PT PLANT
The water treatment plant is designed to meet the requirement of make up water
to the power plant circuit. The scheme is as shown in block diagram.
CHLORINATION ALUM LIME POLYELECTROLYTE
SYSTEM CLIENT SCOPE DOSING DOSING DOSING
RAW
WATER
PUMPS
(client s scoe !
CASCADE STILLING PARSHALL
DISTRI"U#
AERATOR CHAM"ER $LUME TION
CHAM"ER

CLARI$IED WATER
HIGH RATE SOLID CONTACT RESER%OIR
CLARI$IER

TELESCOPIC SLUDGE
SUMP

SLUDGE SUMP
The water collected from raw water Reservoir is pumped to Cascade Aerator
for primary removal of iron.& same water flows through Stilling Chamber where
the turbulence of water is reduced. or disinfection and to make odourless as
well as colourless! chlorination is done in the stilling chamber. "iffuser is
PT PLANT
provided at the bottom of stilling chamber. The water from stilling chamber flows
to #arshall lume! which is used for measuring flow rate. The water then flows to
"istribution chamber through a RCC channel. This water is taken to the $RSCC
where the turbid water is efficiently contacted with Alum and previously formed
sludge! which acts as seed for flocculation. The net result after clarification is the
production of clear raw water low in turbidity.
%ime is dosed in the $igh Rate Solid Contact Clarifier &$RSCC'A()* by
respective gravity feed bo+es! Alum is dosed in the $igh Rate Solid Contact
Clarifier &$RSCC'A()* by respective dosing pump & polyelectrolyte is dosed in
$igh Rate Solid Contact Clarifier &$RSCC'A()* by respective dosing pump.
Ad,ust low rate of lime solution to $RSCC by opening related manual valves.
Ad,ust low rate of alum solution to $RSCC by opening related manual valves.
-pen suction valves of alum solution dosing pumps !ad,ust discharge valves of
pumps to get desire flow rate Start dosing pumps .
Ad,ust low rate of polyelectrolyte solution to $RSCC by opening related manual
valves. -pen suction valves of polyelectrolyte solution dosing pumps! ad,ust
discharge valves of pumps to get desire flow rate. Start dosing pumps. )efore
deciding flow rate of lime! alum & polyelectrolyte solution conduct .ar Test.
According to .ar Test results decide chemical solution flow rate.