br i dges of r el at i on

architecture
building construction science
spring 2014
pr es s u r e s t u di es
wi t h wal l
pr es s u r e s t u di es
wi t h ou t wal l
wi n d s t u di es 1 wi n d s t u di es 2
s u n s t u di es
1ST FLOOR PLAN
A- A bu i l di n g s ec t i on 1
s c al e 1 = 1 / 8
A
B
C
A f i r s t f l oor pl an
s c al e 1 = 1 / 8
B s ec on d f l oor pl an
s c al e 1 = 1 / 8
A- B bu i l di n g s ec t i on 2
s c al e 1 = 1 / 8
Slab-on-Grade - $36,178
Load-Bearing Walls - $65,035
Interior Partions - $10,158
Roof Structure - $54,230
Standing Seam Metal Roof - $59,163
Foundation - $ 5,323
Second Floor Steel Structure - $29,498
Wood Canopy Roof - $1,146
HARD BUILDING COST - $546,533
Storefront - $28,651
Finish Date: - 9/29/14
Duration - 17 Days
Finish Date: - 8/28/14
Duration - 4 Days
Finish Date: - 9/4/14
Duration - 7 Days
Finish Date: - 10/6/14
Duration - 18 Days
Finish Date: - 9/8/14
Duration - 6 Days
Finish Date: - 8/6/14
Duration - 8 Days
Finish Date: - 8/27/14
Duration - 40 Days
Finish Date: - 7/1/14
Duration - 7 Days
Finish Date: - 6/19/14
Duration - 5 Days
TOTAL COST - $656,966
START DATE - 4/21/14
FINISH DATE - 10/20/14
s t r u c t u r al br i c k f ac ade pat t er n
expl oded s t r u c t u r al axon
D wes t el ev at i on
s c al e 1 = 1 / 8
G eas t el ev at i on
s c al e 1 = 1 / 8
C s ou t h el ev at i on
s c al e 1 = 1 / 8
F n or t h el ev at i on
s c al e 1 = 1 / 8
Brick Panels - Excluding Back-up Wall
Total Cost - $191,670
Advantages - Fast installment time and cuts
down on material waste.
Disadvantages - Very costly and requires
extra equipment to erect, along with longer
fabrication times
Brick Veneer - Excluding Back-up Wall
Total Cost - $47,619
Advantages - Brick provide more thermal
insulation when used with a cavity assembly
and are more aesthetically pleasing.
Disadvantages - Brick veneers require a CMU
or metal stud back-up wall, thus raising the
price of the system.
CMU Load-Bearing Exterior
Total Cost - $48,213
Advantages - A CMU exterior is more
effcient and does not require a secondary
back-up wall.
Disadvantages - It is more diffcult to
construct large openings because you risk the
load-bearing walls integrity.
Steel Frame w/ Stud Infll
Total - $194, 764
Advantages - Construction is fast and steel
frame allows for ease of design.
Disadvantages - Still have to have an infll
wall causing for higher cost and longer con
struction.
CMU Load- Bearing Masonry
Total - $150, 391
Advantages - CMUs offer more thermal insu
lation, acts as the structure, as well as the skin
of the building, and cuts down on material
quantities.
Disadvantages - Masonry walls require more
labor hours and skill to construct. Workability
can be harder with a large slanted roof.
H s i t e pl an + s ec t i on
s c al e 1 = 1 / 1 6
s i t e c on t ext s i t e gr i d an al ys i s
METAL STANDING SEAM ROOF
STANDING SEAM CONNECTION INSERT
2 RIGID INSULATION
EXPANSION JOINT
STOREFRONT
8 APP. BAY SLAB
36LH07 OWSJ
METAL TRIM BOARD
W12 X 26 BEAM
LIGHTWEIGHT METAL DECKING ON METAL DECK
AGGREGATE SUB-BASE
GROUTED CELLS W/ REINFORCING
METAL STUD SUPPORT
10K1 OWSJ
EARTH
LOAD BEARING WALL FOOTING
FULLY GROUTED SMU W/ REINFORCING
WOOD CANOPY
12K3 OWSJ
CMU BOND BEAM
C4 X 5.4 PURLINS
VAPOR BARRIER
VAPOR BARRIER
Worker Parking
12x12 Concrete Washout Station
50x100 Laydown Area
8x28 Jobsite Trailer
8 Site Safety Fence
8x12 Superintendent Parking
36x36 Porta-Johns
20 C.Y. Waste Disposal Container
2 Erosion Control Fence
Caution / Construction Area Signs
Building Project Sign & Project Permit Sign
Temporary Road-Way
Company Sign
Temporary Barracades
Scaffolding Zone
Hard-Hat Zone (Entire Job Site)
Crane with Gravel Pads
s i t e u t i l i z at i on pl an
A- C wal l s ec t i on det ai l
s c al e 1 = 1
J pl an det ai l
s c al e 1 = 3
K wal l s ec t i on c al l - ou t
s c al e 1 = 3