Professional Documents
Culture Documents
Client
Title
Project
Phase
Project No.
External distribution
Internal distribution
Author / position
Contents
1 INTRODUCTION.......................................................................................................................2
2 EXECUTIVE SUMMARY........................................................................................................2
3 OVERVIEW OF ACTIVITY
...............................................................................................2
4 PROJECT STATUS...................................................................................................................3
5 OVERALL PROJECT SCHEDULE........................................................................................3
6 MANNING SCHEDULE............................................................................................................3
7 WORK RECORDS ....................................................................................................................4
8 HEALTH, SAFETY AND ENVIRONMENT..........................................................................4
9 FINANCIAL / INVOICE STATUS...........................................................................................4
10 KEY ACTIVITIES AND CONCERNS IN COMING MONTH..........................................4
1
INTRODUCTION
This monthly report provides a record of activities, program for the project management service
Phase of the Nhon Trach 2 Combined Cycle Power Plant Project.
The report presents project information for the month of July 2009.
EXECUTIVE SUMMARY
SIW ongoing and supervision underway
Site occupancy from PMC so design review all disciplines started.
OVERVIEW OF ACTIVITY
The main activities in July were:
Continuing supervision of site activity related to Soils Improvement Works (SIW) being
carried out by PECC2, PMCs appointed site inspectors.
Civil Temp design documentation, structural, SIW, Gas, Oil, water & general layout
docs.
PROJECT STATUS
PMC - Site Supervision
Specific activity during the reporting month has been as follows:
4.1
General
Site Work: Please refer to section 3 for detail
5
5.1
Commercial Operation Date (COD) 30 October 2011 (from a 29 month EPC period)
Gas supply availability end November 2010 would allow a sufficient commissioning period for
Open Cycle Operation in March 2011.
MANNING SCHEDULE
The PMC team continued as for the preceding month:
Stand in Project Manager (Mr. Max Stoessel based in Poyrys Bangkok office)
Project Secretary
7
7.1
WORK RECORDS
Timesheets
The July timesheets are given in Appendix 1.
9
9.1
9.2
10
10.1
10.2
10.3
Construction
10.5
Continuation of detail design, engineering review and approval for civil, mechanical, electrical
and C&I works.
10.4
Nothing to report.