(CIVIL ENGINEERING) DEGREE EXAMINATIONS, APRIL 2012
Third Semester 308CET07- SURVEYING-I (Regulations 2008) Time: 3 Hours Maximum: 100 Marks Answer ALL the questions PART A (10 X 2 = 20 Marks) 1. What are the instruments available for setting out perpendiculars? 2. Classify the surveying based on accuracy. 3. What is local attraction? 4. What is the significance of alidade? 5. Define fly leveling. 6. Enumerate contour interval. 7. Define Latitude and Departure. 8. Mentioned temporary adjustments in theodolite surveying. 9. Explain importance of transition curve. 10. What is curve ranging?
PART - B (5 X 16 =80 Marks) 11. a) (i) Explain classification of surveying based on instruments used. (10) (ii) Explain reciprocal ranging with neat sketch (6) OR 11. b) (i) Explain working principle of optical square. (ii) Enumerate principle of surveying.
12.a) Explain following 1. Dip of a needle 2. Local attraction 3. Magnetic declination OR 12. b) (i) Define Fore bearing and Back bearing. (ii) Following are the bearings taken in a closed compass traverse
Line F.B B.B AB 14230 32230 BC 22315 4415 CD 28700 10745 DE 1245 19315 EA 6000 23900 Compute the interior angles and correct them.
Regd. No. 08 A1337 13.a) (i) Explain Curvature and Refraction. (ii) Enumerate characteristics of contour with neat sketches. OR 13. b) It was required to ascertain the elevation of two points A and B and line of level was run from A to B. The leveling was then continued to bench mark of 77.500 m elevation. TheReadings were as following
B.S I.S F.S R.L Remarks 1.525 A 1.776 0.304 2.005 1.870 2.300 B 0.899 1.011 1.913 2.784 2.113 77.500 B.M
Find theelevation of A and B points.
14.a) (i) Explain errors in Theodolite surveying. (ii) List out various parts of Theodolite instrument. OR 14. b) In a closed traverse ABCDEA the lengths of the lines DE and EA could not be measured due to an obstruction. Determine the length from the following data Line Length in meters Bearing AB 480 9900 BC 625 3105 CD 470 30120 DE XX 23500 EA XX 15325
15.a)(i) List out types of curves and explain briefly each one with appropriate figure. (ii) What are the factors influencing the location of a project site. OR 15.b) Specify the methods for setting out simple curve on the ground and Explain all with suitable figure. 2