You are on page 1of 31

Subject : BILL OF QUANTITIES

Name of Project : Construction of Proposed Document Processing Division Building


Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 1 of 29

SECTION VIII - BILL OF QUANTITIES

Item
Description Quantity Unit Unit Cost Total Cost
No.
I. Site Works
a) Site Enclosure 780.00 m Pesos


and ctvs.
(P ) /m P


b) Staking and Lay-out 1.00 lot Pesos


and ctvs.
(P ) P


Sub Total I P


II. Earthworks
a) Excavation 351.00 m Pesos



and ctvs.
(P ) /m P


b) Gravel Bedding 83.00 m Pesos



and ctvs.
(P ) /m P


c) Selected Filling 477.00 m Pesos
Materials


and ctvs.
(P ) /m P


d) Soil Poisoning 780.00 m Pesos


and ctvs.
(P ) /m P

Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 2 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

Sub Total II P

III. Concrete Works
a) Formworks 1.00 lot Pesos


and ctvs.
(P ) /m P


b) Reinforced Concrete 583.00 m Pesos


and ctvs.
(P ) / lot P


Sub Total III P

IV. Masonry Works
a) 6 x 8 x 16 CHB 1,814.00 m Pesos
incl. reinforcements

and ctvs.
(P ) /m P


b) 4 x 8 x 16 CHB 240.00 m Pesos
incl. reinforcements

and ctvs.
(P ) /m P


Sub Total IV P

V. Plastering Works
a) Plain Cement Finishes 3,678.00 m Pesos


and ctvs.
(P ) /m P


Sub Total V P




Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 3 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.
VI. Roof and Roof Framing
a) Roof Framing 275.00 m Pesos


and ctvs.
(P ) /m P


b) Ga. # 26 Pre-painted 275.00 m Pesos
Long Span Roofing
And accessories
and ctvs.
(P ) /m P


Sub Total VI P

VII. Ceiling
a) 3/16 thk. Fiber 1,340.00 m Pesos
Cement Board on
Metal Furring
and ctvs.
(P ) /m P


Sub Total VII P

VIII. Tiling & Stone Works
a) 600mm x 600mm 804.72 m Pesos
Polished Tiles

and ctvs.
(P ) /m P


b) 300mm x 300mm 229.14 m Pesos
Polished Tiles

and ctvs.
(P ) /m P


c) 300mm x 300mm 55.31 m Pesos
Ceramic Tiles

and ctvs.
(P ) /m P



Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 4 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.
d) 600mm x 600mm 125.21 m Pesos
Granite Tiles

and ctvs.
(P ) /m P

e) 300mm x 300mm 8.81 m Pesos
Mosaic Tiles

and ctvs.
(P ) /m P

f) 300mm x 600mm 55.92 m Pesos
Decorative Tiles

and ctvs.
(P ) /m P

g) Granite Slab 16.88 m Pesos


and ctvs.
(P ) /m P


h) Stone Finish 39.39 m Pesos


and ctvs.
(P ) /m P


i) Decorative Stone 3.38 m Pesos


and ctvs.
(P ) /m P


Sub Total VIII P

IX. Doors & Windows
1) Doors
a) D-1 (3.0m x 4.0m.) 1.00 set Pesos
Two Leaves double
Acting Glass Door
w/ Sidelite & Transom and ctvs.
(P ) /set P

Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 5 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

b) D-1a (3.0m x 4.50m.) 2.00 sets Pesos
Two Leaves double
Acting Glass Door
w/ Sidelite and ctvs.
(P ) /set P

c) D-2 (2.80m x 4.50m.) 3.00 sets Pesos
Two Leaves double
Acting Door
and ctvs.
(P ) /set P


d) D-3 (2.40m x 4.50m.) 3.00 sets Pesos
Two Leaves double
Acting Door with
Sidelite and ctvs.
(P ) /set P


e) D-4 (0.90m x 2.10m.) 5.00 sets Pesos
KD Panel Door on 2
X 6 KD Jambs with
HD Knob & Hinges and ctvs.
(P ) /set P


f) D-5 (0.80m x 2.10m.) 16.00 sets Pesos
KD Panel Door on 2
X 6 KD Jambs with
HD Knob & Hinges and ctvs.
(P ) /set P


g) D-6 (0.70m x 2.10m.) 6.00 sets Pesos
KD Panel Door on 2
X 6 KD Jambs with
HD Knob & Hinges and ctvs.
(P ) /set P


h) D-7 (0.70m x 1.80m.) 2.00 sets Pesos
Panel Door, Swing,
thk. Melamine
Board w/ edging & and ctvs.
accessories (P ) /set P



Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 6 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

i) D-8 (0.80m x 1.80m.) 9.00 sets Pesos
Panel Door, Swing,
thk. Melamine
Board w/ edging & and ctvs.
accessories (P ) /set P


j) 2 x 6 Jambs, Hard 3.00 sets Pesos
Wood, Kiln Dried

and ctvs.
(P ) /set P

2) Windows
a) W-1 (1.00 x 3.35m.) 8.00 sets Pesos
Awning with Fixed
Glass
and ctvs.
(P ) /set P


b) W-2 (2.10 x 3.65m.) 2.00 sets Pesos
Awning with Fixed
Glass
and ctvs.
(P ) /set P


c) W-3 (6.00 x 1.10m.) 3.00 sets Pesos
Awning with Fixed
Glass
and ctvs.
(P ) /set P


d) W-4 (5.50 x 4.00m.) 1.00 set Pesos
Awning with Fixed
Glass
and ctvs.
(P ) /set P


e) W-5 (2.00 x 2.00m.) 1.00 set Pesos
Awning with Fixed
Glass
and ctvs.
(P ) /set P


Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 7 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

f) W-6 (2.00 x 2.00m.) 1.00 set Pesos
Fixed Window

and ctvs.
(P ) /set P


g) W-7 (2.65 x 2.50m.) 1.00 set Pesos
Fixed Window

and ctvs.
(P ) /set P


h) W-8 (5.86 x 5.80m.) 1.00 set Pesos
Fixed Window

and ctvs.
(P ) /set P


i) W-9 (5.50 x 2.50m.) 1.00 set Pesos
Awning with Fixed
Glass
and ctvs.
(P ) /set P


j) W-10 (0.90 x 4.00m.) 1.00 set Pesos
Fixed

and ctvs.
(P ) /set P


k) W-11 (1.85 x 2.50m.) 1.00 set Pesos
Fixed

and ctvs.
(P ) /set P


l) W-12 (0.50 x 2.40m.) 1.00 set Pesos
Awning

and ctvs.
(P ) /set P



Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 8 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

m) W-13 (1.20 x 1.10m.) 1.00 set Pesos
Awning with Fixed

and ctvs.
(P ) /set P


n) W-13a (0.40 x 0.80m.) 1.00 set Pesos
Awning with Fixed

and ctvs.
(P ) /set P


o) W-14 (0.40 x 0.80m.) 7.00 sets Pesos
Awning

and ctvs.
(P ) /set P


p) W-14a (0.40 x 0.60m.) 14.00 sets Pesos
Awning

and ctvs.
(P ) /set P


Sub Total IX P

X. Painting
a) Walls 3,678.00 m Pesos


and ctvs.
(P ) /m P


b) Ceiling 1,073.00 m Pesos


and ctvs.
(P ) /m P


c) Doors 66.96 m Pesos


and ctvs.
(P ) /m P

Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 9 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

Sub Total X P

XI. Electrical Works
1) Panel Boards @ GF
a) BMDP (300AT, 3P, 600 1.00 unit Pesos
Vac w/ 1-60AT; 1-110AT;
1-125AT; 1-175AT, 3P
and ctvs.
(P ) /unit P


b) MDP-1 (150AT, 3P, 600 1.00 unit Pesos
Vac Main Breaker with
1-15AT, 2P; 1-60AT, 2P;
1-40AT, 3P; 1-50AT, 3P; and ctvs.
2-70AT, 3P 600Vac (P ) /unit P
Branches

c) UPS Panel (60AT, 2P, 1.00 unit Pesos
250Vac Main with
4-15AT, 2-20AT 2P
Branches) and ctvs.
(P ) /unit P


d) L.O. & D.C.O. Panel 1.00 unit Pesos
(40AT, 3P, 250Vac Main
w/ 6-15AT; 2-20AT, 2P
Branches and ctvs.
(P ) /unit P


e) ACU Panel (70AT, 3P, 1.00 unit Pesos
250Vac Main with
1-15AT, 7-20AT, 3P
Branches) and ctvs.
(P ) /unit P


f) Elevator Panel (70AT, 1.00 unit Pesos
3P, 600Vac Main with
3-15AT, 1-60AT, 3P
Branches) and ctvs.
(P ) /unit P




Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 10 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

g) Elevator Water Tank 1.00 unit Pesos
Panel (70AT, 3P, 250Vac
Main with 1-15AT,
7-20AT, 3P Branches) and ctvs.
(P ) /unit P


2) Panel Boards @ 2F
a) MDP-2 (100AT, 3P, 600 1.00 unit Pesos
Vac Main Breaker with
1-100AT, 2P; 1-30AT, 3P;
1-50AT, 3P; 600Vac and ctvs.
Branches (P ) /unit P


b) UPS Panel (125AT, 2P, 1.00 unit Pesos
250Vac Main with
3-15AT, 7-20AT 2P
Branches) and ctvs.
(P ) /unit P


c) L.O. & D.C.O. Panel 1.00 unit Pesos
(30AT, 3P, 250Vac Main
w/ 5-15AT; 3-20AT, 2P
Branches and ctvs.
(P ) /unit P


d) ACU Panel (100AT, 3P, 1.00 unit Pesos
250Vac Main with
2-30AT, 4-40AT, 2-50AT,
3P Branches) and ctvs.
(P ) /unit P


3) Panel Boards @ 3F
a) MDP-3 (110AT, 3P, 600 1.00 unit Pesos
Vac Main Breaker with
1-100AT, 2P; 1-30AT, 3P;
1-50AT, 3P; 600Vac and ctvs.
Branches (P ) /unit P


b) UPS Panel (100AT, 2P, 1.00 unit Pesos
250Vac Main with
5-15AT, 3-20AT 2P
Branches) and ctvs.
(P ) /unit P


Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 11 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

c) L.O. & D.C.O. Panel 1.00 unit Pesos
(30AT, 3P, 250Vac Main
w/ 5-15AT; 3-20AT, 2P
Branches and ctvs.
(P ) /unit P


d) ACU Panel (60AT, 3P, 1.00 unit Pesos
250Vac Main with
10-20AT, 3P Branches)
and ctvs.
(P ) /unit P


4) Panel Boards @ 4F
a) MDP-4 (150AT, 3P, 600 1.00 unit Pesos
Vac Main Breaker with
3-15AT, 3P; 1-50AT, 3P;
1-60AT, 3P, 1-100AT, 2P and ctvs.
600Vac Branches) (P ) /unit P


b) UPS Panel (100AT, 2P, 1.00 unit Pesos
250Vac Main with
2-15AT, 2-20AT 2P
Branches) and ctvs.
(P ) /unit P


c) L.O. & D.C.O. Panel 1.00 unit Pesos
(30AT, 3P, 250Vac Main
w/ 5-15AT; 3-20AT, 2P
Branches and ctvs.
(P ) /unit P


d) ACU Panel (60AT, 3P, 1.00 unit Pesos
250Vac Main with
10-20AT, 3P Branches)
and ctvs.
(P ) /unit P


5) Lighting Fixtures
a) 21W T5 Flourescent 30.00 sets Pesos
Lamp

and ctvs.
(P ) /set P


Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 12 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

b) 11W CFL Vertical 28.00 pcs. Pesos
Downlight

and ctvs.
(P ) /pc. P


c) 6W LED Vertical 52.00 pcs. Pesos
Downlight (6 casing)

and ctvs.
(P ) /pc. P


d) 5W CFL Vertical 15.00 pcs. Pesos
Downlight

and ctvs.
(P ) /pc. P


e) 18W CFL Vertical 45.00 pcs. Pesos
Downlight

and ctvs.
(P ) /pc. P


f) 24W LED Floodlight 3.00 pcs. Pesos


and ctvs.
(P ) /pc. P


g) 600VA Chandelier 4.00 units Pesos
Lighting

and ctvs.
(P ) /unit P


h) 22W LED Flou. Lighting 120.00 pcs. Pesos
w/ Louver & reflector

and ctvs.
(P ) /pc. P



Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 13 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

i) 3W Signage Lighting 46.00 pcs. Pesos


and ctvs.
(P ) /pc. P


j) 3W LED Emergency 47.00 units Pesos
Light

and ctvs.
(P ) /unit P


k) Exhaust fan 4.00 units Pesos


and ctvs.
(P ) /unit P


l) Accent Lighting 3.00 pcs. Pesos


and ctvs.
(P ) /pc. P


m) LED Downlight 1.00 pc. Pesos


and ctvs.
(P ) /pc. P


6) Wiring Devices
a) One-Gang Switch, 11.00 sets Pesos
Wide Series

and ctvs.
(P ) /set P


b) Two-Gang Switch, 27.00 sets Pesos
Wide Series

and ctvs.
(P ) /set P


Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 14 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

c) Three-Gang Switch, 34.00 sets Pesos
Wide Series

and ctvs.
(P ) /set P


d) Three-way Switch, 10.00 sets Pesos
Wide Series

and ctvs.
(P ) /set P


7) Power Devices
a) Single Receptacle 47.00 sets Pesos
Outlet, Wide Series

and ctvs.
(P ) /set P


b) Duplex Receptacle 89.00 sets Pesos
Outlet, Grounding
Type
and ctvs.
(P ) /set P


c) Special Purpose Outlet 86.00 sets Pesos


and ctvs.
(P ) /set P


8) Wires & Cables
a) 2.0mm THHN/THWN 16.00 rolls Pesos
Copper Wire

and ctvs.
(P ) / roll P


b) 3.5mm THHN/THWN 40.00 rolls Pesos
Copper Wire

and ctvs.
(P ) / roll P


Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 15 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

c) 5.5mm THHN/THWN 8.00 rolls Pesos
Copper Wire

and ctvs.
(P ) / roll P


d) 8.0mm THHN/THWN 5.00 rolls Pesos
Copper Wire

and ctvs.
(P ) / roll P


e) 14mm THHN/THWN 300.00 mts. Pesos
Copper Wire

and ctvs.
(P ) / m. P


f) 22mm THHN/THWN 300.00 mts. Pesos
Copper Wire

and ctvs.
(P ) / m. P


g) 30mm THHN/THWN 300.00 mts. Pesos
Copper Wire

and ctvs.
(P ) / m. P


h) 38mm THHN/THWN 300.00 mts. Pesos
Copper Wire

and ctvs.
(P ) / m. P


i) 50mm THW Copper 150.00 mts. Pesos
Wire

and ctvs.
(P ) / m. P



Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 16 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

9) Conduits & Fittings
a) 15mm Flexible 6.00 rolls Pesos
Metallic Conduit

and ctvs.
(P ) / roll P


b) 15mm EMT Conduit 1,000.00 lngths Pesos


and ctvs.
(P ) / length P


c) 20mm EMT Conduit 200.00 lngths Pesos


and ctvs.
(P ) / length P


d) 25mm EMT Conduit 80.00 lngths Pesos


and ctvs.
(P ) / length P


e) 32mm EMT Conduit 30.00 lngths Pesos


and ctvs.
(P ) / length P


f) 40mm EMT Conduit 30.00 lngths Pesos


and ctvs.
(P ) / length P


g) 50mm EMT Conduit 30.00 lngths Pesos


and ctvs.
(P ) / length P


Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 17 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

h) 65mm EMT Conduit 30.00 lngths Pesos


and ctvs.
(P ) / length P


i) 80mm EMT Conduit 200.00 lngths Pesos


and ctvs.
(P ) / length P


10) Boxes & Pull Boxes with Cover
a) Metallic Utility Box, 320.00 pcs. Pesos
2 x 4

and ctvs.
(P ) / pc. P


b) Metallic Octagonal Box, 770.00 pcs. Pesos
4 x 4

and ctvs.
(P ) / pc. P


c) Metallic Pull Box, 50.00 pcs. Pesos
4 x 4

and ctvs.
(P ) / pc. P


d) Metallic Pull Box, 30.00 pcs. Pesos
6 x 8 x 8

and ctvs.
(P ) / pc. P


e) Metallic Pull Box, 20.00 pcs. Pesos
6 x 12 x 12

and ctvs.
(P ) / pc. P


Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 18 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

11) Miscellanneous/Consumables
a) Miscellaneous/Consu- 1.00 lot Pesos
Mables (Electl./Rubber
Tapes, Solderless Con-
Nectors, Exp. Bolts, and ctvs.
etc) (P ) / lot P


Sub Total XI P

XII. Auxilliray Works
1) Fire Alarm System
a) Addressable Fire Alarm 1.00 unit Pesos
Control Panel, up to
99 Loops (UL Listed)
and ctvs.
(P ) /unit P


b) Addressable Type 42.00 pcs. Pesos
Smoke Detector

and ctvs.
(P ) /pc. P


c) Heat Detector 22.00 pcs. Pesos


and ctvs.
(P ) /pc. P


d) Addressable Pull 4.00 pcs. Pesos
Station

and ctvs.
(P ) /pc. P


e) Fire Alarm Bell 4.00 pcs. Pesos


and ctvs.
(P ) /pc. P



Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 19 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

f) # 18/2 TF Wire 4.00 boxes Pesos


and ctvs.
(P ) /box P


g) Octagonal Box, PVC, 70.00 pcs. Pesos
4 x 4

and ctvs.
(P ) /pc. P


h) Utility Box 10.00 pcs. Pesos


and ctvs.
(P ) /pc. P


i) 20mm uPVC Flexible 8.00 rolls Pesos
Conduit

and ctvs.
(P ) /roll P


j) Mini-monitor Module 2.00 sets Pesos


and ctvs.
(P ) /set P


k) Back up Battery, 12V 1.00 set Pesos


and ctvs.
(P ) /set P


l) Miscellaneous (PVC 1.00 lot Pesos
fittings, G.I. Wire,
elbows, etc.)
and ctvs.
(P ) /lot P



Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 20 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

2) Telephone System
a) PABX Unit, 8 x 32 1.00 unit Pesos
Configuration; and
Expandable
and ctvs.
(P ) /unit P


b) Port Analogue Trunk 1.00 unit Pesos
Card

and ctvs.
(P ) /unit P


c) 8 Port Digital Hybrid 1.00 unit Pesos
Extension Card

and ctvs.
(P ) /unit P


d) 16-Port Digital 2.00 units Pesos
Extension Card

and ctvs.
(P ) /unit P


e) Power Supply, M-Type 1.00 unit Pesos


and ctvs.
(P ) /unit P


f) Back-up Battery 1.00 unit Pesos
Adapter

and ctvs.
(P ) /unit P


g) Sealed Lead Acid 2.00 units Pesos
Battery, 12V

and ctvs.
(P ) /unit P


Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 21 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

h) Amphenol Cable 3.00 units Pesos
Assembly, 2m.

and ctvs.
(P ) /unit P


i) Telephone Surge Pro- 3.00 units Pesos
tector, (3 incoming
Lines)
and ctvs.
(P ) /unit P


j) Hi tech AVR, 500 Watts, 1.00 unit Pesos
With Power On Delay

and ctvs.
(P ) /unit P


k) Panasonic KX-T7633 1.00 unit Pesos


and ctvs.
(P ) /unit P


l) Single Telephone Line 16.00 units Pesos


and ctvs.
(P ) /unit P


m) Telephone Outlet 16.00 sets Pesos


and ctvs.
(P ) /set P


n) Telephone Drop Wire 100.00 mts. Pesos


and ctvs.
(P ) /m. P



Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 22 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

o) Telephone Wire, 4.00 boxes Pesos
# 22/3

and ctvs.
(P ) /box P


p) PVC Conduit 130.00 lngths Pesos


and ctvs.
(P ) /lngth P


q) Miscellaneous and 1.00 lot Pesos
Consumables (Tie
Wire, etc.)
and ctvs.
(P ) /lot P


3) CCTV
a) HD Camera 16.00 sets Pesos


and ctvs.
(P ) /set P


b) Internet Program 1.00 lot Pesos


and ctvs.
(P ) /lot P


c) IP 32 Channel DVR 1.00 set Pesos


and ctvs.
(P ) /set P


d) 500 GIG Wester 3.00 units Pesos
Digital Disk

and ctvs.
(P ) /unit P


Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 23 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

e) Power Supply 16.00 units Pesos


and ctvs.
(P ) /unit P


f) BNC Connector 28.00 units Pesos


and ctvs.
(P ) /unit P


g) RG6 Cable 180.00 mts. Pesos


and ctvs.
(P ) /m. P


h) # 16 Flatcord 180.00 mts. Pesos


and ctvs.
(P ) /m. P


i) 20mm PVC Pipe 120.00 lngths Pesos


and ctvs.
(P ) /lngth. P


j) 25mm PVC Pipe 60.00 lngths Pesos


and ctvs.
(P ) /lngth. P


k) 32mm PVC Pipe 4.00 lngths Pesos


and ctvs.
(P ) /lngth. P



Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 24 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

l) Telephone Plate 16.00 sets Pesos


and ctvs.
(P ) /set P


m) Utility Box, PVC 16.00 pcs. Pesos


and ctvs.
(P ) /pc. P


n) Junction Box, PVC 15.00 pcs. Pesos


and ctvs.
(P ) /pc. P


o) Pull Box, 4 x 10 x 10 5.00 pcs. Pesos


and ctvs.
(P ) /pc. P


p) Miscellaneous and 1.00 lot Pesos
Consumables (PVC
Solvent Cement, PVC
Fittings, etc.) and ctvs.
(P ) /lot P


Sub Total XII P

XIII. Plumbing Works
a) PVC Pipe and Fittings 1.00 lot Pesos


and ctvs.
(P ) /lot P


b) PPR Pipe and Fittings 1.00 lot Pesos


and ctvs.
(P ) /lot P

Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 25 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

c) Water Closet, American 13.00 sets Pesos
Standard, complete
with fittings
and ctvs.
(P ) /set P


d) Lavatory, American 14.00 sets Pesos
Standard, Pedestal
Type complete with
fittings and ctvs.
(P ) /set P


e) Urinal, American Stan- 8.00 sets Pesos
dard, complete with
fittings
and ctvs.
(P ) /set P


f) Paper Holder, Solid 13.00 sets Pesos
Brass, American
Standard
and ctvs.
(P ) /set P


g) Floor Drain, Stainless, 19.00 sets Pesos
4

and ctvs.
(P ) /set P


h) Septic Vault 1.00 unit Pesos
(7.0m.x 2.50m.x 1.80m.)

and ctvs.
(P ) /unit P


Sub Total XIII P

XIV. Architectural Finishes
a) Floor Mounted, 3/4" 41.00 m Pesos
Melamine Toilet Par-
Tuitions with Stainless
edging and ctvs.
(P ) /m P

Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 26 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

b) 6mm thk. mar. Ply on 1.00 lot Pesos
2 x 3 Hor. & Vert.
Studdings
and ctvs.
(P ) /lot P


c) Handrails/Railings/Grab 1.00 lot Pesos
Bar (Stainless)

and ctvs.
(P ) /lot P


Sub Total XIV P

XV. Mechanical Works
A. Fire Sprinkler System
A.1 Ground Floor
a) Sprinkler Head, NTP, 34.00 pcs. Pesos
Pendent, Wet Type,
Quick Response, 165F,
Bulb Type w/ Escutcheon and ctvs.
Plate (P ) /pc. P


b) Fire Hose Cabinet with 1.00 set Pesos
100 ft. 38mm Hose

and ctvs.
(P ) /set P


c) B.I. Pipes, Schedule 40 1.00 lot Pesos
including fittings and
accessories
and ctvs.
(P ) /lot P


d) Gate / Angle Valves 1.00 lot Pesos


and ctvs.
(P ) /lot P



Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 27 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

e) Miscellaneous and 1.00 lot Pesos
Consumables (Union Pa-

tente, Sight Glass, Blind


Flange, Angle Bar, Gasket,
and ctvs.

Bolts, Nuts & Washer,etc)
(P ) /lot P


A.2 Second Floor
a) Sprinkler Head, NTP, 31.00 pcs. Pesos
Pendent, Wet Type,
Quick Response, 165F,
Bulb Type w/ Escutcheon and ctvs.
Plate (P ) /pc. P


b) Fire Hose Cabinet with 1.00 set Pesos
100 ft. 38mm Hose

and ctvs.
(P ) /set P


c) B.I. Pipes, Schedule 40 1.00 lot Pesos
including fittings and
accessories
and ctvs.
(P ) /lot P


d) Gate / Angle Valves 1.00 lot Pesos


and ctvs.
(P ) /lot P


e) Miscellaneous and 1.00 lot Pesos
Consumables (Union Pa-

tente, Sight Glass, Blind


Flange, Angle Bar, Gasket,
and ctvs.

Bolts, Nuts & Washer, etc.)
(P ) /lot P


A.3 Third Floor
a) Sprinkler Head, NTP, 36.00 pcs. Pesos
Pendent, Wet Type,
Quick Response, 165F,
Bulb Type w/ Escutcheon and ctvs.
Plate (P ) /pc. P


Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 28 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

b) Fire Hose Cabinet with 1.00 set Pesos
100 ft. 38mm Hose

and ctvs.
(P ) /set P


c) B.I. Pipes, Schedule 40 1.00 lot Pesos
including fittings and
accessories
and ctvs.
(P ) /lot P


d) Gate / Angle Valves 1.00 lot Pesos


and ctvs.
(P ) /lot P


e) Miscellaneous and 1.00 lot Pesos
Consumables (Union Pa-

tente, Sight Glass, Blind


Flange, Angle Bar, Gasket,
and ctvs.

Bolts, Nuts & Washer, etc.)
(P ) /lot P


A.4 Fourth Floor
a) Sprinkler Head, NTP, 31.00 pcs. Pesos
Pendent, Wet Type,
Quick Response, 165F,
Bulb Type w/ Escutcheon and ctvs.
Plate (P ) /pc. P


b) Fire Hose Cabinet with 1.00 set Pesos
100 ft. 38mm Hose

and ctvs.
(P ) /set P


c) B.I. Pipes, Schedule 40 1.00 lot Pesos
including fittings and
accessories
and ctvs.
(P ) /lot P


Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 29 of 29

Item
Description Quantity Unit Unit Cost Total Cost
No.

d) Gate / Angle Valves 1.00 lot Pesos


and ctvs.
(P ) /lot P


e) Miscellaneous and 1.00 lot Pesos
Consumables (Union Pa-

tente, Sight Glass, Blind


Flange, Angle Bar, Gasket,
and ctvs.

Bolts, Nuts & Washer, etc.)
(P ) /lot P


f) Elevator; including Tes- 1.00 unit Pesos
ting & Commissioning



and ctvs.


(P ) /unit P


Sub Total XV P


TOTAL BID COST P













Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 30 of 29


Subject : BILL OF QUANTITIES
Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City


Page 31 of 29

You might also like