LEED INDIA NC for New Construction - 2011 Registered Project

Project Name: Project Address: Yes 56 GOLD Yes 14 YES ? 6 No 6 Sustainable Sites Prerequisite 1 Erosion & Sedimentation Control 26 Points Required Credit Requirements Create and implement an erosion and sedimentation control plan for all construction activities associated with the project. The plan must conform to erosion and sedimentation control requirements of Local Standards and Codes (OR) National Building Code of India (NBC), Part 10, Section 1, Chapters 4 & 5, whichever is more stringent. During construction ensure To prevent loss of soil during construction by stormwater runoff and/or wind erosion, including protecting topsoil by stockpiling for reuse. To prevent sedimentation of storm sewers or receiving streams. To prevent pollution of the air with dust and particulate matter. Documents Required Reponsibility Status 27 Nov'2012 Manadatory Requirement Requirements explained/given to the TCS site team. LEED req for civil team shared with the whole team along with details of stabilization entrance/silt fence. TCS site team + TCE to take care of the requirements explained. Provide the site documentation. AECOM has been given/explained LEED requirements for SSp1. Stormwater Management plan to be designed to take care of the credit requirements. Provide photographic documentation of the above three measures TCS Site Team TCE during construction. ( Min 12 relevant photographs) Provide Post construction Storm water Management Plan with details to AECOM Ensure implementation of erosion and sedimentation control measures such that no water that is discharged from the site into the municipal stormwater or natural nallah is laden with sediments. ? 26 No 28 Project Registration status : Project Totals TCS Adibatla Ranga Reddy District, Near Bangluru Junction, Hyderabad NOT DONE 110 Points

Certified: 40-49 points Silver: 50-59 points Gold: 60-79 points Platinum: 80 points & above

Credit 1

Site Selection

Do not develop buildings, hardscape, roads or parking areas on portions of sites that meet any of the following criteria High-value farmland /Previously undeveloped land within areas classified at high or very high hydrogeologic risk,including any land whose elevation is lower than 5 feet (1.5 meters) above the elevation of the 100-year flood, as defined by the relevant local, regional, state or central government agency. Land specifically identified as habitat for any species listed as threatened or endangered by Wildlife Institute of India. Land within 100 feet (30 meters) of a wetland listed as being of high ecological value by the relevant local, regional, state, or central government agency. Renovation of an existing building is allowed if construction impact is limited to the existing development footprint. Previously undeveloped land that is within 50 feet (15 meters) of a water body that supports or could support aquatic life, recreation or industrial use, as determined by a professional biologist. Land that prior to acquisition for the project was public parkland.

Permit from the relevant local authority in the form of a land allotment/ TCS land use letter; also, where applicable, clearance from the Ministry of Environment and Forests (MoEF). Submit the final set of approved architectural drawings, detailed area statement showing building wise, floor wise, space wise areas with space type and area.

TCS to provide land allotment letter/approved zoning plan/commencement certificate from the concerned authority. 5 1 Credit 2 Credit 3 Development Density and Community 5 Connectivity 1 Brownfield Redevelopment NA NA NA NA NA NA NA 6 Credit 4.1 Alternative Transporation, Transportation Access Public 6 Provide a drawing showing the project location on google map with the Edifice + TCS OPTION 2. Bus Stop Proximity Locate the project within 1/4-mile (400-meter) walking distance (measured from a main building nearest bus stop/railway station/campus bus stops marked with entrance) of 1 or more stops for 2 or more public, campus, or private bus lines usable by building pedestrian access from the main building entrance. occupants. TCS to ensure provision of campus buses for shuttle/long distance for employee dropoff and pick up from the common points enroute to the city and near the employee residences on scheduled route such that 70% of the total occupants on the campus can avail this service. Edifice to provide the location of campus bus stops in such a manner that the bus stops are within the walkable distance of 400m from each building entrance. 1 Credit 4.2 Bicycle storage and shower 1 Provide secure bicycle racks and/or storage within 200 yards (200 meters) of a building entrance for 5% or more of all building users (measured at peak periods) Provide shower and changing facilities in the building, or within 200 yards (200 meters) of a building entrance, for 0.5% of full-time equivalent (FTE) occupants. Provide site plan showing the reqd no. of bicycle racks or storage within Edifice 200 m of the building entrance Provide floor plans showing the common shower and changing facilities as reqd. NA

Edifice has been given/explained LEED requirements for architecture package on call with Prashant. Edifice to ensure that bicycle storage to be provided for 5% of total occupants on campus within 200 m of the building entrance/in the building. And showers to be provided for 0.5% of the total building occupants. Edifice/Spectral to ensure that e-charging points to be provided for 3% of the total vehicle parking capacity of the site

Credit 4.3

Credit 4.4

3 Alternative transporation, Low Emmission & Alternative Fuel, Refueling Stations Alternative Transportation, parking 2 capacity

Install alternative-fuel fueling stations for 3% of the total vehicle parking capacity of the site. Liquid or gaseous fueling facilities must be separately ventilated or located outdoors. Size parking capacity to meet, but not exceed, minimum Local Regulations (OR) the National Building Code of India (NBC), AND provide preferred parking for Carpools / Vanpools and Bikepools, capable of serving 5% of the total provided parking spaces, for both 4-wheelers & 2-wheelers.

Provide site/ parking plans showing the location of e-charging points and Edifice + AECOM the total parking calculations as required by the local bye-laws. Provide site/ parking plans showing the location of preferred parking for Edifice + Saga carpooling and the total parking calculations as required by the local byelaws. Copy of parking bye law Sanctioned parking plans

Edifice/Saga to ensure to size parking capacity to meet, but not exceed, minimum Local Regulations. Edifice to provide copy of Parking bye laws and parking calculations.

Credit 5.1

Reduced Site Disturbance, Protect or 1 Restore Habitat

Requirements CASE 1. Greenfield Sites Limit all site disturbance to the following parameters: 40 feet (12 meters) beyond the building perimeter; 10 feet (3 meters) beyond surface walkways, patios, surface parking and utilities less than 12 inches (30 centimeters) in diameter; 15 feet (4.5 meters) beyond primary roadway curbs and main utility branch trenches; 25 feet (8 meters) beyond constructed areas with permeable surfaces (such as pervious paving areas, stormwater detention facilities and playing fields) that require additional staging areas to limit compaction in the constructed area. CASE 3. Sites with Zoning Ordinances but No Open Space Requirements Provide vegetated open space equal to 20% of the project site area.

Require: Photographic documentation at various stages of construction in the form of atleast 21 annotated date wise/stage wise photographs

TCS Site Team TCE TCS site team/PMC to ensure to limit all site disturbance to the following parameters: 40 feet (12 meters) beyond the building perimeter; 10 feet (3 meters) beyond surface walkways, patios, surface parking and utilities less than 12 inches (30 centimeters) in diameter; 15 feet (4.5 meters) beyond primary roadway curbs and main utility branch trenches; 25 feet (8 meters) beyond constructed areas with permeable surfaces (such as pervious paving areas, stormwater detention facilities and playing fields) Provide 21 dated photographs showing the same.

Credit 5.2

Reduced Site Disturbance, Development 1 Footprint

Provide site plan with an area break down of vegetated and open, hardscaped, building footprint area, roads, landscaped areas. Copy of open space byelaw Landscape plans

Edifice + SAGA

Edifice/Saga to ensure to provide vegetated and pervious and open space equal to atleast 20% of the project site area in the master plan. Edifice to provide a copy of master plan with with an area break down of vegetated and open, hardscaped, building footprint area, roads, landscaped areas and copy of open space byelaws.

Credit 6.1

Stormwater Design, Quantity Control

CASE 1. Sites with Existing Imperviousness 50% or Less Implement a stormwater management plan that prevents the post-development peak discharge quantity from exceeding the predevelopment discharge quantity calculated based upon a 24-hour rainfall that is equal to 30% of the average rainfall for the month with the highest average rainfall. CASE 2. Sites with Existing Imperviousness Greater Than 50% Implement a stormwater management plan that results in a 25% decrease in the volume of stormwater runoff calculated based upon a 24-hour rainfall that is equal to 30% of the average rainfall for the month with the highest average rainfall. Implement a stormwater management plan that reduces impervious cover, promotes infiltration and captures and treats the stormwater runoff from 90% of the average annual rainfall using acceptable best management practices (BMPs). BMPs used to treat runoff must be capable of removing 80% of the average annual postdevelopment total suspended solids (TSS) load based on existing monitoring reports. BMPs are considered to meet these criteria if they are designed in accordance with standards and specifications from a state or local program that has adopted these performance standards. Place a minimum of 50% of parking spaces under cover. Any roof used to shade or cover parking must have an SRI of at least 29, be a vegetated green roof or be covered by solar panels that produce energy used to offset some non-renewable resource use.

Provide detailed stormwater Management plan with run-off calculations AECOM pre and post development Provide details of RWH systems/ Recharge/ Storage with the site specific percolation rates and volume reduced. Refer IMD website for rainfall data for project location. Provide photographs of the site Pre-development stage in case the existing imperviousness is >50% to justify the claim.

AECOM has been given/explained LEED requirements for SSc6.1/template sample calcs given, call on 29 nov with Nilesh Naik. Stormwater Management plan to be designed to take care of the credit requirements. Draft storm water plan and calcs to be given.

Credit 6.2

Stormwater Design, Quality Control

Provide design note on 80% TSS Removal from 90% average annual AECOM rainfall and details of RWH systems/Recharge/Storage with the site specific percolation rates and volume reduced. Refer IMD website for rainfall data for project location.

AECOM has been given/explained LEED requirements for SSc6.2/template sample calcs given, call on 29 nov with Nilesh Naik. Stormwater Management plan to be designed to take care of the credit requirements. Draft storm water plan and calcs to be given. Stormwater management plan to remove 80% TSS from 90% of the average annual rainfall using acceptable best management practices (BMPs).

Credit 7.1

Heat Island Effect : Non-Roof

Provide site/ parking plans showing the number of covered parking required/provided and the total parking calculations as required by the local bye-laws. Copy of parking bye law Parking Roof finish (incase parking is housed in an MLCP) should be white china mosaic or heat Sanctioned parking plans resistance finish with Thermatek tiles or paint in case of flat parking roof. In case of surface parking provided on site a white painted GI/Opaque white PVC sheet should be used.

Edifice

Place a minimum of 50% of parking spaces under cover. Edifice given the LEED Req, to revert back. 1 Credit 7.2 Heat Island Effect: Roof 1 Use roofing materials with a solar reflectance index12 (SRI) equal to or greater than78 for a minimum of 75% of the roof surface Terrace top most finish should be white china mosaic or heat resistance finish with Thermatek tiles or paint. Provide all terrace plans showing all flat slab terraces are white heat resistant tiles. Provide all terrace plans showing 75% roof area with high SRI finish excluding the equipment/mechanical areas/water tanks

Use roofing materials with a solar reflectance index (SRI) equal to or greater than78 for a minimum of 75% of the roof surface. Edifice/AECOM to revert back on this.

Credit 8

Light Pollution Reduction

For Interior Lighting OPTION 1 Reduce the input power (by automatic device) of all non-emergency interior luminaires with a direct line of sight to any openings in the envelope (translucent or transparent) by at least 50% between 11 p.m. and 5 a.m. After-hours override may be provided by a manual or occupantsensing device provided the override lasts no more than 30 minutes.

Provide internal and external lighting layouts in CAD format. Provide details of light fixtures installed in the exterior parking, landscape, street etc. Provide IES files of all the exterior lighting fixtures Provide MSDS or cutsheet for timer based exterior lighting controls for non-business hours. Provide BOQ s for external lighting fixtures.

For Exterior lighting - do not exceed LPD for exterior areas, building facades and landscape as per the requirements given in the documents and tables attached.Exterior lighting power densities shall not exceed those specified in ANSI / ASHRAE / IESNA Standard 90.1-2007 with Addenda 1 for the documented lighting zone. 3. Choose 100% of Exterior lighting fixtures with full cut off angles preventing any upward lighting. This is very important to meet the credit compliance as we are located in the outskirts and need to comply to the LZ1 req. Without meeting this we can not comply with the credit requirements for SSc8. 4. Refer to the requirements for EQc6.1 - Provide individual lighting controls for 90% (minimum) of the building occupants to enable adjustments to suit individual task needs and preferences AND Provide lighting system controls for all shared multi-occupant spaces to enable adjustments that meet group needs and preferences. Yes 6 YES ? 4 No 0 Water Efficiency Prerequisite Water use reduction 10 Points a)Kitchen sink/ restroom faucet specification for flow and pressure as per LEED requirements 40% efficient over the baseline of 2.0 LPM at 4 bar ( 58PSI) b)Bath room shower specification for flow and pressure as per LEED requirements - <6.1 LPM at 4 bar (58psi) Selection of dual flush toilets water closets 2 / 4 liters is required to get points in WEc3. urinal should be 2LPF or less. Provide certificate from manufacturer for dual flush water closets for the AECOM/SAGA 2/4 LPF capacity along with MSDS. Provide certificate from the manufacturer for faucets flow rates of 2LPM at 4 Bar along with details of aerators etc. Provide certificate from the manufacturer for efficient urinals less than 4LPF Provide building wise details of FTE calculations for the project considering that 1 FTE = person working for 8 hrs. The FTE calcs should also include details of part time trainees, visitors, vendors staying in the facility for less than 8 hours. If the building operates in shifts provide shift details (time of operation) and FTE details per shift.

MoL/DeepRoots given the LEED requirements for external lighting. Require clarity/call with them to undertsand credit compliance.

AECOM given the LEED Requirements for WEp1. TCE /Saga/AECOM to ensure that required fixtures are selected.

Credit 1

Water Efficient landscaping, No Potable 2 to 4 water use or No irrigation

OPTION 1. Reduce by 50% (2 points) Reduce potable water consumption for irrigation by 50% from a calculated baseline case for the month with the highest evapotranspiration rate. Reductions must be attributed to any combination of the following items: o Plant species, density and microclimate factor o Irrigation efficiency o Use of captured rainwater o Use of recycled wastewater o Use of water treated and conveyed by a public agency specifically for nonpotable uses OR OPTION 2. No Potable Water Use or Irrigation (4 points) Meet the requirements for Option 1. AND PATH 1 Use only captured rainwater, recycled wastewater, recycled graywater or water treated and conveyed by a public agency specifically for nonpotable uses for irrigation. Requirements OPTION 1 (1 point): Treat 100% of wastewater on-site to tertiary standards. Treated water must be used on-site AND/OR OPTION 2 (1 point): Use treated wastewater or captured rain water, to reduce potable water consumption for airconditioning make-up by 50% (if the project uses water-cooled chillers); (AND) Reduce potable water use for building sewage conveyance by 50% through the use of non-potable water (e.g., treated wastewater, municipally treated wastewater, captured rainwater).

Provide WEc1 calcs as required for LEED compliance in discussion with LEED consultant. Provide detailed landscaped plans with list of plant species clearly indicating if the species is native/naturalized or exotic. Detailed area break down calcs on the site plan for landscape area/zonewise on ground/podium, area for roads, hardscaped/paved/parking areas, building footprint etc.

DEEPROOTS

LEED Requirements for Landscape given to Raji, List of MOEF plant species given. Shreyasi from Deep Roots explained in detail the method for calculating irrigation water.

Credit 2

Innovative Wastewater Technologies

AECOM Provide Provide Provide Provide Provide Provide <5 details for dual plumbing flush lines for toilets DBR for STP water balance calculations for annual demand details of HVAC water make up requirements details of STP input details of STP inlet/ outlet water parameters such that COD, BOD AECOM given the LEED Requirements for WEp1.AECOM to ensure that that STP is designed to meet LEET requirements, provide dual plumbing flush lines and that 50% of air -conditioning requirements to be met by STP water. Provide certificate from manufacturer for dual flush water closets for the AECOM/SAGA 2/4 LPF capacity along with MSDS. Provide certificate from the manufacturer for faucets flow rates of 2LPM at 4 Bar along with details of aerators etc. Provide certificate from the manufacturer for efficient urinals less than 4LPF Provide building wise details of FTE calculations for the project considering that 1 FTE = person working for 8 hrs. The FTE calcs should also include details of part time trainees, visitors, vendors staying in the facility for less than 8 hours. If the building operates in shifts provide shift details (time of operation) and FTE details per shift. AECOM given the LEED Requirements for WEc3. TCE /Saga/AECOM to ensure that required fixtures are selected.

Credit 3

Water Use Reduction, 20% reduction

2 to 4

a)Kitchen sink/ restroom faucet specification for flow and pressure as per LEED requirements 40% efficient over the baseline of 2.0 LPM at 4 bar ( 58PSI) b)Bath room shower specification for flow and pressure as per LEED requirements - <6.1 LPM at 4 bar (58psi) Selection of dual flush toilets water closets 2 / 4 liters is required to get points in WEc3. urinal should be 2LPF or less.

Yes 13 Yes

? 10

No 12 Energy & Atmosphere Prereq 1 Fundamental Building Commissioning Systems 35 Points Required Requirements Responsibility Commissioning Agent Commissioned Systems Commissioning process activities must be completed for the following energy-related systems, at a minimum: Heating, ventilating, air conditioning and refrigeration (HVAC&R) systems (mechanical and passive) and associated controls Lighting and daylighting controls Domestic hot water systems Renewable energy systems (e.g., wind, solar) Formulate : Owners project requirements Basis of design Commisionig WO and plan Commissioning Agent Project not at the stage for commissioning

Yes

Prereq 2

Minimum Energy Performance

Required

To achieve points using this credit, the design the building to must meet the following criteria: Comply with the mandatory provisions (Sections 5.4, 6.4, 7.4, 8.4, 9.4 and 10.4) in Standard 90.1- 2007 (with errata but without addenda). Include all energy costs associated with the building project. Energy Simulation

The desired comfort temperature range can be taken upto a maximum of EDS+ MEP + Lighting Envelope Energy Performance Analysis done , Recommended envelope parameters 26 2 deg C. In whole Consultant given. Preliminary Energy Analysis over from the end of EDS, , Annual cooling load building simulation, the same comfort temperature range should be profile given for the HVAC loads, require clarity on issues raised/high data center loads applied for both the base case and design case. from TCS. Provide details required for HVAC simulation input form as required by the LEED consultant in the required format. Provide DBR for all the HVAC systems, lighting systems, cutsheet for chillers, lighting controls, sectional details of envelope indicating the required U-values. Provide cut sheets of chillers highlighting the CFC/ HCF free refrigerants AECOM AECOM has confirmed consideration of pre-requisite requirements.

Yes

Prereq 3

CFC Reduction in HVAC&R Equipment

Required

Zero use of CFC-based refrigerants in new base building HVAC&R systems. When reusing existing base building HVAC equipment, complete a comprehensive CFC phase-out conversion. same as EAp2

Credit 1

Optimize energy Performance

19

same as EAp2

EDS+TCS+AECOM

Envelope Energy Performance Analysis done , Recommended envelope parameters given. Preliminary Energy Analysis over from the end of EDS, , Annual cooling load profile given for the HVAC loads, require clarity on issues raised/high data center loads from TCS. With the present HVAC design we are at 18% energy savings , the target for 10 Yes points equivalent to 30% savings over ASHRAE Baseline is stringent. The preliminary feasibility accounted only 2 points equal to 3% of the RE to offset building energy costs. In order to get more energy savings it is recommended that the % of RE should be increased to 7% to get 2 more points.

Credit 2

Renewable Energy

Use on-site renewable energy systems to offset building energy costs. Calculate project performance by expressing the energy produced by the renewable systems as a percentage of the buildings annual energy cost

Provide onsite RE system DBR, contract or WO from the owner Provide Location plan for the required RE system with technical detail drawings and calculations for RE energy costs to offset the energy consumption.

TCS + AECOM

Credit 3

Additional commissioning

Implement, or have a contract in place to implement the following additional commissioning process activities in addition to the requirements of EA Prerequisite 1: Fundamental Commissioning of Building Energy Systems and in accordance with the LEED 2011 complete Reference Guide for India: The LEED 2011 complete Reference Guide for India provides detailed guidance on the rigor expected for the following process activities: Commissioning design review Commissioning submittal review Systems manual.

Commissioning design review Commissioning submittal review Systems manual.

Commissioning Agent

Project not at the stage for commissioning

Credit 4

Ozone depletion

Provide cutsheets/ MSDS for all the HVAC/ Fire fighting systems/ Fire OPTION 1 Do not use refrigerants. extinguishers indicating HCFC, CFC free refregerants. OR OPTION 2 Select refrigerants and heating, ventilation, air conditioning and refrigeration (HVAC&R) equipment that minimize or eliminate the emission of compounds that contribute to ozone depletion and climate change. The base building HVAC&R equipment must comply with the following formula, which sets a maximum threshold for the combined contributions to ozone depletion and global warming potential: Small HVAC units (defined as containing less than 0.5 pounds of refrigerant) and other equipment, such as standard refrigerators, small water coolers and any other cooling equipment that contains less than 0.5 pounds of refrigerant, are not considered part of the base building system and are not subject to the requirements of this credit. Do not operate or install fire suppression systems that contain ozone-depleting substances such as CFCs, hydrochlorofluorocarbons (HCFCs) or halons. Develop and implement a measurement and verification (M&V) plan consistent with Option D: M&V plan to be formulated as per LEED requirements. Calibrated Simulation (Savings Estimation Method 2) as specified in the International Provision of separate metering for HVAC, lighting, plug loads and water. Performance Measurement & Verification Protocol (IPMVP) Volume III: Concepts and Options for Determining Energy Savings in New Construction, April 2003. The M&V period must cover at least 1 year of post-construction occupancy. Provide a process for corrective action if the results of the M&V plan indicate that energy savings are not being achieved.

AECOM

AECOM to confirm consideration of credit requirements.

Credit 5

Measurement & verification

Commissioning Agent

Project not at the stage for commissioning

2 Yes 6 Yes ? 2 No 6

Credit 6

Green Power, 50%

2 14 Points Required

NA

NA

NA

NA

Materials & Resources MR Prereq 1 Storage and Collection of Recyclables

Provide an easily-accessible dedicated area or areas for the collection and storage of materials for recycling for the entire building. Materials must include, at a minimum: paper, corrugated cardboard, glass, plastics and metals.

Provide location plan for the central storage area on site or common Edifice area for the collection and storage of materials for recycling in each building block. Note that this area should be more than 275 sq ft if the building is more than 50,000 sqft built up area. Ensure that there is provision of bins for collection paper waste at each workstation and common bins for paper/plastic cups, cardboard, metal Provide central storage area on site or common area for the collection and storage of materials and glass at each pantry area in the building. Provide location plan showing for recycling in each building block. Note that this area should be more than 275 sq ft if the the workstation areas and pantry areas. building is more than 50,000 sqft built up area. NA NA NA

Edfice to revert back on this

Credit 1.1

Building Reuse

NA

Credit 1.2

Building Reuse

NA

NA

NA

NA

Credit 2

Construction Waste Management, Divert 1 to 2 50% From Disposal

Divert more than 95% of the construction waste generated during the construction to recyle or scrap vendors.

Documented evidence in the form of letter issued by the receiving/recycling agency is required for all waste types. All moisture absorbent materials like cements, gypsum etc should be kept covered; documented evidence in form of photos has to be provided

TCS Site Team+ TCE

EDS has given the site orientation to main Civil contractors, given the LEED requirements for the CWM, given CWM summary to be maintained on site. TCS site team to provide the documentation/photographs/certificates from scrap vendors , PMC to provide certificates for concrete/brick/broken civil waste reused on site.

Credit 3

Resource Reuse, 5%

1 to 2

NA

NA

NA

NA

Credit 4

Recycled Content, 5% (post-consumer + 1 to 2 1/2 post-industrial)

Use materials with recycled content such that the sum of postconsumer recycled content plus 1/2 of the preconsumer content constitutes at least 10% or 20%, based on cost, of the total value of the materials in the project.

Manufacturer's certiifcate for all civil /Interior materials indicating % of TCS Site Team+ TCE + EDS has given the site orientation to main Civil contractors, given the LEED post consumer and % post industrial recycled content for each cost Edifice Interior Team requirements for the LEED Civil Requirements. TCS site team to provide the extensive material used on site. documentation/certificates from contractors for major civil items. Civil contractors/ PMC to provide the required certificates from the manufacturer for the recycled content present in each material/product as stated in the Requirements for Civil/Interior packages.For all materials used on site, letters shall be collected by the contractor. The letters shall highlight the % of post consumer and % post industrial recycled content for each cost extensive material used on site. Mechanical , Electrical and Plumbing components are not included in the calculations for this credit.

Credit 5

Regional Materials, 20% Manufactured Reg1 to 2

Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 250 miles (400 kilometers) of the project site for a minimum of 10% or 20%, based on cost, of the total materials value. If only a fraction of a product or material is extracted, harvested, or recovered and manufactured locally, then only that percentage (by weight) can contribute to the regional value. The minimum percentage regional materials for each point threshold are as follows:

TCS Site Team+ TCE + EDS has given the site orientation to main Civil contractors, given the LEED Manufacturer's certiifcate for all civil /Interior materials indicating Edifice Interior Team requirements for the LEED Civil Requirements. TCS site team to provide the distance of manufacturing /place of extraction within 400 kms from the documentation/certificates from contractors for major civil items. project site for each cost extensive material used on site.For all materials used on site, letters shall be collected by the contractor. The letters shall highlight the distance of materials point of manufacturing and point of extraction from the site in kilometers (kms) i.e. Adibatla. The distance considered is Arial distance from Adibatla and not the road distance. Mechanical , Electrical and Plumbing components are not included in the calculations for this credit.

Credit 6

Rapidly Renewable Materials, 5% of building 1

Use rapidly renewable building materials and products for 2.5% of the total value of all building materials and products used in the project, based on cost. Rapidly renewable building materials and products are made from plants that are typically harvested within a 10-year or shorter cycle.

Consider materials such as bamboo, wool, cotton insulation, agrifiber, TCS Site Team+ TCS + LEED requirements given to Edifice. Edifice to revert back. linoleum, Wheat board, strawboard and cork. During construction, ensure Edifice Interior Team that the specified renewable materials are installed. Civil contractors/ PMC to provide the required certificates from the manufacturer for the rapidly renewable content present in each material/product as stated in the Requirements for Civil/Interior packages.

Credit 7

Certified Wood, 50% of wood based 1 materials

Use a minimum of 50% (based on cost) of wood-based materials and products that are certified in accordance with the Forest Stewardship Councils principles and criteria, for wood building components. These components include at a minimum, structural framing and general dimensional framing, flooring, subflooring, wood doors and finishes.

Include only materials permanently installed in the project. Provide vendor invoices for all the products and materials that are FSC certified in the correct name of the project. Note that without vendor invoices the credit can not be documented. Provide COC certificates for each FSC certified product or material such that the certificate is valid until the completion of the project.

TCS Site Team+ TCS + Edifice Interior Team

LEED requirements given to Edifice. Edifice to revert back. Yes 7 Yes ? 4 No 4 Indoor Environmental Quality Prereq 1 Minimum IAQ Performance 15 Points Required Provide Building wise/ floorwise/ space wise space by space calculations AECOM Requirements Meet the minimum requirements of Sections 4 through 7 of ASHRAE Standard 62.1-2007, enlisting the area/occupants and the parameters for ASHRAE 62.1 Ventilation for Acceptable Indoor Air Quality (with errata but without addenda23). ventilation rate procedure. AND CASE 1. Mechanically Ventilated Spaces Mechanical ventilation systems must be designed using the ASHRAE 62.1 ventilation rate procedure (OR) the applicable local code, whichever is more stringent. CASE 2. Naturally Ventilated Spaces Use a local standard for establishing a baseline and measure performance relative to that baseline, to demonstrate equivalency with the requirements of ASHRAE Standard 62.12007, Paragraph 5.1 (with errata but without addenda). The following general topics must be addressed in establishing acceptable benchmarks and metrics for demonstrating equivalency with the ASHRAE standard. Naturally ventilated spaces must be permanently open to the outdoors and within 25 feet (8 meters) of operable wall or roof openings. The openable area must be at least 4% of the net occupiable floor area. If an opening is covered with louvers or otherwise partially obstructed, calculate the openable area based on the free, unobstructed area. If an interior space without direct openings to the outdoors is ventilated through an adjoining room, the opening between the rooms must be permanently unobstructed and be at least 8% of the area of the interior room or 25 square feet (2 square meters). Whenever the space is occupied, building occupants must have a readily accessible way to control the opening. If approved by the local authority, an engineered natural ventilation system need not meet the above requirements for location and size of openings and accessible controls. AECOM to confirm consideration of credit requirements.

Yes

Prereq 2

Environmental Tobacco Smoke (ETS) Control

Required

Requirements OPTION 1 Prohibit smoking in the building. Prohibit on-property smoking within 25 feet (8 meters) of entries, outdoor air intakes and operable windows. Provide signage to allow smoking in designated areas, prohibit smoking in designated areas or prohibit smoking on the entire property.

Provide details of No-Smoking policy. Owner to help. TCS +AECOM Provide location plan of all the smoking rooms, details of exhaust , deck to deck partitions with negative pressure differential, Provide location of air intakes or opening such that these are atleast 25 feet away from exhaust from these areas.

TCS to formulate a no-smoking policy on campus and provide proper signages to convey the same. A open to air dedicated smoking area be provided atleast 25 feet away from AHU's/air intakes openings.- AECOM to revert back

Credit 1

Outside Air Delivery Monitoring

Requirements Install permanent monitoring systems to ensure that ventilation systems maintain design minimum requirements. Configure all monitoring equipment to generate an alarm when airflow values or carbon dioxide (CO2) levels vary by 10% or more from the design values via either a building automation system alarm to the building operator or a visual or audible alert to the building occupants. AND CASE 1. Mechanically Ventilated Spaces Monitor CO2 concentrations within all densely occupied spaces i.e., those with a design occupant density of 25 people or more per 1,000 square feet (95 square meters). CO2 monitors must be between 3 and 6 feet (between 1 and 2 meters) above the floor. Provide a direct outdoor airflow measurement device capable of measuring the minimum outdoor air intake flow with an accuracy of plus or minus 15% of the design minimum outdoor air rate, as defined by ASHRAE 62.1-2007 (with errata but without addenda26) for mechanical ventilation systems (OR) an equivalent local standard, where 20% or more of the design supply airflow serves nondensely occupied spaces. If using a local standard for establishing a baseline and measuring performance relative to that baseline, the following general topics must be addressed for equivalency with ASHRAE Standard 62.12007 (with errata but without addenda): Ventilation rate procedure Indoor air quality (IAQ) procedure Design documentation procedures

Provide location plan indicating the location of Co2 sensors in densely TCS + AECOM occupied spaces. SLD or schematic drawings showing the location of Co2 sensors, Air Flow sensors Control logic to induce more fresh air as required. Details of BMS to integrate HVAC controls.

AECOM to confirm consideration of credit requirements.

Credit 2

Increased Ventilation, 30% ASHRAE 62.1 requirements

above

Provide Building wise/ floorwise/ space wise space by space calculations AECOM CASE 1. Mechanically Ventilated Spaces Increase breathing zone outdoor air ventilation rates to all occupied spaces by at least 30% above enlisting the area/occupants and the parameters for ASHRAE 62.1 the minimum rates required by ASHRAE Standard 62.1-2007 (with errata but without addenda27) ventilation rate procedure. (OR) an equivalent Local standard, as determined by IEQ Prerequisite 1: Minimum Indoor Air Quality Performance. If using a local standard for establishing a baseline and measuring performance relative to that baseline, the following general topics must be addressed for equivalency with ASHRAE Standard 62.12007 (with errata but without addenda): Outdoor air quality Systems and equipment Ventilation rate procedure and indoor air quality IAQ (indoor air quality) procedure Construction and system start-up For more details, see the ASHRAE Reference Guide or relevant sections of the equivalent Local standard.

AECOM to confirm consideration of credit requirements.

Credit 3.1

Construction IAQ Management Plan, During Construction

Provide all the photographic details as enlisted in the HVAC IAQ package HVAC Contractor Requirements Develop and implement an IAQ management plan for the construction and preoccupancy phases given for reference to HVAC contractor. of the building as follows: During construction, meet or exceed the recommended control measures by SMACNA Protect stored on-site and installed absorptive materials from moisture damage. If permanently installed air handlers are used during construction, filtration media with a minimum efficiency reporting value (MERV) of 8 must be used at each return air grille, as determined by ASHRAE Standard 52.2-1999 (with errata but without addenda28). Replace all filtration media immediately prior to occupancy. Provide 18 photographssix photographs taken on three different occasions during constructionalong with identification of the SMACNA approach featured by each photograph in order to show consistent adherence to the credit requirements. Conduct a minimum two-week building flush-out with MERV 8 filtration media and 100% outside air after construction ends and prior to occupancy. After flush-out, new filter with minimum MERV 8 value must replace all filters except those solely processing outside air. Note these filters must be MERV 13 or better when a project plans to earn EQ credit 5, Indoor Chemical and Pollutant Source Control

TCE to ensure that LEED Requirements for IAQ package are incorporated in the scope of work /Tender for HVAC contractor. TCE Site team/TCE have been explained the LEED Requirements on site meetings.

Credit 3.2

Construction IAQ Management Plan, (After Construction/Before Occupancy)

Requirements Develop an IAQ management plan and implement it after all finishes have been installed and the building has been completely cleaned before occupancy. OPTION 1. Flush-Out PATH 1 After construction ends, prior to occupancy and with all interior finishes installed, install new filtration media and, perform a building flush-out by supplying a total air volume of 14,000 cubic feet of outdoor air per square foot (4,500 cubic meters of outdoor air per square meter) of floor area while maintaining an internal temperature of at least 60 F (15C) and relative humidity no higher than 60%.

Flush out time period to be included in the project schedule for all the building blocks

Commissioning Agent

Project not at the stage for credit requirements.

Credit 4.1

Low-Emitting Materials, Adhesives and 1 Sealants

Specify low-VOC materials in construction documents. Ensure that VOC limits are clearly stated in each section of the specifications where adhesives and sealants are addressed. Common products to evaluate include general construction adhesives, flooring adhesives, fire-stopping sealants, caulking, duct sealants, plumbing adhesives and cove base adhesives. Review product cut sheets, material safety data (MSD) sheets, signed attestations or other official literature from the manufacturer clearly identifying the VOC contents or compliance with referenced standards.

All adhesives and sealants used in the project have to meet the following TCS Site Team+ TCS + EDS has given the site orientation to main Civil contractors, given the LEED VOC (Volatile Organic Compound) limit. Including adhesives used for Edifice Interior Team requirements for the LEED Civil Requirements. TCS site team+ Edifice interior team to Mechanical , Electrical and Plumbing work are included in the calculations provide the documentation/certificates from contractors for major civil and interior for this credit. based sealents & adhesives Collect information from the manufacturers of adhesives and sealants on the VOC contents present in their products. (MSDS product sheet or Letters from the manufactures are required). The VOC content present should be less than the limits given in LEED Civil Package requirements All adhesives and sealants used on the interior of the building (defined as inside of the weatherproofing system and applied on-site) shall comply with the requirements of the reference standard.

Credit 4.2

Low-Emitting Materials, Paints and Coatings

100% of interior paints/coatings/anti rust paints used on site to be Low VOC as per limits given by Paints and coatings used on the interior of the building defined as inside LEED Civil Package pdf. of the weatherproofing system and applied on-site) shall comply with the requirements of the reference standard. The VOC (Volatile Organic Compounds) content of paints, coatings and primers used must not exceed the VOC content limits given in LEED Civil Package requirements

TCS Site Team+ TCS + EDS has given the site orientation to main Civil contractors, given the LEED Edifice Interior Team requirements for the LEED Civil Requirements. TCS site team+ Edifice interior team to provide the documentation/certificates from contractors for major civil and interior based paints&coatings

List all the interior paints and coatings used in the building and stating that they comply with the current VOC limits. Provide the material safety and data sheet (MSDS) of each product or the VOC test certificate indicating clearly the voc levels from their respective manufacturer or testing laboratory.

Credit 4.3

Low-Emitting Materials, Flooring Systems 1

Clearly specify requirements for product testing and/ or certification in the construction documents. Select products that are either certified under the Green Label Plus program or for which testing has been done by qualified independent laboratories in accordance with the appropriate requirements. All hard surface flooring must demonstrate maximum emissions factors less than or equal to those stated below, as shown with testing by an independent third party. Mineral-based finish flooring products such as tile, masonry, terrazzo, and cut stone without integral organic-based coatings and sealants and unfinished/untreated solid wood flooring qualify for credit without any IAQ testing requirements. However, associated site-applied adhesives, grouts, finishes and sealers must be compliant for a mineralbased

Provide the material safety and data sheet (MSDS) of each product or the TCS + Edifice/saga + Edifice to revert back on selection of Green label plus carpets and flooring that comply CRI Green Label Plus certificate valid for the period in which the project Edifice Interior Team with LEED Requirements. shall get completed from their respective manufacturer. Provide Green label plus certificates for 100% flooring

Credit 4.4

Low-Emitting Materials, Composite Wood and Agrifibre products

Composite wood and agrifiber products used on the interior of the building (i.e., inside the weatherproofing system) must contain no added urea-formaldehyde resins. Laminating adhesives used to fabricate on-site and shop-applied composite wood and agrifiber assemblies must not contain added ureaformaldehyde resins. Composite wood and agrifiber products are defined as particleboard, medium density fiberboard (MDF), plywood, wheatboard, strawboard, panel substrates and door cores. Furniture not included. Design to minimize and control the entry of pollutants into buildings and later crosscontamination of regularly occupied areas through the following strategies: Employ permanent entryway systems at least 10 feet (3 meters) long in the primary direction of travel to capture dirt and particulates entering the building at regularly used exterior entrances. Acceptable entryway systems include permanently installed grates, grill s and slotted systems that allow for cleaning underneath. Roll-out mats are acceptable only when maintained on a weekly basis by a contracted service organization. For each of these spaces where hazardous gases or chemicals may be present or used (e.g., garages, housekeeping and laundry areas, copying and printing rooms), provide selfclosing doors and deck-to-deck partitions or a hard-lid ceiling. Provide containment (i.e. a closed container for storage for off-site disposal in a regulatory compliant storage area, preferably outside the building) for appropriate disposal of hazardous liquid wastes in places where water and chemical concentrate mixing occurs (e.g., housekeeping, janitorial and science laboratories).

Provide the material safety and data sheet (MSDS) of each Composite TCS Site Team+ TCS + Edifice + Edifice Interior team to revert back onto this. wood and agrifiber products from their respective manufacturer indicating Edifice Interior Team that it contain no added urea-formaldehyde resins. Laminating adhesives used to fabricate on-site and shop-applied composite wood and agrifiber assemblies must not contain added urea-formaldehyde resins. .

Credit 5

Indoor Chemical and Pollutant Source Cont1

Provide floor plans indicating the location of 3M mats (10 feet long at each exit/entry point to the building) Provide location plan and sectional details for the janitorial/photocopier/housekeeping storage areas with self closing doors abd desck to deck partitions.

Edifice+ AECOM

Edifice + AECOM to revert back on this.

Credit 6.1

Controllability of Systems, Lighting

Provide individual lighting controls for 90% (minimum) of the building occupants to enable adjustments to suit individual task needs and preferences Provide lighting system controls for all shared multi-occupant spaces to enable adjustments that meet group needs and preferences.

Provide interior lighting layout showing the location of tasklights with headcount calcs. Provide interior lighting layout for mutli-occupancy areas such as conference rooms, cabins, meeting rooms with specification of lighting controls. Provide a building wise, floorwise space wise area statement enlisting the number of spaces, their type and area (carpet area).

Ministry of Lighting + LEED Reuirements for lighting given to Ministry of Lighting. TCS+ MoL to revert back on TCS to confirm the credit compliance. tasklighting

1 1

Credit 6.2 Credit 7.1

Controllability of Systems, Thermal comfort Thermal Comfort, Design

1 1

NA Design heating, ventilating and air conditioning (HVAC) systems and the building envelope to meet the requirements of ASHRAE Standard 55-2004, Thermal Comfort Conditions for Human Occupancy (with errata but without addenda33). Demonstrate design compliance in accordance with the Section 6.1.1 documentation.

NA Provide heat load calculations for the month of monsoon. Provide narrative on all the points required by Section 6.1.1 of ASHRAE 55- 2004.

NA AECOM

NA AECOM to confirm consideration of credit requirements.

Credit 7.2

Thermal Comfort, Verification - 6 to 18 1 months

Achieve IEQ Credit 7.1: Thermal ComfortDesign Agree to conduct a thermal comfort survey of building occupants within 6 TCS +AECOM Provide a permanent monitoring system to ensure that building performance meets the desired to 18 months after occupancy. Agree to develop a plan for corrective action if the survey results indicate comfort criteria as determined by IEQ Credit 7.1: Thermal ComfortDesign.
that more than 20% of occupants are dissatisfied with thermal comfort in the building. This plan should include measurement of relevant environmental variables in problem areas in accordance with ASHRAE Standard 55-2004 (with errata but without addenda34) (OR) equivalent local standard. NA Requirements Achieve a direct line of sight to the outdoor environment via vision glazing between 30 inches and 90 inches (between 0.8 meters and 2.3 meters) above the finish floor for building occupants in 90% of all regularly occupied areas. Determine the area with a direct line of sight by totaling the regularly occupied floor area that meets the following criteria: In plan view, the area is within sight lines drawn from perimeter vision glazing. In section view, a direct sight line can be drawn from the area to perimeter vision glazing. The line of sight may be drawn through interior glazing. For private offices, the entire floor area of the office may be counted if 75% or more of the area has a direct line of sight to perimeter vision glazing. For multioccupant spaces, the actual floor area with a direct line of sight to perimeter vision glazing is counted. NA NA

AECOM to confirm consideration of credit requirements.

1 1

Credit 8.1 Credit 8.2

Daylight & Views, Daylight 75% of Spaces 1 Daylight & Views, Views 90% of Spaces 1

NA With the Kalzip jali on the elevation, this point can not be considered.

Ensure that the workstation height is not more than 42inches considering NA the partition. Provide interior layout showing the location of workstations Provide interior layout for multi-occupancy areas such as conference rooms, cabins, meeting rooms clearly marking the location of glss partitions/windows for views. Provide a building wise, floorwise space wise area statement enlisting the number of spaces, their type and area (carpet area).

Yes 6 1 1

? 0

No 0 Innovation & Design Process Credit 1.1 Credit 1.2 Innovation in Design: Green Education Innovation in HouseKeeping Innovation P f Innovation Design: Green 6 Points 1 1 TCS to formulate a policy on Green Education, ensure that a comprehensive signage program is in place TCS to formulate a policy on GreenHousekeeping and ensure that only Green Seal Certified chemicals are used in the campus TCS to formulate a policy on Green Education, ensure that a comprehensive signage program is in place TCS to formulate a policy on GreenHousekeeping and ensure that only Green Seal Certified chemicals are used in the campus

1 1 1 1

Credit 1.3 Credit 1.4 Credit 1.5 Credit 2

Exemplary P f l Innovation Exemplary P f Accredited i SSProfessional 7 1/WE 4 LEED

in Design: iin Design: l d iinCWM/R Design:i

Exemplary 1 1 1 1 EDS LEED AP to get one point LEED AP Certificate

4 4

0 0

Regional Priority Credit 1 Regional Priority

4 Points 4

Summary of Credit Points under Different Categories 100 possible points under the five core categories SS, 6 possible points under Innovation in Design

4 possible points under Regional Priority Credit Point Thresholds for Different Levels of Certified Silver Gold Platinum 40 - 49 points 50 - 59 points 60 - 79 points 80 points and above