1 Earthwork in excavation/in foundation of bridges

2 Soil excluding rock.


3 Rock not requiring blasting.
4
Rock requiring blasting, but blasting not permitted,hence to be excavated by
chieselling.
5
Extra over item 2001(a) for quantities of works, executed in or under water
and/or liquid mud / under foul position including pumping out water as
required.
6 Providing and laying cement concrete 1:3:6 in foundation
7
Providing and laying design mix control concrete M20/M25 in piers, retaining
walls, wing walls, return walls, bottom/top plug of wells and protection work
etc. using well graded stone aggregate of 40 mm nominal size.
8
Providing and laying Design mix control concrete M25/M30/M35/M40 in RCC
works
9
Providing and laying dry stone backing behind abutments, wing walls, return
walls
10
Providing and laying backfill material behind boulder filling of abutments, wing
walls, return walls
11
Providing and laying 300 mm thick dry stone pitching in flooring, exposed
slopes etc
12
Providing two coats of Coal-tar epoxy of 150 to 200 microns on R.C.C.
substructures of bridges
13
Providing and fixing Bridge Plaque (750 mm base, 720 mm height triangular
section with 400 mm thickness) on both sides of parapet using cement
concrete of specified mix
14
Providing and fixing River Name Boards of size 2.10 m x 1.0 m made of MS
sheet 6 mm thick and ISA 50 x 50 x 5 mm frame all around, fixed on rail posts
erected with Railway's Rails fixed in cement concrete base of size 60 cm x 60
cm x 75 cm of CC 1:2:4 including painting
15
Boring and installing reinforced Cement Concrete cast-in-situ bored piles in
M30/M35 design mix control concrete using well graded stone aggregate of 20
mm including boring in all kinds of soil, boulders and gravels.
16 1200 mm dia pile
17 Conducting load testing on single pile or on separate test pile
18 Initial vertical load test.
19 Routine test
20
Supply and filling sand in well, of approved quality in layers of 300mm
including watering,ramming
21
Providing and fixing of 100 mm dia PVC pipe for weep holes in abutments,
wing walls,return walls, face wall, etc
22 Sinking of well
SCHEDULE-2A
Sl. No. Description Of Work BOQ Rate
23 For depth up to 10 M
24 For depth up to 10 M to 25M
25 For depth up to 25M to 40 M
26 For depth beyoun 40M
27
Making island for well in running or standing water for well of dia upto 9 mts
including cost of making platform sheet piling, earth/sand filling, gunny bags,
bamboos, split bamboo mats etc.
28 upto avearage water depth of 3.0 mts
29
Extra rate for every additional depth of 1 M or part thereof beyond initial
depth of 3.0 M
30
Metalising of girder components with sprayed aluminium and painting the
metalised surface with four coats of approved paint conforming to IRS: BI-
2001including surface preparation by sand blasting
31
Charpy testing of steel plates, if required. Payment will be made on the basis of
steel plates used in girders excuding wastages etc.
Qty. Value Qty. Value Qty. Value
SCHEDULE-2A
Work Executed till date Billed till date Work in Progress
Qty.
1
Supply and Installing Casing Pipe of 6 mm thick MS sheet for bored piles
of 1200 mm dia
2
Providing trolley men refuges, inspection ladder, hand railing, other
miscellaneous components made of GI pipe/structural steel
3
Providing well foundation cutting edge of mild steel as per drawing
and technical specifications
4
Providing steel floating cassions including fabrication,erection and
launching in position as per drawing and technical specification .
5 Providing steel girders
6 Providing pathways of galvanized steel chequered plates
7 Providing and fixing of galvanised steel channel sleepers
8
Providing and fixing of galvanised steel channel sleepers for improve
switch expansion joint
9 Providing bearings on piers and abuments
10 One Rocker type and One roller type bearings for 76.2 M span
11 One Rocker type and One roller type bearings for 36.58 M span
SCHEDULE-2A
Sl. No. Description Of Work BOQ Rate
Work Executed till date
Value Qty. Value Qty. Value
SCHEDULE-2A
Work Executed till date Billed till date Work in Progress