You are on page 1of 3

LARSEN & TOUBRO LIMITED

ECC Division - B & FIC


PROJECT

HYDERABAD METRO RAIL

TITLE

LOAD CALCULATIONS ARM - 1 ESCALATOR

Load Calculations
a] Dead Load
Load due to M.S screen (jally)
Jally spacing b/n 1st and 2nd Column
Jally spacing b/n 2nd and 3rd Column
Jally spacing b/n 3rd and 4th Column
Height of jally
Load on jally First column
Load on jally 2nd column
Load on jally 3rd column
Load on jally 4th column
Dead Load due to shutter
Width of Staircase
Height of shutter
Shutter Width
Shutter load create point Load on column
Shutter load create Moment on column
Total DL on the roof
Bay Length1
Bay Length2
Bay Length3
Bay Length4
Bay Length5
Bay Length6
Bay Length7
Bay Length8

0.6+2.09/2
2
(2.09+3)/2
3
(1.5+(0.38+2.47)/2)
3.04
3.04/2+2.05/2
2.05

=
=
=
=
=
=
=
=

3.065
3.965
3.000
3.790
4.580
3.900
3.975
2.205

=
=
=
=
=
=
=
=

Full Load
0.613
0.793
0.600
0.758
0.916
0.780
0.795
0.441

Load on Rafter:
3.065*0.2
3.965*0.2
3*0.2
3.79*0.2
4.58*0.2
3.9*0.2
3.975*0.2
2.205*0.2

=
=
=
=
=
=
=
=

Full Load
1.716
2.220
1.680
2.122
2.565
2.184
2.226
1.235

DESIGNED BY

VRN

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

kN/m
0.1
3
m
3
m
2.05
m
1.2
m
0.1*(3)/2*1.2
0.18
kN
0.1*(3+3)/2*1.2
0.36
kN
0.1*(3+2.05)/2*1.2
0.30
kN
0.12
kN
2
kN/m
0.35
2
m
3.5
m
0.5
m
1.23
kN
0.35*2*3.5*0.5/2
0.61
kNm
kN/m2
0.20

=
=
=
=

0.75-0.52 2
kN/m2
0.6 m L = 1.00 m
h/L =
0.6
0.56
kN/m2

kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m

3.065*0.56
3.965*0.56
3*0.56
3.79*0.56
4.58*0.56
3.9*0.56
3.975*0.56
2.205*0.56

DATE
1/1/2014

m
m
m
m
m
m
m
m

b] Live Load
Live load (as per IS 875 pt.3)
(For Curved Roof with slope greater than 10 deg.)

Load on Rafter:

DOCUMENT NO.
HM-LE-METMET-MO201DOC-DC-STC-08-023

kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m

CHECKED BY SHEET

BVR

LARSEN & TOUBRO LIMITED


ECC Division - B & FIC
c] Wind Load (Considered Curved Profile)
As per IS 875 Part III
Basic Wind Speed
Design Wind Speed
where,

Design Wind Pressure


Ht of Building

k2

for 15m ht.

1.02

Assuming % of openings more than 20 %


Internal Pressure Coff.
( Cpi )
H
=
L
=
H/L =

C value =
C2 value =
=
=
=

Vb

Vz

k1

1.07

k2

1.02

k3

1.00

Pz

Bay Length1
Bay Length2
Bay Length3
Bay Length4
Bay Length5
Bay Length6
Bay Length7
Bay Length8

On C2 Area -

k1 x

0.6

-1.00
-0.3
-0.4
-0.7
-0.5

Bay Length1
Bay Length2
Bay Length3
Bay Length4
Bay Length5

=
=
=
=
=
=
=
=

=
=
=
=
=

k3 x

Vb

As per clause 5.3 of IS 875 Part III

As per clause 5.3.1 of IS 875 Part III


As per clause 5.3.2.2
for 15m ht.
Category 2 of table 2
of IS 875 Part III
Class B Structure.
As per clause 5.3.3.1 of IS 875 Part III
Vz x Vz

As per clause 5.4 of IS 875 Part III


Design Wind Pressure
2
kN/m
1.380

Refer cl 6.2.2.5 of table 5 of IS 875 (III)


Note: When the wind is blowing Normal to the gable end, Cpe may be
taken as equal to -0.7 for the full width of the roof over a length of L/2
from the gable ends and -0.5 for the remaining portion.

(-1-0.7)*1.38*3.065
(-1-0.7)*1.38*3.965
(-1-0.7)*1.38*3
(-1-0.7)*1.38*3.79
(-1-0.7)*1.38*4.58
(-1-0.7)*1.38*3.9
(-1-0.7)*1.38*3.975
(-1-0.7)*1.38*2.205

FOR
Bay Length1
Bay Length2
Bay Length3
Bay Length4
Bay Length5
Bay Length6
Bay Length7
Bay Length8

k2

for Hyderabad Zone

=
0.7
0.60 m
2.00 m
0.300

FOR
=
=
=
=
=
=
=
=

m/s

Design Wind Speed


m/s
48.02

Load on Rafter:
FOR 0 Deg. Wind
On C Area -

44

Cpi +
Full Load
-7.190
-9.302
-7.038
-8.891
-10.745
-9.149
-9.325
-5.173

(-0.3-0.7)*1.38*3.065
(-0.3-0.7)*1.38*3.965
(-0.3-0.7)*1.38*3
(-0.3-0.7)*1.38*3.79
(-0.3-0.7)*1.38*4.58
(-0.3-0.7)*1.38*3.9
(-0.3-0.7)*1.38*3.975
(-0.3-0.7)*1.38*2.205

Cpi +
Full Load
-4.230
-5.472
-4.140
-5.230
-6.320
-5.382
-5.486
-3.043

(-0.4-0.7)*1.38*3.065
(-0.4-0.7)*1.38*3.965
(-0.4-0.7)*1.38*3
(-0.4-0.7)*1.38*3.79
(-0.4-0.7)*1.38*4.58

Cpi +
Full Load
-4.653
-6.019
-4.554
-5.753
-6.952

0.7
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m

=
=
=
=
=
=
=
=

(-1--0.7)*1.38*3.065
(-1--0.7)*1.38*3.965
(-1--0.7)*1.38*3
(-1--0.7)*1.38*3.79
(-1--0.7)*1.38*4.58
(-1--0.7)*1.38*3.9
(-1--0.7)*1.38*3.975
(-1--0.7)*1.38*2.205

0.7

FOR Cpi
-0.7
Full Load
1.692 kN/m
2.189 kN/m
1.656 kN/m
2.092 kN/m
2.528 kN/m
2.153 kN/m
2.194 kN/m
1.217 kN/m

kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m

=
=
=
=
=
=
=
=

0.7

FOR Cpi
-0.7
Full Load
= (-0.4--0.7)*1.38*3.065
1.269 kN/m
= (-0.4--0.7)*1.38*3.965
1.642 kN/m
= (-0.4--0.7)*1.38*3
1.242 kN/m
= (-0.4--0.7)*1.38*3.79
1.569 kN/m
= (-0.4--0.7)*1.38*4.58
1.896 kN/m

kN/m
kN/m
kN/m
kN/m
kN/m

(-0.3--0.7)*1.38*3.065
(-0.3--0.7)*1.38*3.965
(-0.3--0.7)*1.38*3
(-0.3--0.7)*1.38*3.79
(-0.3--0.7)*1.38*4.58
(-0.3--0.7)*1.38*3.9
(-0.3--0.7)*1.38*3.975
(-0.3--0.7)*1.38*2.205

FOR Cpi -0.7


Full Load
-1.269 kN/m
-1.642 kN/m
-1.242 kN/m
-1.569 kN/m
-1.896 kN/m
-1.615 kN/m
-1.646 kN/m
-0.913 kN/m

LARSEN & TOUBRO LIMITED


ECC Division - B & FIC
Bay Length6
Bay Length7
Bay Length8

=
=
=

(-0.4-0.7)*1.38*3.9
(-0.4-0.7)*1.38*3.975
(-0.4-0.7)*1.38*2.205

FOR 90 Deg. Wind


Bay Length1
Bay Length2
Bay Length3
Bay Length4
Bay Length5
Bay Length6
Bay Length7
Bay Length8

FOR
=
=
=
=
=
=
=
=

(-0.7-0.7)*1.38*3.065
(-0.7-0.7)*1.38*3.965
(-0.7-0.7)*1.38*3
(-0.7-0.7)*1.38*3.79
(-0.7-0.7)*1.38*4.58
(-0.7-0.7)*1.38*3.9
(-0.7-0.7)*1.38*3.975
(-0.7-0.7)*1.38*2.205
FOR

Bay Length1
Bay Length2
Bay Length3
Bay Length4
Bay Length5
Bay Length6
Bay Length7
Bay Length8

=
=
=
=
=
=
=
=

(-0.5-0.7)*1.38*3.065
(-0.5-0.7)*1.38*3.965
(-0.5-0.7)*1.38*3
(-0.5-0.7)*1.38*3.79
(-0.5-0.7)*1.38*4.58
(-0.5-0.7)*1.38*3.9
(-0.5-0.7)*1.38*3.975
(-0.5-0.7)*1.38*2.205

Wind Load on Columns:


Width of Column
Assuming % of openings more than 20 %
Internal Pressure Coff.
( Cpi )
External Pressure Coff.

=
=
=
=

-5.920 kN/m
-6.034 kN/m
-3.347 kN/m
Cpi +
Full Load
-5.922
-7.660
-5.796
-7.322
-8.849
-7.535
-7.680
-4.260
Cpi +
Full Load
-5.076
-6.566
-4.968
-6.276
-7.584
-6.458
-6.583
-3.651

0.7
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m

kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m

(-0.7--0.7)*1.38*3.065
(-0.7--0.7)*1.38*3.965
(-0.7--0.7)*1.38*3
(-0.7--0.7)*1.38*3.79
(-0.7--0.7)*1.38*4.58
(-0.7--0.7)*1.38*3.9
(-0.7--0.7)*1.38*3.975
(-0.7--0.7)*1.38*2.205

(-0.5--0.7)*1.38*3.065
(-0.5--0.7)*1.38*3.965
(-0.5--0.7)*1.38*3
(-0.5--0.7)*1.38*3.79
(-0.5--0.7)*1.38*4.58
(-0.5--0.7)*1.38*3.9
(-0.5--0.7)*1.38*3.975
(-0.5--0.7)*1.38*2.205

FOR Cpi
-0.7
Full Load
0.846 kN/m
1.094 kN/m
0.828 kN/m
1.046 kN/m
1.264 kN/m
1.076 kN/m
1.097 kN/m
0.609 kN/m

=
=
=
=
=
=
=
=

0.132 m
0.7
0.8
-0.6
Internal Pressure Coefficient (Cpi) +

-0.6

Wind Load on Front side Column


Wind Load on Back side Column

=
=
=
=
=
=
=
=

1.615 kN/m
1.646 kN/m
0.913 kN/m
FOR Cpi
-0.7
Full Load
0.000 kN/m
0.000 kN/m
0.000 kN/m
0.000 kN/m
0.000 kN/m
0.000 kN/m
0.000 kN/m
0.000 kN/m

0.7

Refer cl 6.2.2.5 of table 5 of IS 875 (III)

0.8

= (-0.4--0.7)*1.38*3.9
= (-0.4--0.7)*1.38*3.975
= (-0.4--0.7)*1.38*2.205

0.1

=
=

0.7

-1.3

Full Load
0.018
kN/m
-0.237 kN/m
Internal Pressure Coefficient (Cpi) +

0.8

-0.6

For -ve coefficient


Wind Load on Front side Column
Wind Load on Back side Column

1.5

=
=

Full Load
0.273
kN/m
0.018
kN/m

d] SEISMIC LOAD CALCULATION (Based on IS:1893-2002 provisions)


Zone of the building location
= II (hyderabad Area)
Building System
= Steel Frame With Concentric Braces.
The framing consideration
= Steel Frame Building
Soil type
= Rocky/ Hard soil site
width of the building in X-direction
=
3 m
width of the building in Z-direction
=
30 m
Height of the building
=
15 m

-0.7

0.1