: AutoCAD Source Drawing Queries / Report


Shannon Graup
shannon.graup@gmail.com
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Clay

8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"

297.6189901
19.2844453
49.49172632
256.6576997
78.19608938
325.0000637
305.0000651
402.5639234
188.2884708
184.8133646
314.1830619
324.8324764

Clay
Clay

10"
10"

430.6034624
520.3114452

Clay
Clay

12"
12"

131.7868785
77.23339622

Clay
Clay
Clay
Clay
Clay
Clay

15"
15"
15"
15"
15"
15"

193.9808869
34.5903466
142.7091278
143.1062269
247.6252198
294.4791779

Mar. 20, 2014

$
$
$
$
$
$
$
$
$
$
$
$

25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
Total
$
27.00
$
27.00
Total
$
33.00
$
33.00
Total
$
38.00
$
38.00
$
38.00
$
38.00
$
38.00
$
38.00
Total
Clay Total
Grand Total

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

7,440.47
482.11
1,237.29
6,416.44
1,954.90
8,125.00
7,625.00
10,064.10
4,707.21
4,620.33
7,854.58
8,120.81
102,802.92
11,626.29
14,048.41
25,674.70
4,348.97
2,548.70
6,897.67
7,371.27
1,314.43
5,422.95
5,438.04
9,409.76
11,190.21
40,146.66
178,125.22
245,676.57

Page | 12