You are on page 1of 44

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.

se
Steam-fred LiBr
Absorption Chiller
Installation & Operation Manual
V5.1



Contents

Part 1 Working Conditions ............................................................................................................................. 1
Part 2 Working Principle and Cooling cycle .................................................................................................. 2
Part 3 Main Parts and Their Functions ........................................................................................................... 4
Part 4 Properties of LiBr Solution .................................................................................................................. 6
Part 5 Control System and Protections........................................................................................................... 8
Part 6 Installation of system ......................................................................................................................... 13
Part 7 Preparation and Operation ................................................................................................................. 16
Part 8 Operation Record and Management .................................................................................................. 23
Part 9 Troubleshooting ................................................................................................................................. 27
Part 10 Maintenance .................................................................................................................................... 31
Appendix 1Saturated water vapor temperature & pressure table ............................................................ 37
Appendix 2System diagram .................................................................................................................... 38
Appendix 3Solubility curve of LiBr solution .......................................................................................... 39
Appendix 4Users water system linkage diagram ................................................................................... 40
Appendix 5Control cabinet I/O terminals ............................................................................................... 41
Appendix 6Electrical principle diagram ................................................................................................. 42









Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se



1
Part 1 Working Conditions
Chilled water outlet temperature: 5
Cooling water inlet temperature: 1834
Chilled/Cooling water system pressure: 0.8MPa (except special orders)
Cooling water: Clean fresh water, with its quality complying with Table 8-1
Working steam: Saturated vapor with dryness fraction>99% and overheating
degree20C (except other vapors specified in the contract)
Power supply: 3 phase, 380V/50Hz
Machine room temperature: 5C40C
Machine room relative humidity: 85%
Machine room should be free of dust

Warning:
1. The chiller is a type of vacuum equipment and all valves on it have been
firmly sealed before shipment from factory. Any forms of modification to
these valves are prohibited, that may damage or even destroy the chiller.
2. The chiller should be stored at a place where it is protected from rain and
the relative humidity is not greater than 85%, otherwise the electrical
elements may be damaged.
3. The chiller should be unpacked only by our companys professional
commissioning personnel or properly trained individuals.
4. Do install a strainer (60-80 meshes) at the steam inlet.
5. Do install a check valve at the steam inlet.
6. The customers chilled water pump and cooling water pump are required to
be in linkage with the chiller, otherwise the freezing of tubes may occur.

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 1



2
Part 2 Working Principle and Cooling cycle

1. Working principle
Any liquid absorbs heat from its surroundings as it vaporizes. And the lower the
atmospheric pressure, the lower the vaporizing temperature. For example, water vaporizes at
100 under one atmospheric pressure, but under the 0.00891 atmospheric pressure, it
vaporizes at 5.
That is the basic working principle of a LiBr absorption chiller. Water (the refrigerant)
vaporizes in the high-vacuum absorber and absorbs heat from the water to be chilled. The
refrigerant vapor is then absorbed by the LiBr solution (the absorbent) and circulated by pumps
to keep the process going cyclically.
Fig.2-1 Working principle

2. Cooling cycle
The working principle of a steam-fired double-effect LiBr absorption chiller is shown as
Figure 2-1. The diluted solution from the absorber, pumped by the solution pump, passes the
low-temperature heat exchanger (LTHE), condensed water heat exchanger (CWHE) and
6 F
F5 4 F
F3
F2
1 F
1
2
3
4
5
6
7
8
5
4
8
7
6
3
2
1
Cooling water
out
Chilled
water out
Cooling
water in
Chilled
water in
Condenser
Low-temp
generator
Steam in
High-temp
generator
Evaporator Absorber
High-temp generator pressure
High-temp generator intermediate
solution temp
Automatic decrystallizing tube temp
Evaporator liquid level
Evaporation temp
Automatic purge device liquid level
Cooling water inlet temp
Cooling water inlet target flowmeter
Chilled water inlet temp
Chilled water inlet target flowmeter
Chilled water outlet temp
Chilled water outlet target flowmeter
F1 Main purge valve
F2 Ultimate vacuum purge valve
F3 Absorber purge changeover valve
F4 Refrigerant water sampling valve
F5 Solution sampling valve
F6 Refrigerant water regereration valve
Condensate out
Steam trap
Condensate heat
exchanger
Low-temp
heat exchanger
A
u
t
o
m
a
t
i
c

d
e
c
r
y
s
t
a
l
l
i
z
i
n
g
t
u
b
e
High-temp heat exchanger
A
u
t
o
m
a
t
i
c

p
u
r
g
e

d
e
v
i
c
e
Cooler
Vacuum
pump
Refrigerant
pump
Solution
pump
Oil
trap
Concentrated
solution
Intermediate
solution
Diluted solution
Chilled water Cooling water
Refrigerant water
Refrigerant vapor
Steam
Condensate
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 2



3
high-temperature heat exchanger (HTHE) and enters the high-temperature generator (HTG),
where it is boiled by the working steam flowing in the tubes to generate high-pressure,
high-temperature refrigerant vapor. The diluted solution turns into the intermediate solution.
The intermediate solution flows via HTHE into the low-temperature generator (LTG),
where it is heated by the refrigerant vapor from HTG to generate refrigerant vapor. The
intermediate solution becomes the concentrated solution.
The high-pressure, high-temperature refrigerant from HTG, after heating the intermediate
solution in LTG, condenses into refrigerant water. The refrigerant water then, together with the
refrigerant vapor from LTG, enters the condenser, where the mixture is cooled by the cooling
water and turns into refrigerant water.
The refrigerant water generated in the condenser passes through a U-pipe and enters the
evaporator. Part of the refrigerant water vaporizes due to the very low pressure in the
evaporator, while the majority of it is pumped by the refrigerant pump and sprayed on the
evaporator tube bundle. The refrigerant water sprayed on the tube bundle then absorbs the heat
from the water flowing in the tube bundle and vaporizes.
The concentrated solution from LTG flows via LTHE into the absorber and is sprayed on
the tube bundle. After being cooled by the water flowing in the tube bundle, the concentrated
solution absorbs the refrigerant vapor from the evaporator and becomes diluted solution. In this
way, the concentrated solution continuously absorbs the refrigerant vapor generated in the
evaporator, keeping the evaporation process continuing. In the meantime, the diluted solution is
transmitted by the solution pump to HTG, where it is boiled and concentrated again. Thus a
cooling cycle is completed and the cycle repeats.


Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 3



4
Part 3 Main Parts and Their Functions

The steam-fired double-effect LiBr absorption chiller mainly consists of the
high-temperature generator (HTG) (not available for single-effect models), low-temperature
generator (LTG), condenser, evaporator, absorber, high-temperature heat exchanger (HTHE)
(not available for single-effect models), low-temperature heat exchanger (LTHE), condensed
water heat exchanger (CWHE)automatic purge device, vacuum pump, solution pump,
refrigerant pump, electric valve, electric control cabinet, etc.

Table 3-1
S/N Part Name Function
1
HTG
Boils the solution with the working steam to generate the primary refrigerant
vapour which will enter LTG and concentrates the solution into the
intermediate solution which will flow to HTHE.
Working condition: absolute pressure700mmHg
solution temperature155C
2
LTG
Utilizes the primary refrigerant vapour to concentrate the intermediate
solution into concentrated solution. The primary refrigerant vapour changes
into refrigerant water and the secondary refrigerant vapour is created.
For a single-effect model, LTG evaporates the solution with the working
steam to generate the refrigerant vapour, and the solution becomes
concentrated solution.
Working condition: absolute pressure55mmHg
solution temperature90C
3 Condenser
Condenses the refrigerant vapour from LTG into refrigerant water and cools
down the primary refrigerant water from HTG, with the heat generated taken
away by the cooling water.
Working condition: absolute pressure55mmHg.
4 Evaporator
Evaporates the refrigerant water to cool down the chilled water.
Working condition: absolute pressure7mmHg
5 Absorber
Uses the concentrated solution to absorb the refrigerant vapour from the
evaporator, with the heat being taken away by the cooling water.
6
HTHE
Recovers heat from the intermediated solution in HTG, improving the
thermodynamic coefficient of the chiller.
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 4



5
7
LTHE
Recovers heat from the concentrated solution in LTG, improving the
thermodynamic coefficient of the chiller.
8
CWHE
Recovers heat from the condensate of the working steam in HTG, improving
the thermodynamic coefficient and lowering the steam consumption of the
chiller.
9
Automatic
purge device
They constitute the purge system which removes the non-condensable gas in
the chiller, guaranteeing the performance and extending the service life of the
chiller.
10 Vacuum pump
11
Refrigerant
pump
Circulates the refrigerant water, making it dispersed evenly on the heat
transfer tube bundle in the evaporator.
12 Solution pump Circulates the solution.
13
Electric valve
set
Regulates the input of working steam or cuts off the working steam
14
Electric control
cabinet
Accommodates components of the control system.











Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 5



6
Part 4 Properties of LiBr Solution

1. General properties
Lithium bromide (LiBr) is similar to sodium chloride (NaCl) in property. As a stable
substance, it is nonperishable, non-decomposable and nonvolatile in the atmosphere. Its
solution is a clear, transparent, and nontoxic liquid, which has a bitter taste and can cause slight
itching on the skin. LiBr solution becomes slight yellow after lithium chromate (Li
2
CrO
3
) is
added in, and remains clear with lithium molybdate (Li
2
MoO
4
). Avoid touching it directly with
skin, splashing it into eyes and tasting it.
The quality of the LiBr solution decides the chiller performance to a large extent.
Therefore, strict measures must be taken to control its quality, which should meet the following
standards:
Concentration: 500.5%
Alkalinity: pH 9.0~10.5
Li
2
CrO
3
content: 0.10.3% ( Li
2
MoO
4
content: 0.012~0.018%)
Maximum content of impurities:
ChlorideCl
-
: 0.05%
SulphateSO
4
-
: 0.02%
BromateBO
4
-
: non-reaction
AmmoniaNH
3
: 0.0001%
BariumBa: 0.001%
CalciumCa: 0.001%
MagnesiumMg: 0.001%
2. Solubility
The concentration of the saturated LiBr solution is about 60% at normal temperature. At a
given concentration, crystals separate out from the solution when the temperature drops. And at
a given temperature, crystals separate out when the concentration rises. Crystallization must
be avoided during the chillers operation and shutdown period. See Appendix 3 for the
solubility curve of LiBr solution.

3. Specific gravity
The specific gravity of LiBr solution is greater than that of water and is a function of the
concentration and temperature of the solution itself. So once the specific gravity and
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 6



7
temperature of the solution is measured, the concentration can be obtained.

4. Causticity
Though LiBr solution has little caustic effect on common metals under vacuum condition,
it causes severe corrosion with presence of an extremely little amount of oxygen within the
chiller. Therefore, preventing air leaking into the chiller is the fundamental measures for
anti-corrosion. Adding proper amount of Li
2
CrO
3
(Li
2
MoO
4
) in the LiBr solution and keeping
pH value at 9.0~10.5 also effectively reduces its caustic effect on metals.
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 7



8
Part 5 Control System and Protections

1. Components of control system
The control system of the chiller is composed of the PLC, touch screen, inverter,
temperature acquisition module, analog output module, liquid level controller, AC contactor,
thermal relay, intermediate relay, etc. Its peripheral input sensors include target flow switch,
liquid level electrode, platinum resistor, pressure switch, etc.

2. Functions of control system
S/N Function Description
1
Touch screen
operation
Easy and reliable touch operation compared to mechanical
contacts.
2
Human-machine
dialogue
Customers can change the parameter settings, correct the
measured values of parameters, learn how to operate and
maintain the chiller and have access to the memory through the
human-machine interface.
3 Clock display
Time can be displayed on the screen, including the year, month,
date, hour, minute, second and weekday.
4
Auto start/stop
The chiller can be automatically started or stopped at the
customer set time.
5 Information display
Information about the chiller operating status, parameter setting,
correction, etc. is displayed in different pages on the screen.
6
Real-time test and
display
Parameters such as temperature, flow and liquid level are
monitored and displayed in real-time mode.
7 Password protection
Three-level password protection system (power-on password,
parameter correction password and parameter setting password)
prevents unauthorized operations.
8 Auto load-adjusting
When the load varies, the steam input and circulating solution
amount are automatically controled, making the chiller operating
at the best status.
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 8



9
9
Solution pump
inverter control
The solution pump is controlled by an inverter, ensuring
optimum circulating amount of the solution and optimum liquid
level in HTG.
10
Interlock control
system
The chilled water pump, cooling water pump and cooling tower
fan are automatically started or stopped according to the
operating condition, thus realizing automatic control throughout
the air conditioning system.
11
Fault protection and
alarm
Once a fault occurs in the water system or the chiller itself, the
degree of the fault is automatically identified, an alarm is given
and corresponding protective measures are taken.
12 Self-diagnosis
Faults are automatically diagnosed. Their location, cause and
remedy are suggested.
13 Fault record
Information about faults, such as occurring time and type, is
stored automatically.
14
Remote control
(extended function)
Control and monitoring of the chiller can be conducted from a
remote place and or via a DCS/PLC system.
15
Telephone
networking
(extended function)
Various data can be transmitted via the telephone network. Our
company can learn about the operation status of customers units
at any place by telephone, thus achieving active after-sale
service.
16
Building interface
(extended function)
Reserved interface, used for linking with the building control
center.

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 9



10
3. Operation sequence of the AI (artificial intelligence) system





















Close air switch K1

Close air switch K2

Input power-on password

Function selection menu

Chiller function selection

Operation mode selection

Auxiliary function selection

C
o
o
l
i
n
g

A
u
t
o

r
u
n

M
a
n
u
a
l

r
u
n

T
i
m
e
d

o
p
e
r
a
t
i
o
n

R
e
m
o
t
e

c
o
n
t
r
o
l

C
o
n
t
r
o
l

p
a
r
a
m
e
t
e
r

c
o
r
r
e
c
t
i
o
n

C
o
n
t
r
o
l

p
a
r
a
m
e
t
e
r

s
e
t
t
i
n
g

F
a
u
l
t

m
a
n
a
g
e
m
e
n
t

S
y
s
t
e
m

f
u
n
c
t
i
o
n

O
p
e
r
a
t
i
o
n

r
e
c
o
r
d

r
e
t
r
i
e
v
a
l

Auto run (cooling)

Cooling + auto run

Manual run (cooling)

Cooling + manual run

Timed operation (cooling)

Cooling + timed operation

Remote control (cooling)

Cooling + remote control

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 10



11
4. Safety protection functions























Note: A single-effect absorption chiller doesnt have the long-time low liquid level fault in
HTG, high-pressure fault in HTG and false liquid level fault in HTG.
Power supply phase loss or phase reversed
Solution pump or inverter fault
Long-time low liquid level fault in HTG
High-pressure fault in HTG
Low-temp fault of chilled water
Stop of chilled water supply
Chilled water flow sensor fault
Stop of cooling water supply
Cooling water flow sensor fault
Refrigerant pump fault
False liquid level fault in HTG
High-temp fault in HTG
Evaporation low-temp fault
Cooling water high-temp fault
Cooling water low-temp fault
De-crystallizing tube high-temp fault
Chilled water inlet-outlet temp difference
overlarge fault
Chilled water inlet temp sensor fault
Chilled water outlet temp sensor fault
Evaporating temp sensor fault
Cooling water temp sensor fault
HTG temp sensor fault
De-crystallizing tube temp sensor fault

Vacuum pump fault
Chiller stops, with alarm
If faults occur during
auto/manual run, the chiller
switches to dilution
operation, with alarm
This function doesnt affect
the control of the chiller.
If faults occur during auto
run, the chiller switches to
dilution operation. If faults
occur during manual run,
these functions dont affect
the control of the chiller. In
both cases, alarm is given
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 11



12
5. Main parameter settings
AI system is an intelligent control system, which collects the real-time operating data about
the customer system and the chiller itself and adjusts the steam input and the circulating
amount of the solution based on the data. The default settings of the parameters listed below
may be reset by users as required.
Table 5-1
S/N Parameter name Default setting Setting range
1 Cooling water outlet temp 7C 620C
2
Temp difference between cooling water
inlet and outlet temp
5C 510C
3 HTG temp(cooling)
160C (98C for
singe-effect models)
145~160C (90~101C for
singe-effect models)
4 Pressure of pressure controller 0.02MPa Change prohibited
5 Inverter highest operating frequency 50Hz
40 50Hz (non-settable for
certain models)
6 Power-on password 1 09999
7 Parameter setting password **** 09999
8 Parameter correction password **** 09999
Parameter setting procedure
Input the power-on password and parameter setting password, enter the parameter
setting menu and set the parameter.
For safe operation purpose, parameters should be set by professional technicians!

6. Grounding requirement
To ensure safe and reliable operation of the chiller, the chiller is required to have a special
ground pole with the grounding resistance not greater than 10. The grounding terminals of
the chillers electrical devices should be securely connected to this pole. Without a special
ground pole (or a neutral line), the chiller may be damaged and people be injured.
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 12



13
Part 6 Installation of system

1. Machine room
Try to select a machine room which is close to the steam source and to where the
chilled water is used.
The machine room should have enough brightness and good ventilation with the
relative humidity less than 85%. In case the chiller is installed outside the room, the
electrical devices and measuring instruments should be protected from moisture, rain,
sunshine, etc.
Sufficient space should be reserved around the chiller for maintenance: 1m in the
lengthwise direction, 0.2m above the chiller, 1.2m on the control cabinet side and
0.5m on other sides. And on either end of the chiller, a tube-drawing apace, not less
than the distance between the two tube sheets, should be kept so that the heat transfer
tubes can be drawn out.
The machine room should be equipped with necessary devices like electric outlets and
water taps. And there should be drains around the chiller.

2. Placement of chiller
Since the LiBr absorption chiller runs stably
with slight vibration, its foundation may be
designed according to its static load (i.e. operating
weight)
After putting the chiller in place, calibrate the
chiller horizontally with the help of the 4 basic
holes in the two tube sheets. The error of the level
degree should not be greater than 0.002. The level
degree can be regulated through the cushion block
located between the foundation and the support of
the chiller and can be measured with a gradient or a
transparent plastic connecting pipe.

Basic holes
W
a
t
e
r
-
f
i
l
l
e
d

p
l
a
s
t
i
c

p
i
p
e

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 13



14
3. Piping
Flexible connectors and manometers should be mounted at the inlets/outlets of the chilled
water and cooling water. If the dryness of the working steam is less than 0.90, a steam-water
separator should be mounted. At the inlets of chilled and cooling water there should be
strainers with 3-6mm meshes, or the cooling capacity may decrease and frozen tubes may
occur. And at the inlet of the working steam, there should be a strainer with 60-80 meshes,
otherwise failure in the electric valve may occur.
The steam piping is suggested as below:

In certain cases the steam supply cannot be cut off suddenly, for it may affect the
production process or the system. In such cases, replace the motorized two-way valve with a
three-way valve (as shown below).

4. Steam condensate piping
The pressure of the steam condensate usually stands at 0.05MPa. If the condensate cannot
return to the boiler room by itself, install a condensate tank at the condensate exit and then
Steam
Steam piping diagram(for reference)
Strainer
(80-100 meshes)
Strainer
(80-100 meshes)
Cut-off
valve
Cut-off
valve
Cut-off
valve
Pressure
reducing
valve
Electric
valve
Pipe
reducer
HTG end
enclosure
Steam
Cut-off
valve
Cut-off
valve
Cut-off
valve
Strainer
(80-100 meshes)
Strainer
(80-100
meshes)
Pressure
reducing
valve
Electric
valve
Pipe
reducer
HTG end
enclosure
to cooling equipment
when the chiller stops
3-way steam valve piping diagram(for reference)
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 14



15
pump the condensate to the boiler room. The condensate tank should be lower than lowest
place of HTG. The weight of all external pipes connected to the chiller must be carried by
the chiller!
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 15



16
Part 7 Preparation and Operation
1. Preparation for initial start
Preparation of instruments and tools:
Hand tools
Absolute pressure gauge
Digital multi-meter
Liquid-charging flexible pipe: diameter 1 inch25mmlength 6m.
Densi-meter and mercury thermometer
Check of jobsite piping
Check the chilled/cooling water pipes according to the Piping system diagram
Check if the inlets/outlets of the water system, water pumps and cooling tower are
misconnected;
Check if there is a discharge valve on each pipeline;
Check if there is leakage at flanged connections;
Make sure the chilled/cooling water flow rate meets the operation requirement and
check the pressure borne by the chiller water system;
A hand-operated cut-off valve and pressure reducing valve should be installed on the
steam pipe;
Check if a drain valve has been installed at the lowest site of both the steam pipe and
the steam condensate pipe.
Check of purge system
Check if the vacuum pump oil brand number is correct;
Check if the vacuum pump oil has been emulsified and the oil level is in the middle of
the sight glass;
Check the ultimate vacuum of the vacuum pump: close the main purge valve F1, start
the vacuum pump and pump the oil trap only. Connect a McLeod vacuum gauge to the
ultimate vacuum purge valve F2, start the vacuum pump and let it run for 3-5 minutes.
If the reading on the McLeod vacuum gauge is consistent with the ultimate vacuum of
the pump, that indicates the vacuum pump is excellent in performance.
Check of wiring
All system equipment is required to be checked.
Check if the wiring complies with the Wiring diagram and meets the requirement.
Check if the power supply for the cooling tower fan/chilled water pump/cooling water
pump is correctly connected.
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 16



17
Check if the voltage and frequency of the power supply match the motor nameplate
parameters and meet the requirements of the control system.
Check the permitted overload capacity and fuse size of each motor.
Check if all electrical devices have been earthed as required.
During operation, check if all motors lubrication, power supply and rotation direction
are normal.

Do not start the solution pump or refrigerant pump before the LiBr solution is fully
charged into the chiller. Otherwise, the pump will be seriously damaged.

Charging of LiBr solution
The LiBr solution is generally a 50% mixed solution, in which 0.2% lithium chromate (or
0.015% lithium molybdate) has been added as a corrosion inhibitor. The pH value of the
solution has been adjusted within the range of 9~10.5. It is recommended to recheck the
solution and take a sample and reserve the sample prior to the charging.
Charging principle
The solution is sucked into the absorber by the high vacuum in the chiller sucks via the
sampling valve (F5) located at the solution pump outlet.
Attention points
a) Do not start the solution pump while charging the solution.
b) Do not charge the solution directly from a small container into the chiller. That may
bring air into the chiller.
c) When the charging begins, start the vacuum pump to
remove non-condensable gases out of the chiller.
Charging method
Prepare a solution container (made of corrosion
resistant material), pour the solution in it(if solution is turbid
or dirty, filter it first), and connect as the figure on the right.
Fill the flexible pipe with solution to keep air out. Connect
one end of the pipe with the sampling valve, and dip the other end in the container. Notice:
keep the flexible pipe filled with water to prevent air entering; and the end dipped in the
container should be at least 30mm away from the bottom of the container lest the deposits and
impurities flow into the chiller with the solution.
Charging amount
Refer to the nominal parameter table for the charging amount of the solution. Whether


Flexible pipe
Solution
container
Sampling valve
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 17



18
the amount is appropriate can be judged by observing if it meets the circulating requirement of
the chiller under the standard operation condition.

2. Operation of the chiller
Manual run screen















Manual run procedure
a) Start the chilled water pump and open its discharge valve, and regulate the flow rate to
the rated valve;
b) Start the cooling water pump and open its discharge valve, and regulate the flow rate to
the rated value;
c) Open the hand-operated steam valve and condensate drain valve, drain the condensate
water in the steam supply pipe, and regulated the steam pressure to the rated value.
d) Turn on the power switch in the control cabinet. The start-up menu is displayed on the
touch screen. Press Power-on password key, input the pre-set power-on password,
press Confirmation and then enter the Manual run menu following the prompts on
the screen;
e) Press Chilled water pump, Cooling water pump, Solution pump and Refrigerant
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 18



19
pump keys(highlighted after pressed) in sequence. Start the electric valve slowly. The
chiller enters normal operation. When the screen indicates that the cooling water inlet
temperature is equal to or greater than 30, start the cooling tower.
f) Stop procedure: Close all valves first. The chiller starts the dilution operation. Wait until
the temperature of the solution at the HTG exit drops below 80, stop the Solution
pump, Refrigerant pump, Cooling water pump and Chilled water pump in
sequence. Press Back key in the upper right corner of the screen returning to the
start-up menu, then switch off the control power supply.

Function of other touch keys
Vacuum pumpUsed to start the vacuum pump
Alarm silenceUsed to eliminate the fault warning sound temporarily
Solution pump frequencyUsed to display the frequency of the current voltage
HTG levelUsed to display the HTG liquid level, which can be regulated by changing
the frequency of the inverter
Right part of screen: Used to display main operating parameters
Manual run of the chiller is only for commissioning and must be performed by
professional personnel!
To prevent the heat transfer tubes in the evaporator from being frozen due to stop of
cooling water flow, observe the following items:
Confirm that the target flow switch works normally before starting the chiller.
When starting the chiller, start the chilled water pump (and confirm it has run)
first and then the cooling water pump.
After dilution and shutdown, stop the cooling water pump first and then the
chilled water pump.

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 19



20

Auto run screen















Auto run procedure
a) Enter the function selection menu and select Auto run.
b) Press the Auto start key. The chilled water pump, cooling water pump, solution pump,
electric valve and refrigerant pump are started in sequence. If any fault occurs, the
chiller begins dilution operation and gives an alarm and the screen automatically
switches to the fault management menu, which provides information about the fault and
its treatment.
c) Stop procedure: Press the Auto stop key and the chiller begins the dilution operation.
Once the HTG temperature drops to the pre-set value, the chiller stops automatically.
Then stop the cooling water pump, and two minutes later stop the chilled water pump
and turn off the power supply to the chillerwhen the chilled water pump and cooling
water pump are not interlocked with the chiller.
Note: Solution pump, Refrigerant pump, Electric valve, Chilled water pump, Cooling
water pump, and Cooling tower are used only for display. They cannot be operated.

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 20



21
The frequency of the solution pump has been set in the factory, no people other than
professional technicians is permitted to modify it!
Close the steam cut-off valve first after the chiller is stopped (whether automatically
or manually), otherwise hazardous faults such as crystallization in HTG or high pressure
may occur.

5. Purging
In cooling cycle
In cooling operation, purge valves 1 and 2 are closed.
When the liquid level in the gas tank falls below the
sight glass or the control cabinet operation panel requires,
the vacuum pump should be started for purging. Purging
steps are:
1) Start the vacuum pump and keep it running for about
half a minute;
2) Open valve 1 and pump for at least three minutes;
3) Open valve 2 and keep pumping until the cooling
effect recovers;
4) Close valve 1 first and then valve 2;
5) Let the vacuum pump run for another half an hour,
and then stop it.

Attention: If valve 2 is not closed, non-condensable gases in the gas tank will return to
the inside of the chiller through it.

In shutdown period
During a long period of shutdown, the purging should be performed once every month,
each time for about one hour. The method is: start the vacuum pump and open valves 1 and 2.
After purging, close valve 1 first and then stop the vacuum pump and close valve 2, otherwise
the vacuum pump oil will be pumped into the chiller and degrade the cooling performance
greatly.

T

he

chiller

must be kept highly airtight and

the air in it

must be

pumped out timely,

Purge valve 1
Purge valve 2
Sight glass

Vacuum
pump
G
a
s

t
a
k
n

S
o
l
u
t
i
o
n

i
n

Oil
trap
Ejector
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 21



22
otherwis

e the life of the

chiller

will be shortened and the energy consumption increased


dramatically



Replacement of diaphragms
1) The diaphragms of valves 1 and 2 must be replaced every 3 years.
2) Other valve diaphragms must be replaced every 5 years.

Maintenance of the vacuum pump
1) If a water layer emerges at the bottom of the vacuum pump oil, drain it out slowly.
During the pumping of the vacuum pump, the gas ballast valve on it should be left
open so that the water vapor can be removed out of the pump.
2) If the vacuum pump oil is emulsified and turns white, replace it.

Secondary seal for the vacuum valve
Sealing rings wear out due to the rotation of the valve shaft, which in turn will cause gas
leakage; therefore, great attention should be paid to the secondary seal.
1) Remove the oil stains, scrap iron and sealant residues on the valve cap screw thread,
valve body screw thread and O-rings with a steel brush;
2) Spray Letai detergent on them, brush again and dry them;
3) Spread a layer of Letai 567 sealant for pipe thread;
4) Tighten the valve cap with a spanner to secure the seal.
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 22



23
Part 8 Operation Record and Management
1. Operation record form
The operation record is an important document to track the operation status of the chiller.
It is usually recorded at an interval of 1 to 2 hours, which may be longer or shorter as
required.

Operation Record Form for Steam-fired Chillers
Model or S/N Date Recorder
Recording items Time
Unit

Evaporator Chilled water
inlet temp


Chilled water
outlet temp


Evaporation
temp


Chilled water
inlet pressure
MPa
Chilled water
outlet pressure
MPa
Chilled water
flowrate
m
3
/h
HTG Steam
consumption
Kg/h
Steam temp


Steam pressure kPa
Solution temp at
HTG outlet


Condensate
discharge temp


HTHE Intermediate
solution outlet
temp


Diluted solution
outlet temp


LTHE Diluted solution
inlet temp


Concentrated
solution inlet
temp


Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 23



24
Concentrated
solution outlet
temp


Absorber Cooling water
inlet temp


Cooling water
outlet temp


Cooling water
inlet pressure
MPa
Cooling water
flowrate
m
3
/h
Condenser Cooling water
outlet temp


Cooling water
outlet pressure
MPa
Note

2. Operation management
Management of solution
In the initial stage of the operation of the chiller, the content of lithium chromate (or
lithium molybdate) in the solution would decrease due to the generation of the protective film.
And if there is rust or air in the chiller, even an extremely little amount, will lead to chemical
reactions, which in turn will raise the pH value of the solution and even accelerate corrosion of
the chiller. Therefore, the solution should be sampled to check the content of lithium chromate
(or lithium molybdate), iron ion, copper ion, chlorine ion, etc. as well as the pH value of the
solution after the chiller has run for a period of time.
If the content of lithium chromate (or lithium molybdate) drops below 0.1% (or 0.012%),
add some more in time. And the pH value should be kept between 9.0 and 10.5. If its too high,
adjust it with hydro bromic acid (HBr); if its too low, adjust it with lithium hydroxide ( LiOH).

Management of refrigerant water
If the specific weight of the refrigerant water is greater than 1.0 during the running of the
chiler, which means the refrigerant water contains lithium bromide. This is also called
Polluted refrigerant water, which will lower the cooling capacity. The refrigerant water is
usually regarded normal when its specific weight is less than 1.02, otherwise it must be
regenerated and the cause of the pollution be analyzed to prevent its recurrence.
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 24



25
Regeneration of the refrigerant water is as follows:
1) Start the refrigerant pump and open the regeneration valve F3, pumping the
refrigerant water in the evaporator into the absorber via a by-pass.
2) Close F3 and stop the refrigerant pump;
3) When the solution has been concentrated and the refrigerant water has condensed on
the evaporator to a certain amount, restart the refrigerant pump.

Replenishment of octanol
Octanol is insoluble in the solution. After the chiller has run for some time, part of octanol
will float on the surface of the refrigerant water and the solution. And since octanol is a volatile
substance, the running of the vacuum pump will bring some octanol out of the chiller, thus
reducing its circulating amount and affecting the chillers performance. Therefore, octanol
should be replenished as required.
The method for charging octanol is similar to that for the solution. Remember to start the
vacuum pump after the charging to remove the air that might leak into the chiller during the
charging.

Management of water quality
The performance and life span of the chiller depend largely upon the quality of the cooling
water. Water of poor quality is easy to scale on the wall of heat transfer tubes, reducing the
cooling capacity.
The water used in the LiBr absorption chiller should comply with the requirements shown
in Table 8-1. If the water is too hard, soften it before using it.
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 25



26

Table 8-1 Water quality standard
Item Unit
Quality of cooling water Quality
standard for
recharged
water
Standard
value
Tendency
Corrosion Scaling
PH25 6.58.0 + + 6.58.0
Conductivity(25 microhm/cm <800 + <200
Cl
-
mg/L <200 + <50
SO
4
-
mg/L <200 + <50
Total Fe mg/L <1.0 + + <0.3
Acid
consumption
mg/L(CaCO
3
)
<100 + <50
Total hardness mg/L(CaCO
3
) <200 + <50
S
-
mg/L Undetectable + Undetectable
NH
4
-

mg/L <1.0 + Undetectable
SiO
2
mg/L <50 + <30
Management of vacuum pump
Before starting the vacuum pump, check its oil level, which should be above the red
oil line.
During pumping, open the gas ballast valve so that to discharge water vapor and
reduce its condensation in the vacuum pump, thus minimizing the emulsification of
the vacuum pump oil and improving the pumping performance.
After each pumping, let the vacuum pump running for 30 minutes without load in
order to expel the water contained in the vacuum pump oil, ensuring the life span of
the vacuum pump.
Check the status of the vacuum pump oil regularly. If a water layer emerges under
the oil, open the oil drain valve and discharge the water slowly. The drained mixture
of water and oil, after deposition, separates into two layers.
If the vacuum pump oil is emulsified and turns white, replace it with fresh oil.
Vacuum pump oil belongs to consumption products; prepare sufficient amount (no
less than 4kg) for spare use.

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 26



27
Part 9 Troubleshooting

1. Crystallization
During cooling cycle, when crystallization occurs in the concentrated solution in LTHE or
pipes, the temperature of the automatic de-crystallizing tube will rise and an alarm will be
given, while the temperature of the concentrated solution pipe leading to the absorber fall
dramatically.
Remedy
Stop the cooling water pump and chilled water pump, and close the steam cut-off
valve to 40%. Now the high-temperature concentrated solution coming out of LTG
flows directly into the absorber via the de-crystallizing tube and heats the diluted
solution in the absorber. The heated diluted solution then enters LTHE, heats the
concentrated solution there and melts the crystals.
For crystals in pipes, melt them by heating them directly with steam,
high-temperature water or flames.

2. Refrigerant water pollution
In cooling operation, the phenomenon of LiBr solution mixing into the refrigerant water is
referred to as refrigerant water pollution.
Severe pollution will result in a great drop in chiller performance or even operation failure.
The refrigerant water should be regenerated if its density exceeds 1.02.
Regenerating method
With the refrigerant pump running, open the refrigerant water by-pass valve,
diverting the polluted refrigerant water in the evaporator to the absorber.
Causes of refrigerant water pollution
Circulating solution amount is too large and the liquid level in the generator is too
high.
At the beginning of the chiller operation, the pressure of the solution vapor rises too
fast, causing the solution in the generator to boil too violently and enter the
condenser.
The cooling water temperature is too low.
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 27



28
3. Common faults and remedies (see Table 9-1)
Table 9-1
S/N Faults Possible causes Remedies
1
Chiller cant
be started
aNo power is connected to the
control cabinet
bFuse in the control cabinet
blows
aCheck the main power supply and
control switch
bCheck the grounding wiring or short
circuits, and replace the fuse
2
Cooling
capacity lower
than the set
point
a Poor sealing causes air
leakage into the chiller
b Refrigerant water is
polluted
c Circulating amount of the
diluted solution is too small
d Vacuum pump is poor in
pumping performance
e Spraying device is blocked
f Scaling or clogging of heat
transfer tubes
g Cooling water temp is too
high
h Cooling water flow rate is
too small
i Vapor pressure is too low
a Start the vacuum pump to pump air
out and eliminate the leakage
b Examine the density of refrigerant
water. If it is over 1.02, regenerate it
c Increase the frequency of the
inverter
d Test the vacuum pumps
performance and repair the fault
e Clean or replace spraying device
f Eliminate scales and impurities on
the inside wall of heat transfer tubes
g Regulate the cooling tower and
check the cooling water system
h Raise the cooling water flow rate
i Increase the vapor pressure
3
Chilled water
outlet temp is
too high
a External load is greater
than the chillers cooling
capacity
b Cooling water flow rate is
too small or its temp is too
high
c Set point of the chilled
water is too high
d The amount of octanol
decreases
e There are non-condensable
gases in the chiller
a Decrease external load
b Increase the cooling water flow rate
or decrease its temp
c Reset the set point of the chilled
water temp
d Add octanol
e Start the vacuum pump to pump out
non-condensable gases
4
Refrigerant
water is
polluted
a Circulating amount of the
solution sent to HTG is too
large and liquid level in
HTG is too high
b Cooling water temp is too
low and cooling water
amount is too large
a Regulate the frequency of the
inverter
b Decrease the amount of the cooling
water

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 28



29
5
Crystallization
in LTHE
a Cooling water temp is too
low
b Circulating amount of the
solution sent to HTG is too
small
a Increase the cooling water temp and
decrease its flow rate moderately
b Increase the circulating amount of
the solution which is sent to HTG
6
Crystallization
of solution
after shutdown
a Dilution time is too short
b Chillers ambient temp is
too low
a Increase the dilution time,
guaranteeing full mixture of the
solution
b Add refrigerant water to dilute the
solution, preventing it from
crystalizing
7
Cavitation
erosion in
solution pump
a Insufficient solution
amount
b Crystallization of solution
a Add solution
b Melt crystals
8
Purge system
runs
abnormally
Incorrect operation of purge
valves
Check if the valves are correctly opened
or closed, or tightened.
9
Vacuum degree
drops
Leakage
Check to see if valves or instruments
connected directly to atmosphere are
loose, or valve diaphragms become aged


4. Treatment for action of safety devices
During operating, the chiller will stop automatically and give an alarm if any failure
occurs and the safety protection level has been reached. Remedies for the action of safety
devices are listed in Table 9-2 below.

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 29



30
Table 9-2 Remedies for action of safety devices


S/N Location of action Remedies
1
Cooling/chilled
water flow switch
operates
a Check to see if the operation of water pumps is normal.
b Check to see if pressure is normal and if air enters water system.
Discharge air if air enters water system.
c Check to see if valves are open and open them wider.
d Check to see if filters are clogged.
2
Cooling/refrigerant
water temp over
load alarm
a Check to see if external load is lower than the cooling capacity
adjusting range.
b Check to see if cooling water temperature is too low.
3
HTG pressure
switch operates
a Check the airtightness of the chiller, seeing if the purge system
operates normally, and if there is any leakage.
b Check to see if vapor pressure is too high.
c Check to see if the cooling water flow rate is too small.
d Check to see if scaling occurs in the absorber/condenser heat
transfer tubes.
4
HTG low liquid
level alarm
a Check to see if the level control electrode is sensitive.
b Check to see if the solution pump runs normally.
c Check to see if the liquid level is normal.
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 30



31
Part 10 Maintenance

1. Maintenance during short-term shutdown
During short-term shutdown(less than two weeks), the chiller should be maintained as
follows:
Keep a high vacuum degree in the chiller. If air enters the chiller, pump it out timely.
Track the temperature change to prevent crystallization.
During dilution before shutdown, transfer all refrigerant water in the evaporator to
the absorber via the by-pass valve, ensuring full dilution of the solution.
When doing repairs during shutdown period, such as replacing the canned pump or
valves, avoid exposing the inside of the chiller to the atmosphere for a long time. So
conduct the repair quickly, otherwise the chiller may be eroded.

2. Maintenance during long-term shutdown
Great attention should be paid to the long-term shutdown maintenance in order to ensure
the chillers high performance and long life. The maintenance work includes:
Preventing air leaking into the chiller and causing corrosion
Vacuum method: Start the vacuum pump regularly (every 15-30 days) to pump out
air which has leaked into the chiller.
Nitrogen method: Charge high-purity nitrogen gas (99.999%) into the chiller
until the pressure reaches 0.02MPa. Before charging, purge the valve and rubber
tube with the nitrogen gas to prevent air entering the chiller.
For both methods, the diaphragm valves should be sealed lest it should be opened
by accident!
Preventing crystallization
During the dilution operation prior to shutdown, transfer all refrigerant water in
the evaporator to the absorber via the by-pass valve, allowing solution coming
from different parts of the chiller to mix fully and preventing crystallization.
Cleaning heat transfer tubes and water system
Open the water chambers of the absorber, condenser and evaporator, check heat
transfer tubes, and remove residues in water chambers and heat transfer tubes.
If there is scale in the tubes, chemical methods may be used to remove it. The
81-A acidic cleaning agent produced by Shanghai No.2 Reagent Factory is
recommended. The cleaning process is as follows: make the cleaning agent into a
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 31



32
5-10% solution, heat it to 50-60 and circulate it through the transfer tubes. It
normally takes about 18 hours to eliminate 1mm-thick scale. After the cleaning,
drain the cleaning agent, charge 0.5-1% solution of trisodium phosphate (Na
3
PO
4
)
or sodium carbonate (Na
2
CO
3
) into the tubes and circulate it to neutralize the
acidic solution left in the tubes.
Preventing oxygen corrosion and icing
After cleaning up heat transfer tubes and water system,
If icing is impossible, the water system should be fully charged with water to
prevent oxygen corrosion in water chambers of the absorber, condenser and
evaporator.
If icing is possible, drain heat transfer tubes and water system and dry them to
avoid frozen tubes and reduces oxygen corrosion.
Check and replace failed parts
Such as the graphite bearing of the canned pump, valve sealing rings,
diaphragms of diaphragm valves, auto-control components and spring for the
rotary vanes of the vacuum pump.
While replacing the parts of the vacuum system, avoid exposing the inside of the
chiller to the atmosphere for a long time.
All electrical equipment and instruments should be protected against moisture.
3. Treatment of LiBr solution
If LiBr solution becomes turbid and turns dark red, black or green, it must be treated.
There are two methods to treat the solution
Deposition method: put the LiBr solution in a large container, after a certain period
of time, the deposits will settle on the bottom of the container and the solution will
become clear again. Extract the upper clean solution and reuse it.
Filtering method: use a strainer made of propylene, with its meshes being 3mm in
diameter, to filter the solution. While filtering solution containing deposits, it is
recommended to filter it after it has been deposited for 1 or 2 days. Do not use a
strainer made of cotton fiber.
Then measure the content of lithium chromate (or lithium molybdate) and pH value, and
adjust them to the specified values.

4Regular check
The chiller should be checked periodically, during both operation period and shutdown
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 32



33
period, to maintain its good performance and safety running. The check items are listed in the
following table.

Table 10-1 Regular check items
Items Check points
Check cycle
daily weekly monthly yearly
Vacuum pump
a) Pollution and emulsification of oil
b) Performance of vacuum pump
c) Insulation of motor
Solution pump
& refrigerant
pump
a) Operating status of the chiller. Check to see If
there is any unusual noise

b) If power supply to motor exceeds the normal
value

c) Insulation of motor
d) Dismantlement and check of vanes; cleaning
of return pipes

Every
about 5
years
e) Replacement of graphite bearing

Every 5
years
LiBr solution
a) Concentration
b) Cleanness degree
c) pH value and lithium chromate(or lithium
molybdate) concentration

Refrigerant
water
Check its pollution condition and decide whether
to regenerate it

Heat transfer
tubes
a) Corrosion of inner wall
b) Scaling on inner wall
Sealing of
chiller
a) Change of temperature difference between
diluted solution and cooling water; change of
cooling effect

b) Record of pressure changes during shutdown
period

Diaphragm
valves and
solution
adjusting valves
a) Sealing condition
b) Replacement of diaphragms of valves 1 and 2
Every 3
years
c) Replacement of diaphragms of other
diaphragm valves

Every 5
years
d) Replacement of the O-ring of the changeover
valve

Every 5
years
Pressure gauge
and control
cabinet
a) Calibration of indication
b) Insulation of electrical devices
c) Reliability of switches for electrical devices
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 33



34
Operation Rules
(Double-effect steam-fired LiBr absorption chiller)

1. Machine room management rule
(1) The operators must observe this rule to ensure safe running of the chiller.
(2) There should be strict management regulation and shift regulation for the machine room.
(3) There should be personnel on duty in the machine room during running of the chiller.
(4) No one other than qualified persons is allowed to operate the chiller alone.
(5) No one other than the operators is allowed to enter the machine room without permission.
(6) No one other than machine room staff is allowed to open or close any valve or other
components of the chiller, otherwise accident may occur.
(7) The machine room should have excellent ventilation and the relative humidity in it should
be controlled below 75%.
(8) The power supply in the machine room should be normal with stable voltage.
(9) The machine room should have sufficient high-purity (99.999%) nitrogen gas and
common tools, materials and spare parts which are necessary for the maintenance of the
chiller and system.

2. Safe operation rule
(1) It is prohibited to change safety protection parameters. For example, the set point of the
HTG temperature (cooling) is 160.
(2) It is prohibited to adjust safety devices. For example, the set point of the pressure
controller is 0.02MPa.
(3) It is prohibited to start the chiller if there is any abnormality with safety protection
functions.
(4) It is prohibited to start the chiller if there is any abnormality with the target flow regulator
for chilled water.
(5) It is prohibited to start the chiller if there is any leakage.
(6) It is prohibited to start the cooling water pump first and then start the chilled water pump.
(7) It is prohibited to stop the chilled water pump first and then stop the cooling water pump.
When the cooling water temperature is low (25), the chilled water pump must be
stopped two to five minutes after the cooling water pump has been stopped.
(8) It is prohibited to start the chiller if the chiller is obviously vibrated by the piping system.

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 34



35
3. Chiller operation rule
Check the following items each time before starting the chiller
(1) Confirm that the valves at the chilled/cooling water inlet/outlet are open.
(2) Confirm that the safety protection parameters are properly set and select Auto
operation mode on the touch screen.
(3) Safety devices should work normally, particularly when the flow rate of chilled or
cooling water is lower than the specified value, an alarm can be given, the working
steam be cut off, and the chiller be stopped automatically.
Start sequence
(1) Start the chilled water pump first, observe its inlet-outlet pressure difference, and
confirm that the water flow rate meets the operation requirement.
(2) Start the cooling water pump.
(3) Open the by-pass valve for the vapor condensate, and close it after the condensate
water in the pipe has been drain. Then open the vapor cut-off valve.
(4) Press the Auto key.
(5) Start the cooling tower fan when the cooling water inlet temperature reaches 30 (if
the system adopts interlock control, the cooling tower fan will start automatically).
Stop sequence
(1) Press the Stop key and manually close the vapor cut-off valve.
(2) Switch off the power after the automatic dilution process ends.
(3) Stop the cooling tower fan and cooling water pump.
(4) Finally, stop the chilled water pump.
Operation monitoring
(1) Make detailed operation records which are used for the analysis of the chiller
operation condition.
(2) Monitor the liquid level in HTG and the temperature and pressure of the solution in
HTG. The liquid level mustnt be too low, and the temperature and pressure mustnt
be too high, otherwise the heat transfer tubes will be damaged.
(3) Monitor the running of the canned pump. If its shell temperature exceeds 80, stop it
immediately and troubleshoot the problem.
(4) Check to see if the working steam pressure is within the specified range.
(4) Shut off the working steam immediately in any of the following circumstances:
Loss of chilled water flow or failure in the canned pump
Serious air leakage
Liquid level rises unexpectedly or disappears
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 35



36
Accidental power failure

4. Emergency treatment rule
When any significant fault occurs during the running of the chiller, the machine room staff
must take corresponding measures as soon as possible.
Copper tubes are frozen or damaged
Symptom: Liquid level at various locations rises too greatly and the cooling effect
disappears.
Remedy:
1) Stop the chilled water pump and close the valves at the chilled water inlet and
outlet at once.
2) Turn off the main switch in the control cabinet and stop the cooling water pump.
3) Drain the water from the water chamber.
4) Charge nitrogen gas into the chiller until the pressure reaches 0.02MPa.
Discharge the solution into the solution tank for regeneration.
Sudden power-off during operation
1) Close the vapor cut-off valve at once.
2) Resume power supply and start the chiller as soon as possible lest the
concentrated solution should crystallize.

5. Maintenance rule
Maintenance should be performed strictly in accordance with the Operation
Instruction.
Maintenance should be performed by or under the direction of qualified personnel.

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 36



37
Appendix 1Saturated water vapor temperature & pressure table
Temperature Pressure Temperature Pressure
kgf/cm
2
mmHg kgf/cm
2
mmHg
1 0.006697 4.93 66 0.2666 196.2
2 0.007194 5.29 68 0.2912 214.3
4 0.008289 6.10 70 0.3178 233.8
6 0.009530 7.01 72 0.3463 254.7
8 0.01932 8.04 74 0.3769 277.3
10 0.0125 9.2 76 0.4098 301.5
12 0.014292 10.5 78 0.4451 327.4
14 0.01629 12 80 0.4829 355.3
16 0.018529 13.6 82 0.5234 385
18 0.021034 15.5 84 0.5667 416.9
20 0.02383 17.5 86 0.6129 450.9
22 0.026948 19.8 88 0.6623 487.2
24 0.030415 22.4 90 0.7149 525.9
26 0.034266 25.2 92 0.7425 546.2
28 0.038536 28.3 94 0.8306 611
30 0.043261 31.8 96 0.8941 657.7
32 0.04848 35.7 98 0.9616 707.3
34 0.05424 39.9 100 1.033 760
36 0.06058 44.6 102 1.087 799
38 0.06756 49.7 104 1.166 858.7
40 0.07522 55.3 106 1.250 919.6
42 0.08362 61.5 108 1.339 985.1
44 0.09281 68.3 110 1.432 1053
46 0.1028 75.7 112 1.531 1126
48 0.1138 83.7 114 1.636 1026
50 0.1258 92.5 116 1.746 1284
52 0.1388 102.1 118 1.862 1370
54 0.1530 112.5 120 1.98 1456
56 0.1683 123.9 125 2.366 1740
58 0.1850 136.1 130 2.754 2026
60 0.2031 149.4 135 3.192 2348
62 0.2227 163.8 140 3.684 2710
64 0.2438 179.4 145 4.236 3116


Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 37



38
Appendix 2System diagram

Chilled water system Cooling water system Steam system
Load
Expansion water tank
Cooling tower
Pressure
reducing
valve
W
o
r
k
i
n
g

s
t
e
a
m

i
n
C
o
n
d
e
n
s
a
t
e

o
u
t
Check valve Steam trap
Electric
valve
Cut-off
valve
Filter
Flexible
connector
Thermo-
meter
Pressure
gauge
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 38



39
Appendix 3Solubility curve of LiBr solution

t
100.0
75.0
50.0
25.0
0.0
-25.0
-50.0
50.0 55.0 60.0 65.0 70.0 50.0

LiBr %


Crystallization temperature curve of
LiBr solution
(smoothed values)
Horizontal axis: LiBr %
Vertical axis: Crystallization temperature
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 39



40
Appendix 4Users water system linkage diagram


























3


: 1AC250V,5A
()

Q131 Q132 Q141 Q142 Q152 Q151



Control cabinet for Hope Deepblue steam-fired absorption
chiller
Chilled water pump
run command
Cooling water pump
run command
Cooling tower fan
run command
Note:
1. The capacity of the output relays for the linkage terminals of above
water pumps is AC 250V, 5A (resistance load).
2. Q131, Q132, Q141, Q142, Q151 and Q152 are code numbers for wires
in the control cabinet. Please pay attention not to misconnect them.
3. While running the unit, make sure the chilled water pump and cooling
water pump are in linkage control.
Non-voltage output
Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 40



41
Appendix 5Control cabinet I/O terminals

T
3
A
P
E

V
4

0
4
P
E
L
1
N
N
L
2
0
1
0
2
0
3
V
2
U
2
L
3
W
2
U
4
0
5
0
6
0
8
0
7
0
9

1
5
W
4
N
N
1
2
1
1
1
0
1
3
1
4
A
0
7
A
0
3
N
N
1
8
1
6
1
7
1
9
2
0
T
0
A

L
3
N
N
P
E
L
1
L
2
U
2
V
2
U
4
W
2
V
4
A
1
3
1
V
P
V
P
E
2
1
1
E
2
2
A
1
4
2
A
1
4
1
A
1
3
2
A
1
5
2
A
1
5
1
W
4
N
N
N
N
A
0
7
A
0
3
P
E
T
0
B
T
0
C
T
1
A
T
1
B
T
2
B
T
2
A
T
1
C
T
2
C
A
1
3
2
V
P
E
2
1
V
P
A
1
3
1
E
2
2
A
1
4
2
A
1
5
1
A
1
4
1
T
0
A
A
1
5
2
T
1
C
T
1
A
T
0
C
T
0
B
T
1
B
T
2
B
T
2
A
T
3
A
T
2
C
Y
W
4

3
2

V
P
2
6
W
5
U
5
V
5
A
1
7
2
T
H
R
2
2
2
1
2
3
2
5
2
4
E
2
4
1
Y
W
1
Y
W
3
Y
W
2
2
9
2
7
2
8
3
0
3
1
E
0
7
Y
W
5
V
P
3
3
Y
W
5
V
P
V
5
U
5
W
5
T
H
R
A
1
7
2
Y
W
2
E
2
4
1
Y
W
1
Y
W
3
Y
W
4
T
3
C
T
3
B
T
5
B
T
5
A
T
5
C
E
0
7
V
P
T
3
C
T
3
B
T
5
B
T
5
A
T
5
C
4
0
4
1
4
3
4
2
4
4
4
5
4
7
4
6
4
8
5
3
4
9
5
1
5
0
5
2
5
5
5
4
6
1
5
7
5
6
5
9
5
8
6
0
6
3
6
2

N
N
3
8
3
9
N
N
A
1
1
N
N
A
1
2
N
N
A
1
1
A
1
2
N
N

T
4
A

T
4
B
T
4
C
T
4
A
T
4
C
T
4
B
E
2
1

J
X
P
J
X
P
3
4
3
5
3
6
3
7
H
T
G

t
e
m
p

C
o
o
l
i
n
g

w
a
t
e
r

i
n
l
e
t

t
e
m
p

E
v
a
p
o
r
a
t
i
o
n

t
e
m
p

C
h
i
l
l
e
d

w
a
t
e
r

i
n
l
e
t

t
e
m
p

C
h
i
l
l
e
d

w
a
t
e
r

o
u
t
l
e
t

t
e
m
p

S
o
l
e
n
o
i
d

v
a
l
v
e

s
e
t

V
a
c
u
u
m

p
u
m
p

R
e
f
r
i
g
e
r
a
n
t

p
u
m
p

t
h
e
r
m
a
l

p
r
o
t
e
c
t
i
o
n

R
e
f
r
i
g
e
r
a
n
t

p
u
m
p


P
o
w
e
r

s
u
p
p
l
y

t
o

c
o
n
t
r
o
l

c
a
b
i
n
e
t

E
x
t
e
r
n
a
l

a
c
o
u
s
t
o
o
p
t
i
c

w
a
r
n
i
n
g

C
o
o
l
i
n
g

t
o
w
e
r

f
a
n

C
o
o
l
i
n
g

w
a
t
e
r

p
u
m
p

C
h
i
l
l
e
d

w
a
t
e
r

p
u
m
p

L
i
q
u
i
d

l
e
v
e
l

e
l
e
c
t
r
o
d
e

t
e
r
m
i
n
a
l

S
o
l
u
t
i
o
n

p
u
m
p

t
e
r
m
i
n
a
l

H
T
G

h
i
g
h

p
r
e
s
s
u
r
e

f
a
u
l
t

C
o
o
l
i
n
g

w
a
t
e
r

c
u
t
-
o
f
f

C
h
i
l
l
e
d

w
a
t
e
r

c
u
t
-
o
f
f

D
e
c
r
y
s
t
a
l
l
i
z
i
n
g

t
u
b
e

t
e
m
p

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 41



42
Appendix 6Electrical principle diagram

E
l
e
c
t
r
i
c
a
l

P
r
i
n
c
i
p
l
e

D
i
a
g
r
a
m

Thermal Technologies Europe AB | www.thermatec.se | info@thermatec.se p. 42

You might also like