Name: NIC:
Company: Score:
() Single choice(1)
1. Which software is used for configuration BTS end data at SDR base station.
A.Netnumen B.OMCB C.EMS D.LMT
2. For 282_094 SDR BTS configuration, how many RRU, s & UBPG boards required?
A.7 RRU,s & 2 UBPG B. 5 RRU,s & 1 UBPG C .7 RRU,s & 3 UBPG
6 RRU,s & 3 UBPG
3. While configuring GSM carriers in GSM RU parameters using LMT what is the default
value of each carrier power using RU80 with 6 carriers?
A. 16
B. 26
C. 15
D. 13
4. SDR BTS configuration LMT data is also accessible at BSC end at_________.
A. OMCR
B. EASS server
C. CC
D. OMCB
5. Tolerance for weight of steel is
A. 8%
B. 6%
C. 2%
D. 10%
6. Each backfill layer must be
A. 200mm
B. 175mm
C. 300mm
D. 400mm
7. VSWR must be less than ---------
A. 1.2
B. 1.3
C. 1.4
D. 1.5
8. B8200 can support ------------- GSM carriers
A. 40
B. 50
C. 60
D. 72
9. CPRI stands for -------
A. Common Protocol for radiation International
B. Common Public Radio Interface
Internal Use Only
<>
All Rights reserved, No Spreading abroad without Permission of ZTE
2
C. Critical Path for Radio Internet
D. Common Path for Radio Invention
10. SA can support ----------- E1s
A. 4
B. 6
C. 8
D. 16
11. OMCB interacts with SDR through -------------
A. IP Links
B. VOIP Links
C. OMCR
D. RNC
12. If data are inconsistent between them, we will take the data on ------------- as the reference
data.
A. OMCR
B. OMCB
C. CC Board
D. UBPG Board
13. Total of ---------- FS card can be configured
A. 1
B. 2
C. 3
D. 4
14. Each RU supports -------- fiber interfaces.
A. 1
B. 2
C. 3
D. 4
15. Cable ladder deployed on outdoor is -----------
A. 500mm
B. 200mm
C. 300mm
D. 400mm
16. In case of the dual-mode, operation and maintenance tasks of GSM are moved to
, and manages GSM related radio configuration and status management.
A. OMCB,OMCR
B. OMCR,OMCB
C. OMCR,OMCR
D. OMCB,OMCB
17. The SDR solves the problem about antenna extension and repeaters by distributing the
RRU -------------
A. remotely
B. Separately
C. jointly
Internal Use Only
<>
All Rights reserved, No Spreading abroad without Permission of ZTE
3
D. safely
18. Frequency hopping is used due to limited number of ___________
A. RRU
B. BBU
C. CC Card
D. Frequency
19. A fiber can support ___________ TRX.
A. 12
B. 18
C. 24
D. 36
20. IPS main ground cable is ----------- . Internal ground cable is ---------
A. 10mm , 16mm
B. 35mm , 70mm
C. 16mm, 10mm
D. 16mm, 25mm
21. When multiple racks are arranged side by side, the main walkway side should be in one
line, and the sides of the whole row of racks are on the same plane, with a deviation not
more than __________
A. 2mm
B. 5mm.
C. 3mm
D. 4mm.
22. The power cable and signal cable outside a cabinet should be spaced over _____ apart,
without overlapping and mixture
A. 3cm
B. 2cm
C. 5cm
D. 10cm
23. A label should be pasted ___________ away from the end of a cable
A. 3cm
B. 5cm
C. 1cm
D. 2cm
24. After site installation _____ is carried out by ZTE Team.
A. Self Check
B. Spot Check
C. Routine Check
D. Random Check
25. Cable ladder construction are hot dip galvanized manufactured to minimum coating
thickness is ------------ indoor use and ------------ for outdoor use
A. 90 s , 50s
B. 50 s , 90 s
C. 45 s ,75 s
Internal Use Only
<>
All Rights reserved, No Spreading abroad without Permission of ZTE
4
D. 75 s , 90 s
26. There are ________GE interfaces in BBU.
A. 2
B. 3
C. 4
D. 5
27. ________ does not support master slave switch over.
A. CC
B. FS
C. UBPG
D. BPC
28. ______ is environment monitoring module.
A. SA
B. CC
C. FS
D. UBPG
29. Cable trays shall be fixed in concrete blocks with maximum distance ---------.
A. 1m
B. 2m
C. 3m
D. 4m
30. According to national Pakistani building code all structures inland shall be calculated for
a wind speed of ------------
A. 145KPH
B. 175KPH
C. 152KPH.
D. 200KPH
31. All bolts must of ISO ----------- and dimensions as per DED.
A. grade 5.8
B. grade 8.8
C. grade 6.8
D. grade 4.8
32. Additional ______ on the equipment sides and back and additional ______ on the
equipment front
A. 500mm , 1200mm
B. 300mm, 1300mm
C. 400mm, 1400mm
D. 300mm, 1400mm
33. Slope for Sunshade sheets should be at least ___________
A. 1%
B. 2%
C. 3%
D. 4%
34. Maximum distance between cable ladder supports should not exceed ______
Internal Use Only
<>
All Rights reserved, No Spreading abroad without Permission of ZTE
5
A. 3m
B. 4m
C. 2m
D. 1m
35. The electrical resistance of any earth-continuity conductor or earthing lead measured from
its connection with the main earth electrode system of a building to any other position in
the complete installation in the building shall not exceed ______ for BTS sites and _____
for hub site
A. 3,4
B. 1,2
C. 5,2
D. 5,3
36. For channels other than C channels and I beam _____
A. ZTE will dismantle and use Equipment base
B. ZTE will install C channels
C. ZTE will install I beams
D. ZTE will use base frames.
37. Precast concrete block dimension will be (_____________)
A. 350x350x100
B. 350x350x150
C. 350x250x100
D. 250x250x50
38. What kind of working mode is adopted for the rectifier output in the communication
power supply system? ( )
A. serial connection
B. parallel connection;
C. first serial connection, and then serial connection;
D. first serial connection and then serial connection;
39. There are several lightning protection levels in power supply system, normally,the level
B refers to ( )
A. The lightening protection equipment in the AC power distribution box in equipment
room
B. The lightening protection equipment on the roof of the equipment room
C. lightening protection equipment on the switch power rack
D. The lightening protection in rectifier
40. With serial port communication mode, the distance between the monitoring main engine
and monitored power should be less than ( ) m.
A. 12
B. 15
C. 20
D. 25
() Multiple choice(2x15)
1. Which of the followings need attention during indoor height operation: ( )
Internal Use Only
<>
All Rights reserved, No Spreading abroad without Permission of ZTE
6
A. Prevent tools and materials from falling down.
B. The ladder for the height operation should be balanced and fixed
C. Personnel under the work area should leave
D. No electric tools can be used in the height operation
2. After installation which of the following should be carried out. ( )
A. Self check
B. Routine check
C. Spot Check
D. Material Check
3. Significant feature of SDR are ( )
A. Multiple mode processing at RF end
B. Multiple mode processing at base band level
C. software integration
D. Distribution of components for ease
4. The strength of concrete works shall be ( )
A. 7 days cube strength should be at least 2650PSI.
B. 28 days cube strength should be at least 3750PSI.
C. Average strength must be 75% of required and individual value must be 85% of
required.
D. None of above.
5. Site Master is used for ( )
A. VSWR
B. DTF
C. Link Budget
D. Return loss
6. Following HSE documents must be on site during process ( )
A. Check list
B. Site safety plan
C. Project safety plan
D. Site drawing.
7. Following items are belongs to PPE. ( )
A. Tool kit.
B. Safety helmet.
C. Safety shoes.
8. Which fields is mandatory to fill in delivery Order
A. Sire ID
B. Project Name
C. Contract ID
D. Transportation Mode
9. Following HSE documents must be on site during process
A. Check list
B. Site safety plan
C. Project safety plan
D. Site drawing.
Internal Use Only
<>
All Rights reserved, No Spreading abroad without Permission of ZTE
7
10. CW work including ( )
A. RFNP
B. SA
C. Foundation
D. Tower
11. Major Site material delivery process are ( )
A. Plan&prepare
B. DO
C. Outbound
D. Transport
E. Material return
12. Which tow is more difficulty than other part in TK project?
A. Network planning
B. Site acquisition
C. Civil work
D. Optimization
13. If the oil generator cannot stop working, what are the possible reasons?
A. The emergency stop button gets damaged.
B. The shutdown signal line gets disconnected, or connected mistakenly.
C. The storage battery cathodes are not connected well with the generator set, with
impedance being extremely large.
D. Control function for module equalized charging
14. Which of the following parts consist of the power supply system in communication
equipment room?
A. AC power supply system
B. Switch power system
C. Battery
D. Grounding system
15. What are the most difficulties in site acquisition work flow?
A. The accuracy of SAR
B. Sign LA with owner
C. The accuracy of TSSR
D. Access to government license pack
() True/Wrong (1x10)
1. Its necessary to put the protection tube when the fiber is let out the rack. ( T )
2. The signal cable can tied with power cable together. ( F )
3. Base station ip is unique for any SDR BTS in a unique BSC but can be repeated in several
BSC, s. (T)
4. One fiber cable from FS board can support only 32 TRX in one cell using cascading. (F)
5. SDR site require configurations at SDR BTS end by LMT, OMCR & OMCB. ( T )
6. Site pictures are required for 10% sites only. (F)
7. 40 microns is the requirement of bolts galvanization. (T)
8. Normal tools can be used for working on live equipment. (F)
9. Smoking and fire is allowed in Warehouse. ( F )
10. Security guard will check the delivery order before leaving the warehouse.( F )
() Make Short note on following (4x5)
Internal Use Only
<>
All Rights reserved, No Spreading abroad without Permission of ZTE
8
1. Steps required for cable installation (grounding,power)?
2. Complete logistic procedure for a project?
3. What is the purpose of DEMO site construction?
4. What is the key check points of SDR hardware installation?