You are on page 1of 12

Confidential Page 1 of 12

Product Change Notice


Huawei PCN SRAN-2012XXXX (EOM Notice on
DBS3900(AC) APM30H&TMC11H&IBBS200D&T Ver.B
cabinets)
0. Change History
Date
Emendatory
version
Description Author
2012-08-26 Rev: 01 Yongpeng
2012-12-26 Rev: 02
Ver.D1 and Ver.D2 have been amalgamated into Ver.D
Ver.D Cabinet Configuration is the same as Ver.D2
Zhangli
2013-02-05 Rev: 03
1Add the Change History table
2Delete the last order date of spare parts
3Update some spare parts coding
Zhangli




1. Abstract
The Ver.B cabinets and internal parts will be in the end of marketing (EOM). The DBS3900 (AC)
Ver.D cabinets will be sold to replace the Ver.B cabinets. This PCN is intended for customers using Huawei
DBS3900 (AC) Ver.B cabinets.
The last date for purchase of the Ver.B cabinets is June 30, 2013 and the last date for supply of Ver.B
cabinet is December 31, 2013.
2. Supplier Information
Huawei Technologies. Co., Ltd.

Confidential Page 2 of 12

Product Change Notice
3. Basic Information
PCN No. SRAN-2012XXXX
PCN Version Rev: 03
Change Category B
Milestone
Release
Official release of
the PCN
Feb 5, 2013
Implementation
GA of new
cabinets
December 31, 2012
End of Marketing
No order accepted
for Ver.B cabinet
June 30, 2013
End of
Production
No delivery after
EOP for Ver.B
cabinet
December 31, 2013, from which no old cabinets will
be delivered (the delivery time in new sales contracts
should not be later than this date)
End of Service
No service
provided after EOS
Subject to the specific contract
4. Involved Systems and Products
There is one type for APM30H/TMC11H/IBBS200D/T in Ver.D cabinets. Customer can use Ver.D to
replace the current version of cabinets.
Main System Subsystem Hardware Software Firmware Plug-in
DBS3900 (AC) Ver.D Cabinets and internal parts Yes Yes
note1
No No
Note 1To replace Ver.B cabinets with the same maximum configuration of 6 RRU, the Ver.D cabinets can
work normal with the same BTS software version. But if the enhanced configuration of Ver.D need be used
like supporting 12 RRU, the BTS software version should be upgraded.
5. Correlated Change
N/A

Confidential Page 3 of 12

Product Change Notice
6. BOM Code Change
New BOM
Code
Board Name
Old BOM
Code
Board Name Complete Replacement
Ver.D APM30H cabinet Ver.B APM30H cabinet Yes
Ver.D IBBS200D cabinet Ver.B IBBS200D cabinet Yes
Ver.D IBBS200T cabinet Ver.B IBBS200T cabinet Yes
Ver.D TMC11H cabinet Ver.B TMC11H cabinet Yes
01071382 EPU05A-03 02400460 EPS 01B No
01071384 EPU05A-05 02400462 EPS 01D No
02310HBJ R4850G 02130608 EPW30-48A No
02310LYP PMU 11A 02317275 PMU 01B No
02120734 FAN 02D 02120559 FAN 02A No
03021VGY CMUEA 03020NXE CMUA No
02120732 DCDU-12C 02120479 DCDU-03C No
21161105 TEC module 21161003 TEC module No
32030092
The external fan of Heat
Exchanger of
APM30H/TMC11H
Ver.D cabinet
32030077
97051086
The external fan of Heat
Exchanger of
APM30H/TMC11H
Ver.B cabinet
No
7. Categorization Basis
(1) Ver.B cabinets and parts will be in the EOM and be replaced by Ver.D..
(2) The new release has all the functions of current version and better performance. The Ver.B can support 6
RRU(2*40W) at maximum. The Ver.D supports 6 RRU(2*60W) at maximum without BTS software
upgrading. The Ver.D also supports 12 RRU(2*60W) with one DCDU-12B added at 1U user space in
APM30H after BTS software is upgraded. The Ver.D cabinet supports two BBU in one APM30H also.
8. Software version for the enhanced configuration of Ver.D.
The enhanced configuration of Ver.D
1Indoor CabinetFMUEA board
2Outdoor CabinetCMUEA board
3support 5pcs PSU

Network element Software version
SRAN6.0
CME V200R011C00SPC250+CP2501
BSC V900R013C00SPC582
MBTS V100R004C00SPC190
SRAN7.0
CME V200R012C00SPC220+CP2201

Confidential Page 4 of 12

Product Change Notice
BSC V900R014C00SPC520
MBTS V100R007C00SPC240
SRAN8.0
CME ALL
BSC ALL
MBTS ALL
9. Change Description
(A) The change of the Ver. D cabinets
The changed parts include the Heat Exchanger, fan tray, TEC and DCDU.etc. The external size and
installing of new cabinet are the same as old one.
The Ver.D cabinet improves the capacity of power supply, heat dissipation and cabling. It has all the
functions of the Ver.B cabinet and better performance instead. The Ver.D cabinet supports two BBU,
The Cooling capability from 700W to 1500W in one APM30H or TMC11H .
The cabinet version info can be acquired by OMC remotely or be seen on the nameplate in the cabinet
on site.
(B) The major changed parts from Ver.B to Ver.D cabinet



Confidential Page 5 of 12

Product Change Notice
9.1 The change of Heat Exchanger and interal Fan tray in APM30H and TMC11H
(A) The air vent areas are enlarged for the internal heat exchanger on the door of APM30H/TMC11H
Ver.D cabinet. But the external size of the door keeps the same as the Ver.B still.
The external fan type and Heat exchanger core are changed from Ver.B cabinet to Ver.D cabinet.
The external fan type is the same between APM30H/TMC11H Ver.D.

(B) The fan tray is changed from FAN 02A to FAN 02D. The air outlet position is changed from top to
bottom.
The HPMI board is cancelled to make the monitor cable connection simple on the new fan tray.
The GATE and TEM_BAT1interfaces are supported directly in PMU11A module for APM30H.
The other internal reserved interfaces are cancelled to avoid wrong connection.


(C) The heat dissipation capacity of APM30H/TMC11H is improved.
Cabinet version Heat dissipation Acoustic noise
APM30H/TMC11H Ver.B 700W
ETS 300 753, Rural area, Class
4.1E(6.1bels@25, 6.7bels@45)
APM30H/TMC11H Ver.D
<=700W
ETS 300 753, Rural area, Class
4.1E(6.1bels@25, 6.7bels@45)
>700W and <=1500W ETS 300 753, Urban area, Class

Confidential Page 6 of 12

Product Change Notice
4.1E(6.6bels@25, 7.6bels@45)

9.2 The change of AC/DC power system inside in APM30H
(A) The layout and name change.
When Ver.D APM30H cabinet replace the Ver.B cabinet, the EPU05A-03 (220V AC) or
EPU05A-05 (110V AC) replace the EPS 01B (220V AC) or EPS 01D (110V AC) of embedded
power system. The height is 1U only for PSU and PMU in new version cabinet. The old PSU and
PMU are 2U high. upgraded the highest efficiency from 91% to 96%.
APM30H Ver.D supports 5 PSU at maximum. Three PSU can be managed in Ver.D cabinet like
Ver.B cabinet with the same BTS software. The BTS software need be upgraded if four or five
PSU need be used in Ver.D cabinet to support 12 RRU.


(B) The change of PSU
version name Power capacity The highest efficiency
Ver.B EPW30-48A 1600W/PCS
91%
Ver.D R4850G 3000W/PCS
96%
Ver.B PMU 01B
-- --
Ver.D PMU 11A
-- --
Remark: The height is 1U only for PSU and PMU in new version cabinet. The old PSU and PMU
are 2U high.
(C) The change of AC power distribution

Confidential Page 7 of 12

Product Change Notice


(D) The change of DC power distribution


Remark: The spare fuses are changed from 2*5A+6*15A to 5*5A+3*30A in APM30H cabinet.

(E) The change of AC power interface from customer

LLVD
630A(FUSE)RRU
1125A(1P MCB)RFC
BLVD
230A(FUSE)BBU
130A(FUSE)FAN
430A(FUSE)TM
130A (FUSE )TMC
130A(FUSE)IBBS
1125A (2P MCB)BATT
LLVD
620A(1P MCB)RRU
BLVD
215A(FUSE)BBU
115A(FUSE)FAN
45A(FUSE)TM
125A (1P MCB )TMC
115A(FUSE)TEC
1100A (1P MCB)BATT

220V inputEPS 01B
220V inputEPU05A-03
AC Input Breaker
316A(1P MCB)PSU

AC Output Breaker
116A(2P MCB)Heater/Socket
AC Input Breaker
240A+125A (1P MCB)PSU

AC Output Breaker
116A (2P MCB)Heater/Socket
AC Input Breaker
140A(2P MCB)PSU

AC Output Breaker
116A(1P MCB)Heater
116A(1P MCB)Socket

AC Input Breaker
1100A(2P MCB)PSU

AC Output Breaker
116A (1P MCB)Heater
116A (1P MCB)Socket
110V dual phase inputEPS 01D
110V dual phase inputEPU05A-05

Confidential Page 8 of 12

Product Change Notice
Only when the Ver.D cabinet has more powerful RF configurations than Ver.B, the power interface
should be changed.
Input voltage
Cabinet
version
RFU types and
configuration
AC power interface from customer
220Vac three
phase
Ver.B,
Ver.D
6 x RRU(2*40W)
25A/3P (2.5 mm
2
cables)minimum.
Ver.D
6 x RRU(2*60W) 25A/3P (4 mm
2
cables)minimum.
12 RRU(2*60W) 40A/3P (6 mm
2
cables) minimum.
220Vac single
phase
Or 110Vac
dual-live-wire
Ver.B,
Ver.D
6 x RRU(2*40W)
50A/2P, (6 mm
2
cables)minimum.
Ver.D
6 x RRU(2*60W)
63A/2P (16 mm
2
cables)minimum.
12 RRU(2*60W) 100A/2P (16 mm
2
LSZH cables) minimum.

9.3 The change of cable outlet in APM30H and TMC11H
The power cable diameter is enlarged and the cable outlet is adjusted also on the bottom of cabinet. The
new outdoor type of cable bag has double space for cable and much shorter installing time than the current
version.


9.4 The change of DCDU in TMC11H
(A) The layout and name change.


(B) The enhance of DC distribution
Version Distribution capacity
Ver.B 7x12A1P MCB+2x6A1P MCB

Confidential Page 9 of 12

Product Change Notice
Ver.D 10 x 30A (fuse)
Remark: There are three spare fuses of 30A in the right of new DCDU.
(C) The change of the input connection to support the parallel connection of 2 route 16mm
2
cables.

(D) The change of output connectors to benefit installing. Plugging or unplugging the connector can
power on or off the load of the new version DCDU.

(E) For new version DCDU, No supply the DC SPD ALARM Connector.

9.5 The change of fan tray in IBBS200D
There is only one fan in IBBS200D Ver.D to save power consumption. The Ver.B has two fans.
The monitor board is changed from CMUA of Ver.B cabinet to CMUEA of Ver.D cabinet. But the
external cable interfaces keeps the same.

9.6 The change of TEC module in IBBS200T
The Thermoelectric Cooler module is changed in IBBS200T Ver.D. The installing interface keeps
the same for the new TEC module.
The monitor board is changed from CMUA of Ver.B cabinet to CMUEA of Ver.D cabinet. But the
external cable interfaces keeps the same.


Confidential Page 10 of 12

Product Change Notice
9.7 The change of IBBS200D/IBBS200T PDU
The power distribution unit is improved in Ver.D to support more powerful equipments with more
discharge current.


9.8 The change of cable outlet in IBBS200D/IBBS200T
The power cable diameter is enlarged and the cable outlet is adjusted also on the bottom of cabinet. The
new outdoor type of cable bag has double space for cable and much shorter installing time than the current
version.


9.9 The change of all cabinets package
The cabinet external packages are changed from wood to paper in order to be more
environments friendly.



Confidential Page 11 of 12

Product Change Notice
10. Impact of Change
Security Fire Service Communication
None None Yes
For Ver.D cabinet is configured four or
five PSU to support more than 6 RRU,
the BTS software need be upgraded and
it interrupt service within 5 minutes
No service is impacted if there are three
PSU are used in Ver.D at maximum to
support 6 RRU
None
Maintenance Reliability Power Consumption Traffic
Yes.
Some spare parts of the
Ver. D cabinet are
different from the Ver. B
cabinet. Therefore, a
certain quantity of spare
parts of the Ver. B
cabinet must be reserved
for future use.
None Yes
Ver.D cabinet support much more
powerful RRU with some increased
power consumption.
No more power consumption is
increased for Ver.D cabinet using the
same type and number of BBU and
RRU modules as Ver.B cabinet.
Yes.
Ver.D BTS supports
much higher traffic.

11. Involved Documents
The changes will affect the DBS3900 Product description and DBS3900 User Manual.
12. Appendixes
None

Confidential Page 12 of 12

Product Change Notice
13. Remarks
If you have any questions, contact Huawei local sales representatives or technical support personnel for
assistance.

You might also like