You are on page 1of 3

management Missed Questions:

Question: You are trying to hot-add an IDE disk to a running virtual machine; however the option is greyed
out. What could be the possible cause for this? Choose one.
Incorrect response(s):
The virtual machines guest operating system does not support hot adding hardware
Question: Before implementing Single Root I/O Virtualization (SR-IOV) in your customers environment, which
requirements must you fulfill? Choose three.
Incorrect response(s):
Ensure that the host has an Intel processor
Check the vSphere documentation to ensure the host configuration is supported
Ensure that the host has an AMD processor
Note: This response is either incorrect, or additional responses may be required to receive a 100% score for this question.
Question: Your customer has an application solution that runs 4 virtual machines. They need to replicate this
solution repeatedly over a period of time into a number of separate production instances. What deployment
method would you recommend to your customer as being the most suitable for their needs? Choose one.
Incorrect response(s):
Make multiple clones of the running virtual machines and copy them to secondary storage until they are required.
Migrate the clones to production as required.
Question: Which of the following is a major design goal of the vSphere CPU scheduler? Choose one.
Incorrect response(s):
Efficiency
Question: Your customer reports that an application in their virtual machine appears to be underperforming
and performance counters show that the application is utilizing 95% of CPU resources. The customer wants
to be able to hot-add additional CPUs to the virtual machine to resolve this without shutting the machine
down, but cannot. Which of the following are possible reasons? Choose two.
Incorrect response(s):
The guest operating system must support hot add of CPU
An Enterprise Plus license is required to hot add CPU
Note: This response is either incorrect, or additional responses may be required to receive a 100% score for this question.
Question: Your customer requires a solution that will allow them to quickly move running virtual machines
between all their hosts using vMotion. Their current setup has 8 identical hosts running the free vSphere
Hypervisor. Which of the following will they need to do, at a minimum, in order to gain this functionality?
Choose two.
Incorrect response(s):
Upgrade from the free vSphere license to a vSphere Standard license
Upgrade from the free vSphere license to a vSphere Enterprise license
Note: This response is either incorrect, or additional responses may be required to receive a 100% score for this question.
Question: You are designing a remote desktop solution for your customer, they have specified that each
virtual machine must have 4 vCPUs, 128GB of RAM and be able to support graphic-intensive workloads.
Which of the following must be features of your solution in order to achieve your customers design goals?
Choose two.
Incorrect response(s):
Hardware-Based vGPU support
VMware vSphere 5.1
Note: This response is either incorrect, or additional responses may be required to receive a 100% score for this question.
Question: You are engaged in the planning stage prior to a large scale deployment of virtual machines which
will have various hardware configurations. Which of the following are important steps in order to effectively
plan the environment? Choose two.
Incorrect response(s):
Create a vSwitch port group for the virtual machines
Configure VMware vSphere Host Profiles
Note: This response is either incorrect, or additional responses may be required to receive a 100% score for this question.


Stage II
Missed Questions:Question: Before implementing Single Root I/O Virtualization (SR-IOV) in your
customers environment, which requirements must you fulfill? Choose three.
Incorrect response(s):
Ensure that the physical host has vSphere 5.5 installed
Ensure that the host has an Intel processor
Ensure that the host has an AMD processor
Note: This response is either incorrect, or additional responses may be required to receive a 100% score for this question.
Question: Your customer has an application solution that runs 4 virtual machines. They need to
replicate this solution repeatedly over a period of time into a number of separate production
instances. What deployment method would you recommend to your customer as being the most
suitable for their needs? Choose one.
Incorrect response(s):
When a new instance of the solution is required the 4 new virtual machines should be cloned from the
original application solution virtual machines.

Question: Your customer requires a solution that will allow them to quickly move running virtual
machines between all their hosts using vMotion. Their current setup has 8 identical hosts running the
free vSphere Hypervisor. Which of the following will they need to do, at a minimum, in order to gain
this functionality? Choose two.
Incorrect response(s):
Deploy shared storage for the virtual machine storage
Copy each virtual machine to an NFS share
Note: This response is either incorrect, or additional responses may be required to receive a 100% score for this question.
Question: You are designing a remote desktop solution for your customer, they have specified that
each virtual machine must have 4 vCPUs, 128GB of RAM and be able to support graphic-intensive
workloads. Which of the following must be features of your solution in order to achieve your
customers design goals? Choose two.
Incorrect response(s):
Hardware-Based vGPU support
128GB of RAM in each vSphere Host
Note: This response is either incorrect, or additional responses may be required to receive a 100% score for this question.
Question: You are engaged in the planning stage prior to a large scale deployment of virtual machines
which will have various hardware configurations. Which of the following are important steps in order
to effectively plan the environment? Choose two.
Incorrect response(s):
Check the configuration maximums document
Configure VMware vSphere Host Profiles
Note: This response is either incorrect, or additional responses may be required to receive a 100% score for this question.
Missed Questions:
Question: Which of the following is a major design goal of the vSphere CPU scheduler? Choose one.
Incorrect response(s):
Isolation
Question: You are engaged in the planning stage prior to a large scale deployment of virtual machines which
will have various hardware configurations. Which of the following are important steps in order to effectively
plan the environment? Choose two.
Incorrect response(s):
Create a vSwitch port group for the virtual machines
Check the configuration maximums document
Note: This response is either incorrect, or additional responses may be required to receive a 100% score for this question.

You might also like