CONSTRUCTION ENGINEERING and INSPECTION QUALITY GUIDELINES 2 JM-F7-23 Request Checklist for Invoice Approval by QA / QC Manager 2 Test Results quantities approval 3 All RFI's approved 4 Pending Issues ( NCR's, etc.) 1 Is the frame sealed to prevent water leakage 2 Is the standing water a minimum 10 cm 3 Actual height of water 4 Is the test area covered; plastic coated below and reflective surface on
CONSTRUCTION ENGINEERING and INSPECTION QUALITY GUIDELINES 2 JM-F7-23 Request Checklist for Invoice Approval by QA / QC Manager 2 Test Results quantities approval 3 All RFI's approved 4 Pending Issues ( NCR's, etc.) 1 Is the frame sealed to prevent water leakage 2 Is the standing water a minimum 10 cm 3 Actual height of water 4 Is the test area covered; plastic coated below and reflective surface on
CONSTRUCTION ENGINEERING and INSPECTION QUALITY GUIDELINES 2 JM-F7-23 Request Checklist for Invoice Approval by QA / QC Manager 2 Test Results quantities approval 3 All RFI's approved 4 Pending Issues ( NCR's, etc.) 1 Is the frame sealed to prevent water leakage 2 Is the standing water a minimum 10 cm 3 Actual height of water 4 Is the test area covered; plastic coated below and reflective surface on
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES
JM-F7-22 Inspection and Test Plan [ITP]:
Inspection and Test Plan [ITP]
Contractors logo
Project : Engineer : Contractor : ITP-No. : Rev. No. : Date : Page : of
Subject: Inspection Authority H- Hold Point S- Surveillance W- Witness Point R-Record Review 1-Site Engineer 3-PMC 2- Supervisor/QC 4-Third party
No . Test/Inspection Activity Description Referenced Documents Acceptance Criteria. Frequency Forms/Records Verification Document Inspection Form No. 1 2 3 4
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 2
JM-F7-23 Request Checklist for Invoice Approval by QA/QC
Project No.: Invoice No.: Project Name : Invoice Date:
Contracts Department
YES NO N/V
1 Checked as completed by Quantity Surveyor (QS)
Distribution: Original - QA/QC dept.
QA/ QC & HSE Department YES NO N/V
1 RFI's signed by QA/QC Manager
2 Test Results quantities approval
3 All RFI's approved
4 Pending Issues ( NCR's, etc.) Remarks:
Approved by: QA/QC Manager
Signature with Date
Distribution: Original - Contracts dept.
Contracts Department
Received by
Name & Signature Date
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 3
JM-F7-24 Inspection Checklist for Water Penetration Test
Project Name : Project No. : Contractor :
Supplier :
Particulars :
YES
NO
N/A 1 Is the frame sealed to prevent water leakage
2 Is the standing water a minimum 10 cm
3 Actual height of water
4 Is the test area covered; plastic coated below and reflective surface on the top
5 Has the test been left for minimum --------- hrs
6 Height of water after test
7 Water loss
H Others YES
NO
N/A 1 Specify
Remarks:
Site Visited and Inspected By: Date & Time
Name & Signature.
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 4
JM-F7-26 Inspection Checklist for Facilities - Elevator Maintenance
Project Name : Project No. : Contractor :
Supplier :
Particulars :
A General Specifications - Performance YES
NO
N/A 1 Provide 24 hrs services daily during six days a week
2 Ensure Safety of all operating buttons, inner lamps and interphone
3 Check the electric panel, control panel, fuses their bearers and connections
B Technical Specifications - Daily YES
NO
N/A 1 Machine rooms in terms of cleaning, cracks demolishing and Temperature
2 Elevator cars inner operating buttons, static and dynamic status (up and down) alarm
3 Telephone: Battery and working validity
4 External: Calling buttons, signal lamps, elevator hoist way and emergency door
C Technical Specifications - Every Three Months YES
NO
N/A 1 Check electric panel, control panel, fuses and their bearers and connections
D Technical Specifications - Every Six Months YES
NO
N/A 1 Check and calibrate safety edge door locker and handle bar door motor current converter, switches, sparkles and diminishing tools
2 Repair, calibrate and lubricate the magnetic brakes
3 Descending: Check and calibrate the descending devices
4 Pulling Machine: Checking and calibrating, controlling and lubricating the parts of the pulling machines and checking the state of gears
5 Checking, calibrating controlling, lubricating the doors catch hold
6 Pulling Machine: Checking and calibrating, controlling, lubricating the parts of the pulling machines and speed controller
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 5
E Technical Specifications - Every Year YES
NO
N/A 1 Tensioning the ends of the connection box at the hoist way and under the elevator car
2 Tensioning the whole electric connections in machines room
3 Check the anchor bolts and machine bolts and the elevator car bolts
4 Checking, adding and adjusting oil level at the movement tracks lubricators
5 Check calibrate and control the cord tensioning degree
6 Check the relocation cables ensure them having no defects and carry out the works necessary repairs
F Others YES
NO
N/A 1 Specify
Remarks:
Site Visited and Inspected By: Date & Time
Name & Signature
JM-F7-28 Inspection Checklist for Facilities - Daily Cleaning
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 6
Project Name : Project No. : Contractor :
Supplier :
Particulars :
A. Daily Cleaning YES NO N/A 1 Brooming and mopping up the floors and vacuuming the carpets 2 Cleaning the furniture, desks, cupboards and all attachments 3 Cleaning the elevators inside and outside 4 Cleaning and polishing the counters from inside and outside 5 Spray perfume fragrant materials and pesticides 6 Cleaning the doors and all of their accessories 7 Cleaning metal door bases 8 Emptying waste baskets and ashtrays 9 Cleaning and polishing glass and marble walls 10 Cleaning and glittering the uncarpeted floors 11 Cleaning and glittering the inside and outside corridors 12 Cleaning all glass surfaces and windows 13 Cleaning the doors along with wet mopping 14 Filling the water coolers 15 Cleaning the curtains, remove spots, dirt and at their original places 16 Cleaning the inside and outside metal boards and signboards 17 Removing the spots from the floors and the walls 18 Polishing brass and chromium items 19 Cleaning any other edges that are vulnerable to dirt 20 Cleaning the windows and their frames from inside and outside 21 Using vacuum cleaners in cleaning
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 7
22 Collecting all falling and scattered papers 23 Cleaning all stair rails of all types 24 Cleaning toilets that includes wall, floors and sanitary devices &d all fixtures
25 Cleaning equipment such as telephone equipment and fax machines etc
Remarks:
Site Visited and Inspected By: Date & Time
Name & Signature
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 8
JM-F7-29 Inspection Checklist for Facilities - Monthly Cleaning
Project Name : Project No. : Contractor :
Supplier :
Particulars :
A Monthly Cleaning YES
NO
N/A 1 Cleaning and polishing metal sign boards inside and outside Municipality Buildings
2 Polishing the lifts completely from inside and outside
3 Cleaning and polishing all the electric and electronic devices & carry out maintenance
4 Cleaning and polishing inside and outside lamps & search lights
5 Cleaning & Shining all ceilings and remove dust from them
6 Washing trash barrels and containers and spray them with pesticides
7 Polishing the inside and outside corridors and stairs, rails, whether the metal or the wooden ones
8 Polishing the windows from inside and outside and cleaning their frames from inside and outside
9 Cleaning and polishing office furniture, and removing spots from the fabric furniture and partitions
10 Washing walls partitions, at wooden doors and windows and A/C edges
11 Spraying pesticides at all cabins and yards
12 Spraying pesticides at all car parking lots and surrounding floors
13 Opening the manholes for checking the saline water pipes and rodding them as well as gutters (Sewers), blowing them with compressed air for removing dirt, bad smells out and cleaning cesspools
14 Cleaning and operating defected water lines
15 Checking feeding water pipes and ensures no leakage or defect. If any, repair is to be made except emergency cases which must be repaired immediately.
B Cleaning Works - Every Three Months YES
NO
N/A 1 Cleaning of the carpets with lightened shampoo and other proper material
2 Cleaning and polishing the ceilings sunshades and car parking
3 Cleaning, washing and sterilizing drinking water tanks
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 9
4 Cleaning and washing all normal, wooden and metal walls and remove dust out of them
5 Removing the curtains, washing, cleaning them and returning them back to its original place
6 Opening the manholes for checking the saline water pipes and rodding them as well as gutters (Sewers), blowing them with compressed air for removing dirt, bad smells out and cleaning cesspools
7 Checking and cleaning all rainwater spouts and rodding them
8 Cleaning metal and wooden doors and windows as well as metallic mobile curtains
9 Periodical check for water pumps and maintain them
Others YES
NO
N/A 1 Specify
Remarks:
Site Visited and Inspected By: Date & Time
Name & Signature
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 10
JM-F7-30 Inspection Checklist for Facilities - AC Maintenance
Project Name : Project No. : Contractor :
Supplier :
Particulars :
A. General AC Maintenance YES NO N/A 1 Provide 24 hrs service six days a week 2 Check and adjust oil pressure 3 Check and adjust the level of compressing oil (Compressor) 4 Check and adjust control switches, circuit breakers and electric connections
5 Check and adjust fan belts, revoloving parts bearers, stands and condenser
6 Gas refilling if necessary 7 Repair any leakage in the unit 8 Lubricating the fan motor and all other parts B. Maintenance - Every Two Months For Central AC YES NO N/A 1 Cleaning the filters 2 Check and adjust motor oil 3 Cleaning the blower blades 4 Cleaning the receiving and pushing grills 5 Treating air via cleaning filers, grills, blower belts and examining motor bearer
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 11
C. Maintenance - Every Three Months For Central AC YES NO N/A 1 Check and adjust the compressing air oil level (Compressor) 2 Check and adjust oil pressure 3 Check and adjust control switches, circuit breakers and electric connections
4 Check and adjust the fan belts, the bearers of the revolving parts and condensers
5 Clean and check the main and sub control panel 6 Check water pumps, oil lubrication and cleaning water tanks 7 Routine check for compressor and its validity change it if needed D Split Units YES NO N/A 1 Check the filters and change them if needed 2 Check the electric connections 3 Check the thermostats 4 Gas refilling if necessary 5 Repair any leakage at the unit 6 Lubricate the fan motor lubrications and the other parts 7 Routine check for compressor and its validity and change if needed 8 Replace all defected parts 9 Lubricate all oiling parts 10 Keeping record for maintenance process
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 12
Remarks:
Site Visited and Inspected By: Date & Time
Name & Signature
E. Window Units YES NO N/A 1 Check and clean the filters and replace them if neede 2 Check and maintain the condenser and evaporator 3 Gas refilling if needed 4 Repair any leakage at the unit 5 General check for compressor its validity and change if needed Others YES NO N/A 1 Specify :
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 13
JM-F7-31 Inspection Checklist for Lighting Projects - 6 Mtr. Pole Installations
Project Name : Project No. : Contractor :
Supplier :
Particulars :
A.
Foundation's Top Level (as per site conditions) YES NO N/A 1 Shall be 30 to 40 cm high from the road asphalt level
2 Shall be flushed with the pavement or top of the curb stone
B Foundation Size
YES NO N/A 1 Width = 60 cm 2 Breadth = 60 cm
3 Depth = 100 cm
4 PVC long radius Elbow for cable
C Concrete Admixture
YES NO N/A 1 Sulphate Resistant Cement, Type V (required)
2 Required Strength 350 Kg/M3
3 Temperature 32 0 C
4 Slump = 80mm to 100mm
D Anchor Bolt Material
YES NO N/A 1 Stainless steel SS 304 L
2 Galvanized Steel
E Anchor Bolt Size
YES NO N/A 1 Dia = 24 mm2 2 Length = 500 mm
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 14
F Pole
YES NO N/A 1 Height = 6 M 2 Sheet Thickness = 3 mm
3 Galvanic Layer Thickness = 120 microns
4 Pole Alignment = 90o Vertical
5 Epoxy Paint from the bottom = 35 cm
6 Door Hinges, stain less steel = 2 nos. G Fuse Box Including Circuit Breaker, Cable Connectors & Grounding Connection for Fixtures : Approved Type, Size & Make YES NO N/A 1 Aluminum =
2 Steel =
3 Plastic =
4 Circuit Breaker =
5 Connectors =
6 Grounding connection =
H Base Plate Size YES NO N/A 1 Thickness = 10 mm 2 Width = 250 mm
3 Breadth = 350 microns
I Pole Grounding/ Earthling YES NO N/A 1 Size = 16mm2 dia X 150 mm long
2 Bare Copper Conductor size for connection to the pole = 16 mm2 3 Grounding Resistance < 10 Others YES NO N/A 1 Specify :
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 15
Remarks:
Site Visited and Inspected By: Date & Time
Name & Signature
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 16
JM-F7-32 Inspection Checklist for Lighting Projects - 10 Mtr. Pole Installations
Project Name : Project No. : Contractor :
Supplier :
Particulars :
A. Foundation's Top Level (as per site conditions) YES NO N/A 1 Shall be 30 to 40 cm high from the road asphalt level
2 Shall be flushed with the pavement or top of the curb stone
B Foundation Size
YES NO N/A 1 Width = 70 cm 2 Breadth = 70 cm
3 Depth = 120 cm
4 PVC long radius Elbow for cable
C Concrete Admixture
YES NO N/A 1 Sulphate Resistant Cement, Type V (required)
2 Required Strength 350 Kg/M3
3 Temperature 32 0 C
4 Slump = 80mm to 100mm
D Anchor Bolt Material
YES NO N/A 1 Stainless steel SS 304 L
2 Galvanized Steel
E Anchor Bolt Size
YES NO N/A 1 Dia = 24 mm2 2 Length = 500 mm
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 17
F Pole
YES NO N/A 1 Height = 10M 2 Sheet Thickness = 4 mm
3 Galvanic Layer Thickness = 120 microns
4 Pole Alignment = 90o Vertical
5 Epoxy Paint from the bottom = 35 cm
6 Door Hinges, stain less steel = 2 nos. G Fuse Box Including Circuit Breaker, Cable Connectors & Grounding Connection for Fixtures : Approved Type, Size & Make YES NO N/A 1 Aluminum =
2 Steel =
3 Plastic =
4 Circuit Breaker =
5 Connectors =
6 Grounding connection =
H Base Plate Size YES NO N/A 1 Thickness = 15 mm 2 Width = 300 mm
3 Breadth = 400 microns
I Pole Grounding/ Earthing YES NO N/A 1 Size = 16mm2 dia X 150 mm long
2 Bare Copper Conductor size for connection to the pole = 16 mm2 3 Grounding Resistance < 10
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 18
Others
YES
NO
N/A 1 Specify :
Remarks:
Site Visited and Inspected By: Date & Time
Name & Signature
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 19
JM-F7-33 Inspection Checklist for Lighting Projects - 12 Mtr. Pole Installations
Project Name : Project No. : Contractor :
Supplier :
Particulars :
A. Foundation's Top Level (as per site conditions) YES NO N/A
1 Shall be 30 to 40 cm high from the road asphalt level
2 Shall be flushed with the pavement or top of the curb stone
B Foundation Size
YES NO N/A
1 Width = 70 cm
2 Breadth = 70 cm
3 Depth = 140 cm
4 Re-inforced with Steel bars size 15 mm2 @ 15 cm
5 PVC long radius Elbow for cable
C Concrete Admixture
YES NO N/A
1 Sulphate Resistant Cement, Type V (required)
2 Required Strength 350 Kg/M3
3 Temperature 32 0 C
4 Slump = 80mm to 100mm
D Anchor Bolt Material
YES NO N/A
1 Stainless steel SS 304 L
2 Galvanized Steel
E Anchor Bolt Size
YES NO N/A
1 Dia = 27 mm2
2 Length = 900 mm
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 20
F Pole
YES NO N/A
1 Height = 12M
2 Sheet Thickness = 4 mm
3 Galvanic Layer Thickness = 120 microns
4 Pole Alignment = 90o Vertical
5 Epoxy Paint from the bottom = 35 cm
6 Door Hinges, stain less steel = 2 nos.
G Fuse Box Including Circuit Breaker, Cable Connectors & Grounding Connection for Fixtures : Approved Type, Size & Make YES NO N/A
1 Aluminium =
2 Steel =
3 Plastic =
4 Circuit Breaker =
5 Connectors =
6 Grounding connection =
H Base Plate Size YES NO N/A
1 Thickness = 20 mm
2 Width = 300 mm
3 Breadth = 400 microns
I Pole Grounding/ Earthing YES NO N/A
1 Size = 16mm2 dia X 150 mm long
2 Bare Copper Conductor size for connection to the pole = 16 mm2
3 Grounding Resistance < 10
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 21
Others
YES
NO
N/A
1 Specify :
Remarks:
Site Visited and Inspected By: Date & Time
Name & Signature
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 22
JM-F7-34 Inspection Checklist for Lighting Projects - 16 Mtr. Pole Installations
Project Name : Project No. : Contractor :
Supplier :
Particulars :
A. Foundation's Top Level (as per site conditions) YES NO N/A 1 Shall be 30 to 40 cm high from the road asphalt level
2 Shall be flushed with the pavement or top of the curb stone
B Foundation Size
YES NO N/A 1 Width = 100 cm 2 Breadth = 100 cm
3 Depth = 160 cm
4 Re-inforced with Steel bars size 15 mm2 @ 15 cm
5 PVC long radius Elbow for cable
C Concrete Admixture
YES NO N/A 1 Sulphate Resistant Cement, Type V (required)
2 Required Strength 350 Kg/M3
3 Temperature 32 0 C
4 Slump = 80mm to 100mm
D Anchor Bolt Material
YES NO N/A 1 Stainless steel SS 304 L
2 Galvanized Steel
E Anchor Bolt Size
YES NO 1N/A 1 Dia. = 3 mm2 2 Length = 1000 mm
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 23
F Pole
YES NO N/A 1 Height = 16M 2 Sheet Thickness = 4-5 mm
3 Galvanic Layer Thickness = 120 microns
4 Pole Alignment = 90o Vertical
5 Epoxy Paint from the bottom = 35 cm
6 Door Hinges, stain less steel = 2 nos. G Fuse Box Including Circuit Breaker, Cable Connectors & Grounding Connection for Fixtures : Approved Type, Size & Make YES NO N/A 1 Aluminium =
2 Steel =
3 Plastic =
4 Circuit Breaker =
5 Connectors =
6 Grounding connection =
H Base Plate Size YES NO N/A 1 Thickness = 25 mm 2 Width = 500 mm
3 Breadth = 600 microns
I Pole Grounding/ Earthing YES NO N/A 1 Size = 16mm2 dia X 150 mm long
2 Bare Copper Conductor size for connection to the pole = 16 mm2 3 Grounding Resistance < 10
Others
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 24
YES
NO
N/A 1 Specify :
Remarks:
Site Visited and Inspected By: Date & Time
Name & Signature
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 25
JM-F7-35 Inspection Checklist for lighting - Cable Installation, Jointing &Connection
Project Name : Project No. : Contractor :
Supplier :
Particulars :
A. Trench for Cabling - Size & Preparation
YES NO N/A 1 Trench Width =
25 cm ~ 30 cm
2 Trench Depth =
65 cm ~ 70 cm
3 Soft Sand Cushion with approved quality of sand = 10 cm
4 Cleaning Done
B Cable Type and Size - As per Specifications i.e.
YES NO N/A Armoured / Unarmoured / XLPE with PVC/ PE Sheath
1 i- 4 X 25mm2
ii- 16 X 25mm2
iii- 25 X 25mm2
iv- 35X 25mm2
v- 60 X 25mm2
vi- 120 X 25mm2
vii- Armoured
viii- Un-armoured
Cable insulation testing before laying. = 500V ~ 1KV
2
3 Cable continuity testing before laying.
4 Cable Laying
5 Approved Quality Sand Filling on top of cable = 10cm
6 Warning tape installation
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 26
YES NO N/A 1 For road crossing use PVC pipe & concrete to make Duct bank
2 Pre asphalt, check for even depth = 5 cm ~ 7 cm
3 Pre asphalt, check for clear corners =
4 Pre Asphalt surface treatment = MC1/RC2 applied
Asphalt temperature = 150oC YES NO N/A 5
6 Asphalting as per spec./ actual thickness of the road = 5 cm ~ 7 cm
7 Asphalt compression with proper roller = 15 passes
8 For Cabling in the paved area or mid island, fix the tile/pavers properly
D Cable Jointing/ Connection
YES NO N/A 1 Check for colour coding i.e. R, Y, B and Black for earth
2 Use Cable jointing kit (chemical fill type) Raychem/3M or Approved
3 Prepare the cable as per measurements given in the jointing kit leaflet
4 Keep color coding, crimp the ferules with proper tools, stagger joints or use
Others YES NO N/A 1 Specify :
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 27
Remarks:
Site Visited and Inspected By: Date & Time
Name & Signature
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 28
JM-F7-36 Roads & Civil Daily Report Check list Site: Ref: Date: S/N Description YES NO N/A Safety: 1 PPE for all Consultants and Contractors personnel 2 Safety warning and barricades before working on site 3 Official sign board in location of work 4 Rotating flash light for safety in night shift
Engineering: 5 Review for Construction Drawings 6 Surveying works - Line and grade & setting out generally 7 17 Potholes identified 8 36-Review design of sign board for naming & numbering
Supervision & Equipment:
9 Contractor Management staff in location of work 10 Approved Subcontractor in site 11 No of crews of work 12 Efficiency of Equipment 13 Straight edge with foreman 14 Thermometer with foreman
Workmanship:
15 Status of steel bars C o n c r e t e
16 Temperature of concrete 17 Correct practice of concrete pouring 18 Use concrete vibrator correctly
19 Milling thickness reach the old Asphalt for good Asphalt bonding A s p h a l t
20 Milling thickness (4 6 cm) 21 Quality of Asphalt mix design 22 Clean the area before spraying RC-2 23 Use Asphalt saw to cut Asphalt layer for patching 24 Temperature degree of Asphalt 25 Temperature degree of Asphalt RC-2 26 Temperature degree of MC-1 27 Remove unmilled Asphalt near the curbs & around the manholes
28 Temperature degree of Asphalt 29 Correct Asphalt thickness and compaction 30 RC-2 rate of spray 1kg/m2 31 Manholes adjustment
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 29
32 Asphalt creep in asphalt surface layer F i n i s h i n g
33 Asphalt joint status and numbers 34 Bleeding, swell, settlement and cracks of asphalt layer 35 Failure on surface layer after compaction for layer
Materials samples, Measurement & Quality control
36 Sample of curbstone 37 Sample of tiles 38 Quality of tiles installed 39 Quantity of tiles installed 40 Quality of workmanship 41 All works according to specification 42 Area clean and neat after work
Site Engineer / Inspector Signature:
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 30
Particulars : Yes No N/A 1 Does the plant have quality certification? (e.g. ISO) 2 Is the certification available? 3 Is the certification up to date? 4 Is plant laboratory available? 1 Is a 3rd Party laboratory used? 2 Is the laboratory approved? 3 Are bitumen certificates available? 4 Are aggregate (coarse/fine/filler) certificates available? 5 Are aggregate stockpiles well separated? 6 Are hot bins well separated? 7 Is a quality control procedure available? 8 Is a safety plan available? 9 Are operatives wearing PPE? 10 Is a procedure available for checking lorries before loading? 11 Are loaded lorries covered for protection? 12 Are temperature differences between bitumen and aggregate controlled?
13 Are all materials stored correctly? 14 Is concrete cover as per specifications?
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 33
Notes:
Site Visited and Inspected By: Date & Time
Name & Signature
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 34
JM-F7-39 QA/QC Invoice Checklist Project No:
Contractor:
Invoice No:
Documentation Req. Included Not Included Remarks Bill of Quantities [ ] [ ]
Drawings [ ] [ ]
Payment Invoice [ ] [ ]
RFIs [ ] [ ]
Test Results [ ] [ ]
GIS (Where applicable) [ ] [ ]
Factory Certificates [ ] [ ]
Surveying Sheet Signed off by consultants supervisor [ ] [ ]
Verified by:
Date: Approved by: QHSE Manager Date:
NOTE: This check is to confirm that documents are enclosed, not the document adequacy
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 35
JM-F7-40 QA Inspection Checklist for Gate & Butterfly Valves Project Name : Project No. : Contractor :
Supplier :
Particulars :
YES
NO
N/A 1 General - working pressure 10 bar for PN10 pressure pipe
2 General - ISO 2531 (Flanged edges)
3 Butterfly valves - ISO 5752 - No. F14 (Multi-turn Manam control)
4 Butterfly valves 250 mm shall have a hand wheel operating device, with direction indicated
5 Butterfly valves for 250 mm pipelines shall be watertight when closed and shall control the water passage when partially open.
6 Valves shall be of type requiring several revolutions to complete closure
7 Valves requiring revolution for closure will not be accepted
8 Valves shall be of anti-clockwise opening type and shall be furnished with dismantling piece and the materials shall be the same as used in the gate valves
9 Valve bearings for > 250 mm shall be of sleeve type self oiled and worm type gear with external indication to show position
10 Valves shall be coated internally and externally with fusion shrinking epoxy or approved equivalent, having a thickness of minimum 250 mm
11 The valve disc shall operate from 0-90 degrees (totally open to totally closed position and visa versa)
12 Valve seats shall be of the rubber encapsulated metal to provide a tight valve closure and the disc shall be of solid construction concentric type and positioned on guiding post of the self lubricating sleeve type
H Others YES
NO
N/A 1 Specify
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 36
Remarks:
Site Visited and Inspected By: Date & Time
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 37
JM-F7-41 Site Demobilization Inspection Check list Project Name: Project No: Location: Contractor: Contractor Rep:
A Buildings/ Temporary Accommodation YES NO N/A 1 Building / Temporary accommodation removed / relocated 2 Foundations removed 3 Pipes removed 4 Cables removed 5 Septic system emptied and removed 6 Fencing removed 7 Others (specify)
B. Equipment 1 Mobile Equipment removed from site 2 Fixed equipment removed from site 3 Equipment spares / parts removed from site 4 Tanks drained and dykes cleared of collected material 5 Tanks and dispensing facilities removed from site 6 Others (specify)
C. Waste Material 1 Timber removed from site 2 Scrap material removed from site 3 Waste oil / grease, etc. removed from site 4 Chemicals removed from site 5 General litter/ refuse from area picked up & disposed off in appropriate manner
6 Others (specify)
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 38
D. Drainage Infrastructure 1 Drains clear and free of refuse 2 Sediment capturing systems desalted 3 Culverts free of obstruction 4 Manholes or other holes properly covered 5 Drainage plan not altered 6 Others (specify)
E. Miscellaneous 1 Surplus raw material removed 2 Contaminated soil removed and treated 3 Excavation filled and area leveled 4 Sign / Barricades / Reflecting tapes etc. removed 5 Adjacent original work repaired & cleaned 6 Others (specify)
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 39
JM-F7-42 Construction Daily Inspection Report Date : Ref. No : Temp./Weather : Contract No : Project Number : Project Name : Contractor : Location : Manpower Resources: No. Equipment Resources: No.
Total Total Description of Work Performed Today: Unit Quan.
Instructions Issued :
Delays / Interruptions:
Safety Issues : (for accidents attach report)
Contractor Construction Inspector Sr. Const. Engineer
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 40
JM-F7-44 Contractors Quality Report
Contractors Name: Project Locations: Project No.:
Date: CONTRACTOR QUALITY REPORT FOR THE MONTH OF
S.NO.
Description
For the Month
Cumulative
Remarks 1 Quality Manual Approved (Date) 2 Contractor's QC Personnel (No.) 3 Contractor Man Hours Worked (Nos) 4 Sub Contractors (Nos) 5 Sub Contractors Man Hours (Nos) 6 Total Man Hours worked (Nos.) 7 Activities on site
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 42
JM-F7-46 Technical Report Stolen Cable Report
PROJECT NAME:
Municipality / Project No / District / Street / JM Sketch No /
Contractor / Address / Phone / Fax /
Signature /
Name /
Date / JM Director Lighting Dept. JM El ect . Inspector Consultant Project Engineer
Consultant Lighting Inspector CONTRACTOR RECEIPT Signature I Name I Date Received /
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 43
JM-F7-47 Equipment Issuance Form Equipme
Item
Description
Equipment Serial No.
Remarks
1
2
3.
4.
Acknowledgement
Issued by:
Sign
Issuance Approved by:
Sign
Special Instruction/Remarks:
Issuance Recipient of the above mentioned equipment hereby confirmed that he received the equipment as listed above and in good working condition.
Name
Dept.
Sign
Position
Received Date
Project Ref. Remarks:
Returning
Name
Dept.
Sign
Position
Received Date
Returned Date Remarks
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 44
JM-F7-48 Calibration status record
Record No.
Date of Issue
Device Description
Serial No.
Certificate Date
Validity Date
Next Calibration Date
Remarks
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 45
9.1 Audit Form Subject Requirement Y/N Notes Process Check List Is the Quality Organization chart in file? Did the quality organization include inspection operation instructions? Did the quality organization have provided a system for final inspection and testing of each element to complete the work? Are the procedures for identification segregation, and disposition of non- conforming materials in file? Is the project site have at least one responsible inspector or individual identified as the QA/QC contact for the project? Is the Contractor Quality Control Plan have been submitted & reviewed and signed by the CMS QM? Is the Contractor Cost Schedule in file? Is the Materials Coordination Schedule in file? Does the kick of meeting minutes include contractor responsibilities and CMS responsibilities? Quality Management Personnel Qualifications Are all personnel have met the qualification standard? (Include Personnel resumes) Construction Quality Management System Are the procedures for documenting decisions in file? Is the process for issues resolution (such as requests for information (RFIs), nonconformance reports (NCRs), or deviations to the contract related to source inspection) in file? Is the procedures for notification to the source, owners and contractors inspection staff in file? Is the process of when the unit responsible for verification activities is required to write non-conformance reports (NCRs) to document issues related to Product QC Processes in file? Is the policy and/or procedures for handling a disagreement between CMS and contractors staff in file? Is the inspection and Testing Plan (ITP) by CMS in file? Is the Quality Assurance Inspection Plan in file?
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 46
Subject Requirement Y/N Notes Construction Quality Management System Is the Source Inspection Quality Plan (SIQP) in file? Is the verification of adequate off-site QC is in place in file? Is the performance verification of sampling and testing representatives in file? Is the performance of the necessary in-process verification inspections in file? Is the performance of the Non-Destructive Testing at appropriate times in file?
Are mitigating the issues before the material is shipped to the jobsite have been done and in file? Are the Procedures of Control of Special Processes and Job Control Testing in file? Are the Special processes and job control testing associated with hardware fabrication identified and filed? Is the appropriate certification for inspection and test laboratories performing special processes or job control testing are in file? Are the special process inspections and tests identifide by Project Specification or other applicable controlling document in file? Are the credentials of the technicians or inspectors performing special process inspections or tests and job control tests have been reviewed for compliance to applicable codes, standards, special training/tests etc. and accepted by the CMS QM before inspections and tests in file? Is the calibration standards traceable to the National Institute of Standards and Technology (NIST) in file? Is the measuring and test equipment uniquely identified i.e., equipment type, identification number, location etc.? (include procedure) Is the calibration due date that clearly indicate an individual measuring and test equipment items in file? Are the required calibration intervals are identified, documented and periodically reviewed for effectiveness in file? Are the required handling, preservation and storage of measuring and test equipment that ensure that the accuracy and fitness for use is maintained in file? Are the measuring and test equipment calibration records maintained and in file? (include access and procedure) Are the required verification and documentation of developed software in file?
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 47
Subject Requirement Y/N Notes Construction Quality Management System Did the CMS require the Contractor to investigate the cause of the nonconformance, and to initiate corrective action including implementing steps to prevent recurrence? (include forms) Is the cause of the problem, disposition, and corrective action documented and in file? Is the required Repair and Accept-as-is dispositions that has been approved by the CMS QM before affected Work proceeds in file? Is there a prove that the status of nonconforming hardware and materials maintained and status reports have already been distributed to the CMS & PMO senior management and the Quality Manger? (include it) Is the records associated with nonconforming hardware and materials maintained? The CMS shall establish, document and submit for approval to the PMO the following Are the verification sampling and testing program for qualified private laboratory that have perform only one of the following types of testing on the same project: Verification testing, QC testing, or dispute resolution tests in file? Are the lab qualifications verification description for the applicable materials on this project such as ISO 17025 for steel, and AASHTO Accreditation Program (AAP) for concrete in file? Are the verification materials testing filing system description and the physical location in file? Are the forms that were used for sampling material and reporting test results in file? Are the statement that there are no conflicts of interest regarding the verification lab and any other acceptance activities for the project in file? Contractors Quality Control Plan Requirements Is the Contractors in house Project Quality Process according to contract documents, applicable regulatory requirements and industry standards? Are the processes (construction, manufacturing, installation, testing, etc.) that have been put as a part of the Contractors QCP and documented and approved by Contractor individual in file? Is the Contractor construction work process, basic production operations, and all other processing and fabricating, are performed under controlled conditions in accordance with the Contractors QC Program including forms and signed statement in file? Is the construction work plan (CWP) in file? Did the contractor prepared a Construction Work Plan as described according to the Construction Contract Documents? (include signed statement)
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 48
Subject Requirement Y/N Notes Quality Training Is the training needs to support Work in the contract documents provided for all personnel performing activities affecting quality in file? Is the personnel performing specific assigned tasks qualified on the basis of appropriate education, training and experience? (Include resumes) Are the records of training activities retained as quality records? Quality Audits And Surveillance Is the Quality Audits and surveillances by CMS IQA team conducted on an ongoing basis? ( include meeting minutes and list of attendee) Is the Quality Surveillances consist of evaluation of the effectiveness of a specific activity in file? Did the CMS provide trained and experienced quality personnel independent of those responsible for the activity being audited to conduct audits and surveillances? (Include resumes) Have the Quality Audits and surveillances been documented and, at a minimum, distributed to management of the PMO? Quality Records Is the quality records identified, collected indexed and stored in a manner that precludes damage, loss or deterioration in file? Are the specific retention times and location designated and the records accessible for use? (include procedure) Is the required quality records identified by title, contract number, revision, date, and signed by an authorized individual in file? Are all the quality records stamped (controlled) or signed by an authorized individual? (include it) Do the corrections or revisions to quality records received the same level of review and approval as the original document? (include review form) Did the QM, PM, and JM PMO jointly conducted a final inspection of the project?(include forms) Is the final inspection includes inspection of the completed work, associated as-built documents, certifications, and other documentation and contractor punch list item review? Did the QM review quality control document and signed it? Did both the JM PMO and the Quality Manager (QM) jointly agree upon the list of non-conforming work and the corrective action? (include signed statement for both parties)
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 49
Subject Requirement Y/N Notes Final Inspection Did the QM ensured that each deficiency identified during the final inspection is corrected and documented? (include procedure) Is the Final Certificate Of Compliance Completed? Did the CMS PM submit a Certificate of Compliance signed by the QM and the PM indicating that all the Works incorporated in the project conform to the contract requirements or as specified by the contract?
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 50
9.2 Lists of Verification Equipment
List of Verification Equipment No. Equipment 1 Nuclear Density Test 2 Measuring tape 3 Vernier Caliper 4 Thermometer 5 Camera 6 Flash light 7 Elcometer 8 Spirit level 9 Plumb bob 10 Magnet
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 51
9.3 List of Verification Test:
LIST OF VERIFICATION TEST SL # DESCRIPTION NAME OF TEST TESTING METHOD ASTM AASHTO 1 SOIL TESTS Particles Size Analysis of Soils D-422
Determining the Liquid Limit of Soil D-4318 T-89 Determining the Plastic Limit and Plasticity Index of Soils D-4318 T-90 Density of Soil In-Place by Sand Cone D-1556 T-91 Specific Gravity of Solis D-854 T-100 Moisture-Density Relationship of Soils Using Modified Method D-1557 T-180 California Bearing Ratio D-1883 T-193 Laboratory Determination of Moisture of Soil D-2216 T-265 Density of Soil and Soil Aggregate in place by Nuclear Method (Shallow Depth) D-2922 T-310 Grain Size Analysis of Granular Soil Materials T-311 Determination of Organic Matter in Soil by Wet Combustion T-194 Determining Water Soluble Sulfate Ion Content in Soil T-290 Determining Water Soluble Chloride Ion Content in Soil T-291
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 52
LIST OF VERIFICATION TEST SL # DESCRIPTION NAME OF TEST TESTING METHOD ASTM AASHTO 2 AGGREGATE TESTS Amount of Material Finer than 0.075 mm Sieve in Aggregate C-117 T-11
Unit Weight and Voids in Aggregate C-29/29M T-19 Organic Impurities in Fine Aggregate for Concrete C-40 T-21 Specific Gravity and Absorption of Fine Aggregate C-128 T-84 Specific Gravity and Absorption of Coarse Aggregate C-127 T-85 Sieve Analysis of Fine and Coarse Aggregate C-136 T-27 Clay Lumps and Friable Particles in Aggregate C-142 T-112 Resistance to Abrasion of Small Size Coarse Aggregate C-131 T-96 Soundness of Aggregate by use of Sodium or Magnesium Sulfate C-88 T-104 Plastic Fines in Graded Aggregates and Soils by use of Sand Equivalent Test D-2419 T-176 Flat and Elongated Particles in coarse Aggregate D-4791 Determining the Percent of Fractured particles in Coarse Aggregate D-5821 Potential Alkali Reactivity of Aggregates C-1260 Aggregate Durability Index D-3744 T-210
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 53
LIST OF VERIFICATION TEST SL # DESCRIPTION NAME OF TEST TESTING METHOD ASTM AASHTO 3 CEMENT TESTS Time of Setting of Hydraulic Cement by Vicat Needle C-191 T-131
Sampling of Hydraulic Cement C-183 T-127 Density of Hydraulic Cement C-188 T-127 Compressive Strength of Hydraulic Cement Mortar C-109 T-106 Portland Cement Anti Sulfate C-150 4 CEMENT CONCRETE TESTS Compressive Strength of Cylindrical Concrete Specimen C-39/C-39M T-22
Making and Curing Concrete Compressive Strength and Flexural Strength Test Specimens in the Site C-31/C-31M T-23 Bending Strength of Concrete using Simple Beam with three Point Loading C-78 T-97 Slump of Portland Cement Concrete C-143/C- 143M T-119 Standard Practice for Sampling Freshly Mixed Concrete C-172 T-141 Measuring Thickness of Concrete Elements using Drilled Concrete Cores C-174/ C-174M/ C- 1542/1542M T-148 Making and Curing of Concrete Test Specimen in the Laboratory C-192/192M T-126 Splitting Tensile Strength of Cylindrical Concrete Specimens C-496 T-198 Air Content of Freshly Mixed Concrete C-173/C-231 T-152/T- 196/ T-199 Reinforcing Steel Bars A-615 Reinforcing Wire Fabric A-185 Interlocking Brick C-936
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 54
LIST OF VERIFICATION TEST SL # DESCRIPTION NAME OF TEST TESTING METHOD ASTM AASHTO 5 TILES Testing and Sampling Structural Clay Tile C-67
Abrasion Resistance of Stone subjected to Foot Traffic C-241 Sampling and Testing Concrete Masonry Units and Related Units C-140 Flexural Strength of Concrete using Simple Beam with Three Point Loading C-78 T-97 Abrasion Resistance of Concrete by Sand Blasting 6 ASPHALT CEMENT TESTS Flash and Fire Points by Cleveland Open Cup D-92 T-48
Asphalt Penetration Test D-5 T-49 Ductility of Bituminous Materials D-113 T-51 Softening Point (Ring and Ball Method) D-36 T-53 Saybolt viscosity D-88 T-72 Effect of Heat and Air on Asphalt Material D-1754 T-179 Kinematics Viscosity of Asphalt D-2171 T-202 Specific Gravity of Simi-Solid Bituminous Materials D-70 T-228 Effect of Heat and Air on Moving Film of Asphalt (RTFO) D-2872 T-240 Determining the Flexural Creep Stiffness of Asphalt Binder using the Bending Beam Rheometer (BBR) D-6648 TP-1 Determining the Frature Properties of Asphalt Binder in Direct Tension (DT) D-6723 TP-3 Accelerated Aging of Asphalt Binder using pressurized Aging Vessel (PAV) D-6521 Viscosity Test SASO 1776
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 55
LIST OF VERIFICATION TEST SL # DESCRIPTION NAME OF TEST TESTING METHOD ASTM AASHTO 7 ASPHALT CONCRETE TESTS Effect of Water on Cohesion of Compacted Bituminous Mixtures D-1075 T-165
Bulk Specific Gravity of Compacted Asphalt Mixtures using Saturated Surface Dry Specimens D-2726 T-166 Quantitative Extraction of Bitumen From Paving Mixtures D-2172 T-174/T-164 Determining Degree of particle Coating of Bituminous Aggregate Mixture D-2489 T-195 Maximum Specific Gravity of Bituminous Paving Mixture D-2041 T-209 Determining Degree of Pavement Compaction of Bituminous Aggregate Mixture T-230 Resistance of Plastic Flow of Bituminous Mixture using Marshall Apparatus D-5581 T-245 Resistance of Compacted Bituminous Mixture to Moisture Induced Damage T-283 Asphalt Content of Hot Mix Asphalt by Ignition Method D-6307 T-308 Asphalt Content of Bituminous Mixtures by the Nuclear Method D-4125 T-310 Thickness or Height of Compacted Bituminous Paving Mixtures Specimens D-3549 Percent of Air voids in Compacted Dense and Open Bituminous Mixture D-3203 T-269 Tensile Strength Test for Reinforcing Steel Bars A-615 2 Preparation of Test Specimen of Bituminous Mixtures by means of Gyratory Shear Compactor D-4013 TP-4
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 56
LIST OF VERIFICATION TEST SL # DESCRIPTION NAME OF TEST TESTING METHOD ASTM AASHTO 8 GEOTEXTILE, FABRICS AND GEOCOMPOSITE Water Permeability of Geotextiles by Permittivity D-4491
Determining Apparent Opening Size of Geotextile D-4751 Grab Tensile Strength D-4632 Puncture Strength Index D-4833 Trapezoid Tearing Strength of Geotextile D-4533 Grab Breaking Load and Elongation of Geotextile D-4632 Tensile Properties of Geotextile by Wide width Strip Method D-4595 Deterioration of Geotextile by Exposure to Light and Heat in Xenon Arch Type Apparatus D-4355 Water Absorption of Plastics D-570 Determining Resistance of Synthetic Plyometric materials to Fungi G-21 Peel of Stripping Strength of Adhesive Bond D-903 In-Plane Flow per Unit Width and Transmissivity of Geosynthetic D-4716 9 Piling System Integrity Test D-5882 Static Load Testing D-1143 Dynamic Load Testing D-4945-89 10 Pre-Stressing Steel Quality Test A416 11 Bridge Bearings Quality Test D-429 12 Paint Quality Test Project Specs
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 57
No. Responsible Engineer Comment Originator & Organization Comment Code Comments Document Response to comment Designer response Code Comment Originator to check box & date when issue closed/Status
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 58
Issue Resolution Instruction PURPOSE AND SCOPE During the process of construction and start-up of a project, personnel at all levels of Construction Management and Client (PMO) will identify changes that they believe are required for one or both of the following reasons:
Safety Quality Construction Operation Most changes will result in additional costs and/or time extensions. Therefore, all changes must go through an approval process before being implemented. This procedure describes the approval process. RESPONSIBILTIES CMS Project Representative reviews and/or drafts the Issue Resolution Form(s) (IRF) and recommends further action by forwarding it to the Design Engineering Manager. Design Engineering Manager reviews IRF(s). If further action is desired, the Design Engineering Manager will forward the IRF to the project Construction Manager for details of cost and schedule impacts. The CMS will provide necessary recommendations regarding technical and contractual impacts to the Design Engineering Manager. The Design Engineering Manager may approve the change, reject the change or defer the change. PROCEDURE If JMC/C employee has a suggestion that is related to safety, quality or is necessary for facility operation, he should review it with his supervisor and the CMS Representative for that project. If deemed appropriate, the CMS representative will forward the recommendation to the Design Engineering Manager. Under no circumstances will the CMS employee or the CMS employee direct the Contractor to make any changes to the work as described in the Contract Documents. The suggestion shall be submitted on the IRF Form (XYZ123) and include a definitive description of the work, a justification for the work, and any appropriate sketches, photographs or drawings clearly depicting the proposed change. If the Design Engineering Manager concurs with the proposed change, he will sign the IRF and forward it to the CMS who will log the issue into the Access based CMS Toolbox and provide an assessment of cost and schedule impacts. The Construction Engineering Manager may
consult with the Design Manager and either approve, reject, or defer the change. If the change is approved but is not required for safety or construction operation, an e-mail will be sent to the CMS authorizing that a Change Request be developed. The e-mail will be copied to the Directors of Design Engineering and CMS.
2
CONSTRUCTION ENGINEERING & INSPECTION QUALITY GUIDELINES 59
The CMS may use a copy of the IRF and/or this e-mail as a trigger document for the Change Request. The Construction Manager will process the Change Request as per procedure Change order procedure. If the CMS Construction Manager and the Design Manager cannot agree on whether or not a change is required, the PMO and CMS will be given the IRF(s) and the CMS technical and contractual impacts and asked to consult. The PMO will send an e-mail with their final decision to the CMS Construction and Design Managers for resolving in the issue(s).
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 60
Appendix A
ORGANIZATION OF CONSTRUCTION PROJECT DOCUMENTS
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 61
1. General
This section describes the uniform filing system for organizing project records and reports. The system uses numbered categories for filing project documents. Use the uniform filing system on all projects.
There are 44 categories in the filing system. There are several unassigned categories. Use them for project documents that do not fit in assigned categories. If necessary, divide a category into subcategories.
Assign the appropriate category numbers to documents filed at a separate location (such as a field office hanging file). The filing system will then be correct when records are brought together after project completion.
2. Indexing
Use a category index, similar to the sample shown at the end of this section, or an index of categories that is supplied with the labels, for each project. Post the index in a prominent location.
When the location of a category is separate from the main file, indicate its location on the index under appropriate heading. 3. Description of Categories
The discussion below describes the documents that should be included in each category and, for some categories, a recommended order of the documents in the categories.
3.1 Project Personnel Include all personnel related records in this category. Suggested subcategories are listed below. On smaller projects, some of the listed subcategories may be combined when the amount of detail shown is not warranted.
Construction Manager Report of Assignment
Attendance Report
Overtime Records
Monthly Time Sheets
Overtime Requests and Authorizations
Absence Requests
Personnel Transfer Records
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 62
Personnel Roster
Travel Expense Claims and Records
Individual Personnel File. Use this for a file on each individual containing emergency telephone numbers, experience or training records, among other things. 3.2 Project Office Equipment and Supplies In this category, file those documents relating to equipment and supplies. Include records of equipment and supplies that have been received or returned. The subcategories listed below outline the scope of this category.
Equipment Inventory
Shipping Records (related shipping and receiving records should be stapled together)
Receiving Records
Transfer Requests
Local Requests
Automotive Records
Cash Expenditure Vouchers
Purchase Orders
Bills of Lading
3.3 Equipment and Personnel Cost Reports In this category, file construction engineering cost reports.
3.4 Service Contracts In this category, file those documents related to the project office utilities and services. File requests for service along with all correspondence relating to project office service contracts in an appropriate subcategory. File the receiving records for bills for utilities and services in a date received sequence.
It is recommended that a separate subcategory be used for each company or each service agreement. File purchase orders for supplies in Category 2, Project Office Equipment and Supplies.
The subcategories that may be included in this category are as follows:
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 63
Rent
Electricity
Gas
Telephone
Water
Additional service agreements, as required
Do not confuse this category with Category 16, Utility Agreements, Category 17, Utility Work Performed, or a subcategory of Category 52, Charges to Contract Allotment. These are part of the projects construction operations. Category 4 includes only those transactions connected with the resident engineers office.
3.5 General Correspondence In this category, file those letters that do not relate to any other category or subcategory in use. File correspondence concerning a subject that directly relates to some other category in that category. For example file correspondence developed in connection with a contract change order in the contract change order category file.
File correspondence filed in any subcategory in chronological order. When the volume of correspondence builds up, segregate and divide it into more detailed subject subcategories. When appropriate, transfer correspondence from category 5 to a more specific category. For example, a property owner may object to certain conditions on the project. After considerable correspondence, The resident engineer writes a contract change order to solve the problem. At this point, the resident engineer should transfer all of the correspondence related to the contract change order to the contract change order category file.
A letter might cover subjects in different categories. When the letter relates directly to two subjects, file a copy in each category or cross-reference to the location of the original. Cross- referencing need be only a note describing the letter filed in the appropriate category.
The following are examples of the subcategories in category 5. The number of subcategories will depend on the volume of correspondence. Show all subcategories in the index.
To Jeddah Municipality office
From Jeddah Municipality office
To contractor
From contractor
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 64
Property owners
Utility companies
Any additional subcategories that may be required depending on the volume of the correspondence.
3.6 Safety File project documents relating directly to safety in this category. Suggested subcategories are shown below:
Employee Safety
Contract Documents Relating to Safety
A copy of the contractors Code of Safe Practices in use for the project
3.7 Public Relations File the various documents covering the subject of public relations in this category.
3.8 Construction Surveys Use this category for filing all survey documents that do not directly or solely relate to another category. Request for Construction Staking, in this category. Create subcategories for requests on which staking have been completed and for those where staking has not been completed. Cross-file staking requests that include re-staking charges in Category 54, Deductions from Payment to Contractor.
3.9 Extra Category Number Use this extra category number for project documents that do not fit in presently established categories. When used, enter the name of the category on the index sheet.
3.10 Information Furnished at Start of Project In this category, file documents related to planning, design, contract funding, advertising, and opening bids. Do not file documents in this category that apply solely or directly to other established categories. This category should contain the following items. Create subcategories as necessary due to the volume of documents.
Project Report
Preliminary Report
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 65
Detailed Estimate of Project Cost Notice of Award of Contract
Bid Summary Sheets
Detail Estimate
Executed Contract, Special Provisions, and Plans
Notice of Approval of the Contract.
Environmental Permits
Encroachment Permits and Cooperative Agreements
Bidder Inquiry Information
3.11 Contractor Use this category to file the various documents that the contractor is required to submit. Do not use it for general correspondence or documents appropriate to another specific category. The following subcategories suggest the scope of the category:
Contractors organization including the designation of the contractors authorized representative as required
Contractors equipment list
Contractors borrow agreements
List of subcontractors and other project documents concerning subcontracting
Shop plans, if not filed under another appropriate category
False work plans
Insurance documents as required Indemnification and Insurance,
3.12 Photograph Records File routine photographs and their identification in this category. File photographs relating to claims in Category 62, Disputes. It is a good practice to take photographs on a monthly basis to document the work during construction. Maintain videotapes and digital photo files in an organized manner. Note the location of these items in this category file.
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 66
Suggested subcategories for this category are:
Before Construction
During Construction
After Construction
3.13 Accidents In this category, file documents related to accidents. Subcategories may include:
Employee Accident and Injury Reports.
Vehicle Accident Reports.
Local Police Accident Reports.
Records and Investigations of Public Traffic Accidents.
Records and Investigations of Contractor Accidents.
3.14 Utility Work Performed In this category, file daily reports and other records of utility facility work. Create the same the primary subcategories as those used in Category 16.
Create second level subcategories when required by the number of documents and the amount of work. 3.15 Agreements In this category, file agreements (except utility agreements) with third parties or other state or county agencies. The number and levels of subcategories will depend upon the agreements and the nature and extent of the work involved. A list of suggested subcategories follows:
Right-of-Way AgreementsWithout Obligations Right-of-Way AgreementWith Obligations Borrow Agreements (between Contractor and owner) Disposal Agreements (between Contractor and owner) Service Agreements (these are utility service agreements such as for highway lighting) Disposal Permits Records of Royalty Payments
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 67
Encroachment Permits
File an encroachment permit relating to a utility facility agreement under Category 16, Utility Agreements. File an encroachment permit relating to a right-of-way agreement in this category. Where there are several right-of-way agreements requiring some degree of control, such as right-of-way agreements with obligations, maintain a summary to show the status of these agreements. An example of the status summary headings is shown below:
The agreement number.
The location of work to be performed.
A brief description of work to be done and by whom.
When the work is completed.
The contract change order number if the required work is being done by contract change order.
3.16 Hazardous Waste and Hazardous Materials File any information regarding the discovery and removal of hazardous waste in this category.
3.17 Water Pollution Control Plan or Storm Water Pollution Prevention Plan
File all correspondence regarding water pollution control plans (WPCP) or storm water pollution prevention plans (SWPPP) in this category. A list of suggested subcategories follows:
Approved WPCP or SWPPP
Amendments to WPCP or SWPPP
Notification of Construction
Correspondence
Inspections by Contractor
Inspections by CMS
Inspections by Task Force Team
Notices of Noncompliance
Annual Certification of Compliance
Notice of Termination
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 68
3.18 Traffic Management Information Use this category to file information related to traffic management. Possible subcategories include:
Contractor lane closure requests
Lane closure requests submitted to the traffic management center
Approved lane closures
Contractor contingency plans
Traffic count data
3.19 Extra Category Number Use this extra category number for project documents that do not fit in presently established categories. When using an extra category, enter the category number and title in the index.
3.20 Progress Schedule In this category, file the progress schedule, critical path method submittals, and other related information.
3.21 Weekly Statement of Working Days In this category, Weekly Statement of Working Days. Also file correspondence relating to contract time in a subcategory of this category.
3.22 Weekly Newsletter In this category, file periodic newsletters and reports that are prepared during the project. Include those weekly reports of a general nature pertaining to the progress of the contract.
3.23 Materials Information and Preliminary Tests In this category, file materials information and preliminary test reports. Suggested subcategories follow:
Materials information
Report of foundation investigation
Asphalt concrete aggregate (preliminary tests)
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 69
Report of tests on aggregate base (preliminary tests)
Report of tests on aggregate sub base (preliminary tests)
3.24 Notice of Materials to be Inspected In this category, file request for Notice of Materials to be Inspected.
3.25 Notice of Materials to be Furnished In this category, file request for Notice of Materials to be Furnished.
3.26 Treated Base In this category, file documents for cement-treated base, cement-treated permeable base, and asphalt-treated permeable base. Do not include those documents that are to be filed in other specific categories such as 37 and 48.
Use subcategories similar to the examples shown below. Create a numbering system that identifies the category, item and subcategory. For example, 34.26.3 indicates Category 34 Treated Bases, 26 is the contract item number of the material and also identifies the subcategory, and the 3 is the second level subcategory identifying the particular document.
34.26.1 Mix design data, cement-treated base
34.26.2 Plant records, cement-treated base
34.26.3. Spread records, cement-treated base
34.27.1 Mix design data, cement-treated permeable base
34.27.2 Plant records, cement-treated permeable base
34.27.3 Spread records, cement-treated permeable base
34.28.1 Mix design data, asphalt-treated permeable base
34.28.2 Plant records, asphalt-treated permeable base
34.28.3 Spread records, asphalt-treated permeable base
34.4 Certificates of Compliance for materials used in treated bases
3.27 Asphalt Concrete In this category, file documents related to asphalt concrete, except those to be filed in other specific categories such as in 37 and 48. Following are suggested subcategories:
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 70
Mix designs and related project documents
Plant records (other than acceptance tests)
Spread records
Certificates of Compliance for materials used in asphalt concrete
3.28 Portland Cement Concrete (other than structure items) In this category, file documents related to Portland cement concrete. Do not include documents that are to be filed in other specific categories such as 37, 43 and 48. For structure items, the project documents are to be filed in Category 43. See the Bridge Construction Records and Procedures Manual for details. Following are suggested subcategories for this category:
36.1 Portland cement concrete Pavement 36.1.1 Mix Designs 36.1.2 Plant Records 36.1.3 Certificates of Compliance for materials used in concrete pavement 36.2 Portland cement concrete, Class A Structure and minor concrete 36.2.1 Mix Designs 36.2.2 Plant Records 36.2.3 Certificates of Compliance for materials used in Class A structure concrete and minor concrete
3.29 Initial Tests and Acceptance Tests In this category, file initial tests and acceptance tests. File documents in each subcategory chronologically unless there is a specific reason for doing otherwise.
Use subcategories similar to the examples shown below. Create a numbering system that identifies the category, item and subcategory. For example, 37.21.3 indicates Category 37 Acceptance Tests, 21 is the contract item number of the material and also identifies the subcategory, and the 3 is the second level subcategory identifying the particular test result.
Embankment
37.10.1 Relative Compaction
Structure Backfill
Sand Equivalent
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 71
Relative Compaction
Aggregate Sub base
Relative Compaction
Moisture
Sieve Analysis
Sand Equivalent
Record of Thickness (summarized in the order that the measurements are made)
Aggregate Base
Relative Compaction
Moisture
Sieve Analysis
Sand Equivalent
Record of Thickness (summarized in the order that the measurements are made)
Asphalt Concrete
Gradings and sand equivalent (file both in a single subcategory when both results appear on one test report)
Extraction and Moisture
Portland Cement Concrete Pavement
Sand Equivalent Cleanness Value
Sieve Analysis
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 72
Modulus of Rupture
Penetration Values
Cement Content
Coefficient of Friction
Other related items
Test Result Summary for each item of testing, and file it in the appropriate subcategory of this category.
Bills of lading and copies of sample identification tags may be filed in this category temporarily and discarded when their respective test reports are filed.
3.30 Quality Control, Quality Assurance In this category, include all documents relating to quality control, quality assurance. Create a subcategory system to include the following:
The contractors quality control plan
Mix designs
The contractors quality control tests
CMS verification tests
Pay factor calculations
Copies of related correspondence
3.31 Materials Testing Certification of JMC/C Employees In this category, file copies of certifications of the employees performing acceptance tests.
3.32 Field Laboratory Assistant Reports to Site Engineer In this category, file chronologically any reports made out by the projects materials tester. For more than one type of report, such as a report and a summary form, provide separate subcategories.
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 73
3.33 Report of Inspection of Material In this category, file Report of Inspection of Material. Create a subcategory for each contract item requiring inspection at the source by the contract.
Place a summary sheet containing the date of inspection, quantity inspected, accumulated quantity, and lot numbers in each subcategory.
Stable Inspection Release Tag, removed from materials received on the project, to the report of inspection on a letter-size sheet of paper and file it in the appropriate subcategory of this category. The sheet should contain the name of the engineer who removed it and the date removed.
File test reports (Material Inspected and Released on Job) that cover material sampled on the job in lieu of source inspection in the appropriate subcategory of this category, not in Category 37.
File reports of inspection or certificates of compliance for materials assigned to the structure representative in this category in accordance with instructions contained in the Inspection Instruction
3.34 Concrete and Reinforcing Steel In this category, file documents relative to concrete and reinforcing steel in accordance with instructions in the Bridge Construction Records and Procedures Manual.
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 74
3.35 Inspectors Daily Reports In this category, Inspectors Daily Report.
Subcategories may be used. They may vary depending on the complexity of the project and the desires of JM PMO. The CMS assigned engineer must agree on the subcategories before the start of work. Follow the procedures described below to establish the subcategories.
1. Reports Covering Contract Items
Create a subcategory for each major operation so that all items affecting the major operations are grouped together. An example of a system for a relatively large project follows:
Category and Subcategory Number Operations
46.2 Clearing and Grubbing 46.3 Rdwy. Exc., Ditch Exc.
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 75
Modify the above breakdown to conform to the size and nature of the project. Make the breakdown narrow enough so that reports covering any particular contract item may be obtained with ease. Review the breakdown to ensure it includes all contract items.
Make as many daily reports as necessary to cover all contract item work in the appropriate subcategories.
As indicated in the above example, set up a separate subcategory for each structure.
3.36 Drainage Systems In order to maintain a record of contract items for drainage systems,
For each drainage system shown on the drainage quantity plan sheet. The preliminary work required to set up each system summary includes entering the contract number, the system number, planned station and description of the system, and the preliminary or planned quantities which are entered from the drainage quantity plan sheet.
The Inspector describes progress on each drainage system in the daily report and enters estimates of work completed on the Progress Record portion of the drainage system summary.
Enter the quantity of work completed during an estimate period or near the end of the estimate period for each item in the Estimate of Work Completed portion of the drainage system summary.
After all items for a particular drainage system have been calculated and checked, the final quantities are entered in the row labeled, Actual Q.
In order to keep track of and reduce the number of drainage system summaries that have to be checked at the end of each estimate period, divide the category into the following subcategories:
47.1 Before Work Starts
47.2 Staked and Being Worked On
47.3 Drainage System Complete, Final Quantities Not Complete
47.4 Final Quantities Completed
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 76
Example:
47.1 Before Work Starts.
Place the preliminary drainage summaries in this subcategory in numerical order. Each drainage system summary will remain in this subcategory until work starts on that system.
47.2 Staked and Being Worked On.
When a drainage system is staked, transfer the drainage summary sheet from index 47.1, Before Work Starts, to index 47.2, Staked and Being Worked on. Transfer the individual quantity calculation sheets with the drainage summary.
47.3 Drainage System Complete, Final Quantities not complete
After all work is completed on a particular drainage system, transfer the summary sheet with its calculation sheets to this subcategory. Removing the summary from the preceding index (47.2, Staked and Being Worked On), precludes having to go through completed structure summaries at the end of each estimate period when making entries of work completed. Determination of pay quantities should be made as soon as possible after work on the system is complete.
47.4 Final Quantities Completed
After all quantity calculations for a drainage system are completed and the adjusted quantities entered into the project record, transfer the summary sheet and its calculation sheets to this subcategory.
Since all drainage quantity calculation sheets will remain filed in Category 47, some item- numbered folders in Category 48 may have no documents.
3.37 Contract Item Quantity Documents In this category, file source documents supporting contract item quantities. List the subcategories in category 48 by contract item number order. Identify individual calculation sheets for the various contract items in the following manner. A quantity sheet with the number 48-14-2 indicates that it is sheet number 2 covering contract item number 14 and filed in Category 48, Contract Item Quantity Documents. Some drainage item quantity documents may be filed in Category 47.
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 77
3.38 Adjustment in Compensation Calculations In this category, file project documents and calculations to support adjustments in compensation.
3.39 Deductions from Payment to Contractor In this category, file documents related to deductions from payments to contractors. Possible subcategories include the following:
Royalties on material.
Laboratory testing done for the contractor Engineering and inspection charged to the contractor (Lines and Grades, of this manual for re-staking charges).
Costs of damaged or missing state-owned signs.
flagging charges.
3.40 Bridge Estimate Data In this category, file the bridge estimate data
3.41 Contract Administration System Inputs and Reports
In this category, file the outputs for Project Record Item Sheets. Subcategories of this category are estimate numbers in numerical order. Only the most current results need to be retained.
Possible subcategories are: Project Record Item Sheets Progress Pay - Estimate Project Initiation or Update Estimate Verification Form Contract Transactions Input Status of Contract Items Status of Contract Change Orders Contract Change Order Master Listing Daily Extra Work Report Edit Messages Contract Administration System (CAS) - Report Requests If desired, some of the Above project documents (other than the Project Record Item Sheets) may be filed in extra category numbers.
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 78
3.42 Estimates and Project Status In this category, file monthly Project Record - Estimate Request documents. The suggested subcategories of this category are:
Progress Payment Voucher
Project Record-Estimate and Project Status
Estimate Processing Results
Project Record - Estimate Request
3.43 Disputes In this category, file notes, photographs, information, and other project documents that may be necessary to establish facts with respect to a dispute. Include any documents that may be related to a dispute in this category or briefly describe and cross-reference them.
Number notices of potential claims in chronological order. These numbers may then be used for subcategories.
The scope of this category may vary considerably, depending upon the nature and circumstances of the dispute. The following types of documents indicate the type of information that should be included:
Notice of Potential Claim
Acknowledgment of the contractors dispute
Disputes Review Board Agreement
Contractors claim for a time extension (cross-reference to Category 27)
Acknowledgment of the contractors claim for time extension
Other correspondence relating to disputes
Photographs pertaining to disputes
3.44 Project Completion Documents In this category, file documents related to the completion of the project. The following are suggested subcategories:
Contract Acceptance Statement of Materials and Labor Used by Contractors Materials certification
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 79
Punch list
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 80
Category Numbers And Headings Category No. Category Heading 1 Project Personnel 2 Project Office Equipment and Supplies 3 Equipment and Personnel Cost Reports 4 Service Contracts 5 General Correspondence 6 Safety 7 Public Relations 8 Extra Category Number 9 Information Furnished at Start of Project 10 Contractor 11 Photograph Records 12 Accidents 13 Utility Work Performed 14 Agreements 15 Hazardous Waste and Hazardous Materials 16 Water Pollution Control Plan or Storm Water Pollution Prevention Plan 17 Traffic Management Information 18 Extra Category Number 19 Disadvantaged Business Enterprises and Disabled Veteran Business Enterprises 20 Progress Schedule 21 Weekly Statement of Working Days 22 Weekly Newsletter 23 Materials Information and Preliminary Tests 24 Notice of Materials to be Inspected 25 Notice of Materials to be Furnished 26 Treated Base 27 Asphalt Concrete
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 81
28 Portland Cement Concrete (other than structure items) 29 Initial Tests and Acceptance Tests 30 Quality Control, Quality Assurance 31 Materials Testing Certification of Employees 32 Field Laboratory Assistant Reports to Resident Engineer 33 Report of Inspection of Material 34 Concrete and Reinforcing Steel 35 Assistant Resident Engineers Daily Reports 36 Drainage Systems 37 Contract Item Quantity Documents 38 Adjustment in Compensation Calculations 39 Deductions From Payment to Contractor 40 Bridge Estimate Data 41 Contract Administration System Inputs and Reports 42 Estimate and Project Status 43 Disputes 44 Project Completion Documents
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 82
Alphabetical Listing Of Categories Heading Category No. Accidents 12 Adjustment in Compensation Calculations 38 Agreements 14 Asphalt Concrete 27 Assistant Resident Engineers Daily Reports 35 Bridge Estimate Data 40 Concrete and Reinforcing Steel 34 Contract Administration System Inputs and Reports 41 Contract Item Quantity Documents 37 Contractor 10 Deductions From Payment to Contractor 39 Disadvantaged Business Enterprises and Disabled Veteran Business Enterprises 19 Disputes 43 Drainage Systems 36 Equipment and Personnel Cost Reports 3 Estimate and Project Status 42 Extra Category Number 8 Extra Category Number 18 Field Laboratory Assistant Reports to Resident Engineer 32 General Correspondence 5 Hazardous Waste and Hazardous Materials 15 Information Furnished at Start of Project 9 Initial Tests and Acceptance Tests 29 Materials Information and Preliminary Tests 23
ORGANIZATION OF CONSTRUCTION MANAGEMENT PROJECT DOCUMENTS 83
Materials Testing Certification of Employees 31
Notice of Materials to be Furnished 25 Notice of Materials to be Inspected 24 Photograph Records 11 Portland Cement Concrete (other than structure items) 28 Progress Schedule 20 Project Completion Documents 44 Project Office Equipment and Supplies 2 Project Personnel 1 Public Relations 7 Quality Control, Quality Assurance 30 Report of Inspection of Material 33 Safety 6 Service Contracts 4 Traffic Management Information 17 Treated Base 26 Utility Work Performed 13 Water Pollution Control Plan or Storm Water Pollution Prevention Plan 16 Weekly Newsletter 22 Weekly Statement of Working Days 21