No. Fixing of Lighting Fixture Status Remarks 1 All the following activities are to be checked during and after fixing of lighting fixtures. Contractor should be notified by the followings:
a) Contractor should have approved coordinated workshop DRW/coordinated F/C layout clearing final location of all activities and spacing between light F.A.S./EML/CCTV etc.
b) Flowchart for light fitting clearing the following: b.1) Type of light fitting. b.2) Location of light fitting. b.3) IP rating of light fitting. b.4) Light fitting type of mounting (surface, recess, wall bracket, floor, hidden, stair steps, hanging by (threaded rod or hock and chain).
b.5) Way of operation (through lighting switch or lighting control panel or BMS or moving sensor etc.).
c) Check all circuits related to service areas/lift lobbies/main entrance of building/corridors etc. if operating through lighting control system.
d) Ensure that if there is dimmer system the lighting fixture should have the same facility.
e) Contractor should have method statement from supplier for all lighting fixture installation.
f) Check all lighting fixture which arrive to the site as per the approval (type, color, depth, IP, recess, surface etc.)
g) Check if there is any lighting point above A/C duct or FCU.
h) Provide drain pipe for all recess floor fitting in case the opening (cavity) is closed by concrete without sand around it.
i) Metal halide circuit should not exceed 6 numbers and lamp holder should be 3kV 4kV and the size of wire between holder and igniter should be suitable to pass 4kV.
j) All fittings under FCU should be protected from water.
2 N.N. Group 3 (Updated as of 12 July 2011)
k) Ensure that all wires between lighting point/ceiling rose and fittings are heat resistance.
l) Down light fixture/60 x 60 recess type If the distance between light point and false ceiling more than 60cm, the ceiling rose should not be used and the wires to be covered by PVC flexible conduit and directly connected through proper PVC connector.
m) All service room and parking area light fittings l.1) Surface mounted light fittings should be installed as mentioned above.
l.2) Pendent lights should be connected from ceiling rose to the light fitting by using heat resistance wire.
I.3) Check lighting fixture IP65. I.4) Location of all lighting points and lighting fixtures should be coordinated with all other services.
n) Landscaping light: During the material approval and installation at site proper coordination with Contractor/Supplier to be done and to check all the required accessories for each fitting type.
o) Testing procedure: Contractor has to submit method statement for testing and commissioning:
o.1) Megger test for all wires before fixing the fitting. o.2) Operational test often after fixing the fitting. p) Obstruction light: p.1) Ensure location of control panel on service DB in accessible location.
p.2) Workshop DRW (lighting layout for roof and elevation of building clearing final location (surface, recess, and dimension) should be approved by Civil aviation.