Project : Laying of Fire Water Network, Hazira

Description: Pipe Length & Size Calculation


Date:
5-Aug-14
ABOVE GROUND PIPING
Sr. No.

Drwg no.

Location

Sulphur Recovery Flaking &


Bagging Plant

Microwave tower &


Incrinator

Switch Yard
Cement Godown area

6
7

IOTDE-MM-04-003
Sheet 1 of 4

Sulphide Treatment Plant


area
Marketing office and
marcaptan storage
LPG loading Gantry rail I
LPG loading Gantry rail II

Sick Bay & LPG loading


gantry

Caustic wash unit

10

Propane Sphere and slop


tank area

11
12
13

Open area
pump house, ware house,
area near Green Belt
Ware House, Office,
Storeyard area

15

LPG Sphere

16

LPG Shere 2

Pipe Size

Length(Mtr) Weight/mtr

12"
12"
16"
16"
12"
12"
12"
16"
16"
16"
14"
14"
10"
10"
10"
10"
14"
14"
14"
14"
14"

120
120
225
230
70
230
90
200
85
120
140
45
125
52
120
33
55
20
1540
1550

14"

220

14"
14"
14"
14"
14"
14"
14"
10"
10"

210
140
140
165
135
110
110
110
110

14"

155

10"
14"

160
200

8"

380

14"

375

30"
30"
30"
20"
30"
30"
30"
20"

115
110
115
125
145
120
150
120

49.7
49.7
62.62
62.62
49.7
49.7
49.7
62.62
62.62
62.62
54.67
54.67
41.74
41.74
41.74
41.74
54.67
54.67
54.67
54.67
54.67
54.67
54.67
54.67
54.67
54.67
54.67
54.67
54.67
41.74
41.74
54.67
41.74
54.67
33.3
54.67
148.68
148.68
148.68
78.52
148.68
148.68
148.68
78.52

Total Weight
in tonnes
5.964
5.964
14.0895
14.4026
3.479
11.431
4.473
12.524
5.3227
7.5144
7.6538
2.46015
5.2175
2.17048
5.0088
1.37742
3.00685
1.0934
84.1918
0
84.7385
12.0274
11.4807
7.6538
7.6538
9.02055
7.38045
6.0137
6.0137
4.5914
4.5914
8.47385
6.6784
10.934
12.654
20.50125
17.0982
16.3548
17.0982
9.815
21.5586
17.8416
22.302
9.4224

17

captive power plant, Boiler &


DM plant

18

Condensate Fractionation
train 1 & 2

19

LPG Unit

20

Boiler house, Compressor


house, inst air compressor

21

Sub station 3, cooling tower


& CWPH

NGL Tank-20

23

NGL Tank-21

24

IOTDE-MM-04-003
Sheet 2 of 4

22

Kerosine Tank

25

ATF Tank

26

HSD Tank

27

Open Area & FWPH-II

28

NGL Fractionation unit

29

Boiler house

30

DPD trains

31

Condensate fractionation
train 73, 74

16"
16"
16"
16"
12"
12"
12"
12"
12"
12"
24"
16"
14"

105
110
220
220
110
130
190
190
120
120
120
230
120

12"

145

24"
20"
8"
20"
20"
20"
20"
20"
20"
20"
8"
14"
14"
14"
14"
14"
10"
10"
8"
10"
8"
8"
8"
8"
24"
24"
14"
14"
8"
14"
12"
12"
14"
14"
12"
12"
14"
14"
10"

200
320
280
320
110
120
320
325
120
115
290
170
170
80
100
85
190
120
180
65
50
80
45
100
120
160
140
140
125
160
130
220
210
210
125
125
220
220
125

62.62
62.62
62.62
62.62
49.7
49.7
49.7
49.7
49.7
49.7
118.71
62.62
54.67
49.7
118.71
78.52
33.3
78.52
78.52
78.52
78.52
78.52
78.52
78.52
33.3
54.67
54.67
54.67
54.67
54.67
41.74
41.74
33.3
41.74
33.3
33.3
33.3
33.3
118.71
118.71
54.67
54.67
33.3
54.67
49.7
49.7
54.67
54.67
49.7
49.7
54.67
54.67
41.74

6.5751
6.8882
13.7764
13.7764
5.467
6.461
9.443
9.443
5.964
5.964
14.2452
14.4026
6.5604
7.2065
23.742
25.1264
9.324
25.1264
8.6372
9.4224
25.1264
25.519
9.4224
9.0298
9.657
9.2939
9.2939
4.3736
5.467
4.64695
7.9306
5.0088
5.994
2.7131
1.665
2.664
1.4985
3.33
14.2452
18.9936
7.6538
7.6538
4.1625
8.7472
6.461
10.934
11.4807
11.4807
6.2125
6.2125
12.0274
12.0274
5.2175

Condensate fractionation
train 75, 76

33

Cooling tower & CWTP

34

Condensate fractionation
train 77

35

Cooling tower, s/s 17, s/s12,


s/s11 & cwph

36

GDU Train 41,42 & GSU train


31,32,33

37

Control room

38

GDU Train 43,44 & GSU train


34,35

39

GDU Train 45 &


GSU train 36

40

41

IOTDE-MM-04-003
Sheet 3 of 4

32

GDU Train 46, 47 &


GSU train 37, 38
Process waste treatment
plant & contaminated rain
water treatment plant
Slug Catcher I

43

Slug Catcher II

44

Slug Catcher III

45

Open area

46

Filter area pigging & pressure

47
48
49

Control room
Utility block
Gas Terminal
TDE-MM-04-003

42

CISF Admin & FEH

10"
14"
14"
10"
10"
14"
12"
14"
14"
8"
8"
12"
24"

125
220
220
125
125
320
125
255
220
120
120
150
120

16"

200

16"
16"
12"
16"
12"
12"
16"
14"
14"
10"
14"
14"
14"
10"

100
220
100
110
220
220
110
220
220
125
220
220
110
125

14"

220

14"
14"
12"
10"
10"
10"
8"
8"
8"
8"
8"
8"
8"
8"

110
240
130
225
425
310
105
500
500
100
520
520
95
220

8"

100

8"
8"
8"
8"
8"

90
210
95
85
400

8"

505

41.74
54.67
54.67
41.74
41.74
54.67
49.7
54.67
54.67
33.3
33.3
49.7
118.71
62.62
62.62
62.62
49.7
62.62
49.7
49.7
62.62
54.67
54.67
41.74
54.67
54.67
54.67
41.74
54.67
54.67
54.67
49.7
41.74
41.74
41.74
33.3
33.3
33.3
33.3
33.3
33.3
33.3
33.3
33.3
33.3
33.3
33.3
33.3
33.3
33.3

5.2175
12.0274
12.0274
5.2175
5.2175
17.4944
6.2125
13.94085
12.0274
3.996
3.996
7.455
14.2452
12.524
6.262
13.7764
4.97
6.8882
10.934
10.934
6.8882
12.0274
12.0274
5.2175
12.0274
12.0274
6.0137
5.2175
12.0274
6.0137
13.1208
6.461
9.3915
17.7395
12.9394
3.4965
16.65
16.65
3.33
17.316
17.316
3.1635
7.326
3.33
2.997
6.993
3.1635
2.8305
13.32
16.8165

51

IOTDE-MM-04-003
Sheet 4 of 4

50

CISF Admin & FEH


Administration

EIL site office

52

DPD train 51,52,53,54

53

Flare area

8"
8"
8"
8"
12"
12"
12"
16"
16"
16"
12"
8"

310
70
50
872
150
85
70
195
165
110
120
1770

Note:- The pipes for Hydrants are excluded in the above stated pipe Qty
The Pipes sizes included here are from 30" to 8"

33.3
33.3
33.3
33.3
49.7
49.7
49.7
62.62
62.62
62.62
49.7
33.3

10.323
2.331
1.665
29.0376
7.455
4.2245
3.479
12.2109
10.3323
6.8882
5.964
58.941

Project : Laying of Fire Water Network, Hazira


Description: Pipe Length & Size Calculation
Date:
5-Aug-14
Under Ground Piping
Sr. No.

Location

Pipe Size

Length(Mtr)

Rail Wagon Gantry and Loco


Shed

14"

38

Ware House

Open Area

ATF Tank & HSD Tank

5
6

NGL Tanks
Fire Water Pump house II
Propane sphere & Slop oil
tank

8"
20"
14"
10"
8"
20"
24"
14"
10"

115
20
122
59
20
80
21
19
19

14"

64

12"
14"
30"
14"
14"
10"
14"
24"
24"
14"
12"
12"
24"
14"
12"
14"
14"
14"
12"
14"
24"
16"
16"
14"
12"
16"
12"

24
40
40
42
51
46
40
54
24
20
20
24
24
24
24
24
25
18
25
24
21
90
25
22
25
31
49

16"

31

16"

62

16"
12"

29
31

7
8
9
10
11
12
13
14

Caustic wash unit and upper


area
HVLR 3 area
LPG Sphere area II
LPG Loading Gantry area
Mercaptan storage &
Marketing office
Sick Bay
LPG Sphere area I

15

coling twr, substation no 3 &


FWPH 1

16

Cooling twr

17

NGL Fractionation unit

18

Cooling twr

19

Boiler house
Captive power plant Boiler &
DM Plant

20
21

Switch Yard

22

Incinerator

23
24
25

Sulphur recovery flaking &


bagging plant
Condensate fractionation
train 71, 72
LPG Unit

Weight/mtr
54.67
33.3
78.52
54.67
41.74
33.3
78.52
118.71
54.67
41.74
54.67
49.7
54.67
148.68
54.67
54.67
41.74
54.67
118.71
118.71
54.67
49.7
49.7
118.71
54.67
49.7
54.67
54.67
54.67
49.7
54.67
118.71
62.62
62.62
54.67
49.7
62.62
49.7
62.62
62.62
62.62
49.7

Total Weight
in tonnes
2.07746
3.8295
1.5704
6.66974
2.46266
0.666
6.2816
2.49291
1.03873
0.79306
3.49888
1.1928
2.1868
5.9472
2.29614
2.78817
1.92004
2.1868
6.41034
2.84904
1.0934
0.994
1.1928
2.84904
1.31208
1.1928
1.31208
1.36675
0.98406
1.2425
1.31208
2.49291
5.6358
1.5655
1.20274
1.2425
1.94122
2.4353
1.94122
3.88244
1.81598
1.5407

26
27
28
29
30
31
32
33
34

Condensate fractionation
train 73, 74
Condensate fractionation
train 75, 76
Condensate fractionation
train 77
CISF Admin, Administration &
Training centre
Condensate fractionation
train 77
DPD train 51,52,53,54
Gas sweetening train no
31,32& 33
Control room
Gas sweetening train no 34,
35

14"

62

14"

58

14"

60

8"

122

16"
12"
16"

22
66
22

16"

44

12"

44

14"

44

35

Gas sweetening train no 36

14"

44

36

Gas sweetening train no 37,


38
GDU Train no 46 & 47

14"

44

16"
14"
8"
10"
8"
16"
14"
10"
8"
8"
8"

77
11
18
88
22
37
22
75
44
88
86

37

Flare Area

38

Process waste treatment


plant

39

Contaminated rain water


treatment plant

40
41

Slug Catcher
Control room

Note:- The Pipes sizes included here are from 30" to 8"

54.67
54.67
54.67

3.38954
3.17086
3.2802
4.0626

33.3
62.62
49.7
62.62
62.62
49.7
54.67
54.67

1.37764
3.2802
1.37764
2.75528
2.1868
2.40548
2.40548
2.40548

54.67
62.62
54.67
33.3
41.74
33.3
62.62
54.67
41.74
33.3
33.3
33.3

4.82174
0.60137
0.5994
3.67312
0.7326
2.31694
1.20274
3.1305
1.4652
2.9304
2.8638