Hazard Identification and Risk Analysis Procedure (Risk Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, review and effectively manage project-related risks.
Hazard Identification and Risk Analysis Procedure (Risk Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, review and effectively manage project-related risks.
Hazard Identification and Risk Analysis Procedure (Risk Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, review and effectively manage project-related risks.
INTRODUCTION The table below provides a simplified representation of the methodology used and the processes Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, IDENTIFICATION - Pre planning, Method statement , Job safety analysis. ASSESSMENT Mitigation measure, Residual risk Identify activities , Identify hazards Assess Impacts, Analyze Risk , Establish Mitigation Measures. P r o b a b i l i t y & F r e q u e n c y Definite 5 5 10 15 20 High 4 4 8 12 16 Moderate 3 3 6 9 12 Low 2 2 4 6 8 Negligible 1 1 2 3 4 1 2 3 4 Minor Serious Major Catastrophic Severity Key to Priorities Medium Priority (5 days) High Priority (2-3 days) Immediate RISK ASSESSMENT FORM Date of Assessment: 02-08-2010 Assessment No: System/Activity: Transformers Oil Treatment The table below provides a simplified representation of the methodology used and the processes involved in this Hazard Identification & Risk Analysis Procedure (Risk Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, review and effectively manage project-related risks ASSESSMENT Impact, Risk factor, Mitigation measure, Residual risk IMPLEMENTATION & COMMUNICATION REVIEW & UP DATE Assess Impacts, Analyze Risk , Establish Mitigation Measures. Communication & Training Audit, Inspection & Page 2 of 6 118 Rev: 0 involved in this Hazard Identification & Risk Analysis Procedure (Risk related risks throughout the Construction Phase. REVIEW & UP DATE Audit, Inspection & Updating of Log.
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Transfer of equipment Transfer device collide with other things; Oil leakage 4 Transport Traffic risk Collision with person Collision device 3 Movement of traffic Slip/trip/all 3 RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 3 12 Chose a qualified driver before work Check the calibration of all tools Make sure the transport device in good condition 2 3 9 The trucks must respect: The limited speed in the site The circulation signs The circulation plan (updated) 2 3 9 All hose/ropes/cables in use shall be secured to the side of walkways and handrails All unnecessary materials and equipment to be immediately removed from site All exits and walkways to be kept clear for use of personnel High standard of housekeeping to be maintained at all times 2 Page 3 of 6 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed 1 2 3 6 2 4
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Pimping Oil Burst piping Oil spill Hit of persons by projected parts 4 RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 3 12 Checking before the start of the operation the state of the pipes and the quality of fitting Avoid placing the pipes circulated area Avoid or external collision on the pipes signaling pipe with bright colors place the specific safety signs Working awareness and tool box meetings Training of sprayers/formulation Safety wires to be connected in all hoses couplers All hose and cables to be checked prior to use to ensure that they are in good working condition 2 Page 4 of 6 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed 2 4
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 High pressure Static electricity 4 Electricity Electrocution 3 RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 3 12 All hose clamps to be checked priori to use to ensure that they are in good working condition and they are properly secured with spring clip, etc Regular tool box talks to be conducted during operations Working party awareness in adjacent areas Warning signs Daily housekeeping 2 4 12 Protect electrical equipment from ingress of water Identify equipment risk Warning notices Verification of electric cables before the start of work by an electrician 2 Page 5 of 6 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed 2 4 3 6
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Environmental Leaking oil on soil 3 Assessor Print : RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 3 9 Checking the condition of equipments before beginning the work ventilation Workstation making the retention of spill oil Daily housekeeping Predict the absorbent in case overflow the oil 2 Sign: Date: Page 6 of 6 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed 2 4