You are on page 1of 39

Transmission Power Division.

Transmission Protection Department


Protection Field Services
Transmission Protection Commissioning
Quality Procedure

Q U A L I T Y

TP/TPD/PFS/TPC/QP-13

P R O C E D U R E

TITLE

Transformer Differential Protection Testing for Devices and


Schemes.

REF.No

TP/TPD/PFS/TPC/QP - 13

Copy No.

AMENDMENTS
ISSUE /
REVISIO
N
NO.

1/0
2/0

Issue : 2

SUBJECT OF THE AMENDMENT

REVIEWED BY
& SIGNATURE

New Procedure Prepared


Entire procedure has been amended to incorporate
process change and restructuring within the
department.
This procedure supersedes the old procedure No.
TP/TPD/TPC/QP 13

Rev:0

Date: 05.12.2011

AUTHORIZED BY
& SIGNATURE

DATE

05-12-11

Page 1 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

TP/TPD/PFS/TPC/QP-13

CONTENTS

1.0

PURPOSE

2.0

SCOPE

3.0

DEFINITIONS

4.0

CROSS REFERENCES

5.0

RESPONSIBILITY

6.0

PROCEDURE

7.0

RECORDS

8.0

DISTRIBUTION

9.0

ATTACHMENTS

Issue : 2

Rev:0

Date: 05.12.2011

Page 2 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

TP/TPD/PFS/TPC/QP-13

1.0
PURPOSE
1.1 This procedure is to explain in detail the steps to be followed for commissioning of
Transformer differential protection devices and schemes and to facilitate effective
control of documents.
2.0
SCOPE
2.1 This procedure applies to commissioning of Transformer differential protection devices
and schemes in 132 kV and 400 kV substations.
3.0

DEFINITIONS

3.1 Approved drawing: The general arrangement, scheme drawings which are approved by
TPE with status code A or B to execute the work at site.
3.2 Approved setting : The approved values, parameters & configuration of the protection
relays issued by PCS to be implemented in the protection
relays before putting the relay in service.
3.3

BI : Binary Inputs.

3.3

BO : Binary Outputs.

3.4

CB : Circuit breaker

3.5

CT : Current Transformer.

3.6

CM-TPC: Commissioning Manager-Transmission Protection Commissioning.

3.7

DO : Drop Off.

3.8

HV : High Voltage.

3.9

IDT : Inter-Distribution Transformer

3.10

LV : Low Voltage.

3.11

LED: Light Emitting Diode.

3.12

M-TPC: Manager- Transmission Protection Commissioning.

3.13

PCS

: Protection Calculation Setting, a section of TPD.

3.14

POC

: Primary Operating Current.

3.15

PPE

: Personal Protective Equipments.

3.16

PU

: Pick-Up.

3.17

REF

: Restricted Earth Fault.

3.18

RSI

: Relay Setting Identifier.

Issue : 2

Rev:0

Date: 05.12.2011

Page 3 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

TP/TPD/PFS/TPC/QP-13

3.19

TPD

: Transmission Protection Department.

3.20

VP-TP : Vice President-Transmission Protection.

3.21

Testing Engineer: Engineer from contractor or manufacturer who performs the test
as per this procedure.

3.22

Witness Engineer: Engineer from DEWA / approved consultant who witness the
test

4.0
4.1

CROSS REFERENCES
Nil

4.2
5.0

RESPONSIBILITY

5.1 VP-TP : VP-TP is responsible for approval & modification of this procedure.
5.2 M-TPC : M-TPC is responsible for implementation of this procedure.
5.3 CM-TPC : CM-TPC is responsible to plan testing activities as per the details of this
procedure.
5.4 Witness Engineer : Witness engineer is responsible to witness the testing of
relay/scheme

6.0

PROCEDURE

6.1

General.

6.1.1

Ensure the availability of approved setting for the protection device from TPD-PCS.
The RSI number of the setting template to be filled in the test formats

6.1.2

The TPC Witness engineer ensures the calibration certificate of measuring


equipments used for testing are available at site and ensures the availability of
relevant test sheets (given as attachment) prior to performing the site testing. The
testing instruments details shall be recorded in the test report.

Issue : 2

Rev:0

Date: 05.12.2011

Page 4 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

6.1.3

TP/TPD/PFS/TPC/QP-13

Establish a communication between the relay and the computer (lap-top) for
uploading / down loading settings using the appropriate application software and
connecting cables.

6.1.4

Download the default settings from the relay to computer and update the approved
settings with date and time.

6.1.5

Configure the input / output mappings in the application software as per the
approved drawings. The date and time setting to be updated as actual

6.1.6

Upload the updated file to the relay and confirm the relay is healthy.

6.1.7

Relay soft setting and configuration file should be downloaded from the protection
relay finally and saved with the filename provided on the footer of the specific
setting template. A printout of the same shall be signed and attached with the test
report. The setting template sheet, test reports are also to be signed by the
contractor and the witness engineer.

6.1.8

Test report shall be filled during testing and the same shall be signed on the same
day of testing.

6.2

Protection Device testing.


Device - Siemens relay 7UT613 (Refer attachment TP/TPD/PFS/TPC/QP13:A01)
6.2.1
General Data and Inspection.
The testing engineer has to fill the General data (Relay Type, Serial No, Firmware
Version, Rated Current etc.) as mentioned in the test format.

A general visual inspection is carried out to confirm the relay installation and
wirings are carried out as per the approved drawings.

The jumper settings to be set for the rated voltage, current and correct pick up
voltage of the binary inputs. This is to be done as per Siemens relay 7UT613
manual.

6.2.2

Configuration of Protection functions:


Relay configuration is done to enable only those protection functions which are
recommended in the relay setting template.

Issue : 2

Transformer data and differential protection settings are entered in the test report.

Rev:0

Date: 05.12.2011

Page 5 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

6.2.3

TP/TPD/PFS/TPC/QP-13

Measurements Checks:
Use the secondary injection test kit to inject current in HV side CT R phase and
note down the relay display reading. Repeat the current injection in Y & B phases
and note down the display readings in the test format.

Repeat same for LV side CT.

Relay Pick Up values:


Using the secondary injection test kit, gradually raise the current in R phase of HV

6.2.4

side CT till the relay picks up. Note the value of differential pick-up. Repeat the
same for the other phases in HV side CT. Repeat the same for LV side CT.
6.2.5

Timing Tests:
Inject current 1.5 times setting current as mentioned in test format in R phase and
note down the operating times values in the test format. The operating time should
be less than that indicated in the test format.

Repeat the test for other phases.

Differential protection testing:


Bias characteristics are checked by injecting a balanced current in HV side and LV

6.2.6

side CT secondary, and then gradually increasing current in HV side till differential
pickup. Record the trip value of current in CT side-1.

Inject 4 times I diff>> setting current in each phase and check trip time. Record the
values. Also record LED operation.

Repeat the test for other phases.

Testing 2nd Harmonic restraint.


2nd harmonic blocking is set at 15%.

16% 2nd Harmonic is generated using the secondary injection kit and applied to

6.2.7

relay for 5 periods (100 milli sec) and check differential is blocking.

Note the value of set harmonic percentage in test kit.

To check cross block feature


Inject 1 amp at 50 hertz in R phase and B phase along with 0.3 amps at 100 Hertz

6.2.8

in Y phase.

With cross block feature off, the relay should trip by R phase and B phase
differential protection.

Issue : 2

Rev:0

Date: 05.12.2011

Page 6 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

TP/TPD/PFS/TPC/QP-13

Set cross block feature YES and time for cross block as 80 milli sec. The
differential trip will be blocked for 80 milli sec.

6.2.9

Testing of Add on Stabilisation for External faults: (Siemens 7UT612)

The test is carried out to check CT saturation detection during the

duration of add on stabilisation as explained in the test format.


Binary Inputs and Outputs:
Record the function of BI/BO in the test format. Apply voltage and check the BI is

6.2.10

functioning.

Each BO to be checked separately by operating the particular function to which it is


assigned. The BO is tested by checking the continuity between contacts using a
multi-meter.

Each LED indications are to be checked separately by operating the particular


function to which it is assigned. LED resetting operation is checked by manually
resetting the indications.

6.2.11

Other Checks:
Disturbance recorder and event recorder from the relay are to be down loaded to
the computer (laptop) and the printout to be attached with the test report.

Confirm operation of trip relay by inserting the appropriate trip link. Also confirm
signals to fault recorder and SCADA system are send from the relay.
Device - Areva relay Micom P 632(Refer attachment TP/TPD/PFS/TPC/QP13:A02)

6.2.12

Relay Data and General Inspection.

The testing engineer has to fill the General data (Relay Type, Serial No, Firmware
Version, Rated Current etc.) as mentioned in the test format.

A general visual inspection is carried out to confirm the relay installation and
wirings are carried out as per the approved drawings.

6.2.13

LED, Binary Inputs and Outputs:

Record the function of BI/BO in the test format. Apply voltage and check the BI is
functioning.

Issue : 2

Rev:0

Date: 05.12.2011

Page 7 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

TP/TPD/PFS/TPC/QP-13

Each BO to be checked separately by operating the particular function to which it is


assigned. The BO is tested by checking the continuity between contacts using a
multi-meter.

Each LED indications are to be checked separately by operating the particular


function to which it is assigned. LED resetting operation is checked by manually
resetting the indications.

6.2.14

Measurements Checks:

Use the secondary injection test kit to inject 1 amps current in HV side CTs and
note down the relay display reading. Repeat the current injection in LV side CTs
and note down the display readings in the test format. Compare with expected
current.

6.2.15

Differential protection checks.

Differential protection settings are entered in the test report.

Using the secondary injection test kit, gradually raise the current in R phase of HV
side CT till the relay picks up. Note the value of differential pick-up. Repeat the
same for the R phase of LV side CT.

Check 3 phase pickup by gradually raising the current in all phases in HV side CT
till the relay picks up. Repeat the same for LV side CT.

6.2.16

Differential protection checks:

Bias characteristics are checked by injecting a balanced current in HV side and LV


side CT secondary, and then gradually increasing current in HV side till differential
pickup. Record the trip value of current in CT side-1.

6.2.17

CT saturation check: (MICOM P632)

CT saturation Check is tested by applying 1 Amps at 100 Hz to R, Y and


B phases. The setting of vector group will be YY0, setting for 2nd
harmonic should be disable and zero sequence filter OFF .Confirm
the relay detect CT saturation and Block differential function.
Timing Tests:

6.2.18

Inject current 1.0 amp current as mentioned in test format in HV side R phase and
note down the operating time value in the test format. The operating time should be
less than that indicated in the test format.

Issue : 2

Rev:0

Date: 05.12.2011

Page 8 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

6.2.19

TP/TPD/PFS/TPC/QP-13

Repeat the test for other phases in HV side. Repeat the same for LV side also.
Testing 2nd Harmonic restraint.

2nd harmonic blocking is set at 15%.

16% 2nd Harmonic is generated using the secondary injection kit is applied to HV
side R phase of relay and check differential is blocking. Relay should not trip.

Reduce harmonics percentage in the injected current till the relay trips. Record the
value in the test format.

6.2.20

Repeat the test for HV side Y and B phase.


Differential High set (I diff>>)test:

Inject in R phase a current below I diff>> setting and observe the tripping time.
The tripping time should be the normal differential tripping time.

Repeat injection, gradually raising the current till the tripping time is less than the
differential operating current. Record the threshold value of I diff>> pickup
current.

The operating time of HIGH SET will be tested by injecting 2 times of high set
differential setting current and record the time.

6.2.21

Other Checks

Disturbance recorder and event recorder from the relay are to be down loaded to
the computer (laptop) and the printout to be attached with the test report.

Confirm operation of trip relay by inserting the appropriate trip link. Also confirm
signals to fault recorder and SCADA system are send from the relay.
Device Duo Bias M (Refer attachment TP/TPD/PFS/TPC/QP-13:A03)

6.2.22

Relay Data and General Inspection.

The testing engineer has to fill the General data (Relay Type, Serial No, Firmware
Version, Rated Current etc.) as mentioned in the test format.

A general visual inspection is carried out to confirm the relay installation and
wirings are carried out as per the approved drawings.

6.2.23

Measurements Checks:

Issue : 2

Differential protection settings are entered in the test report.


Rev:0

Date: 05.12.2011

Page 9 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

TP/TPD/PFS/TPC/QP-13

Use the secondary injection test kit to inject 1 amps current in HV side CTs and
note down the relay display reading. Repeat the current injection in LV side CTs
and note down the display readings in the test format. Compare with expected
current.

6.2.24

Differential bias characteristic.

Bias characteristics are checked by injecting a bias current as reference, and then
gradually increasing the operating current till differential pickup. Verify results with
expected and measured operating values. The readings are taken keeping bias
currents at 0, 1, 1.5, 2 and 4 amps for each phase.

6.2.25

Timing Tests:

Inject current 3 times setting current or as mentioned in test format in R phase and
note down the operating times values in the test format. Repeat the test for other
phases.

6.2.26

Differential High set test:

The operating time of HIGH SET will be tested by injecting 2 times of high set
differential setting current and record the time. Repeat the test for other phases.

6.2.27

Harmonic Block test

Inject a current higher than differential setting with a harmonic content of more than
harmonic block settings in red phase and see that the relay blocks tripping and
gives correct LED indication.

Repeat the Injection in the other Y & B phases.

LED, Binary Inputs and Outputs:


Record the terminal numbers of BI/BO in the test format. Apply voltage and check

6.2.28

the BI is functioning.

Each BO to be checked separately by operating the particular function to which it is


assigned. The BO is tested by checking the continuity between contacts using a
multi-meter.

Each LED indications are to be checked separately by operating the particular


function to which it is assigned. LED resetting operation is checked by manually
resetting the indications.

Issue : 2

Rev:0

Date: 05.12.2011

Page 10 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

6.2.29

TP/TPD/PFS/TPC/QP-13

Other Checks:
Confirm operation of trip relay by inserting the appropriate trip link. Also confirm
signals to fault recorder and SCADA system are send from the relay.

Disturbance recorder and event recorder from the relay are to be down loaded to
the computer (laptop) and the printout to be attached with the test report.

3.3

Protection Scheme testing.


Note:
For Sensitivity test (refer attachment Transformer Differential Sensitivity Test
Report.- TP/TPD/PFS/TPC/QP-13:A04)
For Stability test (refer attachment Transformer Differential Stability Test Report.TP/TPD/PFS/TPC/QP-13:A05)

6.3.1

To avoid the operation of REF (High Imp) during the sensitivity and stability tests,
ensure the REF and stabilizing resistor are by passed.

6.3.2

Sensitivity on HV Side

The differential relay settings and calculated value of Primary Operating Current
(POC) are recorded in test format.

Primary current shall be injected on HV Side R Phase to earth and the same shall
be increased slowly form zero till the differential protection Operates. The Primary
current at which the protection operates is the minimum Primary Operating Current
for R Phase. Record on test formats the corresponding secondary currents and
relay display readings at this POC. The value shall be with in the limits of tolerance.
The same shall be confirmed for Y and B Phases.

The same injection is repeated for phase to phase injection (R-Y, Y-B and B-R)
and the POC is compared again with the calculated values.

When there are 2 sets of CTs on the HV side, the values are recorded for each set
as Bus-1 and Bus-2 CTs.

6.3.3

Sensitivity on LV Side

Primary current shall be injected to LV side CTs to repeat the test as in 6.3.2, to
find sensitivity of LV side.

6.3.4
Issue : 2

Stability Test.
Rev:0

Date: 05.12.2011

Page 11 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

TP/TPD/PFS/TPC/QP-13

Stability test in carried out as per the details given below. A 3 phase 415 Volts shall
be applied on LV (11kV Side) side of Transformer and all three phases of HV Side
shall be shorted and earthed. Actual values of current on HV and LV shall be
compared with the calculated value based on percentage impedance of
transformer. The differential and bias currents will be compared with the primary
current values.

Identify the IDT for the differential relay under test.

Isolate tripping to both HV and LV CBs from differential relay.

Isolate the section of 11 kV where this IDT-LV is connected by keeping all CBs in
test position and opening the bus earth switch.

132 kV IDT bay is connected to either bus-1 or bus-2 and the connected bus earth
switch is closed. Line isolator and CB is kept closed for IDT.

Supply 3 phase 415 Volts to one of the outgoing feeder in that section of 11 kV.
Rack in the CB of that bay to service and close CB. 11 kV section is now energised
with 415 V supply.

Rack in the CB of the incomer where IDT-LV is connected. Close the CB to


circulate a current in primary circuit.

Record all values of primary and secondary currents including the Differential
current and Restraint currents in the test formats. These are the normal values.
The differential Current shall be zero and Restraint current shall be high. The
currents are recorded while keeping the tap-changer in extreme low tap, middle tap
and high tap.

Keep the tap changer in middle tap. The R phase of HV side CT shall be reversed
without opening the CT. Record all values of primary and secondary currents
including the Differential current and Restraint currents in the test formats. In this
condition the Differential current shall be predominant and Restraint current shall
be less. If the Differential current is more than the setting, the protections shall
operate. After recording the currents, the R phase shall be normalized. Confirm the
currents are normal values again. The same shall be repeated for Y and B Phase.

Issue : 2

Rev:0

Date: 05.12.2011

Page 12 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

TP/TPD/PFS/TPC/QP-13

Keeping the tap changer in middle tap, the R phase of LV side CT shall be
reversed now without opening the CT and record all the above values as done for
HV side CTs. Again in this condition, the Differential current shall be high and
Restraint currents shall be less. If the Differential current is more than the setting
the protections shall operate. After Recording the currents the R phase shall be
normalized and confirm the currents are in order. The same shall be repeated for Y
and B Phase.

If HV side is provided with 2 sets of CTs, each set is compared individually with the
LV side CTs. Also normal values are also taken for each set of CTs in the
beginning and end of testing.

After normalizing the CTs on HV and LV the currents in Diff. Protection shall
measured and confirmed that the Diff current shall be zero and Restraint current
shall be high.

6.4

Risk Assessment & safety precautions.


Safety measures are identified through risk assessment process as follows,

6.4.1

Risk assessment to be carried before the testing activity to identify areas of risk for
both personal and equipment safety while doing the testing activity.

6.4.2

Adequate safety measures to be taken to avoid injury to persons or damages to


equipment based on risk assessment.

6.4.3

Follow safety guidelines and procedures while working in substations.

6.4.4

Regarding the activity mentioned in the QP, The risk assessment & safety
Precautions are identified in,

6.5

TP/TPD/TPC-A01 Conducting relay testing during commissioning

KPI / measurements.
KPI are identified, measured & results analysed to monitor the process/activity
and implement actions to achieve planned results and work for continual
improvement.

Issue : 2

Rev:0

Date: 05.12.2011

Page 13 of 14

Transmission Power Division.


Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure

6.5.1

TP/TPD/PFS/TPC/QP-13

The measurement of the procedure output will be recorded in KPI sheet by


measuring the number of problems and abnormalities noticed after Energization of
substation due to lapses in commissioning activities.

7.0

RECORDS

7.1

The test report shall be signed and kept in concerned file.

7.2

The relay configuration and settings file (soft copy)and signed setting template in
PDF format is submitted to TPD-PCS

8.0

DISTRIBUTION

8.1

VP-TP

8.2

M-TPC

9.0

ATTACHMENTS

9.1

Final Setting Test Report Siemens 7UT612 TP/TPD/PFS/TPC/QP-13:A01(5


pages)

9.2

Final Setting Test Report MICOM P632 - TP/TPD/PFS/TPC/QP-13:A02(4 pages)

9.3

Final Setting Test Report Duo Bias-M - TP/TPD/PFS/TPC/QP-13:A03(3 pages)

9.4

Transformer Differential Sensitivity Test Report.- TP/TPD/PFS/TPC/QP-13:A04


(7 pages)

9.5

Transformer Differential Stability Test Report.- TP/TPD/PFS/TPC/QP-13:A05(5


pages)

9.6

Risk assessment TP/TPD/TPC-A01

9.7

Process form TP/TPD/PFS/TPC/PM-07

Issue : 2

Rev:0

Date: 05.12.2011

Page 14 of 14

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
NAME OF SUBSTATION:

CONTRACT NO:
Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:
Dt.
Final Settings Tests of DIFFERENTIAL RELAY Type: 7UT612.

Manufacturer

RSI:

ELECTROSTATIC DISCHARGE (ESD)


The relay incorporate CMOS static sensitive devices, which may be damaged by static electricity discharged from the body.
When handling care should be taken to avoid contact with components and electrical connections. If the relay is removed from its
case for any period of time. It should be placed in an electrically conducting anti-static bag. If making measurements on the
internal electronic circuitry, its preferable you are earthed to he case with a conductive strap having a resistance to ground
between 500k Ohms 10 m Ohms

REFERENCE DOCUMENT:
SIPROTEC Transformer Differential PROTECTION 7UT612: ...

1- GENERAL DATA
Ordered MLFB:

Serial No.

Built in MLFB:

Ordered Version:

Ordered rated current IN: 1A

Ordered rated auxiliary voltage (DC): 110 V DC

Built-in rated current IN: 1A

Built-in rated auxiliary voltage (DC): 110 V DC

Software used:

DIGSI

Serial interface configuration


RS 232 Front Port
Fault recording setting

Built-in Version:

4.5/4.6

Substation address:
Relay address:
By pick-up

Feeder address:
Baud rate: 38400
By trip command

2- General Inspection and Testing:


i.
ii.
iii.
iv.
v.
vi.
vii.

Visual inspection

Confirmation of unique Sr. Number on Case and inside the relay

Correctness of installation and wiring as per approved drawings

Confirmation of Earthing of relay case to local earth bar

Confirmation of Jumpers on A-CPU for 110- 250VDC Rated Voltage


Confirmation of Jumpers on A-I/O-3 for 1 Amp. Rated current

Confirmation of Jumpers A-CPU for High Binary input voltage

CONFIGURATION OF PROTECTION FUNCTIONS

Differential Protection

Configured

Back Up O/C Time Protection

Configured

Thermal over Load Protection

Configured

Cold Load Pick Up

Configured

TP/TPD/PFS/TPC/QP-13:A01

Page 1 of 5

CONTRACT NO:

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
NAME OF SUBSTATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:

Manufacturer

SCADA No:
Dt.
Final Settings Tests of DIFFERENTIAL RELAY Type: 7UT612.
RSI:

3- Transformer Data:
Transformer Data
Primary Winding
Secondary Winding
UN
132 kV
12kV
PN
50 MVA
50 MVA
IN (calculated)
218.7 A
2405.7
CT Ratio
300/1
3200/1
4- Settings of Diff. Protection:
I diff > :
I/ In =
t diff > delayed :
I diff >> : I/ In =
t diff >> delayed :
2nd. Harmonic :
Slope
1:
5th. Harmonic :
Slope
2:
Vector Group:
Base Point
1:
Base Point
2:
5- Measurements Checks:
Primary
I diff.
I Rest.
Tested
Secondary
Tested Winding
Measured
Measured
Measured
Phases
Injected (A)
(A)
(I/In)
(I/In)
1.0
R
Y
Winding side 1
1.0
B
1.0
1.0
R
Y
Winding side 2
1.0
B
1.0
6- Relay Pickup Values:
Test Function
Tested Winding
Phases
R
Y
Side 1
B
R
Y
Side 2
B
7- Timing Test:
Test
Tested Winding
Function
Side 1 or Side 2
Phases
R
Y
1.5 X Idiff >
B

Expected

Current Inj. (A)

8- DIFFERENTIAL PROTECTION TESTING:

TP/TPD/PFS/TPC/QP-13:A01

Page 2 of 5

Current (A)
P/U

Timing Test
Expected
(mSec)
38
38
38

D/O

Act (mSec)

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
NAME OF SUBSTATION:

CONTRACT NO:
Main Contractor

Name of Bay:

Consultant:

Equipment:

Manufacturer

SCADA No:
Dt.
Final Settings Tests of DIFFERENTIAL RELAY Type: 7UT612.
RSI:

Current
Injection on
CT-1
(A)

Current
Injection on
CT-2
(A)

Expected Trip
Value
CT Side 1

Phases

Relay
Settings

0.2

0.2

0.2

0.4

0.2

0.2

0.2

0.4

0.2

0.2

0.2

0.4

Obtained Trip
Value at
Increasing
current on CT
Side-1

Trip Time
4 x Idiff
Inj.
(A)

7- DIFF (HIGH SET) TESTING


I Diff >> (High Set):

Injected Current (A)

LED Indication: ________

8- HARMONIC BLOCK TESTING


Setting
15 %
15 %
15 %

Harmonic Block in Red Phase


Harmonic Block in Yellow Phase
Harmonic Block in Blue Phase
a. Testing of 2nd Harmonic Restraint :

b. Testing of Cross Blocking of 2nd Harmonics:


- Cross-blocking of Harmonics Setting: 15%

TP/TPD/PFS/TPC/QP-13:A01

Page 3 of 5

LED Indication

TIME
(Sec)

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
NAME OF SUBSTATION:

CONTRACT NO:
Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:
Dt.
Final Settings Tests of DIFFERENTIAL RELAY Type: 7UT612.

Manufacturer

RSI:

Set Cross-block
time
(ms)

Injected
Current (A)

Phase

Frequency/
Harmonics
(Hz)

R
1.0
Y
0.30
B
1.0
9- Testing of Add on Stabilization for External faults :
100

- I-ADD ON STAB setting:

3xI/In and

Measured
Cross-block
time
(ms)

Result with LED


indication

50
100
50

Set duration of ADD-on stabilization: 10 Cycles.

Simulate in state sequencer the saturation condition of one side CT:


Inject through fault currents (3.25 Amps) for 2 ms in state1 and then inject decreased currents through one side of
relay for 2 ms in state2 while other side current is unchanged and then in state3, inject more decreased currents
for time longer than blocking duration to observe trip blocking within the ADD-on stabilization period and trip
release after the period is over. The relay will detect CT saturation within 5 ms after the fault incidence and
saturation of CT and block trip for settable duration only.
Set duration of ADD-on stabilization
(msec)

Measured duration of ADD-on stabilization


(msec)

200

10- BINARY OUTPUT CONTACTS


Binary Output

Terminal No.

BO 1

F6 F7

BO 2

F8 F9

BO 3

F10 F11

BO 4

F12 F13

BO 5

F14 F15

Watch Dog

F3 F5

Assigned for

Test Result

F4 F5
Note: check status of Watch Dog contacts while the relay is energized and de-energized.

10- BINARY INPUTS


Binary Output

Terminal No.

BI 1

F14 F15

BI 2

F16 F15

BI 3

F17 F18

Assigned for

11- LEDS CHECK

TP/TPD/PFS/TPC/QP-13:A01

Page 4 of 5

Test Result

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
NAME OF SUBSTATION:

CONTRACT NO:
Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:
Dt.
Final Settings Tests of DIFFERENTIAL RELAY Type: 7UT612.

Manufacturer

RSI:

LEDs

Assigned for

I Diff > Trip


I Diff >> Trip
Diff 2nd Harm L1/L2/L3
Diff 5th Harm L1/L2/L3
Cross Blk by 2nd Harm
Cross Blk by 5th Harm
Diff blk. EXT.Flt. L1/L2/L3

2
3
4
5
6
7

Test Result

RESETTING OPERATION
I. OTHER CHECKS:
A) Check Operation & Resetting Of All Front Panel LED's

B) Trip Relay Operation And All Alarms

C) DR, ER's Downloaded and print out attached/ Final setting print out attached: ..

Testing Instruments Details


Particulars

Make

Type

Tested By (Manufacturer)
Signature
Name

TP/TPD/PFS/TPC/QP-13:A01

Page 5 of 5

Sr.No.

Cal. Due Date

Witnessed By (DEWA)

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
NAME OF SUB STATION:

CONTRACT NO:
Main Contractor

Name of Bay:

Consultant:

Equipment:

Manufacturer

SCADA No:

Dt.

Final Settings Tests of DIFFERENTIAL RELAY Type MICOM P632


RSI: ..
ELECTROSTATIC DISCHARGE (ESD)
The relay incorporate CMOS static sensitive devices, which may be damaged by static electricity discharged from the body.
When handling care should be taken to avoid contact with components and electrical connections. If the relay is removed from its
case for any period of time. It should be placed in an electrically conducting anti-static bag. If making measurements on the
internal electronic circuitry, its preferable you are earthed to he case with a conductive strap having a resistance to ground
between 500k Ohms 10 m Ohms

1- RELAY DATA

Current In
Voltage Vn
Frequency
Aux. Voltage

Model No.
SL.No.
Software Ref.

2- GENERAL INSPECTION
Visual inspection/ Correctness of Installation and wiring
Sr.No. on module, case and cover are identical
Relay case connected to a local earth bar
Installation & wiring correct to relevant drawings
Wiring and installation checks
Wiring and installation checks
Check for correct voltage polarity/Record the level at rear of the relay
3- LED CHECK

Check the operation of all LEDs on the relay front panel.


LED No.
Allocation
LRD H1
Healthy
LED H2
Out of Service
LED H3
Alarm
LED H4
Main Gen Trip Signal
LED H5
LED H6
LED H7
LED H8
LED H9
LED H10
LED H11
LED H12
LED H13
LED H14
LED H15
LED H16
LED H17
Edit Mode

TP/TPD/PFS/TPC/QP-13:A02

Page 1 of 4

Result

CONTRACT NO:

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:

Manufacturer

SCADA No:

Dt.

Final Settings Tests of DIFFERENTIAL RELAY Type MICOM P632


RSI: ..

4- OUTPUT RELAY CHECKS

Terminal No.
X18:2 - X18:3
X18:5 - X18:6
X18:8 - X18:9
X18:11 - X18:12
X18:14 - X18:15
X18:17 - X18:18
X18:20 - X18:21
X18:23 - X18:24
X18:26 - X18:27
X20:1 - X20:2
X20:3 - X20:4
X20:6 - X20:7
X20:8 - X20:9
X20:10 - X20:11
X20:10 - X20:12
X20:10 - X20:13
X20:10 - X20:14

Output Relay No.

Contact Resistance
( <0.5 Ohms)

Result

K1801
K1801
K1802
K1802
K1803
K1803
K1804
K1805
K1806
K2001
K2001
K2002
K2003
K2004
K2005
K2006
K2007

Note: check status of Watch Dog contacts while the relay is energized and de-energized.
5- MEASUREMENT CHECK :
Winding HV CT ratio: , Winding LV CT ratio:..
HV Side
LV Side
Injected
Expected
Measured
Injected
Expected
Current
Current
Current
Current
Current
Amps
Amps
Amps
Amps
Amps
IR
IY
IB

Measured
Current
Amps

6- DIFFERENTIAL PROTECTION SETTINGS:

HV Winding a Amplitude Matching Factor: Kam,a .


LV Winding b Amplitude Matching Factor: Kam,b
Vector Group referene

Zero Sequence filter on wingidng -HV a

Zero Sequence filter on wingidng -LV b

I diff > . M1 .M2 ..


IR, m2 .

TP/TPD/PFS/TPC/QP-13:A02

Page 2 of 4

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
NAME OF SUB STATION:

CONTRACT NO:
Main Contractor

Name of Bay:

Consultant:

Equipment:

Manufacturer

SCADA No:

Dt.

Final Settings Tests of DIFFERENTIAL RELAY Type MICOM P632


RSI: ..

7- BINARY INPUTS CHECK:

Binary input No.


U 2001

Terminal No.
X20: 18 & 19

Pick up Volgage

Results

8- DIFFERENTIAL PROTECTION CHECKS:

8. a.

Checking of the first section of tripping characteristics.

Test
Winding
Expected operating current
Measured current
3-phase
current
a
= (Idiff>* Inom)/Kam,a
injection
=
=
3-phase
current
b
= (Idiff>* Inom)/Kam,b
injection
=
=
1-phase
current
a
= (Idiff>*Inom)/(Kam,a*Ks,1,a)
injection (R phase)
=
=
1-phase
current
b
= (Idiff>*Inom)/(Kam,b*Ks,1,b)
injection (R phase)
=
=
8. b.
Checking of second/third section of tripping characteristic:
Section of
tripping char.
Under test

Test method : 3 phase currents injected in winding a and b.


Sec. phase
Sec. phase
Differential
Restrain current
currents at
currents at
current measured
measured by
operating point
operating point
by relay at
relay at
Winding a
Winding b
operating point
operating point

Theoretical diff.
current for
measured
restrain current

Second
Second
Third
Third
8. c.

CT Saturation Checks :

Connection

Phase

YY0

Current

2nd Harmonic Disabled

Frequency

Current

Zero Sequence Filter - Off


LED Indications

Frequency

IR
IY
IB

8. d.

Operating Time Measurements: (Expected < 40 m Sec.)

TP/TPD/PFS/TPC/QP-13:A02

Page 3 of 4

CONTRACT NO:

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:

Manufacturer

SCADA No:

Dt.

Final Settings Tests of DIFFERENTIAL RELAY Type MICOM P632


RSI: ..

Injected current = 1A

Operating time

IR HV
IY HV
IB HV

Injected current =
1A
IR LV
IY LV
IB LV

8. e.
2nd Harmonic Magnetizing Inrush Restraint Checks:
Injected Current
1 Amp
nd
2 Harmonic inrush Block Setting
15 %
R
Phase
Y
Phase
Relay performance for 2nd Harmonic
BLK
TRIP
BLK
TRIP
content

Operating time

B Phase
BLK
TRIP

9- HIGH SET FUNCTION CHECKS : Idiff >>

Phase

Operating Current
expected

Setting

Operating Current
(Actual)

Operating Time at
Twice the Setting

IR
IY
IB
10- OTHER CHECKS:
Check Operation Of All Front Panel LED's
Setting Printout taken and Confirmed with Approved Settings
Fault recorder and Events Print out taken and Verified
Operation of Trip Relay F94.1 Confirmed
SCADA Alarms Confirmed
Fault Recorder initiation Confirmed
Particulars

Make

Testing Instruments Details


Type

Tested By (Contractor)
Signature
Name

TP/TPD/PFS/TPC/QP-13:A02

Page 4 of 4

: .
:
:
:
:
:
Sr.No.

Cal. Due Date

Witnessed By (DEWA)

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Dt.

Final Settings Tests of Differential Relay Type DUOBIAS-M


RELAY SETTING IDENTIFIER:

ELECTROSTATIC DISCHARGE (ESD)


The relay incorporate CMOS static sensitive devices, which may be damaged by static electricity discharged from the body.
When handling care should be taken to avoid contact with components and electrical connections. If the relay is removed from its
case for any period of time. It should be placed in an electrically conducting anti-static bag. If making measurements on the
internal electronic circuitry, its preferable you are earthed to he case with a conductive strap having a resistance to ground
between 500k Ohms 10 m Ohms

1. GENERAL DATA
Relay Type
In
Serial No

:
:
:

Model No
Vx

:
:

2- GENERAL INSPECTION
i)

Visual inspection

: __________

ii)

Installation & Wiring Correct To Relevant Drawings

: __________

iii)

Relay Case Connected To Earth Bars

: __________

iv)

Insulation Resistance With 500v Megger

: __________

v)

Aux. Supply Connected To Correct Terminal 13 (+Ve), 14(-Ve)

: __________

vi)

Relay Test Block CT Shorting Proved

: __________

2. SECONDARY INJECTION TEST


RELAY SETTING ADOPTED
H.V. CT RATIO
H.V.INTERPOSING CT
CONNECTION
MULTIPLIER

:___________
:___________
: __________
: ___________

L.V. CT RATIO
:___________
L.V.INTERPOSING CT :___________
CONNECTION
:___________
MULTIPLIER
:___________

4. METERING CHECK
WINDING

PHASES

I-APPLIED

TP/TPD/PFS/TPC/QP-13:A03

RELAY DISPLAY
RELAY CURRENT
L1

L2

Page 1 of 3

W1

W2

OPERATE

REST.

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Dt.

Final Settings Tests of Differential Relay Type DUOBIAS-M


RELAY SETTING IDENTIFIER:

BIAS SETTING

SETTINGINITIAL

PHASES

5A. BIAS CHARACTERISTIC TEST

BIAS SLOPE LIMIT:

0
MEAS.

1
EXPT.

MEAS.

BIAS CURRENT (A1)


1.5
2
OPERATING CURRENT (A2)
EXPT. MEAS EXPT MEAS EXPT

4
MEAS

EXPT

R
Y
B
5B. OPERATING TIME
CURRENT INJECTED
RELAY SETTING

OPERATING TIME AT 3 X Is
B

5 C. HIGHEST ELEMENT
CURRENT INJECTED
RELAY SETTING

OPERATING TIME AT 2 X Is
B

6. MAGNETIZING INRUSH RESTRAIN TEST:


PHASE

SETTING

R
Y
B

20%
20%
20%

SECOND HARMONIC CURRENT %


19
20
22
25

RESULT

7. STATUS INPUT CHECKS

Opto
input no.

Terminal
No.

Pickup
(V)

Drop
Off
(V)

S1
S2
S3
S4

TP/TPD/PFS/TPC/QP-13:A03

Opto
input
no.
S7
S8
S9
S10

Page 2 of 3

Terminal
No.

Pickup
(V)

Drop
Off
(V)

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Dt.

Final Settings Tests of Differential Relay Type DUOBIAS-M


RELAY SETTING IDENTIFIER:
S11

S5

S6
8- LED FUNCTIONAL LABEL AND OPERATION:
LED
FUNCTION
OPERATION
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

LED
NO.

FUNCTION

17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE

GENERAL TRIP
HIGHE SET OPTD
PHASE A TRIP
PHASE B TRIP
PHASE C TRIP
NEW DATA STORED
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE

OPERATION

9. OUTPUT RELAY CHECK


Opto input
no.

Terminal No.

Contact
Resistance

Result

RL1
RL2
RL3
RL4
RL5
RL6
RL7

Opto
input
no.

Terminal
No.

Contact
Resistance

Result

RL8
RL9
RL10
RL11
RL12
RL13

Note: check status of Watch Dog contacts while the relay is energized and de-energized.
10- OTHER CHECKS:
1. Trip relay operation, protection operated signal verified in SCS and FRP
: .
2. Disturbance Recorder and Events printout attached
: .
3. Date and time set in the relay/ Final setting printout attached with test format
: .
Testing Instrument Details

Particulars

Make

Type

Tested By (Contractor)

TP/TPD/PFS/TPC/QP-13:A03

Page 3 of 3

Sr. No.

Cal. Due Date

Witnessed By (DEWA)

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Dt.

Final Settings Tests of Differential Relay Type DUOBIAS-M


RELAY SETTING IDENTIFIER:

Signature
Name

TP/TPD/PFS/TPC/QP-13:A03

Page 4 of 3

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS

Consultant:
Manufacturer

RELAY SETTING
I-DIFF > Setting
Calculated I POC
Slope 1
Base point 1
CT
Ratio

Phases
Injected

:
:
:
:

I/Inob
Amps

Primary
Current
(Amps)

I-DIFF >> Setting

: I/Inob

Slope-2
Base Point-2

:
:

Enter details of measured current in mA at Relay Panel


XA (mA)
1

X87 (mA)

21
22

23
24

X64 (mA)

25
26

27
28

25

27
26

28

RE
YE

TR. DIFF & REF 300/1 (132 KV T1.1 SIDE)


BUS-1

BE
Relay Display
R

HV (A)
Y

Relay Current (mA)


LV (kA)
Y

HV
B

Q1

Q3

Q5

LV
Q6

R1

R3

R5

RE
YE
BE
Rest Current (IN)

Oper. Current (IN)

Relay Display
R

Led Indication

Relay Display
B

SEQ (HV) (A)


I2
3I0

I1

RE
YE
BE
I1
RE
YE
BE

TP/TPD/PFS/TPC/QP-13:A04

Page 1 of 7

SEQ (LV) (kA)


I2
3I0

Relay Display

R6

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS

Consultant:
Manufacturer

CT
Ratio

Phases
Injected

Primary
Current
(Amps)

Enter details of measured current in mA at Relay Panel

XA (mA)
1

X87 (mA)

21
22

23
24

X64 (A)

25
26

27
28

25
26

27
28

RY
YB

BUS-1TR. DIFF & REF 300/1 (132 KV T1.1 SIDE)

BR
Relay Display
LV (kA)

HV (A)
R

Relay Current (mA)

HV
B

Q1

Q3

Q5

LV
Q6

R1

R3

R5

RY
YB
BR

Rest Current (IN)

Oper. Current (IN)

Relay Display

Relay Display

Led Indication
B

RY
YB
BR
I1

SEQ (HV) (A)


I2
3I0

RY
YB
BR

TP/TPD/PFS/TPC/QP-13:A04

Page 2 of 7

I1

SEQ (LV) (kA)


I2
3I0

Relay Display

R6

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS

Consultant:
Manufacturer

CT
Ratio

Phases
Injected

Primary
Current (A)

Enter details of measured current in mA at Relay Panel


XA (mA)
1

X87 (mA)

21
22

23
24

X64 (mA)

25
26

27
28

25
26

27
28

RE
YE

BUS-2TR. DIFF & REF 300/1 (132 KV T1.2 SIDE)

BE
Relay Display
LV (kA)

HV (A)
R

Relay Current (mA)

HV
B

Q1

Q3

Q5

LV
Q6

R1

R3

R5

RE
YE
BE

Rest Current (IN)

Oper. Current (IN)

Relay Display

Relay Display

Led Indication
B

RE
YE
BE
I1

SEQ (HV) (A)


I2
3I0

RE
YE
BE

TP/TPD/PFS/TPC/QP-13:A04

Page 3 of 7

I1

SEQ (LV) (kA)


I2
3I0

Relay Display

R6

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS

Consultant:
Manufacturer

CT
Ratio

Phases
Injected

Primary
Current
(Amps)

Enter details of measured current in mA at Relay Panel

XA (mA)
1

X87 (mA)

21
22

23
24

X64 (A)

25
26

27
28

25
26

27
28

RY
YB

BUS-2TR. DIFF & REF 300/1 (132 KV T1.2 SIDE)

BR
Relay Display
LV (kA)

HV (A)
R

Relay Current (mA)

HV
B

Q1

Q3

Q5

LV
Q6

R1

R3

R5

RY
YB
BR
Rest Current (IN)

Oper. Current (IN)

RELAY DISPLAY
R

Led Indication

RELAY DISPLAY
B

RY
YB
BR
I1

SEQ (HV) (A)


I2
3I0

RY
YB
BR

TP/TPD/PFS/TPC/QP-13:A04

Page 4 of 7

I1

SEQ (LV) (kA)


I2
3I0

Relay Display

R6

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS

Consultant:
Manufacturer

CT
Ratio

Phases
Injected

Primary
Current
(Amps)

Enter details of measured current in mA at Relay Panel


XA (mA)
9

10

X87 (mA)

11

5
6

12

7
8

X64 (mA) (11KV)

9
10

11
12

25
26

27
28

RE
YE
BE

TR. DIFF & REF 3200/1 (11 KV SIDE)

Relay Display
LV (kA)

HV (A)
R

Relay Current (mA)

HV
B

Q1

Q3

Q5

LV
Q6

R1

R3

R5

RE
YE
BE

Rest Current (IN)

Oper. Current (IN)

Relay Display

Relay Display

Led Indication
B

RE
YE
BE
I1

SEQ (HV) (A)


I2
3I0

RE
YE
BE

TP/TPD/PFS/TPC/QP-13:A04

Page 5 of 7

I1

SEQ (LV) (kA)


I2
3I0

Relay display

R6

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS

Consultant:
Manufacturer
CT
Ratio

Phases
Injected

Primary
Current
(Amps)

Enter details of measured current in mA at Relay Panel


XA (mA)
9

10

X87 (mA)

11

5
6

12

7
8

X64 (A) (11KV)

9
10

11
12

25
26

27
28

RY
YB
BR

TR. DIFF & REF 3200/1 (11 KV SIDE)

Relay Display
LV (kA)

HV (A)
R

Relay Current (mA)

HV
B

Q1

Q3

Q5

LV
Q6

R1

R3

R5

RY
YB
BR

Rest Current (IN)

Oper. Current (IN)

Relay Display

Relay Display

Led Indication
B

RY
YB
BR
I1

SEQ (HV) (A)


I2
3I0

RY
YB
BR

TP/TPD/PFS/TPC/QP-13:A04

Page 6 of 7

I1

SEQ (LV) (kA)


I2
3I0

Relay Display

R6

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION SENSITIVITY TESTS

Consultant:
Manufacturer

Particulars

Make

Testing Instruments Details


Type

Tested By (Contractor)
Signature
Name

TP/TPD/PFS/TPC/QP-13:A04

Page 7 of 7

Sr.No.

Cal. Due Date

Witnessed By (DEWA)

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION STEBILITY TESTS

Consultant:
Manufacturer

RELAY SETTING
I-DIFF > Setting
Calculated I POC
Slope 1
Base point 1

:
:
:
:

I/Inob
Amps

I-DIFF >> Setting

: I/Inob

Slope-2
Base Point-2

:
:

RY:.., YB: , BR:.

APPLIED VOLTAGE AT LV SIDE [WHILE HV SIDE SHORTED]:

132KV BUS-1 CT : NORMAL


11KV CT
: NORMAL
Primary
Current
Secondary
current

Relay Display

HV REF

11 KV (A)
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current
(H.V) (A)
Line current
(L.V) (KA)
Differential
current
Restraining
current
Relay current
(mA)

Tap position: 1
R

Tap position: 10
N

---

---

---

---

---

---

---

---

---

---

---

---

---

---

Relay current
(mA)
Operation

CT RATIO: 132 KV : 300/1A


11 KV : 3200/1A

TP/TPD/PFS/TPC/QP-13:A05

---

Operation
LV REF

Tap position: 19

Page 1 of 5

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION STEBILITY TESTS

Consultant:
Manufacturer

132KV BUS-2 CT : NORMAL


11KV CT
: NORMAL
Primary
Current

11 KV (A)

132 KV (F87T)
mA
11 KV (f87T)
mA
Line current (H.V)
(A)
Line current (L.V)
(KA)
Relay Display
Differential
current
Restraining
current
Relay current
(mA)
HV REF
Operation
Relay current
(mA)
LV REF
Operation
132 Reversal

Tap position: 1
R

Tap position: 10
N

Tap position: 19
N

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

Tap position: 10
R - REVERSE
R
Y
B
N

Tap position: 10
Y- REVERSE
Y
B
N

Tap position: 10
B - REVERSE
Y
B
N

Secondary
current

132KV BUS-1 CT : REVERSE


11KV CT
: NORMAL
Primary
Current
Secondary
current

Relay Display

HV REF

LV REF

11 KV (A)
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current
(H.V) (A)
Line current (L.V)
(KA)
Differential
current
Restraining
current
Relay current
(mA)
Operation
Relay current
(mA)
Operation

TP/TPD/PFS/TPC/QP-13:A05

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

Page 2 of 5

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:
Manufacturer

132KV BUS-2 CT : REVERSE


11KV CT
: NORMAL
Primary
Current
Secondary
current

Relay Display

HV REF
LV REF

Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION STEBILITY TESTS
Tap position: 10
Tap position: 10
R - REVERSE
Y- REVERSE
R
Y
B
N
R
Y
B
N
R

11 KV (A)
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current
(H.V) (A)
Line current (L.V)
(KA)
Differential
current
Restraining
current
Relay current
(mA)
Operation
Relay current
(mA)
Operation

Tap position: 10
B - REVERSE
Y
B
N

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

Tap position: 10
R - REVERSE
R
Y
B
N

Tap position: 10
Y- REVERSE
Y
B
N

Tap position: 10
B - REVERSE
Y
B
N

11kV Reversal
132KV BUS-1 CT : NORMAL
11KV CT
: REVERSE
Primary
Current
Secondary
current

Relay Display

HV REF

LV REF

11 KV (A)
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current
(H.V) (A)
Line current (L.V)
(KA)
Differential
current
Restraining
current
Relay current
(mA)
Operation
Relay current
(mA)
Operation

TP/TPD/PFS/TPC/QP-13:A05

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

Page 3 of 5

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:
Manufacturer

132KV BUS-2 CT : NORMAL


11KV CT
: REVERSE
Primary
Current
Secondary
current

Relay Display

HV REF

LV REF

Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION STEBILITY TESTS
Tap position: 10
Tap position: 10
R - REVERSE
Y- REVERSE
R
Y
B
N
R
Y
B
N
R

11 KV (A)
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current
(H.V) (A)
Line current (L.V)
(KA)
Differential
current
Restraining
current
Relay current
(mA)
Operation
Relay current
(mA)
Operation

Tap position: 10
B - REVERSE
Y
B
N

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

Normalising
132KV BUS-1 CT : NORMAL
11KV CT
: NORMAL
Primary
Current
Secondary
current

Relay Display

HV REF

TAP POSISTION: 10
R

11 KV (A)
132 KV (F87T)
mA
11 KV (F87T)
mA
Line current (H.V)
(A)
Line current (L.V)
(KA)
Differential
current
Restraining
current
Relay current
(mA)

---------

Relay current
(mA)
Operation

TP/TPD/PFS/TPC/QP-13:A05

N
---

Operation
LV REF

Page 4 of 5

TRANSMISSION POWER DIVISION


PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:
Equipment:
SCADA No:
Dt.
IDT Differential PROTECTION STEBILITY TESTS

Consultant:
Manufacturer

TAP POSISTION: 10

132KV BUS-2 CT : NORMAL


11KV CT
: NORMAL
Primary
Current

11 KV (A)

Secondary
current

Relay Display

HV REF

---

132 KV (F87T)
mA
11 KV (F87T)
mA
Line current (H.V)
(A)
Line current (L.V)
(KA)
Differential
current
Restraining
current
Relay current
(mA)

---------

Operation
Relay current
(mA)

LV REF

Operation

Particulars

Make

Testing Instruments Details


Type

Tested By (Contractor)
Signature
Name

TP/TPD/PFS/TPC/QP-13:A05

Page 5 of 5

Sr.No.

Cal. Due Date

Witnessed By (DEWA)

You might also like