You are on page 1of 77

Name of Work : SBMS GOWRI KALYANAMANDAPAM, SREESAILAM

S.No.
1
2
3
4
5

DESCRIPTION
Civil Internal Works
Civil Work - External Development Works

SUMMARY OF COST
AMOUNT
SSR
NON-SSR
37,569,320.89

TOTAL
Electrical Works - 12.5% On Civil Int. cost
Plumbing & Sanitary works - 7.5% On Civil
Int.cost

37,569,320.89
4,696,165.11

TOTAL

45,083,185.07

Discount @ 7%

-3,155,822.95
41,927,362.11

NET AMOUNT

2,817,699.07

0.00

EESAILAM

TOTAL AMOUNT

ABSTRACTCIVILINT, SBMS, SREESAILAM

Name of Work : SBMS GOWRI KALYANAMANDAPAM, SREESAILAM


ABSTRACT ( The Estimate is prepared as per SSR 2013 - 2014 )
Amount
Rate
BOQ
Description of Item
Unit
BOQ
Total Amount 7+8
Item No
SSR
Non- SSR
SSR
Non-SSR Items
1
1

Rock Cutting
cum

113.49

520.00

59,012.60

0.00

59,012.60

2,183.00

123,870.03

0.00

123,870.03

395.10

889,660.26

0.00

889,660.26

Sand Filling

cum

56.74

Filling with bouledrs with gravel (60:40)..

cum

2,251.73

PCC 1:4:8

cum

223.75

7,739.36

1,731,685.91

0.00

1,731,685.91

VRCC - M20 A ) FOOTINGS

cum

104.88

10,974.24

1,150,967.59

0.00

1,150,967.59

B ) COLUMNS

cum

107.11

12,102.95

1,296,360.80

0.00

1,296,360.80

C ) T BEAMS

cum

179.12

13,520.13

2,421,747.58

0.00

2,421,747.58

D ) PLINTH BEAMS

cum

33.51

12,540.73

420,205.90

0.00

420,205.90

E ) ROOF SLAB - 4.5" thick

cum

312.71

15,993.33

5,001,195.58

0.00

5,001,195.58

F ) ROOF SLAB - 5" thick - Waist Slab -

cum

19.58

16,992.76

332,719.35

0.00

332,719.35

G ) SUNSHADES -

smt

135.87

625.28

84,958.37

0.00

84,958.37

Reinforcement Steel

MT

81.00

66,651.06

5,398,735.86

0.00

5,398,735.86

Page 3 of 77

ABSTRACTCIVILINT, SBMS, SREESAILAM

Amount

Rate

BOQ
Item No

Description of Item

Unit

BOQ

SSR

Non- SSR

SSR

Non-SSR Items

Total Amount 7+8


9

RR Masonry 2nd sort - CM 1:8

cum

101.09

3,686.11

372,629.55

0.00

372,629.55

Brick Masonry ( CM 1:6 )

cum

518.08

4,908.60

2,543,064.90

0.00

2,543,064.90

Brick Masonry - 4.5" Thick ( CM 1:6 )

sqm

1,052.84

623.81

656,771.76

0.00

656,771.76

10

Ceiling Plastering 12mm ( CM-1:5, CM-1:3 )

Sqm

2,304.23

258.98

596,758.68

0.00

596,758.68

11

Internal wall plastering 12mm (CM 1:6 & 1:3 )

Sqm

6,614.53

255.37

1,689,155.79

0.00

1,689,155.79

12

External plastering

Sqm

1,344.59

312.16

419,732.81

0.00

419,732.81

13

Impervious coating ( Waterproofing terrace )

Sqm

784.24

338.32

265,325.86

0.00

265,325.86

14

Teak wood Door

Sqm

281.74

11,144.12

3,139,722.09

0.00

3,139,722.09

15

Teak wood Window

Sqm

187.55

11,638.14

2,182,691.47

0.00

2,182,691.47

16

Plastic Emulsion paint - Biela wall care - Wall


paint

Sqm

7,959.12

350.00

2,785,692.61

0.00

2,785,692.61

17

Synthetic Enamel paint for Wood work

Sqm

938.57

104.00

97,611.15

0.00

97,611.15

18

Oil Bound Distemper ( Ceilings )

Sqm

2,304.23

76.41

176,066.54

0.00

176,066.54

19

Vitrified Floorings - 598x598x8 mm

Sqm

2,652.15

1,040.65

2,759,953.71

0.00

2,759,953.71

Page 4 of 77

ABSTRACTCIVILINT, SBMS, SREESAILAM

Amount

Rate

BOQ
Item No

Description of Item

Unit

BOQ

SSR

Non- SSR

SSR

Non-SSR Items

Total Amount 7+8


9

20

Polished Tandur Stone

Sqm

187.46

464.65

87,102.93

0.00

87,102.93

21

Dadoing with Decorated coloured background


Sqm
glazed tiles - 200 x 300 mm

829.79

1,067.65

885,921.20

0.00

885,921.20

TOTAL AMOUNT

37,569,320.89
37,569,320.89

Page 5 of 77

0.00

37,569,320.89

ABSTRACTCIVILINT, SBMS, SREESAILAM

Remarks
10
Rate as per
site
condition

Page 6 of 77

ABSTRACTCIVILINT, SBMS, SREESAILAM

Remarks
10

Page 7 of 77

ABSTRACTCIVILINT, SBMS, SREESAILAM

Remarks
10

Page 8 of 77

RA - 7, BOQCIV, GUN, VJA

Name of Work : SBMS GOWRI KALYANAMANDAPAM, SREESAILAM


BILL OF QUANTITIES
BOQ Item
No

Description of Item

Unit

Quantity

Page

Rock Cutting

cum

113.49

Sand Filling

cum

56.74

Filling with bouledrs with gravel (60:40)..

cum

2,251.73

PCC 1:4:8

cum

223.75

VRCC - M20 A ) FOOTINGS

cum

104.88

B ) COLUMNS

cum

107.11

C ) T BEAMS

cum

179.12

D ) PLINTH BEAMS

cum

33.51

E ) ROOF SLAB - 4.5" thick

cum

312.71

F ) ROOF SLAB - 5" thick - Waist Slab -

cum

19.58

G ) SUNSHADES -

smt

135.87

Reinforcement Steel

MT

80.40

RR Masonry 2nd sort - CM 1:8

cum

101.09

Brick Masonry ( CM 1:6 )

cum

518.08

Brick Masonry - 4.5" Thick

sqm

1,052.84

10

Ceiling Plastering 12mm ( CM-1:5, CM-1:3 )

Sqm

2,304.23

11

Internal wall plastering 12mm (CM 1:6 & 1:3 )

Sqm

6,614.53

12

External plastering

Sqm

1,344.59

13

Impervious coating ( Waterproofing terrace )

Sqm

784.24

14

Teak wood Door

Sqm

281.74

15

Teak wood Window

Sqm

187.55

16

Plastic Emulsion paint - Biela wall care - Wall


paint

Sqm

7,959.12

17

Synthetic Enamel paint for Wood work

Sqm

938.57

18

Oil Bound Distemper ( Ceilings )

Sqm

2,304.23

RA - 7, BOQCIV, GUN, VJA


BOQ Item
No

Description of Item

Unit

Quantity

Page

19

Vitrified Floorings - 598x598x8 mm

Sqm

2,652.15

20

Polished Tandur Stone

Sqm

187.46

21

Dadoing with Decorated coloured background


glazed tiles - 200 x 300 mm

Sqm

829.79

10

CIVMSM, SBMSKLYMNDPM, Sreesailam

Name of Work : SBMS GOWRI KALYANAMANDAPAM, SREESAILAM


MEASUREMENTS - CIVIL INTERNAL
S.NO
1

Description
2

Unit
3

1.00

Rock Cutting
F1
F2
F3
F4
F5
F6
F7
TOTAL

Cft

Nos
4

1
1
1
1
1
1
1

X
X
X
X
X
X
X

22
11
10
12
6
4
5
70

X
X
X
X
X
X
X

1
1
1
1
1
1
1

L
5

B
6

6.50
7.00
7.50
8.00
8.50
9.00
9.50

6.50
7.00
7.50
8.00
8.50
9.00
9.50

D
7

1.00
1.00
1.00
1.00
1.00
1.00
1.00

cum
2.00

929.50
539.00
562.50
768.00
433.50
324.00
451.25
4,007.75
113.49

Cft

Sand Filling
F1
F2
F3
F4
F5
F6
F7
TOTAL

1
1
1
1
1
1
1

X
X
X
X
X
X
X

22
11
10
12
6
4
5
70

X
X
X
X
X
X
X

1
1
1
1
1
1
1

6.50
7.00
7.50
8.00
8.50
9.00
9.50

6.50
7.00
7.50
8.00
8.50
9.00
9.50

0.50
0.50
0.50
0.50
0.50
0.50
0.50

cum
3.00

Quantity
8

PCC 1:4:8 :
a) For Footings : F1
F2
F3
F4
F5
F6
F7
TOTAL
b) For RRM :
Long walls Short walls Under Kalyanamandapam hall - LW

464.75
269.50
281.25
384.00
216.75
162.00
225.63
2,003.88
56.74

Cft
1
1
1
1
1
1
1

- SW

X
X
X
X
X
X
X

22
11
10
12
6
4
5
70

X
X
X
X
X
X
X

1
1
1
1
1
1
1

6.50
7.00
7.50
8.00
8.50
9.00
9.50

6.50
7.00
7.50
8.00
8.50
9.00
9.50

0.50
0.50
0.50
0.50
0.50
0.50
0.50

464.75
269.50
281.25
384.00
216.75
162.00
225.63
2,003.88

1 X
1 X
1 X

2 X
2 X
2 X

1
1
1

144.00
80.00
90.00

2.00
2.00
2.00

0.50
0.50
0.50

288.00
160.00
180.00

1 X

2 X

26.00

2.00

0.50

52.00
680.00

C) For Floor bed :


Deduction for walls area : LW
- SW
- intermediate walls

1 X
1 X
1 X

1 X
6 X
6 X

1
1
1

142.75
142.75
80.50

80.50
0.75
0.75

0.50
0.50
0.50

5,745.69
-321.19
-181.13

1 X

4 X

17.00

0.75

0.50

-25.50
5,217.87

TOTAL Quantity

Cft

7,901.75
cum

4.00

RR Stone Maasonry :
Long walls Short walls Under Kalyanamandapam hall - LW

223.75

Cft
1 X
1 X
1 X

Page 11 of 77

2 X
2 X
2 X

1
1
1

144.00
80.00
90.00

1.50
1.50
1.50

3.50
3.50
3.50

1,512.00
840.00
945.00

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Nos
4

Unit
3

Description
2

1 X

- SW

2 X

L
5
1

26.00

B
6
1.50

D
7
3.50

Quantity
8
273.00
3,570.00

cum
5.00

6.00

101.09

1 X

2 X

142.00

80.00

3.50

79,520.00
2,251.73

1 X
1 X

22 X
22 X

1
1

6.00
1.75

6.00
3.00

0.50
0.83

396.00
334.75

1 X
1 X

11 X
11 X

1
1

6.50
1.75

6.50
3.00

0.50
0.83

232.38
189.88

F3
h=10",top size=21"x36"

1 X
1 X

10 X
10 X

1
1

7.00
1.75

7.00
3.00

0.50
0.83

245.00
194.47

F4
h=12",top size=21"x36"

1 X
1 X

12 X
12 X

1
1

7.50
1.75

7.50
3.00

0.50
1.00

337.50
314.74

F5
h=12",top size=21"x36"

1 X
1 X

6 X
6 X

1
1

8.00
1.75

8.00
3.00

0.50
1.00

192.00
175.16

F6
h=12",top size=21"x36"

1 X
1 X

4 X
4 X

1
1

8.50
1.75

8.50
3.00

0.50
1.00

144.50
129.30

F7
h=12",top size=21"x36"

1 X
1 X

5 X
5 X

1
1

9.00
1.75

9.00
3.00

0.50
1.00

202.50
178.12

Basement Filling :

cum

SUB HEAD-III :- RCC WORK


Reinforced cement concrete work in
fotings, plinth beams, roof beams,
suspended floors, roofs having
slope up to 15, landings, balconies,
shelves, chajjas, lintels, bands, plain
window sills, staircases and spiral
stair cases up to floor five level,
excluding the cost of centering, Cft
shuttering,
finishing
and
reinforcement, with 1:2:4 (1 cement
:2 coarse sand :4 graded stone
aggregate 20 mm nominal size).

A) Footings :
F1 - Flat portion
sloped portion
h=10",top size=21"x36"
F2
h=10",top size=21"x36"

Cft

TOTAL

3,266.30
cum

B) Pedestals :

Cft

1 X

TOTAL A + B
C) Columns :

Cft

Page 12 of 77

70 X

1.25

2.50

2.00

92.49
437.50

cum

12.39

cum

104.88

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Description
2
1 ) Upto GL - 9"x24" - 9"x18"
2 ) Above GL - Upto FFL-GF-9"x24"
- 9"x18"
3 ) Ground, 1st & 2nd Floor - 9"x24"
- 9"x18"
4 ) Terrace Floor - 9"x24"
- 9"x18"

Unit
3
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X

Nos
4
52 X
18 X
52 X
18 X
52 X
18 X
52 X
18 X

1
1
1
1
3
3
1
1

L
5
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

B
6
2.00
1.50
2.00
1.50
2.00
1.50
2.00
1.50

D
7
1.50
1.50
4.00
4.00
10.00
10.00
3.00
3.00

TOTAL

Quantity
8
117.00
30.38
312.00
81.00
2,340.00
607.50
234.00
60.75
3,782.63

cum
D) Plinth beams :
Along Long walls : PB1 & PB2

107.11

Cft
1
1
1
1
1
1
1

Along Short walls : PB1 & PB2


Deduction for columns

X
X
X
X
X
X
X

5
2
1
10
1
52
18

X
X
X
X
X
X
X

1
1
1
1
1
1
1

142.75
19.75
130.75
80.50
19.75
0.75
0.75

0.75
0.75
0.75
0.75
0.75
2.00
1.50

1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL

535.31
29.63
98.06
603.75
14.81
-78.00
-20.25
1,183.31

cum
E) Roof slabs :
(1) Beams - GF, FF, & SF - LWs

Cft
1
1
1
1
1
1
1
1
18
18
1
1

- SWs

Balcony slabs - Beams


Deduction for columns

X
X
X
X
X
X
X
X
X
X
X
X

6
1
1
1
6
9
1
2
2
1
52
18

X
X
X
X
X
X
X
X
X
X
X
X

3
3
3
3
3
3
3
3
2
2
1
1

142.75
104.75
26.50
136.75
80.50
28.50
51.75
7.00
4.00
8.00
0.75
0.75

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
2.00
1.50

1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25

TOTAL of (1)

2,408.91
294.61
74.53
384.61
1,358.44
721.41
145.55
39.38
270.00
270.00
-97.50
-25.31
5,844.63

cum
1
1
1
1
18

(2) Slab - GF, FF, & SF


Deduction for Cutout
for Duct
for Lift
For Balcony Slabs

X
X
X
X
X

1
1
1
1
1

X
X
X
X
X

3
3
3
3
2

142.75
86.75
6.00
3.00
8.00

80.50
24.50
7.00
7.00
4.00

0.38
0.38
0.38
0.38
0.38

TOTAL of (2)

165.50
13,100.17
-2,422.93
-47.88
-23.94
437.76
11,043.18

PER EACH FLOOR


F) Staircase :
(1) Waist slab - GF, FF, & SF
Midlanding Midlanding beam -

33.51

cum

312.71

CUM

104.24

Cft
2 X
2 X
2 X

Page 13 of 77

2 X
1 X
1 X

3
3
3

15.00
12.50
12.50

6.00
4.50
0.75

0.41
0.41
1.25

442.80
138.38
70.31

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Unit
3

Description
2
Approach slab
TOTAL

Nos
4
2 X
1 X

L
5
2.50

B
6
6.50

PER EACH FLOOR


G) LINTELS :
For Doors - Ground Floor Main Entrance Door - D
- D1
- D2
- DW3
- DW4
- First Floor - D1
- D2
- D2
- DW3
- DW4
- Second Floor - D1
- D2
- D2
- DW3
- DW4
- Terrace Floor - D1

Cft
Sft

For Windows - Ground Floor -

Sft

D
7
0.41

Quantity
8
39.98
691.47

cum

19.58

CUM

6.53

1
1
1
1
1

X
X
X
X
X

3
15
14
2
2

X
X
X
X
X

1
1
1
1
1

7.50
4.50
4.00
12.50
7.50

0.75
0.75
0.75
0.75
0.75

0.50
0.50
0.50
0.75
0.50

8.44
25.31
21.00
14.06
5.63

1
1
1
1
1

X
X
X
X
X

17
17
17
1
1

X
X
X
X
X

1
1
1
1
1

4.50
4.00
4.00
12.50
7.50

0.75
0.75
0.33
0.75
0.75

0.50
0.50
0.50
0.75
0.50

28.69
25.50
11.22
7.03
2.81

1
1
1
1
1

X
X
X
X
X

17
17
8
1
1

X
X
X
X
X

1
1
1
1
1

4.50
4.00
4.00
12.50
7.50

0.75
0.75
0.33
0.75
0.75

0.50
0.50
0.50
0.75
0.50

28.69
25.50
5.28
7.03
2.81

5 X

4.50

0.75

0.50

8.44

1 X

- W1
- W2
- W3
- W4

1
1
1
1

X
X
X
X

7
15
10
3

X
X
X
X

1
1
1
1

3.50
5.50
4.50
9.50

0.75
0.75
0.75
0.75

0.50
0.50
0.50
0.75

9.19
30.94
16.88
16.03

- W1
- W2
- W3
- W4

1
1
1
1

X
X
X
X

12
23
5
3

X
X
X
X

1
1
1
1

3.50
5.50
4.50
9.50

0.75
0.75
0.75
0.75

0.50
0.50
0.50
0.75

15.75
47.44
8.44
16.03

- W1
- W2
- W3
- W4

1
1
1
1

X
X
X
X

12
23
5
3

X
X
X
X

1
1
1
1

3.50
5.50
4.50
9.50

0.75
0.75
0.75
0.75

0.50
0.50
0.50
0.75

15.75
47.44
8.44
16.03

- W1

1 X

4 X

3.50

0.75

0.50

5.25

- First Floor -

- Second Floor -

- Terrace Floor -

TOTAL

481.05

PER EACH FLOOR


H) Sunshades :
For Doors - Ground Floor Main Entrance Door - D
- First Floor - D2
- Second Floor - D2
- Terrace Floor -

cum

13.62

CUM

4.54

Sft
1 X

3 X

7.00

2.00

(0.165)

42.00

1 X

17 X

3.50

2.00

(0.165)

119.00

1 X

17 X

3.50

2.00

(0.165)

119.00

Page 14 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Nos
4
1 X
5 X

- W1
- W2
- W3
- W4

1
1
1
1

X
X
X
X

7
15
10
3

- W1
- W2
- W3
- W4

1
1
1
1

X
X
X
X

- W1
- W2
- W3
- W4

1
1
1
1

X
X
X
X

- W1

1 X

Unit
3

Description
2
- D1

L
5
4.00

B
6
2.00

D
7
(0.165)

Quantity
8
40.00

X
X
X
X

1
1
1
1

3.00
5.00
4.00
9.00

2.00
2.00
2.00
2.00

(0.165)
(0.165)
(0.165)
(0.165)

42.00
150.00
80.00
54.00

12
23
5
3

X
X
X
X

1
1
1
1

3.00
5.00
4.00
9.00

2.00
2.00
2.00
2.00

(0.165)
(0.165)
(0.165)
(0.165)

72.00
230.00
40.00
54.00

12
23
5
3

X
X
X
X

1
1
1
1

3.00
5.00
4.00
9.00

2.00
2.00
2.00
2.00

(0.165)
(0.165)
(0.165)
(0.165)

72.00
230.00
40.00
54.00

4 X

3.00

2.00

(0.165)

24.00

Sft

For Windows - Ground Floor -

- First Floor -

- Second Floor -

- Terrace Floor -

TOTAL

1,462.00

PER EACH FLOOR

7.00

Centering and shuttering including


strutting, propping etc. and removal of
form for :
Lintels,Beams,Plinthbeams,girders,Bre
ssumers,and Cantilevers
Sft
A) Footings :
F1 - Flat portion

sqm

135.87

sqm

45.29

1 X

22 X

6.00

0.50

264.00

F2

1 X

11 X

6.50

0.50

143.00

F3

1 X

10 X

7.00

0.50

140.00

F4

1 X

12 X

7.50

0.50

45.00

F5

1 X

6 X

8.00

0.50

24.00

F6

1 X

4 X

8.50

0.50

17.00

F7

1 X

5 X

9.00

0.50

22.50

TOTAL

655.50

B) Pedestals :

Sft

C) Columns :
1 ) Upto GL - 9"x24" - 9"x18"
2 ) Above GL - Upto FFL-GF-9"x24"
- 9"x18"
3 ) Ground, 1st & 2nd Floor - 9"x24"
- 9"x18"
4 ) Terrace Floor - 9"x24"

Sft

1 X

70 X

3.75

2.00

525.00

1
1
1
1
1
1
1

52
18
52
18
52
18
52

1
1
1
1
3
3
1

5.50
4.50
5.50
4.50
5.50
4.50
5.50

1.50
1.50
4.00
4.00
10.00
10.00
3.00

429.00
121.50
1,144.00
324.00
8,580.00
2,430.00
858.00

X
X
X
X
X
X
X

Page 15 of 77

X
X
X
X
X
X
X

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Unit
3

Description
2
- 9"x18"

Nos
4
1 X 18 X

L
5
4.50

B
6

D
7
3.00

TOTAL

Quantity
8
243.00
14,129.50

D) Plinth beams :
Along Long walls : PB1 & PB2

Sft
1
1
1
1
1
1
1

Along Short walls : PB1 & PB2


Deduction for columns

X
X
X
X
X
X
X

5
2
1
10
1
52
18

X
X
X
X
X
X
X

1
1
1
1
1
1
1

142.75
19.75
130.75
80.50
19.75
5.50
4.50

2.75
2.75
2.75
2.75
2.75
1.00
1.00

TOTAL

1,962.81
108.63
359.56
2,213.75
54.31
-286.00
-81.00
4,332.06

E) Roof slabs :
(1) Beams - GF, FF, & SF - LWs

Sft
1
1
1
1
1
1
1
1
18
18
1
1

- SWs

Balcony slabs - Beams


Deduction for columns

X
X
X
X
X
X
X
X
X
X
X
X

6
1
1
1
6
9
1
2
2
1
52
18

X
X
X
X
X
X
X
X
X
X
X
X

3
3
3
3
3
3
3
3
2
2
1
1

142.75
104.75
26.50
136.75
80.50
28.50
51.75
7.00
4.00
8.00
5.50
4.50

3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
1.25
1.25

TOTAL of (1)

8,350.88
1,021.31
258.38
1,333.31
4,709.25
2,500.88
504.56
136.50
936.00
936.00
-357.50
-101.25
20,228.32

1
1
1
1
1
1
1
1
1
1

(2) Slab - GF, FF, & SF


Slab edges
For Balcony Slabs
slab edges
Cutout edges
Duct edges
Lift pit slab edges
Deduction for Cutout
for Duct
for Lift

X
X
X
X
X
X
X
X
X
X

1
1
18
18
3
3
3
3
3
3

X
X
X
X
X
X
X
X
X
X

3
3
2
2
1
1
1
1
1
1

142.75
446.50
8.00
16.00
222.50
20.00
26.00
86.75
3.00
6.00

80.50
0.38
4.00

24.50
7.00
7.00

0.38
0.38
0.38
0.38
0.38
0.38
0.38

TOTAL of (2)

34,474.13
509.01
1,152.00
218.88
253.65
22.80
29.64
-2,422.93
-23.94
-47.88
34,165.36

F) Staircase :
(1) Waist slab - GF, FF, & SF
Slab edges
Midlanding Slab edges
Midlanding beam Approach slab
TOTAL

Sft

G) LINTELS :
For Doors - Ground Floor Main Entrance Door - D
- D1
- D2
- DW3
- DW4

Sft

2
2
2
2
2
2

X
X
X
X
X
X

2
4
1
1
1
1

X
X
X
X
X
X

3
3
3
3
3
3

15.00
15.00
12.50
34.00
12.50
2.50

1
1
1
1
1

X
X
X
X
X

3
15
14
2
2

X
X
X
X
X

1
1
1
1
1

7.50
4.50
4.00
12.50
7.50

Page 16 of 77

6.00
4.50

6.50

0.41
0.41
0.41
0.41
3.25
0.41

442.80
147.60
138.38
83.64
243.75
39.98
1,096.15

0.53
0.53
0.40
0.69
0.53

11.93
35.78
22.40
17.25
7.95

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Nos
4

Unit
3

Description
2
- First Floor -

L
5

B
6

D
7

Quantity
8

- D1
- D2
- D2
- DW3
- DW4

1
1
1
1
1

X
X
X
X
X

17
17
17
1
1

X
X
X
X
X

1
1
1
1
1

4.50
4.00
4.00
12.50
7.50

0.53
0.53
0.40
0.69
0.53

40.55
36.04
27.20
8.63
3.98

- D1
- D2
- D2
- DW3
- DW4

1
1
1
1
1

X
X
X
X
X

17
17
8
1
1

X
X
X
X
X

1
1
1
1
1

4.50
4.00
4.00
12.50
7.50

0.53
0.53
0.40
0.69
0.53

40.55
36.04
12.80
8.63
3.98

- D1

1 X

5 X

4.50

0.53

11.93

- W1
- W2
- W3
- W4

1
1
1
1

X
X
X
X

7
15
10
3

X
X
X
X

1
1
1
1

3.50
5.50
4.50
9.50

0.53
0.53
0.53
0.69

12.99
43.73
23.85
19.67

- W1
- W2
- W3
- W4

1
1
1
1

X
X
X
X

12
23
5
3

X
X
X
X

1
1
1
1

3.50
5.50
4.50
9.50

0.53
0.53
0.53
0.69

22.26
67.05
11.93
19.67

- W1
- W2
- W3
- W4

1
1
1
1

X
X
X
X

12
23
5
3

X
X
X
X

1
1
1
1

3.50
5.50
4.50
9.50

0.53
0.53
0.53
0.23

22.26
67.05
11.93
6.56

- W1

1 X

4 X

3.50

0.53

7.42

- Second Floor -

- Terrace Floor -

For Windows - Ground Floor -

- First Floor -

- Second Floor -

- Terrace Floor -

TOTAL

662.01

H) Sunshades :
For Doors - Ground Floor Main Entrance Door - D

Sft
1 X
1 X

3 X
3 X

1
1

7.00
18.00

2.00

1 X
1 X

17 X
17 X

1
1

3.50
11.00

2.00

1 X
1 X

17 X
17 X

1
1

3.50
11.00

2.00

1 X
1 X

5 X
5 X

1
1

4.00
12.00

2.00

X
X
X
X
X
X
X
X

1
1
1
1
1
1
1
1

3.00
10.00
5.00
14.00
4.00
12.00
9.00
22.00

2.00

12 X
12 X
23 X

1
1
1

3.00
10.00
5.00

2.00

0.165

42.00
8.91

0.165

119.00
30.86

0.165

119.00
30.86

0.165

40.00
9.90

- First Floor - D2
- Second Floor - D2
- Terrace Floor - D1
Sft

For Windows - Ground Floor - W1


- W2
- W3
- W4

1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X

7
7
15
15
10
10
3
3

0.165
2.00
0.165
2.00
0.165
2.00
0.165

42.00
11.55
150.00
34.65
80.00
19.80
54.00
10.89

- First Floor - W1
- W2

1 X
1 X
1 X

Page 17 of 77

0.165
2.00

72.00
19.80
230.00

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

1
1
1
1
1

X
X
X
X
X

Nos
4
23 X
5 X
5 X
3 X
3 X

1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X

12
12
23
23
5
5
3
3

Unit
3

Description
2
- W3
- W4

B
6

1
1
1
1
1

L
5
14.00
4.00
12.00
9.00
22.00

X
X
X
X
X
X
X
X

1
1
1
1
1
1
1
1

3.00
10.00
5.00
14.00
4.00
12.00
9.00
22.00

2.00

4 X
4 X

1
1

3.00
10.00

2.00

D
7
0.165

2.00
0.165
2.00
0.165

Quantity
8
53.13
40.00
9.90
54.00
10.89

- Second Floor - W1
- W2
- W3
- W4

0.165

72.00
19.80
230.00
53.13
40.00
9.90
54.00
10.89

0.165

24.00
6.60

0.165
2.00
0.165
2.00
0.165
2.00

- Terrace Floor 1 X
1 X

- W1

TOTAL
8.00

1,813.46

Brick masonry - 9" thick walls


Ground Floor - Long Walls -

Cft

Ground Floor - Short Walls -

Deductions : For openings


- Main Entrance Door - D
- D1
- D2
- DW3
- DW4
- W1
- W2
- W3
- W4
- V1
- V2
Corridor openings - LW
Corridor openings - SW
Staircase openings - SW
Staircase openings - LW
Ground Floor columns - 9"x24"
- 9"x18"

1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X

2
3
2
1
2
2
6
1
2

X
X
X
X
X
X
X
X
X

1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

3
15
14
2
2
7
15
10
3
12
5
2
7
1
1
52
18

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

142.75
90.63
90.63
72.50
19.75
20.50
80.50
51.50
7.00

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

9.00
9.00
3.50
9.00
9.00
9.00
9.00
9.00
9.00

1,927.13
1,835.26
475.81
489.38
266.63
276.75
3,260.25
347.63
94.50

6.00
6.00
12.50
12.50
0.75
0.75

6.00
3.00
2.50
11.00
6.00
2.00
4.00
3.00
8.00
2.00
2.00
0.75
0.75
0.75
0.75
2.00
1.50

8.00
7.00
7.00
7.00
7.00
4.00
4.00
4.00
4.00
2.00
3.00
9.00
9.00
9.00
9.00
9.00
9.00

-144.00
-315.00
-245.00
-154.00
-84.00
-56.00
-240.00
-120.00
-96.00
-48.00
-30.00
-81.00
-283.50
-84.38
-84.38
-702.00
-182.25

TOTAL

6,023.83
1
1
1
1
1
1
1
1
1

First Floor - Long Walls -

First Floor - Short Walls -

X
X
X
X
X
X
X
X
X

2
3
2
1
2
2
6
1
2

X
X
X
X
X
X
X
X
X

1
1
1
1
1
1
1
1
1

17 X

142.75
90.63
90.63
72.50
19.75
20.50
80.50
51.50
7.00

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

9.00
9.00
3.50
9.00
9.00
9.00
9.00
9.00
9.00

1,927.13
1,835.26
475.81
489.38
266.63
276.75
3,260.25
347.63
94.50

3.00

7.00

-357.00

Deductions : For openings


- D1

1 X

Page 18 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Unit
3

Description
2

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

- D2
- DW3
- DW4
- W1
- W2
- W3
- W4
- V1
- V2
Corridor openings - SW
Staircase openings - SW
Staircase openings - LW
Pantry openings - LW
First Floor columns - 9"x24"
- 9"x18"

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

Nos
4
34 X
1 X
1 X
12 X
6 X
5 X
3 X
12 X
5 X
7 X
1 X
1 X
1 X
52 X
18 X

L
5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

6.00
12.50
12.50
6.75
0.75
0.75

B
6
2.50
11.00
6.00
2.00
4.00
3.00
8.00
2.00
2.00
0.75
0.75
0.75
0.75
2.00
1.50

D
7
7.00
7.00
7.00
4.00
4.00
4.00
4.00
2.00
3.00
9.00
9.00
9.00
9.00
9.00
9.00

TOTAL

Quantity
8
-595.00
-77.00
-42.00
-96.00
-96.00
-60.00
-96.00
-48.00
-30.00
-283.50
-84.38
-84.38
-45.56
-702.00
-182.25
6,094.27

Second Floor - Long Walls -

Second Floor - Short Walls -

1
1
1
1
1
1
1

X
X
X
X
X
X
X

3
1
2
1
6
1
2

X
X
X
X
X
X
X

1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

17
17
1
1
12
23
5
3
12
5
6
1
1
1
52
18

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

142.75
90.63
90.63
20.50
80.50
51.50
7.00

0.75
0.75
0.75
0.75
0.75
0.75
0.75

9.00
9.00
3.50
9.00
9.00
9.00
9.00

2,890.69
611.75
475.81
138.38
3,260.25
347.63
94.50

6.00
12.50
12.50
6.75
0.75
0.75

3.00
2.50
11.00
6.00
2.00
4.00
3.00
8.00
2.00
2.00
0.75
0.75
0.75
0.75
2.00
1.50

7.00
7.00
7.00
7.00
4.00
4.00
4.00
4.00
2.00
3.00
9.00
9.00
9.00
9.00
9.00
9.00

-357.00
-297.50
-77.00
-42.00
-96.00
-368.00
-60.00
-96.00
-48.00
-30.00
-243.00
-84.38
-84.38
-45.56
-702.00
-182.25

Deductions : For openings


- D1
- D2
- DW3
- DW4
- W1
- W2
- W3
- W4
- V1
- V2
Corridor openings - SW
Staircase openings - SW
Staircase openings - LW
Pantry openings - LW
Second Floor columns - 9"x24"
- 9"x18"
TOTAL

5,005.94
1 X
1 X

Terrace Floor - Parapet-Long Walls Terrace Floor - Parapet-Short Walls -

2 X
2 X

1
1

142.75
80.50

0.75
0.75

3.50
3.50

TOTAL

1,172.07
TOTAL OF ALL FLOOR

9.00

749.44
422.63

PER EACH FLOOR


Brick masonry - 4.5" thick walls
Ground Floor : Type -2

Ground Floor : Type -1

Cft

18,296.11
cum

518.08

cum

172.69

Cft
1
1
1
1
1

X
X
X
X
X

Page 19 of 77

5
5
5
5
5

X
X
X
X
X

1
1
2
1
1

13.00
6.50
6.50
2.00
19.00

9.00
9.00
10.25
10.25
9.00

585.00
292.50
666.25
102.50
855.00

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Description
2

Unit
3
1
1
1
1
1
1
1

Ground Floor : Type - 3

Ground Floor : Dining Hall


Deduction for openings : Dressg.Op.
D2

X
X
X
X
X
X
X

Nos
4
5 X
5 X
5 X
5 X
1 X
9 X
14 X

1
1
2
1
1
1
1

L
5
6.00
21.25
6.00
2.00
19.75
3.00
2.50

B
6

D
7
9.00
9.00
10.25
10.25
9.00
6.00
7.00

TOTAL

4,215.75
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

First Floor : Type -2

First Floor : Type -1


First Floor : Type - 3

First Floor : Type - 4

Balcony walls Deduction for openings : Dressg.Op.


D2

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

5
5
5
5
5
5
5
5
5
3
3
3
17
9
34

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

1
1
2
1
1
1
1
2
1
1
1
1
1
1
1

13.00
6.50
6.50
2.00
19.00
6.00
21.25
6.00
2.00
19.00
6.00
2.00
11.25
3.00
2.50

9.00
9.00
10.25
10.25
9.00
9.00
9.00
10.25
10.25
9.00
10.25
10.25
3.50
6.00
7.00

TOTAL

585.00
292.50
666.25
102.50
855.00
270.00
956.25
615.00
102.50
513.00
184.50
61.50
669.38
-162.00
-595.00
5,116.38

1
1
1
1
1
1
1
1
1
1
1
1

Second Floor : Type -2


Second Floor : Type -1

Second Floor : Type - 3


Second Floor - 4

Balcony walls Deduction for openings : Dressg.Op.


D2

X
X
X
X
X
X
X
X
X
X
X
X

2
1
5
5
1
1
3
3
3
17
3
17

X
X
X
X
X
X
X
X
X
X
X
X

1
1
1
1
1
1
1
1
1
1
1
1

19.75
19.00
6.00
6.00
19.75
19.00
6.00
6.00
2.00
11.25
3.00
2.50

9.00
9.00
9.00
10.25
9.00
9.00
10.25
9.00
10.25
3.50
6.00
7.00

TOTAL

355.50
171.00
270.00
307.50
177.75
171.00
184.50
162.00
61.50
669.38
-54.00
-297.50
2,178.63

TOTAL OF ALL FLOOR

Sft

11,328.51

PER EACH FLOOR


10.00

Quantity
8
270.00
956.25
615.00
102.50
177.75
-162.00
-245.00

Internal wall plastering :


Ground Floor :
Long Walls : Corridor walls
Short Walls :
Kalyaana mandapam - Low level walls
Hall ( 19'-9" x 19' - 9" ) - LW
Dining Hall ( 19' - 9" x 34' - 6" ) - LW - SW Kitchen ( 19'-9" x 16' - 9" ) - LW
- SW
Type - 3 Room ( 17'0" x 13'0" )

sqm

1,052.84

sqm

350.95

Sft
1
1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X
X

Page 20 of 77

2
2
2
2
2
2
2
2
2
4
4

X
X
X
X
X
X
X
X
X
X
X

1
1
2
2
2
1
1
1
1
2
2

141.25
79.00
88.25
26.00
19.75
19.75
34.50
19.75
16.75
17.00
13.00

9.59
9.59
3.50
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59

2,709.18
1,515.22
1,235.50
997.36
757.61
378.81
661.71
378.81
321.27
1,304.24
997.36

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Description
2
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Short walls - Outside
Type - 1 Room ( 13'0" x 10'0" )
Dressing ( 6'0" x 3'9" )
Toilet ( 6'0" x 6"0" )
Reception ( 9'0" x 7'0" )
Plumber Shaft ( 3'0" x 7'0" )
Lift Shaft ( 6'0" x 7'0" )
Type - 2 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Short walls - Outside
Staircase - Northwest & Southeast Waist Slab bottom
Midlanding bottom
Outer edge
Deductions :
Doors - Main Entrance Door - D
- D1
- D2
- DW3
- DW4
Windows
- W1
- W2
- W3
- W4
Ventilators
- V1
- V2

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

Nos
4
4 X
4 X
4 X
4 X
4 X
2 X
5 X
5 X
5 X
5 X
5 X
1 X
1 X
1 X
1 X
1 X
1 X
5 X
5 X
5 X
5 X
5 X
5 X
5 X
2 X
2 X
2 X
2 X
2 X

1
1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X
X

3
15
14
2
2
7
15
10
3
12
5

Unit
3

X
X
X
X
X
X
X
X
X
X
X

2
2
2
2
4
1
2
2
2
2
4
2
2
2
2
2
2
2
2
2
2
2
2
4
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1

L
5
6.25
6.50
4.00
6.00
6.00
20.50
13.00
10.00
6.00
3.75
6.00
9.00
7.00
3.00
7.00
6.00
7.00
17.00
13.00
6.25
6.50
4.00
6.00
6.00
20.50
20.50
15.00
12.50
42.50

B
6

6.00
3.00
2.50
11.00
6.00
2.00
4.00
3.00
8.00
2.00
2.00

D
7
9.59
9.59
9.59
9.59
3.00
9.59
9.59
9.59
9.59
9.59
3.00
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
3.00
9.59
9.59
6.00
4.50
0.41

Quantity
8
479.50
498.68
306.88
460.32
288.00
393.19
1,246.70
959.00
575.40
359.63
360.00
172.62
134.26
57.54
134.26
115.08
134.26
1,630.30
1,246.70
599.38
623.35
383.60
575.40
360.00
393.19
393.19
360.00
112.50
34.85

8.00
7.00
7.00
7.00
7.00
4.00
4.00
4.00
4.00
2.00
3.00

-144.00
-315.00
-245.00
-154.00
-84.00
-56.00
-240.00
-120.00
-96.00
-48.00
-30.00

TOTAL

First Floor :
Long Walls : Corridor walls
Short Walls :
Cut out of slab - Central portion - Low
level walls
Hall ( 19'-9" x 19' - 9" ) - LW
Type - 4 Room ( 13'0" x 17'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Short walls - Outside
Type - 3 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )

23,112.85

1 X
1 X

2 X
2 X

1
1

141.25
79.00

9.59
9.59

2,709.18
1,515.22

1 X

2 X

88.25

3.50

1,235.50

1
1
1
1
1
1
1
1
1
1
1
1
1

2
2
3
3
4
4
4
4
4
2
4
4
4

2
2
2
2
2
2
2
2
4
1
2
2
2

26.00
19.75
13.00
17.00
6.25
6.50
4.00
6.00
6.00
20.50
17.00
13.00
6.25

9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
3.00
9.59
9.59
9.59
9.59

997.36
757.61
748.02
978.18
479.50
498.68
306.88
460.32
288.00
393.19
1,304.24
997.36
479.50

X
X
X
X
X
X
X
X
X
X
X
X
X

Page 21 of 77

X
X
X
X
X
X
X
X
X
X
X
X
X

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Wash Room ( 4'0" x 6"0" )


Toilet ( 6'0" x 6"0" )
Short walls - Outside
Type - 1 Room ( 13'0" x 10'0" )
Dressing ( 6'0" x 3'9" )
Toilet ( 6'0" x 6"0" )
Pantry ( 9'0" x 7'0" )
Plumber Shaft ( 3'0" x 7'0" )
Lift Shaft ( 6'0" x 7'0" )
Type - 2 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Short walls - Outside
Staircase - Northwest & Southeast Waist Slab bottom
Midlanding bottom
Outer edge
Deductions :
Doors

Windows

Ventilators

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

Nos
4
4 X
4 X
4 X
4 X
2 X
5 X
5 X
5 X
5 X
5 X
1 X
1 X
1 X
1 X
1 X
1 X
5 X
5 X
5 X
5 X
5 X
5 X
5 X
2 X
2 X
2 X
2 X
2 X

1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X

17
34
1
1
12
23
5
3
12
5

Unit
3

Description
2

- D1
- D2
- DW3
- DW4
- W1
- W2
- W3
- W4
- V1
- V2

X
X
X
X
X
X
X
X
X
X

2
2
2
4
1
2
2
2
2
4
2
2
2
2
2
2
2
2
2
2
2
2
4
1
1
2
1
1

1
1
1
1
1
1
1
1
1
1

L
5
6.50
4.00
6.00
6.00
20.50
13.00
10.00
6.00
3.75
6.00
9.00
7.00
3.00
7.00
6.00
7.00
17.00
13.00
6.25
6.50
4.00
6.00
6.00
20.50
20.50
15.00
12.50
42.50

B
6

3.00
2.50
11.00
6.00
2.00
4.00
3.00
8.00
2.00
2.00

D
7
9.59
9.59
9.59
3.00
9.59
9.59
9.59
9.59
9.59
3.00
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
3.00
9.59
9.59
6.00
4.50
0.41

Quantity
8
498.68
306.88
460.32
288.00
393.19
1,246.70
959.00
575.40
359.63
360.00
172.62
134.26
57.54
134.26
115.08
134.26
1,630.30
1,246.70
599.38
623.35
383.60
575.40
360.00
393.19
393.19
360.00
112.50
34.85

7.00
7.00
7.00
7.00
4.00
4.00
4.00
4.00
2.00
3.00

-357.00
-595.00
-77.00
-42.00
-96.00
-368.00
-60.00
-96.00
-48.00
-30.00

TOTAL
Second floor :
Long Walls : Corridor walls
Short Walls :
Cut out of slab - Central portion - Low
level walls
Hall ( 19'-9" x 19' - 9" ) - LW
Men & Women Dormitory ( 13'0" x 52'0"
)
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Short walls - Outside
Dressing ( 6'0" X 3'9" )
General Dormitory ( 69'6" x 19'9" )

25,288.02

1 X
1 X

2 X
2 X

1
1

141.25
79.00

9.59
9.59

2,709.18
1,515.22

1 X

2 X

88.25

3.50

1,235.50

1 X
1 X

2 X
2 X

2
2

26.00
19.75

9.59
9.59

997.36
757.61

1 X

2 X

13.00

9.59

498.68

1
1
1
1
1
1
1
1
1
1
1

2
3
3
3
3
8
2
5
5
2
2

2
2
2
2
2
4
1
2
2
2
2

52.00
6.25
6.50
4.00
6.00
6.00
20.50
6.00
3.75
69.50
19.75

9.59
9.59
9.59
9.59
9.59
3.00
9.59
9.59
9.59
9.59
9.59

1,994.72
359.63
374.01
230.16
345.24
576.00
393.19
575.40
359.63
2,666.02
757.61

X
X
X
X
X
X
X
X
X
X
X

Page 22 of 77

X
X
X
X
X
X
X
X
X
X
X

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Description
2
General Toilets-Dressing ( 6'0" x 3'9" )

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

Nos
4
5 X
5 X
5 X
1 X
1 X
1 X
1 X
1 X
1 X
2 X
2 X
5 X
5 X
5 X
5 X
5 X
2 X
2 X
2 X
2 X
2 X

1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X

17
25
1
1
12
23
5
3
12
5

Unit
3

Toilet ( 6'0" x 6"0" )


Pantry ( 9'0" x 7'0" )
Plumber Shaft ( 3'0" x 7'0" )
Lift Shaft ( 6'0" x 7'0" )
General Washroom ( 6'0" x 19.75" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Short walls - Outside
Staircase - Northwest & Southeast Waist Slab bottom
Midlanding bottom
Outer edge
Deductions :
Doors & Windows :
- D1
- D2
- DW3
- DW4
- W1
- W2
- W3
- W4
- V1
- V2

X
X
X
X
X
X
X
X
X
X

2
2
4
2
2
2
2
2
2
1
1
2
2
2
2
4
1
1
2
1
1

1
1
1
1
1
1
1
1
1
1

L
5
6.00
3.75
6.00
9.00
7.00
3.00
7.00
6.00
7.00
6.00
19.75
6.25
6.50
4.00
6.00
6.00
20.50
20.50
15.00
12.50
42.50

B
6

3.00
2.50
11.00
6.00
2.00
4.00
3.00
8.00
2.00
2.00

D
7
9.59
9.59
3.00
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
9.59
3.00
9.59
9.59
6.00
4.50
0.41

Quantity
8
575.40
359.63
360.00
172.62
134.26
57.54
134.26
115.08
134.26
115.08
378.81
599.38
623.35
383.60
575.40
360.00
393.19
393.19
360.00
112.50
34.85

7.00
7.00
7.00
7.00
4.00
4.00
4.00
4.00
2.00
3.00

-357.00
-437.50
-77.00
-42.00
-96.00
-368.00
-60.00
-96.00
-48.00
-30.00

TOTAL

21,106.06

Terrace Floor ;
Terrace Floor - Parapet-Long Walls Terrace Floor - Parapet-Short Walls Top

1
1
1
1

X
X
X
X

2
2
2
2

X
X
X
X

1
1
1
1

142.75
80.50
142.75
80.50

3.50
3.50
0.23
0.23

999.25
563.50
65.67
37.03
1,665.45

TOTAL OF ALL FLOORS :

71,172.38

PER EACH FLOOR


11.00

Internal ceiling plastering :


Ground Floor :
Corridor walls - long
Corridor walls - short
Hall ( 19'-9" x 19' - 9" ) - LW
Dining Hall ( 19' - 9" x 34' - 6" ) - LW Kitchen ( 19'-9" x 16' - 9" ) - LW
Type - 3 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )

sqm

6,614.53

sqm

2,204.84

Sft
1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X

Page 23 of 77

1
1
2
1
1
1
4
4
4
4

X
X
X
X
X
X
X
X
X
X

1
1
1
1
1
1
1
1
1
1

141.25
88.25
79.00
19.75
19.75
19.75
17.00
6.25
4.00
6.00

6.00
6.00
6.00
19.75
34.50
16.75
13.00
6.50
9.59
6.00

847.50
529.50
948.00
390.06
681.38
330.81
884.00
162.50
153.44
144.00

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Description
2
Type - 1 Room ( 13'0" x 10'0" )
Dressing ( 6'0" x 3'9" )
Toilet ( 6'0" x 6"0" )
Reception ( 9'0" x 7'0" )
Type - 2 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Staircase room ( 20'0" x 12'6" )

Unit
3
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X

Nos
4
5 X
5 X
5 X
1 X
5 X
5 X
5 X
5 X
1 X

1
1
1
1
1
1
1
1
1

L
5
13.00
6.00
6.00
9.00
17.00
6.25
4.00
6.00
20.50

B
6
10.00
3.75
6.00
7.00
13.00
6.50
6.00
6.00
12.50

TOTAL

Quantity
8
650.00
112.50
180.00
63.00
1,105.00
203.13
120.00
180.00
256.25

7,941.07

First Floor :
Corridor - long
Corridor - short
Hall ( 19'-9" x 19' - 9" ) - LW
Type - 4 Room ( 13'0" x 17'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Type - 3 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Type - 1 Room ( 13'0" x 10'0" )
Dressing ( 6'0" x 3'9" )
Toilet ( 6'0" x 6"0" )
Reception ( 9'0" x 7'0" )
Type - 2 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Staircase room ( 20'0" x 12'6" )

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

1
2
1
3
4
4
4
4
4
4
4
5
5
5
1
5
5
5
5
1

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

141.25
79.00
19.75
13.00
6.25
4.00
6.00
17.00
6.25
4.00
6.00
13.00
6.00
6.00
9.00
17.00
6.25
4.00
6.00
20.50

6.00
6.00
19.75
17.00
6.50
6.00
3.00
13.00
6.50
9.59
6.00
10.00
3.75
6.00
7.00
13.00
6.50
6.00
6.00
12.50

TOTAL

847.50
948.00
390.06
663.00
162.50
96.00
72.00
884.00
162.50
153.44
144.00
650.00
112.50
180.00
63.00
1,105.00
203.13
120.00
180.00
256.25

7,392.88

Second floor :
Corridor - Long

1
1
1
1

Corridor - Short
Hall ( 19'-9" x 19' - 9" ) - LW
Men & Women Dormitory ( 13'0" x 52'0"
)
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Dressing ( 6'0" X 3'9" )
General Dormitory ( 69'6" x 19'9" )
General Toilets-Dressing ( 6'0" x 3'9" )
Toilet ( 6'0" x 6"0" )
Pantry ( 9'0" x 7'0" )
General Washroom ( 6'0" x 19'9" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )

X
X
X
X

X
X
X
X

1
1
1
1

141.25
88.25
79.00
19.75

6.00
6.00
9.59
19.75

847.50
529.50
1,515.22
780.13

1 X

2 X

13.00

52.00

1,352.00

1
1
1
1
1
1
1
1
1
1
1
1

3
3
8
5
2
5
5
1
2
5
5
5

1
1
1
1
1
1
1
1
1
1
1
1

6.25
4.00
6.00
6.00
69.50
6.00
6.00
9.00
6.00
6.25
4.00
6.00

6.50
6.00
6.00
3.75
19.75
3.75
6.00
7.00
19.75
6.50
6.00
6.00

121.88
72.00
288.00
112.50
2,745.25
112.50
180.00
63.00
237.00
203.13
120.00
180.00

X
X
X
X
X
X
X
X
X
X
X
X

TOTAL
TOTAL OF ALL FLOORS

D
7

1
1
2
2

X
X
X
X
X
X
X
X
X
X
X
X

9,459.61
Sft

Page 24 of 77

24,793.56

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Nos
4

Unit
3

Description
2

L
5

B
6

PER EACH FLOOR


12.00

External plastering :
Ground Floor :
LWs
SWs
Sunshades
- For D

1
1
1
1
1
1
1
1
1
1
1
1

- W1
- W2
- W3
- W4

X
X
X
X
X
X
X
X
X
X
X
X

2
2
3
3
7
7
15
15
10
10
3
3

X
X
X
X
X
X
X
X
X
X
X
X

1
1
1
1
1
1
1
1
1
1
1
1

142.75
80.50
7.00
18.00
3.00
10.00
5.00
14.00
4.00
12.00
9.00
22.00

D
7
sqm

Quantity
8
2,304.23

sqm

768.08

10.61
10.61
2.00
0.165
2.00
0.165
2.00
0.165
2.00
0.165
2.00
0.165

TOTAL

5,191.17

First Floor :
LWs
SWs
Sunshades

3,029.16
1,708.21
42.00
8.91
42.00
11.55
150.00
34.65
80.00
19.80
54.00
10.89

1
1
1
1
1
1
1
1
1
1
1

- For D2
- W1
- W2
- W3
- W4

X
X
X
X
X
X
X
X
X
X
X

2
2
17
17
12
12
23
23
5
5
3

X
X
X
X
X
X
X
X
X
X
X

1
1
1
1
1
1
1
1
1
1
1

142.75
80.50
3.50
11.00
3.00
10.00
5.00
14.00
4.00
12.00
9.00

10.61
10.61
2.00
0.165
2.00
0.165
2.00
0.165
2.00
0.165
2.00

TOTAL

3,029.16
1,708.21
119.00
30.86
72.00
19.80
230.00
53.13
40.00
9.90
54.00
5,366.06

Second floor :
LWs
SWs
Sunshades
- For D2

1
1
1
1
1
1
1
1
1
1
1
1

- W1
- W2
- W3
- W4

X
X
X
X
X
X
X
X
X
X
X
X

2
2
17
17
12
12
23
23
5
5
3
3

X
X
X
X
X
X
X
X
X
X
X
X

1
1
1
1
1
1
1
1
1
1
1
1

142.75
80.50
3.50
11.00
3.00
10.00
5.00
14.00
4.00
12.00
9.00
22.00

10.61
10.61
2.00
0.165
2.00
0.165
2.00
0.165
2.00
0.165
2.00
0.165

TOTAL

2,347.79

Terrace Floor ;
LWs
SWs

1 X
1 X

2 X
2 X

1
1

142.75
80.50

3.50
3.50

TOTAL
TOTAL OF ALL FLOORS

3,029.16
1,708.21
119.00
30.86
72.00
19.80
230.00
53.13
40.00
9.90
54.00
10.89

999.25
563.50
1,562.75

Sft

14,467.77
sqm

Page 25 of 77

1,344.59

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Description
2
PER EACH FLOOR

13.00

Doors

Nos
4

Unit
3

- Ground Floor Main Entrance Door - D


- D1
- D2
- DW3
- DW4
- First Floor - D1
- D2
- DW3
- DW4
- Second Floor - D1
- D2
- DW3
- DW4
- Terrace Floor - D1

L
5

B
6

D
7
sqm

Sft
1
1
1
1
1

X
X
X
X
X

3
15
14
2
2

X
X
X
X
X

1
1
1
1
1

6.00
3.00
2.50
11.00
6.00

8.00
7.00
7.00
7.00
7.00

144.00
315.00
245.00
154.00
84.00

1
1
1
1

X
X
X
X

17
34
1
1

X
X
X
X

1
1
1
1

3.00
2.50
11.00
6.00

7.00
7.00
7.00
7.00

357.00
595.00
77.00
42.00

1
1
1
1

X
X
X
X

17
25
1
1

X
X
X
X

1
1
1
1

3.00
2.50
11.00
6.00

7.00
7.00
7.00
7.00

357.00
437.50
77.00
42.00

5 X

3.00

7.00

105.00

1 X

TOTAL

3,031.50
sqm

14.00

Windows

Quantity
8
448.20

- Ground Floor - W1
- W2
- W3
- W4
- First Floor - W1
- W2
- W3
- W4

281.74

Sft
1
1
1
1

X
X
X
X

7
15
10
3

X
X
X
X

1
1
1
1

2.00
4.00
3.00
8.00

4.00
4.00
4.00
4.00

56.00
240.00
120.00
96.00

1
1
1
1

X
X
X
X

12
23
5
3

X
X
X
X

1
1
1
1

2.00
4.00
3.00
8.00

4.00
4.00
4.00
4.00

96.00
368.00
60.00
96.00

- W1
- W2
- W3
- W4

1
1
1
1

X
X
X
X

12
23
5
3

X
X
X
X

1
1
1
1

2.00
4.00
3.00
8.00

4.00
4.00
4.00
4.00

96.00
368.00
60.00
96.00

- W1

1 X

4 X

2.00

4.00

32.00

- Second Floor -

- Terrace Floor -

TOTAL

1,784.00
sqm

15.00

Ventilators - Ground Floor - V1


- V2
- First Floor - V1
- V2
- Second Floor - V1
- V2

165.80

Sft
1 X
1 X

12 X
5 X

1
1

2.00
2.00

2.00
3.00

48.00
30.00

1 X
1 X

12 X
5 X

1
1

2.00
2.00

2.00
3.00

48.00
30.00

1 X
1 X

12 X
5 X

1
1

2.00
2.00

2.00
3.00

48.00
30.00

TOTAL

234.00
sqm

Page 26 of 77

21.75

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1
16.00

Description
2
Floorings
Ground Floor :
Corridor - long

Nos
4

Unit
3
Sft

L
5

B
6

D
7

Quantity
8

Corridor - short

1 X
1 X
1 X

1 X
1 X
2 X

1
1
1

141.25
88.25
79.00

6.00
6.00
6.00

847.50
529.50
948.00

Dining Hall ( 19' - 9" x 34' - 6" ) - LW -

1 X

1 X

19.75

34.50

681.38

Type - 3 Room ( 17'0" x 13'0" )


Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Type - 1 Room ( 13'0" x 10'0" )
Dressing ( 6'0" x 3'9" )
Toilet ( 6'0" x 6"0" )
Reception ( 9'0" x 7'0" )
Type - 2 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Staircase room ( 20'0" x 12'6" )
Staircase Treads
Staircase Risers
Staircase Midlanding

1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1

4
4
4
4
5
5
5
1
5
5
5
5
1
2
2
2

X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 12
X 11
X 1

17.00
6.25
4.00
6.00
13.00
6.00
6.00
9.00
17.00
6.25
4.00
6.00
20.50
6.00
20.50
12.50

13.00
6.50
9.59
6.00
10.00
3.75
6.00
7.00
13.00
6.50
6.00
6.00
12.50
1.00
0.41
4.50

884.00
162.50
153.44
144.00
650.00
112.50
180.00
63.00
1,105.00
203.13
120.00
180.00
256.25
288.00
369.82
112.50

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

TOTAL
First Floor :
Corridor - long
Corridor - short
Type - 4 Room ( 13'0" x 17'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Type - 3 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Type - 1 Room ( 13'0" x 10'0" )
Dressing ( 6'0" x 3'9" )
Toilet ( 6'0" x 6"0" )
Type - 2 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Staircase Treads
Staircase Risers
Staircase Midlanding

7,990.52

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

1
2
3
4
4
4
4
4
4
4
5
5
5
5
5
5
5
2
2
2

X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 1
X 12
X 11
X 1

141.25
79.00
13.00
6.25
4.00
6.00
17.00
6.25
4.00
6.00
13.00
6.00
6.00
17.00
6.25
4.00
6.00
6.00
20.50
12.50

6.00
6.00
17.00
6.50
6.00
3.00
13.00
6.50
9.59
6.00
10.00
3.75
6.00
13.00
6.50
6.00
6.00
1.00
0.41
4.50

TOTAL
Second floor :
Corridor - Long
Corridor - Short
Men & Women Dormitory ( 13'0" x 52'0"
)
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Dressing ( 6'0" X 3'9" )

847.50
948.00
663.00
162.50
96.00
72.00
884.00
162.50
153.44
144.00
650.00
112.50
180.00
1,105.00
203.13
120.00
180.00
288.00
369.82
112.50
7,453.89

1 X
1 X
1 X

1 X
1 X
2 X

1
1
1

141.25
88.25
79.00

6.00
6.00
9.59

847.50
529.50
1,515.22

1 X

2 X

13.00

52.00

1,352.00

1
1
1
1

3
3
8
5

1
1
1
1

6.25
4.00
6.00
6.00

6.50
6.00
6.00
3.75

121.88
72.00
288.00
112.50

X
X
X
X

Page 27 of 77

X
X
X
X

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Description
2
General Dormitory ( 69'6" x 19'9" )
General Toilets-Dressing ( 6'0" x 3'9" )
Toilet ( 6'0" x 6"0" )
General Washroom ( 6'0" x 19'9" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Staircase Treads
Staircase Risers
Staircase Midlanding

Unit
3
1
1
1
1
1
1
1
2
2
1

X
X
X
X
X
X
X
X
X
X

Nos
4
2 X 1
5 X 1
5 X 1
2 X 1
5 X 1
5 X 1
5 X 1
2 X 12
2 X 11
2 X 1

L
5
69.50
6.00
6.00
6.00
6.25
4.00
6.00
6.00
20.50
12.50

B
6
19.75
3.75
6.00
19.75
6.50
6.00
6.00
1.00
0.41
4.50

D
7

TOTAL
TOTAL OF ALL FLOORS

9,386.80
Sft

24,831.21

PER EACH FLOOR


17.00

Cladding ( Dado )
Ground Floor :
Kitchen ( 19'-9" x 16' - 9" ) - LW
Type - 3 Room - Toilet ( 6'0" x 6"0" )
Type - 1 Room - Toilet ( 6'0" x 6"0" )
Type - 2 Room - Toilet ( 6'0" x 6"0" )
Deduction for D2

sqm

2,307.73

sqm

769.24

Sft
1
1
1
1
1

X
X
X
X
X

1
4
5
5
14

X
X
X
X
X

1
4
4
4
1

73.00
6.00
6.00
6.00
2.50

7.00
7.00
7.00
7.00
7.00

TOTAL

1
1
1
1
1

X
X
X
X
X

4
4
5
5
17

X
X
X
X
X

4
4
4
4
1

6.00
6.00
6.00
6.00
2.50

7.00
7.00
7.00
7.00
7.00

TOTAL

1 X
1
1
1
1
1
1

X
X
X
X
X
X

8 X
5
5
1
5
17
1

X
X
X
X
X
X

6.00

7.00

1,344.00

1
4
1
4
1
1

19.50
6.00
32.00
6.00
2.50
7.00

7.00
7.00
7.00
7.00
7.00
7.00

682.50
840.00
224.00
840.00
-297.50
-49.00
3,584.00

Sft

8,928.50

PER EACH FLOOR


Skirting
Ground Floor :
Corridor walls - long

672.00
672.00
840.00
840.00
-297.50

2,726.50

Second floor :
Men & Women Dormitory Toilet ( 6'0" x
6"0" )
General Toilets-Dressing ( 6'0" x 3'9" )
General Toilet ( 6'0" x 6"0" )
Pantry ( 9'0" x 7'0" )
Toilet ( 6'0" x 6"0" )
Deduction for
D2
Deduction for Pantry opening
TOTAL

18.00

511.00
672.00
840.00
840.00
-245.00
2,618.00

First Floor :
Type - 4 Room - Toilet ( 6'0" x 6"0" )
Type - 3 Room - Toilet ( 6'0" x 6"0" )
Type - 1 Room - Toilet ( 6'0" x 6"0" )
Type - 2 Room - Toilet ( 6'0" x 6"0" )
Deduction for D2

TOTAL OF ALL FLOORS

Quantity
8
2,745.25
112.50
180.00
237.00
203.13
120.00
180.00
288.00
369.82
112.50

sqm

829.79

sqm

276.60

Sft
1 X
1 X

Page 28 of 77

2 X
2 X

1
2

141.25
88.25

0.41
0.41

115.83
144.73

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Description
2
Corridor walls - short
Hall ( 19'-9" x 19' - 9" ) - LW
Dining Hall ( 19' - 9" x 34' - 6" ) - LW Kitchen ( 19'-9" x 16' - 9" ) - LW
Type - 3 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Type - 1 Room ( 13'0" x 10'0" )
Dressing ( 6'0" x 3'9" )
Reception ( 9'0" x 7'0" )
Type - 2 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Staircase room ( 20'0" x 12'6" )
Staircase Treads
Staircase Risers
Staircase Midlanding
Deduction for Door

Staircase Opening

-D
- D1
- D2
- DW3
- DW4

Unit
3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

Nos
4
2 X 2
4 X 1
2 X 1
2 X 1
2 X 1
2 X 1
4 X 2
4 X 2
4 X 2
4 X 2
4 X 2
4 X 2
5 X 2
5 X 2
5 X 2
5 X 2
1 X 2
1 X 2
5 X 2
5 X 2
5 X 2
5 X 2
5 X 2
5 X 2
5 X 4
1 X 2
1 X 2
2 X 12
2 X 11
2 X 1
3 X 1
15 X 2
14 X 1
2 X 2
2 X 2
2 X 1

L
5
79.00
19.75
19.75
34.50
19.75
16.75
17.00
13.00
6.25
6.50
4.00
6.00
13.00
10.00
6.00
3.75
9.00
7.00
17.00
13.00
6.25
6.50
4.00
6.00
6.00
20.50
12.50
6.00
20.50
21.50
6.00
3.00
2.50
11.00
6.00
12.50

B
6

D
7
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41

TOTAL
First Floor :
Corridor - long
Corridor - short
Hall ( 19'-9" x 19' - 9" ) - LW
Type - 4 Room ( 13'0" x 17'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Type - 3 Room ( 17'0" x 13'0" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Type - 1 Room ( 13'0" x 10'0" )
Dressing ( 6'0" x 3'9" )
Reception ( 9'0" x 7'0" )

Quantity
8
129.56
32.39
16.20
28.29
16.20
13.74
55.76
42.64
20.50
21.32
13.12
19.68
53.30
41.00
24.60
15.38
7.38
5.74
69.70
53.30
25.63
26.65
16.40
24.60
49.20
16.81
10.25
118.08
369.82
17.63
-7.38
-36.90
-14.35
-18.04
-9.84
-10.25
1,518.67

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

Page 29 of 77

2
2
4
3
3
4
4
4
4
4
4
4
4
4
4
5
5
5
5
2
2

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

1
2
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
1

141.25
79.00
19.75
13.00
17.00
6.25
6.50
4.00
6.00
17.00
13.00
6.25
6.50
4.00
6.00
13.00
10.00
6.00
3.75
9.00
7.00

0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41

115.83
129.56
32.39
31.98
41.82
20.50
21.32
13.12
19.68
55.76
42.64
20.50
21.32
13.12
19.68
53.30
41.00
24.60
15.38
7.38
5.74

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Unit
3

Description
2
Type - 2 Room ( 17'0" x 13'0" )

1
1
1
1
1
1
1
1
1
1
1
1
1

Dressing ( 6'3" X 6"6" )


Wash Room ( 4'0" x 6"0" )
Balcony
Deduction for

- D1
- D2
- DW3
- DW4

Staircase Opening

X
X
X
X
X
X
X
X
X
X
X
X
X

Nos
4
5 X
5 X
5 X
5 X
5 X
5 X
17 X
17 X
17 X
17 X
1 X
1 X
2 X

2
2
2
2
2
2
2
2
2
2
2
2
1

L
5
17.00
13.00
6.25
6.50
4.00
4.00
7.24
3.62
3.00
2.50
11.00
6.00
12.50

B
6

D
7
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41

TOTAL

1,005.23

Second floor :
Corridor - Long

1
1
1
1

Corridor - Short
Hall ( 19'-9" x 19' - 9" ) - LW
Men & Women Dormitory ( 13'0" x 52'0"
)

X
X
X
X

1 X
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Dressing ( 6'3" X 6"6" )


Wash Room ( 4'0" x 6"0" )
Toilet ( 6'0" x 6"0" )
Dressing ( 6'0" X 3'9" )
General Dormitory ( 69'6" x 19'9" )
General Toilets-Dressing ( 6'0" x 3'9" )
Pantry ( 9'0" x 7'0" )
General Washroom ( 6'0" x 19'9" )
Dressing ( 6'3" X 6"6" )
Wash Room ( 4'0" x 6"0" )
Balcony
Deduction for

Quantity
8
69.70
53.30
25.63
26.65
16.40
16.40
100.93
50.46
-41.82
-34.85
-9.02
-4.92
-10.25

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

2
2
2
2

X
X
X
X

2
2
2
4

141.25
88.25
79.00
19.75

0.41
0.41
0.41
0.41

231.65
144.73
129.56
64.78

2 X

13.00

0.41

21.32

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

2
2
2
2
2
4
2
2
2
2
2
2
1
1
1
1
1
1
2
2
2
2

52.00
6.25
6.50
4.00
6.00
6.00
6.00
3.75
69.50
19.75
6.00
3.75
9.00
7.00
6.00
19.75
6.25
6.50
4.00
6.00
7.24
3.62

0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41

85.28
15.38
15.99
9.84
14.76
78.72
24.60
15.38
113.98
32.39
24.60
15.38
7.38
5.74
4.92
16.20
12.81
13.33
16.40
24.60
100.93
50.46

2
3
3
3
3
8
5
5
2
2
5
5
2
2
2
2
5
5
5
5
17
17

- D1

1 X

17 X

3.00

0.41

-41.82

- D2
- D2
- DW3
- DW4

1
1
1
1
1

8
17
1
1
2

1
2
2
2
1

2.50
2.50
11.00
6.00
12.50

0.41
0.41
0.41
0.41
0.41

-8.20
-34.85
-9.02
-4.92
-10.25

Staircase Opening

X
X
X
X
X

X
X
X
X
X

TOTAL
TOTAL OF ALL FLOORS

1,182.05
Sft

3,705.95
sqm

Page 30 of 77

344.42

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

19.00

Description
2
PER EACH FLOOR

Nos
4

Unit
3

Impervious Flooring - Terrace floor :


Sft
( Waterproofing )
Terrace floor of the Building :
Deduction for the Cut out of the
Kalyana Mandapam area
Deduction for the Staircase head
rooms

L
5

B
6

D
7
sqm

1 X

1 X

141.25

79.00

11,158.75

1 X

1 X

86.75

24.50

-2,125.38

1 X

2 X

21.25

14.00

-595.00

TOTAL

8,438.37
sqm

20.00

Tandur Stone Flooring


Ground Floor
Hall ( 19'-9" x 19' - 9" ) - LW
Kitchen ( 19'-9" x 16' - 9" ) - LW
First Floor
Hall ( 19'-9" x 19' - 9" ) - LW
Pantry ( 9'0" x 7'0" )
Second Floor
Hall ( 19'-9" x 19' - 9" ) - LW
Pantry ( 9'0" x 7'0" )

Quantity
8
114.81

784.24

Sft
1 X
1 X

1 X
1 X

1
1

19.75
19.75

19.75
16.75

390.06
330.81

1 X
1 X

1 X
1 X

1
1

19.75
9.00

19.75
7.00

390.06
63.00

1 X
1 X

2 X
1 X

1
1

19.75
9.00

19.75
7.00

780.13
63.00
2,017.06
sqm

Page 31 of 77

187.46

CIVMSM, SBMSKLYMNDPM, Sreesailam

S.NO
1

Description
2

Unit
3

Nos
4

Page 32 of 77

L
5

B
6

D
7

Quantity
8

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 33 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

cft
cum

Page 34 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 35 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Balc.drs.17

Balc.drs.17

Balc.drs.17
Balc.drs.17

Page 36 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 37 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 38 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Balc.drs.17

Balc.drs.17

Balc.drs.17

Balc.drs.17

Page 39 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 40 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Balc.drs.17

Page 41 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 42 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 43 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Balc.drs.17

Page 44 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Balc.drs.17

Page 45 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 46 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Balc.drs.17

Balc.drs.17

Page 47 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Balc.drs.17

Balc.drs.17

Page 48 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 49 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 50 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 51 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Balc.drs.17

Balc.drs.17

Page 52 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 53 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Remarks
9

Page 54 of 77

Reinforcement Steel, SBMS , Sreesailam

Name of Work : SBMS GOWRI KALYANAMANDAPAM, SREESAILAM


STEEL MEASUREMENTS - CIVIL
S.No.

Description of Work
Reinforcement
for
R.C.C.
work
including
straightening, cutting, bending, placing in position
and binding all complete.
Thermo mechanically treated bars
( A ) FOOTINGS :
F1
F2
F3
F4
F5
F6
F7
( B ) PEDESTALS :
For F1, F2, & F3 - Main
- Stirrups
For F4, F5, F6, & F7 - Main
- Stirrups
( C ) COLUMNS - Incl. 3' extn col.on terrace
For Col 1 - Main - Stirrups
For Col 2 - Main - Stirrups
For Col 3 - Main - Stirrups
For Col 4 - Main - Main - Stirrups
For Col 5 - Main - Main - Stirrups
For Col 6 - Main - Main - Stirrups
( D ) PLINTH BEAMS :
PB1 : LW ( From C1 to C70 ) - Main
- Stirrups
- Main
- Stirrups
- Main
- Stirrups

Cutting
Length

No.

Dia Unit

8mm

10mm

12mm

16mm

20mm

25mm

Rmt
12
12
12
12
12
12
12

22
11
10
12
6
4
5

x
x
x
x
x
x
x

2
2
2
2
2
2
2

x
x
x
x
x
x
x

15
16
21
23
24
26
27

6.84
5.00
7.84
8.50
9.00
9.50
10.00

8
8
8
8

1
1
1
1

x
x
x
x

43
43
27
27

x
x
x
x

8
6
7
7

5.13
7.42
5.47
7.42

16
8
16
8
16
8
20
16
8
25
16
8
25
16
8

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

15
15
20
20
18
18
7
7
7
5
5
5
5
5
5

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

8
91
12
91
8
91
4
10
91
4
10
91
6
10
91

52.26
5.42
52.26
5.42
52.26
4.42
54.51
52.26
5.42
57.24
52.26
5.42
57.24
52.26
5.42

12
8
12
8
12
8

1
1
1
1
1
1

x
x
x
x
x
x

5
5
1
1
1
1

x
x
x
x
x
x

6
217
6
199
6
33

143.25
3.10
131.25
3.10
21.75
3.10

4470.36
1769.23
3330.81
4642.55
2621.45
1959.88
2730.30
1764.72
1914.36
962.22
1305.25
6271.20
7359.28
12542.40
9812.37
7525.44
7201.77
218.04
3658.20
3434.33
1144.80
2613.00
2453.09
1717.20
2613.00
2453.09
4297.50
3364.20
787.50
616.48
130.50
102.16

Page 55 of 88

28mm

32mm

Remarks

Reinforcement Steel, SBMS , Sreesailam

S.No.

Description of Work
PB1 : SW ( From C1 to C70 ) - Main
- Stirrups
PB1 : SW ( From C1 to C70 ) - Main
- Stirrups
PB2 : SW ( From C1 to C70 ) - Main
- Stirrups
PB2 : SW ( From C1 to C70 ) - Main
- Stirrups
( E ) STAIRCASE :
WAIST SLAB : Main
Distribution
Top mat
Distribution
( F ) ROOF SLAB : ( FOR ALL 3 FLOORS )
- ROOF BEAMS Beam - 1 : C1 to C11 : Main top
Bottom Main :
Extra bars - top - C1 to C11 - @C1
@C2,C3
@C5
@C6
@C7
@C8
@C9,C10
@C11
- bottom @C1-C2
@C5-C6
@C6-C7
@C7-C8
@C8-C9
@C10-C11
Stirrups - C2 TO C9 - C1 TO C2 - C9 TO C11 -

Beam - 1A : B14 to B23 : Main top


Bottom Main :
Extra bars - top - B14 to B23 -@B16
@B18

12
8
12
8
12
8
12
8

1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x

8
8
1
1
2
2
1
2

x
x
x
x
x
x
x
x

6
116
6
34
4
123
4
12

Cutting
Length
81.00
3.10
22.46
3.10
80.96
3.10
7.96
3.10

12
10
12
10

6
6
6
6

x
x
x
x

2
2
2
2

x
x
x
x

12
47
12
18

25.94
6.12
18.86
6.12

16
16
16
16
20
20
16
16
16
16
20
20
20
16
16
16
16
20
8
8
8
8
8
8
16
16
20
20

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

2
1
2
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
190
28
9
30
26
13
3
3
2
2

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1

143.55
44.00
119.30
24.25
7.99
16.25
9.25
10.75
10.75
10.75
18.25
7.24
13.50
12.50
12.50
12.50
12.50
14.25
4.60
4.60
4.60
4.60
4.60
4.60
78.72
78.72
9.00
10.75

No.

Dia Unit

8mm

10mm

12mm

16mm

20mm

3888.00
2874.55
134.76
105.49
647.68
760.53
31.84
74.78
3735.36
3467.84
2715.84
1320.45

861.30
132.00
715.80
72.75
23.97
48.75
55.50
64.50
64.50
64.50
54.75
21.72
40.50
75.00
75.00
75.00
75.00
42.75
2615.10
386.40
242.13
407.10
358.80
172.50
708.48
708.48
27.00
32.25

Page 56 of 88

25mm

28mm

32mm

Remarks

Reinforcement Steel, SBMS , Sreesailam

S.No.

Description of Work

- bottom -

@B20
@B22
@B23
@B16-B18
@B18-B20
@B20-B22

Stirrups - C2 TO C9 Beam - 2 : B23 to B25 : Main top


Bottom Main :
Extra bars - top - B23 to B25 -@Cantelever
@B25
- bottom @B25
Stirrups - B23 TO B25 Centre span End span at fixed end
Beam - 3 & 3A : C14 to C15 TO B15 : Main top
Bottom Main :
Extra bars - top - C15 to B13 -@Cantelever
@B11
- bottom @B11
Stirrups - B13 TO C15 Centre span End span at fixed end
Beam - 4 : C16 to C22 : Main top
Bottom Main :
Extra bars - top - C16 to C22 -@C18
@C19
@C20
@C21
@C22
- bottom @C18-C19
@C19-C20
@C20-C21
@C21-C22
Stirrups - C16 TO C22 Beam - 5 : C25 to C30 : Main top
Bottom Main :
Extra bars - top - C25 to C30 -@C25
@C26
@C27
@C28
@C29
@C30
- bottom @C39-C40

No.

Dia Unit
20
20
20
16
16
16
8
16
16
20
20
20
8
8
8
16
16
20
20
20
8
8
8
16
16
16
16
16
16
20
16
16
16
16
8
16
16
16
16
16
16
16
16
16

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

2
2
2
2
2
2
156
3
3
2
2
2
39
30
20
3
3
2
2
2
39
30
20
3
3
2
2
2
2
2
2
2
2
2
167
2
2
2
2
2
2
2
2
2

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Cutting
Length
10.75
10.75
6.23
12.50
12.50
12.50
4.60
28.29
28.29
12.50
6.97
14.25
4.60
4.60
4.60
28.29
28.29
12.50
6.97
14.25
4.60
4.60
4.60
84.02
84.02
9.00
10.75
10.75
10.75
6.22
12.50
12.50
12.50
12.50
4.60
84.77
84.77
6.22
10.75
10.75
10.75
10.75
6.22
12.50

8mm

10mm

12mm

16mm

20mm
32.25
32.25
18.69

75.00
75.00
75.00
2147.28
254.61
254.61
37.50
20.91
42.75
536.53
407.10
279.76
509.22
509.22
75.00
41.82
85.50
1073.05
814.20
559.53
756.18
756.18
54.00
64.50
64.50
64.50
18.66
75.00
75.00
75.00
75.00
2299.08
508.62
508.62
37.32
64.50
64.50
64.50
64.50
37.32
75.00

Page 57 of 88

25mm

28mm

32mm

Remarks

Reinforcement Steel, SBMS , Sreesailam

S.No.

Description of Work
@C40-C41
@C41-C42
@C42-C43
@C43-C44
Stirrups - C39 TO C40 & C43 TO 44 Stirrups - C40 TO C43 Beam - 6 : C39 to C44 : Main top
Bottom Main :
Extra bars - top - C39 to C44 -@C39
@C40
@C41
@C42
@C43
@C44
- bottom @C39-C40
@C40-C41
@C41-C42
@C42-C43
@C43-C44
Stirrups - C40 TO C43 Stirrups - C39 TO C40 & C43 TO C44 Beam - 7 : C47 to C57 : Main top
Bottom Main :
Extra bars - top - C47 to C57 - @C47
@C48,C49
@C50
@C51
@C52
@C53
@C54
@C57
- bottom @C47-C48
@C49-C50
@C50-C51
@C51-C52
@C52-C53
@C53-C54
@C56-C57
Stirrups - C48 TO C57 - C9 TO C11 Beam - 8 : B10 to B12 : Main top

No.

Dia Unit
16
16
16
16
8
8
16
16
16
16
16
16
16
16
20
16
16
16
16
8
8
16
16
16
16
20
20
16
16
16
16
16
16
20
16
16
16
16
16
16
8
8
8
16

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

2
2
2
2
54
168
2
2
2
2
2
2
2
2
2
2
2
2
2
102
54
2
1
2
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
252
24
16
3

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1

Cutting
Length
12.50
12.50
12.50
12.50
4.60
4.60
84.77
84.77
6.22
10.75
10.75
10.75
10.75
6.22
12.50
12.50
12.50
12.50
12.50
4.60
4.60
143.55
44.00
119.30
20.50
7.99
16.25
9.00
10.75
10.75
10.75
7.75
6.97
13.50
12.50
12.50
12.50
12.50
12.50
8.50
4.60
4.60
4.60
19.29

8mm

10mm

12mm

16mm

20mm

75.00
75.00
75.00
75.00
1491.24
2319.78
508.62
508.62
37.32
64.50
64.50
64.50
64.50
37.32
37.50
75.00
75.00
75.00
75.00
1400.70
1491.24
861.30
132.00
715.80
61.50
23.97
48.75
54.00
64.50
64.50
64.50
46.50
41.82
40.50
75.00
75.00
75.00
75.00
75.00
51.00
3478.98
327.75
447.87
173.61

Page 58 of 88

25mm

28mm

32mm

Remarks

Reinforcement Steel, SBMS , Sreesailam

S.No.

Description of Work
Bottom Main :
Extra bars - top - B10 to B12 -@B10
@B12
- bottom Stirrups - Centre span Beam - 8A : B13 to B23 : Main top
Bottom Main :
Extra bars - top - B13 to B23 -@B13
@B15
@B17
@B19
@B21
@B23
- bottom @B13-B15
@B15-B17
@B17-B19
@B19-B21
@B21-B23
Stirrups - B13 TO B23 Beam - 9 : C61 to C70 : Main top
Bottom Main :
Extra bars - top - C61 to C70 - @C61
@C62
@C64
@C65
@C66
@C67
@C68,C69
@C70
- bottom @C61-C62
@C63-C64
@C64-C65
@C65-C66
@C66-C67
@C67-C68
@C69-C70
Stirrups - C62 TO C70 - C61 TO C62 Beam - 10 : C61 to C1 : Main top

No.

Dia Unit
16
20
20
20
8
16
16
16
16
16
16
16
16
16
20
16
16
16
20
8
16
16
16
16
20
20
16
16
16
16
20
20
20
16
16
16
16
16
20
8
8
8
16
16

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

3
2
2
2
38
2
2
1
2
2
2
2
2
2
2
2
2
2
2
168
2
1
2
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
252
24
16
2
1

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1

Cutting
Length
19.29
6.24
6.24
13.50
4.60
84.77
84.77
18.86
6.22
10.75
10.75
10.75
10.75
6.22
12.50
12.50
12.50
12.50
12.50
4.60
143.55
19.47
123.52
20.50
6.99
16.25
9.00
10.75
10.75
10.75
18.00
6.72
13.50
12.50
12.50
12.50
12.50
12.50
13.50
4.60
4.60
4.60
77.02
20.97

8mm

10mm

12mm

16mm

20mm

173.61
18.72
18.72
40.50
517.50
508.62
508.62
56.58
37.32
64.50
64.50
64.50
64.50
37.32
37.50
75.00
75.00
75.00
37.50
4639.56
861.30
58.41
741.12
61.50
20.97
48.75
54.00
64.50
64.50
64.50
54.00
20.16
40.50
75.00
75.00
75.00
75.00
75.00
40.50
3478.98
327.75
447.87
462.12
62.91

Page 59 of 88

25mm

28mm

32mm

Remarks

Reinforcement Steel, SBMS , Sreesailam

S.No.

Description of Work
Bottom Main :
Extra bars - top - C61 to C1 - @C61
@C47,C37
@C33
@C14
@C1
- bottom @C61-C47
@C33-C37
@C14-C33
@C14-C1
Stirrups - C61 TO C47 Centre span - C47 TO C1 Beam - 11 : B3A to B1 : Main top
Bottom Main :
Extra bars - top - B3A to B1 - @B3A
@B3A Midspan
@B3
@B1
- bottom @B3A-B3A
@B3A-B3
@B3-B1
Stirrups - B3A TO B1 Beam - 12 : C62 to C2 : Main top
Bottom Main :
Extra bars - top - C62 to C2 - @C62
@C48,C38
@C34
@C15
@C2
- bottom @C62-C48
@C38-C34
@C34-C15
@C15-C2
Stirrups - C62 TO C48 Centre span - C48 TO C2 Beam - 13 : C63 to C3 : Main top
C39 - C25
Bottom Main :

No.

Dia Unit
16
16
20
20
16
20
16
20
16
16
16
8
8
8
16
16
16
20
16
16
16
16
16
8
16
16
16
16
20
20
20
16
16
20
16
16
16
8
8
8
20
20
20
20

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

2
1
2
2
2
2
2
2
2
2
2
10
18
46
2
2
2
2
2
2
2
2
2
58
2
1
2
1
2
2
2
2
2
2
2
2
2
10
18
46
2
1
2
1

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1

Cutting
Length
77.02
20.97
6.97
18.25
10.75
10.75
6.22
14.75
12.50
12.50
12.50
4.60
4.60
4.60
54.27
54.27
6.22
10.75
10.75
6.22
12.50
12.50
12.50
4.60
77.02
20.97
77.02
20.97
6.97
18.25
10.75
10.75
6.22
14.75
12.50
12.50
12.50
4.60
4.60
4.60
81.02
25.72
81.02
25.72

8mm

10mm

12mm

16mm

20mm

462.12
62.91
20.91
54.75
64.50
32.25
37.32
44.25
75.00
75.00
75.00
288.34
241.50
631.66
325.62
325.62
37.32
32.25
64.50
37.32
75.00
75.00
75.00
1593.82
462.12
62.91
462.12
62.91
20.91
54.75
32.25
64.50
37.32
44.25
75.00
75.00
75.00
288.34
241.50
631.66
243.06
77.16
243.06
77.16

Page 60 of 88

25mm

28mm

32mm

Remarks

Reinforcement Steel, SBMS , Sreesailam

S.No.

Description of Work
Extra bars - top - C63 to C3 - @C63
@C49,C39
@C25,C16
@C3
- bottom @C63-C49
@C39-C25
@C16-C3
Stirrups - C63 TO C49 & C16 TO C3 Centre span - C39 TO C25 Beam - 14 : B23 to C4 : Main top
Bottom Main C17 - C4
Extra bars - top - @C17
@C4
- bottom @B1/A
Stirrups - B23 TO C17 - C4 Centre span - C17 TO C4 Beam - 15 : C64 to C40 : Main top
Bottom Main C64 - C40
Extra bars - top -

- @C64
@C50
@C64-C50

- bottom Stirrups - C40 TO C50 - C64 Centre span Beam - 16 : C26 to C5 : Main top
Bottom Main - C18 - C5
Extra bars - top -

- @C5
@C18
@C18-C5

- bottom Stirrups - C26 TO C18 - C5 Centre span Beam - 17 : C65 to C41 : Main top
Bottom Main C65 - C41
Extra bars - top - bottom -

- @C65
@C51
@C65-C51

No.

Dia Unit
20
25
25
20
20
25
20
8
8
16
20
20
20
20
8
8
8
16
16
16
16
20
20
20
8
8
8
16
16
16
16
20
20
20
8
8
8
16
16
16
16
20
20
20

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

3
3
3
3
3
3
3
65
76
3
2
2
2
2
31
12
30
2
1
2
1
2
2
2
41
12
30
2
1
2
1
2
2
2
41
12
30
2
1
2
1
2
2
2

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Cutting
Length
6.97
20.75
20.50
6.72
14.75
17.50
14.50
4.60
4.60
28.27
22.47
12.97
6.97
14.25
4.60
4.60
4.60
29.02
21.86
29.02
21.86
6.97
13.58
14.25
4.60
4.60
4.60
29.02
21.86
29.02
21.86
6.97
13.58
14.25
4.60
4.60
4.60
29.02
21.86
29.02
21.86
6.97
13.58
14.25

8mm

10mm

12mm

16mm

20mm

25mm

20.91
186.75
184.50
20.16
44.25
157.50
43.50
1781.45
1048.80
254.43
67.41
38.91
20.91
42.75
421.53
170.62
407.10
174.12
65.58
174.12
65.58
20.91
40.74
42.75
559.53
170.62
407.10
174.12
65.58
174.12
65.58
20.91
40.74
42.75
559.53
170.62
407.10
174.12
65.58
174.12
65.58
20.91
40.74
42.75

Page 61 of 88

28mm

32mm

Remarks

Reinforcement Steel, SBMS , Sreesailam

S.No.

Description of Work
Stirrups - C41 TO C51 - C65 Centre span Beam - 18 : B27 to C6 : Main top
Bottom Main C19 - C6
Extra bars - top - @C27,C19
@C6
- bottom @B1/A
Stirrups - B287 TO C19 - C6 Centre span - C19 TO C6 Beam - 19 : C66 to C42 : Main top
Bottom Main C66 - C42
Extra bars - top -

- @C66
@C52
@C66-C52

- bottom Stirrups - C4 TO C52 - C66 Centre span Beam - 20 : C28 to C7 : Main top
Bottom Main - C20 - C7
Extra bars - top -

- @C7
@C20
@C20-C7

- bottom Stirrups - C28 TO C20 - C7 Centre span Beam - 21 : C67 to C43 : Main top
Bottom Main C67 - C43
Extra bars - top -

- @C67
@C53
@C67-C53

- bottom Stirrups - C43 TO C53 - C67 Centre span Beam - 22 : C28 to C8 : Main top

No.

Dia Unit
8
8
8
16
20
20
20
20
8
8
8
16
16
16
16
20
20
20
8
8
8
16
16
16
16
20
20
20
8
8
8
16
16
16
16
20
20
20
8
8
8
16
16

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

41
12
30
3
2
2
2
2
31
12
30
2
1
2
1
2
2
2
41
12
30
2
1
2
1
2
2
2
41
12
30
2
1
2
1
2
2
2
41
12
30
2
1

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Cutting
Length
4.60
4.60
4.60
28.27
22.47
12.97
6.97
14.25
4.60
4.60
4.60
29.02
21.86
29.02
21.86
6.97
13.58
14.25
4.60
4.60
4.60
29.02
21.86
29.02
21.86
6.97
13.58
14.25
4.60
4.60
4.60
29.02
21.86
29.02
21.86
6.97
13.58
14.25
4.60
4.60
4.60
29.02
21.86

8mm

10mm

12mm

16mm

20mm

559.53
170.62
407.10
254.43
67.41
38.91
20.91
42.75
421.53
170.62
407.10
174.12
65.58
174.12
65.58
20.91
40.74
42.75
559.53
170.62
407.10
174.12
65.58
174.12
65.58
20.91
40.74
42.75
559.53
170.62
407.10
174.12
65.58
174.12
65.58
20.91
40.74
42.75
559.53
170.62
407.10
174.12
65.58

Page 62 of 88

25mm

28mm

32mm

Remarks

Reinforcement Steel, SBMS , Sreesailam

S.No.

Description of Work
Bottom Main - C29 - C8
Extra bars - top -

- @C8
@C21
@C21-C8

- bottom Stirrups - C29 TO C21 - C8 Centre span Beam - 23 : C68 to C9 : Main top
C44 - C30
Bottom Main :

Extra bars - top - C66 to C9 - @C66


@C54,C44
@C30,C22
@C9
- bottom @C68-C54
@C44-C30
@C22-C9
Stirrups - C68 TO C54 & C22 TO C9 Centre span - C39 TO C25 Beam - 24 : C69 to C10 : Main top
Bottom Main :
Stirrups - C69 TO C10 Beam - 25 : C69 to C10 : Main top
Bottom Main :
Stirrups - C69 TO C10 Beam - 26 : C70 to C11 : Main top
Bottom Main :
Stirrups - C70 TO C11 - ROOF SLAB S1 - ( 16'9"X6'0" ) - 15 Nos - Along l/s - Main Straight
- Crank
Extra at top Tie bars
S1 - ( 16'9"X6'0" ) - 15 Nos - Along s/s - Main Straight
- Crank
Extra at top Tie bars
S2 - ( 16'9"X13'0" ) - 12 Nos - Along l/s - Main Straight - 8" c/c -

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
2
1
1
2
1
1
2

Cutting
Length
29.02
21.86
6.97
13.58
14.25
4.60
4.60
4.60
81.02
25.72
81.02
25.72
6.97
20.75
20.50
6.72
14.75
17.50
14.50
4.60
4.60
81.52
81.52
4.60
54.27
54.27
4.60
81.52
81.52
4.60

15 x

14 x

6.85

4240.77

8
8
8

15 x
15 x
15 x

14 x
14 x
2 x

3
6
6

7.01
2.15
17.97

4339.83
2655.90
3320.37

15 x

6 x

17.60

4446.00

8
8
8

15 x
15 x
15 x

6 x
6 x
2 x

3
6
6

17.76
5.76
7.22

4486.42
2852.65
1334.06

12 x

11 x

17.56

6901.08

No.

Dia Unit
16
16
20
20
20
8
8
8
20
20
20
20
20
25
25
20
20
25
20
8
8
12
20
8
12
20
8
12
20
8

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

2
1
2
2
2
41
12
30
2
1
2
1
3
3
3
3
3
3
3
65
76
3
3
162
3
3
107
3
3
162

8mm

10mm

12mm

16mm

20mm

25mm

174.12
65.58
20.91
40.74
42.75
559.53
170.62
407.10
243.06
77.16
243.06
77.16
20.91
186.75
184.50
20.16
44.25
157.50
43.50
1781.45
1048.80
733.68
244.56
4460.16
488.43
162.81
2955.96
733.68
244.56
4460.16

Page 63 of 88

28mm

32mm

Remarks

Reinforcement Steel, SBMS , Sreesailam

S.No.

Description of Work
- Crank
Extra at top Tie bars
S2 - ( 16'9"X13'0" ) - 12 Nos - Along s/s - Main Straight - 6" c/c - Crank
Extra at top Tie bars
S1 - ( 16'9"X6'6" ) - 9 Nos - Along l/s - Main Straight
- Crank
Extra at top Tie bars
S1 - ( 16'9"X6'6" ) - 9 Nos - Along s/s - Main Straight
- Crank
Extra at top Tie bars
S1 - ( (13'+2x6+2x9"= 26'6"X9'9" ) - 5 Nos - Along
l/s - Main
- Straight
- Crank
Extra at top - On Beam - 24 & Beam - 25 Extra at top - On Beam - 23 & Beam - 26 Tie bars
S1 - ( (13'+2x6+2x9"= 26'6"X9'9" ) - 5 Nos - Along
s/s - Main
- Straight
- Crank
Extra at top Tie bars
S1 - ( 19'9"X6'0" ) - 4 Nos - Along l/s - Main Straight
- Crank
Extra at top Tie bars
S1 - ( 19'9"X6'0" ) - 4 Nos - Along s/s - Main Straight
- Crank
Extra at top Tie bars
S2 - ( 19'9"X13'0" ) - 1 Nos - Along l/s - Main Straight - 8" c/c - ( C47-C48,C61-C62 )
- Crank
Extra at top Tie bars

8
8
8

12 x
12 x
12 x

11 x
11 x
11 x

Cutting
Length
3
17.72
5.15
6
17.97
6

12 x

18 x

6.85

4438.80

8
8
8

12 x
12 x
12 x

18 x
6 x
4 x

6
6
6

7.01
4.63
14.22

9084.96
1836.01
4504.90

9 x

6 x

17.60

3016.80

8
8
8

9 x
9 x
9 x

6 x
6 x
4 x

3
6
6

17.76
5.21
7.72

3044.23
1785.40
1853.22

9 x

14 x

17.60

6487.20

8
8
8

9 x
9 x
9 x

14 x
14 x
2 x

3
6
6

17.76
5.76
17.97

6546.17
4242.48
1992.22

5 x

9 x

27.96

3695.17

8
8
8
8

5
5
5
5

9
9
9
3

x
x
x
x

3
6
6
6

28.44
27.96
2.17
10.97

3758.60
7549.20
584.82
939.43

5 x

22 x

10.60

3418.50

8
8
8

5 x
5 x
5 x

22 x
22 x
2 x

3
6
6

10.76
3.66
27.72

3470.10
2357.48
1707.30

4 x

16 x

6.85

1317.69

8
8
8

4 x
4 x
4 x

16 x
16 x
2 x

3
6
6

7.01
2.15
20.97

1348.47
825.24
937.93

4 x

6 x

20.60

1387.69

8
8
8

4 x
4 x
4 x

6 x
6 x
5 x

3
6
6

20.76
6.66
7.22

1398.47
879.67
864.43

1 x

11 x

20.56

673.34

8
8
8

1 x
1 x
1 x

11 x
11 x
3 x

3
6
6

20.72
4.02
20.97

678.58
263.31
434.65

No.

Dia Unit

x
x
x
x

8mm
6963.96
4043.97
14124.42

Page 64 of 88

10mm

12mm

16mm

20mm

25mm

28mm

32mm

Remarks

Reinforcement Steel, SBMS , Sreesailam

S.No.

Description of Work
S2 - ( 19'9"X13'0" ) - 1 Nos - Along s/s - Main Straight - 6" c/c - Crank
Extra at top Tie bars
Miscellaneous - Balconies - l/w - s/w

1 x

21 x

8
8
8
8
8

1
1
1
3
3

21
6
4
17
17

TOTAL LENGTH :
UNIT WEIGHT :
TOTAL :
TOTAL WEIGHT :

Cutting
Length

No.

Dia Unit

x
x
x
x
x

x
x
x
x
x

8mm

6.85

431.55

3
6
6
9
17

7.01
6.66
14.22
8.20
6.37

441.63
219.92
375.41
3763.80
5522.79

81817.31
0.395
32317.84

10mm

1459.49
0.617
900.50

12mm

10783.65
0.888
9575.88
80396.70

Kg

Page 65 of 88

16mm

18485.75
1.58
29207.49

20mm

1536.63
2.47
3795.48

25mm

1194.68
3.85
4599.51

28mm

0.00
4.83
0.00

MT ( Metric Tonne )

32mm

Remarks

0.00
6.31
0.00
80.40

CIVMSM, SBMSKLYMNDPM, Sreesailam

Name of Work : SBMS GOWRI KALYANAMANDAPAM, SREESAILAM


DATA & SPECIFICATIONS OF ITEMS
Item No.

Quantity

Unit

Description

Rate

per

Amount

Remarks

Rock Cutting

Sand Filling

Filling with boulders with gravel (60:40) including cost and conveyance of all materials and labour charges, spreading etc.
complete.
0.400 cmt
0.600 cmt
0.310 Nos
4.00%
14.00%

200.00 Cmt
274.60 Cmt
280.00 Each

VAT
Contractor's Overheads,
Establishment charges & Profit
Rounding off
Rate per Cmt

331.56

80.00
164.76
86.80
331.56
13.26
46.42
0.04
722.84

Cement concrete (1:4:8 ) proportion using 40mm guage machine crushed metal other than granite metal from approved
quarry including cost and conveyance of all materials and labour charges, seignorage charges on all materials, machine
mixing of concrete laying, in foundation, ramming in layers of 15 cm thick each, finishing top surface to required level neatly,
water curing, etc.,complete for finshed item of work for foundation.
0.920 cmt 40mm metal
3,256.25 Cmt
2,995.75
0.460 cmt C.M. (1:4)
4,480.25 Cmt
2,060.92
0.906 Nos Mason 1st class
350.00 Each
317.10
0.140 Nos Mason 2nd class
320.00 Cmt
44.80
1.800 Nos Man Mazdoor
280.00 Cmt
504.00
1.400 Nos Woman Mazdoor
280.00 Each
392.00
1.000 cmt Mahine Mixixng
303.00 Cmt
303.00
1.000 cmt Deduct Hand Mixing charges
-50.00 Cmt
-50.00

4.00%

VAT
Contractor's Overheads,
Establishment charges & Profit
Sundries
Rounding off
Rate per Cmt

14.00%

Cost of Gravel
Cost of boulders
Spreading charges

6,567.57
202.27

5,056.67

919.46
50.00
0.06
7,739.36

Vibrated reinforced cement concrete M20 grade as per IS 456 - 1876, ( equivalent to 1 : 1 1/2 : 3 mix using 20mm size
nominal machine crushed HBG metal ( coarse aggregate ) 66% (2/3), & 12mm HBG Machine crushed metal 20% and 6mm
size machine crushed metal mixing, with necessary reinforcement including cost, seinorage and conveyance of all materials
like cement, sand, coarse aggregate, water etc from approved quarries to work site and all operational, incidental, labour
charges, such as centering, form work, machine mixing, laying concrete, vibrating, making smooth to required levels, water
curing, etc., complete, but excluding cost of steel and its fabrication charges for finished item of work.

0.610
0.190
0.120
0.460
383.000
0.120
0.280
2.100

cmt
cmt
cmt
cmt
Kgs
Nos
Nos
Nos

Cost of 20mm HBG Metal


Cost of 12mm HBG Metal
Cost of 6mm HBG Metal
Cost of Sand
Cost of Cement
Mason 1st class
Mason 2nd class
Man Mazdoor

BASIC RATE
3,875.00
3,556.25
3,125.00
2,105.00
5,800.00
350.00
320.00
280.00

Page 66 of 77

Cmt
Cmt
Cmt
Cmt
MT
Each
Each
Each

2,363.75
675.69
375.00
968.30
2,221.40
42.00
89.60
588.00

CIVMSM, SBMSKLYMNDPM, Sreesailam

Item No.

Quantity

Unit

3
3.500 cmt
1.000 cmt
1.330 cmt

Description

Rate

5
Woman Mazdoor
Mahine Mixixng charges
Vibrating charges

per

6
7
280.00 Each
303.00 Cmt
120.40 Cmt

Amount

Remarks

9
980.00
303.00
160.13

8,766.87
8,766.87
A ) FOOTINGS
V.R.C.C 1 : 11/2 : 3 using 20mm, 12mm, and 6mm ..
1.000 cmt Grade metal
1.000 cmt Centering charges
4.00%
VAT
Contractor's Overheads,
14.00%
Establishment charges & Profit
Rounding off

8,766.87 Cmt
552.00 Cmt
8,766.87

8,766.87
552.00
350.67
1,304.64
0.06
10,974.24

B ) COLUMNS
V.R.C.C 1 : 11/2 : 3 using 20mm, 12mm, and 6mm ..
1.000 cmt Grade metal
1.000 cmt Centering charges
4.00%
VAT
Contractor's Overheads,
14.00%
Establishment charges & Profit
Rounding off

8,766.87 Cmt
1,787.00 Cmt
1,787.00

8,766.87
1,787.00
71.48
1,477.54
0.06
12,102.95

C ) T BEAMS
V.R.C.C 1 : 11/2 : 3 using 20mm, 12mm, and 6mm ..
1.000 cmt Grade metal
1.000 cmt Centering charges
4.00%
VAT
Contractor's Overheads,
14.00%
Establishment charges & Profit
Rounding off

8,766.87 Cmt
2,988.00 Cmt
2,988.00

8,766.87
2,988.00
119.52
1,645.68
0.06
13,520.13

D ) PLINTH BEAMS
V.R.C.C 1 : 11/2 : 3 using 20mm, 12mm, and 6mm ..
1.000 cmt Grade metal
1.000 cmt Centering charges
4.00%
VAT
Contractor's Overheads,
14.00%
Establishment charges & Profit
Rounding off

8,766.87 Cmt
2,158.00 Cmt
2,158.00

8,766.87
2,158.00
86.32
1,529.48
0.06
12,540.73

E ) ROOF SLAB - 4.5" thick


V.R.C.C 1 : 11/2 : 3 using 20mm, 12mm, and 6mm ..
1.200 cmt Grade metal
1.000 cmt Centering charges
4.00%
VAT
Contractor's Overheads,
14.00%
Establishment charges & Profit
Rounding off

8,766.87 Cmt
3,390.00 10Smt
3,390.00

10,520.24
3,390.00
135.60
1,947.43
0.06
15,993.33

Page 67 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Item No.

Quantity

Unit

Description

Rate

per

Amount

Remarks

F ) ROOF SLAB - 5" thick - Waist


Slab V.R.C.C 1 : 11/2 : 3 using 20mm, 12mm, and 6mm ..
1.300 cmt Grade metal
1.000 cmt Centering charges
4.00%
VAT
Contractor's Overheads,
14.00%
Establishment charges & Profit
Rounding off

8,766.87 Cmt
3,390.00 10Smt
3,390.00

11,396.93
3,390.00
135.60
2,070.17
0.06
16,992.76

G ) SUNSHADES - 0.80 M Wide


V.R.C.C 1 : 11/2 : 3 using 20mm, 12mm, and 6mm ..
0.047 cmt Grade metal
0.800 cmt Centering charges
0.800
50% Extra for ornamental centering
4.00%
VAT
Contractor's Overheads,
14.00%
Establishment charges & Profit
Rounding off
For 0.800 M wide
For 0.600 M Wide
6

8,766.87 Cmt
257.00 1 Smt
128.50 1 Smt
308.40

412.04
205.60
102.80
12.34
100.86
0.06

1 Rmt

833.70
625.28

Providing High Yield Strength Deformed bars Fe415 of different diameters wrought and put up, including cost and
conveyance of steel and all wastages, overlaps, splices, welded joints, chairs, spacer bars, etc., and its curing and bending
to required sizes and shapes, placing, binding, and fixing inposition as shown in drawing including cost of binding wire,
bending charges and any other incidental charges if any, for finished item of work. ( Payment will be made on the basis of
weight of fabriated deformed bars only )
As per market which is

1000.000 Kgs

Cost of steel

49,000.00 MT

49,000.00 less than SSR 2013-14,

50.000 Kgs

Add 5% wastages

49,000.00 MT

2,450.00

20.000 Kgs

Deduct 2% towards recovery of scrap

49,000.00 MT

-980.00

6,920.00 MT

6,920.00

i.e. Rs. 50,000/-

1.000 MT
4.00%

Fabrication charges
VAT
Contractor's Overheads,
Establishment charges & Profit
Rounding off

14.00%

51,450.00

2,058.00
7,203.00
0.06
66,651.06

RR Masonry 2nd sort in cement mortar CM 1:8 for foundations and basement using rough stones from aproved quarries,
including cost and conveyance of all materials and all labour charges, seignorage charges on all materials like cement,
sand, and stones etc., to work site, including labour charges for dressing stones to requierd size and shape, mixing of
cement mortar, masonry construction, scaffolding charges, water curing etc., complete finished item of work.
1.100
0.340
0.540
1.260
1.400
1.400

4.00%
14.00%

cmt
cmt
Nos
Nos
Nos
cmt

Rough stone
C.M. ( 1 : 8 )
Mason 1st class
Mason 2nd class
Man Mazdoor
Woman Mazdoor

569.02
3,436.25
350.00
320.00
280.00
280.00

VAT
Contractor's Overheads,
Establishment charges & Profit

1,794.25

Page 68 of 77

Cmt
Cmt
Each
Each
Each
Each

625.92
1,168.33
189.00
403.20
392.00
392.00
3,170.45
71.77
443.86

CIVMSM, SBMSKLYMNDPM, Sreesailam

Item No.

Quantity

Unit

Description

Rate

per

Amount

Rounding off

Remarks
9
0.03

3,686.11
8

Brick Masonry for superstructure in cement mortar CM 1:6 ( 1 Cement : 6 Sand ), using traditional 2nd class bricks having
crushing strength of not less than 35 kgs/cm2, including cost and conveyance of all materials and all labour charges,
seignorage charges on all materials like cement, sand, and bricks etc., to work site, including labour charges for mixing of
cement mortar, masonry construction, scaffolding charges, water curing etc., complete finished item of work.
512.000
0.200
0.420
0.980
0.700
0.210
1.000

Nos
cmt
Nos
Nos
Nos
cmt
cmt

4.00%
14.00%

Cost of bricks
C.M. ( 1 : 6 )
Mason 1st class
Mason 2nd class
Man Mazdoor
Woman Mazdoor
Scaffolding charges

5,236.90
3,784.25
350.00
320.00
280.00
280.00
36.00

VAT
Contractor's Overheads,
Establishment charges & Profit
Rounding off

3,438.14

Cmt
Cmt
Each
Each
Each
Each
Cmt

2,681.29
756.85
147.00
313.60
196.00
58.80
36.00
4,189.54
137.53
581.50
0.03
4,908.60

11.5 cm ( 41/2" ) wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks
including cost of all materials, seigniorage charges, labour and all operations for constructing half brick masonry, mixing
cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials.
Country bricks, second class
traditional size 23x11x7cm
106.000 kg.
Cement
0.220 cum Sand
0.220 cum Seigniorage charges for sand
0.600 day Mason 1st class
0.600 day Mason 2nd class
2.750 day Mazdoor (unskilled)
1%
Add water charges 1%
1.000 cum Scaffolding charges
Total
4%
VAT
Contractor's Overheads,
14%
Establishment charges & Profit
Grand Total
PER 1 SQM
565.000 nos

10

5.24 nos
5.80
2,185.00
40.00
380.00
320.00
280.00
4,063.15
36.00

2,958.85

kg.
cum
cum
Each
Each
Each

614.80
480.70
8.80
228.00
192.00
770.00
40.63
36.00
5,329.78
162.17

cum

746.17
Rs.

6,238.12
623.81

Ornamental plastering to ceiling, 12 mm thick in two coats with base coat of 8 mm thick in CM (1:5), and top coat of 4mm
thick in CM (1:3), with dubara spong finishing including cost and conveyance of all materials like cement, sand, water etc.,
to site, including seiniorage charges, sales and other taxes on all materials, and all operational, incidental charges on
materials, including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing including cutting
grooves complete for finished item of work.
Base Coat 8mm thick in CM ( 1:5 )
0.110 cum Cement Mortar 1:5
4,062.65 cum
446.89
0.300 Nos Mason 1st class
350.00 Each
105.00
0.700 Nos Mason 2nd class
320.00 Each
224.00
0.500 Nos Man Mazdoor
280.00 Each
140.00
1.000 Nos Woman Mazdoor
280.00 Each
280.00
Top Coat 5mm thick in CM ( 1:3 )
0.040 cum Cement Mortar 1:3
5,176.25 cum
207.05
0.330 Nos Mason 1st class
350.00 Each
115.50
0.770 Nos Mason 2nd class
320.00 Each
246.40

Page 69 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Item No.
1

Quantity

Unit

Description

Rate

3
5
0.500 Nos Man Mazdoor
1.100 Nos Woman Mazdoor
10.000 Sqm Scaffolding charges
Total
4%
VAT
Contractor's Overheads,
14%
Establishment charges & Profit
Rate per 10 Sqm
Rate per 1 Sqm
2

per

6
7
280.00 Each
280.00 Each
36.00 cum

Amount

Remarks

140.00
308.00
36.00
2,248.84
26.16
314.84
2,589.84
258.98

11

Plastering 12 mm thick in two coats with base coat of 8 mm thick in CM (1:6), and top coat of 4mm thick in CM (1:3), with
dubara spong finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including
seiniorage charges, sales and other taxes on all materials, and all operational, incidental charges on materials, including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing including cutting grooves complete for
finished item of work. ( For Internal Wall surfaces )
Base Coat 8mm thick in CM ( 1:6 )
0.110 cum Cement Mortar 1:6
3,784.25 cum
416.27
0.300 Nos Mason 1st class
350.00 Each
105.00
0.700 Nos Mason 2nd class
320.00 Each
224.00
0.500 Nos Man Mazdoor
280.00 Each
140.00
1.000 Nos Woman Mazdoor
280.00 Each
280.00
Top Coat 5mm thick in CM ( 1:3 )
0.040 cum Cement Mortar 1:3
5,176.25 cum
207.05
0.330 Nos Mason 1st class
350.00 Each
115.50
0.770 Nos Mason 2nd class
320.00 Each
246.40
0.500 Nos Man Mazdoor
280.00 Each
140.00
1.100 Nos Woman Mazdoor
280.00 Each
308.00
10.000 Sqm Scaffolding charges
36.00 cum
36.00
Total
2,218.22
4%
VAT
24.93
Contractor's Overheads,
14%
310.55
Establishment charges & Profit
Rate per 10 Sqm
2,553.70
Rate per 1 Sqm
255.37

12

Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6), and top coat of 4mm thick in CM (1:3), with
dubara spong finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including
seiniorage charges, sales and other taxes on all materials, and all operational, incidental charges on materials, including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing including cutting grooves complete for
finished item of work. ( For External Wall surfaces )
Base Coat 16 mm thick in CM ( 1:6 )
0.180 cum Cement Mortar 1:6
3,784.25 cum
681.17
0.300 Nos Mason 1st class
350.00 Each
105.00
0.700 Nos Mason 2nd class
320.00 Each
224.00
0.500 Nos Man Mazdoor
280.00 Each
140.00
1.800 Nos Woman Mazdoor
280.00 Each
504.00
Top Coat 4 mm thick in CM ( 1:3 )
0.040 cum Cement Mortar 1:3
5,176.25 cum
207.05
0.330 Nos Mason 1st class
350.00 Each
115.50
0.770 Nos Mason 2nd class
320.00 Each
246.40
0.500 Nos Man Mazdoor
280.00 Each
140.00
1.100 Nos Woman Mazdoor
280.00 Each
308.00
10.000 Sqm Scaffolding charges
36.00 cum
36.00
Total
2,707.12
4%
VAT
35.53
Contractor's Overheads,
14%
379.00
Establishment charges & Profit
Rate per 10 Sqm
3,121.65
Rate per 1 Sqm
312.16

Page 70 of 77

CIVMSM, SBMSKLYMNDPM, Sreesailam

Item No.

Quantity

Unit

Description

Rate

per

Amount

Remarks

13

Providing impervious coat to exposed RCC roof slab surface to required slopes with CM 1:3 prop. 20 mm thick ( average ),
mixed with waterproofing compound, manufactured by reputed manufacturers, as approved by Engineer - in - charge, at 1
kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and
thread lining at regular intervals of 45 cm x 45 cm, including cost and conveyance of all materials like cement, sand,
waterproofing compound, etc to site, including seigniorage charges, sales and other taxes on all materials, and operational,
incidental and labour charges for mixing mortar, laying, lift charges, rendering smoothand thread lining, curing, including
rounding off junctions of wall and slab etc., for finished item of work.
0.210
0.660
1.540
0.500
3.200
2.000
4%
14%

cum
Nos
Nos
Nos
Nos
Kgs

Cement Mortar 1:3


Mason 1st class
Mason 2nd class
Man Mazdoor
Woman Mazdoor
Waterproofing compound
Total
VAT
Contractor's Overheads,
Establishment charges & Profit
Rate per 10 Sqm
Rate per 1 Sqm

5,176.25
350.00
320.00
280.00
280.00
40.00

Supply and fixing of teak wood door size 7'-0" x 3'-0". ( 1.95 Sq.m. )
14
1x2 7'0"
0'5" x 0'3"
Verticals
Frame
0'5" x 0'3"
Horizontals 1x2 3'6"
Cft
Quantity of wood
Cum Frame for door
130,948.00
0.062
Shutter
1x1 6'9" x 2'9"
Verticals
0'11/4"
0'5" x 0'3"
Horizontals 1x2 3'6"
Cft
Quantity of wood
Cum Door shutter with reapers
130,948.00
0.055
Nos 12" Powder coated Aldrops
341.00
2.000
Nos 6" Butt hinges
132.00
3.000
Nos 8" Tower bolts - powder coated
113.00
3.000
Nos 6" Handles
101.00
2.000
Sqm Labour charges
807.00
1.950
Total
4%
VAT
Contractor's Overheads,
14%
Establishment charges & Profit
Rate per 1.950 Sqm
Rate per 1 Sqm

cum
Each
Each
Each
Each
Kg

409.75
3,383.24
338.32

1.46
0.73
2.19
Cum
1.93
0.73
2.66
Cum
Each
Each
Each
Each
Sqm

Supply and fixing of teak wood glazed window size 5'-0" x 4'-0". ( 1.85 Sq.m. )
15
1x4 4'0"
0'4" x 0'3"
Verticals
1.33
Frame
0'4" x 0'3"
Horizontals 1x2 5'6"
0.91
Cft
Quantity of wood
2.24
Cft Frame for door
3,708.00
2.240
Cum
Shutter
1x3 10'6" x 0'3"
Verticals
0.98
0'11/2"
Cft
Quantity of wood
0.98
Cft Window shutter with reapers
3,708.00
0.980
Cum
Sqm 4mm Pin headed glass
601.00
1.130
Sqm
3" Powder coated Butt hinges ( 75mm
Nos
89.00
9.000
Each
)
4" Tower bolts - powder coated
Nos
76.00
6.000
Each
(100mm )
Nos 5" Handles ( 125mm )
101.00
3.000
Each
Kgs Welded safety grills
75.00
35.000
Kg
Sqm Labour charges
807.00
1.850
Sqm
Total

Page 71 of 77

1,087.01
231.00
492.80
140.00
896.00
80.00
2,926.81
46.68

0.062 Cum
8,120.52

0.055 Cum
7,156.31
682.00
396.00
339.00
202.00
1,573.65
18,469.48
675.83
2,585.73
21,731.04
11,144.12

8,305.92
0.055 Cum
3,633.84
679.13
801.00
456.00
303.00
2,625.00
1,492.95
18,296.84

CIVMSM, SBMSKLYMNDPM, Sreesailam

Item No.

Quantity

Unit

2
4%

14%

Description
5
VAT
Contractor's Overheads,
Establishment charges & Profit
Rate per 1.850 Sqm
Rate per 1 Sqm

Rate

per

Amount

Remarks

9
672.16

2,561.56
21,530.55
11,638.14

16

Supply and application of two coats of Birla Wall care superfine, on one coat of cement primer and two coats of Birla White
wall care ( Plastic Emulsion paint ), including cost and conveyance of all materials and all operational, incidental and labour
charges etc., complete for finished item of work.
Sqm Plastic Emulsion paint
3,500.00 10 Sqm
1.000
350.00

17

Painting two coats of synthetic enamel paint 1st grade over 1 primer coat on wood work, including cost and conveyance of
all materials to site including cost of brushes, scaffolding charges, lift charges etc., and all labour charges etc., for finished
item of work.
Sqm Synthetic Enamel paint
1,040.00 10 Sqm
1.000
104.00

18

Painting two coats of Oil Bound Distemper paint over 1 primer coat with approved colours on walls, including cost and
conveyance of all materials, water to site including cost of brushes, scaffolding charges, lift charges etc., and all labour
charges etc., for finished item of work.
Painting coats material
Cost of Primer ( S.No. 372, Pg.No.34
0.500 Lts
121.00 Ltr
60.50
)
0.080 Nos Painter 1st class
400.00 Each
32.00
0.190 Nos Painter 2nd class
320.00 Each
60.80
1.700 Ltr
0.360 Nos
0.840 Nos
14%

Cost of washable OBD ( S.No. 390 )


Labour
Painter 1st class
Mazdoor unskilled
Total
Contractor's Overheads,
Establishment charges & Profit
Rounding off
Rate per 10 Sqm

81.00 Ltr

137.70

400.00 Each
280.00 Each

144.00
235.20
670.20
93.83
0.07
764.10

19

Flooring with vitrified tiles 598 x 598 x 8 mm, over 8mm thick cement mortar in 1:8, with neat cement slurryof honey like
consistency, spread at 3.3 kgs per 1 sqm, and jointed neatly with cement paste mixed with pigment of matching shade , to
full depth of joint, including cost of all materials like cement, sand tiles, colouring agents, etc., complete, including
seiniorage charges, all labour charges, curing etc., complete for finished item of work.
Materials
10.500 Sqm Supply of Vitrified tiles ( Slno. 53 )
607.00 Sqm
6,373.50
21.600 Kgs Cement
5.80 Kgs
125.28
33.000 Kgs Cement slurry
5.80 Kgs
191.40
6.000 Kgs White cement for jointing
25.00 Kgs
150.00
0.140 cum Sand
2,225.00 cum
311.50
Labour
0.960 Nos Mason 1st class
350.00 Each
336.00
2.240 Nos Mason 2nd class
320.00 Each
716.80
3.300 Nos Man Mazdoor
280.00 Each
924.00
Total
9,128.48
Contractor's Overheads,
14%
1,277.99
Establishment charges & Profit
Rate per 10 Sqm
10,406.47
Rate per 1 Sqm
1,040.65

20

Flooring with Polished Tandur Stone slab of 15 to 18 mm thick ( 0.457 x 0.304 m ), in single piece, with edges flat nosed and set over a
base coat of cement mortar 1:3 12 mm thick, and fixing in position with neat paste, including cost and conveyance of all materials like
cement, sand, stone to site, seiniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges
such as dressingof stones to required sizes, mixing of cement mortar, fixing in position, curing, lift charges, etc, complete for finished
item of work.

Materials
Polished Tandur stone, 15 to 18mm
11.000 Sqm
thick

Page 72 of 77

1,544.00 10 Sqm

1,698.40

CIVMSM, SBMSKLYMNDPM, Sreesailam

Item No.
1

Quantity
2
21.600
33.000
20.000
0.120

Unit
3
Kgs
Kgs
Kgs
cum

3.100 Nos
1.100 Nos
0.860 Nos
14%

21

Description

Rate

5
Cement 1:3 for base coat
Cement slurry
Cement for jointing
Sand for CM 1:3
Labour
Mason 1st class
Mason 2nd class
Man Mazdoor ( Unskilled )
Total
Contractor's Overheads,
Establishment charges & Profit
Rate per 10 Sqm
Rate per 1 Sqm

6
5.80
5.80
5.80
2,225.00

per
7
Kgs
Kgs
Kgs
cum

350.00 Each
320.00 Each
280.00 Each

Amount

Remarks

9
125.28
191.40
116.00
267.00

1,085.00
352.00
240.80
4,075.88
570.62
4,646.50
464.65

Dadoing with 1st quality Decorated coloured background glazed tiles of approved brand, colour, and shade, of size 200 x
300 mm, set over 12mm thick in CM 1:3 proportion base coat and with neat cement paste spread at the rate of 3.30 kgs of
cement per 1 sq.m., and jointedwith neat white ement paste, mixed with pigments of matching shade including cost and
conveyance of all materials and labour charges etc., complete Johnson 1st quality.
Materials
Decorated coloured background
10.500 Sqm glazed tiles 200 x 300 mm ( S.no. 41,
P.no. 15 )
33.000 Kgs Cement slurry
6.000 Kgs Cement for jointing
0.120 cum CM 1:3
Labour
0.960 Nos Mason 1st class
2.240 Nos Mason 2nd class
3.300 Nos Man Mazdoor ( Unskilled )
Total
Contractor's Overheads,
14%
Establishment charges & Profit
Rate per 10 Sqm
Rate per 1 Sqm

Page 73 of 77

612.00 1 Sqm
5.80 Kgs
25.00 Kgs
5,176.25 cum
350.00 Each
320.00 Each
280.00 Each

6,426.00
191.40
150.00
621.15
336.00
716.80
924.00
9,365.35
1,311.15
10,676.50
1,067.65

LEAD CHART (SSR 2013-2014, August 2013 )

Name of Work : SBMS GOWRI KALYANAMANDAPAM, SREESAILAM


District :
Name of the work :

Sl.
No.

Nature of Material

KURNOOL
Construction of SBMS

Location of
quarry

Location :

Sreesailam

Machine
crushing
Total
Total
Conveyanc
Inntial Blasting charges Seigniorag
Lead
conveyanc
e charges
rate charges 25% extra e Charges
(KM)
e charges
Seinorage
charges
4

10

11

12

13

Total
Rate

UNITS

14

15

16

Uni
t
17

Per

Sand for Moratar

Puduru

162

1680

1680

505

40.00

2225.00

Cum

Sand for Concrete

Puduru

162

1680

1680

385

40.00

2105.00

Cum

Sand for filling

Puduru

162

1680

1680

285

40.00

2005.00

Cum

Gravel

Local

80

80

98

22.00

200.00

Cum

Quarry rubbish

Local

80

80

98

178.00

Cum

6mm HG MC Metal

Tamrajpalli

189

1950

1950

700 250.00

175.00

50.00

3125.00

Cum

12mm HG MC Metal

Tamrajpalli

189

1950

1950

1045 250.00

261.25

50.00

3556.25

Cum

20mm HG MC Metal

Tamrajpalli

189

1950

1950

1300 250.00

325.00

50.00

3875.00

Cum

Sl.
No.

Nature of Material

1
9

Location of
quarry

2
40mm HG MC Metal

3
Tamrajpalli

Machine
crushing
Total
Total
Conveyanc
Inntial Blasting charges Seigniorag
Lead
conveyanc
e charges
rate charges 25% extra e Charges
(KM)
e charges
Seinorage
charges
4

10

11

12

189

1950

1950

805 250.00

Total
Rate

UNITS

13

14

15

16

Uni
t
17

201.25

50.00

3256.25

Cum

Per

10 40mm HBG MC Metal

Local

80

80

170 250.00

50.00

550.00

Cum

11 RR Stone ( OTG )

Local

80

80

280 250.00

50.00

660.00

Cum

Tripuranthakam

80

1408

1491.4

3707

38.50

5236.90 1000 Nos

2000

5800
50000

12

Bricks 2nd class of size


22x11x7 cm

14 CEMENT
15 HYSD Steel

AT SITE
AT SITE

16 2.36 to 5 mm HBG Metal

Tamrajpalli

189

1950

1950

330

70.00

82.50

17 5 to 7 mm HBG Metal

Tamrajpalli

189

1950

1950

530

70.00

18 9.5 to 11.2 mm HBG Metal Tamrajpalli

189

1600

1600

573

189

1600

1600

260

19

2.36 mm and below HBG


Metal

Tamrajpalli

5800.00
52000.00

1
1

MT
MT

50.00

2482.50

Cum

132.00

50.00

2732.00

Cum

70.00

143.25

50.00

2436.25

Cum

70.00

65.00

50.00

2045.00

Cum

Sl.
No.

Nature of Material

Location of
quarry

Machine
crushing
Total
Total
Conveyanc
Inntial Blasting charges Seigniorag
Lead
conveyanc
e charges
rate charges 25% extra e Charges
(KM)
e charges
Seinorage
charges
4

10

11

Total
Rate

UNITS

12

13

14

15

16

Uni
t
17

Per

20 40 to 45 mm HBG Metal

Tamrajpalli

189

1600

1600

530

70.00

132.50

50.00

2382.50

Cum

21 25 to 27 mm HBG Metal

Tamrajpalli

189

1600

1600

874

70.00

218.50

50.00

2812.50

Cum

22 19 to 22 mm HBG Metal

Tamrajpalli

189

1600

1600

998

70.00

249.50

50.00

2967.50

Cum

23 12 to 14 mm HBG Metal

Tamrajpalli

189

1600

1600

727

70.00

181.75

50.00

2628.75

Cum

24 Kadapa slabs

Bethamcherla

200

1140.48

1140.48

840

1980.48

10 Sqm

25 CR Stones

Local

74.6

74.6

444.4

50.00

569.02

Cum

26 Boulders

Local

74.6

74.6

150

50.00

274.60

Cum

27 20mm OTG Metal

Hazipur

80

696

696

696 251.00

62.75

1775.75

cum

70.00

Name of Work : SBMS GOWRI KALYANAMANDAPAM, SREESAILAM


CEMENT MORTAR (SSR 2013-2014, August 2013 )
KURNOOL
Location :
Construction of SBMS Kalyanamandapam

District :
Name of the work :

Sl.
No.

Description

Rate

3
Unit
Cement Content per 1 Cum of Mortar

1 Cement
2 Sand ( 2225x1.05)
3 Mixing Charges (0.20x280/-)
TOTAL

Sreesailam

Unit

(1:11/2)

(1:2)

(1:3)

(1:4)

(1:5)

(1:6)

(1:8)

5
Kgs
960

6
Kgs
720

7
Kgs
480

8
Kgs
360

9
Kgs
288

10
Kgs
240

11
Kgs
180

5,800.00 MT
2,336.25 1 Cum
56.00 1 Cum

5,568.00
2,336.25
56.00

4,176.00
2,336.25
56.00

2,784.00
2,336.25
56.00

2,088.00
2,336.25
56.00

1,670.40
2,336.25
56.00

1,392.00
2,336.25
56.00

1,044.00
2,336.25
56.00

7,960.25

6,568.25

5,176.25

4,480.25

4,062.65

3,784.25

3,436.25

You might also like