You are on page 1of 30

SEMESTER I

I Year B.E. / B.Tech.


GE 2115 COMPUTER PRACTICE LABORATORY I
Requirements for a batch of 30 students
S.No. Description of Equipment
Quantity
required

Quantity
available

Deficiency %

Hardware
1.
LAN system with 33 nodes (OR) stand
alone PCs
33 Nos.
2. Printer 3 Nos.
Software
1. Operating System
Windows /
Unix Clone
Available / Not
Available

2. Compiler C compiler
Available / Not
Available

3. Application package Office suite
Available / Not
Available



SEMESTER I
I Year B.E./ B.Tech.
GE 2116 Engineering Practices Laboratory
Requirements for a batch of 30 students
Sl.No. Description of Equipment
Quantity
required

Quantity
available

Deficiency %

CIVIL
1.
Assorted components for plumbing
consisting of metallic pipes, plastic
pipes, flexible pipes, couplings, unions,
elbows, plugs and other fittings.
15 sets
2. Carpentry vice (fitted to work bench) 15 No.
3. Standard woodworking tools 15 sets
4.
Models of industrial trusses, door joints,
furniture joints
5 each
5.
Power Tools:
(a) Rotary Hammer
(b) Demolition Hammer
(c) Circular Saw
(d) Planer
(e) Hand Drilling Machine
(f) J igsaw

2 Nos
2 Nos
2 Nos
2 Nos
2 Nos
2 Nos

MECHANICAL
1.
Arc welding transformer with cables and
holders
5 No.
2. Welding booth with exhaust facility 5 No.
3.
Welding accessories like welding shield,
chipping hammer, wire brush, etc.
5 sets
4.
Oxygen and acetylene gas cylinders,
blow pipe and other welding outfit.
2 No.
5. Centre lathe 2 No.
6. Hearth furnace, anvil and smithy tools 2 sets
7. Moulding table, foundry tools 2 sets
8. Power Tool: Angle Grinder 2 Nos
9.
Study-purpose items: centrifugal pump,
air-conditioner
One Each.
ELECTRICAL
1.
Assorted electrical components for
house wiring
15 sets
2. Electrical measuring instruments 10 sets
3.
Study purpose items: Iron box, fan and
regulator, emergency lamp
One each
4. Megger (250V/500V) 1 No.
5.
Power Tools:
(a) Range Finder
(b) Digital Live-wire detector
2 Nos
2 Nos

ELECTRONICS
1. Soldering guns 10 No.
2.
Assorted electronic components for
making circuits
50 No.
3. Small PCBs 10 No.
4. Multi Meters 10 No.
5.
Study purpose items: Telephone, FM
radio, low-voltage power supply
2 each




SEMESTER I
I Year B.E. / B.Tech.
PHYSICS & CHEMISTRY LABORATORY - I
Requirements for a batch of 30 students
Physics Laboratory
S.No. Description of Equipment
Quantity
required
Quantity
available
Deficiency %
1.
Lees disc apparatus
(With accessories)
5 Nos.
2.
Air Wedge apparatus
(With traveling microscopes and
accessories)
5 Nos.
3.
Spectrometer
(With grating, prism and accessories)
5 Nos.
4.
Diode laser (2 mW power) or
He-Ne laser (2mW)
(Lycopodium powder, Optical fibre Kit
and accessories)
5 Nos.
5.
Ultrasonic interferometer
(With accessories)
5 Nos.
6. B-H Curve traces apparatus 5 Nos.

Chemistry Laboratory

S.No. Description of Equipment
Quantity
required

Quantity
available

Deficiency %

1. Electronic balance 1 No.
2. pH meter 8 Nos.
3. Conductivity bridge 8 Nos.
4. Potentiometer 8 Nos.
5. Platinum electrodes 8 Nos.
6. Calomel electrodes 8 Nos.
7. Spectrophotometer 1 No.
8. Flame photometer 1 No.
9. Oswald viscometer 15 Nos.
10. Glassware
Sufficient
Quantity


SEMESTER II
I Year B.E. / B.Tech.
GE2155 COMPUTER PRACTICE LABORATORY - II
Requirements for a batch of 30 students
Sl.No. Description of Equipment
Quantity
required

Quantity
available

Deficiency
%
Hardware
1. UNIX Clone Server 1 No.
2. 33 Nodes (thin client or PCs) 33 Nos.
3. Printer 3 Nos.
Software
4.
Operating System
(33 user license or License free Linux)
Unix Clone
Available /
Not Available

5. Compiler C compiler
Available /
Not Available



SEMESTER II
I Year B.E. / B.Tech.
GS2165 PHYSICS & CHEMISTRY LABORATORY - II
Requirements for a batch of 30 students
Physics Laboratory
Sl.No. Description of Equipment
Quantity
required
Quantity
available
Deficiency %
1.
Torsional Pendulum apparatus
(With accessories)
5 Nos.
2.
Non-uniform Bending apparatus
(With accessories)
5 Nos.
3.
Viscosity (Poiseuilles flow) apparatus
(With accessories)
5 Nos.
4. Band gap apparatus/ Post office box 5 Nos.
5.
Spectrometer
(With grating, prism and accessories)
5 Nos.
6. Carey Foster Bridge 5 Nos.

Chemistry Laboratory

S.No. Description of Equipment
Quantity
required

Quantity
available

Deficiency %

1. Electronic balance 1 No.
2. pH meter 8 Nos.
3. Conductivity bridge 8 Nos.
4. Potentiometer 8 Nos.
5. Platinum electrodes 8 Nos.
6. Calomel electrodes 8 Nos.
7. Spectrophotometer 1 No.
8. Flame photometer 1 No.
9. Oswald viscometer 15 Nos.
10. Glassware
Sufficient
Quantity


SEMESTER II
I Year B.E. /B.Tech.
EE 2155 Electrical Circuits Laboratory
Requirement for a batch of 30 students

Sl.
No.
Name of the
Equipment
Range / Spec
Quantity
required
Quantity
available
Deficienc
y %
1. C.R.O 30MHZ 6
2. D.C, Power
Supply
(regulated)
0-30 V 6



3. Function
Generator
Frequency: 1 MHZ
Amplitude: Max volt:
20V
Min volt:
20mV
Waveforms: Sine,
Square,
triangular
6

4. Digital Storage
Oscilloscope
-
1

SEMESTER III
Faculty of Electrical Engineering
B.E. Electronics and Instrumentation Engineering
EE 2207 Electronic Devices and Circuits Laboratory
Requirement for a batch of 30 students
S.No. Description of Equipment

Quantity
required
Quantity
available

Deficiency
%

1. Regulated Power Supply 15
2. Dual Tree CRO (20 MHz) 15
3. Function Generator 15
4. 3
1/2
Digit digital multimeter 10
5. Bread Boards 40
6.
Transistor
25 Nos.

7.
J FET 10 Nos.

8.
Diode 10 Nos.

9.
Zener Diode 5 Nos.

10.
UJ T 5 Nos.

11.
Photo Diode 5 Nos.

12.
Photo Transistor 5 Nos.

13.
Thermistors 5 Nos.

14.
OP-amp 10 Nos.

15.
Milli Ammeter (0-100mA) 15 Nos.

16.
Micro Ammeter (0-50A) 10 Nos.

17.
Low range voltmeter (0-30V) 10 Nos.

18.
Resistor of various ranges 50 Nos.

19.
Capacitors of various ranges 50 Nos.

20.
Connecting wires
Sufficient
Nos



SEMESTER III
Faculty of Electrical Engineering
B.E. Electronics and Instrumentation Engineering
EE 2209 Data Structures and Algorithms Laboratory
Requirement for a batch of 30 students
S.No. Description of Equipment Quantity
required
Quantity
available

Deficiency
%

1. Computer(Pentium 4) 40 Nos with
one server

2. Dot matrix printer 3 Nos
3. Laser Printer 2 Nos
4. UPS (5 KVA) 2
5. Turbo C 40 Nodes


SEMESTER III
Faculty of Electrical Engineering
B.E. Electronics and Instrumentation Engineering
EI 2208 Electrical Machines Laboratory
Requirement for a batch of 30 students
S.No.
Description of Equipment
Quantity
required
Quantity
available

Deficiency
%

6. D.C motor Generator set
D.C motor Shunt Generator
D.C motor Compound Generator

2 set
2 set

7. D.C. Shunt Motor 2 Nos.
8. D.C. Series Motor 1 No.
9. D.C. Compound Motor 1 No.
10. Single phase transformers 7 Nos.
11. Three phase transformers 2 Nos.
12. D.C. Motor Alternator set 4 sets
13. Three phase Induction Motor (Squirrel
cage)
3 Nos.
14. Three phase slip ring Induction Motor 1 No.
15. Single phase Induction Motor 2 Nos.
16. Resistive load
3 phase 2 , single phase - 3
5 Nos.
17. Inductive load 1 No.
18. Single phase Auto transformer 5 Nos.
19. Three phase Auto transformer 3 Nos.
20. Moving Coil Ammeter of different
ranges
20 Nos.
21. Moving Coil Voltmeter of different
ranges
20 Nos.
22. Moving Iron Ammeter of different
ranges
20 Nos.
23. Moving Iron voltmeter of different
ranges
20 Nos.
24. Wire wound Rheostats of different
ratings
30 Nos.
25. Tachometers 10 Nos.
26. Single element wattmeters of different
ranges
UPF / LPF
20 Nos.
27. Double element wattmeters of different
ranges
4 Nos.
28. Power factor meter 2 Nos.
29. Digital multimeter 5 Nos.
30. Three point starter, four point
starter,DOL starter, manual star / delta
starter, semi automatic and fully
automatic star / delta starter
1 No each
for study
experiment

31. SCR based semi and fully controlled
rectifier module
2 Nos.
32. SCR based chopper module 2 Nos.
33. SCR based inverter module 2 Nos.
34. SCR based AC voltage regulation
module
2 Nos.
35. SCR, MOSFET, IGBT Trainer module Each 2
Nos.



SEMESTER IV
Faculty of Electrical Engineering
B.E. Electrical and Electronics Engineering
EI 2257 Transducers and Measurements Laboratory
Requirement for a batch of 30 students
S.No. Description of Equipment Quantity
required
Quantity
available

Deficiency
%

Loading Effect on potentiometer
1. Potentiometer Linear displacement transducer kit 1 No
2. Regulated power supply 1 No
3. FET voltmeter, ordinary voltmeter 1 No
Characteristics of Strain Guage and Load cell
4. Strain guage and Load cell kit 1 No
5. Variable power supply 1 No
6. Loads for measurement A set
Characteristics of LVDT
7. LVDT trainer kit 1 No.
8. Power supply 1 No.
Half Effect Transducers
9. Hall effect characteristics trainer 1 No.
10. Power supply 1 No.
11. Voltmeter 1 No.
Photoelectric tachometer
12. Speed control trainer kit 1 No
13. Power supply 1 No.
14. Wires Some
15. Multimeter 1 No.
Characteristics of LDR
16. Photo conductive trainer kit 1 No.
17. Multimeter 1 No.
18. Connecting wires 1 No.
Characteristics of thermistor
19. Thermistor Trainer kit 1 No.
20. Heater 1 No.
21. Thermistor 1 No.
22. Thermometer 1 No.
23. Voltmeter 1 No.
Characteristics of Thermocouple
24. Thermocouple trainer kit 1 No.
25. Thermocouple 1 No.
26. Heater 1 No.
27. Voltmeter 1 No.
Step Response characteristics of RTD and Thermocouple
28. Thermocouple and RTD trainer kit 1 No.
29. Thermocouple and RTD sensors 1 No.
30. Thermometer 1 No.
31. Heater 1 No.
32. Voltmeter 1 No.
33. I/P trainer kit 1 No.
34. Pressure source 1 No.
35. Control valve etc 1 No.
Measurement Of Medium Resistance Using a) Wheatstones Bridge
36. Resistors 1 No.
37. Galvanometer 1 No.
38. Regulated Power Supply 1 No.
39. Bread Board 1 No.
40. Decade Resistance Box 1 No.
41. Multimeter 1 No.
b) Kelvins Double Bridge
42. Power supply 1 No.
43. Fixed resistance 1 No.
44. Unknown resistance 1 No.
45. Decade Resistance box 1 No.
46. Multimeter 1 No.
47. Galvanometer 1 No.
48. Bread Board 1 No.
Scherings Bridge for capacitance measurement
49. Resistors Some set
50. Capacitance Some set
51. Decade Resistance box 1 No.
52. Decade Capacitance Box 1 No.
53. CRO 1 No.
54. Function Generator 1 No.
Andersons Bridge for inductance measurement.
55. Resistors Some Set
56. Decade Inductance box 1 No.
57. Decade Condenser box 1 No.
58. Regulated Power Supply 1 No.
59. CRO 1 No.
60. Bread Board 1 No.
Calibration of Single Phase Energy Meter
61. Wattmeter 2 No.
62. Voltmeter 1 No.
63. Ammeter 1 No.
64. Resistive Load 1 No.
Calibration of wattmeter
65. Ammeter 1 No.
66. Voltmeter 1 No.
67. Wattmeter 1 No.
68. Load 1 No.
Calibration of Ammeter
69. Standard Ammeter 1 No.
70. Ammeter 1 No.
71. Variable resistive load 1 No.
72. RPS 1 No.
Calibration of Voltmeter
73. Standard Voltmeter 1 No.
74. Voltmeter 1 No.
75. Auto transformer 1 No.
76. RPS 1 No.
Series type Ohmmeters
77. Ohmmeter (Analog Multimeter) 1 No.
78. Voltmeter 1 No.
79. Ammeter 1 No.
80. Resistor 1 No.
81. RPS 1 No.
Shunt type Ohmmeter
82. Ohmmeter (Analog Multimeter) 1 No.
83. Voltmeter 1 No.
84. Ammeter 1 No.
85. Resistor 1 No.
86. RPS 1 No.

SEMESTER IV
Faculty of Electrical Engineering
B.E. Electronics and Instrumentation Engineering
EI 2258 Thermodynamics Laboratory
Requirement for a batch of 30 students
S.No. Description of Equipment Quantity
required
Quantity
available

Deficiency
%

Thermodynamics Lab
87. Engine cut section models 1 set
88. Single cylinder petrol engine with
Mechanical dynamometer
1 set
89. Multi cylinder petrol engine with hydraulic
dynamometer
1 set
90. Multi cylinder diesel engine with Electrical
dynamometer
1 set
91. Steam boilers with suitable mountings and
accessories
1 set
92. Refrigeration Test Rig 1 No.
93. Forced convection Heat transfer Test set
up.
1 No.
94. Free convection Heat transfer test set up. 1 No.
95. Apparatus for measuring pipe friction 1 No.
96. Francis turbine 1 No.
97. Pelton wheel 1 No.
98. Turgo impulse wheel 1 No.
99. Stop watches 6 Nos.

SEMESTER IV
Faculty of Electrical Engineering
B.E. Electronics and Instrumentation Engineering
EE 2258 Linear and Integrated Circuits Laboratory
Requirement for a batch of 30 students
\S.No. Description of Equipment Quantity
required
Quantity
available

Deficiency
%

1. Interface such as, A/D, D/A converter,
DMA, PIC Serial, Interface,
Temperatures controller, Stepper
motor, Key board
4 each
2. CRO and function generator 3 each
3. IC trainer Kit 15
4. Analog AC trainer kit 4
5. Components and bread boards 10 each
6. Chips IC 7400 10
7. Chips IC 7402 10
8. Chips IC 7408 10
9. Chips IC 7432 10
10. Chips IC 7410 25
11. Chips IC 555 10
12. Chips IC 741 10
13. Chips IC 74153 10
14. Chips IC 7474 10
15. Chips IC 7490 10
16. Chips IC 7447 10
17. Chips IC 7476 10
18. Chips IC 7420 10
19. Chips IC 7404 15
20. Chips LM 317 10
21. Chips LM 723 10
22. Chips MA 7840 10
23. Chips LM 380 10
24. Chips ICL - 8038 10
25. Traffic light control kit 2
26. VDU 2
27. 7 segment Display 5
28. Interfacing card such as keyboard etc. 3 each
29. Work tables 15




SEMESTER V
Faculty of Electrical Engineering
B. E. Electronics and Instrumentation Engineering
EC 2313 Microprocessor and Microcontroller Laboratory
Requirement for a batch of 30 students
Sl.
No.
Description of Equipment
Quantity
required
Quantity
available
Deficiency
%
1.
8085 Microprocessor Trainer with Power
supply
10

2.
8051 Micro controller Trainer Kit with power
supply
10

3. 8255 Interface board 5

4. 8251 Interface board 5

5. 8259 Interface board 5

6. 8279 Keyboard/Display Interface Board 5

7. 8253 timer counter 5

8. ADC and DAC card 5 each

9. Stepper motor with Controller 1

10. Traffic Light Control System 1

11. Regulation power supply 1

12. Universal ADD-ON modules 3

13. 8 Digit Multiplexed Display Card 2

14. Function Generator 3

15. Multimeter 3

16. C Compliers 2

17. KEIL or RIDE software 2 license

18.
8051 Microcontroller trainer kit with flash
memory
2

19. AT89C51 Microcontroller Kit 2


SEMESTER V
Faculty of Electrical Engineering
B.E. - Electronics and Instrumentation Engineering (R 2008)
CS 2312 Object Oriented Programming Laboratory
(Requirement for a batch of 25 students)

Sl.
No.
Description of Equipment
Quantity
Required
Quantity
Available
Deficiency
in %
Hardware Required
1. Computers (Pentium-4)
40 Nos with one
server

2. Dot matrix printer 3 Nos
3. Laser Printer 2 Nos.
4. UPS (5 KVA) 2
Software Required
5. Turbo C++ 40 Nodes
6.
(J ava 2 SDK)
J DK 5.0 update 6 (1.5.0 -
Internal Version No.)
40 Nos.

SEMESTER V
Faculty of Electrical Engineering
B. E. Electronics and Instrumentation Engineering (R 2008)
EI 2304 Industrial Instrumentation Laboratory
(Requirement for a batch of 30 students)
S.No. Description of Equipment
Quantity
required
Quantity
available

Deficiency
%

Discharge coefficient of orifice plate
1. Orifice meter 1 No.

2. Stopwatch 1 No.

Calibration of Pressure Gauge
3. Dead weight tester 1 No.

4.
Pressure gauge and standard
weight
1 No.

Torque Measurement
5. Strain gauge torsion meter 1 No.

6. Dead weight 1 No.

Measurement of Viscosity Using Saybolt Viscometer
7. Thermometer 1 No.

8. Stop watch 1 No.

9. 60ml flask 1 No.

10. Water 1 No.

Vacuum pressure measurement
11. Vacuum pressure setup 1

12. Vacuum pressure transmitter 1

13. Voltmeter 1

S.No. Description of Equipment
Quantity
required
Quantity
available

Deficiency
%

Level Measurement Using DPT

14. DPT 1 No.

15. Container 1 No.

UV-Visible Spectrophotometer

16. UV spectrophotometer 1 No.

17. Cuvettes

IR Spectrophotometer
18. IR spectrophotometer sl-117 1

19. Cuvette 1

20. Solution Adequate

21. Printer 1

pH Meter Measurement of p
H
- value of Test Solutions
22. pH meter 1 No.

23. Test solutions Few types

24. Beaker 2 Nos.

25. Stand 1 No.

Measurements of conductivity of test solutions.
26. Solution under test. Adequate

27. Conductivity electrode Adequate

28.
Conductivity meter setup with
display.
Adequate


SEMESTER V
Faculty of Electrical Engineering
B.E. Electronics and Instrumentation Engineering (R 2008)
GE2321 Communication Skills Laboratory
Requirement for a batch of 60 students
Sl.No. Description of Equipment
Quantity
required
Quantity
available
Deficiency %
Server
o PIV system
o 1 GB RAM / 40 GB HDD
o OS: Win 2000 server
o Audio card with headphones (with
mike)
1.
o J RE 1.3
1 No.

Client Systems
o PIII or above
o 256 or 512 MB RAM / 40 GB
HDD
o OS: Win 2000
o Audio card with headphones (with
mike)
2.
o J RE 1.3
60 No.

Softwares
a) Interactive Teacher Control Software Available / Not Available
b) English Language Lab Software Available / Not Available
3.
c) Career Lab software Available / Not Available
4. Handicam Video Camera (with video lights
and mic input)
1 No.

5. Television - 29 1 No.
6. Collar mike 1 No.
7. Cordless mikes 1 No.
8. Audio Mixer 1 No.
9. DVD Recorder / Player 1 No.
10. LCD Projector with MP3 /CD /DVD provision
for audio / video facility - Desirable
1 No. Available / Not Available

SEMESTER VI
Faculty of Electrical Engineering
B. E. Electrical and Electronics Engineering (R 2008)
EI 2355 Communication and DSP Laboratory


Details will be given later
SEMESTER VI
Faculty of Electrical Engineering
B. E. Electrical and Electronics Engineering (R 2008)
EI 2356 Process Control System Laboratory
Requirement for a batch of 30 students
S.No. Description of Equipment Quantity
required
Quantity
available

Deficiency
%

1. Two tank system with provision for
making them as interfacing and non-
interfacing.

Level transmitters

Recorder


1 No


1 No

1 No


2. Two tank system with provision for
transportation delay (Non interacting
process)

Level transmitter

Recorder

1 No



1 No

1 No

3. Electronic PID controller Source for
generating step and ramp inputs

Recorder

Digital Multimeter

1 No


1 No

1 No


4. Control valve trainer (with position for
varying P across the valve)

Flowmeter

1 No


1 No

5. Flow process station with all
accessories

Analog / Digital PID controller

Recorder
1 No


1 No

1 No


6. Level process station with all
accessories

Analog / Digital PID controller

Recorder

1 No


1 No

1 No

S.No. Description of Equipment Quantity
required
Quantity
available

Deficiency
%

7. Temperature process station with all
accessories

Analog / Digital PID controller

Recorder
1 No


1 No

1 No

8. Pressure process station with all
accessories

Analog / Digital PID controller

Recorder

1 No


1 No

1 No

9. Process control trainer / real time
process (level / thermal process)

Recorder

PID controller

1 No


1 No

1 No

10. Cascade control system with flow as
inner variable and liquid level as outer
Variable with following accessories.

Level transmitter

Flow transmitter

Control valve

Analog / Digital PID controller

Recorder





1 No

1 No

1 No

1 No

1 No


SEMESTER VI

Faculty of Electrical Engineering
B. E. Electronics and Instrumentation Engineering (R 2008)
EI 2357 Virtual Instrumentation Laboratory
(Requirement for a batch of 30 students)
S.No. Description of Equipment
Quantity
required
Quantity
available
Deficiency
%
1. Lab View Software
5 License
(Minimum)

2. DAQ Card (USB or PCI based) 4
3. Temperature Process setup 1
4.
Any Sequential Process set up (for
PLC Application)
1
5. CRO 1
6. DC Power Supply 4
7. Multimeter 2
8. V/I, I/V Converter 1 each



SEMESTER VII
Faculty of Electrical Engineering
B. E. Electronics and Instrumentation Engineering (R 2008)
EI 2405 VLSI Laboratory
(Requirement for a batch of 25 students)

Sl.No.

Description of Equipment
Quantity
Required
Quantity
Available
Deficiency
in %
1.
Software Simulation,
Synthesis, back
annotation, place & route
Xlinx ISE (latest version)
5 User
License
(minimum)

2. Spartan 2E boards 5 Nos.
3. Spartan 3 AN boards 1 No.
4.
Add on boards
1. Real - time clock
2. 2. Traffic light control
3. 3. LED displays with switches
4. 4. I/O boards
1 No.
1 No.
1 No.
1 No.

5. Multimeter 2 Nos.

SEMESTER VII
Faculty of Electrical Engineering
B. E. Electronics and Instrumentation Engineering (R 2008)
EI 2406 Instrumentation System Design Laboratory


Details will be given later

You might also like