Browse Building Act Buying a house Buying a section Construction phase Building stages Approving variations to the structure or materials Progress payments Building & resource consents Monitoring progress Building inspections Final stages Landscaping Dealing with tradespeople Design & architects Do-it-yourself? Home maintenance Leaky buildings Legal issues Materials & features Moving a house Project management Renovations & alterations Resources Updates
Monitoring progress
Once building work is under way, there are a number of things to keep an eye on. How long should the project take, who should keep records, and are building materials being stored correctly?
This page...
Order of construction How long will it all take? Keeping an eye on things Setting out the house on the site Storage of materials Safety on the building site Keeping records Keeping your own records Photographs and videos Print page Email page link
Order of construction
The usual order of construction is: Excavate the section and lay the foundations Pour concrete floors Construct the framing Put the roof on Mount the w indow s Put on the exterior cladding Organise plumbing and w iring Fit insulation Put in the doors Install cabinets and interior lining Tile floors and w alls Carry out final plumbing and electrical w ork Paint the house and complete any finishing w ork Lay the floor coverings
Materials are checked off w hen they arrive to make sure they are w hat is ordered and required. Timber is of the specified treatment type and at specified moisture levels. The house is set out correctly on the site. Plans and specifications are follow ed. Materials are installed to manufacturers instructions. Finished construction is protected from the w eather. Even if you are not managing the project, you may w ell be taking a keen interest in progress. If you spot anything that does not look right, bring it up immediately w ith the builder. It w ould be better to replace a few bricks that are the w rong colour than w ait until the house is finished before pointing it out. Most things that go w rong are simply mistakes w hich your builder w ould prefer to know about sooner rather than later. Speak to the project manager first and let them deal w ith any problems. It is part of the project manager's job and it's w hat you are paying for. Use a diary to record all your questions and comments to your project manager.
Storage of materials
Building materials may be in perfect condition w hen they are delivered to your site, but by the time they become part of the structure of the house, they may have become damaged due to their storage and handling on the building site. Kiln-dried timber is a good example. It needs to be kept dry after it is delivered and w hen it is installed. Practices that can damage materials include: No cover from the w eather. Rough handling w hen coming off the delivery truck. Storage directly on the ground causing dampness. Storage on uneven surfaces causing w arping. Storage that doesnt allow for sw eating and escape of moisture. Using the materials as a storage or w ork platform. If you see any of these practices occurring take it up w ith the builder or project manager and photograph it so you can show how damage occurred if there are resulting problems.
Keeping records
The main contractor or project manager should be keeping a complete and organised set of site records. Depending on your involvement in the project, there are a number of documents, including photographs, you should acquire and file for your ow n protection. The reason for keeping a document trail is to provide protection for everyone involved if there are any disputes. The records relating to building houses include: A record of the original site conditions, including photographs.
converted by Web2PDFConvert.com
The plans and specifications. The contract. Site diaries kept by the main contractor (or project manager). Your ow n diary of notes. Individual builders vary in w hether they keep a site diary or not and how much information they record. But keeping records of the reasons for delays outside their control, in particular, could be very useful to the builder if there are any time penalties built into the contract. Usual information recorded in the site diary: W hat w ork has been done. Verbal instructions given. Variations (w hich may require an amendment to the building consent before they are done). W hen subcontractors came and w ent. Weather conditions. Reasons for stoppages. Materials delivered and their condition. Setting out w ork. Inspections. Visitors to the site. Moisture content checks. Building specification checks. Builders may keep registers. For example, a Request for Clarification Register to ask questions and a Contract Site Instruction Register to record the answ er. They may also keep a similar set of registers for their dealings w ith subcontractors. In the glossary there is a list of the common documents used in building projects.
Keeping a record of the accounts w ill help you keep tabs on spending and help you stay w ithin your budget.
converted by Web2PDFConvert.com
Good insulation can greatly improve your indoor quality of life, and save money. We explain your options. Read more
Our database of over 100 w oodburners w ill help you find the right model for your needs. Read more
Our survey finds the cheapest fuels for space and w ater heating. Read more
ConsumerBuild is a partnership between the Building and Housing Group within the Ministry of Business, Innovation & Employment and Consumer NZ Copyright Ministry of Business, Innovation & Employment and Consumer NZ.
converted by Web2PDFConvert.com