2013 Tank Shutdown Schedule

Activity No Tag No D (m) Description Status Finding Summary Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 T-7311 34.8 Diesel In progress
Anomaly Finding:
Similar condition with T-7312, except localized wall loss
at 2 spots detected by MFL floor scanning (near bottom
sump area). One spot to be patched repair now while the
other spot is planned during next tank Hygienic Cleaning
(5 yearly).
2 wks 2 wks
2 T-7312 34.8 Diesel Completed
Anomaly Finding: None
Internal - originally not coated. Superficial pitting on
bottomplates and shell wall of 0.5 ~1mm. No anomaly
finding based on NDT results.
2 wks
3 T-73208 20.1 HCK Kerosene 2 wks
4 T-73207 20.1 HCK Kerosene 2 wks
5 T-73209 45.8 Distillate (P) 2 wks
6 T-1101 3.9 Caustic OSTA - TBA 2 wks
7 T-1601 4 3 Degree Be Caustic Completed
Anomaly Finidng:
Turnbuckle was found detached formthe 2" caustic
distributor pipe support with missing gasket between
distributor pipe flanges. All defective items were repaired
to AIMD satisfaction.
Internal - originally not coated.
Bottomplate and shell wall - satisfactory.
External - paint touch repair at corroded parts.
2 wks
8 T-1604 4.2 Alkaline Waste Water Completed
Anomaly Finding: None
Internal - originally not coated.
Bottomplate and shell wall - satisfactory.
External - paint touch repair at corroded parts.
2 wks
9 T-5601 4 50 Degree Be Caustic Completed
Anomaly Finding: None
Internal - originally not coated.
Bottomplate and shell wall - satisfactory.
External - paint touch repair at corroded parts.
2 wks
10 T-5101 15.1 Demineralized Water
11 T-5201 27.7 Fire Water Completed
Anomaly Finding:
BottomPlate area between Manhole M1B and adjacent
column - paint blisters with no evidence of corrosion
underneath the blisters.
Roof Underside and Roof Trusses/Rafters - evidence of
paint blisters and corroded structural supports and roof
underside between 80
o
~140
o
orientation. To conduct
crawler scanning fromroof topside to assess thickness
of corroded roof plate.
Note: Assessment by scaffolding was not performed
because the tank needs to be urgently boxed up due to
U23 Furnace fire.
MFL floor scanning - satisfactory.
2 wks
12 T-5204 29 City Water
13 T-7107 56.8 Tapis Crude In progress Sludge removal is still in progress.
14 T-7106 56.8 Bintulu Condensate
15 T-7506 38.1 Mogas In progress
Precleaning Inspection
Anomaly Findings:
1. Bottomplate - paint blisters
2. Coflexip hose snapped/cut and severely dented.
3. Uniformpitting corrosion on shell internal
4.Scattered localized paint damage (peeled-off) on shell
wall internal with evidence of pitting corrosion
underneath.
5. Pipe Hanger support damage.
16 T-7501 38.1 PC Naphta
17 T-34251 15.5 Sour Water
18 T-71203 71.2 Heated Crude Oil
19 T-75201 38.3 High Sulphur Fuel Oil
(P) - requires maintenance blasting and painting
2 wks Originalplan 2 wks Inprogress 2 wks Completed
PSR-1
Rejuv
4 months
4 months
Hygienic
Cleaning
PSR-1
TA
6 wks
6 wks
6 wks
Maintenance
3 months
3 months
3 months
5 months
5 months