You are on page 1of 8

Day Mo. Yr. Day Mo. Yr.

8 11 10 21 1 11
24 1 11 7 2 11
8 2 11 18 2 11
21 2 11 25 2 11
28 2 11 25 3 11
28 3 11 2 5 11
6 5 11 13 5 11
16 5 11 23 5 11
24 5 11 29 11 11
1 12 11 29 12 11
4 1 12 13 1 12
16 1 12 31 1 12
1 2 12 29 2 12
1 3 12 23 3 12
% (MAX)
MINIMUM
CREDIT HOURS
30%
25%
15%
LOG SHEET OF DIVERSIFIED TRAINING FOR ARCHITECTS LICENSURE EXAMINATION
SUMMARY
FIELD OF PRACTICE
ARCHITECTURAL DESIGNING/DRAFTING, STRUCTURAL CONCEPTUALIZATION,
PLANNING & THE LIKE
TOTAL NO. OF HOURS
ACCOMPLISHED
1252
976
836
A
B
C
balance/excess
100
16
260
460
400
528
TOTAL
10%
1152
960
576
384
PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATION WRITING, BILL OF
MATERIALS, COST ESTIMATES, GENERAL CONDITIONS, BIDDING DOCUMENTS,
CLERK OF WORKS AND THE LIKE
FIELD SUPERINTEDENCE, PROJECT MANAGEMENT ADMINISTRATION & THE
LIKE
ARCHITECTURAL LAY-OUTING OF MECHANICAL ELECTRICAL, ELECTRONIC,
SANITARY, PLUMBING, COMMUNICATIONS AND OTHER UTILITY SYSTEMS,
EQUIPMENT AND FIXTURES ARCH'L LIGTHING, ACOUSTICS AND ALLIED FIELD
OF PRACTICE
ARCHITECTURAL INTERIORS/SPACE PLANNING, RESTORATION/PRESERVATION
AND OTHER ANCILLARY SERVICES
Preparation of estimates, specifications and materials
Meeting with client and project approval
Application for building permit
Site Supervision
4452
TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES, PROJECT
PROMOTIONAL, PRE-DESIGN & THE LIKES
10%
10%
384
384
3840
Corresponding Number of hours of Described
Training (FOP)
PERIOD COVERED
D E
188
Final cost analysis of the project
FROM TO
A B C
Preparation of Architectural shop drawings
Consultation meeting with client
Application for occupancy
Architectural Interior detailing
PROJECT TITLE/DESCRIPTION & LOCATION
Project title: Ms. XX Residence
Location: Porac Pampanga
Conducted ar. Programming and feasibility
Schematic Design preparation
Consultation and presentation to client
Preparation of drawings for building permit
Architectural Interior space planning
44
36
100
380
92
24
68
48
48
D
E
F
TOTAL NO OF HOURS
192 232 380 280
32
24
0
16
144
76
Day Mo. Yr. Day Mo. Yr.
2 5 12 11 5 12
14 5 12 25 5 12
28 5 12 15 6 12
18 6 12 22 6 12
25 6 12 17 8 12
20 8 12 21 9 12
24 9 12 28 9 12
1 10 12 12 10 12
15 10 12 22 10 12
23 10 12 27 3 13
2 2 13 27 3 13
1 4 13 10 5 13
14 5 13 12 7 13
15 7 13 31 7 13
1 8 13 23 8 13
Day Mo. Yr. Day Mo. Yr.
26 8 13 30 8 13
2 9 13 6 9 13
16 9 13 20 9 13
23 9 13 30 9 13
1 10 13 15 11 13
18 11 13 29 11 13
2 12 13 20 12 13
PROJECT TITLE/DESCRIPTION & LOCATION
PERIOD COVERED Corresponding Number of hours of Described
Training (FOP) FROM TO
A B C D E
Project title: Dr. XYZ Residence
Location: Villa Teresa, Brgy. Sto Rosario, Angeles City
Site Inspection, data gathering and analysis 64
Schematic Design preparation and rendering 112
Conducted ar. Programming and feasibility 80
304
Consultation and presentation to client 40
Application for building permit 48
Preparation of estimates, specifications and materials 184
Preparation of Asbuilt plans 336
Architectural show drawings 228
Application for Occupancy 96
Architectural Interior Detailing
Preparation of Bid documents and contracts 80
Architectural Interior Planning
Preparation of drawings for building permit
PROJECT TITLE/DESCRIPTION & LOCATION
PERIOD COVERED Corresponding Number of hours of Described
Training (FOP) FROM TO
A B C
TOTAL NO OF HOURS
980 408 416 120 480
D E
Project title: ABC Medical Arts building Renovation
Location: Rizal St. Balibago Angeles City
Asbuilt drawing of plans 40
Site Inspection, data gathering and analysis 40
Layouting of Electrical, mechanical, Sanitary, plumbing 48
Schematic Design preparation and rendering 40
Preparation of Bid documents and contracts 80
Preparation of estimates, specifications and materials 256
Architectural Interior detailing and planning
336 40 0 48
Layouting of Electrical, mechanical, Sanitary, plumbing 480
Site Supervision 352
TOTAL NO OF HOURS
80
Prepared by:
Ar. Jan Philippe N. Cortes
Hope it will help! Cheers and good luck!
n 18
d 20
ja 15
LOG SHEET OF DIVERSIFIED TRAINING FOR ARCHITECTS LICENSURE EXAMINATION
SUMMARY
balance/excess
100
16
260
Corresponding Number of hours of Described
Training (FOP)
E
80
Total No.
of hours
80
48
76
68
F
92
24
24
380
48
32
212
44
36
100
53
156 1264 0
76
16
144
76
21
20
19
23 10 12 28 12
2 2 13 27 3
Corresponding Number of hours of Described
Training (FOP)
Total No.
of hours
E F
64
80
112
304
336
104 104
96
jan
feb
mar
80 80
80
40
60
Corresponding Number of hours of Described
Training (FOP)
Total No.
of hours
480 184 2588
E F
40
48 48
80
48 120 624
120 120
256
40
40
480
228
352
184
Layouting of Electrical, mechanical, Sanitary, plumbing
Site Supervision 480
48
12
13
760
480 480 480
352

You might also like