You are on page 1of 28

NATIONAL GAS INDUSTRIALATION COMPANY

GASCO

GASCO
NEW LPG FILLING PLANTS
INTRODUCTION
GASCO intends to build four new
LPG Filling Plants in the areas of
Jizan

Jizan
Hail
Al- Ahsa and
Tabuk
About the Owner
Gasco was founded in 1974 by merging 4 LPG filling and distribution
companies under the name of National Gas & Industrialization
company (GASCO).
It is the only LPG filling and distributor company in Saudi Arabia. It
does not have a direct collaboration in LPG business.

It sells over 2 million cubic meters of LPG with a turnover of about


1.5 billion Saudi Riyals a year.
Operate 7 filling plants, two operation departments, one cylinder
maintenance workshop over the Kingdom of Saudi Arabia, a fleet of
400 semi trailers in addition to 100 bobtails for LPG tanks refilling
supported by about 2000 employees of which 85% are Saudi.
About the Consultant
INGAS is an engineering company based
in France. It provides the consultation and
the engineering work in LPG field

Today Mr. Xavier Fontova is representing


INGAS
About the Contractor
?????

Locations
TABUK
Hail
Existing plants

Jizan
Al-Ahsa
New plants
Locations

Area in possession of GASCO in each site is:


114,000 m approximately (380 x 300 m).
Concrete buildings 3000m
2
Concrete buildings 3000m
2
Steel structures 3500m2
Asphalt area 50000m2
Plant Lay Out

Components of
Main Area
Main components of each plant will mainly consist of
the following:
LPG mounded storage tanks area
LPG loading and unloading area

LPG loading and unloading area


LPG pumps, compressors, pneumatic, firefighting, water
LPG cylinder filling hall
Stock yard for handling (Empty and filled LPG cylinders)
Stock yard (cylinders for maintenance & scrapping)
Scope of Work
Scope of work, including, but not limited to the following:
Detailed Designing & Engineering
Manufacturing
Transportation

Transportation
Installation, Testing and Commissioning
Training
Safety & Security
Documentation
Scope of Work
(contd..)
Complete project design as follows:
Process and Plant Design
Final P&I and P&F diagrams
Civil, Mechanical & Electrical works

Storage tanks
Piping for LPG, pressurized air, industrial and potable
water
Electrical works
Instrument and Machinery
safety installation & fire fighting
Scope of Work
(contd..)
Complete detailed engineering design is required i.e. it should
include, but not limited to the following :
Plot plans and locations

LPG tanks & Water tanks


All civil works inclusive of structural steel works
Piping inclusive of all supports and ancillaries
Scope of Work
(contd..)
Complete detailed engineering design is required i.e. it should include,
but not limited to the following :
Electrical inclusive of grounding and protection systems
PA/GA system

PA/GA system
Fire fighting system & CCTV
Instruments & Machinery
Painting, coating and protecting of all surfaces
Adequate air conditioning for Class A & B buildings
Scope of Work
(contd..)
Utilities:
Infrastructure for communication
Power, control and lighting distribution
Industrial and potable water system

Industrial and potable water system


Sewers with septic tank and water
treatment
Plant for black water and dispersing pit for
rainfall and domestic use
Main Entrance

Main Entrance

Admin Building

Cylinder Stock Yard

Cylinder Stock Yard

Filling Hall Carousel

Filling Hall Carousel

Loading/Unloading Area

Loading/Unloading Area

Mounded Tanks

Mounded Tanks

LPG Pump & Compressor Area

Date of Call of
Tenders
Expected time for call of tenders
March 2011

March 2011
Thank you for your
time and good luck

time and good luck