Project

: Planning and Design for King Khalid University (College of Languages and Translation-MC-04)

Location

: Abha, Kingdom of Saudi Arabia

Owner

: Ministry of Higher Education

Subject

: Tender Quantity (BOQ) and Design Drawings Evaluation

Date

: February 21, 2012

Item

Division

Amount

Description of Works
BOQ

Bill 1

Site Construction

Bill 1

Bill 1
Bill 1

Variance

Tender Drawings

2,540,890.96

1,947,860.97

593,029.99

Concrete

34,943,793.37

30,948,437.77

3,995,355.60

Masonry

1,520,380.65

1,599,934.28

79,553.63

Metals

1,976,598.23

2,183,058.71

206,460.48

Bill 1

Wood & Plastic

1,999,191.62

2,084,804.82

85,613.20

Bill 1

Thermal & Moisture Protection

2,715,948.70

2,746,817.67

30,868.97

Bill 1

Door Windows

11,139,704.47

10,515,830.25

623,874.22

Bill 1

Finishes

17,719,441.93

18,168,261.07

448,819.14

Bill 1

10

Specialties

1,063,885.04

1,040,617.99

23,267.05

Bill 1

11

Equipment

277,732.95

246,756.35

30,976.60

Bill 1

12

Furnishings

0.00

79,224.00

79,224.00

Bill 1

13

Special Construction

0.00

0.00

0.00

Bill 1

14

Conveying System

6,800,060.00

3,736,732.00

3,063,328.00

Bill 1

15A

Mechanical (Plumbing)

4,482,947.81

4,581,805.55

98,857.74

Bill 1

15B

Mechanical (HVAC)

18,654,004.16

33,224,648.75

14,570,644.59

Bill 1

16

Electrical

21,270,626.71

24,749,919.29

3,479,292.58

Bill 2

Site Construction

10,924,009.81

8,065,068.38

2,858,941.43

Total Bill Summary


Note:

Some cost of New Items were not included

138,029,216.41

145,919,777.85

7,890,561.44

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount

Tender
Drawing

BOQ

RATE
BOQ

Variance

Tender
Drawing

DIVISION 2 - SITE WORK


EXCAVATION AND EARTHWORK
Necessary moving or transportation about the
site excavation material including handling to
temporary stockpile or ultimate disposal off
site is to be included in the unit rate of
excavation

NOTE

Excavation in natural land consisting of


solid rock formation, cracked rocks,
bolders and natural contoured soil,
temporary earthwork supports, dewatering
and any work below the normal water table
level as per specifications sections 02200
01

01

02

03

01

02

01
02
03

Excavation for foundations commencing from


existing grade level
Backfilling
Approved selected imported fill material
including compaction in making up levels
around and over foundations, beds and the
like as per specifications sections 02200
Approved fill material selected from excavated
material including compaction as per
specification section 02200
Disposal
Disposal of excavated material off site to a
designated tip as directed by the Engineer
(Client's representative)
Drainage layer
100 mm thick compacted coarse gravel to
underside of slabs on grade as per
specification section 02200
Soil treatment application for termite
control
To subgrades of slabs and along periphery of
building
Thermoplastic paint for traffic marking on
parking pavement in parking floor and subterrain floor as shown on drawings and
detail on G-A 902 and specification section
02580
Ref. type PSI, Handicapped marking on floor
Straight arrows
Parking lane marking, 100 mm wide

M3

23,400

13,167.096

64.70

1,513,980.00

851,911.11

662,068.89

M3

6,100

8,591.556

40.93

249,673.00

351,652.39

101,979.39

0.00

M3

ITEM

40.93

1.000

400,021.78

400,021.78

400,021.78

0.00

M2

9,328

8,714.875

27.73

258,665.44

241,663.47

17,001.97

M2

11,255

9,601.556

7.92

89,139.60

76,044.32

13,095.28

No.
No.
M

6
44
355

6.000
44.000
308.190

330.10
133.36
60.74

1,980.60
5,867.84
21,562.70

1,980.60
5,867.84
18,719.46

0.00
0.00
2,843.24

To Bill Summary

227158363.xls.ms_officeDiv 2

2,540,890.96

Page 1 of 61

1,947,860.97

593,029.99

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount

Tender
Drawing

BOQ

RATE
BOQ

Tender
Drawing

Variance

Remarks

DIVISION 3 - CONCRETE
CONCRETE WORK

01

01
02
03
04
05
06
07
New Item

CONCRETE TYPES
Include in Unit Rates for concrete of the
following types and locations:
30 Mpa
a) Footings b) Columns and Walls c) Floor
and roof slabs, beams, stairs, concrete
toppings d) Slab on grade, water tanks,
helipads, equipment pads
35 Mpa
Precast and prestressed concrete elements
20 Mpa
a) Blinding concrete b) Catch basins and side
walls
Plain insitu concrete, 20 Mpa, type V as per
specifications section 03300
Blinding beds, 100 mm thick
Insitu reinforced concrete, 30 Mpa type V
including formwork and steel
reinforcements conforming to ASTM A615
and A185 as per specifications sections
03100, 03200 & 03300
R.C raft
Raft to suit utility as shown on drawings
R.c walls and slab to suit utility tunnel as
shown on drawings
Footing and wall footing
Tie beams
Columns pedestals
Steps and landings on grade
Reinforced Concrete Pedestals
Insitu reinforced concrete, 30 Mpa type V
including formwork and steel
reinforcements conforming to ASTM A615
and A185 as per specifications sections
03100, 03200 & 03300

01

Slab on grade 125 mm thick with A193 WWF


mesh reinforcement including thickening

02

Slab on grade 150 mm thick with A252 WWF


mesh reinforcement including thickening

03
04

01
02
03
04
06

150 mm thick raised slabs ramps and curbs


with hight required to suit parking area
Reinforced concrete equipment pads on
grade as per details
Insitu reinforced concrete, 30 Mpa type I
cement including formwork and steel
reinforcements conforming to ASTM A615
and A185 as per specifications sections
03100, 03200 & 03300
Columns
RC wall
Beams
Suspended slabs (solid slabs)
Stairs

NOTE

M3

545

492.003

462.14

251,866.30

227,374.27

24,492.03

M3
M3
M3

51
21

63.672
-

1,637.30
1,637.30

83,502.30
34,383.30

104,250.17
-

25

80.290

1,927.78

48,194.50

154,781.46

20,747.87
34,383.30
106,586.96

M3
M3
M3
M3
M3

2,360
470
278
8
-

2,384.069
463.719
293.460
8.340
798.327

1,394.34
1,727.08
1,742.93
1,927.78

3,290,642.40
811,727.60
484,534.54
15,422.24

3,324,202.77
800,879.81
511,480.24
16,077.69

198

196.221

929.56

184,052.88

182,399.19

1,170

1,044.478

929.56

1,087,585.20

970,904.97

160

165.291

963.89

154,222.40

159,322.34

1.000

66,020.00

66,020.00

66,020.00

2,650
2,465
4,938
1,020
320

1,966.448
1,355.436
4,344.090
903.992
449.439

1,584.48
1,766.70
1,727.08
1,307.20
1,927.78

4,198,872.00
4,354,915.50
8,528,321.04
1,333,344.00
616,889.60

3,115,797.53
2,394,648.78
7,502,590.96
1,181,698.34
866,419.52

as per design drawing

M3

1,653.69

M3

M3
ITEM

M3
M3
M3
M3
M3

116,680.23

STRUCTURAL PRECAST CONCRETE

227158363.xls.ms_officeDiv 3

33,560.37
10,847.79
26,945.70
655.45

Page 1 of 61

5,099.94
0.00

1,083,074.47
1,960,266.72
1,025,730.08
151,645.66
249,529.92

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount
RATE

Tender
Drawing

BOQ

Variance

Tender
Drawing

BOQ

Remarks

Precast, pre-stressed, 35 Mpa reinforced


concrete hollow core slab system with
type-I cement and steel reinforcements
conforming to ASTM-A416 including
elastomeric bearing pads, (where required)
insitu structural concrete 65 mm thick with
A98 and A193 WWF mesh reinforcements
all as per details on drawings and
specifications section 03410
01

300 mm thick Hollow core slabs including 65


mm thick with A193 WWF reinforcements

02

250 mm thick Hollow core slabs including 65


mm thick with A193 WWF reinforcements

03

Double DT slab system including 65 mm thick


structural screed with A252 WWF
reinforcements thick 340 mm

M2

137,750.23
730

1,132.802

341.98

249,645.40

387,395.63

20,350

17,401.447

275.96

5,615,786.00

4,802,103.31

455

547.562

394.80

179,634.00

216,177.48

9,445
3,190
1,552

9,529.417
3,533.028
3,268.641

129.40
133.36
236.35

1,222,183.00
425,418.40
366,815.20

1,233,106.56
471,164.61
772,543.30

16

2,926.01

46,816.16

4.000

14.000

113

114.000

417.25

47,149.25

47,566.50

9.000

3,829.16

30,633.28

34,462.44

M2

813,682.69

M2

36,543.48

PRECAST CONCRETE
Precast reinforced concrete exterior
panels, pre-finished including fixings,
grooves, recesses, joints, forming
openings, accessories, steel
reinforcements conforming to ASTM A615
and A185 as per details on drawing and
specifications section 03450
01
02
03
04
New Item
New Item

01

Sand blasted precast panels


Ditto, but mud color
Sand blasted precast louvers, 150mm thick
Sand blasted precast columns 1200 mm dia
(to suit external elevation)
Sand blasted precast columns 1200 mm dia
3.50m High (to suit external elevation)
Sand blasted precast columns 1200 mm dia
7.30m High (to suit external elevation)
Precast concrete wheel stopper including
dowels, grouting and accessories for
complete installation as per detail on
drawing G-A902
Precast concrete wheel stopper includung
fixings as shown on detail 5 drawing G-A902
as per specifications section 03450

M2
M2
M2
No.
No.
No.

10,923.56
45,746.21
405,728.10
46,816.16

as per design drawing


as per design drawing

No.

417.25

Precast concrete splash block including


fixing and all accessories for complete
installation as per detail on drawing G-A901
02

Precast conceret splash block including


grouting as shown on detail 16 on drawing GA901

No.

3,829.16

01
02
New Item

01

227158363.xls.ms_officeDiv 3

GLASS FIBER REINFORCEMENT


CONCRETE (GRC)
As detailed on drawing and as per
specifications section 03455
GRC shade
GRC decorative circular columns 600mm dia
(to suit external elevations)
GRC decorative circular columns 600mm dia
(to suit external elevations), 6.275m High
Sundries
Allow for 12 mm premoulded joint filler and
sealant at contact joints of concrete as
required.

M
No.
No.

89

374.394

676.04

60,167.56

253,105.32

50

50.000

5,017.52

250,876.00

250,876.00

4.000

192,937.76
0.00
0.00
as per design drawing

ITEM

0.00
1

1.000

79,224.00

Page 2 of 61

79,224.00

79,224.00

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

02
03

01
02

Allow for expansion joint, fillers, back rods


and sealants (metal covers measured
Allow for pipe sleeves of various sizes in
basement walls including forming holes,
supports, fixings and the like
Sundries
Allow for precast concrete scupper drain
including all associated works as shown and
detailed on drawings
Cast in place concrete curb wides 200 mm
with 750 mm high mm to suit parking area
NOTES

ITEM

Amount
RATE

Tender
Drawing
1.000

132,040.00

132,040.00

Tender
Drawing
132,040.00

1.000

181,555.00

181,555.00

181,555.00

2.000

229,485.52

458,971.04

458,971.04

232

218.338

225.79

52,383.28

49,298.54

BOQ

BOQ

ITEM

Variance
0.00
0.00

No.

0.00

3,084.74

Include in unit rates works associated to


construction and control joints including joints
surrounding equipment pads along with
necessary caulking, forming and the like.

To Bill Summary

227158363.xls.ms_officeDiv 3

34,943,793.37 30,948,437.77

Page 3 of 61

3,995,355.60

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY CAMPUS ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT
BOQ

Amount

Tender
Drawing

RATE
BOQ

Tender
Drawing

Variance

DIVISION 4 - MASONRY

01
02
03
04
05
06
07

UNIT MASONRY
Concrete hollow blocks in courses with
cement-lime mortar including vertical and
horizontal reinforcement, fixings, fillers,
sealants grout and RC lintels over
openings as per specification section
04200
100 mm thick wall
200 mm thick wall
Ditto, but one hour fire rated
Ditto, but two hour fire rated
Ditto, but three hour fire rated
300 mm thick wall
300 mm thick wall, two hour fire rated

M2
M2
M2
M2
M2
M2
M2

790
1,720
8,600
2,379
79
75
50

1,459.228
1,903.809
7,811.146
2,894.873
78.854
193.393
23.865

76.58
85.83
102.99
162.41
196.74
145.24
274.64

To Bill Summary

227158363.xls.ms_officeDiv 4

Page 1 of 61

60,498.20
147,627.60
885,714.00
386,373.39
15,542.46
10,893.00
13,732.00

111,747.68
163,403.93
804,469.93
470,156.32
15,513.74
28,088.40
6,554.28

51,249.48
15,776.33
81,244.07
83,782.93
28.72
17,195.40
7,177.72

1,520,380.65

1,599,934.28

79,553.63

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY CAMPUS ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount

Tender
Drawing

BOQ

RATE
BOQ

Tender
Drawing

Variance

Remarks

DIVISION 5 - METALS

01

01

02

HANDRAILS
25 X 75 mm hammered steel handrail
anodized finish, 70x12 mm solid steel post
and with 1212 mm solid steel square wire
mesh panel including fixings, finishings,
and accessories as per detail 1 drawing GA401 and as per specification section
05500
Railing, 1100 mm high, to suit stairs
40 mm dia. galvanized steel pipe rail and
baluster including fixings, finishings and
accessories as per detail 16 drawing GA401 and as per specification section
05500
Guard rail to suit locations
40 mm dia. galvanized steel pipe rail and
baluster including fixings, finishings and
accessories as per detail 4 drawing GA401 and as per specification section
05500
Guard rail, 1060 mm high to suit / stairs

860

931.023

792.24

681,326.40

737,594.01

56,267.61

236

377.840

792.24

186,968.64

299,339.98

112,371.34

260

477.123

792.24

205,982.40

377,996.12

172,013.72

520

322.475

382.92

199,118.40

123,481.99

75,636.41

M
M
M
M
M
M

180
120
50
80
83
10

143.283
143.913
86.446
93.175
30.325
-

580.98
448.94
314.26
281.25
184.86
422.53

104,576.40
53,872.80
15,713.00
22,500.00
15,343.38
4,225.30

83,244.56
64,608.30
27,166.52
26,205.47
5,605.88
-

21,331.84
10,735.50
11,453.52
3,705.47
9,737.50
4,225.30

M
M

120
30

120.238
-

524.20
281.25

62,904.00
8,437.50

63,028.76
-

124.76
8,437.50

18

18.003

126.76

2,281.68

2,282.06

0.38

17.040

264.08

2,376.72

4,499.92

2,123.20

Wall mounted 38 mm dia. galvanized steel


pipe handrail on wall brackets including
fixings, fittings and accessories as per
detail 5 drawing G-A401 and as per
specification section 05500
01

Wall railing to suit stairs

01
02
03
04
05

EXPANSION JOINT
Expansion joint including extruded
aluminum assemblies, fillets, accessories,
fixing and sealants as per detail on
drawing G-A 903 and as per specification
section 05810
Floor to floor as detail 3
Ceiling to ceiling as detail 1
Ceiling to wall as detail 2
Floor to wall as detail 4
Roof to roof as detail 5

06

Roof to roof as detail 6

07

Wall to wall as detail 7

08

Wall to wall as detail 8

01
02

227158363.xls.ms_officeDiv 5

GRATING
Cast iron grating 30 mm thick including
medium gauge galvanised steel gutter as
per detail on drawing GA901 and as per
specification section 05500
300 mm wide cast iron grating
Stainless steel grating
Grating to suit ablution

Page 1 of 61

nowhere to found in design


drawing
nowhere to found in design
drawing

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY CAMPUS ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

02

Metal nosing
Abrasive cast iron nosing including fixing
and accessories as per drawings and as
per specification section 05500
Step nosing size 40 x 40 mm
Roof hatch and ladder as per detail G-A401
and specifications section 05500
Roof hatch to suit in stair no. 4,5,6

03

Ditto. But as per detail 12 on drawing G-A401

01

Ladders
Galvanized steel ladder as detail on
drawing G-A401 and as per specification
section 05500
Not exceeding 5, 000 mm high

01

02
03

Bollard
150 mm dia. Steel pipe filled with concrete
as per detail on drawing G-A902 and
specification section 05500
Overall exposed height 780 mm
Painted galvanized steel decorative member
2500mm length to suit roof trellis

Amount

Tender
Drawing

BOQ

RATE
BOQ

Variance

1,460

1,491.042

237.67

346,998.20

354,375.95

7,377.75

No.
No.

3
2

1.000
2.000

7,346.71
507.03

22,040.13
1,014.06

7,346.71
1,014.06

14,693.42
0.00

No.

1.000

2,970.90

14,854.50

2,970.90

11,883.60

No.
No.

6
10

6.000
-

382.92
2,376.72

2,297.52
23,767.20

2,297.52
-

0.00
23,767.20

1,976,598.23

2,183,058.71

206,460.48

To Bill Summary

227158363.xls.ms_officeDiv 5

Tender
Drawing

Page 2 of 61

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount

Tender
Drawing

BOQ

RATE

Variance

Tender
Drawing

BOQ

Remarks

DIVISON 6 - WOOD AND PLASTIC

01

02
03
New Item

CABINET AND COUNTER


Shoe rack and cabinet to suit at pray
hallrooms no S-032&G-046&I-040 &2-069
as detail B/i501 and as per specification
section 06400
As detail B/I501
CUSTOM MADE COUNTER
Coustom made counters as per interior
design drawings as detail ID-501 and
specification section 06400
To suit in cafeteria room nos. 1-019 as per
detail C and drawing i501
Library counter to suit room nos 5.029 as per
detail A on drawing i501
To suit in cafeteria room nos. G-107 as per
plan drawing M-A502

No.

8.000

101,438.41

811,507.28

811,507.28

4.000

88,758.61

355,034.44

355,034.44

3.962

88,758.61

355,034.44

351,661.61

0.00

0.00
3,372.83
M

4.500

0.00

as per design drawing

Vanity Top

02

Vanity top, comprising counter top holed


for lavatory (lavatory measured elsewhere)
with backsplash , facia, sides, and metal
framing including finishings, sealants, and
trims as shown on drawing G-A501 and as
per specification section 06400
Granite vanity top to suit required locations
Artificial Stone Countertop to suit kitchenette
and caf services
Decorative wood work including dark
cherry finish, all elements for complete
installations, fixing and all associated
works as detailed on drawing MC04i401,
specs
To suit lobby hall (2-033)

M2

12

10.874

2,178.66

26,143.92

23,690.75

2,453.17

01
02

KITCHEN CABINETS
Kitchen base and wall cabinets Including
doors, hardwares, shelves, decorations, as
per detail 2 on drawing G-A501 and
specification section 06400
Ref. 001, Base cabinet
Ref. 002, Wall cabinet

M
M

4
4

27.915
27.915

2,561.58
2,561.58

10,246.32
10,246.32

71,506.51
71,506.51

61,260.19
61,260.19

1,999,191.62

2,084,804.82

85,613.20

01
New Item

M
M

85
-

78.870
47.285

5,070.34
-

To Bill Summary

227158363.xls.ms_officeDiv 6

Page 1 of 61

430,978.90
-

399,897.72
-

31,081.18
0.00

as per design drawing

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT
BOQ

Amount

Tender
Drawing

RATE
BOQ

Tender
Drawing

Variance

Remarks

DIVISION 7 - THERMAL AND MOISTURE


PROTECTION

01

Wall insulation
50 mm thickThermal rigid insulation
specifications section 07200
WATERPROOFING AND MOISTURE
PROTECTION

M2

5,112

9,867.603

121.48

621,005.76

1,198,716.41

577,710.65

M2

545

657.713

51.50

28,067.50

33,872.22

5,804.72

02

Membrane waterproofing laid in floors in "wet


room" areas including upturn to abutting walls
or upstands as per specification section 07100

03

Membrane waterproofing concrete wall

M2

5,150

8,507.403

44.89

231,183.50

381,897.32

150,713.82

04

Protection board
Damp proofing
Two coats of bituminous coatings onto
surfaces of concrete in contact with soil as
per specifications section 07150
Vapour barrier
Vapour barrier to underside of slabs, beds,
and the like, specifications section 07100

M2

4,850

8,507.403

113.55

550,717.50

966,015.61

415,298.11

M2

9,420

4,559.126

9.24

87,040.80

42,126.32

44,914.48

M2

9,328

8,714.875

5.28

49,251.84

46,014.54

3,237.30

M2

6,692

6,013.481

171.65

1,148,681.80

78,175.25

1,070,506.55

2,715,948.70

2,746,817.67

30,868.97

05

01

ROOFING SYSTEM
Roofing system comprising gravel layer
separation sheet, rigid insulation,
waterproofing membrane and concrete
screed to form slope to drain, including
precast tiles where occur for maintenance
walks, forming of cant strips, and
waterproofing membrane base flashing,
metal flashing, sealants and fixings, steel
fabrications, all as detailed on drawings
and specifications section 07500
02

To suit roof area


To Bill Summary

227158363.xls.ms_officeDiv 7

Page 1 of 61

rc wall, raft, planter box,


elevator

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount
RATE

BOQ

Tender
Drawing

28
52

1,888.17
2,759.64

52,868.76
143,501.28

Variance

Tender
Drawing

BOQ

Remarks

DIVISION 8 - DOORS AND WINDOWS

01
02
03
04
05
New Item

01
02
03
04
05
06
07
08
09

01
02
03
04
05
06
07
08
09
New Item

01
02
03
04

05

DOOR SETS
All doors including fixings, decorations
and the like, as detailed on drawing GA801
to suit masonry openings.
44mm thick hollow metal with paint finish
including frames drawing G-A801 and
specification section 08100
Type A1, frame type 1
Ditto, but 60 minutes fire rating

No.
No.

28
52

Ditto, but frame type 3

No.

69

3,340.61

Ditto, but 90 minutes fire rating


Ditto, but 120 minutes fire rating
Ditto, but frame type 3 but 60minutes fire
rating, 0.90m wide x 2.15m high
44mm thick hollow metal with paint finish
including frames drawing G-A801 and
specification section 08100
Type A2, frame type 1
Ditto, but 60 minutes fire rating
Type A3, frame type 1
Ditto, but 45 minutes fire rating
Ditto, but 60 minutes fire rating
Ditto, but 120 minutes fire rating
Type A3, frame type 3 and 60 minutes fire
rating
Ditto, but 90 minutes fire rating
Ditto, but 120 minutes fire rating
44mm thick hollow metal with paint finish
including frames drawing G-A801 and
specification section 08100
Type A4, frame type 3 and 60 minutes fire
rating
Type B1, frame type 1
Ditto, but 60 minutes fire rating
Ditto, but 120 minutes fire rating
Type B2, frame type 1
Ditto, but 60 minutes fire rating

No.
No.

8
11

11
11

4,793.05
4,951.50

No.

73

No.
No.
No.
No.
No.
No.

23
47
18
6
19
10

22
48
17
1
26
11

No.

No.
No.

7
3

No.
No.
No.
No.
No.
No.

Ditto, but frame type 3


Ditto, but 90 minutes fire rating
Ditto, but 120 minutes fire rating
B2 frame type 3 but 60 minutes fire rating,
0.90m wide x 2.15m high
44mm thick hollow metal with paint finish
including frames drawing G-A801 and
specification section 08100
Type B3, frame type 1
Ditto, but 60 minutes fire rating
Type C2, frame type 3 and 60 minutes fire
rating
Type E2, frame type 1
30mm thick hollow metal with paint finish
including frames drawing G-A801 and
specification section 08100
Type D1, frame type 3 and 60 minutes fire
rating

52,868.76
143,501.28

0.00
0.00

230,502.09

230,502.09

38,344.40
54,466.50

52,723.55
54,466.50

14,379.15
0.00

0.00

2,033.42
2,904.88
3,340.61
4,705.91
4,705.91
5,083.54

46,768.66
136,529.36
60,130.98
28,235.46
89,412.29
50,835.40

44,735.24
139,434.24
56,790.37
4,705.91
122,353.66
55,918.94

2,033.42
2,904.88
3,340.61
23,529.55
32,941.37
5,083.54

5,083.54

45,751.86

25,417.70

20,334.16

2
5

5,083.54
5,083.54

35,584.78
15,250.62

10,167.08
25,417.70

25,417.70
10,167.08

18

18

1,597.68

28,758.24

28,758.24

0.00

15
105
1
1
4

14
105
1
1
4

2,033.42
3,010.51
3,485.86
2,720.02
2,904.88

30,501.30
316,103.55
3,485.86
2,720.02
11,619.52

28,467.88
316,103.55
3,485.86
2,720.02
11,619.52

2,033.42
0.00
0.00
0.00
0.00

No.

2,772.84

11,091.36

11,091.36

No.
No.

3
6

2
4

3,036.92
3,234.98

9,110.76
19,409.88

6,073.84
12,939.92

3,036.92
6,469.96

No.

0.00

No.
No.

1
3

1
3

3,340.61
4,720.43

3,340.61
14,161.29

3,340.61
14,161.29

0.00
0.00

No.

22

22

3,340.61

73,493.42

73,493.42

0.00

No.

4,720.43

14,161.29

14,161.29

0.00

No.

10

10

5,228.78

52,287.80

52,287.80

0.00

Shutters

227158363.xls.ms_officeDiv 8

Page 1 of 61

nowhere to found in design


drawing

as per design drawing

nowhere to found in design


drawing

as per design drawing

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

01

01
02
03

DESCRIPTION
Electricaly operated anodized galvanized
steel slat fire rated rolling shutter (work up
on singnal from alarm system according to
attached detectors or recall manually or
press button)
Type S01
Hard wood solid core door with cherry
wood veneer including frames drawing GA801 and specification section 08100
Type G1, frame type 1
Ditto, but 60 minutes fire rating
Type G2, frame type 1
DIVISION 8 - DOORS AND WINDOWS

UNIT

Amount
RATE

Variance

Tender
Drawing

Remarks

BOQ

Tender
Drawing

No.

4,793.05

4,793.05

4,793.05

0.00

No.
No.
No.

1
2
1

1
2
1

3,340.61
3,631.10
2,178.66

3,340.61
7,262.20
2,178.66

3,340.61
7,262.20
2,178.66

0.00
0.00
0.00

No.
No.
No.
No.
No.
No.

2
3
2
2
1
2

2
2
2
3
1
2

31,953.68
33,841.85
19,607.94
26,143.92
18,881.72
18,881.72

63,907.36
101,525.55
39,215.88
52,287.84
18,881.72
37,763.44

63,907.36
67,683.70
39,215.88
78,431.76
18,881.72
37,763.44

0.00
33,841.85
0.00
26,143.92
0.00
0.00

No.

0.00

as per design drawing

m2

40.162

0.00

as per design drawing

No.
No.
No.
No.
No.

1
1
1
1
3

1
1
1
1
3

131,424.69
128,531.70
27,085.37
461,677.86
64,634.90

131,424.69
128,531.70
27,085.37
461,677.86
193,904.70

131,424.69
128,531.70
27,085.37
461,677.86
193,904.70

0.00
0.00
0.00
0.00
0.00

No.
No.
No.
No.
No.

1
1
1
4
4

1
1
1
4
4

36,934.23
609,414.78
443,210.75
49,245.64
88,642.41

36,934.23
609,414.78
443,210.75
196,982.56
354,569.64

36,934.23
609,414.78
443,210.75
196,982.56
354,569.64

0.00
0.00
0.00
0.00
0.00

BOQ

GLAZED DOORS

01
02
03
04
05
06
New Item
New Item

01
02
03
04
05

01
02
03
04
05

24 mm thk double tinted / clear tempered


glass pivoted door on anodized aluminum
frames including saddels and hardware as
on drawing GA801 and specifications
section 08120
Ref GD01
Ref GD02
Ref GD03
Ref GD04
Ref GD05
Ref GD06
Glass Door to suit Nooks glass partition,
1.80m wide x 2.30m high
Glass Partition to suit nooks
Curtain Walling
24 mm thick double tempered glazed
Curtain Walling, tinted outside/clear inside
on anodized aluminum frames including all
hardware, fixtures, packings, sealants,
weather strippings and the like as
described drawing G-A803, G-A804 to to
suit openings and as per specification
section 08920
Ref. CW01
Ref. CW02
Ref. CW03
Ref. CW04
Ref. CW05
24 mm thick double tempered glazed
Curtain Walling, tinted outside/clear inside
on anodized aluminum frames including all
hardware, fixtures, packings, sealants,
weather strippings and the like as
described drawing G-A803, G-A804 to to
suit openings and as per specification
section 08920
Ref. CW06
Ref. CW07
Ref. CW08
Ref. CW09
Ref. CW10
WINDOWS

227158363.xls.ms_officeDiv 8

Page 2 of 61

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount
RATE

Variance

BOQ

Tender
Drawing

Tender
Drawing

No.
No.
No.
No.
No.
No.

5
6
12
53
6
73

5
6
15
53
6
72

5,545.68
4,198.87
1,597.68
5,545.68
5,572.09
6,100.25

27,728.40
25,193.22
19,172.16
293,921.04
33,432.54
445,318.25

27,728.40
25,193.22
23,965.20
293,921.04
33,432.54
439,218.00

0.00
0.00
4,793.04
0.00
0.00
6,100.25

No.
No.
No.
No.
No.

10
1
17
120
30

10
1
17
120
30

4,066.83
15,184.60
3,050.12
15,448.68
3,631.10

40,668.30
15,184.60
51,852.04
1,853,841.60
108,933.00

40,668.30
15,184.60
51,852.04
1,853,841.60
108,933.00

0.00
0.00
0.00
0.00
0.00

No.
No.
No.
No.
No.
No.
No.

15
15
12
28
9
2
12

15
15
12
28
9
2
12

3,631.10
8,582.60
5,809.76
6,866.08
14,894.11
5,149.56
2,904.88

54,466.50
128,739.00
69,717.12
192,250.24
134,046.99
10,299.12
34,858.56

54,466.50
128,739.00
69,717.12
192,250.24
134,046.99
10,299.12
34,858.56

0.00
0.00
0.00
0.00
0.00
0.00
0.00

m2
m2

434
462

447.262
286.057

1,742.93
2,033.42

756,431.62
939,440.04

779,546.36
581,674.02

23,114.74
357,766.02

m2

207.94

0.00

BOQ

Remarks

24 mm thick double tempered glazid


window, tinted outside clear inside on
anodized aluminum frames provided as
shown on drawings including all hardware,
fixtures, packings, sealants, weather
strippings and the like as described
drawing G-A802 to suit opening and as per
specification section 08520
01
02
03
04
05
06

Ref. W01
Ref. W02
Ref. W03
Ref. W04
Ref. W05
Ref. W06
24 mm thick double tempered glazid
window, tinted outside clear inside on
anodized aluminum frames provided as
shown on drawings including all hardware,
fixtures, packings, sealants, weather
strippings and the like as described
drawing G-A802 to suit opening and as per
specification section 08520

01
02
03
04
05

Ref. W07
Ref. W08
Ref. W09
Ref. W10
Ref. W11
24 mm thick double tempered glazid
window, tinted outside clear inside on
anodized aluminum frames provided as
shown on drawings including all hardware,
fixtures, packings, sealants, weather
strippings and the like as described
drawing G-A802 to suit opening and as per
specification section 08520

01
02
03
04
05
06
07

01
02
New Item

Ref. W12
Ref. W13
Ref. W14
Ref. W15
Ref. W16
Ref. W17
Ref. W18
Skylight
Double glazed polycarbonate skylight
including necessary flashings and fixings
as described on drawing GA-901 and as
per specification section 08630 (Areas are
measured on plan)
As det., 6
As det., 7
Double glazed polycarbonate skylight as per
plan and detail drawing A906
Hardware
Hardware sets including necessary
templates, cutting of openings in doors
and frames and key system as detailed on
drawing GA-801 and as per specification
section 08710

227158363.xls.ms_officeDiv 8

Page 3 of 61

as per design drawing

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

01
02
03
04
05

Ref. HW 05
Ref. HW 06
Ref. HW 07
Ref. HW 08
Ref. HW 09
Ref. HW 10
Ref. HW 13
Hardware sets including necessary
templates, cutting of openings in doors
and frames and key system as detailed on
drawing GA-801 and as per specification
section 08710
Ref. HW 14
Ref. HW 15
Ref. HW 18
Ref. HW 21
Ref. HW 26
Ref. HW 27
Ref. HW 32
Hardware sets including necessary
templates, cutting of openings in doors
and frames and key system as detailed on
drawing GA-801 and as per specification
section 08710
Ref. HW 34
Ref. HW 35
Ref. HW 36
Ref. HW 37
Ref. HW 39

01
02
03
04
05
06
07

Saddle
Saddle as detailed on drawing G-A801 and
as per specification section 08710
Ref. Type 2
Ref. Type 3
Ref. Type 4
Ref. Type 5
Ref. Type 6
Ref. Type 7
Ref. Type 8

01
02
03
04
05
06
07

01
02
03
04
05
06
07

Amount

No.
No.
No.
No.
No.
No.
No.

121
2
57
4
69
12
93

Tender
Drawing
121
2
57
4
69
12
95

No.
No.
No.
No.
No.
No.
No.

38
9
10
23
22
17
2

No.
No.
No.
No.
No.

No.
No.
No.
No.
No.
No.
No.

RATE
1,742.93
2,396.53
1,452.44
2,323.90
1,888.17
3,195.37
1,452.44

210,894.53
4,793.06
82,789.08
9,295.60
130,283.73
38,344.44
135,076.92

38
9
10
23
22
17
2

2,323.90
1,597.68
1,597.68
1,161.95
6,100.25
2,904.88
11,817.58

88,308.20
14,379.12
15,976.80
26,724.85
134,205.50
49,382.96
23,635.16

88,308.20
14,379.12
15,976.80
26,724.85
134,205.50
49,382.96
23,635.16

0.00
0.00
0.00
0.00
0.00
0.00
0.00

5
2
5
17
2

2
2
5
16
2

4,080.04
4,317.71
8,212.89
8,859.88
13,784.98

20,400.20
8,635.42
41,064.45
150,617.96
27,569.96

8,160.08
8,635.42
41,064.45
141,758.08
27,569.96

12,240.12
0.00
0.00
8,859.88
0.00

2
135
22
138
177
23
10

2
135
22
138
178
23
10

493.83
145.24
3,301.00
72.62
290.49
101.67
151.85

987.66
19,607.40
72,622.00
10,021.56
51,416.73
2,338.41
1,518.50

987.66
19,607.40
72,622.00
10,021.56
51,707.22
2,338.41
1,518.50

0.00
0.00
0.00
0.00
290.49
0.00
0.00

BOQ

To Bill Summary

227158363.xls.ms_officeDiv 8

Variance

Tender
Drawing
210,894.53
4,793.06
82,789.08
9,295.60
130,283.73
38,344.44
137,981.80

BOQ

11,139,704.47 10,515,830.25

Page 4 of 61

0.00
0.00
0.00
0.00
0.00
0.00
2,904.88

623,874.22

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount
RATE

Tender
Drawing

BOQ

BOQ

Tender
Drawing

Variance

Remarks

DIVISION 9 - FINISHES
INTERNAL FINISHES
Flooring including respective types of
bonding materials, accessories for
complete installations as per drawings and
as per specification sections 09310, 09600,
09650, 09671, 09680, 09681 and 09700
01
02
03
04
05

Broadloom carpet 1, ref. F01


Broadloom carpet 2, ref. F02
Carpet tiles (50x50 cm), ref. F03
Porcelain tiles, ref. F05
Porcelain tiles in pattern, ref. F06
Ceramic tiles (200x200x8 mm) slip resistant,
ref. F07

M2
M2
M2
M2
M2

180
718
3,810
2,938
3,510

167.761
708.899
3,571.145
3,014.655
4,123.269

221.83
221.83
221.83
145.24
171.65

39,929.40
159,273.94
845,172.30
426,715.12
602,491.50

37,214.42
157,255.07
792,187.10
437,848.49
707,759.12

M2

860

685.437

132.04

113,554.40

90,505.10

23,049.30

07

30mm thick polished granite ref. F08

M2

725

224.47

162,740.75

0.00

162,740.75

08

Accoustic, seamless, self smoothing, heavy


duty polyrethane base flooring system, ref.
F09

M2

1,920

2,020.225

118.84

228,172.80

240,083.54

11,910.74

M2

1,174

1,283.170

169.01

198,417.74

216,868.56

18,450.82

M2

3,866

3,707.941

169.01

653,392.66

626,679.11

26,713.55

M2

64

63.612

169.01

10,816.64

10,751.06

65.58

M2

722

72.62

52,431.64

0.00

52,431.64

M2

5,310

5,161.384

83.19

441,738.90

429,375.53

12,363.37

M2

1,660

1,735.323

99.03

164,389.80

171,849.04

7,459.24

06

2,714.98
2,018.87
52,985.20
11,133.37
105,267.62

qty reflected below at stair


finishes

Flooring including respective types of


bonding materials, accessories for
complete installations as per drawings and
as per specification sections 09310, 09600,
09650, 09671, 09680, 09681 and 09700
01
02
03
04

Static conductive, hard wearing polyurthane


base flooring system, ref. F10
Seamless, self smoothing, heavy duty
polyurethane base flooring system, ref.F11
Anti-static carpet tiles (50x50cm) on raised
floor (raised floor measured elsewhere) , ref.
F12
Exposed concrete with hardner (broom finish
for treads and risers), ref. F13

qty reflected below at stair


finishes

Flooring including respective types of


bonding materials, accessories for
complete installations as per drawings and
as per specification sections 09310, 09600,
09650, 09671, 09680, 09681 and 09700

06

75mm thick steel troweled concrete screed


with hardener Ref.( F14 )
Epoxy coat on 75 mm thick concrete

07

Marble with natural gravels, ref. F04

M2

185

257.564

924.28

170,991.80

238,061.25

67,069.45

01
02

Vinyl sheet 150x3000 cm, ref. F17


Epoxy terrazzo flooring,
ref. F18
Finishings : bases including sand-cement
backing mortar and grout
200 mm high soild, natural finished wood, ref.
B01
Granite tiles, ref. B02
100 mm high vinyl skirting, ref. B03
Porcelain tiles, ref. B06
Finishings : walls including metal angle
beads and lathing at junctions of differing
backgrounds
Plaster paint with wood cladding ref. W01
Painted walls with rough accoustic finish, ref.
W03
Porcelain tiles, ref. W04

M2
M2

850
1,210

876.234
1,258.225

117.52
165.05

99,892.00
199,710.50

102,975.02
207,670.04

3,083.02
7,959.54

2,970

2,801.420

85.83

254,915.10

240,445.88

14,469.22

M
M
M

255
3,885
2,850

183.317
3,709.724
2,440.173

132.04
33.01
85.83

33,670.20
128,243.85
244,615.50

24,205.18
122,457.99
209,440.05

9,465.02
5,785.86
35,175.45

M2

550

530.934

264.08

145,244.00

140,209.05

5,034.95

M2

954

828.644

116.20

110,854.80

96,288.43

14,566.37

M2

5,925

5,539.381

85.83

508,542.75

475,445.07

33,097.68

05

01
02
03
04

05
06
07

227158363.xls.ms_officeDiv 9

Page 1 of 61

not found in the design


drawing schedule

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

01
02
03
04
05
06
New Item

01

02

03

01
02
03

01
02

Finishings : walls including metal angle


beads and lathing at junctions of differing
backgrounds
Plaster paint finish, ref. W05
Paint on gypsum board, ref. W05
Ceramic tiles (200x200x8 mm) glazed finish,
ref. W06
Paint on exposed walls, ref. W07
Granite cladding, ref. W10 as shown on
detailed on drawing MC04i401
Decorative painted gypsum plaster, light color
and dark color as shown on detailed on
drawing MC04i401
Accoustic Panel with Wood Cladding, W08
Finishings : walls including metal angle
beads and lathing at junctions of differing
backgrounds
Decorative painted gypsum plaster as shown
on drawing MC04i401
Decorative painted plaster,accustical wood
cladding natural veneer finish on M.D.F
boards to suit seminar hall (S-022) as shown
on drawing MC04i401
Wood clading (dark cherry veneer) as shown
on drawing MC04i401
Wall board system : Free-standing dry wall
partition, including rockwool insulation
and metal studs (where erquired) as
discribed on drawing and as per
specifications section 09250
Double side gypsum board partition, 12.5 mm
thick
Ditto. But fire rated
16 mm thick single side gypsum board on
galv. Metal furring
Finishings : ceilings
Sand-cement plaster to soffits of structural
slabs and beams including paint ref. C09
Paint on exposed structure ref. C10

Amount
RATE

Tender
Drawing

BOQ

Tender
Drawing

BOQ

Variance

M2
M2

16,670
16,230

22,330.290
15,063.653

110.91
110.91

1,848,869.70
1,800,069.30

2,476,652.46
1,670,709.75

627,782.76
129,359.55

M2

3,279

2,548.370

114.87

376,658.73

292,731.26

83,927.47

M2

4,215

4,941.187

47.53

200,338.95

234,854.62

34,515.67

M2

70

136.261

924.28

64,699.60

125,943.32

61,243.72

M2

70

190.378

172.97

12,107.90

32,929.68

20,821.78

M2

34.861

0.00

0.00

0.00

M2

35

172.97

6,053.95

0.00

6,053.95

M2

138

67.938

172.97

23,869.86

11,751.24

12,118.62

M2

80

78.868

613.99

49,119.20

48,424.16

695.04

M2

4,230

4,332.172

145.24

614,365.20

629,204.66

14,839.46

M2

1,725

1,738.782

151.85

261,941.25

264,034.05

2,092.80

M2

4,160

4,049.179

171.65

714,064.00

695,041.58

19,022.42

M2

770

2,153.568

46.21

35,581.70

99,516.39

63,934.69

M2

2,230

2,514.881

47.53

105,991.90

119,532.29

13,540.39

M2

1,650

1,781.736

224.47

370,375.50

399,946.28

29,570.78

M2

6,770

6,084.845

264.08

1,787,821.60

1,606,885.87

180,935.73

M2

1,210

1,275.491

246.91

298,761.10

314,931.48

16,170.38

Finishings: Suspended ceilings including


suspension system as shown on drawings
and as per specification sections 09250,
09510 & 09515 (Area measured on plan)
03
04
05

Gypsum board,including paint with light cove


ref. C01
Mineral fiber accoustical panels with painted
gypsum board, ref. C05
Perforated metal accoustical panels with
painted gypsum board, ref. C06
Finishings: Suspended ceilings including
suspension system as shown on drawings
and as per specification sections 09250,
09510 & 09515 (Area measured on plan)

01
02
03

01
02

227158363.xls.ms_officeDiv 9

Moisture resistant painted gypsum board, ref.


C07
60x60 cm mineral fiber accoustical panels,
ref. C08
Gypsum board including paint ref. C04
Finishings : treads , risers and stair
landings, including bedding mortar,
abrasive inserts and pointing as shown on
details & drawings
Polished granite treads, 30 mm tick
Polished granite risers, 20 mm thick

M2

625

615.176

250.88

156,800.00

154,335.35

2,464.65

M2

9,270

9,181.735

250.88

2,325,657.60

2,303,513.68

22,143.92

M2

320

310.188

224.47

71,830.40

69,627.90

2,202.50

M
M

782
844

794.603
856.791

198.06
171.65

154,882.92
144,872.60

157,379.07
147,068.18

2,496.15
2,195.58

Page 2 of 61

Remarks

as per DD schedule

item repeated

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

03

04
05

06

01
02

03

Polished granite landings


Broom finish with hardner to suit fair faced
treads, risers and stair landings as shown
on details & drawings
To suit treads and risers
To suit landings
Coarse texture finish to suit curb ramps as
shown on drawings
To suit ramps on parking area
Epoxy terrazzo covering to suit steps
landing for college main hall as shown on
drawings
To suit treads and risers
To suit landings
Decorations
Paint system to fairface concrete concrete
curb 750mm dia.high, 200mm wide
EXTERNAL FINISHES

Amount

M2

170

Tender
Drawing
259.057

M
M2

1,350
547

M
M2

RATE

Variance

660.20

112,234.00

Tender
Drawing
171,029.43

2,858.230
799.119

52.82
132.04

71,307.00
72,225.88

150,971.71
105,515.67

79,664.71
33,289.79

107
25

193.847
33.325

52.82
132.04

5,651.74
3,301.00

10,239.00
4,400.23

4,587.26
1,099.23

140

218.338

110.91

15,527.40

24,215.87

8,688.47

BOQ

BOQ

Remarks

58,795.43

ITEM

Finishings: treads,risers, andstair landings


grainte, ref.(Gsh) including bedding mortar
and pointing as shown on drawings
01
New Item

Granite treads and risers including anti-slip


abrasive strips

ITEM

1.000

0.00

0.00

0.00

14.611 m length, 0.30m tread


by 0.15m riser

Broom Finish

ITEM

1.000

0.00

0.00

0.00

13.18 m length, 0.30m tread


by 0.15m riser

89

374.394

184.86

16,452.54

69,210.47

52,757.93

44

44.000

47.53

2,091.32

2,091.32

0.00

4.000

0.00

0.00

0.00

17,719,441.93 18,168,261.07

448,819.14

Decorations
02
03
New Item

Paint system to GRC shade including beams


Paint system to fairface concrete columns
600mm dia.
Paint system to fairface concrete columns
600mm dia., 6.275m High

To Bill Summary

227158363.xls.ms_officeDiv 9

Page 3 of 61

as per design drawing

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT
BOQ

Amount

Tender
Drawing

RATE
BOQ

Tender
Drawing

Variance

Remarks

DIVISION 10 -SPECIALTIES
TOILET AND BATH ACCESSORIES
Supply and installation of following toilet
and bath accessories as per schedule
including fixings and trims as shown on
drawings and specification section 10800
to suit locations as required
01
02

Ref. FM1, Clear glass mirror on 20 mm thick


plywood backing, 960 mm high
Ref. FMh, Clear glass mirror with stainless
steel frame, size 400 x 600 mm (
handicapped)

114

83.983

92.43

10,537.02

7,762.53

2,774.49

No.

12

10.000

343.30

4,119.60

3,433.00

686.60

No.

13

13.000

132.04

1,716.52

1,716.52

0.00

No.

13

13.000

198.06

2,574.78

2,574.78

0.00

No.

20

20.000

105.63

2,112.60

2,112.60

0.00

No.

17

21.000

2,376.72

40,404.24

49,911.12

9,506.88

No.

323.50

970.50

0.00

970.50

nowhere to found in design


drawing

nowhere to found in design


drawing

Supply and installation of following toilet


and bath accessories as per schedule
including fixings and trims as shown on
drawings and specification section 10800
to suit locations as required
01
02
03
04
05

Ref. GB1, 32 mm dia. Satin finish stainless


steel grab bar 600 mm length
Ref. GB2, 32 mm dia. Satin finish stainless
steel grab bar 1050 mm length
Ref. GB3, 32 mm dia. Satin finish stainless
steel grab bar 300 mm length
Ref. HD, Surface mounted push button
electric hand dryer
Ref. PTD, Surface mounted stainless steel
paper towel dispenser
Supply and installation of following toilet
and bath accessories as per schedule
including fixings and trims as shown on
drawings and specification section 10800
to suit locations as required

01

Ref. RH1, single robe hook (high category)

No.

79.22

158.44

0.00

158.44

02
03

Ref. RH2, Single robe hook


Ref. RHh, Single robe hook (handicapped )

No.
No.

184
22

228.000
26.000

79.22
79.22

14,576.48
1,742.84

18,062.16
2,059.72

3,485.68
316.88

No.
No.

79
13

81.000
13.000

151.85
264.08

11,996.15
3,433.04

12,299.85
3,433.04

303.70
0.00

Supply and installation of following toilet


and bath accessories as per schedule
including fixings and trims as shown on
drawings and specification section 10800
to suit locations as required
01
02
03
04

Ref. SD, Wall mounted soap dispenser


Ref. SDH2, Wall mounted soap dish and
holder (high category)
Ref. HS1, Hand spray with flexible hose and
wall hook (high category)
Ref. HS2, Hand spray with flexible hose and
wall hook

No.

290.49

290.49

0.00

290.49

No.

97

107.000

145.24

14,088.28

15,540.68

1,452.40

No.

89

98.000

198.06

17,627.34

19,409.88

1,782.54

Supply and installation of following toilet


and bath accessories as per schedule
including fixings and trims as shown on
drawings and specification section 10800
to suit locations as required
01

Ref. TPH2, Toilet paper holder


TOILET COMPARTMENTS

227158363.xls.ms_officeDiv 10

Page 1 of 61

nowhere to found in design


drawing

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT
BOQ

01

Proprietary solid phenolic core toilet


compartments with high pressure
melamine matt surface, including,
stainless steel pilasters, fixings,
finishings, hardware and accessories as
shown on drawings and specification
section 10155
Toilet partitions including doors as per detail 8
drawing G-A501

Amount

Tender
Drawing

RATE
BOQ

Tender
Drawing

Variance

205

216.526

2,772.84

568,432.20

600,392.75

31,960.55

No.

92

95.000

594.18

54,664.56

56,447.10

1,782.54

No.
No.
No.
No.
No.

2
11
24
1
5

2.000
11.000
25.000
1.000
-

1,980.60
1,320.40
607.38
1,848.56
3,036.92

3,961.20
14,524.40
14,577.12
1,848.56
15,184.60

3,961.20
14,524.40
15,184.50
1,848.56
0.00

0.00
0.00
607.38
0.00
15,184.60

M2

64

924.28

59,153.92

0.00

59,153.92

No.
No.
No.
No.
No.
No.
No.

328
122
31
82
16
13
20

341.000
144.000
31.000
81.000
16.000
13.000
19.000

198.06
198.06
264.08
198.06
396.12
2,640.80
1,584.48

64,963.68
24,163.32
8,186.48
16,240.92
6,337.92
34,330.40
31,689.60

67,538.46
28,520.64
8,186.48
16,042.86
6,337.92
34,330.40
30,105.12

2,574.78
4,357.32
0.00
198.06
0.00
0.00
1,584.48

No.
No.

12
2

11.000
2.000

396.12
7,262.20

4,753.44
14,524.40

4,357.32
14,524.40

396.12
0.00

1,063,885.04

1,040,617.99

23,267.05

Remarks

Wall and Column Guards


Rubber guards including aluminium
retainer as per detail 8 on drawing G-A902
and as per specification section 10265
01

Rubber guard 600 mm high

01
02
03
04

ALUMINUM LOUVERS
Aluminum Louvers panels including
insects mesh (where required) as per
drawing G-A802
Type L01
Type L02
Type L03
Type L04

05

Type L05

nowhere to found in design


drawing

ACCESS FLOORING
Proprietary raised floor system including
fixing, and all associated works as shown
on detail 12 on drawing G-A902 (carpet
tiles measured elsewhere) specification
section 10270
01

To suit required locations


SIGNAGE

01
02
03
04
05
06
07

01
02

Manufacturer's standard indoor signs,


letters and plaques including fixings,
finishes, accessories complete as per
interior design drawings MC04i901 to
MC04i927 and as per specification section
10431
Refer type S01
Refer type S02
Refer type S03
Refer type S04
Refer type S05
Refer type S06
Refer type S07
Manufacturer's standard indoor signs,
letters and plaques including fixings,
finishes, accessories complete as per
interior design drawings MC04i901 to
MC04i927 and as per specification section
10431
Refer type S09
Refer type S10
To Bill Summary

227158363.xls.ms_officeDiv 10

Page 2 of 61

nowhere to found in design


drawing

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount
RATE

Variance

BOQ

Tender
Drawing

Tender
Drawing

No.
No.
No.

11
5
9

11
8
9

3,301.00
1,452.44
9,903.00

36,311.00
7,262.20
89,127.00

36,311.00
11,619.52
89,127.00

0.00
4,357.32
0.00

No.
No.

8
8

9
9

1,584.48
2,904.88

12,675.84
23,239.04

14,260.32
26,143.92

1,584.48
2,904.88

No.
No.

6
0

0
3

1,320.40
-

7,922.40
-

7,922.40
0.00

M
M
No.

1
1
1

1
1
1

3,565.08
5,017.52
19,806.00

3,565.08
5,017.52
19,806.00

3,565.08
5,017.52
19,806.00

0.00
0.00
0.00

No.
No.
No.

1
1
1

1
1
1

3,736.73
2,376.72
8,318.52

3,736.73
2,376.72
8,318.52

3,736.73
2,376.72
8,318.52

0.00
0.00
0.00

No.
No.
No.
No.

1
1
1
1

1
1
1
2

4,555.38
2,838.86
16,967.14
1,056.32

4,555.38
2,838.86
16,967.14
1,056.32

4,555.38
2,838.86
16,967.14
2,112.64

0.00
0.00
0.00
1,056.32

No.

4,119.65

32,957.20

32,957.20

No.

0.00

277,732.95

246,756.35

30,976.60

BOQ

Remarks

DIVISION 11 -EQUIPMENT

01
02
03
04
05
06
New Item

01
02
03
04
05
06

01
02
03
04

01
New Item

FOOD SERVICE EQUIPMENT


Supply and installation of Tearoom and
cafeteria equipments as described on
drawing G-A501 and specification section
11400
Ref. 003, one bowl sink
Ref. 004, bottle type water cooler
Ref. 005, stainless steel refrigerator under
counter
Ref. 006, water boiler
Ref. 007, two hot plate electric range on
counter
Ref. 008, trash bin
Waste Receptacle
Supply and installation of Tearoom and
cafeteria equipments as described on
drawing G-A501 and specification section
11400
Ref. 102, stainless steel wall cabinet
Ref. 104, stainless steel base cabinet
Ref. 105, stainless steel cold salad bar with
preparation table
Ref, 106, juicer extractor
Ref. 107, juicer blender
Ref, 108, juicer squeezer
Supply and installation of Tearoom and
cafeteria equipments as described on
drawing G-A501 and specification section
11400
Ref, 111, toaster
Ref, 112, microwave oven
Ref. 113, coffee machine
Ref. 114, water boiler
PARKING CONTROL EQUIPMENT
Parking control equipment as per
specifications section 11150
Traffic control barrier with overall arm length
4000 mm
Traffic control barrier with overall arm length
3000 mm
To Bill Summary

227158363.xls.ms_officeDiv 11

Page 1 of 61

as per Design Drawing

BOQ length conflicts the


design drawing
as per design drawing

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount

BOQ

Tender
Drawing

0.00

1.00

RATE

Tender
Drawing

BOQ

Variance

Remarks

DIVISION 12 -FURNISHINGS
SUNDRIES
01

Plasma screen as per suppliers and approved


by client to suit college main hall /S-027

ITEM

79,224.00

To Bill Summary

227158363.xls.ms_officeDiv 12

Page 1 of 61

0.00

79,224.00

79,224.00

0.00

79,224.00

79,224.00

as per plan internal elevation


MC04-i401 with 23.556 sq.m.

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount
RATE

Remarks

Tender
Drawing

No.

752,628.00

1,505,256.00

1,505,256.00

0.00

No.

699,812.00

699,812.00

699,812.00

0.00

No.

752,628.00

2,257,884.00

752,628.00

1,505,256.00

as per Design Drawing

No.

779,036.00

2,337,108.00

779,036.00

1,558,072.00

as per Design Drawing

6,800,060.00

3,736,732.00

3,063,328.00

BOQ

Tender
Drawing

Variance

BOQ
DIVISION 14 -CONVEYING SYSTEM

01

01

01

02

ELEVATORS
Supply, installation, testing and
commissioning of electric traction
elevators complete including driving
mechanism, cars, hoistways, entrances,
rails guide rollers, buffers, signals,
indicating devices, control system, lighting
and wiring within elevator unit and all
accessories and spare parts required as
per specification section 14240 and
drawings
Ref. Elevator Nos. 2 & 3
Type:
1
Capacity:
1600 kg
Speed:
1.6 m/sec
No. of stops: (6)
Supply, installation, testing and
commissioning of electric traction
elevators complete including driving
mechanism, cars, hoistways, entrances,
rails guide rollers, buffers, signals,
indicating devices, control system, lighting
and wiring within elevator unit and all
accessories and spare parts required as
per specification section 14240 and
drawings
Ref. Elevator No. 1
Type:
1
Capacity:
1600 kg
Speed:
1.6 m/sec
No. of stops: (4)
Supply, installation, testing and
commissioning of electric traction
elevators complete including driving
mechanism, cars, hoistways, entrances,
rails guide rollers, buffers, signals,
indicating devices, control system, lighting
and wiring within elevator unit and all
accessories and spare parts required as
per specification section 14240 and
drawings
Ref. Elevator Nos. 4
Type:
3
Capacity:
1600 kg
Speed:
1.6 m/sec
No. of stops: (6)
Ref. Elevator Nos. 5
Type:
2
Capacity:
2000 kg
Speed:
1 m/sec
No. of stops: (6)
To Bill Summary

227158363.xls.ms_officeDiv 14

Page 1 of 61

1.3204

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY CAMPUS - ABHA
BOQ FOR COLLEGE OF COMPUTER SCIENCE -MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT
BOQ

Amount

Tender
Drawing

RATE

Variance

Tender
Drawing

BOQ

Remarks

DIVISION 15A - MECHANICAL

New Item

01
02
03

01

01
02
03

01
02

01
02
03
04
05
06
07

01
02
New Item
New Item

01
New Item

02
03

PLUMBING INSTALLATIONS
Sanitary wares and fixtures including
traps, spouts, valves and short lengths of
water supply pipes, all fittings,
accessories, trims and the like as on
drawing and as per specification section
15440
Ref. WC1, Floor mounted water closet with
flush tank (high Catergory)
Ref. WC2, Floor mounted water closet with
flush tank
Ref. WC3, Wall hung water closet with flush
valve
Ref. WC4, Cast iron eastern style water closet,
with flush valve
Sanitary wares and fixtures including
traps, spouts, valves and short lengths of
water supply pipes, all fittings,
accessories, trims and the like as on
drawing and as per specification section
15440
Ref. WCh, Wall hung water closet with flush
valve (for handicapped)
Sanitary wares and fixtures including
traps, spouts, valves and short lengths of
water supply pipes, all fittings,
accessories, trims and the like as on
drawing and as per specification section
15440
Ref. LAV1, Counter top lavatory
Ref. LAV2 wall hang lavatory
Ref. LAV2h, Wall hung lavatory for
handicapped
DRINKING WATER FOUNTAINS
Recessed wall mounted type medel 103 as
manufactured by Filtrine or equally
approved including satin finish push
button bubbler, removable access panel as
shown on drawing and specification
section 15441
Ref. DF, Drinking fountain
Package type chiller / purifier unit for
dedicated drinking water system model ES160
RFC by FILTRINE or equally approved rating
10 HP as per drawing and specifications

1
No.

No.

44

44

No.

50

50

No.

12

12

No.
No.

79
1

80
1

No.

12

13

No.

24

No.

4,119.65

4,119.65

(4,119.65)

4,119.65

4,119.65

4,119.65

3,802.75

167,321.00

3,168.96

158,448.00

3,948.00

47,376.00

2,614.39
2,535.17
2,506.12

206,536.81
2,535.17
30,073.44

209,151.20
2,535.17

(2,614.39)
-

32,579.56

(2,506.12)

28

4,016.66

96,399.84

112,466.48

(16,066.64)
-

63,379.20

63,379.20

63,379.20

167,321.00

158,448.00

47,376.00

DRAINAGE INSTALLATIONS
Supply, installation and test drainage pipe
work UPVC schedule 40, including fittings,
supports hangers, excavation and
backfilling, cast iron pipes on roof for vent
with caps as shown on drawings and as
per specifications section 15420
Piping Installation
200 mm dia
150 mm dia
100 mm dia
75 mm dia
50 mm dia
40 mm dia
32 mm dia
Supply, installation drainage piping
specialities including supports and fixation
as shown on drawings and as per
specification section 15420
50 mm dia floor drain
100 mm dia floor cleanout
150 mm dia floor cleanout

M
M
M
M
M
M
M

105
215
1980
730
1185
525
15

163.05
446.54
1507.73
748.82
1629.11
481.25
13.24

221.83
143.92
113.55
79.22
52.82
39.61
38.29

23,292.15
30,942.80
224,829.00
57,830.60
62,591.70
20,795.25
574.35

36,168.27
64,265.46
171,202.40
59,321.52
86,049.59
19,062.31
507.11

(12,876.12)
(33,322.66)
53,626.60
(1,490.92)
(23,457.89)
1,732.94
67.24

No.
No.
No.

88
1

92
15
7

99.03
171.65
171.65

8,714.64
171.65
-

9,110.76
2,574.75
1,201.55

(396.12)
(2,403.10)
(1,201.55)

200 mm dia floor cleanout

No.

231.07

231.07

(231.07)

Supply, installation drainage piping


specialities including supports and fixation
as shown on drawings and as per
specification section 15420
100 mm dia cleanout
50 mm dia cleanout

No.
No.

16

84
42

303.69
73.94

4,859.04
-

25,509.96
3,105.48

(20,650.92)
(3,105.48)

75 mm dia cleanout
150 mm dia cleanout
200 mm dia cleanout

No.
No.
No.

5
3

7
7
1

79.22
171.65
231.07

396.10
514.95
-

554.54
1,201.55
231.07

(158.44)
(686.60)
(231.07)

100 mm dia cleanout


75 mm dia floor cleanout
50 mm dia floor cleanout
100 mm dia cleanout
75 mm dia cleanout
Supply, installation drainage piping
specialities including supports and fixation
as shown on drawings and as per
specification section 15420
50 mm dia, air handling unit drain ref. AHUD

No.
No.
No.
No.
No.

91
22
57
2
1

113.55
79.22
73.94
303.69
79.22

10,333.05
1,742.84
4,214.58
607.38
79.22

396.10
73.94
-

10,333.05
1,346.74
4,140.64
607.38
79.22

No.
No.

26

30
35

1,214.77
99.03

31,584.02
-

36,443.10
3,466.05

(4,859.08)
(3,466.05)

No.

7,130.16

28,520.64

28,520.64

No.
No.
No.
No.

11

11
3
2
2

759.23

8,351.53

8,351.53

858.26
680.01

2,574.78
-

1,716.52
1,360.02

858.26
(1,360.02)

75 mm dia. Splash to day light


Roof drain (different sizes).
Funnel floor drain for indirect water

No.
No.
No.
No.

2
2
28
24

759.23
680.01
1,109.14
759.23

1,518.46
1,360.02
31,055.92
18,221.52

19,720.29
31,055.92
-

1,518.46
(18,360.27)
18,221.52

Scuffer Drain

No.

New Item

04
05
06
07
08

01
New Item

02

01
New Item

02
New Item

03
04
05
New Item

50 mm dia. Area drain


Trench drain complete with TDO as per detail
7 G-P005 including concrete trench etc.
Supply, installation drainage piping
specialities including supports and fixation
as shown on drawings and as per
specification section 15420
Vent stack thru roof (different sizes)
200 mm dia. Splash to day light
150 mm dia. Splash to day light

01
02
03
04
05
06

01
02

HOT WATER SUPPLY & RETURN


INSTALLATION
Supply, install and test pipework, CPVC
Schedule 80 for potable hot water,
including valves fittings, supports,
excavation & backfilling, insulation as
required as shown on drawings and as per
specifications sections 15100, 15250 &
15411
63 mm dia
50 mm dia

227158363.xls.ms_officeDiv 15A

29
28

Not Shown in the Design


Drawing

Shown in the Design


Drawing,Unit cost taken from
MC-06
Shown in the Design
Drawing, Unit cost taken from
MC-07 Part 1

Shown in the Design


Drawing,Unit cost taken from
MC-10

Shown in the Design


Drawing, Unit cost taken from
MC-07 Part 1
mentioned above

mentioned above
mentioned above

Shown in the Design


Drawing,Unit cost taken from
MC-10

100 mm dia. Splash to day light

COLD WATER INSTALLATION


Supply, installation and test pipe work
UPVC schedule 80 for potable cold water,
including valves, fittings and supports,
excavation and backfilling as required as
shown on drawings and as per
specifications sections 15100 & 15411
100 mm dia
75 mm dia
63 mm dia
Supply, installation and test pipe work
UPVC schedule 80 for potable cold water,
including valves, fittings and supports,
excavation and backfilling as required as
shown on drawings and as per
specifications sections 15100 & 15411
50 mm dia
40 mm dia
32 mm dia
25 mm dia
20 mm dia
15 mm dia

01
02
03

5
1

Shown in the Design


Drawing,Unit cost taken from
MC-10

M
M
M

125
105
50

97.11
84.19
49.34

174.29
142.60
130.72

21,786.25
14,973.00
6,536.00

16,925.30
12,005.49
6,449.20

4,860.95
2,967.51
86.80

M
M
M
M
M
M

260
80
80
140
1130
715

251.08
65.99
67.45
256.90
880.63
775.55

118.84
100.35
72.62
68.66
66.02
52.82

30,898.40
8,028.00
5,809.60
9,612.40
74,602.60
37,766.30

29,838.35
6,622.19
4,898.22
17,638.75
58,138.99
40,964.55

1,060.05
1,405.81
911.38
(8,026.35)
16,463.61
(3,198.25)

M
M

95
115

111.06
109.05

130.72
118.84

12,418.40
13,666.60

14,518.23
12,959.98

(2,099.83)
706.62

Shown in the design drawing,


no unit cost.
Shown in the Design
Drawing, Unit cost taken from
MC-10

No Description for this item.


No Unit Cost from BOQ
References

Page 2 of 61

1.3204

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY CAMPUS - ABHA
BOQ FOR COLLEGE OF COMPUTER SCIENCE -MALE (MC04)
Quantity
ITEM

03
04
05
06
07

DESCRIPTION
Supply, install and test pipework, CPVC
Schedule 80 for potable hot water,
including valves fittings, supports,
excavation & backfilling, insulation as
required as shown on drawings and as per
specifications sections 15100, 15250 &
15411
40 mm dia
32 mm dia
25 mm dia
20 mm dia
15 mm dia

Amount

UNIT

M
M
M
M
M

RATE

85
75
280
530
585

79.20
78.64
279.65
657.36
639.02

100.35
72.62
68.66
66.02
52.82

Variance

Remarks

8,529.75
5,446.50
19,224.80
34,990.60
30,899.70

7,947.72
5,710.55
19,200.77
43,399.11
33,752.93

582.03
(264.05)
24.03
(8,408.51)
(2,853.23)

HOT & COLD WATER INSTALLATION


Fittings and accessories as per drawing
and specification section 15100 & 15411
No.
New Item

01
02
03
04

05
06
07

10

897.87

8,978.70

(8,978.70)

No.
No.
No.
No.

20
14
13
56

8
16
2
48

713.02
228.43
198.06
132.04

14,260.40
3,198.02
2,574.78
7,394.24

5,704.16
3,654.88
396.12
6,337.92

8,556.24
(456.86)
2,178.66
1,056.32

No.
No.
No.
No.

13
17
24

14
17
26
57

99.03
6,602.00
76.58
242.95

1,287.39
112,234.00
1,837.92
-

1,386.42
112,234.00
1,991.08
13,848.15

(99.03)
(153.16)
(13,848.15)

SET

19,013.76

19,013.76

19,013.76

No.

47,534.40

95,068.80

95,068.80

M
M
M
M
M

210
365
1140
955
700

194.99
368.35
983.39
886.11
726.13

796.20
447.62
221.83
174.29
129.40

167,202.00
163,381.30
252,886.20
166,446.95
90,580.00

155,251.04
164,880.83
218,145.40
154,439.94
93,961.48

11,950.96
(1,499.53)
34,740.80
12,007.01
(3,381.48)

M
M
M
M

850
870
375
5885

691.21
763.95
323.25
6422.18

59.42
50.18
36.97
33.01

50,507.00
43,656.60
13,863.75
194,263.85

41,071.78
38,335.01
11,950.55
211,996.16

9,435.22
5,321.59
1,913.20
(17,732.31)

Supply & installation, 63 mm dia gate valve


Supply & installation, 50 mm dia gate valve
Supply & installation, 25 mm dia gate valve
Supply & installation 20 mm dia. Gate valve
Supply & installation 15 mm dia gate valve
Fittings and accessories as per drawing
and specification section 15100 & 15411
Hose bibb, bronz body, 15mm dia.
Janitor sink water mixer
Wall mounted faucet
15 mm Water Hammer Arrester

New Item

01

02

01
02
03
04
05

06
07
08
09
01
02
03
01

New Item

02

EQUIPMENT
Supply & installation hot water recirculating
pumps with time clock control including
valving and fittings within pump room (one
duty / one standby) capacity 3.5 m/hr at 15m
head as detailed on drawings and as per
specification section 15510
Supply & installation heat exchanger capacity
1500 liters, 96KW thermal rating (each)
including valving and short length piping work
within room equipment as detailed on
drawings and as per specifications section
15411
FIRE PROTECTION SYSTEM
Supply, installation and test pipework,
galvanized steel schedule 40 to ASTM A53
welded including fittings, supports,
excavation and backfilling as shown on
drawings and as per specification section
15300
200 mm dia
150 mm dia
100 mm dia
75 mm dia
63 mm dia
Supply, installation and test pipework,
galvanized steel schedule 40 to ASTM A53
welded including fittings, supports,
excavation and backfilling as shown on
drawings and as per specification section
15300
50 mm dia
40 mm dia
32 mm dia
25 mm dia
Accessories
Supply and install 100 mm dia gate valve with
supervisory switch
Supply and install fire department valve 100
mm dia ref. (FDV)
Test pipe
Accessories
Supply and install floor control valve assembly
150 mm dia
Supply and install floor control valve assembly
100 mm dia

No.

2,824.34

14,121.70

14,121.70

No.

29

29

2,429.54

70,456.66

70,456.66

No.

23

23

396.12

9,110.76

9,110.76

No.

10

2,944.49

8,833.47

29,444.90

2,947.13

2,947.13

3,492.46

27,939.68

No.

Supply and install sprinkler heads,

No.

(2,947.13)
27,939.68

Sprinkler heads, pendent

No.

1,790

47.53

85,078.70

(85,078.70)

03

Sprinkler heads, upright

No.

1,801

461

47.53

85,601.53

21,911.33

63,690.20

04

Sprinkler heads, side wall type

No.

510

30.37

15,488.70

No.

47

46

4,024.58

189,155.26

185,130.68

No.
No.

25
37

25
37

285.21
396.12

7,130.25
14,656.44

7,130.25
14,656.44

M
M

45
35

40.00
41.27

130.72
118.84

5,882.40
4,159.40

5,228.80
4,904.37

653.60
(744.97)

No.
No.

8
4

9
4

89,589.14
6,377.53

716,713.12
25,510.12

806,302.26
25,510.12

(89,589.14)
-

No.
No.
No.
No.
No.

4
4
4
10
10

4
4
4
10
10

713.02
835.81
592.86
1,366.61
759.23

2,852.08
3,343.24
2,371.44
13,666.10
7,592.30

2,852.08
3,343.24
2,371.44
13,666.10
7,592.30

No.

171,652.00

171,652.00

171,652.00

05

01
02

01
02

01
02
01
02
03
04
05

06

Proprietary integrated fire hose reel and


fire extinguisher, cabinet including fire
extinguisher, hose reel nozzle, fixing,
isolating valve, 63mm dia. and trims as
detailed on drawings and specifications
Ref. FHC
Supply and install portable fire
extinguisher, multipurpose including fixing
as per specifications section 15300
Ref. PFE
Ref CO2
FM 200 SYSTEM (For 6 location)
Supply install and test pipework,
galvanized steel schedule 80 to ASTM A53
welded for FM200 including fittings,
supports, excavation and back filling as
shown on drawings and as per
specification section 15300
63 mm dia.
50 mm dia.
FM 200 SYSTEM (For 4 location)
Supply install and test pipework,
galvanized steel schedule 80 to ASTM A53
welded for FM200 including fittings,
supports, excavation and back filling as
shown on drawings and as per
specification section 15300
FM 200 cylinders
Control panel
FM 200 SYSTEM (For 6 location)
Remote manual release
Abort switch
Alarm bell
4-port nozzle
Ionization detector
Allow for underground fiberglass diesel
fuel storage tank with required capacity
including concrete anti-flotation pad, heavy
duty traffic type manhole ring and cover,
pipework, valves duplex diesel fuel
transfer pumps, steel ladder, pea gravel
bed, earthworks, fixings and accessories
all as detailed on drawings
Proprietary tank units
To Bill Summary

227158363.xls.ms_officeDiv 15A

4,482,947.81 4,581,805.55

Shown in Design
Drawing,Unit Cost taken from
MD-01

(20,611.43)

New Item

Shown in Design
Drawing,Unit Cost taken from
MC-10

15,488.70

Shown in the design drawing


and unit cost taken from MC10
Can't be consider as pendent
sprinkler heads because of
unit cost.
As per Design Drawing take
Off, Unit Cost taken from MC10
The unit Cost of this item as
per BOQ
The unit Cost of this item as
per BOQ

4,024.58

(98,857.74)

Page 3 of 61

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY CAMPUS - ABHA
BOQ FOR COLLEGE OF COMPUTER SCIENCE -MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount

BOQ

Tender
Drawing

M
M
M
M
M

70
10
15
40
25

45.53
2.26
10.90
44.71
11.40

M
M
M
M
M
M

110
125
135
365
150
120

M
M
M
M
M

Unit Rate

Variance

Remarks

BOQ

Tender
Drawing

34.33
40.93
51.50
64.70
75.26

2,403.10
409.30
772.50
2,588.00
1,881.50

1,562.96
92.65
561.12
2,892.78
857.96

840.14
316.65
211.38
(304.78)
1,023.54

115.59
106.28
160.16
288.13
140.61
105.11

93.75
151.85
186.18
225.79
433.09
691.89

10,312.50
18,981.25
25,134.30
82,413.35
64,963.50
83,026.80

10,836.95
16,137.96
29,819.38
65,056.30
60,897.86
72,721.79

(524.45)
2,843.29
(4,685.08)
17,357.05
4,065.64
10,305.01

15
45
220
90
320

9.99
53.28
192.28
67.54
326.07

40.93
51.50
64.70
75.26
93.75

613.95
2,317.50
14,234.00
6,773.40
30,000.00

408.73
2,743.83
12,440.26
5,083.16
30,568.63

205.22
(426.33)
1,793.74
1,690.24
(568.63)

M
M
M

80
185
120

2.74
140.65
121.84

151.85
186.18
225.79

12,148.00
34,443.30
27,094.80

415.73
26,187.09
27,510.80

11,732.27
8,256.21
(416.00)

NO.
NO.
NO.
NO.

10
10
2
2

10
10
0
2

2,535.17
713.02
237.67
2,852.06

25,351.70
7,130.20
475.34
5,704.12

25,351.70
7,130.20
0.00
5,704.12

0.00
0.00
475.34
0.00

NO.

44,365.44

133,096.32

133,096.32

0.00

NO.

28,520.64

85,561.92

85,561.92

0.00

Hot water Air Separator Tank c/w accessories

NO.

15,844.80

0.00

15,844.80

(15,844.80)

Verify if included in SHWP as


per package, capacity not
specified, Unit rate is for
reference purposes only

Hot water Expansion Tank c/w accessories

NO.

30,369.20

0.00

30,369.20

(30,369.20)

Verify if included in SHWP as


per package, capacity not
specified, Unit rate is for
reference purposes only

NO.

22,182.72

44,365.44

44,365.44

0.00

NO.

79,224.00

79,224.00

79,224.00

0.00

NO.

71,301.60

71,301.60

71,301.60

0.00

NO.

90,315.36

90,315.36

90,315.36

0.00

NO.

129,927.36

129,927.36

129,927.36

0.00

NO.

123,589.44

123,589.44

123,589.44

0.00

NO.

55,456.80

55,456.80

55,456.80

0.00

NO.

117,251.52

117,251.52

117,251.52

0.00

NO.

141,018.72

141,018.72

141,018.72

0.00

NO.

139,434.24

139,434.24

139,434.24

0.00

NO.

125,173.92

125,173.92

125,173.92

0.00

NO.

117,251.52

117,251.52

117,251.52

0.00

NO.

74,470.56

74,470.56

74,470.56

0.00

NO.

137,849.76

137,849.76

137,849.76

0.00

NO.

107,744.64

107,744.64

107,744.64

0.00

NO.

129,927.36

129,927.36

129,927.36

0.00

NO.

115,667.04

115,667.04

115,667.04

0.00

NO.

117,251.52

117,251.52

117,251.52

0.00

DIVISION 15B - MECHANICAL

01
02
03
04
05
01
02
03
04
05
06
01
02
03
04
05
01
02
03
02
05
08
10

1
2

3
01
02
01
02
01
02
01
02
01
02
01
02
01
01
01
02
01

HVAC INSTALLATIONS
CHILLED WATER SYSTEM
Black steel pipework
15 mm dia
20 mm dia.
25 mm dia.
32 mm dia.
40 mm dia.
Black steel pipework
50 mm dia.
65 mm dia.
80 mm dia.
100 mm dia.
150 mm dia.
200 mm dia.
Black steel pipework
20 mm dia.
25 mm dia.
32 mm dia.
40 mm dia.
50 mm dia.
Black steel pipework
65 mm dia.
80 mm dia.
100 mm dia.
Valving accessories
100 mm dia. Gate valve
50 mm dia. Gate valve
25 mm dia. Gate valve
Reinforced concrete valve box
Chilled/ hot water pumps unit
TCWP-01 to 03, 30.49 LPS capacity at 35 m
TDH
SHWP-01 & 02, 5.17 LPS capacity at 35 m
TDH

Heat Exchanger
HEX-01,02 324.1 KW capacity
Air handling units
AHU-01, 41.9 KW cooling capacity,16 KW
heating capacity
AHU-02, 19.7 KW cooling capacity,
AHU-03, 55.6 KW cooling capacity 19.6KW
heating capacity
AHU-04, 99.6 KW cooling capacity, 32KW
heating capacity
AHU-05, 90.6KW cooling capacity,45.1KW
heating capacity
AHU-06, 11.5 KW cooling capacity,61 KW
heating capacity
AHU-07, 82.9KW cooling capacity, 28 KW
heating capacity
AHU-08, 111.5 KW cooling capacity, 34.7KW
heating capacity
AHU-09 108.2 KW cooling capacity, 40.8 KW
heating capacity
AHU-10 93.6 KW cooling capacity, 31.2 KW
heating capacity
AHU-11 71 KW cooling capacity, 28.6 KW
heating capacity
AHU-12 36 KW cooling capacity, 12 KW
heating capacity
AHU-13 103.7 KW cooling capacity, 45.7 KW
heating capacity
AHU-14 70.7 KW cooling capacity
AHU-15 100.7 KW cooling capacity, 28 KW
heating capacity
AHU-16 80.7KW cooling capacity 28.6 KW
heating capacity
AHU-17 84.2 KW cooling capacity, 28.4 KW
heating capacity

02
01
02
01
02
01
02
01
02
03
01
02
03

03
04
01
02
03
04
05
06
07
08
01
02
03
04
05
06
07
01
02
03
04
05
06
01
02
03
04
05
06
07
01
02
03
04
05
06
07
08
01
02
03
04
05
06
07
08
09
01
02
03
04
05
new item
new item

AHU-18 119.6 KW cooling capacity, 51.5 KW


heating capacity
AHU-19 26 KW cooling capacity
AHU-20 101.1 KW cooling capacity, 28.5 KW
heating capacity
AHU-21 59.7 KW cooling capacity, 32.4 KW
heating capacity
AHU-22 68.8 KW cooling capacity, 25.3 KW
heating capacity
AHU-23 93.6 KW cooling capacity, 35.3 KW
heating capacity
AHU-24 133.7 KW cooling capacity, 56.7 KW
heating capacity
AHU-25 54 KW cooling capacity,
AHU-26 56 KW cooling capacity,
Electric steam humidifers
SH-01 27 Kg steam/Hr
Fan coil units ducted type
FCU-01, 0.7 KW cooling capacity 2KW
heating capacits
FCU-02, 0.6 KW cooling capacity
FCU-03, 0.6 KW cooling capacity 2KW
heating capacits
Mini split type air conditiong
FCU-04/ACCU-01, 1.7 kw capacity 2KW
heating capacity
FCU-05/ACCU-02, 1.7 kw capacity
Ventilating fans
EF-1, 80 LPS capacity
EF-2, 280 LPS capacity
EF-3, 200 LPS capacity
EF-4, 425 LPS capacity
EF-5, 850 LPS capacity
EF-6, 220 LPS capacity
EF-7, 50 LPS capacity
EF-8, 50 LPS capacity
Ventilating fans
EF-9, 900 LPS capacity
EF-10, 870 LPS capacity
EF-11, 820 LPS capacity
EF-12, 120 LPS capacity
EF-13, 120 LPS capacity
EF-14, 990 LPS capacity
EF-15, 750 LPS capacity
Ventilating fans
EF-16 30 LPS capacity
EF-17 100 LPS capacity
EF-18 315 LPS capacity
EF-19 430 LPS capacity
EF-20 105 LPS capacity
EF-21 170 LPS capacity
Ventilating fans
SMEF-01 3140 LPS capacity
SMEF-02 4480 LPS capacity
SMEF-03&04 5400 LPS capacity
SMEF-05 6000 LPS capacity
SMEF-06 10000 LPS capacity
SPF-01-06 1400 LPS capacity
SPF-02 2100 LPS capacity
Fire dampers
6501300 mm
650900 mm
6001600 mm
6001100 mm
6001000 mm
600600 mm
5501100 mm
5501000 mm
Fire dampers
5001200 mm
500950 mm
500800 mm
500700 mm
500650 mm
450550 mm
400850 mm
400700 mm
400500 mm
Fire dampers
350400 mm
300400 mm
300300 mm
150150 mm
100300 mm
Fire dampers
1000500mm
1200600mm

NO.

148,941.12

148,941.12

148,941.12

0.00

NO.

63,379.20

63,379.20

63,379.20

0.00

NO.

131,511.84

131,511.84

131,511.84

0.00

NO.

95,068.80

95,068.80

95,068.80

0.00

NO.

106,160.16

106,160.16

106,160.16

0.00

NO.

125,173.92

125,173.92

125,173.92

0.00

NO.

161,616.96

161,616.96

161,616.96

0.00

NO.
NO.

1
1

1
1

88,730.88
90,315.36

88,730.88
90,315.36

88,730.88
90,315.36

0.00
0.00

NO.

28,520.64

28,520.64

28,520.64

0.00

NO.

18,221.52

54,664.56

72,886.08

(18,221.52)

NO.

18,221.52

18,221.52

18,221.52

0.00

NO.

18,221.52

18,221.52

18,221.52

0.00

NO.

11,408.26

34,224.78

22,816.52

11,408.26

NO.

30,105.12

30,105.12

30,105.12

0.00

NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.

3
1
1
1
1
1
1
1

3
1
1
2
1
1
1
1

1,901.38
3,755.22
2,677.77
5,704.13
11,223.40
2,955.06
1,901.38
1,901.38

5,704.14
3,755.22
2,677.77
5,704.13
11,223.40
2,955.06
1,901.38
1,901.38

5,704.14
3,755.22
2,677.77
11,408.26
11,223.40
2,955.06
1,901.38
1,901.38

0.00
0.00
0.00
(5,704.13)
0.00
0.00
0.00
0.00

NO.
NO.
NO.
NO.
NO.
NO.
NO.

1
1
1
1
2
1
1

1
1
1
1
1
1
1

12,089.58
11,677.62
11,012.14
1,901.38
1,901.38
13,293.79
10,077.29

12,089.58
11,677.62
11,012.14
1,901.38
3,802.76
13,293.79
10,077.29

12,089.58
11,677.62
11,012.14
1,901.38
1,901.38
13,293.79
10,077.29

0.00
0.00
0.00
0.00
1,901.38
0.00
0.00

NO.
NO.
NO.
NO.
NO.
NO.

1
1
1
1
2
1

1
1
1
1
1
1

1,901.38
1,901.38
4,230.56
5,767.51
1,901.38
2,281.65

1,901.38
1,901.38
4,230.56
5,767.51
3,802.76
2,281.65

1,901.38
1,901.38
4,230.56
5,767.51
1,901.38
2,281.65

0.00
0.00
0.00
0.00
1,901.38
0.00

NO.
NO.
NO.
NO.
NO.
NO.
NO.

1
1
2
1
1
1
2

1
1
2
1
1
1
2

38,872.58
60,194.40
72,410.74
80,618.34
133,096.32
17,297.24
34,858.56

38,872.58
60,194.40
144,821.48
80,618.34
133,096.32
17,297.24
69,717.12

38,872.58
60,194.40
144,821.48
80,618.34
133,096.32
17,297.24
69,717.12

0.00
0.00
0.00
0.00
0.00
0.00
0.00

NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.

6
2
2
2
2
2
3
8

6
0
2
0
2
0
3
3

617.95
332.74
1,441.88
998.22
876.75
546.65
1,045.76
835.81

3,707.70
665.48
2,883.76
1,996.44
1,753.50
1,093.30
3,137.28
6,686.48

3,707.70
0.00
2,883.76
0.00
1,753.50
0.00
3,137.28
2,507.43

0.00
665.48
0.00
1,996.44
0.00
1,093.30
0.00
4,179.05

NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.

2
10
10
5
7
4
4
2
7

1
5
2
8
3
0
0
1
3

998.22
237.67
207.30
269.36
538.72
158.45
269.36
258.80
565.13

1,996.44
2,376.70
2,073.00
1,346.80
3,771.04
633.80
1,077.44
517.60
3,955.91

998.22
1,188.35
414.60
2,154.88
1,616.16
0.00
0.00
258.80
1,695.39

998.22
1,188.35
1,658.40
(808.08)
2,154.88
633.80
1,077.44
258.80
2,260.52

NO.
NO.
NO.
NO.
NO.

2
10
28
2
16

2
3
8
4
0

448.94
485.91
394.80
229.75
301.05

897.88
4,859.10
11,054.40
459.50
4,816.80

897.88
1,457.73
3,158.40
919.00
0.00

0.00
3,401.37
7,896.00
(459.50)
4,816.80

NO.
NO.

0
0

8
2

759.23
1061.6

0
0

6,073.84
2,123.20

(6,073.84)
(2,123.20)

1 unit wall mounted

Not mention at B.O.Q


Not mention at B.O.Q

new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item

new item
new item
new item

01
02
03
04
05
06
07
08
01
02
03
04
05
06
07
08
09
01
02
03
04
05
06
07
08
09
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item
new item

1300550mm
1100500mm
900500mm
850550mm
850500mm
750500mm
600500mm
600450mm
500450mm
500300mm
400400mm
450300mm
300250mm
350300mm
350350mm
150100mm
100100mm

NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

2
2
3
2
2
2
1
1
3
3
1
2
7
4
3
15
5

1225.33
950.7
683.97
911.7325
650.96
862.88
683.97
444.97
371.03
495.15
425.17
485.91
485.36
485.91
501.75
277.28
184.66

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

2,450.67
1,901.40
2,051.91
1,823.47
1,301.92
1,725.76
683.97
444.97
1,113.09
1,485.45
425.17
971.82
3,397.52
1,943.64
1,505.25
4,159.20
923.30

(2,450.67)
(1,901.40)
(2,051.91)
(1,823.47)
(1,301.92)
(1,725.76)
(683.97)
(444.97)
(1,113.09)
(1,485.45)
(425.17)
(971.82)
(3,397.52)
(1,943.64)
(1,505.25)
(4,159.20)
(923.30)

2000x1000mm

NO.

25

1853.84

46,346.00

(46,346.00)

850x600mm
600x400mm
500x350mm
Bellmouth opening
500700mm
500600mm
4501400mm
450600mm
450500mm
4001300mm
450950 mm
400450 mm
Bellmouth opening
400400 mm
3501200mm
3501100mm
350800mm
350550mm
300900mm
300750mm
300650mm
300350mm
Bellmouth opening
250550mm
250450mm
250250mm
200350mm
200300mm
200200mm
150450mm
150350mm
150150mm
Bellmouth opening
1200400mm
1400400mm
1000350mm
1000400mm
1200450mm
1100400mm
1300500mm
950350mm
900350mm
900400mm
950400mm
850350mm
850300mm
800400mm
800300mm
700400mm
700350mm
750350mm
700300mm
600300mm
600350mm
600250mm
650350mm
650500mm
500300mm
500250mm
500150mm
550300mm
500200mm
400250mm
400200mm
450300mm
400150mm
450200mm

NO.
NO.
NO.

0
0
0

1
2
1

657.56
637.75
537.4

0
0
0

657.56
1,275.50
537.40

(657.56)
(1,275.50)
(537.40)

NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.

4
1
3
1
4
3
8
1

1
0
2
2
1
3
0
1

192.78
174.29
298.41
174.29
166.37
174.29
237.67
532.12

771.12
174.29
895.23
174.29
665.48
522.87
1,901.36
532.12

192.78
0.00
596.82
348.58
166.37
522.87
0.00
532.12

578.34
174.29
298.41
(174.29)
499.11
0.00
1,901.36
0.00

8
3
4
10
10
3
15
21
3

1
1
2
4
1
1
5
2
1

505.71
262.76
294.45
184.86
142.60
213.90
166.37
151.85
110.91

4,045.68
788.28
1,177.80
1,848.60
1,426.00
641.70
2,495.55
3,188.85
332.73

505.71
262.76
588.90
739.44
142.60
213.90
831.85
303.70
110.91

3,539.97
525.52
588.90
1,109.16
1,283.40
427.80
1,663.70
2,885.15
221.82

23
32
21
20
4
20
3
6
1

9
7
8
3
14
12
0
2
1

150.53
134.68
92.43
92.43
88.47
79.22
126.76
93.75
102.99

3,462.19
4,309.76
1,941.03
1,848.60
353.88
1,584.40
380.28
562.50
102.99

1,354.77
942.76
739.44
277.29
1,238.58
950.64
0.00
187.50
102.99

2,107.42
3,367.00
1,201.59
1,571.31
(884.70)
633.76
380.28
375.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

2
1
2
1
1
1
1
1
2
4
1
6
3
1
1
2
4
4
4
14
1
3
1
1
11
11
1
5
1
16
7
5
2
5

401.40
464.84
247.41
1,099.89
451.58
1,209.89
217.72
388.24
213.90
285.10
211.31
196.37
161.53
211.20
156.69
154.35
135.13
108.79
159.11
144.59
151.05
158.46
159.50
183.54
131.38
142.61
143.27
137.33
104.31
126.76
96.39
124.56
110.26
100.33

802.80
464.84
494.82
1,099.89
451.58
1,209.89
217.72
388.24
427.80
1,140.42
211.31
1,178.19
484.59
211.20
156.69
308.69
540.52
435.17
636.44
2,024.26
151.05
475.37
159.50
183.54
1,445.18
1,568.66
143.27
686.65
104.31
2,028.08
674.73
622.78
220.51
501.65

(802.80)
(464.84)
(494.82)
(1,099.89)
(451.58)
(1,209.89)
(217.72)
(388.24)
(427.80)
(1,140.42)
(211.31)
(1,178.19)
(484.59)
(211.20)
(156.69)
(308.69)
(540.52)
(435.17)
(636.44)
(2,024.26)
(151.05)
(475.37)
(159.50)
(183.54)
(1,445.18)
(1,568.66)
(143.27)
(686.65)
(104.31)
(2,028.08)
(674.73)
(622.78)
(220.51)
(501.65)

NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.

Not mention at B.O.Q


Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Assuming that the size
of the damper is equal
to the size of the louver
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q

Not mention at B.O.Q


Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q

new item
new item
new item
new item
new item
new item
new item
new item

01
02

01
02
03
04
01
02
03
04
05
01
02
03
04
05
01
02
03
04
05
06
01
02
03
04
05
06
07
01
02
03
04
05
06
07

01
02
03
01
02
03
04
05
06
01
02
03
04
05
06
07
08
01
02
03
04
05
06
01
02
03
04
05

450350mm
400300mm
350250mm
300150mm
250200mm
250150mm
150100mm
400x350mm
Bellmouth opening
150x200 mm
Generator exhaust louver including exhaust
duct
Variable air volume
Box no 1, 55-170 lps capacity
VAV-01
VAV-01A
VAV-01B
VAV-01C
Box no 2, 171-225 lps capacity
VAV-02
VAV-02A
VAV-02B
VAV-02C
VAV-02D
Box no 3, 226-280 lps capacity
VAV-03
VAV-03A
VAV-03B
VAV-03C
VAV-03D
Box no 4, 281-425 lps capacity
VAV-04
VAV-04A
VAV-04B
VAV-04C
VAV-04D
VAV-04E
Box no 5,426-565 lps capacity
VAV-05
VAV-05A
VAV-05B
VAV-05C
VAV-05D
VAV-05E
VAV-05F
Box no 6 ,566-1130 lps capacity
VAV-06
VAV-06B
VAV-06C
VAV-06D
VAV-06E
VAV-06F
VAV-06K
Variable air volume
Box no 7,1131-1415 lps capacity
VAV-07
VAV-07E
VAV-07C
Sound attenuator units
SA-1S
SA-1R
SA-2S
SA-2R
SA-3S
SA-3R
Sound attenuator units
SA-4S
SA-4R
SA-5S
SA-5R
SA-6S
SA-6R
SA-7S
SA-7R
Sound attenuator units
SA-8S
SA-8R
SA-9S
SA-9R
SA-10S
SA-10R
Sound attenuator units
SA-11S
SA-11R
SA-12S
SA-12R
SA-13S

NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.

0
0
0
0
0
0
0
0

1
1
10
5
13
4
2
1

125.70
117.73
113.56
96.06
83.85
74.60
95.07
479.30

13

15

85.83

NO.

NO.
NO.
NO.
NO.

12
8
13
2

7
6
13
2

NO.
NO.
NO.
NO.
NO.

4
1
6
7
1

NO.
NO.
NO.
NO.
NO.

125.70
117.73
1,135.55
480.30
1,089.99
298.38
190.14
479.30

(125.70)
(117.73)
(1,135.55)
(480.30)
(1,089.99)
(298.38)
(190.14)
(479.30)

1,115.79

1,287.45

(171.66)

39,612.00

39,612.00

0.00

3,881.98
3,881.98
3,881.98
3,881.98

46,583.76
31,055.84
50,465.74
7,763.96

27,173.86
23,291.88
50,465.74
7,763.96

19,409.90
7,763.96
0.00
0.00

4
1
6
7
1

3,850.29
3,850.29
3,850.29
3,850.29
3,850.29

15,401.16
3,850.29
23,101.74
26,952.03
3,850.29

15,401.16
3,850.29
23,101.74
26,952.03
3,850.29

0.00
0.00
0.00
0.00
0.00

4
4
19
14
1

4
4
20
14
1

4,167.18
4,167.18
4,167.18
4,167.18
4,167.18

16,668.72
16,668.72
79,176.42
58,340.52
4,167.18

16,668.72
16,668.72
83,343.60
58,340.52
4,167.18

0.00
0.00
(4,167.18)
0.00
0.00

NO.
NO.
NO.
NO.
NO.
NO.

11
2
24
16
3
2

11
2
24
15
3
2

4,167.18
4,167.18
4,167.18
4,167.18
4,167.18
4,167.18

45,838.98
8,334.36
100,012.32
66,674.88
12,501.54
8,334.36

45,838.98
8,334.36
100,012.32
62,507.70
12,501.54
8,334.36

0.00
0.00
0.00
4,167.18
0.00
0.00

NO.
NO.
NO.
NO.
NO.
NO.
NO.

3
1
11
5
2
3
1

3
1
11
6
2
3
1

4,278.10
4,278.10
4,278.10
4,278.10
4,278.10
4,278.10
4,278.10

12,834.30
4,278.10
47,059.10
21,390.50
8,556.20
12,834.30
4,278.10

12,834.30
4,278.10
47,059.10
25,668.60
8,556.20
12,834.30
4,278.10

0.00
0.00
0.00
(4,278.10)
0.00
0.00
0.00

NO.
NO.
NO.
NO.
NO.
NO.
NO.

20
9
13
8
6
1
4

19
9
13
8
6
1
4

4,848.51
4,848.51
4,848.51
4,848.51
4,848.51
4,848.51
4,848.51

96,970.20
43,636.59
63,030.63
38,788.08
29,091.06
4,848.51
19,394.04

92,121.69
43,636.59
63,030.63
38,788.08
29,091.06
4,848.51
19,394.04

4,848.51
0.00
0.00
0.00
0.00
0.00
0.00

NO.
NO.
NO.

5
1
2

5
1
2

5,006.96
5,006.96
5,006.96

25,034.80
5,006.96
10,013.92

25,034.80
5,006.96
10,013.92

0.00
0.00
0.00

NO.
NO.
NO.
NO.
NO.
NO.

1
1
1
1
1
1

1
1
1
1
1
1

4,278.10
4,278.10
4,246.41
4,246.41
5,704.13
5,704.13

4,278.10
4,278.10
4,246.41
4,246.41
5,704.13
5,704.13

4,278.10
4,278.10
4,246.41
4,246.41
5,704.13
5,704.13

0.00
0.00
0.00
0.00
0.00
0.00

NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.

1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1

4,769.28
4,769.28
6,866.08
6,866.08
3,184.80
3,184.80
5,181.25
5,181.25

4,769.28
4,769.28
6,866.08
6,866.08
3,184.80
3,184.80
5,181.25
5,181.25

4,769.28
4,769.28
6,866.08
6,866.08
3,184.80
3,184.80
5,181.25
5,181.25

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

NO.
NO.
NO.
NO.
NO.
NO.

1
1
1
1
1
1

1
1
1
1
1
1

5,149.56
5,149.56
4,119.65
4,131.53
5,070.34
5,070.34

5,149.56
5,149.56
4,119.65
4,131.53
5,070.34
5,070.34

5,149.56
5,149.56
4,119.65
4,131.53
5,070.34
5,070.34

0.00
0.00
0.00
0.00
0.00
0.00

NO.
NO.
NO.
NO.
NO.

1
1
1
1
1

1
1
1
1
1

4,721.75
4,721.75
4,254.33
4,254.33
3,184.80

4,721.75
4,721.75
4,254.33
4,254.33
3,184.80

4,721.75
4,721.75
4,254.33
4,254.33
3,184.80

0.00
0.00
0.00
0.00
0.00

39,612.00

Not mention at B.O.Q


Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q
Not mention at B.O.Q

06
07
08
01
02
03
04
05
06
07
08
01
02
03
04
05
06
07
08
01
02
03
04
05
06
07
08

new item

01

02

03

04

SA-13R
SA-14S
SA-14R
Sound attenuator units
SA-15S
SA-15R
SA-16S
SA-16R
SA-17S
SA-17R
SA-18S
SA-18R
Sound attenuator units
SA-19S
SA-19R
SA-20S
SA-20R
SA-21S
SA-21R
SA-22S
SA-22R
Sound attenuator units
SA-23S
SA-23R
SA-24S
SA-24R
SA-25S
SA-25R
SA-26S
SA-26R
Galvanized steel sheet rectangular ductwork

18 gauge

20 gauge

22 gauge

24 gauge

26 gauge

NO.
NO.
NO.

1
1
1

1
1
1

3,184.80
3,541.31
3,541.31

3,184.80
3,541.31
3,541.31

3,184.80
3,541.31
3,541.31

0.00
0.00
0.00

NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.

1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1

3,541.31
3,541.31
3,129.35
3,129.35
3,129.35
3,129.35
7,043.01
7,043.01

3,541.31
3,541.31
3,129.35
3,129.35
3,129.35
3,129.35
7,043.01
7,043.01

3,541.31
3,541.31
3,129.35
3,129.35
3,129.35
3,129.35
7,043.01
7,043.01

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.

1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1

7,272.76
7,272.76
3,184.80
3,184.80
2,091.51
2,091.51
2,091.51
2,091.51

7,272.76
7,272.76
3,184.80
3,184.80
2,091.51
2,091.51
2,091.51
2,091.51

7,272.76
7,272.76
3,184.80
3,184.80
2,091.51
2,091.51
2,091.51
2,091.51

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

NO.
NO.
NO.
NO.
NO.
NO.
NO.
NO.

1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1

1,901.38
1,901.38
1,901.38
1,901.38
1,901.38
1,901.38
4,254.33
4,254.33

1,901.38
1,901.38
1,901.38
1,901.38
1,901.38
1,901.38
4,254.33
4,254.33

1,901.38
1,901.38
1,901.38
1,901.38
1,901.38
1,901.38
4,254.33
4,254.33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

KG

KG

KG

KG

13000

6000

19000

1564.89

25632.77

41187.71

20528.39

165.05

171.65

178.25

184.86

0.00

2,231,450.00

1,069,500.00

3,512,340.00

258,284.31

4,399,864.54

7,341,709.45

3,794,879.00

(258,284.31)

Refer to Table-1 G-M002,


constructional
requirements duct longer
size from 1500mm to
2250mm at 1.2mm nominal
thickness, is equivalent to
gauge 18

(2,168,414.54)

Refer to Table-1 G-M002,


constructional
requirements duct longer
size from 1000mm to
15000mm at 1.2 nominal
thickness, is equivalent to
gauge 20

(6,272,209.45)

Refer to Table-1 G-M002,


constructional
requirements duct longer
size from 600mm to
1000mm at 0.8mm nominal
thickness, is equivalent to
gauge 22

(282,539.00)

Refer to Table-1 G-M002,


constructional
requirements duct longer
size from 400mm to
600mm at 0.6mm nominal
thickness, is equivalent to
gauge 24
Refer to Table-1 G-M002,
constructional
requirements duct longer
size up to 400mm at
0.6mm nominal thickness,
is equivalent to gauge 26

KG

8000

16426.39

191.46

1,531,680.00

3,144,996.27

(1,613,316.27)

Galvanized steel sheet round ductwork


new item

26 gauge

KG

8786.51

191.46

0.00

1,682,265.72

(1,682,265.72)

new item

24 gauge

KG

2034.29

184.86

0.00

376,059.48

(376,059.48)

8500

16,040.26

190.14

1,616,190.00

3,049,894.22

(1,433,704.22)

2,348.59

190.14

0.00

446,560.74

(446,560.74)

NO.
NO.
NO.
NO.
NO.

68
103
150
272
95

70
91
146
271
96

1,449.80
1,505.26
1,530.34
1,565.99
1,558.07

98,586.40
155,041.78
229,551.00
425,949.28
148,016.65

101,486.00
136,978.66
223,429.64
424,383.29
149,574.72

(2,899.60)
18,063.12
6,121.36
1,565.99
(1,558.07)

NO.
NO.

14
4

11
4

1,558.07
1,222.69

21,812.98
4,890.76

17,138.77
4,890.76

4,674.21
0.00

NO.

1,220.05

6,100.25

6,100.25

0.00

05
NEW
ITEM
01
02
03
04
05
01
02
01

Duct insulation
2
Thermal semi-rigid insulation to rectangular ductwork
M
Thermal semi-rigid insulation to round ductwork
Supply air square ceiling diffusers
SD1A, B, C, D, E
SD2A, B, C, D & E
SD3A, B, C, D & E
SD4A, B, C, D & E
SD5A, B, C, D & E
Supply air square ceiling diffusers
SD6, B, C, D, E
SD7&A,B,C,D
Supply air round ceiling diffusers
SD1

Same price as rectangular


duct
Same price as rectangular
duct

Same price as rectangular


duct insulation

02
03
04
05
01
02
03
04
01
02
03
04
01
02
03
04
05
06
07
01
02
03
04
05
01
02
01
02
03
04
05
06
01
02
03
04
05
06
07

SD2
SD3
SD4
SD5
Supply air linear diffusers
SLD1 size upto 60 LPS capacity
SLD2, size upto 90 LPS capacity
SLD3, size 91upto 140 LPS capacity
SLD6, size 220 upto 300 LPS capacity
Supply, return, exhaust linear bar diffusers
RLD1 size upto 60 LPS capacity
RLD2, size upto 90 LPS capacity
RLD3, size 91upto 140 LPS capacity
RLD6, size 220 upto 300 LPS capacity
Return square louver face ceiling diffusers
RD1A, B, C, D & E
RD2A, B, C, D & E
RD3A, B, C, D & E,
RD4A, B, C, D & E
RD5A, B, C, D & E
RD6A, B, C, D & E
RD7D
Return round louver face ceiling diffusers
RD1
RD2
RD3
RD4
RD5
Exhaust register grille
ER1 size 250 x 150 mm
ER2 size 450 x 150 mm
Door grille
DG1, size 300 x 200 mm
DG2, size 300 x 300 mm
DG3, size 450 x 600 mm
DG4, size 600 x 600 mm
Relif outlet hood
ROH
Exhaust grill
EG1
Supply return registers return grilles
SR1,RR1size 300 x 100 mm
SR2, RR2 size 350 x 150 mm
SR3, RR3 size 500 x 150 mm
SR4, RR4,size 450 x 200 mm
SR5, RR5,size 500x200 mm
SR6, RR6,size 600 x 200 mm
SR7, RR7,size 650x200 mm

To Bill Summary

NO.
NO.
NO.
NO.

7
17
5
5

7
17
5
4

1,299.27
1,188.36
1,188.36
1,188.36

9,094.89
20,202.12
5,941.80
5,941.80

9,094.89
20,202.12
5,941.80
4,753.44

0.00
0.00
0.00
1,188.36

NO.
NO.
NO.
NO.

12
28
81
3

12
38
76
3

713.02
1,029.91
1,188.36
2,271.09

8,556.24
28,837.48
96,257.16
6,813.27

8,556.24
39,136.58
90,315.36
6,813.27

0.00
(10,299.10)
5,941.80
0.00

NO.
NO.
NO.
NO.

13
39
81
3

17
37
80
3

673.40
1,029.91
1,109.14
792.24

8,754.20
40,166.49
89,840.34
2,376.72

11,447.80
38,106.67
88,731.20
2,376.72

(2,693.60)
2,059.82
1,109.14
0.00

NO.
NO.
NO.
NO.
NO.
NO.
NO.

38
91
129
275
84
5
2

37
83
143
274
96
11
5

1,902.70
1,663.70
1,940.99
1,971.36
1,630.69
1,983.24
2,009.65

72,302.60
151,396.70
250,387.71
542,124.00
136,977.96
9,916.20
4,019.30

70,399.90
138,087.10
277,561.57
540,152.64
156,546.24
21,815.64
10,048.25

1,902.70
13,309.60
(27,173.86)
1,971.36
(19,568.28)
(11,899.44)
(6,028.95)

NO.
NO.
NO.
NO.
NO.

4
4
15
5
4

1
7
18
4
4

475.34
298.41
310.29
310.29
310.29

475.34
2,088.87
5,585.22
1,241.16
1,241.16

1,426.02
(895.23)
(930.87)
310.29
0.00

NO.
NO.

126
4

125
4

332.74
443.65

1,901.36
1,193.64
4,654.35
1,551.45
1,241.16
0.00
41,925.24
1,774.60

41,592.50
1,774.60

332.74
0.00

NO.
NO.
NO.
NO.

3
4
22
3

3
7
21
3

414.61
430.45
950.69
998.22

1,243.83
1,721.80
20,915.18
2,994.66

1,243.83
3,013.15
19,964.49
2,994.66

0.00
(1,291.35)
950.69
0.00

NO.

7,592.30

22,776.90

22,776.90

0.00

NO.

570.41

2,281.64

2,281.64

0.00

NO.
NO.
NO.
NO.
NO.
NO.
NO.

33
28
30
6
16
24
7

38
23
24
17
4
22
7

455.54
532.12
759.23
835.81
1,243.82
1,659.74
1,774.62

15,032.82
14,899.36
22,776.90
5,014.86
19,901.12
39,833.76
12,422.34

17,310.52
12,238.76
18,221.52
14,208.77
4,975.28
36,514.28
12,422.34

(2,277.70)
2,660.60
4,555.38
(9,193.91)
14,925.84
3,319.48
0.00

18,654,004.16 33,224,648.75 (14,570,644.59)


Unit rates for new items
were based on other MC
buidings and still subject for
client's approval. Also take
note that some unit rates for
new items were extracted
through flow rate

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount

BOQ

Tender
Drawing

No.

No.

No.
No.
No.

RATE
BOQ

Tender
Drawing

485,907.20

971,814.40

971,814.40

110,669.33

221,338.66

221,338.66

1
1
1

1
1
1

No.

60,738.40
91,107.60
71,301.60
387,345.94

60,738.40
91,107.60
71,301.60
387,345.94

60,738.40
91,107.60
71,301.60
387,345.94

No.
No.
No.

1
1
1

1
1
1

45,003.19
52,567.76
42,437.66

45,003.19
52,567.76
42,437.66

45,003.19
52,567.76
42,437.66

No.
No.
No.
No.

1
1
1
1

1
1
1
1

42,436.34
41,670.50
52,320.85
43,703.92

42,436.34
41,670.50
52,320.85
43,703.92

42,436.34
41,670.50
52,320.85
43,703.92

475,344.00

475,344.00

475,344.00

Variance

Remarks

DIVISION 16 - ELECTRICAL
MEDIUM AND LOW VOLTAGE
DISTRIBUTION
Supply, installation, testing and
commissioning of the following equipment
including grounding, all accessories and
necessary works required for installation
as shown on the drawings and as
described in specifications section 16410,
16432, 16441, 16452 & 16461
01
02
01
02
03
04
05
06
07
01
02
03
04

01

Transformers (TR1 & TR2) 2000 KVA, dry


type , including MV cables from RMU'S to
transformers
Ring Main Units (RMU4-1,4-2), including MV
cables between RMU'S
MAIN AND SUB-MAIN POWER
Ref. EMDP
Ref. EMDP1 with ATS-1 ( Built-in )
Ref. EMDP1 with ATS-2 ( Built-in )
Ref. MDP comprising of MDP1,MDP2 & Bus
coupler as per drawings E-501, E-502
Ref. DPHVAC1
Ref. DPHVAC2
Ref. DP1
MAIN AND SUB-MAIN POWER
Ref. DP2
Ref. DP3
Ref. DP4
Ref. DP5
MAIN AND SUB-MAIN POWER
Generator set 323 KVA, 3 phase 4 wire,
380/220V including day tank, piping and fuel
feeding system and all accessories needed for
operation (main external tank and piping are
included in mechanical works)

227158363.xls.ms_officeDiv16

No.

Page 10 of 61

EMDP 2 on the plan

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount

BOQ

Tender
Drawing

16

21

RATE
BOQ

Tender
Drawing

Variance

Remarks

Supply, installation & commissioning of


bus duct system including connectors or
plug in and all associated works as shown
on drawings and described in specification
section 16129
Busduct System
02

Bus duct, 4000A, TPN

7,922.40

126,758.40

166,370.40

(39,612.00) including vertical length


to panels

2,705.50

21,644.00

29,760.50

2,030.78

40,615.60

64,984.96

1,683.51

8,417.55

11,784.57

1,312.48

38,061.92

43,311.84

(8,116.50) including vertical length


to panels
(24,369.36) including vertical length
to panels
(3,367.02) including vertical length
to panels
(5,249.92) including vertical length
to panels

1,214.77

6,073.85

12,147.70

950.69

47,534.50

36,126.22

607.38

15,184.50

19,436.16

355.19

33,743.05

30,191.15

Supply, installation & commissioning of


bus duct system including connectors or
plug in and all associated works as shown
on drawings and described in specification
section 16129
01

Bus duct, 1250A, TPN

11

03

Bus duct, 800A, TPN

20

32

03

Bus duct, 630A, TPN

04

Bus duct, 400A, TPN

29

33

10

50

38

Sub-Main Circuit: Supply and install


600/1000V XLPE/PVC multicore copper
cable on cable tray (measured elsewhere)
or in cable trench, conduit, including
junction boxes, connection for feeders and
various power loads as shown on drawings
and as described in specifications, section
16126
01

2(4C-185mm2)+185 mm2

02

4C-240mm +120mm

03

4C-185mm2+95mm2

25

32

04

4C-120mm2+70mm2

95

85

227158363.xls.ms_officeDiv16

Page 11 of 61

(6,073.85) quantified as per layout


including vertical length
11,408.28 quantified as per layout
including vertical length
(4,251.66) quantified as per layout
including vertical length
3,551.90 quantified as per layout
including vertical length

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

05

DESCRIPTION

4C-95mm +50mm

UNIT

Amount

BOQ

Tender
Drawing

530

524

RATE
334.06

177,051.80

Tender
Drawing
175,047.44

273.32

307,485.00

302,565.24

301.05

197,187.75

242,044.20

170.33

148,187.10

137,115.65

155.81

79,463.10

72,607.46

114.87

260,754.90

246,396.15

80.54

173,563.70

166,637.26

60.74

99,066.94

92,810.72

BOQ

Variance

Remarks

2,004.36 quantified as per layout


including vertical length

Sub-Main Circuit: Supply and install


600/1000V XLPE/PVC multicore copper
cable on cable tray (measured elsewhere)
or in cable trench, conduit, including
junction boxes, connection for feeders and
various power loads as shown on drawings
and as described in specifications, section
16126
01

4C-70mm +35mm

1125

1107

02

4C-50mm2+25mm2

655

804

03

4C-35mm +16mm

04

4C-25mm +16mm

05

870

805

510

466

4C-16mm2+16mm2

2270

2145

2155

2069

1631

1528

4,919.76 quantified as per layout


including vertical length
(44,856.45) quantified as per layout
including vertical length
11,071.45 quantified as per layout
including vertical length
6,855.64 quantified as per layout
including vertical length
14,358.75 quantified as per layout
including vertical length

Sub-Main Circuit: Supply and install


600/1000V XLPE/PVC multicore copper
cable on cable tray (measured elsewhere)
or in cable trench, conduit, including
junction boxes, connection for feeders and
various power loads as shown on drawings
and as described in specifications, section
16126
2

01

4C-10mm +10mm

02

4C-6mm2+6mm2

MV Single Core Cables 3(1x300 copper)mm2, XLPE,


Aluminum Armored

New Item

not mentioned on the BOQ


but it was shown on the plan

74

POWER AND LIGHTING INSTALLATION

227158363.xls.ms_officeDiv16

6,926.44 quantified as per layout


including vertical length
6,256.22 quantified as per layout
including vertical length

Page 12 of 61

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

01
02
New
Item

01
02
03
04
05
06

01
02
03
04

DESCRIPTION
Supply and install power and lighting
accessories including all necessary boxes,
switches, sockets and as required seal
enclosures. In addition to final sub-circuits
comprising cables, conduits, fittings,
connections and assocciated works as
required to suit the locations shown on
drawings and as described in
specifications section 16050
Boxes
Junction box, ceiling mounted
Junction box, wall mounted

UNIT

No.
No.

BOQ

Tender
Drawing

394
33

386
33

Junction Box Floor Mounted, Weatherproof


POWER AND LIGHTING INSTALLATION
Disconnect switch , non-fused, weatherproof ,
20A, 3P, 380V for UPS
Disconnect switch , non-fused, weatherproof ,
30A, 3P, 380V for H-01
Disconnect switch with piolt light, non-fused,
20A, 1P, 220V for RE-CIRCULATING PUMP
Disconnect switch non-fused, 30A, 3P, 380V
for Drinking water
Disconnect switch non-fused, 30A, 3P, 380V ,
weatherproof , for SEWAG-PUMP
Disconnect switch non-fused, 20A, 3P, 380V ,
weatherproof , for SEWAG-PUMP
POWER AND LIGHTING INSTALLATION
Disconnect switch non-fused, 150A, 3P, 380V
,weatherproof for MCC-COOLING
Disconnect switch non-fused, 150A, 3P, 380V
, weatherproof for MCC-HEATING
Disconnect switch with piolt light, nonfused,20A, 1P, 220V for FACP
Disconnect switch non-fused, 40A, 3P, 380V
for Elevators,weatherproof,

227158363.xls.ms_officeDiv16

Amount
RATE
BOQ

258.80
273.32

101,967.20
9,019.56

Tender
Drawing

99,896.80
9,019.56

No.

No.

No.

No.

No.

No.

No.

No.

No.

Remarks

2,070.40
as per design drawing

No.

Variance

670.76

670.76

670.76

736.78

736.78

736.78

351.23

351.23

351.23

736.78

736.78

736.78

736.78

1,473.56

1,473.56

716.98

716.98

716.98

1,536.95

1,536.95

1,536.95

1,536.95

1,536.95

1,536.95

525.52

525.52

525.52

790.92

3,954.60

3,954.60

Page 13 of 61

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT
BOQ

05

06

01

02

03

04

05

06

01
02
03
04

Disconnect switch and with pilot light, nonfused, weatherproof, 10A, 1P, 220V for EF'S
Disconnect switch and with pilot light, nonfused, weatherproof, 16A, 3P, 380V for SEF'S
, SPF'S
POWER AND LIGHTING INSTALLATION
To Motor Control Center points (Ref. MCC supplied and installed by others)
Disconnect switch and with pilot light, nonfused, weatherproof, 16A, 3P, 380V for SMEF01
Disconnect switch and with pilot light, nonfused, weatherproof, 16A, 3P, 380V for SMEF02
Disconnect switch and with pilot light, nonfused, weatherproof, 16A, 3P, 380V for SMEF03
Disconnect switch and with pilot light, nonfused, weatherproof, 16A, 3P, 380V for SMEF04
Disconnect switch and with pilot light, nonfused, weatherproof, 16A, 3P, 380V for SMEF05
POWER AND LIGHTING INSTALLATION
Disconnect switch , fused,with pilot light,
weatherproof , 20A, 1P, 220V for FCU-01
Disconnect switch , fused,with pilot light,
weatherproof , 20A,1P, 220V for FCU-02
Disconnect switch , fused,with pilot light, ,
20A, 1P, 220V for FCU-03
Disconnect switch , fused,with pilot light,
weatherproof , 20A, 1P, 220V for FCU-04,05
POWER AND LIGHTING INSTALLATION

227158363.xls.ms_officeDiv16

Amount

Tender
Drawing

No.

13

13

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

RATE
BOQ

Tender
Drawing

331.42

4,308.46

4,308.46

718.30

3,591.50

2,873.20

44,807.77

89,615.54

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

525.52

1,576.56

1,576.56

525.52

1,051.04

1,051.04

525.52

1,051.04

1,051.04

525.52

2,102.08

1,576.56

Page 14 of 61

Variance

Remarks

one exhaust fan at roof


level has no
disconnectswitch but it
was included on DD qty.
718.30

89,615.54 as specied, it will be


supplied and installed
by others
718.30 not shown on the plan

525.52

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

01
02
03
04
05

01
02
03
04
05

01
02
03
04
05

01
02

DESCRIPTION
Disconnect switch , non-fused, weatherproof,
20A, 3P, 380V for AHU-01
Disconnect switch , non-fused, weatherproof,
20A, 3P, 380V for AHU-02
Disconnect switch , non-fused, weatherproof,
30A, 3P, 380V for AHU-03
Disconnect switch , non-fused, weatherproof,
40A, 3P, 380V for AHU-04
Disconnect switch , non-fused, weatherproof,
30A, 3P, 380V for AHU-05
POWER AND LIGHTING INSTALLATION
Disconnect switch , non-fused, weatherproof,
20A, 3P, 380V for AHU-06
Disconnect switch , non-fused, weatherproof,
30A, 3P, 380V for AHU-07
Disconnect switch , non-fused, weatherproof,
50A, 3P, 380V for AHU-08
Disconnect switch , non-fused, weatherproof,
50A, 3P, 380V for AHU-09
Disconnect switch , non-fused, weatherproof,
30A, 3P, 380V for AHU-10
POWER AND LIGHTING INSTALLATION
Disconnect switch , non-fused, weatherproof,
40A, 3P, 380V for AHU-11
Disconnect switch , non-fused, weatherproof,
20A, 3P, 380V for AHU-12
Disconnect switch , non-fused, weatherproof,
40A, 3P, 380V for AHU-13
Disconnect switch , non-fused, weatherproof,
30A, 3P, 380V for AHU-14
Disconnect switch , non-fused, weatherproof,
60A, 3P, 380V for AHU-15
POWER AND LIGHTING INSTALLATION
Disconnect switch , non-fused, weatherproof,
30A, 3P, 380V for AHU-16
Disconnect switch , non-fused, weatherproof,
30A, 3P, 380V for AHU-17

227158363.xls.ms_officeDiv16

UNIT

Amount

BOQ

Tender
Drawing

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

RATE
718.30

718.30

Tender
Drawing
718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

718.30

880.71

880.71

880.71

880.71

880.71

880.71

718.30

718.30

718.30

798.84

798.84

798.84

718.30

718.30

718.30

798.84

798.84

798.84

718.30

718.30

718.30

945.41

945.41

945.41

718.30

718.30

718.30

718.30

718.30

718.30

BOQ

Page 15 of 61

Variance

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

03
04
05

01
02
03
04
05
06
New Item

01
02
03
04
05
06

DESCRIPTION
Disconnect switch , non-fused, weatherproof,
80A, 3P, 380V for AHU-18
Disconnect switch , non-fused, weatherproof,
20A, 3P, 380V for AHU-19
Disconnect switch , non-fused, weatherproof,
40A, 3P, 380V for AHU-20
POWER AND LIGHTING INSTALLATION
Disconnect switch , non-fused, weatherproof,
40A, 3P, 380V for AHU-21
Disconnect switch , non-fused, weatherproof,
30A, 3P, 380V for AHU-22
Disconnect switch , non-fused, weatherproof,
30A, 3P, 380V for AHU-23
Disconnect switch , non-fused, weatherproof,
60A, 3P, 380V for AHU-24
Disconnect switch , non-fused, weatherproof,
30A, 3P, 380V for AHU-25
Disconnect switch , non-fused, weatherproof,
30A, 3P, 380V for AHU-26
Disconnect switch and with pilot light, non-fused,
weatherproof, 16A, 3P, 380V for SMEF-06

POWER AND LIGHTING INSTALLATION


Single pole, one-way, one gang switch,
Single pole, one-way, two gang switch,
Three way, one gang switch, 13A
Three way, two gang switch, 13A
Push button for lighting control
Pull cord switch

New Item Single pole, one-way, one gang switch, Weatherproof

UNIT
BOQ

Tender
Drawing

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.
No.
No.
No.
No.
No.

08
09

Single socket outlet 15A, 230V, grounding


type.
Ditto, but with weatherproof protection
Single socket outlet 13A, 220V, with residual
current device (RCD)
POWER AND LIGHTING INSTALLATION

227158363.xls.ms_officeDiv16

1,062.92

1,062.92

Tender
Drawing
1,062.92

652.28

652.28

652.28

798.84

798.84

798.84

798.84

798.84

798.84

718.30

718.30

718.30

718.30

718.30

718.30

974.46

974.46

974.46

718.30

718.30

718.30

718.30

718.30

718.30

BOQ

598
14
67
10
46
12

No.

589
12
67
10
46
12

718.30

220.51
237.67
332.74
335.38
277.28
558.53

131,864.98
3,327.38
22,293.58
3,353.80
12,754.88
6,702.36

(718.30)

129,880.39
2,852.04
22,293.58
3,353.80
12,754.88
6,702.36

1,984.59
475.34

539

No.

48

No.

56

523

56

Remarks

unit rate is the same with item


2.2.14

as per design drawing


as per design drawing

No.

Variance

718.30

11

New Item Single pole, one-way, two gang switch, Weatherproof

07

Amount
RATE

277.28

149,453.92

145,017.44

303.69
393.48

14,577.12
22,034.88

22,034.88

Page 16 of 61

4,436.48 other quantities are in


specific load
14,577.12

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount

BOQ

Tender
Drawing

01

Single bench socket outlet, 13A, 220V,


grounding type

No.

99

99

02

Power socket outlet, 20A,230V, grounding type

No.

29

29

03

Power socket outlet, 30A,230V, grounding type

No.

28

28

No.

400

400

No.

422

422

No.

14

04
05
06

Duplex socket outlet 15A, 230V, grounding


type.but
Duplex socket outlet 15A, 230V, grounding
type.but floor mounted
Three phase single socket outlet 20A, 380V,
grounding type,weatherproof

New Item Single socket outlet, 15A, 220V, ref. REF

New Item Single socket outlet, 15A, 220V, ref. DWC

New Item

Single socket outlet 15A, 230V, grounding type.


Weatherproof

New Item

Three phase single socket outlet 20A, 380V, grounding


type

No.

319.54

31,634.46

Tender
Drawing
31,634.46

306.33

8,883.57

8,883.57

314.26

8,799.28

8,799.28

293.13

117,252.00

117,252.00

301.05

127,043.10

127,043.10

668.12

9,353.68

3,340.60

BOQ

01
02
03

No.
No.
No.

3
59
40

3
59
40

04

Ref. A

No.

258

259

05

Ref. A1A

No.

61

61

Remarks

6,013.08 some are not in


weatherproof type

2,218.24

(2,218.24) as per design drawing, unit


rate is the same with item no.
2.3.2.1

277.28

1,940.96

(1,940.96) as per design drawing, unit


rate is the same with item no.
2.3.2.1

277.28

13,309.44

(13,309.44) as per design drawing, unit


rate is the same with item no.
2.3.2.1

577.01

5,193.09

(5,193.09) as per design drawing, unit


rate from MC 07 (Part 1)

6,184.75
802.80
846.38
1,204.20

18,554.25
47,365.20
33,855.20
310,683.60

18,554.25
47,365.20
33,855.20
311,887.80

1,230.61

75,067.21

75,067.21

Page 17 of 61

Variance

277.28

48

Supply, installation of lighting fixtures


complete with lamps or tubes, connection
boxes, heat resisting flexible cables,
fixings and suspensions including all
necessary boxes, plates, and associated
cables/wires and conduits as shown on
drawings and as per specification section
16050
Chandlier outelt ( 480 W )
Ref. EX ( wall mounted, single sided)
Ref.EX ( ceiling mounted,double sided )

227158363.xls.ms_officeDiv16

RATE

(1,204.20) other quantities are in


essential circuit
other quantities are in
essential circuit

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount

BOQ

Tender
Drawing

01

POWER AND LIGHTING INSTALLATION


Ref. A1AE

No.

02

Ref. A 1

No.

122

123

03

Ref. A1E

No.

04

Ref. AD

No.

46

47

05

Ref. A1D

No.

22

22

06

Ref. B

No.

07

Ref. BD

No.

765

765

08

Ref. B6A

No.

39

39

09

Ref. B6AE

No.

22

21

10

Ref. B7

No.

RATE
BOQ

Tender
Drawing

1,041.80
1,271.55

1,041.80
155,129.10

1,041.80
156,400.65

979.74
1,659.74

979.74
76,348.04

78,007.78

1,729.72

38,053.84

38,053.84

885.99
1,410.19

1,771.98
1,078,795.35

1,771.98
1,078,795.35

1,341.53

52,319.67

52,319.67

1,937.03
1,260.98

42,614.66
5,043.92

40,677.63
5,043.92

538.72

538.72

691.89

8,302.68

8,302.68

623.23

80,396.67

80,396.67

900.51

18,010.20

18,010.20

1,431.31
1,106.50
1,667.67
900.51

11,450.48
100,691.50
56,700.78
9,005.10

11,450.48
100,691.50
56,700.78
8,104.59

1,591.08
1,469.61

4,773.24
174,883.59

4,773.24
174,883.59

2,001.73
1,465.64
1,102.53

100,086.50
4,396.92
2,205.06

100,086.50
4,396.92
2,205.06

Variance

Remarks

(1,271.55) other quantities are in


essential circuit
979.74 not found in any layout
(1,659.74) other quantities are in
essential circuit
other quantities are in
essential circuit
other quantities are in
essential circuit
other quantities are in
essential circuit
1,937.03
other quantities are in
essential circuit

POWER AND LIGHTING INSTALLATION


01

Ref. B9

No.

02

Ref. B10

No.

12

12

03

Ref. B11

No.

129

129

04

Ref. C1A

No.

20

20

05
06
07

Ref. C1AE
Ref. C1AD
Ref. C1ADE

No.
No.
No.

8
91
34

8
91
34

08

Ref. C2

No.

10

09

Ref. C2E

No.

10

Ref. C2D

No.

119

119

01
02
03

POWER AND LIGHTING INSTALLATION


Ref. C2DE
Ref. C3D
Ref. C3DE

No.
No.
No.

50
3
2

50
3
2

227158363.xls.ms_officeDiv16

Page 18 of 61

538.72 not found in any layout


plan
other quantities are in
essential circuit
other quantities are in
essential circuit
other quantities are in
essential circuit

900.51 other quantities are in


essential circuit
other quantities are in
essential circuit

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount

04

Ref. C3E

No.

Tender
Drawing
1

05

Ref. D

No.

168

167

06

Ref. DA

No.

23

22

07
08

Ref. DAE
Ref. DE

No.
No.

12
59

14
58

09

Ref. DD

No.

300

300

10

Ref. DDE
POWER AND LIGHTING INSTALLATION

No.

81

82

01

Ref. D1D

No.

138

138

02
03
04

Ref. D1DE
Ref. D2A
Ref. D2AE

No.
No.
No.

70
2
11

70
2
11

05

Ref. D3

No.

65

65

06

Ref. D3D

No.

163

163

07
08
09
10

Ref. D3DE
Ref. D3E
Ref. D4
Ref. D6
POWER AND LIGHTING INSTALLATION
Ref. D6A
Ref. D6E
Ref. D6B
Ref. D6BE
Ref. D6BD
Ref. D6BDE
Ref. D6D
Ref. D6DE
Ref. D16E
Ref. D18
POWER AND LIGHTING INSTALLATION

No.
No.
No.
No.

16
4
243
1

1,011.43
664.16

1,011.43
111,578.88

Tender
Drawing
1,011.43
110,914.72

747.35

17,189.05

16,441.70

1,106.50
1,356.05
926.92

13,278.00
80,006.95
278,076.00

15,491.00
78,650.90
278,076.00

1,496.01

121,176.81

122,672.82

862.22

118,986.36

118,986.36

404.04
691.89
1,106.50
608.70

28,282.80
1,383.78
12,171.50
39,565.50

28,282.80
1,383.78
12,171.50
39,565.50

830.53

135,376.39

135,376.39

16
4
243
1

796.20
450.26
691.89
1,245.14

12,739.20
1,801.04
168,129.27
1,245.14

12,739.20
1,801.04
168,129.27
1,245.14

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

1
189
27
32
4
2
14
8
18
25

1
189
27
32
4
2
14
8
18
25

1,404.91
1,881.57
889.95
1,802.35
855.62
903.15
856.94
831.85
736.78
830.53

1,404.91
355,616.73
24,028.65
57,675.20
3,422.48
1,806.30
11,997.16
6,654.80
13,262.04
20,763.25

1,404.91
355,616.73
24,028.65
57,675.20
3,422.48
1,806.30
11,997.16
6,654.80
13,262.04
20,763.25

Ref. D19

No.

20

20

426.49

8,529.80

8,529.80

BOQ

01
02
03
04
05
06
07
08
09
10
01

227158363.xls.ms_officeDiv16

RATE
BOQ

Page 19 of 61

Variance

Remarks

664.16 other quantities are in


essential circuit
747.35 other quantities are in
essential circuit
(2,213.00)
1,356.05
other quantities are in
essential circuit
(1,496.01)
other quantities are in
essential circuit

other quantities are in


essential circuit
other quantities are in
essential circuit

other quantities are in


essential circuit

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount

BOQ

Tender
Drawing

442.33

6,192.62

Tender
Drawing
6,192.62

580.98

75,527.40

74,946.42

580.98

47,640.36

47,640.36

1,341.53

83,174.86

83,174.86

29,365.76
35,817.12
25,164.10
34,982.74
3,319.48

29,365.76

26
26
2

1,835.36
1,989.84
967.85
1,345.49
1,659.74

9
56
104
21
1
2
47
2
63
210

917.68
917.68
1,172.52
769.79
726.22
1,374.54
1,606.93
2,143.01
900.51
849.02

8,259.12
51,390.08
121,942.08
16,165.59
726.22
2,749.08
75,525.71
4,286.02
56,732.13
178,294.20

8,259.12
51,390.08
121,942.08
16,165.59
726.22
2,749.08
75,525.71
4,286.02
56,732.13
178,294.20

18

1,630.69

6,510.89

02

Ref. D20

No.

14

14

03

Ref. N

No.

130

129

04

Ref. NA

No.

82

82

05

Ref. WL1

No.

62

62

06
07
08
09
10

Ref. WL1D
Ref. WL1E
Ref. WL3
Ref. WL5
Ref. HC
POWER AND LIGHTING INSTALLATION
Ref. HL
Ref. ST1
Ref. UL1
Ref. KL1 (cove light) with length 480 mm
Ref. KL1D (cove light) with length 480 mm
Ref. KL2D (cove light) with length 1245 mm
Ref. KL3 (cove light) with length 2395 mm
Ref. KL3D (cove light)with length 2395 mm
Ref. KF1 (cove light) with length 455 mm
Ref. KF1D (cove light) with length 455 mm

No.
No.
No.
No.
No.

16
18
26
26
2

16

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

9
56
104
21
1
2
47
2
63
210

01
02
03
04
05
06
07
08
09
10
New
Item

01

Ref. WL1DE

POWER AND LIGHTING


Supply, installation, testing and
commissioning of control gear
panelboards complete including circuit
breakers, enclosures, fixings, supports and
associated lighting contactors for
complete installation as shown on
drawings and as per specification section
16442
Ref. LPP22

227158363.xls.ms_officeDiv16

No.

RATE
BOQ

Page 20 of 61

Remarks

other quantities are in


essential circuit
580.98 other quantities are in
essential circuit
other quantities are in
essential circuit
other quantities are in
essential circuit
35,817.12 not shown on the plan

25,164.10
34,982.74
3,319.48

29,352.42

6,510.89

Variance

6,510.89

as per design drawing,


(29,352.42) unit rate from WL1DE of
MC 07 (Part 1)

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT
No.
No.
No.
No.
No.

1
1
1
1
1

Tender
Drawing
1
1
1
1
1

6,562.39
6,476.56
6,649.53
5,610.38
5,697.53

6,562.39
6,476.56
6,649.53
5,610.38
5,697.53

Tender
Drawing
6,562.39
6,476.56
6,649.53
5,610.38
5,697.53

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1

4,571.22
2,893.00
5,161.44
7,531.56
2,529.89
5,680.36
5,957.64
5,783.35
5,697.53
4,225.28

4,571.22
2,893.00
5,161.44
7,531.56
2,529.89
5,680.36
5,957.64
5,783.35
5,697.53
4,225.28

4,571.22
2,893.00
5,161.44
7,531.56
2,529.89
5,680.36
5,957.64
5,783.35
5,697.53
4,225.28

No.
No.
No.
No.
No.
No.
No.
No.

1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1

2,858.67
3,013.15
2,754.35
3,238.94
4,918.49
4,225.28
3,460.77
2,385.96

2,858.67
3,013.15
2,754.35
3,238.94
4,918.49
4,225.28
3,460.77
2,385.96

2,858.67
3,013.15
2,754.35
3,238.94
4,918.49
4,225.28
3,460.77
2,385.96

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1

5,177.29
7,341.42
6,753.85
6,129.30
6,303.59
5,610.38
7,711.14
8,911.38
8,981.36
11,012.14

5,177.29
7,341.42
6,753.85
6,129.30
6,303.59
5,610.38
7,711.14
8,911.38
8,981.36
11,012.14

5,177.29
7,341.42
6,753.85
6,129.30
6,303.59
5,610.38
7,711.14
8,911.38
8,981.36
11,012.14

No.

3,834.44

3,834.44

3,834.44

BOQ
02
03
04
05
06
01
02
03
04
05
06
07
08
09
10
01
02
03
04
05
06
07
08
01
02
03
04
05
06
07
08
09
10
01

Ref. ELPP22
Ref. LPP23
Ref. ELPP23
Ref. LPP24
Ref. ELPP24
Power and Llighting Panel boards
Ref. SLP1
Ref. SLP2
Ref. PPP11
Ref. PPP14
Ref. LPP11
Ref. ELPP11
Ref. LPP13
Ref. ELPP13
Ref. LPP14
Ref. ELPP14
Power and Llighting Panel boards
Ref. LPBC1
Ref. LPBC2
Ref. LPBC3
Ref. LPBC4
Ref. PPP13
Ref. LPST1
Ref. PPST1
Ref. PPST1A
Power and Llighting Panel boards
Ref. LPST2
Ref. PPST2
Ref. ELPST2
Ref. LPST3
Ref. PPST3
Ref. PPST3A
Ref. ELPST3
Ref. LPST4
Ref. PPST4
Ref. PPST4A
Power and Llighting Panel boards
Ref. ELPST1

227158363.xls.ms_officeDiv16

Amount
RATE
BOQ

Page 21 of 61

Variance

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT
No.
No.
No.
No.
No.
No.
No.
No.
No.

1
1
1
1
1
1
1
1
1

Tender
Drawing
1
1
1
1
1
1
1
1
1

3,580.92
5,091.46
5,177.29
6,269.26
8,224.77
5,865.22
6,009.14
6,269.26
5,057.13

3,580.92
5,091.46
5,177.29
6,269.26
8,224.77
5,865.22
6,009.14
6,269.26
5,057.13

Tender
Drawing
3,580.92
5,091.46
5,177.29
6,269.26
8,224.77
5,865.22
6,009.14
6,269.26
5,057.13

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1

6,269.26
3,929.51
4,123.61
3,929.51
4,425.98
3,228.38
3,929.51
4,425.98
6,839.67
6,856.84

6,269.26
3,929.51
4,123.61
3,929.51
4,425.98
3,228.38
3,929.51
4,425.98
6,839.67
6,856.84

6,269.26
3,929.51
4,123.61
3,929.51
4,425.98
3,228.38
3,929.51
4,425.98
6,839.67
6,856.84

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1

3,579.60
3,929.51
4,703.26
4,477.48
3,048.80
4,564.62
4,123.61
3,228.38
3,228.38
5,697.53

3,579.60
3,929.51
4,703.26
4,477.48
3,048.80
4,564.62
4,123.61
3,228.38
3,228.38
5,697.53

3,579.60
3,929.51
4,703.26
4,477.48
3,048.80
4,564.62
4,123.61
3,228.38
3,228.38
5,697.53

No.
No.
No.
No.
No.
No.

1
1
1
1
1
1

1
1
1
1
1
1

7,481.39
7,720.38
6,163.63
6,269.26
4,506.53
3,843.68

7,481.39
7,720.38
6,163.63
6,269.26
4,506.53
3,843.68

7,481.39
7,720.38
6,163.63
6,269.26
4,506.53
3,843.68

BOQ
02
03
04
05
06
07
08
09
10
01
02
03
04
05
06
07
08
09
10
01
02
03
04
05
06
07
08
09
10
01
02
03
04
05
06

Ref. ELPST4
Ref. LPST5
Ref. PPST5
Ref. LPG1
Ref. PPG1
Ref. ELPG1
Ref. LPG2
Ref. PPG2
Ref. ELPG2
Power and Llighting Panel boards
Ref. LPG3
Ref. PPG3
Ref. ELPG3
Ref. LPG4
Ref. PPG4
Ref. ELPG4
Ref. LPG5
Ref. PPG5
Ref. LPF1
Ref. PPF1
Power and Llighting Panel boards
Ref. ELPF1
Ref. LPF2
Ref. PPF2
Ref. ELPF2
Ref. LPF3
Ref. PPF3
Ref. ELPF3
Ref. LPF5
Ref. PPF5
Ref. ELPF5
Power and Llighting Panel boards
Ref. LPS1
Ref. PPS1
Ref. ELPS1
Ref. LPS2
Ref. PPS2
Ref. PPS2A

227158363.xls.ms_officeDiv16

Amount
RATE
BOQ

Page 22 of 61

Variance

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount

07
08
09
10

Ref. LPS3
Ref. PPS3
Ref. ELPS2
Ref. ELPS3

No.
No.
No.
No.

1
1
1
1

Tender
Drawing
1
1
1
1

01
02
03
04
05
06
07

Supply, installation, testing and


commissioning of motor control centers
with magnetic starters complete with all
accessories, fitting, support as shown on
drawing and as described in specification
sections 16050 & 16442
Ref. MCC1
Ref. MCC2
Ref. MCC3
Ref. MCC4
Ref. MCC5
Ref. MCC-HEATING
Ref. MCC-COOLING

No.
No.
No.
No.
No.
No.
No.

1
1
1
1
1
1
1

01

Supply and install an emergency


Uninterruptable Power Supply (UPS) unit
including supports, battery rack,
accessories and all associated works to
suit the location shown on drawings and
as described in specifications. Section
16610
Ref. UPS (10KVA)

No.

BOQ

RATE
6,079.12
5,714.69
5,931.24
6,106.85

6,079.12
5,714.69
5,931.24
6,106.85

Tender
Drawing
6,079.12
5,714.69
5,931.24
6,106.85

1
1
1
1
1
1
1

12,822.40
12,822.40
12,822.40
12,822.40
12,822.40
11,067.59
11,067.59

12,822.40
12,822.40
12,822.40
12,822.40
12,822.40
11,067.59
11,067.59

12,822.40
12,822.40
12,822.40
12,822.40
12,822.40
11,067.59
11,067.59

166,005.97

166,005.97

166,005.97

BOQ

Screed Trunking System


Supply and installation of under floor
mounted, 3-compartment metal trunking
system for power and communication
including ladders where required, fittings,
fixings and support system as shown on
drawings and as described in
specifications section 16050

227158363.xls.ms_officeDiv16

Page 23 of 61

Variance

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

01

DESCRIPTION

Under floor upvc duct with three compartment


( Power & COMM. ), 300 mm width

UNIT

Amount
RATE

BOQ

Tender
Drawing

730

739

439.69

320,973.70

324,930.91

M
M

327
130

426
147

69.98
83.19

22,883.46
10,814.70

29,811.48
12,228.93

BOQ

Tender
Drawing

Variance

Remarks

(3,957.21)

MAIN AND SUB-MAIN POWER


Sub-Main Circuits: Supply and install
heavy duty hot dip galvanized steel cable
tray / cable ladder and for power and
communication cables, including fixings,
covers and supports as required to suit the
locations shown on drawings and as
described in specifications, section 16050
01
02

200mm wide
300mm wide

227158363.xls.ms_officeDiv16

Page 24 of 61

(6,928.02) including vertical length


(1,414.23) including vertical length

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT
BOQ

03
04
05
New Item

01

400mm wide
600mm wide
800mm wide

M
M
M

15
145
225

400mm wide x 750mm deep, cable trench with heavy duty


M
steel checkered plate

EUROPIAN INSTALLATION BUS SYSTEM


(EIB)
Supply, installation, testing and
commissioning of an europian installation
bus system (EIB) to control and dimming
lighting with infra-red and natural /
electricity lighting, sensible dimmable
detectors, EIB dimmable lighting switch,
adjustable EIB on/off orbit timer and
control unit, PC & printer and power supply
with UPS including all components,
accessories and all associated work to
complete installation as shown on
drawings and as described in specification
section 16050
To suit Building (MC04) Intelligent Bus System
ITEM
(EIB)

Amount

Tender
Drawing
21
158
300

RATE
BOQ
96.39
110.91
138.64

32

Variance

Remarks

(578.34) including vertical length


(1,441.83) including vertical length
(10,398.00) including vertical length
as per design drawing

907,496.40

GROUNDING AND LIGHTNING


PROTECTION

227158363.xls.ms_officeDiv16

1,445.85
16,081.95
31,194.00

Tender
Drawing
2,024.19
17,523.78
41,592.00

Page 25 of 61

907,496.40

907,496.40

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

01

DESCRIPTION
Supply and installation of a grounding &
lightning protection system comprising
bare copper conductor to bond the
building's distribution boards and HVAC
equipments to the main earthing grid of the
building. Including necessary earthwork,
buried galvanized steel foundations strips
surrounding the building & extended to the
lightning protection network on the roof &
upper roof including down conductor,
phosphor bronze test joints & triangular
counter poise and all associated works to
suit grounding resistivity required all as
shown on drawings and as described in
specifications sections 16452 & 16670
Complete building grounding and lightning
protection system network to suit ground
resistivity

COMMUNICATION SYSTEMS
All communication systems include fittings,
tapes, pull boxes, connectors, supports, face
plates, extensions of cables in conduit and all
associated works as required to form a
complete and fully operative system in the
building as shown on drawings and as
described in specifications (system outside
building is measured elsewhere)

UNIT

Amount

BOQ

Tender
Drawing

RATE
BOQ

470,277.63
ITEM

NOTE

PUBLIC ADDRESS SYSTEM

227158363.xls.ms_officeDiv16

Page 26 of 61

470,277.63

Tender
Drawing

470,277.63

Variance

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT
BOQ

Amount

Tender
Drawing

RATE
BOQ

Tender
Drawing

Variance

Remarks

Supply, installation, testing and


commissioning of public address system
comprising amplifiers, zone selector
emergency battery DC back-up, call
station, CD/DVD player, recorder player,
mixers paging system, power supply
including pull boxes, ceiling mounted
loudspeaker microphone, cable wire and
conduiting supports, fittings, interfacing
works as shown on drawings and as
described in specification section 16726

01

01
02
03
04
05
06
07
08

To suit system network equipped with:


Public address rack with Public Address
TCP/IP Interface , Ref. ( PA ), power supply ,
amplifiers , microphone , CD/DVD pleayer ,
recorder player , mixers
PUBLIC ADDRESS / SOUND SYSTEM ,
Microphone jack outlet
loudspeaker, ceiling mounted
Amplifier units (240W)
Information call station
Security office call station
CD / DVD player
Recorder player
Mixer

New Item Zone Zelector

No.

No.
No.
No.
No.
No.
No.
No.
No.

1
148
7
1
1
1
1
1

1
149
7
1
1
1
1
1

No.

50,263.67

50,263.67

50,263.67

1,659.74
610.02
6,628.41
8,301.35
5,614.34
5,672.44
4,465.59
6,135.90

1,659.74
90,282.96
46,398.87
8,301.35
5,614.34
5,672.44
4,465.59
6,135.90

1,659.74
90,892.98
46,398.87
8,301.35
5,614.34
5,672.44
4,465.59
6,135.90

to verify if the cost was


already included on the other
items for public address
system system

SOUND SYSTEM FOR PRAYER HALL


Supply and install sound system for prayer
hall system consisting of, but not limited to:
01
02
03

Public address ampilfier


Microphone jack outlet
loudspeaker, ceiling mounted

227158363.xls.ms_officeDiv16

No.
No.
No.

4
4
14

4
4
14

(610.02)

3,538.67
1,661.06
553.25

Page 27 of 61

14,154.68
6,644.24
7,745.50

14,154.68
6,644.24
7,745.50

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount

BOQ

Tender
Drawing

No.

No.

No.
No.
No.
No.
No.
No.
No.
No.
No.

59
24
91
531
12
55
52
30
36

RATE
BOQ

Tender
Drawing

Variance

FIRE ALARM SYSTEM


Supply, installation, testing and
commissioning of fire detection/alarm
system comprising of analogue , ps. ,ups
addressable intelligent fire alarm system,
sounders detectors, control, alarm bell,
pull stations, modules including
associated cable wires and conduiting,
interfacing as shown on drawings and as
described in specification section 16721

02

Supply and install fire alarm system consisting


of, but not limited to:
Master addressable fire alarm control panel
with UPS and power supply , ref. (FACP) Fire
alarm TCP-IP interface
Interface unit - to data system

01
02
03
04
05
06
07
08
09

Fire alarm bell


Sounder with Strob ligh
Fire alarm manual call station.
Optical smoke detector,ceiling mounted.
Heat detector, ceiling mounted
Heat detector, ceiling mounted
Smoke detector, duct mounted
Interface units
Magnetic door holder

01

New Item Smoke detector, wall mounted

No.

121,476.80

121,476.80

121,476.80

2,766.24

2,766.24

2,766.24

59
24
91
533

47,209.44
15,939.84
61,159.28
563,008.68
7,320.24
49,891.05
55,134.56
81,679.80
19,061.28

47,209.44
15,939.84
61,159.28
565,129.24

54
51
30
36

800.16
664.16
672.08
1,060.28
610.02
907.11
1,060.28
2,722.66
529.48

12

1,060.28

TELECOMMUNICATION SYSTEM

227158363.xls.ms_officeDiv16

Page 28 of 61

48,983.94
54,074.28
81,679.80
19,061.28
12,723.36

(2,120.56)
7,320.24
907.11
1,060.28

(12,723.36)

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount

BOQ

Tender
Drawing

No.

No.

No.

No.

No.

81

81

No.

230

230

No.

95

95

No.

99

98

06

Power supply , UPS 10 KVA


Telecommunication outlet with (RJ 45) fore
wireless access point, ref. (TO WAP )
Telecommunication outlet (1 Data, 1
Telephone), ref. (T0)
Telecommunication outlet (2 Data, 1
Telephone), ref. (T01)
Telecommunication outlet (1 Telephone, 1
Spare), ref. (T02)
TELECOMMUNICATION SYSTEM

01

Telecommunication outlet (1 Data ) , ref.(T05)

No.

467

465

No.

94

94

No.
No.
No.
No.
No.

1
4
4
3
3

1
4
4
3
3

01
02

01
02
01
02
03
04
05

02
03
04
05
06
07

Supply, installation testing and


commissioning of telecommunication
system comprising of main data / switches,
telephone MDF and IP PABX,
data/printer/telephone outlets including
cable / wires and conduits as shown on
drawings and as described in specification
section 16715
To suit system network equipped with:
Main distribution frame (MDF,600 pairs)
Main data and communication panel with
cabinet, monitors and interface units
TELECOMMUNICATION SYSTEM
Main voice communication cabinet "IP PABX"
600 extension / 60 trunk line (with IP interface)

Telecommunication outlet ceiling mounted (1


Data ) , ref. (T05)
Data patch panel ref. (FDP)
Data patch panel ref. (FDST)
Data patch panel ref. (FDG)
Data patch panel ref. (FDF)
Data patch panel ref. (FDS)

RATE
BOQ

Variance

24,628.10
161,326.47

24,628.10
161,326.47

24,628.10
161,326.47

950,688.00

950,688.00

950,688.00

142,603.20
1,293.99

142,603.20
104,813.19

142,603.20
104,813.19

1,468.28

337,704.40

337,704.40

2,178.66

206,972.70

206,972.70

1,468.28

145,359.72

143,891.44

1,468.28

1,293.99

604,293.33

601,705.35

2,587.98

1,293.99

121,635.06

121,635.06

83,001.66
83,002.98
83,002.98
83,002.98
83,002.98

83,001.66
332,011.92
332,011.92
249,008.94
249,008.94

83,001.66
332,011.92
332,011.92
249,008.94
249,008.94

MATV SYSTEM

227158363.xls.ms_officeDiv16

Tender
Drawing

Page 29 of 61

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount

BOQ

Tender
Drawing

No.

No.
No.
No.

4
11
4

RATE
BOQ

Tender
Drawing

Variance

Remarks

Supply, installation, testing and


commissioning of television system
comprising of main amplifier, multi-band
antenna, splitters, receptacles, end of line
resistors, 75 ohm coaxial cabling/wire,
conduiting, fittings and supports all as
shown on drawings and as described in
specification section 16785

02
03
04

MATV equipment with (


TCP-IP )
interface Ref. ( TVHE )
Television Splitter Unit Ref.(TVS1,2,3,TVP )
TV socket outlet, 300 mm AFF
End Of Line Resistor (EOLR)

01

CLOCK SYSTEM
Supply, installation, testing and
commissioning of master clock system
comprising of master clock panel,MCP-G "
TCP-IP" INTERFACE, PS, UPS, channel line
amplifier rack, slave clocks and twisted
shielded cable/wire, conduits including
interfacing and all associated works as on
drawing and as described in specification
section 16730
Supply and install a clock system
consisting of, but not limited to:
Interface unit MCP 'TCP-IP' - to data system

No.

02

IP base clock, single sided, wall mounted

No.

82

84

No.

No.
No.

1
1

1
1

01

03
04
05

Master clock (micro quartz units) with wireless


GPS receiver
Rack for channel line amplifier
Power supply unit

24,901.42

24,901.42

24,901.42

4
11
4

4,425.98
4,564.62
384.24

17,703.92
50,210.82
1,536.96

17,703.92
50,210.82
1,536.96

1,952.87
1,072.16

1,952.87
87,917.12

1,952.87
90,061.44

130,929.54

130,929.54

130,929.54

9,694.38
16,600.07

9,694.38
16,600.07

9,694.38
16,600.07

CCTV SYSTEM

227158363.xls.ms_officeDiv16

Page 30 of 61

(2,144.32) quantified both on one


line diagram and layout
plan

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount

BOQ

Tender
Drawing

No.
No.

2
2

2
2

No.

No.
No.

1
40

1
40

RATE
BOQ

Tender
Drawing

Variance

Remarks

Supply, installation, testing and


commissioning of CCTV system
comprising of CCTV server with complete
digital video recorder, monitor and CCTV IP
cameras including cable/wires, conduits
and interfacing as shown on conduits and
interfacing as shown on drawings and as
described in specification section 16783
01
02
03

01
02

To suit system network equipped with:


17" colour spot monitor
24" colour spot monitor
CCTV server with complete digital video
recorder with power supply and UPS with
CCTV "TCP-IP" interface
CCTV SYSTEM
Raid storage system
IP base fixed camera, ceiling mounted

11,066.27
16,601.39
166,005.97

22,132.54
33,202.78
166,005.97

22,132.54
33,202.78
166,005.97

108,905.27
12,349.70

108,905.27
493,988.00

108,905.27
493,988.00

BUILDING MANAGEMENT SYSTEM (BMS)


Supply and install a BMS system consisting of,
but not limited to:
BMS equipment including BMS Monitoring and
control server LAN TCP/IP operator terminal
(PC), direct digital controllers DCC, IP/Routers
and printer as necessary to suit system
network for the monitoring and control of
electro-mechanical installations as indicated
on plumbing, HVAC and electrical input/output
schedules (all BMS as in the drawing and as in
the specification section 16950

01

To suit building BMS system

227158363.xls.ms_officeDiv16

ITEM

3,485,856.00

Page 31 of 61

3,485,856.00

to verify if it is "by
others" scope since the
(3,485,856.00)
quantity was not
included on the BOQ

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount
RATE

BOQ

Tender
Drawing

No.
No.
No.

33
33
33

33
33
33

47,703.41
2,733.23
1,787.82

1,574,212.53
90,196.59
58,998.06

1,574,212.53
90,196.59
58,998.06

ITEM

26,408.00

26,408.00

26,408.00

143,791.56

143,791.56

143,791.56

No.

No.

578.34

2,313.36

2,313.36

No.

31,812.40

95,437.20

95,437.20

BOQ

Tender
Drawing

ANTI THEFT SYSTEM


Supply installation, testing and
commissioning of anti theft system
comprising of anti theft control unitsplatter ,alarm unit power supply with
activation of the CCTVsystem and all
associated work required including
cable/wires, conduits and interfacing as
shown on drawings and as described in
specification
To suit anti theft system network equipped with:
01
02
03
04

Anti theft control unit- Ref., COU


Wall/ceiling mounted antenna Ref., ATH
Anti theft alarm unit Ref., AU
Antenna cable under ground and around the
door perimeter

ACCESS CONTROL SYSTEM


Supply installation, testing and
commissioning of access control system
comprising of AMC system - TCP-IP
interface with PC converter unit, printer,
PC, control barrier, door lock, card reader
and all associated work required including
cable/wires, conduits and interfacing as
shown on drawings and as described in
specification section 16050 & 16783

01
02
01

Supply and install access control system


consisting of, but not limited to:
Access control system "ACC" with system
TCP-IP interface including Master PC, printer,
PC converter, UPS & power supply
Ref. AMC-1 to AMC-4
ACCESS CONTROL SYSTEM
Output control barrier , type ( A )

227158363.xls.ms_officeDiv16

Page 32 of 61

Variance

Remarks

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)
Quantity
ITEM

DESCRIPTION

UNIT

Amount

BOQ

Tender
Drawing

02

Card reader

No.

03

Door lock , type ( C )

No.

04

Door lock , type ( D )

No.

22

22

05

Door lock , type ( E )

No.

06

Push button switch

No.

RATE
2,309.38

18,475.04

Tender
Drawing
18,475.04

1,136.86

3,410.58

3,410.58

1,360.01

29,920.22

29,920.22

636.43

5,091.44

5,091.44

611.35

1,222.70

1,222.70

21,270,626.71

24,749,919.29

BOQ

To Bill Summary

Note: Some of the new item's rate were from BOQ's of other building (see remarks).
Other items have no unit rate, the description/specs of those items cannot be found on other BOQ's
Highlighted items are those without unit rate

227158363.xls.ms_officeDiv16

Page 33 of 61

Variance

Remarks
quantified on one-line
diagram
quantified both on
layout plan and one line
diagram
quantified both on
layout plan and one line
diagram
quantified both on
layout plan and one line
diagram

)3,479,292.58(

PROJECT: THE PLANNING & DESIGN FOR KING KHALID UNIVERSITY


CAMPUS - ABHA
BOQ FOR COLLEGE OF LANGUAGES & TRANSLATION MALE (MC04)

Quantity
ITEM

DESCRIPTION

UNIT

Amount

Tender
Drawing

BOQ

RATE
BOQ

Variance

Tender
Drawing

Remarks

DIVISION 2 - SITE CONSTRUCTION


EXCAVATION AND EARTHWORK
Excavation over site generally in reducing
levels commencing from existing grades
and excavation for foundations of
driverways in the area of plaza including
hauling to stockpile about the site or
disposal tip as required, temporary
earthwork supports, dewatering,
compacting bases, special contouring,
clearing of deleterious materials all as
deemed necessary as shown on drawings
and as per specification section 02200
01

Existing ground levels to formation subgrade


of beds, pavements, landscaping and the like

M3

7,390

64.70

478,133.00

478,133.00

M3

1,090

40.93

44,613.70

44,613.70

RTCC office

Filling over site in making up levels


generally including hauling from stockpile
or the like, compaction, embankments,
special contouring, clearing of deleterious
materials all as as shown on drawings and
as per specification section 02200

01

Selected fill from excavations or imported fill


material (as per Engineer's approved) in
building up levels to formation subgrade of
beds, pavements, landscaping and the like
Work on proposed structural built-up areas
from part of the Work pertaining to respective
building or structure as measured elsewhere.

RTCC office

01

CONCRETE WORK
Insitu plain concrete, 20 Mpa, type V
cement in :
Blinding beds, 100 mm thick

M3

58

72.547

462.14

26,804.12

33,526.87

6,722.75

02

Blinding beds, 75 mm thick

M3

33

501.75

16,557.75

16,557.75

not found in the site works plan

03

Cement screed 50 mm thick

M2

80

52.82

4,225.60

4,225.60

not found in the site works plan

01
02
03

Insitu reinforced concrete 30 Mpa type V


cement including steel base plates, dowel
bars, grouting, formwork and steel
reinforcement conforming to ASTM A615
and A185 in:
Isolated and strap footing
Tie beams
Columns pedestals
Insitu reinforced concrete 30 Mpa type V
cement including steel base plates, dowel
bars, grouting, formwork and steel
reinforcement conforming to ASTM A615
and A185 in:

M3
M3
M3

232
137
44

159.528
129.728
41.964

1,394.34
1,727.08
1,742.93

323,486.88
236,609.96
76,688.92

222,436.27
224,050.63
73,140.31

101,050.61
12,559.33
3,548.61

01

RC wall

M3

102

1,766.70

180,203.40

180,203.40

M3
M3
M3

312
124
210

231.000
398.353
280.891

1,584.48
1,727.08
1,307.20

494,357.76
214,157.92
274,512.00

366,014.88
687,987.50
367,180.72

128,342.88
473,829.58
92,668.72

01
02
03

Insitu reinforced concrete 30 Mpa type I


cement including steel base plates, dowel
bars, grouting, formwork and steel
reinforcement conforming to ASTM A615
and A185 in:
Columns
Beams
Suspended slabs (solid slabs)
Concrete to suit stairs

227158363.xls.ms_officeBill No 2

not found in the design


drawing site works

Page 34 of 61

Quantity
ITEM

DESCRIPTION

UNIT

Amount

Landings
Treads and Risers
Damp-proofing
Bituminous paint onto surfaces of concrete in
contact with soil
Membrane water proof

M3
M3

Tender
Drawing
9.917
38.074

M2

1,961

02

Membrane water proof

M2

03

Protection board
PAVING AND SURFACING
Asphalt pavement comprising 80 mm thick
single layer bituminous wearing course, 150
mm thick granular base including prime coat,
tack coat and compacted subgrade as per
detail A on drawing XL-31 and specification
section 02510

BOQ
New Item
New Item

01

01

02

01

01

02

01

02

01

02

Dry stream bed covered with rock and gravel


gropings including compacted earth and 100
mm thick mortar bed as per detail 8 shown on
drawng XL-32 and specification section
Sidewalks and pavements
Cast-in-place concrete paving 100mm thick
with A193 WWF reinforcement, smooth finish
with local stone edge and band score joints,
moisture barrier and compacted subgrade as
per detail-F-2, drawing XL-31 and
specification section 02500
Stone capped steps
Stone capped steps including compacted
subgrade, 75 mm compacted sand stepped
concrete work, stone paving set with mortar
as per detail 4 show on drawing XL-32 and as
per specification section 02515
Wooden bridge
Wooden bridge including 150 x 20 mm
wooden flooring, wooden column, wooden
balustrade and handrail as per detail 11 on
drawing XL-32
Stone steps
60 mm thick local stone step laid on 100 mm
thick compacted gravel course including
compacted subgrade as shown on drawing
XL-11 and specification section 02515
Granite steps
Granite steps as per detail 6 shown on
drawing XL-32 and specification
Random local stone paving
Random local stone paving with local stone
edge and band including compacted
subgrade, moisture barrier, concrete work, 20
mm thick cement mortar setting bed as per
detail E10 shown on drawing XL-31 and
specification section 02515
Ditto. But as per detail E5 shown on drawing
XL-31 and specifcation section 02515

RATE

Variance

Tender
Drawing

BOQ

Remarks
as per design drawing

0.00
0.00

1,927.018

9.24

18,119.64

17,805.65

313.99

300

51.50

15,450.00

15,450.00

not found in the design drawing

M2

233

113.55

26,457.15

26,457.15

not found in the design drawing

M2

2,560

2,052.687

244.27

625,331.20

501,409.85

123,921.35

M2

40

29.720

396.12

15,844.80

11,772.69

4,072.11

M2

2,446

1,840.750

290.49

710,538.54

534,719.47

175,819.07

213

252.452

538.72

114,747.36

136,000.94

21,253.58

No.

2.000

174,850.01

349,700.02

349,700.02

0.00

No.

16

16.000

17,406.83

278,509.28

278,509.28

0.00

200

185.674

1,299.27

259,854.00

241,240.66

18,613.34

M2

880

894.739

237.67

209,149.60

212,652.62

3,503.02

M2

315

245.025

1,011.43

318,600.45

247,825.64

70,774.81

38

51.665

323.50

12,293.00

16,713.63

4,420.63

No.

158.45

316.90

316.90

as per design drawing

CONCRETE SEATING
Seating

01

Reinforced concrete seats (type A) back rest


450mm high, 100 x 100 mm inlaid ceramic tile
band, rolled edges, finishes, expansion joint,
fixings complete as per detail 7 on drawing XL32 and specification section 02900

02

Ditto. But type a per detail 7 shown on


drawing XL-32 and specification section 02900

227158363.xls.ms_officeBill No 2

as per design drawing

Page 35 of 61

Quantity
ITEM

DESCRIPTION

UNIT

Amount

Tender
Drawing

BOQ

RATE

Variance

Tender
Drawing

BOQ

Remarks

CONCRETE SEATING
01

02

03

01

02

01

02

03
New Item

01

Stone seat wall 500 mm high on 300 x 300


mm concrete base as per detail 2 on drawing
XL-32 and specification section 02900

KERBS AND EDGING


Concrete curbing
Precast concrete curb, 300X500X150 mm
exposed aggregate finish including bedding,
haunching, concrete base and compacted
subgrade as per detail 1 ondrawing XL-32 as
per specification section 02529
Concrete mowing edge as per detail 10 on
drawing XL-32 and specifications
RIPRAP
As ahown detail 9 on drawing XL-32 including
all associated works to suit the required
places as per drawings and specifcation

PLANTER RETAINING WALL


Stone faced planterretaining wall
200 mm thick and 600 mm high reinforced
concrete retaining wall with flat cap stone on
top, 450 x 300 mm concrete foundation
including expansion joint with adjacent paving
as per detail 3 on drawing XL-32 and
specification section 02900
Concrete raised planters
Reinforced concrete raised planters including
finishing and all associated works as per
detail 12 drawing XL32
GRANITE PAVING ( PATTERNED)
Patterned layout 30 mm thick granite paving
including 100mm thick cast-in-place concrete
slab with A193 WWF mesh reinforcement,
20mm thick cement mortar setting bed,
approved polyethylene moisture barrier,
compacted subgrade complete as per detail-C
on drawing XL31 as per specification section
02515
Sidewalks and pavements
Terrazo tiles with granite band as detail G9
drawing XL31
Terrazo tiles with granite band as detail G11
drawing XL31
SUNDRIES
Steel handrail
As shown in detail 13 drawing XL32 and as
per specification

32

31.501

323.50

10,352.00

10,190.57

161.43

670

605.463

71.30

47,771.00

43,169.51

4,601.49

45

34.382

71.30

3,208.50

2,451.44

757.06

M2

560

463.486

343.30

192,248.00

159,114.74

33,133.26

511

444.692

1,180.44

603,204.84

524,932.22

78,272.62

ITEM

130

126.463

1,180.44

153,457.20

149,281.98

4,175.22

M2

120

95.570

1,109.14

133,096.80

106,000.51

27,096.29

M2

1,500

1,109.14

1,663,710.00

1,663,710.00

M2

98.067

0.00

320

42.190

792.24

253,516.80

33,424.61

220,092.19

1
6
5
8
5
5
1

1.000
6.000
5.000
9.000
6.000
5.000
1.000

468.74
349.91
448.94
429.13
438.37
359.15
376.31

468.74
2,099.46
2,244.70
3,433.04
2,191.85
1,795.75
376.31

468.74
2,099.46
2,244.70
3,862.17
2,630.22
1,795.75
376.31

0.00
0.00
0.00
429.13
438.37
0.00
0.00

DD quantity, unit is in l.m.

not found in the design drawing


as per design drawing

LANDSCAPING
Trees including pit excavation, stakes and
ties, soil planting mix, mulching, filter
membrane and drainage layer all as details
and planting schedule on drawing XL-41
as per specification section 02900
01
02
03
04
05
06
07

T/Aa
T/Cs
T/Cv
T/Ao
T/Fs
T/Pa
TZSc

227158363.xls.ms_officeBill No 2

No.
No.
No.
No.
No.
No.
No.

Page 36 of 61

Quantity
ITEM

DESCRIPTION

UNIT

Amount

Tender
Drawing

BOQ

RATE
BOQ

Tender
Drawing

Variance

Remarks

Shrubs and ground cover including


planting, site excavation as required , soil
planting mix, mulching, filter membrane
and drainage layer all as per details and
planting schedule on drawing XL-41 as per
specification section 02900
01
02
03
04
05
06
07

S/Ji
S/Cn
S/In
S/Js
S/Li
S/Gj
S/Aw

No.
No.
No.
No.
No.
No.
No.

10
18
7
19
7
49
21

10.000
11.000
7.000
19.000
5.000
49.000
21.000

126.76
151.85
153.17
102.99
153.17
153.17
96.39

1,267.60
2,733.30
1,072.19
1,956.81
1,072.19
7,505.33
2,024.19

1,267.60
1,670.35
1,072.19
1,956.81
765.85
7,505.33
2,024.19

0.00
1,062.95
0.00
0.00
306.34
0.00
0.00

No.
No.
No.
No.

28
3
23
4

29.000
3.000
23.000
4.000

349.91
109.59
153.17
349.91

9,797.48
328.77
3,522.91
1,399.64

10,147.39
328.77
3,522.91
1,399.64

349.91
0.00
0.00
0.00

Shrubs and ground cover including


planting, site excavation as required , soil
planting mix, mulching, filter membrane
and drainage layer all as per details and
planting schedule on drawing XL-41 as per
specification section 02900
01
02
03
04

S/Ah
S/Ld
S/Cg
S/TS
Shrubs and ground cover including
planting, site excavation as required , soil
planting mix, mulching, filter membrane
and drainage layer all as per details and
planting schedule on drawing XL-41 as per
specification section 02900

01
02
03
04

G/Av
G/Wt
G/Vr
G/Vp

No.
No.
No.
No.

377
1,045
706
373

339.000
933.000
830.000
392.000

17.17
14.52
15.84
14.52

6,473.09
15,173.40
11,183.04
5,415.96

5,820.63
13,547.16
13,147.20
5,691.84

652.46
1,626.24
1,964.16
275.88

05

G/Gr

06

G/Gr(Y)

No.
No.

494
171

665.000

42.25
42.25

20,871.50
7,224.75

28,096.25

20,871.50
20,871.50

No.
No.
No.
No.
No.
No.

108
319
137
470
196
193

108.000
638.000
137.000
518.000
196.000
193.000

153.17
14.52
14.52
116.20
153.17
153.17

16,542.36
4,631.88
1,989.24
54,614.00
30,021.32
29,561.81

16,542.36
9,263.76
1,989.24
60,191.60
30,021.32
29,561.81

0.00
4,631.88
0.00
5,577.60
0.00
0.00

M2
M2
M2

18
9
9

18.000
9.000
9.000

33.01
50.18
42.25

594.18
451.62
380.25

594.18
451.62
380.25

0.00
0.00
0.00

M2

139

75.000

221.83

30,834.37

16,637.25

14,197.12

not found in the design drawing

Shrubs and ground cover including


planting, site excavation as required , soil
planting mix, mulching, filter membrane
and drainage layer all as per details and
planting schedule on drawing XL-41 as per
specification section 02900
01
02
03
04
05
06

01
02
03

01

G/Ac
G/Cgp
G/Of
GC/Ln
G/Lcn(O)
G/Lcn(w)
Succuleuts including soil planting, mix,
filter membrane, drainage layer and
waterproofing membrane where required
as per details and planting schedule on
drawing XL-41
Sc/Ea
Sc/Eg
Sc/Ep
Lawn planting including soil planting, mix,
filter membrane, drainage layer and
waterproofing membrane where required
as per details and planting schedule on
drawing XL41
L/Cd
DRAINAGE INSTALLATIONS

227158363.xls.ms_officeBill No 2

Page 37 of 61

Quantity
ITEM

DESCRIPTION

UNIT

Amount
RATE

Variance

BOQ

Tender
Drawing

No.

15,844.80

79,224.00

79,224.00

0.00

No.

20,598.24

61,794.72

61,794.72

0.00

No.

3,168.96

15,844.80

15,844.80

0.00

M
M
M

25
50
200

20
48
398

71.30
87.15
126.76

1,782.50
4,357.50
25,352.00

1,446.41
4,198.89
50,473.30

336.09
158.61
25,121.30

No.

507.03

507.03

507.03

0.00

No.
No.
No.

1
1
1

1
1
1

63,379.20
63,379.20
63,379.20

63,379.20
63,379.20
63,379.20

63,379.20
63,379.20
63,379.20

0.00
0.00
0.00

01

Sump pit No.(1)


Sump pit No.(2)
Sump pit No.(3)
Constant discharge submersible pumps
(two duty, one stand-by) including
associated valving pipe work within sump
pit, and accessories within sump pit
chamber as described on drawings (sump
pit measured separately)
Ref. (SP-1) capacity 7.90m 3 /h & 36.26 m PSI

set

87,146.40

87,146.40

87,146.40

0.00

02

Ref. (SP-2) capacity 22.00m 3 /h & 36.26 m PSI

set

150,525.60

150,525.60

150,525.60

0.00

03

Ref. (SP-3) capacity 11.40m 3 /h & 36.26 m PSI

set

102,991.20

102,991.20

102,991.20

0.00

01
02

POTABLE WATER SYSTEM


Supply and installation potable pipework,
UPVC schedule 80 including, fittings and
supports hot water pipes insulation ,
excavtion and backfilling as required
shown on drawings as per specification
section 02668
100 mm dia.
63 mm dia.
Allowances for testing and commissioning for
potable water system
Accessories
Supply and install 100 mm dia. Pressure
reducing valve (PRV)
Supply and install 100 mm dia. Back flow
prventer (BFP)

M
M
ITEM

15
30

12.573
25.1394

174.29
130.72

2,614.35
3,921.60

2,191.35
3,286.22

423.00
635.38

No.

5,545.68

5,545.68

5,545.68

0.00

No.

1,980.60

1,980.60

1,980.60

BOQ

Tender
Drawing

Remarks

Reinforced concrete sewer manhole with


standard traffic type cast-iron manhole
cover and frame (heavy duty) 0.60m dia.
including foundation bed and associated
civil and earthworks as on drawing and as
per specification section 02730
01

02

Ref. SMH
Plain concrete catch basin with steel cover
and frame including foundation bed and
associated earthworks as detailed on
drawing
Ref. C.B
Soakaway pit including excavation in
unclassified ground and filling with 100mm
thick graded and base layer 300mm thick
gravel course and300 mm thick earth fill
topping all as detail on drawings

01

01
02
03
04

Soakaway pit, 300 mm dia.,700 mm deep


Supply and installation pipework, UPVC
schedule 40, including trench work,
fittings and supports as required as
shown on drawings and as per
specifications section 02730
75 mm dia.
100 mm dia.
150 mm dia.
ACCESSORIES
Floor cleanout 150mm dia. Ref. (GCO)
Reinforced concrete sump pit including
concrete works waterproofing, access
ladders, internal lining, proprietary
galvanized steel manhole cover and frame,
guide bar, lifting chain and all associated
works as detailed on drawing

01
02
03

03
01
02

227158363.xls.ms_officeBill No 2

Page 38 of 61

Quantity
ITEM

DESCRIPTION

UNIT

Amount

03

Supply and install 100 mm dia. isolating valve

No.

Tender
Drawing
1

04
05

FIRE WATER SYSTEM


Supply and installation pipework including
fitting and support, excavation and
backfilling as required as shown on
drawings and as per specificatons section
15300
200 mm dia.
100 mm dia.

M
M

15
45

12.607
65.01

No.

No.

No.

No.

M
M
M
M
M

100
175
60
50
220

M
M
M

01
02

Accessories
Supply and install 200 mm dia. Pressure
reducing valve (PRV)
Supply and install 200 mm dia. Back flow
preventer (BFP)

03

Supply and install 200 mm dia. Isolating valve

04

Fire department connection, 2 way fire


department inlet connection type, with gate
and check valve, 100 mm dia.

01
02
03
04
05

01
02
03
04

01
02
03

IRRIGATION SYSTEM
Supply and installation irrigation line
pipework, UPVC schedule 80, including
trenching, backfill, fittings and supports as
required as shown on drawings and as per
specifications section 02810
20 mm dia.
25 mm dia.
32 mm dia.
40 mm dia.
50 mm dia.
Supply and installation irrigation line
pipework, UPVC schedule 80, including
trenching, backfill, fittings and supports as
required as shown on drawings and as per
specifications section 02810
63 mm dia.
75 mm dia.
100 mm dia.
Accessories
Supply and installation irrigation controller as
detailed on drwings and as per specifications
section 02810
Accessories
Supply and installation bubbler for shrubs,
ground cover and succulents
Supply and installation bubblers for trees
Supply and installation spray lawn sprinkler

RATE

Variance

3,301.00

3,301.00

Tender
Drawing
3,301.00

839.77
221.83

12,596.55
9,982.35

10,586.98
14,421.17

2,009.57
4,438.82

14,260.32

14,260.32

14,260.32

5,545.68

5,545.68

5,545.68

0.00

7,130.16

7,130.16

7,130.16

23,767.20

142,603.20

142,603.20

0.00

75
166
50
45
194

66.02
68.66
72.62
100.35
118.84

6,602.00
12,015.50
4,357.20
5,017.50
26,144.80

4,921.13
11,422.28
3,631.00
4,469.59
23,012.18

1,680.87
593.22
726.20
547.91
3,132.62

40
5
150

36
2
135

130.72
142.60
174.29

5,228.80
713.00
26,143.50

4,686.18
330.35
23,450.72

542.62
382.65
2,692.78

No.

8,239.30

8,239.30

8,239.30

0.00

No.

874

697

15.84

13,844.16

11,040.48

2,803.68

No.
No.

160
5

27

15.84
633.79

2,534.40
3,168.95

427.68
-

2,106.72
3,168.95

No.

12

12

4,008.73

48,104.76

48,104.76

0.00

BOQ

BOQ

Remarks

0.00

Supply and installation remote control


valve assembly including piping complete
with valve box, Y-strainer, accessories and
all associated works as detail on drawing
and as per specifications section 02810
04

01

Ref. RCV 01 to 12
IRRIGATION SYSTEM
Allowances for testing and commissioning for
irrigation system

ITEM

ELECTRICAL UTILITIES
SITE LIGHTING

227158363.xls.ms_officeBill No 2

Page 39 of 61

Quantity
ITEM

01
02
03
04
01
02
03

DESCRIPTION
Supply, installation, testing and
commissioning of outdoor lighting fixtures
complete including poles, cables/wires
and conduits, trenching work, foundations
and all accessories as shown on drawings
and as described in specifications section
16050
Type (BLI)
Tyep (L1)
Type (L3)
Type (ST)
SITE LIGHTING
Type (ST2)
Type (UL)
Type (WL4)
To TENDER SUMMARY

227158363.xls.ms_officeBill No 2

UNIT

Amount
RATE

Tender
Drawing

No.
No.
No.
No.

75
20
89
7

75
20
88
7

2,535.17
5,228.78
4,436.54
1,014.07

190,137.75
104,575.60
394,852.06
7,098.49

190,137.75
104,575.60
390,415.52
7,098.49

0.00
0.00
4,436.54
0.00

No.
No.
No.

19
35
94

19
35
94

3,168.96
3,168.96
3,168.96

60,210.24
110,913.60
297,882.24

60,210.24
110,913.60
297,882.24

0.00
0.00
0.00

BOQ

10,924,009.81

Tender
Drawing

Variance

BOQ

8,065,068.38

Remarks

2,858,941.43

Page 40 of 61