You are on page 1of 16

3 way plug valve cana cu 3 cai a arde gazele la cos

A.V. (annular velocity) viteza in sp. inelar a descompune in bucati


absolete types tipuri invechite a elimina prin cernere
air hoist troliu cu aer a fi stantat
ajustable wrench cheie reglabila a furniza
amount suma, total, cantitate a infasura, incolaci,inveli
API chain lant rotary a inhata ceva
ash cenusa a introduce
attempt to pull incercare de extragere a introduce
automatic hanger agatator tip baioneta a isuruba
B.H.A. (bottom hole assembly) ansamblu de drilcolare a lua proba de sita
B.O.B (bit on bottom) sapa pe talpa a monta la gura sondei
B.O.P. (blow out preventer) prevenitor de eruptie a pune bucata
back up tong cleste de contra a pune pasi pe scaun
backfilling umplerea putului a recupera ceva de la put
backwashing spalare inversa a sapa cu prevenitor rotativ
baffle collar niplu cu ring opritor a se depune
bail swivel toarta CH a se gripa
balling up mansonare a se gripa
barrel butoi a socoti
baryte barita a sparge , plesni
bearing locked gripaj rulmenti a tine pe gaura
bearing loose role pierdute abandonarea unei sonde
bell socket tuta absortie laterala
belt curea ac
bentonite bentonita adaugarea unei bucati
bidge pod de darimatura agatator col pierduta
bit sapa de foraj agatator col tubaj
bit balling mansonarea sapei agatator tip baioneta
bit breaker amnar agitator
bit nozzle duza de sapa al dolea rind de dinti
blind flange flansa oarba al treilea rind de dinti
blowtorch lampa de benzina amestecator de ciment
bod kim sula amnar
boll joint articulatie sferica amortizor de soc
bolt surubelnita ansamblu de drilcolare
borrow roaba ansamblu de garnituri
box wrench cheie inelara ansamblu de utilaje
brake block placa ferodou apasarea pe sapa
breack band banda de frina articulatie sferica
breack rims tamburi de frina bacuri ptr. Clesti
break out cat head mosor de desurubat banda de frina
break out down desurubare in prajini barita
break out tong cleste ptr slabit batal de decantare
break the bit in carefully rodeaza sapa cu atentie batal ptr. ingreunat noroi
brittle fracture rupere casanta beciul sondei
broken teeth dinti rupti bentonita
bull dog type schocket corunca cu pene bidon, galeata cu capac
bulldog clamp gambet ptr ancora bolt de cleste
bumper sub geala broasca cu pene
burst a sparge , plesni bucati
by means prin intermediul burlan freza
C.M.C. (complete mud cycle) un ciclu de circulatie burlanul tijei
cable tool drilling foraj percutant butoi
caliper log cavernometrie cabina sondor sef
casing bowl tuta ptr. Burlane cablu foraj
casing centralizers centrori de coloana cablul sforii mosorului
Page 1
casing hanger agatator col tubaj cadere de presiune
cat line cablul sforii mosorului camasa de pompa
cat line swivel virtej ptr. Cablu cana cu 3 cai
cat walk podul rampei de prajini cana de siguranta
catching samples a lua proba de sita cana ptr ulei
caving darimarea peretilor cana ptr. Tija patrata
caving darimare canal ptr inel de etansare
cavity caverna cap de cruce
cellar beciul sondei cap hidraulic
cement mixer amestecator de ciment carota
cement slurry lapte de ciment carotaj electric
cement unit truk carotaj electric
centrifugal pump pompa centrifuga carotiera
chain lant carotiera orientata
chain tong cleste cu lant caverna
chalk creta cavernometrie
changing rams schimbare bacuri prevenitor cazma
charging valve ventil de incarcare centrori de coloana
chisel dalta cenusa
chisel dalta cercetare geologica
choke duza fixa cheie franceza
clamp sarniera cheie inelara
clliper compas cheie ptr cana
clog up colmata cheie reglabila
con bidon, galeata cu capac chiolbasi
cone con chiolbasi
core carota cimentare sub presiune
core barrel carotiera cintar de noroi
count a socoti ciocan
crack crapatura circ. unui volum de put
croocked joint racord stimb circulatie inversa
crose head cap de cruce cirlig
crown block geamblac ciupitor lateral
cutter cutit clema
cuttings detritus cleste cu lant
D.D.P. (displacement drill pipe) deplasarea prajinilor cleste de contra
D.P.CONN (drill pipe connection) adaugarea unei bucati cleste mecanizat
derrick floor platforma sondei cleste ptr slabit
derrick winch troliu manual cleste Varco
desander denisipator clupa de tractiune
desilter demiluitor coada clestelui
deviation survey masurarea deviatiei coagulare , floculare
device dispozitiv coef de siguranta
discharge strainer screen filtru de la imoigere colmata
dog house cabina sondor sef coloana de productie
dog leg schimbare brusca de inclinare compas
dog type overshot corunca compas ptr racorduri
dope brush pensula ptr. Unsoare con
double pas de doaua buc corectare
down ward in jos corectare de siguranta
drag a tine pe gaura corunca
drain - rate valve valva regulator de debit corunca
drift pin dorn corunca cu pene
drill pipe prajina corunca detasabila
drill pipe protector manson Bettis cot
drill stem test proba stratelor cu prajini covor de cauciuc
drill string prajina cu racorduri crapatura
Page 2
drilling jar geala creta
drilling out frezarea dopului de ciment curatitor
drilling time log diagrama de avansare curea
drilling under pressure a sapa cu prevenitor rotativ curgere dop
drillpipe and casing protector protector cu toarta cutit
drive bushings patratii tijei cutit ptr tubing
drum toba granicului D.I.B.A
dullness uzura dintilor dalta
elbow cot dalta
electrical coring carotaj electric darimare
elevator bails chiolbasi darimarea peretilor
excentric OD wear uzura excentrica la racord debitul pompelor
extension rod prelungitor de tija degetul de pasi
fals floor scaun de pasi demiluitor
feed lubricator ungator demontare prevenitor
feed oiler cana ptr ulei denisipator
filling the hole umplerea putului depanator cablu
filter press presa ptr filtru deplasarea prajinilor
finger board degetul de pasi desurubare in prajini
first row primul rind de dinti desurubati cu clestele de mina !
fishing neek git de op al drillc detect zonei de pierdere
flexi ball joint leg rapida sferica detritus
float collar niplu cu bila deviere cu pana de deviere
float shoe siu plutitor cu bila diagrama de avansare
floculation coagulare , floculare dinti rupti
floor man sondor la gura putului dispozitiv
floore a arde gazele la cos dop
flow check obs put cu tija sus, pomp stop dop de noroi in praj pt extrage
flowing well sonda in eruptie naturala dorn
foamed mud noroi spumat dorn conic
full stop oprire definitiva dorn de instrumentatie
funnel pilnie ptr. Viscozitate drept
fuse siguranta electrica drillcolar normal
gage exteriorul rolei drillcolar patrat
gall a se gripa drillcolar spiralat
galled thread filet gripat duza de sapa
gas-oil ratio ratia gaze tiei duza fixa
gate valve ventil cu pana elevator cu pene
geological investigation cercetare geologica elevator ptr. drillcolar
ginding stone piatra de polizor executarea unui mars
going in hole a introduce exteriorul rolei
goose neck luleaua CH extractor de scaun
H.C. (hole cycle) circ. unui volum de put extragerea garniturii
H.V. (hole volume) volumul gaurii extrge tija deasupra mesei
hammer ciocan extrge tija deasupra mesei
hand grease gun gresor falca cu inchidere
handle miner pana falca cu trepte
happer mixer ptr. Noroi falca de cleste
heavy tool room magazie scule de foraj filet
height inaltime filet ascutit
hex nut union leg rapida cu hexagon filet gripat
hook cirlig filtru de la imoigere
hose reel toba ptr furtun flansa oarba
inclination unghi de deviere flansa simpla filetata
inner end of tooth partea dinspre centru a dintelui foaie tabla
jack vinci, cric foraj percutant
jack turla freza baschet
Page 3
jar geala frezarea dopului de ciment
jaw (long, short) falca de cleste fundul dintelui
jet gun pusca ptr. Noroi furtun tragere
joint calliper compas ptr racorduri galeata
joints bucati gambet ptr ancora
junk abandonarea unei sonde garnitura de etansare
junk basket freza baschet garnituri teava spalare
keep close watch urmareste cu atentie ! gaura buc de avansare
kelly cock cana ptr. Tija patrata gaura care se stringe
kelly drive bushings patratii tijei gaura cheie
kelly saver sub reductie prot tija gaura netubata
kelly spinner D.I.B.A geala
key seat gaura cheie geala
key seat wiper stab corector plasat deasu dril geala
kick a se gripa geamblac
killing a well omorire de sonda git de op al drillc
ladder scara gratar ptr podea
last engaged thread ultimul filet angajat gresor
latch jaw falca cu inchidere gripaj rulmenti
latch on punerea elev pe prajina ia sus
lay down a descompune in bucati ia sus
leak spiruire ia sus
length lungime in jos
length of box lungime racord mufa in sus
length of pin lungime racord cep inaltime
let it down lasa jos incarcator
lever coada clestelui incercare de extragere
lifting cap protector cu toarta inel de retinere
lifting sub suvei insurubati cu clestele de mina !
lighte ned mud noroi usurat intinzator de cablu
line guide depanator cablu intocmirea unui raport
liner hanger agatator col pierduta intrerupator
link za de lant introdu incet !
link belt chain lant de transmisie cu zale introducere incet
links chiolbasi introducerea cu masura
liver pirghie introducerea garnit. cu masura
load sarcina introducerea garnit. cu masura
loadind flank partea din fata a dintelui introducerea garnit. cu masura
log intocmirea unui raport introducerea garniturii
logging carotaj electric izolarea unei portiuni de aflux
long nipple niplu lung jgeab de noroi
lounge store room magazia piese schimb jilip
lower end partea inferioara lacat
lubricant pump pompa de gresat lampa de benzina
lug jaw falca cu trepte lant
making a conection punerea buc de avansare lant de transmisie cu zale
making a trip executarea unui mars lant rotary
making up a joint punerea buc de avansare lapte de ciment
master bushing patrati de masa largirea gaurii sub siu
master bushings patratii tijei lasa jos
mixing mud prepararea noroiului lasa jos
monkey board podetul podarului lasa jos
monkey wrench cheie franceza lasa sudata
mouse hole gaura buc de avansare latime
mud balance cintar de noroi leg de siguranta
mud hopper pilnie de prep. Noroi leg rapida cu fluture
mud mix agitator leg rapida cu hexagon
Page 4
mud off stapinirea sondei contra aflux leg rapida sferica
needle ac legatura rapida (holender)
nick zgirietura lopata
niplle down BOP demontare prevenitor lopata, lopatica
niplle up BOP montare prevenitor luleaua CH
non weighted mud noroi natural lungime
nut piulita lungime racord cep
oil seal semering lungime racord mufa
oil string coloana de productie macara
open hole gaura netubata magazia piese schimb
orientated core carotiera orientata magazie scule de foraj
outer end of tooth partea dinspre exterior manson Bettis
overshot corunca mansonare
P.O. (pump output) debitul pompelor mansonarea sapei
P.O.H. (pull out on hole) extragerea garniturii mareste turatia
packing ansamblu de garnituri masurarea deviatiei
packing covor de cauciuc micsoreaza turatia
pad lack lacat mineca, bucsa, manson
pail galeata miner pana
petal basket umbrela de cimentare mixer ptr. Noroi
pick it up ia sus montare prevenitor
pick up extrge tija deasupra mesei mosor
pin bolt de cleste mosor de desurubat
pipe rack rampa de prajini mosor de strins
pipe spinner (tong) cleste Varco niplu cu bila
pipe wiper stergator niplu cu ring opritor
plain drillcollar drillcolar normal niplu lung
platform truck platforma de transport niplu scurt
plug dop noroi ingreunat
plug back izolarea unei portiuni de aflux noroi natural
plug flow curgere dop noroi spumat
plug valve ventil cana noroi usurat
poddle lopata, lopatica o bucata
power slips pene automate obs put cu tija sus, pomp stop
power tong cleste mecanizat omorire de sonda
pressure decline cadere de presiune oprire definitiva
pressure differential sticking prindere p diferentiala partea dinspre centru a dintelui
pressure guage needle valve ventil cu ac partea din fata a dintelui
provide a furniza partea din spate a dintelui
pump valve seat puller extractor de scaun partea dinspre exterior
R.C. (reverse circulation) circulatie inversa partea inferioara
R.I.C. tubat coloana pas de 3-4 buc
R.I.H. ( run in hole) introducerea garniturii pas de doaua buc
R.O.P. (rate of penetration) rata de penetrare patrati de masa
R.P.M. (rotation per minute) rotatii pe minut patratii tijei
raise it ia sus patratii tijei
ramp jilip patratii tijei
rate hole burlanul tijei pene
ream to safety corectare de siguranta pene automate
reamming corectare pensula ptr. Unsoare
reel mosor piatra de polizor
releasing socket corunca detasabila pilnie de prep. Noroi
retainer ring inel de retinere pilnie ptr. Viscozitate
retrieve a recupera ceva de la put pirghie
rig up a monta la gura sondei piston de pompa
ring groove canal ptr inel de etansare piulita
roller barings gone role de rulment (pirdute la put) placa ferodou
Page 5
run in casing tubat coloana plasa de sita
run in hole a introduce platforma de transport
run in slowley introdu incet ! platforma sondei
run in slowly introducere incet pod de darimatura
S.L.M. introducerea garnit. cu masura pod de tubaj
S.L.M. (steel line measure) introducerea cu masura podetul podarului
safety clamps sarniera cu zale podul rampei de prajini
safety coefficient coef de siguranta pompa centrifuga
safety joint leg de siguranta pompa de gresat
safety valve sub cana de siguranta pompa de stropit
scraping tools unelte de curatat prajina
scratcher curatitor prajina cu racorduri
screen plasa de sita prelungitor de tija
screen out a elimina prin cernere prepararea noroiului
screw a isuruba presa ptr filtru
screw driver surubelnita prevenitor de eruptie
seal garnitura de etansare prezon
second row al dolea rind de dinti primul rind de dinti
set casing tubajul coloanei prin intermediul
settle a se depune prindere de prajini
settling pit batal de decantare prindere p diferentiala
shackle clupa de tractiune priza de cimentare
shale shaker sita vibratoare proba stratelor cu prajini
shane rola scripete protector cu toarta
sharp change schimbare brusca protector cu toarta
sharp crowns filet ascutit punerea buc de avansare
sheaves rolele geamblacului punerea buc de avansare
shock absorber amortizor de soc punerea elev pe prajina
shoe siu ,sabot pusca ptr. Noroi
short nipple niplu scurt rac
shovel lopata racord stimb
side suction absortie laterala rampa de prajini
side traking with whip stock deviere cu pana de deviere rata de penetrare
side wall coring ciupitor lateral ratia gaze tiei
single o bucata reductie prot tija
slack down lasa jos rezistent la torsiune
slack off lasa jos rezistent la tractiune
sleeve mineca, bucsa, manson roaba
slip and cut line rulat si taiat cablul robinet de retinere cu clapet
slip elevator spider elevator cu pene rodeaza sapa cu atentie
slips pene rola scripete
slogging pit batal ptr. ingreunat noroi role de rulment (pirdute la put)
slow down the rotary micsoreaza turatia role pierdute
slug the pipe dop de noroi in praj pt extrage rolele geamblacului
slush pump liner camasa de pompa rotatii pe minut
slush pump piston piston de pompa rotirea mesei la dreapta
slush pump piston rod tija de piston rulat si taiat cablul
slush pump valve supapa pompa ruleta
snatch a inhata ceva rupere casanta
spade cazma ruperea prajinei la torsiune
spear rac saiba plata
spear point virful conului 1 saiba plata
speed the rotary up mareste turatia sapa de foraj
spider broasca cu pene sapa pe talpa
spinner survey detect zonei de pierdere sarcina
spinning cat head mosor de strins sarniera
spiral drillcollar drillcolar spiralat sarniera cu zale
Page 6
sprayer pompa de stropit scara
spudding scuturarea sapei scaun de pasi
square drillcollar drillcolar patrat scaun supapa
squeeze job cimentare sub presiune schimb de 8 ore
stabbig board pod de tubaj schimbare bacuri prevenitor
stack ansamblu de utilaje schimbare brusca
stancil stanta schimbare brusca de inclinare
stand back a pune pasi pe scaun scripete ptr sfoara
stand of pipe pas de 3-4 buc scuturarea sapei
stand pipe incarcator semering
steel line mesure introducerea garnit. cu masura siguranta electrica
steel safety step gratar ptr podea sita vibratoare
steel sheet foaie tabla siu ,sabot
storage thermometer termometru maximal siu plutitor cu bila
strap introducerea garnit. cu masura sonda in eruptie naturala
strap clema sondor la gura putului
strap lasa sudata spalare inversa
streight drept spiruire
stuck prindere de prajini spiruire la racorduri
stud bolt prezon stab corector plasat deasu dril
suck on it ia sus stanta
suction hose furtun tragere stapinirea sondei contra aflux
swing check valve robinet de retinere cu clapet stergator
switch intrerupator stingere
swivel cap hidraulic strins,ingust,(gaura micsorata)
T.D. (total depth) talpa sondei subtire
T.M. (total mud) volum total noroi sudura
tackle block scripete ptr sfoara sula
tape rule ruleta suma, total, cantitate
tapered dorn conic supapa pompa
tensile strenght rezistent la tractiune surubelnita
the pered tap dorn de instrumentatie surubelnita
thim subtire suvei
third row al treilea rind de dinti talpa sondei
thread compound unsoare de filete tamburi de frina
threaded flange flansa simpla filetata teava de spalare CH
thred filet termometru maximal
tight strins,ingust,(gaura micsorata) tija de piston
tight hole gaura care se stringe timp nefavorabil
tightnees stingere timp nefavorabil
to be hand tanged in insurubati cu clestele de mina ! tipuri invechite
to be hand tanged out desurubati cu clestele de mina ! toarta CH
to be stantilled a fi stantat toba granicului
to connect a pune bucata toba ptr furtun
tong diea bacuri ptr. Clesti torsiune
tooth crest virful dintelui troliu cu aer
tooth root fundul dintelui troliu manual
torque torsiune truk
torsioanl strenght rezistent la torsiune tubajul coloanei
tour schimb de 8 ore tubat coloana
trailing flank partea din spate a dintelui tubat coloana
trough jgeab de noroi turla
trveling block macara tuta
tubbing cater cutit ptr tubing tuta ptr. Burlane
turn buckle intinzator de cablu ultimul filet angajat
turning to the right rotirea mesei la dreapta umbrela de cimentare
twist off ruperea prajinei la torsiune umplerea putului
Page 7
under guage uzura in diametru umplerea putului
under ream largirea gaurii sub siu un ciclu de circulatie
up ward in sus unelte de curatat
valve body plate saiba plata ungator
valve seats scaun supapa unghi de deviere
W.O.B. (weight on bit) apasarea pe sapa unsoare de filete
W.O.C. ( wait on cement) priza de cimentare urmareste cu atentie !
W.O.W timp nefavorabil uzura dintilor
wait on weather timp nefavorabil uzura excentrica la racord
wash out spiruire la racorduri uzura in diametru
wash pipe teava de spalare CH valva regulator de debit
wash pipe packing garnituri teava spalare ventil cana
washer saiba plata ventil cu ac
washover pipe burlan freza ventil cu pana
weighted mud noroi ingreunat ventil de incarcare
weld sudura vinci, cric
width latime virful conului 1
wing nut union leg rapida cu fluture virful dintelui
wing union legatura rapida (holender) virtej ptr. Cablu
wire rope cablu foraj viteza in sp. inelar
with draw kelly extrge tija deasupra mesei volum total noroi
wrap up a infasura, incolaci,inveli volumul gaurii
wrench for valve cheie ptr cana za de lant
zip elevator elevator ptr. drillcolar zgirietura
wiper trip mars control mars control
Page 8
floore
lay down
screen out
to be stantilled
provide
wrap up
snatch
going in hole
run in hole
screw
catching samples
rig up
to connect
stand back
retrieve
drilling under pressure
settle
gall
kick
count
burst
drag
junk
side suction
needle
D.P.CONN (drill pipe connection)
liner hanger
casing hanger
automatic hanger
mud mix
second row
third row
cement mixer
bit breaker
shock absorber
B.H.A. (bottom hole assembly)
packing
stack
W.O.B. (weight on bit)
boll joint
tong diea
breack band
baryte
settling pit
slogging pit
cellar
bentonite
con
pin
spider
joints
washover pipe
rate hole
barrel
dog house
wire rope
cat line
Page 9
pressure decline
slush pump liner
3 way plug valve
safety valve sub
feed oiler
kelly cock
ring groove
crose head
swivel
core
electrical coring
logging
core barrel
orientated core
cavity
caliper log
spade
casing centralizers
ash
geological investigation
monkey wrench
box wrench
wrench for valve
ajustable wrench
elevator bails
links
squeeze job
mud balance
hammer
H.C. (hole cycle)
R.C. (reverse circulation)
hook
side wall coring
strap
chain tong
back up tong
power tong
break out tong
pipe spinner (tong)
shackle
lever
floculation
safety coefficient
clog up
oil string
clliper
joint calliper
cone
reamming
ream to safety
dog type overshot
overshot
bull dog type schocket
releasing socket
elbow
packing
crack
Page 10
chalk
scratcher
belt
plug flow
cutter
tubbing cater
kelly spinner
chisel
chisel
caving
caving
P.O. (pump output)
finger board
desilter
niplle down BOP
desander
line guide
D.D.P. (displacement drill pipe)
break out down
to be hand tanged out
spinner survey
cuttings
side traking with whip stock
drilling time log
broken teeth
device
plug
slug the pipe
drift pin
tapered
the pered tap
streight
plain drillcollar
square drillcollar
spiral drillcollar
bit nozzle
choke
slip elevator spider
zip elevator
making a trip
gage
pump valve seat puller
P.O.H. (pull out on hole)
pick up
with draw kelly
latch jaw
lug jaw
jaw (long, short)
thred
sharp crowns
galled thread
discharge strainer screen
blind flange
threaded flange
steel sheet
cable tool drilling
junk basket
Page 11
drilling out
tooth root
suction hose
pail
bulldog clamp
seal
wash pipe packing
mouse hole
tight hole
key seat
open hole
bumper sub
jar
drilling jar
crown block
fishing neek
steel safety step
hand grease gun
bearing locked
pick it up
raise it
suck on it
down ward
up ward
height
stand pipe
attempt to pull
retainer ring
to be hand tanged in
turn buckle
log
switch
run in slowley
run in slowly
S.L.M. (steel line measure)
S.L.M.
steel line mesure
strap
R.I.H. ( run in hole)
plug back
trough
ramp
pad lack
blowtorch
chain
link belt chain
API chain
cement slurry
under ream
let it down
slack down
slack off
strap
width
safety joint
wing nut union
hex nut union
Page 12
flexi ball joint
wing union
shovel
poddle
goose neck
length
length of pin
length of box
trveling block
lounge store room
heavy tool room
drill pipe protector
balling up
bit balling
speed the rotary up
deviation survey
slow down the rotary
sleeve
handle
happer
niplle up BOP
reel
break out cat head
spinning cat head
float collar
baffle collar
long nipple
short nipple
weighted mud
non weighted mud
foamed mud
lighte ned mud
single
flow check
killing a well
full stop
inner end of tooth
loadind flank
trailing flank
outer end of tooth
lower end
stand of pipe
double
master bushing
drive bushings
kelly drive bushings
master bushings
slips
power slips
dope brush
ginding stone
mud hopper
funnel
liver
slush pump piston
nut
brake block
Page 13
screen
platform truck
derrick floor
bidge
stabbig board
monkey board
cat walk
centrifugal pump
lubricant pump
sprayer
drill pipe
drill string
extension rod
mixing mud
filter press
B.O.P. (bow out preventer)
stud bolt
first row
by means
stuck
pressure differential sticking
W.O.C. ( wait on cement)
drill stem test
drillpipe and casing protector
lifting cap
making a conection
making up a joint
latch on
jet gun
spear
croocked joint
pipe rack
R.O.P. (rate of penetration)
gas-oil ratio
kelly saver sub
torsioanl strenght
tensile strenght
borrow
swing check valve
break the bit in carefully
shane
roller barings gone
bearing loose
sheaves
R.P.M. (rotation per minute)
turning to the right
slip and cut line
tape rule
brittle fracture
twist off
valve body plate
washer
bit
B.O.B (bit on bottom)
load
clamp
safety clamps
Page 14
ladder
fals floor
valve seats
tour
changing rams
sharp change
dog leg
tackle block
spudding
oil seal
fuse
shale shaker
shoe
float shoe
flowing well
floor man
backwashing
leak
wash out
key seat wiper
stancil
mud off
pipe wiper
tightnees
tight
thim
weld
bod kim
amount
slush pump valve
bolt
screw driver
lifting sub
T.D. (total depth)
breack rims
wash pipe
storage thermometer
slush pump piston rod
W.O.W
wait on weather
absolete types
bail swivel
drum
hose reel
torque
air hoist
derrick winch
cement unit
set casing
R.I.C.
run in casing
jack
bell socket
casing bowl
last engaged thread
petal basket
backfilling
Page 15
filling the hole
C.M.C. (complete mud cycle)
scraping tools
feed lubricator
inclination
thread compound
keep close watch
dullness
excentric OD wear
under guage
drain - rate valve
plug valve
pressure guage needle valve
gate valve
charging valve
jack
spear point
tooth crest
cat line swivel
A.V. (annular velocity)
T.M. (total mud)
H.V. (hole volume)
link
nick
wiper trip
Page 16

You might also like