You are on page 1of 75

WEEKLY PROGRESS REPORT

WEEK NO. 74 ( 21-26 JULY, 2012 )


RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
CIVIL & BUILDING WORKS
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
1
A.
B.
2
A.
B.
C.
3
A.
4
A Document submittal list
B. Material approval list
C Method of statement list
D Manpower & equipment status
E.
One Week Forecast Weather Report
5 PHOTOS
WEEK NO. 74 ( July 21,2012 - July 26,2012 )
CONSTRUCTION
TABLE OF CONTENTS
Civil Works
QA/QA
Area of Concrete ( weekly concrete casting )
MRIR Weekly Status
RFI Weekly Status
APPENDIX
Building Works
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
CIVIL & BUILDING WORKS
EHS
EHS Weekly
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
WEEK NO. 74 ( JULY 21 2012 - JULY 26,2012 )
1. CONSTRUCTION
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
CIVIL & BUILDING WORKS
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
A. SWITCHGEAR FOR MSF
A.1 MSF 71-72
1 Switchgear Room ( North side ) ---- Final painting of walls and ceiling are completed. Also, repairing for floor prior for final coat.
Switchgear Room ( South side ) ---- First painting of walls and ceiling are completed. Repairing prior to final coat is on-going
2 Transformer Foundation ---- Lean concrete & waterproofing membrane are completed.
3 Office Room ( Floor ) ---- Floor tiles are already installed last July 24, 2012
4 Staircase ( Both side ) ---- Application of putty & primer are finished.
5 I & C Room ---- Grouting for electrical channels, and some areas of wall are already applied with putty & primer.
A.2 MSF 73-74
1 Parapet ---- We closed already the south side and half of west side. Starting date for shuttering is July 18,2012
2 Basement ---- Repairing/ preparation prior to application of putty & primer are completed last July 18,2012
A.3 MSF 75-76
1 Roof Beam & Slab ---- Scaffoldings & supports are completed last July 24,2012
---- Also, fabrication of sidings & installation of bottom for beams start last July 23,2012
A.4 MSF 77-78
1 Ground Columns ---- Fabrication of reinforcement for columns are completed and ready for erection/installation
---- We already casted kickers as construction procedures last July 25,2012
---- Fabricated column forms are available already at site.
B. INTAKE CHANNEL AND PUMPING STATION
B.1 SWITCHGEAR FOR SEA WATER INTAKE
1 Block Works ---- Almost 95% completed.
2 Plastering Works ( Inside ) ---- Almost 65% completed inside the building.
B.2 ELECTRO-CHLORINATION BUILDING
1 Outdoor Foundation MF5 ---- Lean concrete is casted already. This area is ready for waterproofing.
2 Ground Floor ---- Preparation for hollow blocks installation started last July 26, 2012
B.3 CHEMICAL STORAGE FOR MSF
1 Foundations ---- 55% are already casted, 15% for on going formworks and 15% for rebar works
and 15% for surface preparation
C. REMINERALIZATION
C.1 SWGR BLDG FOR POTABILIZATION
1 Parapet ---- We put inside forms already at the south side and half of west side.
Starting date for installation of forms is July 16,2012
2 Basement Ceiling & Wall ----
C.2 GAS CHLORINATION BUILDING
1 Grid/Ground Beam ----
C.3 LIME STORAGE BUILDING ----
C.4 DRINKING & SERVICE WATER PUMP HOUSE ----
C.5 SHELTER FOR WATER ANALYZER ----
C.6 WAREHOUSE FOR SPARE PARTS ----
D. PARKING SHED ----
E. MISC. WORKS ----
Period Covered: Week No. 47 ( 21-26 JULY, 2012 )
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
CIVIL & BUILDING WORKS
WEEKLY SITE ACTIVITY PROGRESS REPORT
MSF Plant Civil Works
BUILDING WORKS
Application of first coat for ceiling & walls are completed last July 26,2012
Casting of south side completed last July 22,2012. Only balance is East side
No activity
N/A
N/A
N/A
N/A
N/A
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Period Covered: Week No. 47 ( 21-26 JULY, 2012 )
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
CIVIL & BUILDING WORKS
WEEKLY SITE ACTIVITY PROGRESS REPORT
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
A. SITE PREPARATION
RGF / LAB. WORKS ---- Third Party is present upon request, concreting & testing.
B. EVAPORATOR FOUNDATION
Evaporator #76 Inside ---- Backfilling & Compaction of crashed stones. Balance is part 1 of evaporator 76.
C. EVAPORATOR MISCELLANEOUS FOUNDATION
1 EVA. UNIT # 71
F39 Foundation ---- Soil Preparation completed. It is ready for Lean concrete. ( starting date : July 25,2012 )
2 EVA. UNIT # 72
CEP System Foundation ( 2 Nos ) ----
Flash Tank Foundation ---- Base slab Casted last July 25,2012
Ball Cleaning Panel , Ball Cleaning skid Fdn. ---- Screed & Lean Concrete finished.
F4 Foundation between 19 & 20 pedestals ---- Casted already.
3 EVA. UNIT # 73
F3, F12 ( 2 Nos. ) and F12-1 Pedestal ---- Rebars completed, ready for closure of forms.
4 EVA. UNIT # 74
F3, F2-1 , F 12 ( 2 Nos. ) Foundations ---- Lean concrete complete last July 26,2012
Ball Cleaning Panel SF1 , SF2 ---- Lean concrete complete last July 26,2012
5 EVA. UNIT # 75, 76. 77 & 78
No Activity for Misc. Foundation
D. BRINE HEATER FOUNDATION
1 Flat Form F5, F6, F7, F8 , F9 @ Unit 76 ---- Lean concrete complete last July 19,2012 ( Ready for waterproofing membrane )
E. BRP/BBDP/DP PIT
1 EVA. UNIT # 71 & # 72 ---- Already installed.
2 EVA. UNIT # 73
BRP1 & BRP 2 ---- Surface preparation prior for painting, Completed
2 EVA. UNIT # 74 ----
3 EVA. UNIT # 75
Pedestals w/ plate @ A1-B1 ---- Installation of forms/Closure , 63% completed
4 EVA. UNIT # 76
BRP 1 ( 2nd lift ) ---- Installation of corbels forms & alignment , 92% completed
5 EVA. UNIT # 77
Dearator Wall ( B2 ) ---- Rebarworks are completed. Ready for formworks/closure.
Dearator Wall ( B1 ) ---- Rebarworks are completed. Ready for formworks/closure.
6 EVA. UNIT # 78
Deaerator Foundation B2 ( Base Slab ) ---- Rebarworks are completed. Ready for formworks/closure.
B3 Columns ---- Scaffoldings, Completed & Rebarworks start last July 26,2012
F. SEMI GANTRY CRANE ----
G. LP STEAM FOUNDATION
Pipe Rack Foundation F2 ( 4 Nos ) Pedestal ---- Casted already, Removal of forms last July 26,2012
at Unit 71
H. CHEMICAL DOSING ----
I. CIVIL WORKS FOR SW SUPPLY PIPE
North of Unit 74-75 ---- SC1 Backfilling around pipes started July 25,2012, On-Going
West Side of Unit 71 to MSF 71-72 Bldg. ---- Ordinary Backfilling started July 25,2012, On-Going
Pipe Protection Slab Wall Type 4 ----
Pipe Protection slab ( near Electro Bldg. ) ---- Rebar works start last july 25,2012
J. CIVIL WORKS FOR DISCHARGE PIPE
North of Unit 74-75 ( in between ) ---- SC1 Backfilling around pipes completed
North of Unit 76 ---- SC1 beddings completed
East side of Unit 73 ( beside BRP ) ---- Soil Preparation & SC1 Bedding completed
No activity
No activity
N/A
Waterproofing membarane completed
Rebar works completed, 60% completed for formworks
CIVIL WORKS
Zone 1
MSF Plant Civil Works
Period Covered: Week No. 47 ( 21-26 JULY, 2012 )
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
CIVIL & BUILDING WORKS
WEEKLY SITE ACTIVITY PROGRESS REPORT
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
K. CIVIL WORKS FOR DISTILLATE PIPE
North of Unit 74 - 75 ---- SC1 Backfilling around pipes started July 25,2012, On-Going
North of Unit 73 - 74 ---- SC1 Backfilling around pipes started July 25,2012, On-Going
Flushing Line ( Acid Cleaning ) ---- SC1 Bedding completed. Some area excavation started.
L. CIVIL WORKS FOR EVAPORATOR CABLE ROUTE
1 EVA. UNIT # 71
DB 07 & DB 04 Bet. CP 46-48 ---- Primer for waterproofing membrane applied . Balance is membrane and protection board.
Pump Pit Cover ---- Rebars, completed. Formworks is almost 65 %
DB 11 Extension @ CP 48 ---- Casted July 21,2012
DB 11 Extension @ CP173 & CP174 ---- Casted already
DB 11 Extension @ CP 157 ---- Casted already
2 EVA. UNIT # 72
DB 07 bet. CP55 & CP 56 ---- Waterproofing for screed completed last July 23,2012
CP 57 and CP 58 Wall ---- Rebars completed. Also 20% formworks
DB 09 - 4 ( 2 Nos ) Bet. CP60 & CP 156 ---- Lean concrete casted & waterproofing membrane completed.
CP63, CP64 , CP65 , CP182 , & CP 183 ---- First Coat painting applied.
3 EVA. UNIT # 73
CP-72 Wall
CP-86 Wall
CP 75, CP76, & CP77 Walls ---- Rebars completed, 15% for formworks
F40 ---- Lean concrete casted & waterproofing membrane installed.
DB-05 Bet. 141 & CP 142 ---- Casted last July 25,2012
DB 11-2 bet CP214 & CP 215 ---- Casted last July 23,2012
4 EVA. UNIT # 74
CP 85 ---- Excavation started, Preparation for lean concrete is on going.
DB11-8 Extension @ CP211 ---- Casted
CP 221 ---- Formworks is about 80%
CP 144 Wall ---- Casted
CP 190 & CP191 base slab ---- Casted Last July 21,2012
7 EVA. UNIT #75, #76 ,#77 & # 78
NO ACTIVITY For This Area
8 Other Area
CP 02 & CP 05 ---- Rebars completed. Ready for formworks/closure
DB 10-05 bet CP 156 & CP 178 ---- Casted July 24,2012
TRENCH #1 ---- 5% rebarworks
MH 06 ( Near seawater Intake bldg. ) ---- Casted July 22,2012
M. ROAD AND PAVING FOR EVAPORATOR - N/A
N. FIRE FIGHTING FOR EVAPORATOR - N/A
O. LIGHTING POLE FOR EVAPORATOR - N/A
P. FENCE AND GATE - N/A
Q. DRAINAGE AND SEWAGE FOR EVAPORATOR - N/A
R. DRAINAGE AND SEWAGE FOR POWER PLANT - N/A
S. AUXILLARY PIPE FOR EVAPORATOR
SF 40 ( 3 nos. ) Pedestal @ unit 71 ---- Casted
SF28 ( 2 Nos ) , SF 40 ( 2 nos. ) ---- Casted
SF 19 ( 2 nos. ) SF 15, 17 , 20, 21, 23, 42 ---- Casted
SF 12 ---- Casted
SF13 ( 2 nos ) ---- Casted
T. BY PASS LINE FOR R.O. TEMPERING - N/A
A1. SITE PREPARATION FOR REMIN.
A1.a RGF / LAB. WORKS ---- Third Party is present upon request, concreting & testing.
B1. REMINERALIZATION PLANT
B1.a Limestone Filter Foundation ---- Backfilling of crashed stones completed
Zone 2
**** Formworks & soil preparation is on going
Period Covered: Week No. 47 ( 21-26 JULY, 2012 )
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
CIVIL & BUILDING WORKS
WEEKLY SITE ACTIVITY PROGRESS REPORT
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
B1.b Concrete Pit For Static Mixer ---- Casted, removal of forms completed
C1. CIVIL WORKS FOR REMIN. CABLE ROUTE
CP 9 Wall ---- Rebar works completed , Installation of forms about 80%
CP 10 Wall ---- Casted last July 25,2012
D1. ROAD AND PAVING FOR REMIN - N/A
E1. FIRE FIGHTING FOR REMIN - N/A
F1. LIGHTING POLE FOR REMIN - N/A
G1. DRAINAGE AND SEWAGE FOR REMIN - N/A
H1. AUX. PIPE FOR REMIN - N/A
A2. ROAD AND PAVING FOR RO - N/A
Verified by : Approved by:
Engr. Aries Hernandez
Office Engineer
Prepared by:
Engr. Roger Betania
Chief-Office-Engineer Project Manager
Engr. Shaik Shafiullah
Zone 8
WEEK NO. 74 ( JULY 21 2012 - JULY 26,2012 )
2. QA / QC
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
CIVIL & BUILDING WORKS
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 9 of 75
Date Time
1 MSF # 74 Sump Pit Pump Pit Unit # 74 Foundation July 21, 2012 5:45 17.00 5:45 hrs to 6:05 hrs
2 Building Gas Chlorination
Gas Chlorination Bldg, Grade Beams At Grid
A/3-6,B/1-8& Bet.A-B/3&6
July 21, 2012 8:00 16.00 8:00 hrs to 8:20 hrs
3 Cable Route Cable Pit Cable Pit, CP-190 & 191 Base Slab July 21, 2012 8:35 7.00 8:35 hrs to 8:45 hrs
4 Steam Pipe (Z1) AUX
Steam Pipe & AUX Pipe Foundation
SF15,24,27-1,29,29-1&30 (1ea.), SF28
(2nos.)&SF40(2nos) Pedestals, Unit # 72-
(As Shown)
July 21, 2012 10:00 15.00 10:00 hrs to 10:20 hrs
5 Cable Route Duct Bank
Duct Bank, DB-11 Connection @ CP-48
South Side
July 21, 2012 10:25 4.00 10:25 hrs to 10:30 hrs
6 Cable Route Duct Bank
Duct Bank, DB-11 Connection @ CP-173
South Side
July 21, 2012 10:35 7.00 10:35 hrs to 10:45 hrs
7 Cable Route Duct Bank
Duct Bank, DB-11 Connection @ CP-174
North Side
July 21, 2012 10:55 9.00 10:55 hrs to 11:05 hrs
8 MSF # 72 Misc.
Misc. Foundation F1,F3&F4 At Grid B3, Unit
# 72- Area B
July 21, 2012 11:07 15.00 11:07 hrs to 11:20 hrs
9 Building Chemical Storage
Chemical Storage Bldg. Footings At Gridline
D/1-7,E&F/6-8- Foundation
July 22, 2012 6:00 45.00 6:00 hrs to 8:00 hrs
10 Cable Route Cable Pit Cable Pit, CP-144 Wall July 22, 2012 9:00 7.00 9:00 hrs to 9:10 hrs
11 Steam Pipe (Z1) AUX
Steam Pipe & AUX. Pipe
Foundation,SF12,14&40 (1ea.) Pedestals,
Unit # 71 (As Shown)-
July 22, 2012 9:15 10.00 9:15 hrs to 9:25 hrs
12 MSF # 71 Pipe Rack
Pipe Rack Foundation F-2 (4nos.) Pedestals,
Evap # 71 (As Shown)
July 22, 2012 9:30 0.50 9:30 hrs to 9:33 hrs
13 MSF # 72 Misc.
Misc. Foundation F4, Bet. 19 &20 Pedestal,
Unit # 72
July 22, 2012 9:40 4.00 9:40 hrs to 9:45 hrs
14 Cable Route Duct Bank
Duct Bank, DB-11 Connection @ CP-157
West Side
July 22, 2012 9:50 5.50 9:50 hrs to 10:00 hrs
15 Cable Route Duct Bank Duct Bank, DB-11-2 Bet. CP-214&215 July 23, 2012 6:00 9.00 6:00 hrs to 6:10 hrs
16 Cable Route Duct Bank
Duct Bank, DB-11-8 Connection @ CP-211
East Side
July 23, 2012 6:35 8.00 6:35 hrs to 6:45 hrs
17 MSF # 72 Flash Tank Misc. Foundation Flash Tank, Unit # 72 July 24, 2012 7:05 8.00 7:05 hrs to 7:10 hrs
18 Cable Route Cable Pit
Cable Trench Arrangement Plan-B-M/H-06,
Wall
July 24, 2012 7:20 7.00 7:20 hrs to 7:30 hrs
19 MSF # 72 Misc.
Misc. Foundation F5 (1 no) Bet. Grid 20&21,
Pedestal Unit # 72 @ Precast Yard- (As
Shown)
July 24, 2012 9:25 2.00 9:25 hrs to 9:28 hrs
20 MSF # 72 Misc.
Misc. Foundation F32 (1no.) near Grid B,
Pedestal, Unit # 72 As Shown- ASC Precast
Yard
July 24, 2012 9:30 1.00 9:30 hrs to 9:33 hrs
21 Steam Pipe (Z1) AUX
Steam Pipe & AUX Pipe Foundation SF32
(1no) Pedestal, Unit # 72- (As Shown)
@ ASC Precast Yard
July 24, 2012 9:36 1.00 9:36 hrs to 9:38 hrs
22 Cable Route Duct Bank Duct Bank, DB-10-5 Bet. CP-156&178 July 25, 2012 6:05 9.00 6:05 hrs to 6:15 hrs
23 Cable Route PTP Cable Pit, CP-10 Wall July 25, 2012 8:45 7.00 8:45 hrs to 8:55 hrs
24 Cable Route Duct Bank Duct Bank, DB-05 Bet. CP-141&142 July 25, 2012 9:45 20.00 9:45 hrs to 10:10 hrs
25 Building Switch Gear Bldg.
SWGR Bldg. for MSF Area Kicker Columns,
Unit # 77 & 78
July 25, 2012 10:15 1.00 10:15 hrs to 10:18 hrs
235.00 m
26 Cable Route Duct Bank Duct Bank, DB-09-4 Bet. CP-60&156 July 22, 2012 8:05 11 8:05 hrs to 8:15 hrs
27 Building Electro Chlorination
Electro Chlorination Bldg. Out Door
Foundation MF5- As Shown
July 22, 2012 8:20 3 8:20 hrs to 8:25 hrs
28 Unit # 74 misc.
Misc. Foundation F-3, F-12 (2 nos),
F-12-1, SF-1&2 Bet. Gridline 16
to 21, Unit # 74 (As Shown)-Part 01 of 02
July 25, 2012 6:55 1 6:55 hrs to 6:58 hrs
29 Unit # 74 Misc.
Misc. Foundation F-3, F-12 (2 nos),
F-12-1, SF-1&2 Bet. Gridline 16
to 21, Unit # 74 (As Shown)-Part 01 of 02
July 26,2012 6:55 3 6:55 hrs to 6:58 hrs
18.00 m
30 Unit # 73 Misc. Misc. Foundation F40, Unit # 73 July 23, 2012 6:50 1 6:50 hrs to 6:53 hrs
31 Unit # 71 Trench Trench # 1 & Aux Pipe, Unit # 71 July 23, 2012 7:40 7 7:40 hrs to 7:50 hrs
TOTAL Quantity :
LEAN CONCRETE
SCREED CONCRETE
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
WEEKLY CONCRETE CASTING REPORT
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
TOTAL Quantity :
Quantity in M
3
Remark
REINFORCED CONCRETE
Sl. No Unit Type Of Structure Description Of work
Concrete Pouring
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 10 of 75
Date Time
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
WEEKLY CONCRETE CASTING REPORT
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
Quantity in M
3
Remark Sl. No Unit Type Of Structure Description Of work
Concrete Pouring
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
32 Unit # 72 Misc.
Misc. Foundation Ball Cleaning & Panel, Unit
# 72
July 24, 2012 7:50 0.3 7:50 hrs to 7:53 hrs
33 Cable Route Duct Bank Duct Bank, DB-07 Bet. CP-55 & 56 July 24, 2012 7:58 0.2 7:58 hrs to 8:00 hrs
34 Building Chemical Storage
Chemical Storage Buildings Footings At Grid
B/1-11
July 24, 2012 8:05 6.5 8:05 hrs to 8:15 hrs
15.00 m
AS SUMMARY :
DATE Lean Screed Structural Production per Day ( M )
July 21,2012 0 0 90 90
July 22,2012 14 0 72 86
July 23,2012 0 8 17 25
July 24,2012 0 7 19 26
July 25,2012 1 0 37 38
July 26,2012 3 0 0 3
TOTAL : 18 15 235 268
Prepared by :
ENGR. ARIES HERNANDEZ
Office Engineer
TOTAL Quantity :
ENGR. SHAIK SHAFIULLAH
Project Manager
ENGR. ROGER BETANIA
Chief-Office-Engineer
Approved by: Verified by :
Page 11 of 75
Sl. DF-EF-I- Dept. Mat. No. Submit Date Location
Date of
Inspection
Time of
Inspection
Item Description
ITP
Op. No.
Doosan
Point
Owner
Point
DRAWING NO.
Cont.
Representative
from
(ASSAD SAID)
Cont.
Representative
from (Doosan)
Doosan
Recd on
Status
ASC
Recd on
Concrete Casting Date
Vol. of
Concrete
( m )
Remark
1 5222 Civil N/A 7/19/2012
Steam Pipe & AUX Pipe Foundation SF32
(1no) Pedestal, Unit # 72- (As Shown) @
ASC Precast Yard
July 21, 2012 8:15 AM Formworks/ Concreting
CW03/
CW06
W W
70-UMY-CLD-002 (Rev.0a),
70-UMY-CLB-006 (Rev.0)
Md. Hamza R.C.Basco 19/Jul/12 CLOSED July 24, 2012 1
2 5223 Civil N/A 7/19/2012 Cable Pit, CP-144 Wall July 21, 2012 10:00 AM Formworks/ Concreting
CW03/
CW06
W W
70-UBZ-CLD-005 (Rev.3a)&
70-UBZ-CLB-017 (Rev.3a)
Md. Hamza R.C.Basco 19/Jul/12 CLOSED July 22, 2012 7
3 5224 Civil N/A 7/19/2012 Duct Bank, DB-11-2 Bet. CP-214&215 July 21, 2012 10:00 AM Embedments /Formwork
CW04/C
W03
W W
70-UBZ-CLD-004 (Rev.3b) &
70-UBZ-CLB-011 (Rev.3a)
Md. Hamza R.C.Basco 19/Jul/12 CLOSED
4 5225 Civil N/A 7/19/2012 Duct Bank, DB-11-2 Bet. CP-214&215 July 21, 2012 10:30 AM Concreting CW06 W W
70-UBZ-CLD-004 (Rev.3b) &
70-UBZ-CLB-011 (Rev.3a)
Md. Hamza R.C.Basco 19/Jul/12 CLOSED July 23, 2012 9
5 5226 Civil N/A 7/19/2012
Steam Pipe & AUX. Pipe
Foundation,SF12,14&40 (1ea.)
Pedestals,Unit # 71 (As Shown)-
July 21, 2012 10:45 AM Formworks/ Concreting
CW03/
CW06
W W
70-UMY-CLD-002 Rev.0a)&
70-UMY-CLB-003/008
(Rev.0)
Md. Hamza R.C.Basco 19/Jul/12 CLOSED July 22, 2012 10
6 5227 Civil N/A 7/19/2012 Cable Pits, CP-57&58 Walls July 21, 2012 11:30 AM
Reinforcement
/Embedments
CW04/05 W W
70-UBZ-CLD-004 (Rev.3b)&
70-UBZ-CLB-017 (Rev.3a)
Md. Hamza R.C.Basco 19/Jul/12 Open Not Ready
7 5228 Civil N/A 7/19/2012
Misc. Foundation F-3, F-12 (2 nos),
F-12-1, SF-1&2 Bet. Gridline 16 to 21, Unit
# 74 (As Shown)
July 21, 2012 10:35 AM Release for Blinding Concrete CW02 W H 70-UXB-CLD-001 (Rev.1b) Md. Hamza R.C.Basco 19/Jul/12 CLOSED July 25, 2012 1
7 5229 Civil N/A July 21, 2012
Misc. Foundation CEP System Foundation
(1no.), Unit # 72-As Shown
July 22, 2012 8:00 AM
Reinforcement
/Embedments
CW04/05 W W
70-UXB-CLD-002/023
(Rev.0)
Md. Hamza R.C.Basco 21/Jul/12 CLOSED
8 5230 Civil N/A July 21, 2012
Steam Pipe & AUX Pipe Foundation SF40
(3nos) Pedestal, Unit # 71- (As Shown)
July 22, 2012 8:15 AM
Reinforcement
/Embedments
CW04/05 W W
70-UMY-CLD-002 (Rev.0a),
70-UMY-CLB-008 (Rev.0)
Md. Hamza R.C.Basco 21/Jul/12 CLOSED
9 5231 Civil N/A July 21, 2012 Cable Pits, CP-63,64,65,182&183 July 22, 2012 8:30 AM
Surface Preparation Prior to
Primer or 1st Coat Application
PW02 H W
70-UBZ-CLD-004 (Rev.3b) &
70-UBZ-CLB-017 (Rev.3a)
Md. Hamza R.C.Basco 21/Jul/12 Open Not Ready
10 5232 Civil N/A July 21, 2012
Storm Drainage System CP36 Type(D-1)
Bet. Evap # 71&72- Foundation @ ASC
Precast Yard
July 22, 2012 8:45 AM
Reinforcement
/Embedments
CW04/05 W W
70-UZG-CLD-005 (Rev.0) &
70-UZG-CLB-004 (Rev.0)
Md. Hamza R.C.Basco 21/Jul/12 CLOSED
11 5233 Civil N/A July 21, 2012
Cable Trench Arragement Plan-B-M/H-06,
Wall
July 22, 2012 9:15 AM Formworks/ Concreting
CW03/
CW06
W W 70-UBZ-CLD-007 (Rev.2b) Md. Hamza R.C.Basco 21/Jul/12 CLOSED July 24, 2012 7
12 5201 (1) Civil N/A 21-Jul-12
SWGR Bldg. for Post Treatment Bldg.
Parapet Walls At Grid A-C/1-9
July 22, 2012 9:30 AM
Reinforcement
/Embedments
CW04/05 W W
85-UBX-CLC-010 (Rev.0b) &
85-UBX-CLC-017 (Rev.0)
Md. Hamza R.C.Basco 21/Jul/12 Open
Resubmission
( Not Ready )
13 5234 Civil N/A July 22, 2012 Cable Pit, CP-10 Wall July 23, 2012 8:00 AM Formworks/ Concreting
CW03/
CW06
W W
70-UBZ-CLD-002 (Rev.3b)&
70-UBZ-CLB-016 (Rev.2b)
Md. Hamza R.C.Basco 22/Jul/12 CLOSED July 25, 2012 7
14 5235 Civil N/A July 22, 2012 Cable Pit, CP-85 July 23, 2012 8:00 AM Release for Blinding Concrete CW02 W H 70-UBZ-CLD-005 (Rev.3a) Md. Hamza R.C.Basco 22/Jul/12 CLOSED
15 5236 Civil N/A July 22, 2012
SWGR Bldg. for MSF Area SWGR Room
Floor, Unit # 71 & 72
July 23, 2012 8:45 AM
Surface Preparation Prior to
Primer or 1st Coat Application
PW02 H W
70-UBX-CLH-102/106
(Rev.1)
Md. Hamza R.C.Basco 22/Jul/12 CLOSED
16 5237 Civil N/A July 22, 2012
Misc. Foundation F5 (1 no) Bet. Grid
20&21, Pedestal Unit # 72 @ Precast Yard-
(As Shown)
July 23, 2012 8:15 AM Formworks/ Concreting
CW03/
CW06
W W
70-UXB-CLD-001
(Rev.1b),70-UXB-CLB-002
(Rev.1)
Md. Hamza R.C.Basco 22/Jul/12 CLOSED July 24, 2012 1.5
17 5238 Civil N/A July 22, 2012 Misc. Foundation Flash Tank, Unit # 72 July 23, 2012 8:30 AM
Reinforcement/ Embedments/
Formwork
CW05/C
W04/CW
03
W W
70-UXB-CLD-002 (Rev.0) &
70-UXB-CLB-021 (Rev.0)
Md. Hamza R.C.Basco 22/Jul/12 CLOSED
18 5239 Civil N/A July 22, 2012 Misc. Foundation Flash Tank, Unit # 72 July 23, 2012 9:15 AM Concreting CW06 W W
70-UXB-CLD-002 (Rev.0) &
70-UXB-CLB-021 (Rev.0)
Md. Hamza R.C.Basco 22/Jul/12 CLOSED July 24, 2012 8
19 5240 Civil N/A July 22, 2012 Cable Pits, CP-75,76&77 Walls July 23, 2012 8:05 AM Reinforcement/ Embedments CW04/05 W W
70-UBZ-CLD-004 (Rev.3b) &
70-UBZ-CLB-017 (Rev.3a)
Md. Hamza R.C.Basco 22/Jul/12 CLOSED
20 5241 Civil N/A July 22, 2012
Misc. Foundation CEP System Foundation
(1no.), Unit # 72-As Shown
July 23, 2012 8:20 AM Reinforcement/ Embedments CW04/05 W W
70-UXB-CLD-002/023
(Rev.0)
Md. Hamza R.C.Basco 22/Jul/12 CLOSED
21 5242 Civil N/A July 22, 2012
Storm Drainage System DMA22- Type-A-3
Bet. Evap # 71&72-@ ASC Precast Yard
July 23, 2012 8:25 AM Reinforcement/ Embedments CW04/05 W W
70-UZG-CLD-005 (Rev.0) &
70-UZG-CLB-004 (Rev.0)
Md. Hamza R.C.Basco 22/Jul/12 CLOSED
22 5243 Civil N/A July 23, 2012 Cable Pits, CP-02&05 Walls July 24, 2012 8:00 AM Reinforcement/ Embedments CW04/05 W W
70-UXB-CLD-002 (Rev.2c)
& 70-UXB-CLB-016 (Rev.2d)
Md. Hamza R.C.Basco 23/Jul/12 CLOSED
23 5244 Civil N/A July 23, 2012 Duct Bank, DB-10-5 Bet. CP-156&178 July 24, 2012 9:00 AM
Reinforcement/
Embedments/Formworks
CW05/C
W04/CW
03
W W
70-UXB-CLD-002 (Rev.2c)
& 70-UXB-CLB-011 (Rev.3a)
Md. Hamza R.C.Basco 23/Jul/12 CLOSED
24 5245 Civil N/A July 23, 2012 Duct Bank, DB-10-5 Bet. CP-156&178 July 24, 2012 9:45 AM Concreting CW06 W W
70-UXB-CLD-002 (Rev.2c)
& 70-UXB-CLB-011 (Rev.3a)
Md. Hamza R.C.Basco 23/Jul/12 CLOSED July 25, 2012 9
25 5246 Civil N/A July 23, 2012
Deaerator Area (B2) North, East & West
Sides Walls, Unit # 77
July 24, 2012 8:15 AM Reinforcement/Embedments CW04/05 W W
70-UXA-CLB-014/016
(Rev.0a),70-UXA-CLC-014
(Rev.0) & 70-UXA-CLB-015
Md. Hamza R.C.Basco 23/Jul/12 CLOSED
26 5247 Civil N/A July 23, 2012
Underground Pipeline for Flushing Line
(Acid Cleaning), Unit # 74
July 24, 2012 8:00 AM
Pipe Bedding Prior to Pipe
Laying.
70-UG-CLD-014 (Rev.2a) Md. Hamza R.C.Basco 23/Jul/12 CLOSED
PHASE 1 PACKAGE "D"
WEEKLY QA/QC INSPECTION STATUS REPORT ( EXTERNAL RFI's )
DATE COVERED : WEEK NO. 74 ( 21-22 JULY,2012 )
RAS AL KHAIR DESALINATION PLANT
JULY 21,2012
JULY 22,2012
JULY 23,2012
JULY 24,2012
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 12 of 75
Sl. DF-EF-I- Dept. Mat. No. Submit Date Location
Date of
Inspection
Time of
Inspection
Item Description
ITP
Op. No.
Doosan
Point
Owner
Point
DRAWING NO.
Cont.
Representative
from
(ASSAD SAID)
Cont.
Representative
from (Doosan)
Doosan
Recd on
Status
ASC
Recd on
Concrete Casting Date
Vol. of
Concrete
( m )
Remark
PHASE 1 PACKAGE "D"
WEEKLY QA/QC INSPECTION STATUS REPORT ( EXTERNAL RFI's )
DATE COVERED : WEEK NO. 74 ( 21-22 JULY,2012 )
RAS AL KHAIR DESALINATION PLANT
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
27 5248 Civil N/A July 23, 2012
Underground Piping for Discharge Pipeline,
Unit # 73
July 24, 2012 8:10 AM
Pipe Bedding Prior to Pipe
Laying.
70-UG-CLD-014 (Rev.2a) Md. Hamza R.C.Basco 23/Jul/12 CLOSED
28 5249 Civil N/A July 23, 2012 Duct Bank, DB-05 Bet. CP-141&142 July 24, 2012 9:00 AM Embedments/Formwork
CW04/C
W03
W W
70-UBZ-CLD-004 (Rev.3b) &
70-UBZ-CLB-011 (Rev.3a)
Md. Hamza R.C.Basco 23/Jul/12 CLOSED
29 5250 Civil N/A July 23, 2012 Duct Bank, DB-05 Bet. CP-141&142 July 24, 2012 9:30 AM Concreting CW06 W W
70-UBZ-CLD-004 (Rev.3b) &
70-UBZ-CLB-011 (Rev.3a)
Md. Hamza R.C.Basco 23/Jul/12 CLOSED July 25, 2012 20
30 5251 Civil N/A July 23, 2012
Brine Heater Area F6 Foundation, Pedestal
Unit # 72-ASC Precast Yard
July 24, 2012 8:30 AM Formworks/ Concreting
CW03/
CW06
W W
70-UXA-CLD-041 (Rev.0a)
& 70-UXB-CLB-022 (Rev.0)
Md. Hamza R.C.Basco 23/Jul/12 CLOSED
31 5252 Civil N/A July 24, 2012
Misc. Foundation F27 (3no.), Unit # 72- As
Shown- ASC Precast Yard
July 25, 2012 8:00 AM
Reinforcement/Embedments/F
ormwork
CW05/C
W04/CW
03
W W
70-UXB-CLD-001
(Rev.1b)&70-UXB-CLB-009
(Rev.1)
Md. Hamza R.C.Basco 24/Jul/12 CLOSED
32 5253 Civil N/A July 24, 2012
Misc. Foundation F27 (3no.), Unit # 72- As
Shown- ASC Precast Yard
July 25, 2012 9:00 AM Concreting CW06 W W
70-UXB-CLD-001
(Rev.1b)&70-UXB-CLB-009
(Rev.1)
Md. Hamza R.C.Basco 24/Jul/12 CLOSED
33 5254 Bldg. N/A July 24, 2012
SWGR Bldg. for MSF Area Battery Room
Ceiling, Unit # 71 & 72
July 25, 2012 8:00 AM
Surface Preparation Prior to
Primer or 1st Coat Application
PW02 H W
70-UBX-CLH-102/106
(Rev.1)
Md. Hamza R.C.Basco 24/Jul/12 CLOSED
34 5227 ( 1 ) Civil N/A 7/19/2012 Cable Pits, CP-57&58 Walls July 21, 2012 11:30 AM
Reinforcement
/Embedments
CW04/05 W W
70-UBZ-CLD-004 (Rev.3b)&
70-UBZ-CLB-017 (Rev.3a)
Md. Hamza R.C.Basco 19/Jul/12 CLOSED Resubmission
35 5255 Civil N/A July 25, 2012 Cable Pit, CP-221 Wall July 26, 2012 8:15 AM Formworks/ Concreting
CW03/
CW06
W W
70-UBZ-CLD-005 (Rev.3a) &
70-UBZ-CLB-018 (Rev.1a)
Md. Hamza R.C.Basco 25/Jul/12 CLOSED
36 5256 Civil N/A July 25, 2012 Cable Pit, CP-72 Wall July 26, 2012 8:30 AM Reinforcement/ Embedments CW04/05 W W
70-UBZ-CLD-004 (Rev.3b)&
70-UBZ-CLB-017 (Rev.3a)
Md. Hamza R.C.Basco 25/Jul/12 CLOSED
37 5201 ( 2 ) Bldg. N/A July 25, 2012
SWGR Bldg. for Post Treatment Bldg.
Parapet Walls At Grid A-C/1-9
July 26, 2012 9:00 AM
Reinforcement
/Embedments
CW04/05 W W
85-UBX-CLC-010 (Rev.0b) &
85-UBX-CLC-017 (Rev.0)
Md. Hamza R.C.Basco 17/Jul/12 Open
Resubmission
( Not Ready )
38 5231 ( 1 ) Civil N/A July 21, 2012 Cable Pits, CP-63,64,65,182&183 July 26, 2012 8:30 AM
Surface Preparation Prior to
Primer or 1st Coat Application
PW02 H W
70-UBZ-CLD-004 (Rev.3b) &
70-UBZ-CLB-017 (Rev.3a)
Md. Hamza R.C.Basco 21/Jul/12 CLOSED
Verified by :
Office Engineer
Approved by:
ENGR. SHAIK SHAFIULLAH
Project Manager
ENGR. ROGER BETANIA
Chief-Office-Engineer
JULY 25,2012
JULY 26,2012
Prepared by :
ENGR. ARIES HERNANDEZ
Page 13 of 75
No. DF-EF-I- File No. Date Location
Requested
by
Item Description Qt'y Shipment No.
B/L
No.
Shop Insp. Cert.
No.
Packing List Material Approval No. Sub-Cont. Date Doosan Date Remarks
1 N/A 2-Aug-12
Assad Said Laydown
Area
Mr. Song
Acid Resistant Ceramic Tile
290-2912, 15.1X15.1X0.9 cm
572.00 m
2
Attachment #1 N/A N/A
AS-DF-T-0188, DS-C-
0126
Mr. P.G.Kwak 2-Aug-12 Mr. P.G.Kwak 2-Aug-12 Civil
2 N/A 2-Aug-12
Assad Said Laydown
Area
Mr. Song
Hollow Blocks (200X200X400mm 3 Cell
Strecher Block) =3032
Hollow Blocks (100X190X390mm 2 Cell
Corner Block)=460
3032.00
460.00
=3492.00
Attachment #1 N/A N/A Attachment #1
DH-EF-L-0087/DS-C-
0060
Mr. P.G.Kwak 2-Aug-12 Mr. P.G.Kwak 2-Aug-12
3 N/A 31-Jul-12
Assad Said Laydown
Area
Mr. Song
Fenomastic Pure CL ENA SG (STD 0567) 18
L
60 pcs Attachment #2 N/A N/A Attachment #1
DH-EF-L-0257/DS-C-
0127
Mr. P.G.Kwak 31-Jul-12 Mr. P.G.Kwak 31-Jul-12 Civil
4 N/A 26-Jul-12
Assad Said Laydown
Area
Mr. Song
Fiberlon-APP Modified Bitumen Membranes
4mm
Polyflame-APP Modified Btumen
Waterproofing Membrance 4mm Black
3910 M2
1150 M2
Total 5060 M2
Attachment #2 N/A N/A Attachment #1
DH-EF-L-0238/0240 &
DS-C-0119/0121
Mr. P.G.Kwak 26-Jul-12 Mr. P.G.Kwak 26-Jul-12 Civil
5 2349 N/A 23-Jul-12
Assad Said Laydown
Area
Mr. Song
Nitotile 489 (12kg)
Nitotile XS Grey (20kg)
88
50
Total 138
Attachment #2 N/A N/A Attachment #1
DH-EF-L-0102/103/DS-C-
0069/70
Mr. P.G.Kwak 23-Jul-12 Mr. P.G.Kwak 23-Jul-12 Civil
6 2347 N/A 19-Jul-12
Assad Said Laydown
Area
Mr. Song
WT-200-1123,25x25x0.8 cm Tile
WT-210-1124,25x33x0.8 cm Tile
WT-290-0015,15.1x15.1 cm Tile
G.P.240-3178, 50x50x1.0 cm Tile
66 M2
272 M2
747 M2
260 M2
Total 1345 M2
Attachment #2 N/A N/A Attachment #1 Mr. P.G.Kwak 19-Jul-12 Mr. P.G.Kwak 19-Jul-12 Civil
7 2343 N/A 17-Jul-12
Assad Said Laydown
Area
Mr. Song
Femomastic Emulsion Primer
Stucco
50 pcs
100 pcs
Total 150 pcs
Attachment #2 N/A Attachment #1 Attachment #1
DH-EF-L-0089/DS-C-
0063
Mr. P.G.Kwak 17-Jul-12 Mr. P.G.Kwak 17-Jul-12 Civil
8 2342 N/A 16-Jul-12
Assad Said Laydown
Area
Mr. Song ESSCOFOAM 35KG,50MM,1250X600 1445 pcs Attachment #2 N/A Attachment #1 Attachment #1
DF-EH-L-0267/DS-C-
0135
Mr. P.G.Kwak 16-Jul-12 Mr. P.G.Kwak 16-Jul-12 Civil
9 2341 N/A 16-Jul-12
Assad Said Laydown
Area
Mr. Song Femomastic Pure CL ENA SG (STD 0567) 8 pcs Attachment #2 N/A Attachment #1 Attachment #1 Mr. P.G.Kwak 16-Jul-12 Mr. P.G.Kwak 16-Jul-12 Civil
10 2301 N/A 4-Jul-12
Assad Said Laydown
Area
Mr. Song
Hollow Blocks (200X200X400mm 3 Cell
Strecher Block)
Hollow Blocks (100X190X390mm 2 Cell
Corner Block)
11,468 pcs
9,540 pcs
Total 21,008 pcs
Attachment #2 N/A Attachment #1 Attachment #1
DH-EF-L-0087/DS-C-
0060
Mr. P.G.Kwak 4-Jul-12 Mr. P.G.Kwak 4-Jul-12 Civil
11 2290 N/A 25-Jun-12
Assad Said Laydown
Area
Mr. Song
UPVC Pipe-500mm 14.6m R/J CL-3
Pipe 400mm 11.7mm R/J CL-3
Pipe 315mm 9.2mm SCJ CL-3
Pipe 250mm 7.3mm Class-3
Pipe 200mm 5.9mm Class-3
Anger Rubber 500mm
Anger Rubber 400mm
11 pcs
43 pcs
28 pcs
6 pcs
86 pcs
11 pcs
43 pcs
Total 228 pcs
Attachment #2 N/A Attachment #1 Attachment #1
DH-EF-L-0045/DS-C-
0039
Mr. P.G.Kwak 25-Jun-12 Mr. P.G.Kwak 25-Jun-12 Civil
12 2272 N/A 18-Jun-12
Assad Said Laydown
Area
Mr. Song
Hollow Blocks ( 200X200X400 mm 3 Cell
Strecher Block )
5878 pcs Attachment #2 N/A Attachment #1 Attachment #1
DH-EF-L-0087/DS-C-
0060
Mr. P.G.Kwak 18-Jun-12 Mr. P.G.Kwak 18-Jun-12 Civil
13 2267 N/A 9-Jun-12
Assad Said Laydown
Area
Mr. Song
UPVC Pipe-500mm 14.6m R/J CL-3
Pipe 160mm 4.7mm Class-3
Pipe 110mm 3.2mm Class-3
Anger Rubber 500mm
28 pcs
6 pcs
41 pcs
28 pcs
Total 103 pcs
Attachment #2 N/A Attachment #1 Attachment #1
DH-EF-L-0045/DS-C-
0039
Mr. P.G.Kwak 9-Jun-12 Mr. P.G.Kwak 9-Jun-12 Civil
14 2247 N/A 29-May-12
Assad Said Laydown
Area
Mr. Song
Blue Guard-Extruded Polystyrene Insulation
Boards
600 pcs
600 pcs
Total 1200 pcs
Attachment #2 N/A Attachment #1 Attachment #1
DH-EF-L-0195/DS-C-
0107 (A)
Mr. P.G.Kwak 29-May-12 Mr. P.G.Kwak 29-May-12 Civil
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
QA/QC MRIR REPORT
DATE COVERED : As of 25 August,2012
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 14 of 75
No. DF-EF-I- File No. Date Location
Requested
by
Item Description Qt'y Shipment No.
B/L
No.
Shop Insp. Cert.
No.
Packing List Material Approval No. Sub-Cont. Date Doosan Date Remarks
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
QA/QC MRIR REPORT
DATE COVERED : As of 25 August,2012
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
15 2216 N/A 17-May-12
Assad Said Laydown
Area
Mr. Song
Hollow Blocks (200X200X400mm 3 Cell
Strecher Block)
Hollow Blocks (100X190X390 mm 2 Cell
Corner Block)
14,284 pcs
8,135 pcs
Total 22,419 pcs
Attachment #2 N/A Attachment #1 Attachment #1
DH-EF-L-0087/DS-C-
0060
Mr. P.G.Kwak 17-May-12 Mr. P.G.Kwak 17-May-12 Civil
16 N/A 15-Apr-12
Assad Said Laydown
Area
Mr. Song Nitocote EPU/ EPU RAL 7032 200 Sets Attachment #2 N/A Attachment #1 Attachment #1
DH-EF-L-0088/DS-C-
0061 A
Mr. P.G.Kwak 15-Apr-12 Mr. P.G.Kwak 15-Apr-12 Civil
17 2160 N/A 31-Mar-12
Assad Said Laydown
Area
Mr. Song
Hollow Blocks ( 200*200*400 mm 3 Cell
Strecher Block )
1300 pcs Attachment #2 N/A Attachment #1 Attachment #1
DH-EF-L-0087/DS-C-
0060
Mr. P.G.Kwak 31-Mar-12 Mr. P.G.Kwak 31-Mar-12 Civil
18 2158 N/A 31-Mar-12
Assad Said Laydown
Area
Mr. Song
FBEC (Coated Reinforcing Steel Bars) Dia 25
mm
26 ton Attachment #2 N/A Attachment #1 Attachment #1 DF-EH-L-0006
Mr. Shaik
Shafiullah
31-Mar-12 Mr. P.G.Kwak 31-Mar-12 Civil
19 2053 N/A 20-Dec-11
Assad Said Laydown
Area
Mr. Basco
FBEC (Coated Reinforcing Steel Bars) Dia 25
mm
Total 278 ton Attachment #1 N/A Attachment #1 Attachment #1 DF-EH-L-0006
Mr. Shaik
Shafiullah
20-Dec-11
Mr. Rigoberto C.
Basco
20-Dec-11 Civil
20 2004 N/A 19-Jul-11
Assad Said Laydown
Area
Mr. Basco
FBEC (Coated Reinforcing Steel Bars) Dia 20
mm
FBEC (Coated Reinforcing Steel Bars) Dia 25
mm
60 ton
92 ton
Total 152 ton
Attachment #1 N/A Attachment #1 Attachment #1 DF-EH-L-0006
Mr. Rodrigo
Betania
19-Jul-11
Mr. Rigoberto C.
Basco
19-Jul-11 Civil
21 2003 N/A 13-Jul-11
Assad Said Laydown
Area
Mr. Basco Plastic Coated Binding Wires 295 Rolls Attachment #1 N/A Attachment #2 Attachment #1 DF-EH-L-0006
Mr. Rodrigo
Betania
13-Jul-11
Mr. Rigoberto C.
Basco
13-Jul-11 Civil
22 2002 N/A 7-Jul-11
Assad Said Laydown
Area
Mr. Basco
FBEC (Coated Reinforcing Steel Bars) Dia 25
mm
52 ton Attachment #1 N/A Attachment #1 Attachment #1 DF-EH-L-0006
Mr. Rodrigo
Betania
7-Jul-11
Mr. Rigoberto C.
Basco
7-Jul-11 Civil
23 2001 N/A 29-Jun-11
Assad Said Laydown
Area
Mr. Basco
FBEC (Coated Reinforcing Steel Bars) Dia 10
mm
FBEC (Coated Reinforcing Steel Bars) Dia 12
mm
FBEC (Coated Reinforcing Steel Bars) Dia 16
mm
FBEC (Coated Reinforcing Steel Bars) Dia 20
mm
FBEC (Coated Reinforcing Steel Bars) Dia 22
mm
808 ton
706 ton
1,383 ton
2,844 ton
706 ton
Total 6,447 ton
Attachment #1 N/A Attachment #1 Attachment #1 DF-EH-L-0006
Mr. Rodrigo
Betania
28-Jun-11
Mr. Rigoberto C.
Basco
28-Jun-11 Civil
WEEK NO. 74 ( JULY 21 2012 - JULY 26,2012 )
3. HSE
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
CIVIL & BUILDING WORKS
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
WEEK NO. 74 ( JULY 21 2012 - JULY 26,2012 )
3. HSE
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
CIVIL & BUILDING WORKS
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 17 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
Verified by : Approved by:
Office Engineer
ENGR. ARIES HERNANDEZ
ENGR. SHAIK SHAFIULLAH
Project Manager
ENGR. ROGER BETANIA
Chief-Office-Engineer
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
Prepared by :
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 18 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 19 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 20 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 21 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 22 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 23 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 24 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 25 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 26 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 27 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 28 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 29 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 30 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 31 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 32 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 33 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 34 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 35 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 36 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 37 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 38 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 39 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 40 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 41 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 42 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 43 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 44 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 45 of 75
ASSAD SAID
Letter No. Submittal's MS Docu.Ref.No Rev Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0032 MS 70-GG-CDC-001 June 08, 2011 Excavation Excavation Works for Evaporator Foundation 6/8/2011 DF-EH-D-0010/019 B 1/31/2012 Vol-1
2 AS-DS-L-0035 MS 70-GG-CDC-002 June 08, 2011 Blind Concrete Concreting Works (General) 6/8/2011 DF-EH-D-0011 B 1/31/2012 Vol-1
3 AS-DS-L-0034 MS 70-GG-CDC-003 June 08, 2011 Water Proofing Works Waterproofing Membrane & Protective Coatings 6/8/2011 DF-EH-D-0013/30 B 1/31/2012 Vol-1
4 AS-DS-T-0028 MS 70-GG-CDC-004 June 25, 2011 Concrete General A Vol-1
5 AS-DF-T-0032 MS 70-GG-CDC-005 June 25, 2011 Back Filling 6/8/2011 DF-EH-D-0016 B 1/31/2012 Vol-1
6 AS-DS-L-0036 MS 70-GG-CDC-006 June 08, 2011 Dewatering & Sheet Piling Works Dewatering & Sheet Piling Works 6/8/2011 DF-EH-D-0015 B 1/31/2012 Vol-1
7 MS 70-GG-CDC-007 June 25, 2011 Deep Excavation DF-EH-D-0014 B 1/31/2012 Vol-1
8 MS 70-GG-CDC-008 June 15, 2011 BRP/FDN Excavation 8/6/2011 DF-EH-D-0022 B 1/31/2012 Vol-1
9 MS 70-GG-CDC-009 June 27, 2011 Building Works Vol-1
10 MS 70-GG-CDC-010 August 17, 2011 Formworks Vol-1
11 MS 70-GG-CDC-011 August 17, 2011 Concrete Repair Vol-1
12 AS-DS-L-0113 MS 70-GG-CDC-011 October 23, 2011 Concrete Repair Deaerator Area Unit # 71 Wall 10/23/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
13 AS-DS-L-0116 MS 70-GG-CDC-011 October 25, 2011 Concrete Repair (Deaerator Wall) Deaerator Area Unit # 71 Wall 10/25/2011
Reply NCR no. 003, Attached MS no.70-
GG-CDC-011 (Concrete Repair) No
Photos Attached
Vol-1
14 MS 70-GG-CDC-012 August 17, 2011 Mechanical Couplers Vol-1
15 AS-DF-T-0070 MS 70-GG-CDC-013 September 25, 2011 Concrete(Thin Section) 9/25/2011 Vol-1
16 AS-DF-T-0081 MS 70-GG-CDC-013 1 October 03, 2011 Concrete(Thin Section) 10/3/2011 Vol-1
17 AS-DF-T-0099 MS 70-GG-CDC-015 November 20, 2011
Excavation-Post Treatment
Sedimentation Basin
11/20/2011 Vol-1
18 AS-DF-T-0096 MS 70-GG-CDC-016 November 15, 2011 (Erection of PS-Hollow Core Slabs) 11/15/2011 Vol-1
19 AS-DF-T-0097 MS 70-GG-CDC-017 November 15, 2011 (Erection of LLC Siporex Wall Panels) 11/15/2011 Vol-1
20 AS-DF-T-0109 MS 70-GG-CDC-018 November 26, 2011
Masonry Block Work-As Permanent
Form Work
11/26/2011 Vol-1
21 AS-DF-T-0137 MS 70-GG-CDC-019 March 14, 2012 CMU-Block Masonry Works-Walls 3/14/2012 Vol-1
22 AS-DF-T-0149 MS 70-GG-CDC-020 April 16, 2012
Epoxy Paint on Exposed Concrete
Surface
4/16/2012 Vol-1
23 AS-DF-T-0150 MS 70-GG-CDC-021 April 28, 2012 Plastering Works for Walls 4/28/2012 Vol-1
24 AS-DF-T-0166 MS 70-GG-CDC-022 May 20, 2012 Emulsion & Enamel Paint 5/20/2012 Vol-1
25 AS-DF-T-0178 MS 71-GG-CDC-023 June 03, 2012 Roof Waterproofing System 6/3/2012 Vol-1
26 AS-DF-T-0182 MS 71-GG-CDC-023 1 June 10, 2012 Roof Waterproofing System 6/10/2012 Vol-1
27 AS-DF-T-0194 MS 71-GG-CDC-024 July 22, 2012 Tiling Works for Floors & Walls 7/22/2012 Vol-1
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
METHOD OF STATEMENT REPORT
DATE COVERED : AS OF JULY 26,2012
S.N.
DOOSAN
Name of
Suppliers
Place of Application/Location Date of Submit Description of Material Doosan Recd
File
Location
ASC Transmittal no.
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 46 of 75
Letter No. Material no. Submittal's Rev. Material Ref. No Reference No. Status ASC Recd Remarks
1 AS-DS-L-0004 DS-C-0001 MT 5/9/2011 Potable Water for Concrete Concrete & Reinforcement Assad Said Contracting co. Ltd Saudi 9/May/11 DF-EF-L-0001 A 9/May/11
2 AS-DS-L-0002 DS-C-0002 MT 4/27/2011 3-8 Coarse Aggregates of Concrete Concrete & Reinforcement Assad Said Contracting co. Ltd Saudi 27/Apr/11 DF-EF-L-0002 A 9/May/11
3 AS-DS-L-0001 DS-C-0003 MT 5/9/2011 Sand for Concrete Concrete & Reinforcement Assad Said Contracting co. Ltd Saudi 9/May/11 DF-EF-L-0003 A 9/May/11
4 AS-DS-L-0003 DS-C-0004 MT 5/9/2011 3-4 Coarse Aggregates of Concrete Concrete & Reinforcement Assad Said Contracting co. Ltd Saudi 9/May/11 DF-EF-L-0004 A 9/May/11
5 AS-DS-L-0010 MT 5/9/2011 Form Works System Concrete & Reinforcement Assad Said Contracting co. Ltd Saudi 9/May/11 DF-EF-L-0006 A 9/May/11
6 AS-DS-L-0012 5/8/2011 Formworks Accessories Saudi Alamar Trading & Industries Co. 8/May/11
7 AS-DF-T-0018 DS-C-0011 MT 5/9/2011
REBOOL- Chemical Mould Release
Agent
For All Formworks of The Project FOSAM Co. Ltd.P.O.11081 Jeddah 21453 9/May/11 DF-EH-L-0013 A 4/Oct/11 Vol-2
8 AS-DS-L-0014 MT x 5/9/2011 Water Proofing Membrane & Primer
Waterproofing tanking system of
underground structure &inverted roof
Gulf Seal P.O.Box.231573 Riyadh 11321
KSA
28/May/11 Vol-2
9 AS-DF-T-0030 DF-EH-L-0017 DS-C-0020 MT x 6/8/2011 Alyaf A351- Geotextile 250 g/m2
Separation Layar Chipping Area & BRP
Pit, DP & BBDP Pit
ISAM KABBANI & Partner for Building &
Const Material Co.P.O.6897 Damman KSA
8/Jun/11 DS-C-0020 DF-EH-L-0017 A 14/Sep/11 Vol-2
10 AS-DS-L-0023 MT 5/13/2011
CONPLAST RP264 - Retarding Water
Reducing admixtures.
CONPLAST SP 432 MS - High
Performance Admixture for Microsilica
Concrete.
As Concrete Additives FOSAM Co. Ltd.P.O.11081 Jeddah 21453
11 AS-DF-T-0020 DS-C-0000 MT x 5/31/2011
1.Polyethylene Sheet (100 Microns to
300 Microns)2.Block Work Accessories
3. Filler Board & 4.Expanded Matal
For all Underlean Concrete,Masonry
Works, for Expansion Joint & Walls in
Contact with Soil or Substructure &
Plastering Works
Mazen M.Al-Saeed Building Material
Co.Ltd P.O.Box 79619,Al-Khobar 31952
31/May/11 DS-C-0014 DF-EF-L-0016 A 25/Sep/11 Vol-5
12 AS-DF-T-0068 AS-DS-L-82 DS-C-0016 MT 001 x 2 9/25/2011
Supercast PVC Waterstop Range
(200mm wide for wall Thicking upto
300mm & PVC water 300mm wide for
For Expansion & Construction Joint in
all Structural Underground Concrete
works & kicker where it is required
Saudi BASF for Building Material co.Ltd.
P.O.Box.1884 Al-Khobar-31952 KSA
25/Sep/11 DS-C-0043 DF-EH-L-0053 B 18/Oct/11 Vol-1
13 AS-DF-T-0069 AS-DS-L-83 DS-C-0009 MT 001 x 1 9/26/2011
Filler Board Bitu Impregnated 20mm
think
For Expansion & Construction Joint in
all Structural Underground Concrete
works
ISAM KABBANI & Partner for Building &
Const Material Co.P.O.6897 Damman KSA
26/Sep/11 DS-C-0044 DF-EH-L-0054 B 18/Oct/11 Vol-1
14 AS-DF-T-0074 AS-DS-L-89 DS-C-0019 MT X 2 10/1/2011
Masterflow 524L Non Shrink
Cementitions Grout
Anchor BOLT Rod,Column to Column,
Column Basses, Rail Post to Slab &
Heavy Equipment Machinary Bases
Saudi BASF for Building Material co.Ltd.
P.O.Box.1884 Al-Khobar-31952 KSA
1/Oct/11 DS-C-0058 DF-EH-L-0081 A 1/Feb/12 No Comment Vol-1
15 AS-DF-T-0072 AS-DS-L-0087 DS-C-0017 MT X 1 9/29/2011 Couplers /Splicing System Splicing of Reinforcement Bar
Technical Factory of Steel Works Co.Ltd
P.o Box.16464 Jeddah 21464
3/Oct/11 DS-C-0048 DF-EH-L-0060 C 1/Feb/12 Vol-1
16 AS-DF-T-0075 AS-DS-L-0090 DS-C-0020 MT x 10/1/2011
THIOFLEX 600 Gun Grade for Sealing
Expansion & Contraction Joint
For Sealing Expansion & Contraction
Joint
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 1/Oct/11 DS-C-0046 B 18/Oct/11 Vol-1
17 AS-DF-T-0076 AS-DS-L-0091 DS-C-0021 MT x 10/1/2011
Bitumat Bituprotect (4mm) Bituminous
Protection Board
To be used as Protection Board for all
substructure in the whole Project.
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31462
1/Oct/11 DS-C-0047 DF-EH-L-0058 A 18/Oct/11 Vol-1
18 AS-DF-T-0079 AS-DS-L-0094 DS-C-0009 MT 001 x 2 10/3/2011 Protection Board 20mm
To be used as Protection Board for all
substructure in the whole Project.
ISAM KABBANI & Partner for Building &
Const Material Co.P.O.6897 Damman KSA
3/Oct/11 DS-C-0049 DF-EH-L-0061 B 15/Nov/11 Vol-1
19 AS-DF-T-0009 MT 5/25/2011
Renderoc TG- Single Component
Medium Weight Concrete & Masonry
Reinstatement Mortar use in Hot
Climates,Renderoc FC-Single
Component polymer Modified
Cementitious Fairing Coat & Nitobond
AR-Acrylic Emulsion
If Required for Concrete Repair in the
Whole Project
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 25/May/11 DS-C-003 B 15/Nov/11 Vol-2
20 DS-C-0000 MT 5/28/2011 fine aggregate For All Under Lean Concrete
ISAM KABBANI & Partner for Building &
Const Material Co.P.O.6897 Damman KSA
28/May/11 DS-C-0010 DF-EH-L-0012 B
21 AS-DS-L-0020 DS-C-0000 MT 5/11/2011
STC- Specialist Trading Corporation for
Polyethylene Film
Assad Said Contracting co. Ltd Saudi 11/May/11 DS-C-0015 DF-EH-L-0015 A 12/May/11
22 AS-DF-T-0017 AS-DS-L-0024 DS-S-0000 MT 5/30/2011
Supercast PVC Waterstop Range
Centrally & Externally Placed PVC
Waterstop
For All Underground Concrete,
Concrete Expansion Joints and Kicker
Where It Is Required
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 30/May/11 DS-C-0012 DF-EH-L-0014 B 1/Oct/11 Vol-2
23 AS-DS-L-0018 MT 5/9/2011
Polyethylene Sheet (100 Microns to
300 Microns) Which Will be Used
Under the Building Concrete of
Foundation
For All Under Lean Concrete
Mazen M.Al-Saeed Building Material
Co.Ltd P.O.Box 79619,Al-Khobar 31952
9/May/11 DS-C-0014 DF-EH-L-0016 B
24 AS-DF-T0022 MT 6/1/2011
Microsilica to be Added to Ready Mix
Concrete (for Batching Plant)
Ready Mix Concrete for the Whole
Project
Specialist Trading Corp. P.O.Box 325027,
Riyadh 11371
1/Jun/11 DS-C-0015 DF-EH-L-0018 B 14/Sep/11 Vol-2
No.of
Sample
File
Location
Sample Doosan Recd
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
MATERIAL SUBMITTAL STATUS REPORT
DATE COVERED : As of 25 August ,2012
S.N.
DOOSAN
Name of Suppliers Place of Application / Location
ASSAD SAID ASC
Transmittal
no.
Date of Submit Description of Material
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 47 of 75
No.of
Sample
File
Location
Sample Doosan Recd
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
MATERIAL SUBMITTAL STATUS REPORT
DATE COVERED : As of 25 August ,2012
S.N.
DOOSAN
Name of Suppliers Place of Application / Location
ASSAD SAID ASC
Transmittal
no.
Date of Submit Description of Material
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
25 AS-DF-T0006 AS-DS-L-0009 DS-C-0000 MT 5/8/2011 FBEC (Coated Reinforcing steel Bars)
For All Reinforced Concrete in
theWhole Project
Al Faisal Steel Product Company P.Obox
2705, Dammam 31461
8/May/11 DS-C-0004 DF-EH-L-0006 A 14/Sep/11 Vol-2&3
26 AS-DF-T0019 DS-C-0000 MT 5/15/2011
Ordinary Portland Cement (Type-1) &
Sulphate Resisting Portland Cement
For All Concrete Reinforced Concrete,
Mortar,Grout & Plaster Works
Eastern Province Cement Co. P.O.Box.4536
Dammam 31412
15/May/11 DS-C-0013 DF-EH-L-0015/0084 A 3/Dec/11 Vol-2&3
27 AS-DF-T0015 DS-C-0009 MT 5/28/2011 Filler Board / Protection Board
For Expansion Joint & Wall In Contact
With Soils Or Substructure
ISAM KABBANI & Partner for Building &
Const Material Co.P.O.6897 Damman KSA
28/May/11 DS-C-0009 DF-EH-L-0011 C 4/Oct/11 Vol-4
28 AS-DF-T0021 DS-C-0000 MT 6/1/2011
Supercast PVC Waterstop Range
Centrally & Externally Placed PVC
Waterstop
For All Underground Concrete,
Concrete Expansion Joints and Kicker
Where It Is Required
Saudi BASF for Building Material co.Ltd.
P.O.Box.1884 Al-Khobar-31952 KSA
1/Jun/11 DS-C-0016 DF-EH-L-0019 C 14/Sep/11 Vol-3
29 AS-DF-T0010 MT 5/25/2011 Protection Board
For Expansion Joint & Wall In Contact
With Soils Or Substructure
Specialist Trading Corp. P.O.Box 325027,
Riyadh 11371
25/May/11 DS-C-0002 DF-EH-L-0004 C 4/Oct/11
30 AS-DF-T-0033 AS-DS-L-0039 DS-C-000 MT x 6/22/2009 SC1 Crushed Stone
To be used for GRP Pipe Backfinning
Material
Mohd.Nassir Al Hajry Sons P.o.Box.881 Al-
Khobar 31952
22/Jun/09 DS-C-0022 DF-EH-L-0023 A 29/Nov/11 Vol-1
31 AS-DF-T-0034 AS-DS-L-0042 DS-C-000 MT x 6/30/2009 Resubmitted after change the date To be Used for Epoxy Coated Rebars
Specialist Trading Corp. P.O.Box 325027,
Riyadh 11371
30/Jun/11 DS-C-0022 DF-EH-L-0023 A 11/Oct/11 Vol-1
32 AS-DF-T-0035 AS-DS-L-0045 DS-C-0000 MT 7/13/2011
BITUSEAL 1000 & 1200 Self Adhesive
Reinforced Membranes
For Waterproofing Tanking System of
Underground Structure
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31462
13/Jul/11 DS-C-0026 DF-EH-L-0030 C 9/Oct/11 Vol-1
33 AS-DF-T-0036 AS-DC-L-0045 DS-C-0000 MT 7/11/2011
Bitustick XL- Cross Laminated Self
Adhesive Waterproofing Membrane
For Waterproofing Tanking System of
Underground Structure
Henkel Polybit Industries Ltd P.O.Box.2230
Al-Khobar 31952
11/Jul/11 Vol-1
34 AS-DF-T-0039 AS-DS-L-0054 DS-C-0032 MT x 7/28/2011
Round Bar 20mm dia. With PVC Pipe
25mm dia. & Cap
To be Used as Dowel Bar at Expansion
Joint
Approved Direct Line Trading
P.O.Box.6729 Dhahran 31311
30/Jul/11 Vol-1
35 AS-DF-T-0040 AS-DS-L-0055 DS-C-0033 MT x 7/28/2011
Concure WB309 Water Based Concrete
Curing Compound
To be Used for As Curing Compound for
All Concrete Structure
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 28/Jul/11 DS-C-0031 DF-EH-L-0035 B 11/Oct/11 Vol-1
36 AS-DS-L-0055 DS-C-0000 MT 7/30/2011
Concrete Mix Design for PS: Grade A-
Type 1 Cement (50Mpa)
For all Structural Concrete Works Assad Said Contracting co, Ltd Saudi 30/Jul/11 vol-4
37 AS-DF-T-0041 AS-DS-L-0056 DS-C-0034 MT x 7/28/2011
Concure A Multipurpose, Pliolite Resin,
Curing Compound
For Curing of All Concrete Structure FOSAM Co. Ltd.P.O.11081 Jeddah 21453 28/Jul/11 DS-C-0030 DF-EH-L-0034 A 11/Oct/11 Vol-1
38 AS-DS-L-0056 7/31/2011 SC1 Material Test Results 31/Jul/11 Attached Reports
39 AS-DS-L-0056A 001 8/1/2011 SC1 Material Test Results 3/Aug/11 Attached Reports
40 AS-DF-T-0045 AS-DS-L-0061 DS-C-0036 MT x 8/21/2011
Esscofoam 35- Thermal Insulation
Board
For Thermal Insulation Roof
Gulf Insulating Material Manufacturing &
Trading Co, P.O.Box.1306 Al-Farwaniah
80000 Kuwait
21/Aug/11 DS-C-0033 DF-EH-L-0038 C 11/Oct/11 Issued by Doosan Vol-1
41 AS-DF-T-0046 AS-DS-L-0062 DS-C-0027 MT x 8/21/2011
Rheofinish 202 Chemical Mould
Release Agent
For All Formworks of The Project
Saudi BASF for Building Material co.Ltd.
P.O.Box.1884 Al-Khobar-31952 KSA
21/Aug/11 DS-C-0034 DF-EH-L-0039 B 11/Oct/11 Vol-1
42 AS-DS-L-0067 DS-C-0037 MT 9/4/2011 Concrete (Class-C40) Spacer Block
To Be Used for as Reinforcement
Support for All Structural Concrete
Assad Said Contracting co. Ltd Saudi 4/Sep/11 DS-C-0036 DF-EH-L-0041 A 11/Oct/11
43 AS-DF-T-0064 AS-DS-L-0074 DS-C-0000 MT x 9/14/2011
UPVC Pipe Dia. 100mm,
200mm,300mm,400mm,500mm&
600mm
For Building Pipe Sleeves, Drainage &
Sewage Pipe Line for Evaporator
Remain Plant Area
Fabco Plastic Factory Co. P.O box 150
Dammam 31411
14/Sep/11 DS-C-0039 DF-EH-L-0045 A 29/Nov/11 Vol-1
44 AS-DS-L-0077 9/17/2011 Select Fill Test Results 17/Sep/11 Attached Reports
45 AS-DS-L-0080 9/19/2011 Ordinary Fill Test Results 19/Sep/11 Attached Reports
46 AS-DF-T-0067 AS-DS-L-0081 DS-C-0028 MT x 9/19/2011
Chipping Gravel (25mm) Uniform
Gauge
To be Used for Backfilling of Evaporator
Mohd.Nassir Al Hajry Sons P.o.Box.881 Al-
Khobar 31952
19/Sep/11 DS-C-0042 DF-EH-L-0052 A 7/May/12 Vol-1
47 DF-EH-L-0032 DS-C-0028 MT x 7/17/2011
Bitumat Bituprotect - Indentation &
Impact Resistant Board for Water
proofing Membrane
To be Used for Protection Board for all
Substructure in the Whole project
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31462
20/Jul/11 DS-C-0028 DF-EH-L-0032 B 11/Oct/11 Vol-3
48 DF-EH-L-0033 DS-C-0029 MT x 7/19/2011
Bitumat Bitutherm- Extruded
Polystyrene Thermal Insulation Boards
For Termal Insulation for Roof
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31462
20/Jul/11 Vol-3
49 DF-EH-L-0034 DS-C-0030 MT x 7/19/2011
Polyflame-Torch Welded APP (Atactic
Polypropylene) Modified Bitumen
Membranes
For Retaining Walls 150mm Above
Ground Level & Roof Water Proofing
System
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31462
20/Jul/11 DS-C-0029 DF-EH-L0033 C 11/Oct/11 Vol-5
50 AS-DF-T-0039 DF-EH-L-0035 DS-C-0031 MT x 7/20/2011
Masterflex 610-Water Swelling
Waterbar for Joints
For Construction Joints & Where it is
Required
Saudi BASF for Building Material co.Ltd.
P.O.Box.1884 Al-Khobar-31952 KSA
20/Jul/11 DS-C-0018 DF-EH-L-0064 A 15/Nov/11 Vol-3
51 AS-DF-T-0080 AS-DS-L-0100 DS-C-000 MT 001 x 1 10/9/2011
Bituseal 1200 -Self Adhesive Reinforced
Membrane
For Waterproofing Tanking System of
Underground Structure
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31462
9/Oct/11 DS-C-0050 DF-EF-L-0063 B 1/Feb/12
52 AS-DF-T-0071 AS-DS-L-0085 MT 10/10/2011 Chequered Plates/Steel Grating Pre-Qualification TEMCO Technical Works Industries Co.Ltd
53 AS-DF-T-0023 MT x 6/2/2011
Masterflex 700- Polysulphide
Elastomeric Joint Sealant
For Expansion Construction and
Isolation Joint
Saudi BASF for Building Material co.Ltd.
P.O.Box.1884 Al-Khobar-31952 KSA
2/Jun/11 DS-C-0018 DF-EH-L-0021 C 11/Oct/11 Vol-3
54 AS-DF-T-0008 AS-DS-L-0012 DS-C-0000 MT 5/8/2011 PVC Chamfer, PVC Cone & PVC Pipe For formwork for entrie project
Saudi Alamar Trading & Industries Co.
P.O.Box.17, Dammam 31411
8/May/11 DS-C-0001 DF-EH-L-0003 B 11/Oct/11 Vol-2
Page 48 of 75
No.of
Sample
File
Location
Sample Doosan Recd
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
MATERIAL SUBMITTAL STATUS REPORT
DATE COVERED : As of 25 August ,2012
S.N.
DOOSAN
Name of Suppliers Place of Application / Location
ASSAD SAID ASC
Transmittal
no.
Date of Submit Description of Material
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
55 MT sand for Concrete Concrete Works
FESIL AS P.O.Box.1824 Lade 7440
Trondhelm Norway
DS-C-0027 DF-EH-L-0031 B 11/Oct/11
56 MT Potable Water for Concrete Concrete
Al-Bayader Group P.O.Box.11966 Al-Jubail
31961
DS-C-0038 DF-EH-L-0044 A 11/Oct/11
57 MT Aggergates for Concrete production Concrete Works
Mohd.Nassir Al Hajry Sons P.o.Box.881 Al-
Khobar 31952
DS-C-0032 DF-EH-L-0036 B 11/Oct/11
58 MT
Bedding and Backfill Material for GRP
Pipe Installation
GRP Pipe Layingbi
Mohd.Nassir Al Hajry Sons P.o.Box.881 Al-
Khobar 31952
DF-EH-L-0040 B 11/Oct/11
59 AS-DF-T-0013 AS-DS-L-0016 DS-C-0030 MT 5/29/2011
1) Polyflame-APP Modified Bitumen
Waterproofing Membrane with non-
Woven Polyester re-Inforcement 2)
Concrete Primer-Bituminious Primer
For waterproofing Tanking System of
Underground Structure & Invented roof
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31462
29/May/11 DS-C-0008 DF-EH-L-0010 B 11/Oct/11 Vol-3
60 AS-DF-T-0031 AS-DS-L-0031 DS-C-0020 MT x 5/23/2011
Concrete Mix Design for 20N/mm2 (
Grade/Class C20) @28 days on Cube &
40 N/mm2 (Grade/Class C40) @28
Days on Cube
If Required for Concrete Repair in the
Whole Project
Saudi Readymix Conc31839 Al-Khobar
31952
23/May/11 DS-C-0019 DF-EH-L-0025 C 11/Oct/11 Vol-2
61 AS-DF-T-0032 AS-DS-L-0038 DS-C-0000 MT 6/13/2011
Concrete Mix Design for 20N/mm2 (
Grade/Class C20) @28 days on Cube &
40 N/mm2 (Grade/Class C40) @28
Days on Cube
If Required for Concrete Repair in the
Whole Project
Assad Said Contracting co, Ltd Saudi 13/Jun/11 DS-C-0002 DF-EH-L-0022 B 11/Oct/11 Vol-2
62 AS-DF-T-0011 AS-DS-L-0014 DS-C-0000 MT x 5/28/2011
GS Plasto 4F Waterproofing
Memebrane & GS Primer
For Waterproofing Tanking System of
Underground Structure and Inverted
Roof
Gulf Seal P.O.Box.231573 Riyadh 11321
KSA
28/May/11 DS-C-0006 DF-EH-L-0008 B 11/Oct/11 Vol-2
63 AS-DF-T-0016 5/29/2011
Polyethylene Sheet (100 Microns to
300 Microns) Which Will be Used
Under the Building Concrete of
Foundation
For All Under Lean Concrete
Specialist Trading Corp. P.O.Box 325027,
Riyadh 11371
DS-C-0007 DF-EH-L-0009 A 11/Oct/11
64
Select Fill & Material Fill from +2.10m
savd up to +2.10m savd up to +310m
savd at ro
Site Filling from +2.10m savd up to
+310m savd to ro
Mofarreh 4028 m. Al-Harbi Est. P.O.Box.
4028 Dmmama 31491
DS-C-0025 DF-EH-L-0029 A 11/Oct/11
65 AS-DF-T-0012 DS-C-0000 MT 5/28/2011
SIKA Bitumen 60- (Bitumen Emulsion
Protective Coating)
For All Concrete Exposed to Ground
SIKA Saudi Arabia Co. Ltd. PH Floor
Obaikan Blgd, Prince Sultan Street,
P.O.Box.112356 Jeddah, KSA
28/May/11 vol-5
66 AS-DS-L-0098 10/6/2011 Test results of Excavated Natural Soil 6/Oct/11 Attached Reports
67 AS-DF-T-0081 AS-DS-L-0102 DS-C-0018 MT 001 10/11/2011
Masterflex 700- Polysulphide
Elastomeric Joint Sealant
For Expansion Construction and
Isolation Joint
Saudi BASF for Building Material co.Ltd.
P.O.Box.1884 Al-Khobar-31952 KSA
11/Oct/11 DS-C-0018 DF-EH-L-0064 A 29/Nov/11 Vol-1
68 AS-DF-T-0082 AS-DS-L-0103 DS-C-0038 MT x 10/12/2011
SIKA Waterbar-Joint Sealing PVC Profile
& Sika Waterbars SG
For All Underground Concrete,
Concrete Expansion Joints and Kicker
Where It Is Required
SIKA Saudi Arabia Co. Ltd. PH Floor
Obaikan Blgd, Prince Sultan Street,
P.O.Box.112356 Jeddah, KSA
12/Oct/11 DS-C-0056 DF-EH-0076 B 15/Nov/11 Vol-1
69 AS-DF-T-0083 AS-DS-L-0109 DS-C-0039 MT 10/24/2011 Security Fence SSD-1 & SSD-2 Category
This Material to be Used for Inner &
Outer Fencing in the Whole Project
Saudi Chainlink Fence Mfg.Co.Ltd
P.O.Box.2577 Dammam 31461 KSA
24/Oct/11
On Hold returned on 25-10-
11, After issueing the Dwg
from Doosan than Submission
Vol-6
70 AS-DF-T-0084 AS-DS-L-0110 DS-C-0040 MT x 2 10/24/2011 Latifia Geogrids Type B20
This Material to be Used as Road
Base/Sub Base Reinforcement in the
Whole Project
Geosynthetics Technologies Co.Ltd
P.O.Box.77067 Al-Khobar 31952 KSA
24/Oct/11
On Hold returned on 25-10-
11, After issueing the Dwg
from Doosan than Submission
Vol-6
71 AS-DF-T-0085 AS-DS-L-0105 10/15/2011
Steel Door,Fire Rated Steel Doors &
Frame,Steel Gates,Folding Doors, Roller
Shutter Doors
Pre-Qualification
Al-Kuhaimi Metal Industries Ltd, P.O.Box
545, Dammam 31421 KSA
15/Oct/11
72 AS-DF-T-0086 AS-DS-L-0111 DS-C-0041 MT x 10/23/2011
Sikafloor-161,Sikafloor-264 & Sikafloor-
359 SG
This Material to be Used for Epoxy
Coating for Outside Surface of Concrete
and Wherever it is Required
SIKA Saudi Arabia Co. Ltd. PH Floor
Obaikan Blgd, Prince Sultan Street,
P.O.Box.112356 Jeddah, KSA
23/Oct/11 DS-C-0052 DF-EH-L-0072 B 1/Feb/12
The color code shall be in
accordance to SWCC color
coding system. Approval is
subject to final inspection and
acceptance of sample to be
prepared at site.
Vol-6
73 AS-DF-T-0087 AS-DS-L-0112 DS-C-0042 MT 10/23/2011 Renderoc TG- Xtra
This Material to be Used for Repair of
Honeycombing,Voids Greater Than
10mm Deep, Vertical & Overhead
Repair in Concrete and Wherever it is
Required
Fosam Co. Ltd.P.O.11081 Jeddah 21453 23/Oct/11 DS-C-0053 DF-EH-L-0069 B 15/Nov/11 Vol-6
74 AS-DF-T-0090 AS-DS-L-0114 DS-C-0043 MT x 10/27/2011
Chequered Plate (Thk 6mm&8mm)&
Steel Gratings
This Material to be Used for
Manholes,Trenches,Metal
Steps,Platforms,Walkways & Wherever
it is Required
Saudi Pan Gulf (Steel Division) P.O.Box
2473 Al-Khobar 31952 KSA
27/Oct/11
Resubmitted on 28-11-11
with Galvanizing Sample &
Test Certificate
Vol-6
75 AS-DF-T-0089 AS-DS-L-0117 DS-C-0044 MT X 10/25/2011
Renderoc HF- High Performance non-
Shrink Cementitious Microconcrete
This Material to be Used for Repair of
Concrete Where Rebar are Exposed
and Wherever it is Required for the
Whole Project
Fosam Co. Ltd.P.O.11081 Jeddah 21453 25/Oct/11 DS-C-0055 DF-EH-L-0073 A 15/Nov/11 Vol-6
76 AS-DS-L-0121 10/25/2011
Concrete Mix Design for Doosan
Project: Grade A-Type 1 Cement
(40Mpa)
For all Structural Concrete Works Assad Said Contracting co, Ltd Saudi 25/Oct/11
Attached Trial Mixes & Field
Test Report for 7 Days C40
Page 49 of 75
No.of
Sample
File
Location
Sample Doosan Recd
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
MATERIAL SUBMITTAL STATUS REPORT
DATE COVERED : As of 25 August ,2012
S.N.
DOOSAN
Name of Suppliers Place of Application / Location
ASSAD SAID ASC
Transmittal
no.
Date of Submit Description of Material
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
77 AS-DF-T-0091 AS-DS-L-0122 DS-C-0045 MT 10/27/2011
Sikagrout-114 Cementitious,Shrinkage
Compensated General Purpose Grout
This Material to be Used for Grouting in
Machine foundations, Base Plates,
Concrete Anchors, Cavities, Gaps,
Recesses and General Concrete repairs.
SIKA Saudi Arabia Co. Ltd. PH Floor
Obaikan Blgd, Prince Sultan Street,
P.O.Box.112356 Jeddah, KSA
27/Oct/11 DS-C-0089 DF-EF-L-0137 B 16/Feb/12
Contractor to strictly follow
the mix proportion as per the
manufactureer
recommendation
Vol-6
78 AS-DF-T-0088 AS-DS-L-0120 DS-C-0046 MT x 10/27/2011
Embedded Plates, Plates (thk 9mm) &
MS Pipes (Dia.38mm&42mm)
This Material to be Used for
Manholes,Trenches,Metal
Steps,Platforms,Walkways & Wherever
it is Required
Saudi Pan Gulf (Steel Division) P.O.Box
2473 Al-Khobar 31952 KSA
27/Oct/11
Resubmitted on 28-11-11
with Galvanizing Sample &
Test Certificate
Vol-6
79 AS-DF-T-0092 AS-DS-L-0119 DS-C-0047 MT x 10/27/2011 Angle Bars & Steel Bars
This Material to be Used in Trenches,
Metal Steps, Ladder & wherever it is
required
Saudi Pan Gulf (Steel Division) P.O.Box
2473 Al-Khobar 31952 KSA
27/Oct/11
Resubmitted on 28-11-11
with Galvanizing Sample &
Test Certificate
Vol-6
80 AS-DF-T-0093 AS-DS-L-0128 DS-C-0048 MT 10/29/2011
Conbextra GP-General Purpose non-
Shrink Cementitious Grout
This Material is used Where it is
Essential to Eliminate Shrinkage when
Completely Filling the Void b/w a Base
Plate and a Substrate.
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 29/Oct/11 DS-M-0001 DF-EH-L-0066 B 15/Nov/11 Vol-6
81 AS-DS-L-0125 10/30/2011
Concrete Mix Design for PS 1: Grade A-
Type 1 Cement (40Mpa)
For all Structural Concrete Works Assad Said Contracting co, Ltd Saudi 30/Oct/11
EF-DF-L-007&DH-EF-
D-0060,
A After Revising the Slump
82 AS-DF-T-0094 AS-DS-L-129 DS-C-0049 MT 10/31/2011 Renderco HS Xtra
This Material is used for Vertical &
Overhead repairs to restore covercrete,
General Concrete & Masonry repairs,
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 31/Oct/11 DS-C-0057 DF-EH-L-0078 B 15/Nov/11 Vol-6
83 AS-DS-L-0135 11/16/2011
Concrete Mix Design for Doosan
Project: Grade A-Type 1 Cement
(40Mpa)
For all Structural Concrete Works Assad Said Contracting co, Ltd Saudi 16/Nov/11
Attached Trial Mixes & Field
Test Report for 28 Days C40
84 AS-DF-T-0098 AS-DS-L-0136 DS-C-0051 MT x 11/17/2011 Nitocote EPU Nitoflor EPU 100
For Epoxy Coating of Wall & Floor for
Concrete Protection, Seawater Tanks,
Channels & Intake,Reservoirs, Water
Treatment Plants, Manhole & Pipe
Linings, Secondary Containments, Lining
for Sewage & Effluents Plants.
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 17/Nov/11 DS-C-0061 DH-EF-L-0088 B 1/Feb/12
The color code shall be in
accordance to SWCC color
coding system. Approval is
subject to final inspection and
acceptance of sample to be
prepared at site.
Vol-6
85 AS-DF-T-0100 AS-DS-L-0138 DS-C-0050 MT x 2 11/20/2011 Concrete Interlocking Pavers
This Material Used for Roads & Areas to
be Paved with Interlocking Concrete
Blocks & Wherever it is required for the
whole project
Jubail Concrete Product Co.Ltd (Div. Al-
Khinaini Co.Ltd) P.O.Box 30, Jubail 31951
KSA
20/Nov/11 Vol-6
86 AS-DF-T-0101 AS-DS-L-0139 DS-C-0051 MT x 1 11/20/2011 Kerb Stone
Used for all the Road Works For Whole
Project
Jubail Concrete Product Co.Ltd (Div. Al-
Khinaini Co.Ltd) P.O.Box 30, Jubail 31951
KSA
20/Nov/11 Vol-6
87 AS-DF-T-0102 AS-DS-L-0140 DS-C-0052 MT x 2 11/20/2011 Hollow Blocks
Hollow Blocks is to be used for All
Blocks Masonry Work in the Whole
Project
Jubail Concrete Product Co.Ltd (Div. Al-
Khinaini Co.Ltd) P.O.Box 30, Jubail 31951
KSA
20/Nov/11 DS-C-0059 DH-EF-L-0085 C 1/Feb/12 Vol-6
88 AS-DF-T-0103 AS-DS-L-0141 DS-C-0053 MT x 2 11/20/2011 Hollow Blocks
Hollow Blocks is to be used for All
Blocks Masonry Work in the Whole
Project
Saudi Ready Mix Concrete Co. Ltd P.O.Box.
31839 Al-Khobar 31952
20/Nov/11 DS-C-0060 DH-EH-L-0087 B 1/Feb/12
Hollow masonry blocks to be
used in partition or non -load
bearing walls
Vol-6
89 AS-DF-T-0104 AS-DS-L-0143 DS-C-0054 MT 11/21/2011
Fenomastic Emulsion Primer & Stucco
Putty
For Fully Cured Cement Plastered Walls,
Ceiling, Concrete ,Gypsum Board
Partitions, GRC Works etc Prior to Paint
Application in the Building Wherever it
is Reqquired for the Whole Project
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
21/Nov/11 DS-C-0063 DH-EF-L-0063 B 1/Feb/12
The primer used shall be
compatible with the
subsequent coating system
Vol-6
90 AS-DF-T-0105 AS-DS-L-0144 DS-C-0055 MT 11/21/2011
Fenomastic Emulsion Matt &
Fenomastic Emulsion Semigloss
This Material is to be Used on Most
Interior Surface, i.e Cement Plaster,
Stucco Filler Gypsum Boards, Concrete,
Asbestos Cement Sheeting & Rendered
Block Works
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
21/Nov/11 DS-C-0062 DH-EF-L-0086 B 1/Feb/12
The color code shall be in
accordance to SWCC color
coding system and subject to
approval of sample at site
prior to application
Vol-6
91 AS-DF-T-0106 AS-DS-L-0149 DS-C-0056 MT 11/24/2011
Nitoflor FC 110 & Nitoflor Lithurin As
Liquid Hardener
This Material is to be used as Liquid
Hardener for Floor Finishing in S/G
Building for Post Treament Plant,
Seawater Intake S/G Building,RO
Building & Wherever it is required
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 24/Nov/11 Vol-6
92 AS-DS-L-0151 11/24/2011
Concrete Mix Design for Doosan
Project: Grade A-Type 1 Cement
(20Mpa)
For all Structural Concrete Works Assad Said Contracting co, Ltd Saudi 24/Nov/11
Attached Trial Mixes & Field
Test Report for 28 Days C20
93 AS-DF-T-0107 AS-DS-L-0152 11/24/2011 Precast Hollow Core Slab Pre-Qualification Assad Said Contracting for Precast 24/Nov/11 With Soft copy
94 AS-DF-T-0108 AS-DS-L-0154 DS-C-0057 MT X 11/27/2011
Ceramic Tiles & Acid Resistant Ceramic
Tiles (Floor & Walls)
This Material to be Used for Tiling Work
in Floors & Walls of Electrochlorination
Building, S/G Bldg for MSF area, S/G
Bldg for Post Treatment Plant,
Seawater Intake S/G Bldg & Wherever
it is Required
Saudi Ceramics Co. Ltd P.O Box. 3893
Riyadh 11481 KSA
27/Nov/11 Vol 6
Page 50 of 75
No.of
Sample
File
Location
Sample Doosan Recd
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
MATERIAL SUBMITTAL STATUS REPORT
DATE COVERED : As of 25 August ,2012
S.N.
DOOSAN
Name of Suppliers Place of Application / Location
ASSAD SAID ASC
Transmittal
no.
Date of Submit Description of Material
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
95 AS-DF-T-0110 AS-DS-L-0159 DS-C-0058 MT 12/1/2011
Heavy Duty Ductile Cast Iron & Medium
& Heavy Duty Grey Cast Iron Manhole
Cover & Frame
This Material to be Used in Manholes,
Pits & Wherever it is Applicable in the
Whole Project
Riyadh Foundry Co. P.O.Box 157474,
Second Industrial Area, Riyadh KSA
1/Dec/11 DS-C-0068 DF-EF-L-0101 B 28/Feb/12
Provide protective bitumen
paint details, Element size
would be according to
approved drawings,
Inscription in Arabic & English
to be written on the M.H
cover top as drainage or
storm water manhole as
appropriate
Vol-6
96 AS-DF-T-0111 AS-DS-L-0160 DS-C-0059 MT 12/1/2011
Cast Iron Heavy Duty Round Covers &
Round Frame
This Material to be Used in Manholes,
Pits & Wherever it is Applicable in the
Whole Project
Saudi Cast P.O.Box.3505, Riyadh 11481,
KSA
1/Dec/11 DS-C-0067 DF-EF-L-0100 B 28/Sep/12
Provide protective bitumen
paint details, Element size
would be according to
approved drawings,
Inscription in Arabic & English
to be written on the M.H
cover top as drainage or
storm water manhole as
appropriate
Vol-6
97 AS-DF-T-0112 AS-DS-L-0161 DS-C-0060 MT 12/4/2011
NITOTILE 489- Epoxy Tile Adhesive and
Grout
This Material to be used as a Chemical
Resistant Adhesive and Grout for
bonding quarry and Ceramic Tiles to
concrete or steel, also suitable as a
multi-purpose adhesive for bedding and
repairs & wherever it is required
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 4/Dec/11 DS-C-0069 DF-EF-L-0102 B 27/Jun/12 Vol-7
98 AS-DF-T-0113 AS-DS-L-0162 DS-C-0061 MT X 12/4/2011
NITOTILE XS - Polymer-Modified, One
Component, High Performance,
waterproof Tile Adhesive
This Material to be used as an adhesive
for the permanent fixing of Ceramic
Wall and Floor Tiles including Porcelain
and fully Vitrified Tiles, Ceramic
Mosaics, Quarry Tiles, Dark Natural
Stone, Terrazzo and Brick Silps &
wherever required.
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 4/Dec/11 DS-C-0070 DF-EF-L-0103 B Vol-7
99 AS-DF-T-0114 AS-DS-L-0163 DS-C-0062 MT X 12/4/2011
NITOTILE GP- General Purpose Tile
Adhesive
This Material to be used as an adhesive
for the permanent fixing of Ceramic
Tiles & wherever it is required.
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 4/Dec/11 DS-C-0071 DF-EF-L-0104 B Vol-7
100 AS-DF-T-0115 AS-DS-L-0164 DS-C-0063 MT 12/4/2011 Roof Drain
This material is to be used as roof drain.
Sample will be provided as per your
selection from the attached brochure
which we marked.
Saudi Cast P.O.Box.3505, Riyadh 11481,
KSA
4/Dec/11 DS-C-0072 DF-EF-L-0105 B 1/Feb/12 Only Model 4020 Approved Vol-7
101 AS-DF-T-0116 AS-DS-L-0169 DS-C-0057 MT 001 x 12/13/2011 Ceramic Tiles (Floor & Walls)
This Material to be Used for Tiling Work
in Floors & Walls of Electrochlorination
Building, S/G Bldg for MSF area, S/G
Bldg for Post Treatment Plant,
Seawater Intake S/G Bldg & wherever it
is required
Saudi Ceramics Co. Ltd P.O Box. 3893
Riyadh 11481 KSA
13/Dec/11 Vol-7
102 AS-DS-L-0170 12/13/2011
Test results of Batching Plant
Aggregates (3/4", 3/8", 3/16" & Sand)
& Water
Assad Said Contracting co, Ltd Saudi 13/Dec/11
Test Results of BP for the
Month of October 2011
Vol-7
103 AS-DF-T-0117 AS-DS-L-0172 12/13/2011
Al-Radayef Crusher (Select Fill,
Basecourse, Subbase, Sand &
Aggregates 1", 3/4", 3/8" & 3/16")
Pre-Qualification
Al-Radayef Trading & Contracting Co. P.O
Box 30291 Al-Khobar 31952 KSA
13/Dec/11
104 AS-DF-T-0118 AS-DS-L-0174 DS-C-0064 MT X 12/19/2011 Angle Bars & Steel Bars
This Material to be Used in Trenches,
Metal Steps, Ladder & wherever it is
required
Al-Sharq Factory Steel Industries P.O.Box
40300, Riyadh 11499
19/Dec/11 Vol-7
105 AS-DF-T-0119 AS-DS-L-0175 DS-C-0065 MT X 12/19/2011 Chequered Plates
This Material to be Used for
Manholes,Trenches,Metal
Steps,Platforms,Walkways & Wherever
it is Required
Al-Sharq Factory Steel Industries P.O.Box
40300, Riyadh 11499
19/Dec/11 Vol-7
106 AS-DF-T-0120 AS-DS-L-0176 DS-C-0066 MT X 12/19/2011 MS Plate & Tube
This Material to be Used for
Manholes,Trenches,Metal
Steps,Platforms,Walkways & Wherever
it is Required
Al-Sharq Factory Steel Industries P.O.Box
40300, Riyadh 11499
19/Dec/11 DS-C-0082 DF-EF-L-0125 B 7/Apr/12 Vol-7
107 AS-DF-T-0121 AS-DS-L-0177 DS-C-0067 MT 1/22/2012 Anchor Bolts
This material is to be used for
foundation sample will be provided as
per selection from the attached
brochure
Saudi Alamar Trading & Industries Co. 22/Jan/12 DS-C-0087 DF-EF-L-0133 C 16/Feb/12
Material Requested not
suitable for the intended
installed as per attached
document
Vol-7
108 AS-DF-T-122 AS-DS-L-0178 DS-C-0068 MT 12/19/2011 Lifting Socket & Lifting Loop
This Material is to be used for Cable
Trench, Precast Cover & wherever it is
required
Saudi Alamar Trading & Industries Co. 19/Dec/11 DS-C-0079 DF-EF-L-0121 B 28/Feb/12
The socket upper end to be
plugged with plastic/PVC plug
to prevent from rusting and
sand filling
Vol-7
Page 51 of 75
No.of
Sample
File
Location
Sample Doosan Recd
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
MATERIAL SUBMITTAL STATUS REPORT
DATE COVERED : As of 25 August ,2012
S.N.
DOOSAN
Name of Suppliers Place of Application / Location
ASSAD SAID ASC
Transmittal
no.
Date of Submit Description of Material
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
109 AS-DF-T-0123 AS-DS-L-0180 DS-C-0069 MT 12/31/2011
Masterseal EPU 180- Two Component
Solvent Free High Build Flexible Epoxy
Poly-Urethane Resin Coating System
This material to be used to provide
Heavy-duty Protective, Waterproof,
Flexible Coating, Lining of Tank, Pipe
and Ducting, Coating Concrete,
Asbestos Cement, Steel Pipes and Non-
ferrous metals, wherever it is required
Saudi BasF for Building Material co.Ltd.
P.O.Box.1884 Al-Khobar-31952 KSA
31/Dec/11 DS-C-0078 DF-EF-L-0120 B 28/Feb/12
Subject to approved of Mock-
up test at site, Specify the
exact location to be used
Vol-7
110 AS-DF-T-0124 AS-DS-L-0189 DS-C-0070 MT 1/1/2012 Precast Hollow Core Slab
This Material is to be used as Wall Panel
in Electro chlorination Building,
Switchgear Building for MSF, SWI
Switchgear Building, and Switchgear
Building for Post Treatment Plant.
Assad Said for Precast Factory 1/Jan/12 Vol-7
111 AS-DF-T-0125 AS-DS-L-0190 DS-C-0071 MT X 1 1/1/2012 Siporex Wall Panels
This Material is to be used as Wall Panel
in Electro chlorination Building,
Switchgear Building for MSF, SWI
Switchgear Building, and Switchgear
Building for Post Treatment Plant.
LCC- Siporex P.O.Box.6230, Riyadh 1142,
KSA
1/Jan/12 DS-C-0083 DF-EF-L-0126 C 28/Feb/12
This is not a specified
material
Vol-7
112 AS-DF-T-0126 AS-DS-L-0200 DS-C-0072 MT 1 1/8/2012 MS Plate
This Material to be Used for
Manholes,Trenches,Metal
Steps,Platforms,Walkways & Wherever
it is Required
Al-Sharq Factory Steel Industries P.O.Box
40300, Riyadh 11499
8/Jan/12 Vol-7
113 AS-DS-L-0198 1/8/2012
Test results of Batching Plant
Aggregates (3/4", 3/8", 3/16" & Sand)
& Water
Assad Said Contracting co, Ltd Saudi 8/Jan/12
For the Month of December
2011
114 AS-DS-L-0179 12/22/2011
Test results of Batching Plant
Aggregates (3/4", 3/8", 3/16" & Sand)
& Water
Assad Said Contracting co, Ltd Saudi 24/Dec/11
For the Month of November
2011
115 AS-DF-T-0127 AS-DS-L-0209 1/15/2012
Independent Testing Laboratories
Geotechnical & Material Engineers
Pre-Qualification Omar Jazzar Consulting Engineers 15/Jan/12 With Softcopy
116 AS-DS-L-0209 (A) 1 3/5/2012
Independent Testing Laboratories
Geotechnical & Material Engineers
Pre-Qualification & Company
Questionnaire
Omar Jazzar Consulting Engineers 5/Mar/12
Submitted with Company
Questionnaire
Vol-8
117 AS-DF-T-0128 AS-DS-L-0216 DS-C-0045 MT 1 x 1 1/22/2012
Sikagrout-114 Cementitious,Shrinkage
Compensated General Purpose Grout
This Material to be Used for Grouting in
Machine foundations, Base Plates,
Concrete Anchors, Cavities, Gaps,
Recesses and General Concrete repairs.
SIKA Saudi Arabia Co. Ltd. PH Floor
Obaikan Blgd, Prince Sultan Street,
P.O.Box.112356 Jeddah, KSA
22/Jan/12 Vol-7
118 AS-DF-T-0129 AS-DS-L-0217 DS-C-0073 MT 1/22/2012
Sikafloor- Curehard- 24 (Transparent
Surface Hardener, Dust Proofer, Sealing
& Curing Compound for Concrete
This Material is to be used as Liquid
Hardener for Floor Finishing in S/G
Building for Post Treament Plant,
Seawater Intake S/G Building,RO
Building & Wherever it is required
SIKA Saudi Arabia Co. Ltd. PH Floor
Obaikan Blgd, Prince Sultan Street,
P.O.Box.112356 Jeddah, KSA
22/Jan/12 DS-C-0088 DF-EF-L-0136 B 16/Feb/12
Subject to approved of
sample panel to be provided
at site
Vol-7
119 AS-DF-T-0131 AS-DS-L-0219 DS-C-0075 MT X 1 1/28/2012
Sikaflex PRO-3 WF -1 Part high
performance for flooring
For Expansion Construction and
Isolation Joint
SIKA Saudi Arabia Co. Ltd. PH Floor
Obaikan Blgd, Prince Sultan Street,
P.O.Box.112356 Jeddah, KSA
28/Jan/12 DS-C-0090 DF-EF-L-0138 A 16/Feb/12 No Comment Vol-7
120 AS-DF-T-0130 AS-DS-L-0218 DS-C-0074 MT 2/6/2012 Anchor Bolts
This material is to be used for
foundation sample will be provided as
per selection from the attached
Ali Al-Dar Hardwares Est. P.O. Box 8554,
Dammam 31492, KSA
6/Feb/12 DS-C-0092 DF-EF-L-0142 C 28/Feb/12
Size & type of Anchor Bolt to
be highlighted on the
attached brochure, Sample to
Vol-7
121 AS-DF-T-0133 AS-DS-L-0229 DS-C-0077 MT X 2 2/6/2012 Block Works & Plastering Accessories
This material is to be used for all blocks
masonry in the whole project
ISAM KABBANI & Partner for Building &
Const Material Co.P.O.6897 Damman KSA
6/Feb/12 DS-C-0095 DF-EF-L-0147 A 28/Feb/12
Same material and supplier
has already been approved
for ASC, refer CRS attached
Vol-7
122 AS-DF-T-0134 AS-DS-L-0254 DS-C-0078 MT X 3/5/2012
Suspended Metal Ceiling (Aluminum
Panel Ceiling System)
This material is to be used as
Suspended Metal Ceiling in Toilets of All
Buildings & Wherever it is required in
the whole project
Taliah Trading & Industrial Co. P.O Box.
41084 Riyadh-11521
5/Mar/12 DS-C-0099 DF-EF-L-0158 C 7/Apr/12 Vol-8
123 AS-DF-T-0135 AS-DS-L-0259 DS-C-0079 MT X 3/5/2012
Suspended Ceiling (Mineral Board
Ceiling)
This material is to be used as
Suspended Mineral Board Ceiling in
Corridor & Office of All Buildings &
Wherever it is required in the whole
project
Taliah Trading & Industrial Co. P.O Box.
41084 Riyadh-11521
5/Mar/12 DS-C-0100 DF-EF-L-0160 C 7/Apr/12 Vol-8
124 AS-DF-T-0136 AS-DS-L-0271 DS-C-0080 MT X 3/21/2012 Lifting Socket & Lifting Loop
This Material is to be used for Cable
Trench, Precast Cover & wherever it is
required
AI-Monathem Industrial Tools Co.
P.O.Box.118797, Jeddah KSA
21/Mar/12 DS-C-0104 DF-EF-L-0167 B 7/May/12
Sample provided on 10-4-12,
Plastic caps to be provided
over socket to prevent
ingress of dust
Vol-8
125 AS-DS-L-278 MT 1 X 3/24/2012 Anchor Bolts
This material is to be used for
foundation.
Saudi Alamar Trading & Industries Co. 24/Mar/12
Returned from Doosan on 2-4-
12
Vol-8
126 AS-DF-T-0138 AS-DS-L-279 DS-C-0082 MT 4/1/2012
Sikagard-PW (Non Toxic High Chemical
Resistance Epoxy Coating)
This Material to be used for heavy
protective coating for concrete, wood
floors and metal structrure subjected to
chemical attack & wherever it is
required
SIKA Saudi Arabia Co. Ltd. PH Floor
Obaikan Blgd, Prince Sultan Street,
P.O.Box.112356 Jeddah, KSA
1/Apr/12 DS-C-0106 DF-EF-L-0194 C 23/Jul/12
Contractor to specify the
exact location where they
intend to use this material
Vol-8
127 AS-DF-T-0137 AS-DS-L-291 DS-C-0081 MT x 4/3/2012 Anchor Bolts
This material is to be used in Columns
Corbel for Crane Beams, Girders &
Foundation.
Saudi Alamar Trading & Industries Co. 3/Apr/12 DS-C-0087 DF-EF-L-0193 B 26/May/12
Resubmitted to Doosan on 3-
4-12 with Mill & Galvanizing
Coating Certificate & Samples
Vol-8
Page 52 of 75
No.of
Sample
File
Location
Sample Doosan Recd
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
MATERIAL SUBMITTAL STATUS REPORT
DATE COVERED : As of 25 August ,2012
S.N.
DOOSAN
Name of Suppliers Place of Application / Location
ASSAD SAID ASC
Transmittal
no.
Date of Submit Description of Material
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
128 AS-DS-L-0284 3/27/2012
Test results of Batching Plant
Aggregates (3/4", 3/8", 3/16" & Sand)
& Water
Assad Said Contracting co, Ltd Saudi 27/Mar/12
For the Month of January
2012
129 AS-DS-L-0292 4/4/2012
Test results of Batching Plant
Aggregates (3/4", 3/8", 3/16" & Sand)
& Water
Assad Said Contracting co, Ltd Saudi 4/Apr/12
For the Month of February
2012
130 AS-DF-T-0140 AS-DS-L-293 DS-C-0084 MT X 1 4/5/2012
Blue Guard-Extruded Polystyrene
Insulation Boards
This Material is to be used for Cavity
Wall of SWGR Building for Post
Treament Plant, Seawater Intake SWGR
Building, Gas Chlorination Building,
Electro Chlorination Building
SAPTEX- Insulation Products Factory 5/Apr/12 DS-C-0107 DF-EF-L-0195 A 17/May/12 Vol-8
131 AS-DF-T-0141 AS-DS-L-299 DS-C-0086 MT 4/8/2012 Vetonit Premium Fix & Ceramic Tile Fix
This Material is to be used for Tiling
Work Adhesive In Floors & Walls of
SWGR Building for Post Treament Plant,
Seawater Intake SWGR Building, Electro
Chlorination Building & Wherever it is
required
Saudi Vetonit Co. Ltd. P.O.Box. 52235
Riyadh 11563 KSA
8/Apr/12 DS-C-0108 DF-EF-L-0200 B 17/May/12 Vol-8
132 AS-DF-T-0142 AS-DS-L-300 DS-C-0087 MT 4/8/2012 Vetonit Grout
This Material is to be used for Tiling
Works Grout In Floors & Walls of
SWGR Building for Post Treament Plant,
Seawater Intake SWGR Building, Electro
Chlorination Building & Wherever it is
required
Saudi Vetonit Co. Ltd. P.O.Box. 52235
Riyadh 11563 KSA
8/Apr/12 DS-C-0109 DF-EF-L-0201 B 17/May/12 Vol-8
133 AS-DF-T-0143 AS-DS-L-302 DS-C-0088 MT 4/11/2012
Mastertile 30-Internal & External Tile
Adhesive
This Material is to be used for Tiling
Work Adhesive In Floors & Walls of
SWGR Building for Post Treament Plant,
Seawater Intake SWGR Building, Electro
Chlorination Building & Wherever it is
required
Saudi BASF for Building Material co.Ltd.
P.O.Box.1884 Al-Khobar-31952 KSA
11/Apr/12 DS-C-0112 DF-EF-L0213 B 17/May/12 Vol-8
134 AS-DF-T-0144 AS-DS-L-303 DS-C-0089 MT 4/11/2012
Mastertile 530- Coloured Grout for
Ceramic Tiles
This Material is to be used for Tiling
Works Grout In Floors & Walls of
SWGR Building for Post Treament Plant,
Seawater Intake SWGR Building, Electro
Chlorination Building & Wherever it is
required
Saudi BASF for Building Material co.Ltd.
P.O.Box.1884 Al-Khobar-31952 KSA
11/Apr/12 DS-C-0111 DF-EF-L-0212 B 17/May/12 Vol-8
135 AS-DF-T-0145 AS-DS-L-304 DS-C-0090 MT 4/11/2012
Mastertop 20- Concrete Hardening &
Dustproofing Liquid
This Material is to be used as Liquid
Hardener for Floor Finishing in S/G
Building for Post Treament Plant,
Seawater Intake S/G Building &
Wherever it is required
Saudi BASF for Building Material co.Ltd.
P.O.Box.1884 Al-Khobar-31952 KSA
11/Apr/12 DS-C-0110 DF-EF-L-0211 B 23/Jul/12
Hardening and dustproofing
liquid shall be compatible
with the successive hi-built
epoxy coating
Vol-8
136 AS-DS-L-326 MT X 4/30/2012 Roof Water Proofing System
This material to be applied to all Bldgs
such as Switchgear Buildings for MSF
Area, Sea Water Intake Switchgear
Building, Switchgear Building for Post
Treatment, Electro Chlorination
Building & Gas Chlorination Building.
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31462
30/Apr/12
Submitted Sample with
attached Specfi & Drawings
Vol-8
137 AS-DF-T-0151 AS-DS-L-0325 DS-C-0096 MT 5/3/2012 Hollow Metal Doors
The doors to be installed in all Bldgs
such as Switchgear Buildings for MSF
Area, Sea Water Intake Switchgear
Building, Switchgear Building for Post
Treatment, Electro Chlorination
Building & Gas Chlorination Building &
Wherever it is required.
Al-Manashy Doors Manufacturer Al-
Khozama Dist/Exit 1 P.O.Box.71021 Al-
Diriyah 11587 KSA
3/May/12 DS-C-0126 DF-EF-L-0250 C 23/Jul/12
No Sample Provided & Frame
thickness should be 4mm
thick
vol-8
138 AS-DF-T-0150 AS-DS-L-0317 DS-C-0094 MT 5/3/2012
Paintco Alkali Resistant Primer 1507,
Acrylux Enamel 6633 & Magna Spray
Plaster Putty 20000 (Interior)
For Fully Cured Cement Plastered Walls,
Ceiling, Concrete ,Gypsum Board
Partitions, GRC Works etc Prior to Paint
Application in the Building Wherever it
is Reqquired for the Whole Project
Paintco Co. Ltd. P.O.Box 2549 Riyadh
11461 KSA
3/May/12 vol-8
139 AS-DF-T-0152 AS-DS-L-0329 DS-C-0098 MT 5/3/2012
Paintco Alkali Resistant Primer 1507,
Acrylux Enamel 6633 & Magna Spray
Plaster Putty 20000 (Exterior)
For Fully Cured Cement Plastered Walls,
Ceiling, Concrete ,Gypsum Board
Partitions, GRC Works etc Prior to Paint
Application in the Building Wherever it
is Reqquired for the Whole Project
Paintco Co. Ltd. P.O.Box 2549 Riyadh
11461 KSA
3/May/12 vol-8
140 AS-DF-T-0153 AS-DS-L-0327 DS-C-0097 MT 5/3/2012
Paintco Latex Primer Sealer 1201,
Acrylic Emulsion Interior/ Exterior 2635
& Magna Wall Filler 10000 (Interior)
This Material is to be Used on Most
Interior Surface, i.e Cement Plaster,
Stucco Filler Gypsum Boards, Concrete,
Asbestos Cement Sheeting & Rendered
Block Works
Paintco Co. Ltd. P.O.Box 2549 Riyadh
11461 KSA
3/May/12 vol-8
Page 53 of 75
No.of
Sample
File
Location
Sample Doosan Recd
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
MATERIAL SUBMITTAL STATUS REPORT
DATE COVERED : As of 25 August ,2012
S.N.
DOOSAN
Name of Suppliers Place of Application / Location
ASSAD SAID ASC
Transmittal
no.
Date of Submit Description of Material
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
141 AS-DF-T-0154 AS-DS-L-0330 DS-C-0098 MT 5/3/2012
Paintco Latex Primer Sealer 1201,
Acrylic Emulsion Interior/ Exterior 2635
& Magna Spray Plaster Putty 20000
(Exterior)
This Material is to be Used on Most
Exterior Surface, i.e Cement Plaster,
Stucco Filler Gypsum Boards, Concrete,
Asbestos Cement Sheeting & Rendered
Block Works
Paintco Co. Ltd. P.O.Box 2549 Riyadh
11461 KSA
3/May/12 vol-8
142 AS-DF-T-0156 AS-DS-L-0332 DS-C-0099 MT 5/7/2012
Concrete Primer-Bituminous Roofing
Primer & Polyflame-APP Modified
Bitumen Waterproofing Membrane
with Non-Woven Polyester Re-
Inforcements
This material to be used as Roof Water
Proofing Membrane in all Bldgs such as
Switchgear Buildings for MSF Area, Sea
Water Intake Switchgear Building,
Switchgear Building for Post Treatment,
Electro Chlorination Building & Gas
Chlorination Building.
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31462
7/May/12 vol-8
143 AS-DF-T-0157 AS-DS-L-0333 DS-C-0100 MT 5/7/2012
FIBERLON-APP Modified Bitumen
Membranes with Non-Woven Polyester
Re-Inforcement
This material to be used for exposed to
weather upstands for Roof Parapets
and sides of HVAC Equipment
Foundation Pads at Roof Waterproofing
System at Roof in all Bldgs such as
Switchgear Buildings for MSF Area, Sea
Water Intake Switchgear Building,
Switchgear Building for Post Treatment,
Electro Chlorination Building & Gas
Chlorination Building.
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31463
8/May/12 vol-8
144 AS-DF-T-0158 AS-DS-L-0334 DS-C-0101 MT 5/7/2012 BITUTEX-Non-woven Geotextiles
This material to be used as Building
Paper in Roof Waterproofing System in
all Bldgs such as Switchgear Buildings
for MSF Area, Sea Water Intake
Switchgear Building, Switchgear
Building for Post Treatment, Electro
Chlorination Building & Gas
Chlorination Building.
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31464
9/May/12 vol-8
145 AS-DF-T-0159 AS-DS-L-0335 DS-C-0102 MT 5/7/2012
BITUTHERM-Extruded Polystyrene
Thermal Insulation Boards
This material to be used as Rigid
Thermal Insulation in Roof
Waterproofing System in all Bldgs such
as Switchgear Buildings for MSF Area,
Sea Water Intake Switchgear Building,
Switchgear Building for Post Treatment,
Electro Chlorination Building & Gas
Chlorination Building.
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31463
8/May/12 vol-8
146 AS-DF-T-0155 AS-DS-L-0331 5/8/2012
Handover of SWGR for MSF Area Unit #
71 & 72
Handover of SWGR for MSF Area Unit #
71 & 72, Basement Floor, Walls,
Columns, Beams & Ceiling
8/May/12
147 AS-DF-T-0160 AS-DS-L-0339 DS-C-103 MT X 5/8/2012
Concrete Tiles (400x400x40) for Roof
Waterproofing System
This material to be used as Concrete
Tiles in Roof Waterproofing System in
all Bldgs such as Switchgear Buildings
for MSF Area, Sea Water Intake
Switchgear Building, Switchgear
Building for Post Treatment, Electro
Chlorination Building & Gas
Chlorination Building.
New Century Est. Branch, Near Dallah
Driving School, Industrial Area, Dammam,
KSA
8/May/12 DS-C-0125 DF-EF-L-0249 C 23/Jul/12 Sample to be provided vol-8
148 AS-DS-L-0340 5/9/2012
Test results of Batching Plant
Aggregates (3/4", 3/8", 3/16" & Sand)
Assad Said Contracting co, Ltd Saudi 9/May/12
Test Results of BP for the
Month of March 2012
149 AS-DF-T-0161 AS-DS-L-0341 DS-C-104 MT 5/9/2012 Angle Bars
This Material to be Used in Trenches,
Metal Steps, Ladder & wherever it is
required
Al-Sharq Factory Steel Industries P.O.Box
40300, Riyadh 11499
9/May/12 DS-C-122 DF-EF-L-246 C 27/May/12
Attached Technical Datasheet
& Test Certificate
150 AS-DF-T-0162 AS-DS-L-0342 DS-C-105 MT 5/9/2012 Steel Plates
This Material to be Used for Manholes,
Trenches, Metal Steps, Plateform &
Walkways & wherever it is required
Al-Sharq Factory Steel Industries P.O.Box
40300, Riyadh 11500
9/May/12 DS-C-124 DF-EF-L-248 C 27/May/12
Attached Technical Datasheet
& Test Certificate
151 AS-DF-T-0163 AS-DS-L-0343 DS-C-106 MT 5/9/2012 Chequered Plates
This Material to be Used for Manholes,
Trenches, Metal Steps, Plateform &
Walkways & wherever it is required
Al-Sharq Factory Steel Industries P.O.Box
40300, Riyadh 11501
9/May/12 DS-C-123 DF-EF-L-247 C 27/May/12
Attached Technical Datasheet
& Test Certificate
152 AS-DF-T-0164 AS-DS-L-0352 DS-C-0106 MT 5/16/2012 Hollow Metal Doors
The doors to be installed in all Bldgs
such as Switchgear Buildings for MSF
Area, Sea Water Intake Switchgear
Building, Switchgear Building for Post
Treatment, Electro Chlorination
Building & Gas Chlorination Building &
Wherever it is required.
Al-Kuhaimi Metal Industries Ltd, P.O.Box
545, Dammam 31421 KSA
16/May/12 DS-C-0128 DF-EF-L-0258 C 23/Jul/12
Sample need to be submitted
& Door frame steel sheet
thickness should be 4mm
vol-8
Page 54 of 75
No.of
Sample
File
Location
Sample Doosan Recd
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
MATERIAL SUBMITTAL STATUS REPORT
DATE COVERED : As of 25 August ,2012
S.N.
DOOSAN
Name of Suppliers Place of Application / Location
ASSAD SAID ASC
Transmittal
no.
Date of Submit Description of Material
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
153 AS-DS-L-0353 X 1 5/16/2012 Internal Painting System This Material to be used in all Bldgs
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
16/May/12 Submitted as a sample board vol-8
154 AS-DF-T-165 AS-DS-L-0353 DS-C-0107 MT 5/17/2012 Fenomastic Enamel Semigloss
This material to be used for fully cured
Cement Plastered Walls, Cielings,
Concrete, Gypsum board Partitions,
GRC works etc Prior to Paint application
in the Buildings &wherever it is
required for the whole Project
Paintco Co. Ltd. P.O.Box 2549 Riyadh
11461 KSA
17/May/12 vol-8
155 AS-DF-T-0167 AS-DS-L-357 DS-C-109 MT X 1 5/21/2012 Back-Up-Rod
This material is to be used inside
Buildings at the peripheral gaps bet.
Structural Elements Columns & Beams
and block masonry & wherever it is
required for the whole Project.
Saudi Alamar Trading & Industries Co.
P.O.Box.17, Dammam 31411
21/May/12 DS-C-0132 DF-EF-L-0264 A 23/Jul/12 No Comment vol-8
156 AS-DF-T-0168 AS-DS-L-358 DS-C-110 MT X 1 5/23/2012
Sarnafil Solar Reflective Roofing System
With Method Statement
This material to be used in Roof
Waterproofing System in all Bldgs such
as Switchgear Buildings for MSF Area,
Sea Water Intake Switchgear Building,
Switchgear Building for Post Treatment,
Electro Chlorination Building & Gas
Chlorination Building.
SIKA Saudi Arabia Co. Ltd. PH Floor
Obaikan Blgd, Prince Sultan Street,
P.O.Box.112356 Jeddah, KSA
23/May/12 DS-C-0134 DF-EF-L-0266 C 23/Jul/12
Submitted system is not
according to specs as per
SWCC specs roofing system
should be asphalt built up
roofing
vol-8
157 AS-DF-T-0169 AS-DS-L-361 DS-C-111 MT X 1 5/23/2012 FRP-Gratings & Angle Bars
This materials to be used for Trenches
Covers the following structures.
- Electro Chlorination Bldg Trenches
- Gas Chlorination Bldg Trenches
- PTP Recharging System Trenches
- Or wherever it is required for the
whole Project
World Quality Fiberglass Factory P.O.Box.
3137, Al-Khobar 31952 KSA
23/May/12 DS-C-0133 DF-EF-L-0265 C 23/Jul/12
This Material is not specified
in the project speci. The
reference given at MAR
application is irrelevant to
FRP-material
vol-8
158 AS-DS-L-364 MT X 1 5/26/2012 Tiles Sample Board for Walls & Floors
This material to be used for Toilets Area
in all Bldgs such as Switchgear Buildings
for MSF Area, Sea Water Intake
Switchgear Building, Switchgear
Building for Post Treatment, Electro
Chlorination Building & Gas
Chlorination Building.
Saudi Ceramics Co. Ltd P.O Box. 3893
Riyadh 11481 KSA
26/May/12
Submitted as a sample board-
Size (200x200mm)
vol-8
159 AS-DF-T-0171 AS-DS-L-365 DS-C-0113 MT X 1 5/28/2012 Terrazzo Tiles (300x300x30)
This material to be used as Terrazzo Tile
in Control Pannel Room in Electro
Chlorination Building
New Century Est. Branch, Near Dallah
Driving School, Industrial Area, Dammam,
KSA
28/May/12
Attached Technical Datasheet
& Test Result
vol-9
160 AS-DS-L-366 MT X 1 5/28/2012 Roof Water Proofing System
This material to be used as Roof
Waterproofing System in all Bldgs such
as Switchgear Buildings for MSF Area,
Sea Water Intake Switchgear Building,
Switchgear Building for Post Treatment,
Electro Chlorination Building & Gas
Chlorination Building.
BITUMAT Co.Ltd P.O BOX 7487 Dammam
31463
28/May/12
MAD submitted in one
Document
vol-9
161 AS-DS-L-367 MT X 1 5/28/2012 Penguard FC (Saffron Yellow)
This material to be used for Doors in all
Bldgs such as Switchgear Buildings for
MSF Area, Sea Water Intake Switchgear
Building, Switchgear Building for Post
Treatment, Electro Chlorination
Building & Gas Chlorination Building.
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
28/May/12
Submitted as a sample board-
RAL no.1017
Vol-9
162 AS-DS-L-368 MT X 1 5/28/2012
Fenomastic Semigloss & High Gloss
(Enamel)
For Internal Paint-Plastered Walls &
Concrete Walls in all Bldgs.
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
28/May/12
Submitted as a sample board-
RAL no.9002
Vol-9
163 AS-DS-L-370 MT X 1 5/28/2012 Oil Paint-(Black)
For Skirting wherever applicable in all
Bldgs.
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
28/May/12
Submitted as a sample board-
RAL no.9011
vol-9
164 AS-DS-L-371 MT X 1 5/28/2012 Pilot II- (Oyster White) For Rain Water Down Pipes in all Bldg.
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
28/May/12
Submitted as a sample board-
RAL no.1013
Vol-9
165 AS-DS-L-372 MT X 1 5/28/2012
Tiles Sample Board for Walls & Floors
for Battery Rooms
For Battery Rooms in all Bldgs.
Saudi Ceramics Co. Ltd P.O Box. 3893
Riyadh 11481 KSA
28/May/12 Submitted as a sample board Vol-9
166 AS-DF-T-0172 AS-DS-L-373 DS-C-0114 MT 5/29/2012 Fenomastic Enamel High Gloss
This material is to be used for Cement
Plastered Walls, Concrete Walls &
Exposed Concrete Ceilings in all Bldg.
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
29/May/12 DS-C-0136 DF-EF-L-0269 B 23/Jul/12
Contractor to use Fenomastic
Enamel Semigloss Jotun Paint
for Internal plastered &
concrete walls with Jotun
Code no. # 0567 as agreed in
the MOM last 26-6-12 & High
gloss not accepted
Vol-9
Page 55 of 75
No.of
Sample
File
Location
Sample Doosan Recd
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
MATERIAL SUBMITTAL STATUS REPORT
DATE COVERED : As of 25 August ,2012
S.N.
DOOSAN
Name of Suppliers Place of Application / Location
ASSAD SAID ASC
Transmittal
no.
Date of Submit Description of Material
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
167 AS-DS-L-374 X 1 5/29/2012 Tiles Sample Board for Walls & Floors
This material to be used for Toilets Area
in all Bldgs such as Switchgear Buildings
for MSF Area, Sea Water Intake
Switchgear Building, Switchgear
Building for Post Treatment, Electro
Chlorination Building & Gas
Chlorination Building.
Saudi Ceramics Co. Ltd P.O Box. 3893
Riyadh 11481 KSA
29/May/12
Submitted as a sample board-
Option -2 (200x200mm)
Vol-9
168 AS-DS-L-374 X 1 5/29/2012 Polyguard 85 MC (Light Blue)
This material is to be used for steel
structural in all bldg.
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
29/May/12
Submitted as a sample board-
RAL no.5012
Vol-9
169 AS-DS-L-376 X 1 5/29/2012 Pilot II- with LC
This Material is to be used for Hand Rail
of Staircases in all bldg.
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
29/May/12
Submitted as a sample board-
RAL no.1018
Vol-9
170 AS-DF-T-165 AS-DS-L-353 DS-C-0107 MT 5/17/2012 Fenomastic Enamel Semigloss
This material to be used for fully cured
Cement Plastered Walls, Cielings,
Concrete, Gypsum board Partitions,
GRC works etc Prior to Paint application
in the Buildings &wherever it is
required for the whole Project
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
17/May/12 DS-C-0127 DF-EF-L-0257 B 23/Jul/12
Material Approved as per
DSC/Poyry/SWCC material
review last 26-6-12, to be use
interior plastered wall &
concrete surfaces with jotun
paint color code #0567
Vol-9
171 AS-DF-T-173 AS-DS-L-0377 DS-C-0115 MT X 2 6/2/2012
PRIMER- D41, ASAD- REINFORCED
MEMBRANES (SELF ADHESIVE)-ASAD-
1.6G & MEMBRANE SHIELD-MS-30
(BITUMINOUS PROTECTION BOARDS)
as an alternative and second option for
all underground Concrete Structures of
Waterproofing/Tanking System &
wherever it is required for whole
project.
Awazel Co.Ltd. 2/Jun/12 Vol-9
172 AS-DF-T-0174 AS-DS-L-378 DS-C-0116 MT X 2 6/2/2012
NOISE SUPPRESSION PROFILE-EPDM.
RUBBER & PIPE STRAP-TWO HOLE/ U-
CLIP STAINLESS STEEL
This materials is to be used for
Clamping of 75mm dia. PVC pipe in
BRP,BBDP & DP Pits & wherever it is
required for whole project.
Unitech for Building & Construction
Material
2/Jun/12 Vol-9
173 AS-DF-T-0175 AS-DS-L-380 DS-C-0117 MT X 1 6/2/2012 Dual-Clip Anchor NST
This materials is to be used for
Clamping of 75mm dia. PVC pipe in
BRP,BBDP & DP Pits & wherever it is
required for whole project.
AI-Monathem Industrial Tools Co.
P.O.Box.118797, Jeddah KSA
2/Jun/12 Vol-9
174 AS-DS-L-387 X 6/3/2012
Nitocote EPU-for External Paint of All
Bldg.-Concrete Surfaces
Used for External Walls- in all Bldg. Fosam Co. Ltd.P.O.11081 Jeddah 21453 3/Jun/12
Submitted as a sample board-
RAL no.1001
175 AS-DF-T-0176 AS-DS-L-381 DS-C-118 MT 6/4/2012
HDPE Pipe-Dia.
100mm,150mm&500mm
This material is to be used for Drainage
System & wherever it is required for
whole project.
Al-Jubail Sanitary Pipe Factory P.O.Box
10177, Al-Jubail, Al-Sinayah 31961 KSA
4/Jun/12 Vol-9
176 AS-DF-T-0177 AS-DS-L-382 DS-C-119 MT 6/4/2012
HDPE Pipe-Dia.
100mm,150mm&500mm
This material is to be used for Drainage
System & wherever it is required for
whole project.
New Product Industries Co. Ltd. P.O.Box
460, Jeddah 21411, KSA
4/Jun/12 Vol-9
177 AS-DS-L-390 MT X 3 6/4/2012 Hollow Metal Doors
The doors to be installed in all Bldgs
such as Switchgear Buildings for MSF
Area, Sea Water Intake Switchgear
Building, Switchgear Building for Post
Treatment, Electro Chlorination
Building & Gas Chlorination Building &
Wherever it is required.
Al-Manashy Doors Manufacturer Al-
Khozama Dist/Exit 1 P.O.Box.71021 Al-
Diriyah 11587 KSA
4/Jun/12 Submitted Sample Only
178 AS-DF-T-180 AS-DS-L-391 DS-C-0120 MT X 2 6/6/2012 Steel Rain Water Down Pipe
This material is to be used for Rain
Water Down Pipe in all Bldg.
Modern Industries Est. Modinest, Jarir
Street, Riyadh-KSA
6/Jun/12 Vol-9
179 AS-DF-T-0183 AS-DS-L-0397 DS-C-0122 MT X 1 6/11/2012 Roof Water Proofing System
This material to be used in Roof
Waterproofing System in all Bldgs such
as Switchgear Buildings for MSF Area,
Sea Water Intake Switchgear Building,
Switchgear Building for Post Treatment,
Electro Chlorination Building & Gas
Chlorination Building.
ISAM KABBANI & Partner for Building &
Const Material Co.P.O.6897 Damman KSA
11/Jun/12 Vol-9
180 AS-DF-T-0185 AS-DS-L-0399 DS-C-0123 MT 6/11/2012 Aluminum Flashing
This material to be used in Roof
Waterproofing System in all Bldgs such
as Switchgear Buildings for MSF Area,
Sea Water Intake Switchgear Building,
Switchgear Building for Post Treatment,
Electro Chlorination Building & Gas
Chlorination Building.
ISAM KABBANI & Partner for Building &
Const Material Co.P.O.6897 Damman KSA
11/Jun/12 Vol-9
181 AS-DF-T-0181 AS-DS-L-0393 DS-C-121 MT X 3 6/12/2012 Terrazzo Tiles (250x250x25mm)
This material to be used as Terrazzo Tile
in Control Pannel Room in Electro
Chlorination Building
New Century Est. Branch, Near Dallah
Driving School, Industrial Area, Dammam,
KSA
12/Jun/12 Vol-9
182 AS-DF-T-0186 AS-DS-L-0400 DS-C-0124 MT 6/13/2012
Penguard Primer, Penguard HB &
Hardtop AS
This material is to be used for Steel
structure & wherever it is required in
the whole project.
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
14/Jun/12 Vol-9
Page 56 of 75
No.of
Sample
File
Location
Sample Doosan Recd
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
MATERIAL SUBMITTAL STATUS REPORT
DATE COVERED : As of 25 August ,2012
S.N.
DOOSAN
Name of Suppliers Place of Application / Location
ASSAD SAID ASC
Transmittal
no.
Date of Submit Description of Material
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
183 AS-DF-T-0187 AS-DS-L-0402 DS-C-0125 MT 6/17/2012 Roof Water Proofing System
This material to be applied to all Bldgs
such as Switchgear Buildings for MSF
Area, Sea Water Intake Switchgear
Building, Switchgear Building for Post
Treatment, Electro Chlorination
Building & Gas Chlorination Building.
Refer to the attchedment 17/Jun/12 Attached: Appendix 1 & 2 Vol-9
184 AS-DS-L-0403 X 6/18/2012
Fenomastic Semigloss (Emulsion)-
Sample Board
This Material Used for Concrete Ceiling
in all Bldgs.
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
18/Jun/12 RAL-9010,9918&1453
185 AS-DS-L-0404 X 6/18/2012
Fenomastic Semigloss (Emulsion)-
Sample Board
This Material Used for Exterior
Plastered Walls in all Bldgs.
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
18/Jun/12 RAL-002,0118&1063
186 AS-DS-L-0407 X 6/20/2012
Fenomastic Semigloss (Enamel)-Sample
Board
This Material Used for Interior Walls-
Plastered & Concrete Surfaces in all
Bldgs.
Jotun Saudi Co. Ltd P.O.Box 4906
Dammam 31412, KSA
20/Jun/12
Jotun # 0567, RAL no. # 7035
& 7047
Red Folder
187 AS-DF-T-0188 AS-DS-L-0413 DS-C-0126 MT 6/25/2012
Acid/Alkali Resistant Ceramic Tile for
Floors & Walls (15X15)
This material is to be used for Battery
Room in SWGR bldgs for MSF area,
SWGR Bldg for Post Treatment, SWGR
Bldg for SWI, for Electrolyzer Room in
Electro Chlorination Bldg & Flooring of
Chemical Storage Bldg.
Saudi Ceramics Co. Ltd P.O Box. 3893
Riyadh 11481 KSA
25/Jun/12 Vol-9
188 AS-DS-L-0416 X 1 6/26/2012
Sample Board for Nitocote EPU-Epoxy
Paint for External Exposed Concrete
Surfaces All Bldgs.
This material is to be used for External
Exposed Concrete Surfaces in all Bldgs.
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 26/Jun/12 RAL NO.-1013,1014&1015
189 AS-DS-L-0419 7/2/2012
Test results of Batching Plant
Aggregates (3/4", 3/8", 3/16" & Sand)
Assad Said Contracting co, Ltd Saudi 2/Jul/12
Test Results of BP for the
Month of April 2012
190 AS-DS-L-0420 X 2 7/4/2012 Submission of Ceramic Tiles Sample
This Material is to be in Battery, Offices
Rooms & Toilet
Saudi Ceramics Co. Ltd P.O Box. 3893
Riyadh 11481 KSA
4/Jul/12 Annex 1
191 AS-DS-L-0421 X 1 7/4/2012
Sample Board for Nitocote EPU-Epoxy
Paint for Floor
This material is to be used for Flooring
in Electro Bldg. & Chemcal Storage
Bldg.
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 4/Jul/12 RAL No # 7032
192 AS-DF-T-0189 AS-DS-L-0424 DS-C-0127 MT 7/5/2012
Nitocote EPU-Chemical/Acid Resistant
Paint
This material is to be used in place of
Chemical & Acid Resistant Paint in all
Bldgs. & all the exposed concrete in the
whole project
FOSAM Co. Ltd.P.O.11081 Jeddah 21453 5/Jul/12
Attached:Clarification for
Nitocote EPU from Fosam
193 AS-DF-T-0193 AS-DS-L-0432 DS-C-0128 MT 7/11/2012
Hempadur 15553, Hempadur Mastic
45881 & Hempathane Topcoat 55210
This material is to be used for Steel
structure & wherever it is required in
the whole project.
Hempel Paints Co. Ltd. P.O
Box.6783,Jeddah 21415
11/Jul/12 Vol-9
194 AS-DS-L-0435 7/18/2012
Test results of Batching Plant
Aggregates (3/4", 3/8", 3/16" & Sand)
Assad Said Contracting co, Ltd Saudi 18/Jul/12
Test Results of BP for the
Month of May 2012
195 AS-DF-T-195 AS-DS-L-438 DS-C-0129 MT X 7/22/2012 Aluminum Windows
The Windows to be installed in all Bldgs
such as Switchgear Buildings for MSF
Area, Sea Water Intake Switchgear
Building, Switchgear Building for Post
Treatment, Electro Chlorination
Building & Gas Chlorination Building.
Future Aluminum Factory Riyadh,
Industrial Area Ext 11
22/Jul/12 Vol-9
196 AS-DF-T-196 AS-DS-L-439 DS-C-0130 MT X 1 7/23/2012
Suspended Ceiling System-
Ceramaguard
TheMaterial is to be used as Suspended
Ceiling in Corridor & Office in the Bldgs.
such as Switchgear Buildings for MSF
Area, Sea Water Intake Switchgear
Building, Switchgear Building for Post
Treatment, Electro Chlorination
Building & Gas Chlorination Building.
Technical Trading Factory Co.Ltd P.o
Box.1915 Riyadh 11372
23/Jul/12 Vol-10
197 AS-DF-T-198 AS-DS-L-442 DS-C-0103 MT 1 X 1 7/23/2012
Concrete Tiles (400x400x40) for Roof
Waterproofing System
This material to be used as Concrete
Tiles in Roof Waterproofing System in
all Bldgs such as Switchgear Buildings
for MSF Area, Sea Water Intake
Switchgear Building, Switchgear
Building for Post Treatment, Electro
Chlorination Building & Gas
Chlorination Building.
New Century Est. Branch, Near Dallah
Driving School, Industrial Area, Dammam,
KSA
23/Jul/12 Vol-10
198 AS-DF-T-197 AS-DS-L-443 DS-C-0131 MT X 3 7/23/2012 Suspended Aluminum Ceiling-Nortile
TheMaterial is to be used as Suspended
Aluminum Ceiling in Toilets in the Bldgs.
such as Switchgear Buildings for MSF
Area, Sea Water Intake Switchgear
Building, Switchgear Building for Post
Treatment, Electro Chlorination
Building & Gas Chlorination Building.
Technical Trading Factory Co.Ltd P.o
Box.1915 Riyadh 11372
23/Jul/12 Vol-10
199 AS-DF-T-199 AS-DS-L-0446 DS-C-0132 MT X 1 26/Jul/12 Aluminum Strip Ceiling System
This material is to be used in Toilets in
all Bldgs. except Gas Chlorination Bldg
Building Material House est. for Trading
P.O.Box.23628 Riyadh:11436
26/Jul/12 Vol-10
Page 57 of 75
No.of
Sample
File
Location
Sample Doosan Recd
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
MATERIAL SUBMITTAL STATUS REPORT
DATE COVERED : As of 25 August ,2012
S.N.
DOOSAN
Name of Suppliers Place of Application / Location
ASSAD SAID ASC
Transmittal
no.
Date of Submit Description of Material
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
200 AS-DS-L-0445 28/Jul/12
Assad Said for Structural Steel
Fabrication Procedure & Quality
Manual
Assad Said Contracting co. Ltd Saudi 28/Jul/12
201 AS-DF-T-200 AS-DS-L-0448 DS-C-0133 MT 1/Aug/12 Nitoseal PU40
This Material is to be used for sealing
external & internal joints in concrete,
blockwork, brickwork, perimeter
sealing around doors and windows in
the Bldgs. such as Switchgear Buildings
for MSF Area, Sea Water Intake
Switchgear Building, Switchgear
Building for Post Treatment & Electro
Chlorination Building.
Fosam Co. Ltd.P.O.11081 Jeddah 21453 1/Aug/12 Vol-10
202 AS-DS-L-450 8/6/2012
Test results of Batching Plant
Aggregates (3/4", 3/8", 3/16" & Sand)
Assad Said Contracting co, Ltd Saudi 6/Aug/12
Test Results of BP for the
Month of June 2012
Page 58 of 75
NO.S
(
S
a
t
)

2
1
-
J
u
l
(
S
u
n
)

2
2
-
J
u
l
(
M
o
n
)

2
3
-
J
u
l
(
T
u
e
)

2
4
-
J
u
l
(
W
e
d
)

2
5
-
J
u
l
(
T
h
u
)

2
6
-
J
u
l
(
F
r
i
)

2
7
-
J
u
l
1 0 0 0 0 0 0
2 1 1 1 1 1 1
3 1 1 1 1 1 1
4 1 1 1 1 1 1
5 1 1 1 1 1 1
6 5 5 5 5 5 5
7 1 1 1 1 1 1
8 1 1 1 1 1 1
9 3 3 3 3 3 3
10 0 0 0 1 1 1
11 1 1 1 1 1 1
12 1 1 1 1 1 1
13 1 1 1 1 1 1
14 1 1 1 1 1 1
15 4 4 4 4 4 4
16 3 3 3 3 3 3
17 1 1 1 2 2 2
18 9 9 9 9 9 9
19 7 7 7 7 7 7
20 1 1 1 1 1 1
21 8 8 8 9 9 9
22 1 1 1 0 0 0
23 1 1 1 1 1 1
24 0 0 0 0 0 0
25 1 1 1 1 1 1
26 1 1 1 1 1 1
27 4 4 4 3 3 3
28 2 2 2 2 4 4
29 2 2 2 2 2 2
30 2 2 2 2 2 2
31 1 1 1 1 1 1
32 2 2 2 2 2 2
33 1 1 1 1 1 1
34 3 3 3 2 2 2
35 0 0 0 0 2 2
36 8 8 8 8 8 8
37 11 11 11 10 10 10
38 9 9 9 9 9 9
39 1 1 1 1 1 1
40 27 27 27 27 27 27
41 40 40 40 40 40 40
WEEKLY MANPOWER UTILIZATION REPORT
FOR CIVIL & BUILDING WORKS
DATE COVERED : WEEK NO.74 ( 21-26 JULY,2012 )
General Foreman
Scaffolder LM
Mason LM
Carpenter LM
Steel Fixer LM
Painter LM
Operator
Driver
Painter Foreman
HSE Supvrvisor
Male Nurse
Workshop Supvrvisor
Ass,t.Workshop Supvrvisor
Eqpt. Supervisor
Supervisor
Mason Foreman
Scaffold Foreman
Carpenter Foreman
Steel Fixer Foreman
Welder Foreman
Safety Officer
Asst. QA/QC
Site Admin
Accountant
Camp Boss
Purchaser
Store keeper
Time Keeper
Chief Surveyor
Surveyor
Ass,t.Surveyor
Safety Manager
Week No. 74
PHASE 1 PACKAGE "D"
RAS AL KHAIR DESALINATION PLANT
Qa/Qc /ASST.
Project Manager
Civil manager
Building Manager
TRADE/POSITION
Field monitoring engr.
Chief Office Engr.
Site Engr.
Drawing Engr.
Liason Officer
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Prepared by:
ENGR. ARIES HERNANDEZ
Office Engineer
Verified by:
ENGR. ROGER BETANIA
Chief-Office-Engineer
Approved by:
ENGR. SHAIK SHAFIULLAH
Project Manager
Page 59 of 75
NO.S
(
S
a
t
)

2
1
-
J
u
l
(
S
u
n
)

2
2
-
J
u
l
(
M
o
n
)

2
3
-
J
u
l
(
T
u
e
)

2
4
-
J
u
l
(
W
e
d
)

2
5
-
J
u
l
(
T
h
u
)

2
6
-
J
u
l
(
F
r
i
)

2
7
-
J
u
l
WEEKLY MANPOWER UTILIZATION REPORT
FOR CIVIL & BUILDING WORKS
DATE COVERED : WEEK NO.74 ( 21-26 JULY,2012 )
Week No. 74
PHASE 1 PACKAGE "D"
RAS AL KHAIR DESALINATION PLANT
TRADE/POSITION
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
42 7 7 7 10 10 10
43 7 7 7 6 6 6
44 1 1 1 1 1 1
45 4 4 4 4 4 4
46 0 0 0 0 0 0
47 2 2 2 2 2 2
48 10 10 10 10 10 10
49 4 4 4 4 4 4
50 41 41 43 42 38 33
51 32 28 32 31 31 31
52 77 73 76 72 59 67
53 196 166 167 167 168 171
54 2 2 2 2 2 2
55 111 111 109 112 112 111
56 4 4 4 4 4 4
57 14 14 14 14 14 14
58 1 1 1 1 1 1
59 80 71 75 79 77 75
60 16 16 16 20 20 20
59 2 2 2 1 1 1
779 732 744 749 735 738
17 37 27 15 24 24
796 769 771 764 759 762
ABSENT :
TOTAL ASSAD SAID MANPOWER:
Tea Boy
Helper
Batching Plant
RGF LABORATORY
DEDICATED PROJECT MANPOWER :
Mason
Carpenter
Steel Erector
Steel Fixer
Watchman
Cook
AC Technician
Auto Electrician
Welder
Plumber
Scaffold
Painter
Electrician
Rigger
Mechanic
Tire Man
Prepared by:
ENGR. ARIES HERNANDEZ
Office Engineer
Verified by:
ENGR. ROGER BETANIA
Chief-Office-Engineer
Approved by:
ENGR. SHAIK SHAFIULLAH
Project Manager
Page 60 of 75
NO.S
Number of Units
Mobilized
(
S
a
t
)

2
1
-
J
u
l
(
S
u
n
)

2
2
-
J
u
l
(
M
o
n
)

2
3
-
J
u
l
(
T
u
e
)

2
4
-
J
u
l
(
W
e
d
)

2
5
-
J
u
l
(
T
h
u
)

2
6
-
J
u
l
(
F
r
i
)

2
7
-
J
u
l
1 7 7 7 7 7 7 7
2 1 1 1 1 1 1 1
3 1 1 1 1 1 1 1
4 2 2 2 2 2 2 2
5 2 1 1 1 1 1 1
6 13 12 12 12 11 11 12
7 3 3 3 3 3 3 3
8 1 1 1 1 1 1 1
9 5 5 5 5 5 5 5
10 7 7 7 7 7 7 7
11 6 6 6 5 5 5 5
12 6 6 6 6 6 6 6
13 1 1 1 1 1 1 1
14 6 6 6 6 6 6 6
15 1 1 1 1 1 1 1
16 1 1 1 1 1 1 1
17 1 1 1 1 1 1 1
18 5 4 4 4 4 3 4
19 2 2 2 2 2 2 2
20 2 1 2 1 1 1 2
21 4 4 4 4 4 4 4
22 2 2 2 2 2 2 2
23 3 3 3 3 3 3 3
24 2 2 2 2 2 2 2
25 8 8 8 7 7 7 7
26 1 1 1 1 1 1 1
27 1 1 1 1 1 1 1
28 5 5 5 5 5 5 5
29 1 1 1 1 1 1 1
30 2 2 2 3 3 2 2
31 2 2 2 2 2 2 2
32 7 7 7 7 7 7 7
33 4 4 4 4 4 4 4
34 7 7 7 7 7 7 7
35 1 1 1 1 1 1 1
36 9 9 9 9 9 9 9
37 9 9 9 9 9 9 9
38 2 2 2 2 2 2 2
Tower Lights
GENERAL ITEMS FOR SITE
Batching Mixer Machine ( 3 cu. Meter )
Storage Water Tank ( Big )
Storage Water Tank ( Small )
Bench Saw
Small Generator ( Site )
Dyna
Trailer Highbeds
Service Pick-up ( Double Cabin )
Service Pick-up ( Single Cabin )
Staff Mini Bus
Labor Bus
Ambulance
Engineer's Service
POWER GENERATION
Big Generator ( Batching Plant )
Big Generator ( Camp & Workshop )
Concrete Pump
Water Tanker
Backhoe Loader ( JCB )
Dewatering Pump by Sub-Con
LIFTING EQUIPTMENTS
Mobile Crane ( 20 Tons )
Mobile Crane ( 75 Tons )
Mobile Crane ( 70 Tons )
Mobile Crane ( 25 Tons )
Potable Water Tanker
Waste Water Tanker
Concrete Mixer
Trailer Dumptrucks
BACKFILLING & EXCAVATION
Excavator ( Normal Arm )
Excavator ( Long Arm )
Grader
Roller ( 10 Tons )
Roller ( 3 tons ) + Hand Roller
Plate Compactor and Jumper Compactor
Skid Loader ( Bobcat )
Forklift
Loaders
Dumptrucks
Week No. 74
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
WEEKLY EQUIPMENT UTILIZATION REPORT
FOR CIVIL & BUILDING WORKS
DATE COVERED : WEEK NO. 74 ( 21-26 JULY, 2012)
TRADE/POSITION
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Prepared By :
ENGR. ARIES HERNANDEZ
Office Engineer
Verified by:
ENGR. ROGER BETANIA
Chief-Office-Engineer
Approved by:
ENGR . SHAIK SHAFIULLA
Project Manager
Page 61 of 75
NO.S
Number of Units
Mobilized
(
S
a
t
)

2
1
-
J
u
l
(
S
u
n
)

2
2
-
J
u
l
(
M
o
n
)

2
3
-
J
u
l
(
T
u
e
)

2
4
-
J
u
l
(
W
e
d
)

2
5
-
J
u
l
(
T
h
u
)

2
6
-
J
u
l
(
F
r
i
)

2
7
-
J
u
l
Week No. 74
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
WEEKLY EQUIPMENT UTILIZATION REPORT
FOR CIVIL & BUILDING WORKS
DATE COVERED : WEEK NO. 74 ( 21-26 JULY, 2012)
TRADE/POSITION
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
39 3 3 3 3 3 3 3
40 3 2 2 2 2 2 2
41 2 2 2 2 2 2 2
42 6 6 6 6 6 6 6
43 1 1 1 1 1 1 1
44 6 6 6 6 6 6 6
45 2 2 2 2 2 2 2
46 4 4 4 4 4 4 4
47 1 1 1 1 1 1 1
48 2 2 2 2 2 2 2
49 3 3 3 3 3 3 3
176 171 172 170 169 167 170
Under Repair / Not working; 5 3 5 6 8 5
TOTAL :
Grout Mixer
Air Compressor
Block Cutting Machine
Mechanical Trowel
Diesel Water Pump
Vibrators
Bar Bending Machine
Bar Cutting Machine
Welding Machine Generator
Welding Machine
Mini Diesel Tanker
Prepared By :
ENGR. ARIES HERNANDEZ
Office Engineer
Verified by:
ENGR. ROGER BETANIA
Chief-Office-Engineer
Approved by:
ENGR . SHAIK SHAFIULLA
Project Manager
FRI
27
(Morning)
FRI
27
(Night)
SAT
28
(Morning)
SAT
28
(Night)
SUN
29
(Morning)
SUN
29
(Night)
MON
30
(Morning)
MON
30
(Night)
TUES
31
(Morning)
TUES
31
(Night)
WED
1
(Morning)
WED
1
(Night)
THU
2
(Morning)
THU
2
(Night)
CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR
------ -------- ------ -------- ------ -------- ------ -------- ------ -------- ------ -------- ------ --------
------ -------- ------ -------- ------ -------- ------ -------- ------ -------- ------ -------- ------ --------
41 41 42 42 42 42 43 44 44 45 43 42 46 46
40 40 39 39 41 41 41 43 42 45 42 38 46 39
40 40 39 39 41 41 41 43 42 45 42 38 46 39
5550 5550 5450 5550 5600 5700 5850 5950 6000 6050 6100 6200 6150 6150
5:05 -------- 5:05 -------- 5:05 -------- 5:05 -------- 5:07 -------- 5:07 -------- 5:07 --------
------ 18:39 ------ 18:39 ------ 18:38 ------ 18:37 ------ 18:37 ------ 18:37 ------ 18:36
WEATHER FORECAST SUMMARY : Most Dry , Warm ( Max 46 C on Thursday Morning , Min. 38 C on Wednesday Night, wind will be generally light )
Min. Temp ( C )
Wind Chill ( C )
Freezing Level ( m )
Sunset
Sunrise
Rain ( mm )
Snow ( cm )
Max. Temp ( C )
JULY AUGUST
Wind ( km/h )
Summary
CIVIL & BUILDING WORKS
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
WEATHER FORECAST CONDITION
Period Covered : WEEK NO. 74 ( 21-26 JULY, 2012 )
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
WEEK NO. 74 ( JULY 21 2012 - JULY 26,2012 )
5. PHOTOS
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
CIVIL & BUILDING WORKS
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 64 of 75
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
PHOTOS
CIVIL WORKS
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
PIPE PROTECTION SLAB
( SOUTH WEST OF ELECTRO
CHLORINATION BUILDING )
TRENCH # 1
DB 05 BETWEEN CP141 & CP142 DB 11-2 BETWEEN CP214 & CP215
CP 57 & CP58 CP 75 , CP76 & CP77
Page 65 of 75
CABLE ROUTE
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
PHOTOS
CIVIL WORKS
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
CP 05
CP 02
DB09-4 BET.
CP60 & CP156
DB10-5 BET. CP
156 & CP178
CP 219 & CP221
CP 190 & CP191
CONCRETE PIT FOR
STATIC MIXER
CP 09 & CP10
Page 66 of 75
UNDERGOUND PIPES ( GRP )
2. B3 columns
- Rebar works
BRINE HEATER FLATFORM
FOUNDATION UNI# 76
1. Flatform F5, F6, F7, F8 & F9
- For bituminous paint
DEAERATOR UNIT # 78
1. A1 BASE SLAB
- Rebar works
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
PHOTOS
CIVIL WORKS
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Evaporator unit 71
West side.

Ordinary soil,
backfilling
Evaporator unit 73 East
side ,

surface preparation
Evaporator unit 76-77
North side

SC1 backfilling around
pipes
Page 67 of 75
DEAERATOR UNIT # 77
1. Wall
- formworks
PUMP PIT D-1 STORM DRAINAGE
- Base slab, casted
- wall rebars
DEAERATOR UNIT # 76
1. BRP 1
- formworks & alignmment
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
PHOTOS
CIVIL WORKS
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 68 of 75
EVAPORATOR UNIT # 74
( CABLE ROUTE )
1. CP-85
- Surface preparation
DEAERATOR UNIT # 75
- formworks
EVAPORATOR UNIT # 74
( MISCELLANEOUS FOUNDATION )
1. F12-1, F12( 2 Nos. ), SF1, SF2, F3, BCP &
BCSF
- Lean concrete already casted
EVAPORATOR UNIT # 73
( MISCELLANEOUS FOUNDATION )
1. F4 Foundation
- waterproofingmembrane
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
PHOTOS
CIVIL WORKS
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 69 of 75
- formworks
- some are casted already
- Waterproofing membrane & protection board ,
balance
CABLE ROUTE
( NEAR EVAP. UNIT # 71 )
1. DB-07 Between CP47 & CP48
2. DB-04 Between CP46 & CP 47
EVAPORATOR between UNIT
# 71 & UNIT # 72
1. PIPE STEAM & AUX. FOUNDATION
- surface preparation
EVAPORATOR UNIT # 72
( MISCELLANEOUS FOUNDATION )
1. F4, F3 & F1
- Casted & surface preparation
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
PHOTOS
CIVIL WORKS
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 70 of 75
2. Flash Tank Foundation
- Curing
EVAPORATOR UNIT # 72
1. CEP Foundation ( 2 nos. )
- Formworks
EVAPORATOR UNIT # 71
( MISCELLANEOUS FOUNDATION )
1. F39 Foundation
- surface preparation
EVAPORATOR UNIT # 71
( MISCELLANEOUS FOUNDATION )
1.Pump Pit Cover
- Rebar works
- block-outs & form works
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
PHOTOS
CIVIL WORKS
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 71 of 75
1. Pipe Rack Type 2
- F2 ( 4 Nos ) Pedestal, Casted
1. CP 52 , CP 53, & CP 54
EVAPORATOR UNIT # 71
( CABLE PIT )
- Painting
EVAPORATOR UNIT # 71
( MISCELLANEOUS FOUNDATION )
EVAPORATOR UNIT # 71
( MISCELLANEOUS FOUNDATION )
1. Vehicle Area Foundation
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
PHOTOS
CIVIL WORKS
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 72 of 75
1. Foundations
---- formworks
---- CHB installation & plastering inside
building
---- Surface preparation in roof
CHEMICAL STORAGE BUILDING
---- rebarworks
---- soil preparation for Lean concrete
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
PHOTOS
BUILDING WORKS
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
ELECTRO-CHLORINATION BUILDING
1. Ground Floor
---- preparation for installation of Hollow
Blocks
---- waterproofing membrane , preparation
for screed
2. MF5 Outdoor Foundation
SEAWATER INTAKE BUILDING
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 73 of 75
1. Parapet
1. Roof Beam
1. Ground Floor
---- Kicker already casted
---- reinforcement of column fabricated /
erection

RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
PHOTOS
BUILDING WORKS
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
SWITCHEGEAR BUILDING FOR MSF 73-74
--- .Installation of forms , South side &
west side
--- Surface preparation Finished
2. Basement ( Ceiling, Wall & Floor )
SWITCHEGEAR BUILDING FOR MSF 75-76
---- Installation of supports & plates, Bottom of
Beam already started.
---- Fabrication of sidings for beam & slab
SWITCHEGEAR BUILDING FOR MSF 77-78
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 74 of 75
1. Ground Beam
1. Parapet
1. Ceiling & Wall
2. Flooring
----- Surface preparation
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
PHOTOS
BUILDING WORKS
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
GAS CHLORINATION BUILDING
----- South side Casted, East side Balance
POST TREATMENT BUILDING
----- Installation of forms ,South
side & west side
POST TREATMENT BUILDING (
BASEMENT )
----- Application of first coat
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.
Page 75 of 75
1. Wall & Ceiling
1. Wall & Ceiling
2. Flooring
1. Wall & Ceiling
2. Flooring
SWITCHEGEAR BUILDING FOR MSF 71-72
( TRANSFORMER FOUNDATION )
---- ready for screed
---- Preparation for final Coat
SWITCHEGEAR BUILDING FOR MSF 71-72
( OFFICE ROOM )
---- Final Coat Finished
---- Tiles Installation Finished
---- Application of First Coat
SWITCHEGEAR BUILDING FOR MSF 71-72
( SWITCHGEAR ROOM - NORTH SIDE )
---- Final Coat Finished
---- First Coat Finished
RAS AL KHAIR DESALINATION PLANT
PHASE 1 PACKAGE "D"
PHOTOS
DATE COVERED :WEEK NO. 74 ( 21-26 JULY,2012 )
SWITCHEGEAR BUILDING FOR MSF 71-72
( SWITCHGEAR ROOM - SOUTH SIDE )
BUILDING WORKS
Doosan Heavy Industries
& Construction.
Assad Said
For Contracting Co.,Ltd.

You might also like