1 2
PartI:GeneralRequirements
1 Mobilization/Demobilization
2 Temfancil/fieldoffice/bunkhouse
3 BondsandPermit
A.PerformanceBond
B.Insurance/CARI
C.BuildingPermit(Allpermits)
4 SafetyRequirements
5 Engineeringworks:Design&PreparationofPlans
PartII:220ftGuyedTower(Existing)
2.1 TowerWorks
2.1. TowerRebolting
2.1. TowerRepainting
2.1. CableTray/Ladder/Walkway
2.1. Erection/Installationoftower
2.1. Supplyofguywiresandaccessories(9levels)
2.1. TowerAssembleandGuyingHolderBracket
Qty
UnitCost
TotalCost
1lot
1lot
150,000.00
50,000.00
150,000.00
50,000.00
1lot
70,000.00
1lot
1lot
12,000.00
30,000.00
70,000.00
RPN
RPN
15,000.00
50,000.00
1lot
1lot
1lot
1lot
1lot
1lot
90,000.00
123,200.00
130,000.00
484,147.00
420,000.00
160,600.00
90,000.00
123,200.00
130,000.00
484,147.00
420,000.00
160,600.00
2.2 FoundationWorks
2.2. Excavation
2.2. Concreteworks
2.2. Rebarworks
2.2. Formworks
2.2. Backfill
2.2. ATUFoundation
1lot
1lot
112,200.00
2,800,000.00
Included
Included
Included
Included
Included
112,200.00
2.3 TowerElectrical
2.3. TowerLightningProtectionSystem
2.3. Towerpowersupplyandaccessories
2.3. TowerlightingSystem,obstructionlight
1lot
1lot
1lot
46,000.00
215,000.00
180,000.00
46,000.00
215,000.00
180,000.00
1lot
1,285,000.00
1lot
450,000.00
1,265,000.00
Included
TBD
450,000.00
1lot
1lot
190,000.00
70,000.00
190,000.00
70,000.00
PartIII:TransmitterBuilding(8x10m)
1 Constructionof8x10mTransmitterBuilding
2 HouseElectricalWorks
3 TransmitterElectricalWorks(TBD)
4 EarthWorksandSiteDevelopment
PartIV:GensetHouseandFuelTank
1 ConstructionofGenSetHouse&PADfor75KVAcapacity
2 1000LiDayTankincludingfoundation
PartV:SupplyandInstallationofUnipoleKitandATU
1 UnipoleKit
2 ATU
3 Installation+Commissioningservices
PartVI:constructionofBuilding&Towergroundstripandstrap
1 SolidCopperRod/StainlessGroundRod
2 AWG#4/0GroundingCable&accessories
3 4"GroundingPlate
PartVII:SupplyandInstallationofGroundRadials
1 Supplyofsoftdrawnbarecopperwire#10
2 SupplyGroundingPlatetowerbasetotx,bldg.
3 InstallationServices
PartVIII:Supplyof300ft15/8"FoamtypeTrnamissionline
1 transmissionlineconnector
2 transmissionlinegroundingkit
3 transmissionlinebutterflyclamps&adaptor
TOTALCOST
DISCOUNTED
OVERALLTOTALCOSTVATINCLUSIVEPHP
TermsOfPayment:
30%DownPayment
60%ProgressBilling
10%UponProjectCompletionandAcceptanceoftheproject
DeliveryTime:
EstimatedTimeUponCompletion:
Warranty 1yearwarrantyfortheworkmanship
SincerelyYours,
Engr.TeofiloMacanas
Civil/StructuralEngineer
dys
21
dys
7 8
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
30
dys
dys
25
dys
dys
30
dys
dys
dys
N/A
N/A
N/A
1lot
1lot
1lot
35,000.00
97,000.00
60,000.00
35,000.00
97,000.00
60,000.00
26,400
1Lot
1lot
18.00
240,000.00
530,000.00
475,200.00
240,000.00
530,000.00
300
278,000.00
278,000.00
Included
Included
Included
8,786,347.00
595,847.00
8,200,000.00