Name of Project : Construction of Proposed Document Processing Division Building
Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 1 of 29
SECTION VIII - BILL OF QUANTITIES
Item Description Quantity Unit Unit Cost Total Cost No. I. Site Works a) Site Enclosure 780.00 m Pesos
and ctvs. (P ) /m P
b) Staking and Lay-out 1.00 lot Pesos
and ctvs. (P ) P
Sub Total I P
II. Earthworks a) Excavation 351.00 m Pesos
and ctvs. (P ) /m P
b) Gravel Bedding 83.00 m Pesos
and ctvs. (P ) /m P
c) Selected Filling 477.00 m Pesos Materials
and ctvs. (P ) /m P
d) Soil Poisoning 780.00 m Pesos
and ctvs. (P ) /m P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 2 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
Sub Total II P
III. Concrete Works a) Formworks 1.00 lot Pesos
and ctvs. (P ) /m P
b) Reinforced Concrete 583.00 m Pesos
and ctvs. (P ) / lot P
Sub Total III P
IV. Masonry Works a) 6 x 8 x 16 CHB 1,814.00 m Pesos incl. reinforcements
and ctvs. (P ) /m P
b) 4 x 8 x 16 CHB 240.00 m Pesos incl. reinforcements
and ctvs. (P ) /m P
Sub Total IV P
V. Plastering Works a) Plain Cement Finishes 3,678.00 m Pesos
and ctvs. (P ) /m P
Sub Total V P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 3 of 29
Item Description Quantity Unit Unit Cost Total Cost No. VI. Roof and Roof Framing a) Roof Framing 275.00 m Pesos
and ctvs. (P ) /m P
b) Ga. # 26 Pre-painted 275.00 m Pesos Long Span Roofing And accessories and ctvs. (P ) /m P
Sub Total VI P
VII. Ceiling a) 3/16 thk. Fiber 1,340.00 m Pesos Cement Board on Metal Furring and ctvs. (P ) /m P
Sub Total VII P
VIII. Tiling & Stone Works a) 600mm x 600mm 804.72 m Pesos Polished Tiles
and ctvs. (P ) /m P
b) 300mm x 300mm 229.14 m Pesos Polished Tiles
and ctvs. (P ) /m P
c) 300mm x 300mm 55.31 m Pesos Ceramic Tiles
and ctvs. (P ) /m P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 4 of 29
Item Description Quantity Unit Unit Cost Total Cost No. d) 600mm x 600mm 125.21 m Pesos Granite Tiles
and ctvs. (P ) /m P
e) 300mm x 300mm 8.81 m Pesos Mosaic Tiles
and ctvs. (P ) /m P
f) 300mm x 600mm 55.92 m Pesos Decorative Tiles
and ctvs. (P ) /m P
g) Granite Slab 16.88 m Pesos
and ctvs. (P ) /m P
h) Stone Finish 39.39 m Pesos
and ctvs. (P ) /m P
i) Decorative Stone 3.38 m Pesos
and ctvs. (P ) /m P
Sub Total VIII P
IX. Doors & Windows 1) Doors a) D-1 (3.0m x 4.0m.) 1.00 set Pesos Two Leaves double Acting Glass Door w/ Sidelite & Transom and ctvs. (P ) /set P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 5 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
b) D-1a (3.0m x 4.50m.) 2.00 sets Pesos Two Leaves double Acting Glass Door w/ Sidelite and ctvs. (P ) /set P
c) D-2 (2.80m x 4.50m.) 3.00 sets Pesos Two Leaves double Acting Door and ctvs. (P ) /set P
d) D-3 (2.40m x 4.50m.) 3.00 sets Pesos Two Leaves double Acting Door with Sidelite and ctvs. (P ) /set P
e) D-4 (0.90m x 2.10m.) 5.00 sets Pesos KD Panel Door on 2 X 6 KD Jambs with HD Knob & Hinges and ctvs. (P ) /set P
f) D-5 (0.80m x 2.10m.) 16.00 sets Pesos KD Panel Door on 2 X 6 KD Jambs with HD Knob & Hinges and ctvs. (P ) /set P
g) D-6 (0.70m x 2.10m.) 6.00 sets Pesos KD Panel Door on 2 X 6 KD Jambs with HD Knob & Hinges and ctvs. (P ) /set P
h) D-7 (0.70m x 1.80m.) 2.00 sets Pesos Panel Door, Swing, thk. Melamine Board w/ edging & and ctvs. accessories (P ) /set P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 6 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
i) D-8 (0.80m x 1.80m.) 9.00 sets Pesos Panel Door, Swing, thk. Melamine Board w/ edging & and ctvs. accessories (P ) /set P
j) 2 x 6 Jambs, Hard 3.00 sets Pesos Wood, Kiln Dried
and ctvs. (P ) /set P
2) Windows a) W-1 (1.00 x 3.35m.) 8.00 sets Pesos Awning with Fixed Glass and ctvs. (P ) /set P
b) W-2 (2.10 x 3.65m.) 2.00 sets Pesos Awning with Fixed Glass and ctvs. (P ) /set P
c) W-3 (6.00 x 1.10m.) 3.00 sets Pesos Awning with Fixed Glass and ctvs. (P ) /set P
d) W-4 (5.50 x 4.00m.) 1.00 set Pesos Awning with Fixed Glass and ctvs. (P ) /set P
e) W-5 (2.00 x 2.00m.) 1.00 set Pesos Awning with Fixed Glass and ctvs. (P ) /set P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 7 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
f) W-6 (2.00 x 2.00m.) 1.00 set Pesos Fixed Window
and ctvs. (P ) /set P
g) W-7 (2.65 x 2.50m.) 1.00 set Pesos Fixed Window
and ctvs. (P ) /set P
h) W-8 (5.86 x 5.80m.) 1.00 set Pesos Fixed Window
and ctvs. (P ) /set P
i) W-9 (5.50 x 2.50m.) 1.00 set Pesos Awning with Fixed Glass and ctvs. (P ) /set P
j) W-10 (0.90 x 4.00m.) 1.00 set Pesos Fixed
and ctvs. (P ) /set P
k) W-11 (1.85 x 2.50m.) 1.00 set Pesos Fixed
and ctvs. (P ) /set P
l) W-12 (0.50 x 2.40m.) 1.00 set Pesos Awning
and ctvs. (P ) /set P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 8 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
m) W-13 (1.20 x 1.10m.) 1.00 set Pesos Awning with Fixed
and ctvs. (P ) /set P
n) W-13a (0.40 x 0.80m.) 1.00 set Pesos Awning with Fixed
and ctvs. (P ) /set P
o) W-14 (0.40 x 0.80m.) 7.00 sets Pesos Awning
and ctvs. (P ) /set P
p) W-14a (0.40 x 0.60m.) 14.00 sets Pesos Awning
and ctvs. (P ) /set P
Sub Total IX P
X. Painting a) Walls 3,678.00 m Pesos
and ctvs. (P ) /m P
b) Ceiling 1,073.00 m Pesos
and ctvs. (P ) /m P
c) Doors 66.96 m Pesos
and ctvs. (P ) /m P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 9 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
Sub Total X P
XI. Electrical Works 1) Panel Boards @ GF a) BMDP (300AT, 3P, 600 1.00 unit Pesos Vac w/ 1-60AT; 1-110AT; 1-125AT; 1-175AT, 3P and ctvs. (P ) /unit P
b) MDP-1 (150AT, 3P, 600 1.00 unit Pesos Vac Main Breaker with 1-15AT, 2P; 1-60AT, 2P; 1-40AT, 3P; 1-50AT, 3P; and ctvs. 2-70AT, 3P 600Vac (P ) /unit P Branches
c) UPS Panel (60AT, 2P, 1.00 unit Pesos 250Vac Main with 4-15AT, 2-20AT 2P Branches) and ctvs. (P ) /unit P
d) L.O. & D.C.O. Panel 1.00 unit Pesos (40AT, 3P, 250Vac Main w/ 6-15AT; 2-20AT, 2P Branches and ctvs. (P ) /unit P
e) ACU Panel (70AT, 3P, 1.00 unit Pesos 250Vac Main with 1-15AT, 7-20AT, 3P Branches) and ctvs. (P ) /unit P
f) Elevator Panel (70AT, 1.00 unit Pesos 3P, 600Vac Main with 3-15AT, 1-60AT, 3P Branches) and ctvs. (P ) /unit P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 10 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
g) Elevator Water Tank 1.00 unit Pesos Panel (70AT, 3P, 250Vac Main with 1-15AT, 7-20AT, 3P Branches) and ctvs. (P ) /unit P
2) Panel Boards @ 2F a) MDP-2 (100AT, 3P, 600 1.00 unit Pesos Vac Main Breaker with 1-100AT, 2P; 1-30AT, 3P; 1-50AT, 3P; 600Vac and ctvs. Branches (P ) /unit P
b) UPS Panel (125AT, 2P, 1.00 unit Pesos 250Vac Main with 3-15AT, 7-20AT 2P Branches) and ctvs. (P ) /unit P
c) L.O. & D.C.O. Panel 1.00 unit Pesos (30AT, 3P, 250Vac Main w/ 5-15AT; 3-20AT, 2P Branches and ctvs. (P ) /unit P
d) ACU Panel (100AT, 3P, 1.00 unit Pesos 250Vac Main with 2-30AT, 4-40AT, 2-50AT, 3P Branches) and ctvs. (P ) /unit P
3) Panel Boards @ 3F a) MDP-3 (110AT, 3P, 600 1.00 unit Pesos Vac Main Breaker with 1-100AT, 2P; 1-30AT, 3P; 1-50AT, 3P; 600Vac and ctvs. Branches (P ) /unit P
b) UPS Panel (100AT, 2P, 1.00 unit Pesos 250Vac Main with 5-15AT, 3-20AT 2P Branches) and ctvs. (P ) /unit P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 11 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
c) L.O. & D.C.O. Panel 1.00 unit Pesos (30AT, 3P, 250Vac Main w/ 5-15AT; 3-20AT, 2P Branches and ctvs. (P ) /unit P
d) ACU Panel (60AT, 3P, 1.00 unit Pesos 250Vac Main with 10-20AT, 3P Branches) and ctvs. (P ) /unit P
4) Panel Boards @ 4F a) MDP-4 (150AT, 3P, 600 1.00 unit Pesos Vac Main Breaker with 3-15AT, 3P; 1-50AT, 3P; 1-60AT, 3P, 1-100AT, 2P and ctvs. 600Vac Branches) (P ) /unit P
b) UPS Panel (100AT, 2P, 1.00 unit Pesos 250Vac Main with 2-15AT, 2-20AT 2P Branches) and ctvs. (P ) /unit P
c) L.O. & D.C.O. Panel 1.00 unit Pesos (30AT, 3P, 250Vac Main w/ 5-15AT; 3-20AT, 2P Branches and ctvs. (P ) /unit P
d) ACU Panel (60AT, 3P, 1.00 unit Pesos 250Vac Main with 10-20AT, 3P Branches) and ctvs. (P ) /unit P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 12 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
b) 11W CFL Vertical 28.00 pcs. Pesos Downlight
and ctvs. (P ) /pc. P
c) 6W LED Vertical 52.00 pcs. Pesos Downlight (6 casing)
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 13 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
i) 3W Signage Lighting 46.00 pcs. Pesos
and ctvs. (P ) /pc. P
j) 3W LED Emergency 47.00 units Pesos Light
and ctvs. (P ) /unit P
k) Exhaust fan 4.00 units Pesos
and ctvs. (P ) /unit P
l) Accent Lighting 3.00 pcs. Pesos
and ctvs. (P ) /pc. P
m) LED Downlight 1.00 pc. Pesos
and ctvs. (P ) /pc. P
6) Wiring Devices a) One-Gang Switch, 11.00 sets Pesos Wide Series
and ctvs. (P ) /set P
b) Two-Gang Switch, 27.00 sets Pesos Wide Series
and ctvs. (P ) /set P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 14 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
c) Three-Gang Switch, 34.00 sets Pesos Wide Series
and ctvs. (P ) /set P
d) Three-way Switch, 10.00 sets Pesos Wide Series
and ctvs. (P ) /set P
7) Power Devices a) Single Receptacle 47.00 sets Pesos Outlet, Wide Series
and ctvs. (P ) /set P
b) Duplex Receptacle 89.00 sets Pesos Outlet, Grounding Type and ctvs. (P ) /set P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 15 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
c) 5.5mm THHN/THWN 8.00 rolls Pesos Copper Wire
and ctvs. (P ) / roll P
d) 8.0mm THHN/THWN 5.00 rolls Pesos Copper Wire
and ctvs. (P ) / roll P
e) 14mm THHN/THWN 300.00 mts. Pesos Copper Wire
and ctvs. (P ) / m. P
f) 22mm THHN/THWN 300.00 mts. Pesos Copper Wire
and ctvs. (P ) / m. P
g) 30mm THHN/THWN 300.00 mts. Pesos Copper Wire
and ctvs. (P ) / m. P
h) 38mm THHN/THWN 300.00 mts. Pesos Copper Wire
and ctvs. (P ) / m. P
i) 50mm THW Copper 150.00 mts. Pesos Wire
and ctvs. (P ) / m. P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 16 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 17 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
h) 65mm EMT Conduit 30.00 lngths Pesos
and ctvs. (P ) / length P
i) 80mm EMT Conduit 200.00 lngths Pesos
and ctvs. (P ) / length P
10) Boxes & Pull Boxes with Cover a) Metallic Utility Box, 320.00 pcs. Pesos 2 x 4
and ctvs. (P ) / pc. P
b) Metallic Octagonal Box, 770.00 pcs. Pesos 4 x 4
and ctvs. (P ) / pc. P
c) Metallic Pull Box, 50.00 pcs. Pesos 4 x 4
and ctvs. (P ) / pc. P
d) Metallic Pull Box, 30.00 pcs. Pesos 6 x 8 x 8
and ctvs. (P ) / pc. P
e) Metallic Pull Box, 20.00 pcs. Pesos 6 x 12 x 12
and ctvs. (P ) / pc. P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 18 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
11) Miscellanneous/Consumables a) Miscellaneous/Consu- 1.00 lot Pesos Mables (Electl./Rubber Tapes, Solderless Con- Nectors, Exp. Bolts, and ctvs. etc) (P ) / lot P
Sub Total XI P
XII. Auxilliray Works 1) Fire Alarm System a) Addressable Fire Alarm 1.00 unit Pesos Control Panel, up to 99 Loops (UL Listed) and ctvs. (P ) /unit P
b) Addressable Type 42.00 pcs. Pesos Smoke Detector
and ctvs. (P ) /pc. P
c) Heat Detector 22.00 pcs. Pesos
and ctvs. (P ) /pc. P
d) Addressable Pull 4.00 pcs. Pesos Station
and ctvs. (P ) /pc. P
e) Fire Alarm Bell 4.00 pcs. Pesos
and ctvs. (P ) /pc. P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 19 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
f) # 18/2 TF Wire 4.00 boxes Pesos
and ctvs. (P ) /box P
g) Octagonal Box, PVC, 70.00 pcs. Pesos 4 x 4
and ctvs. (P ) /pc. P
h) Utility Box 10.00 pcs. Pesos
and ctvs. (P ) /pc. P
i) 20mm uPVC Flexible 8.00 rolls Pesos Conduit
and ctvs. (P ) /roll P
j) Mini-monitor Module 2.00 sets Pesos
and ctvs. (P ) /set P
k) Back up Battery, 12V 1.00 set Pesos
and ctvs. (P ) /set P
l) Miscellaneous (PVC 1.00 lot Pesos fittings, G.I. Wire, elbows, etc.) and ctvs. (P ) /lot P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 20 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
2) Telephone System a) PABX Unit, 8 x 32 1.00 unit Pesos Configuration; and Expandable and ctvs. (P ) /unit P
b) Port Analogue Trunk 1.00 unit Pesos Card
and ctvs. (P ) /unit P
c) 8 Port Digital Hybrid 1.00 unit Pesos Extension Card
and ctvs. (P ) /unit P
d) 16-Port Digital 2.00 units Pesos Extension Card
and ctvs. (P ) /unit P
e) Power Supply, M-Type 1.00 unit Pesos
and ctvs. (P ) /unit P
f) Back-up Battery 1.00 unit Pesos Adapter
and ctvs. (P ) /unit P
g) Sealed Lead Acid 2.00 units Pesos Battery, 12V
and ctvs. (P ) /unit P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 21 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
h) Amphenol Cable 3.00 units Pesos Assembly, 2m.
and ctvs. (P ) /unit P
i) Telephone Surge Pro- 3.00 units Pesos tector, (3 incoming Lines) and ctvs. (P ) /unit P
j) Hi tech AVR, 500 Watts, 1.00 unit Pesos With Power On Delay
and ctvs. (P ) /unit P
k) Panasonic KX-T7633 1.00 unit Pesos
and ctvs. (P ) /unit P
l) Single Telephone Line 16.00 units Pesos
and ctvs. (P ) /unit P
m) Telephone Outlet 16.00 sets Pesos
and ctvs. (P ) /set P
n) Telephone Drop Wire 100.00 mts. Pesos
and ctvs. (P ) /m. P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 22 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
o) Telephone Wire, 4.00 boxes Pesos # 22/3
and ctvs. (P ) /box P
p) PVC Conduit 130.00 lngths Pesos
and ctvs. (P ) /lngth P
q) Miscellaneous and 1.00 lot Pesos Consumables (Tie Wire, etc.) and ctvs. (P ) /lot P
3) CCTV a) HD Camera 16.00 sets Pesos
and ctvs. (P ) /set P
b) Internet Program 1.00 lot Pesos
and ctvs. (P ) /lot P
c) IP 32 Channel DVR 1.00 set Pesos
and ctvs. (P ) /set P
d) 500 GIG Wester 3.00 units Pesos Digital Disk
and ctvs. (P ) /unit P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 23 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
e) Power Supply 16.00 units Pesos
and ctvs. (P ) /unit P
f) BNC Connector 28.00 units Pesos
and ctvs. (P ) /unit P
g) RG6 Cable 180.00 mts. Pesos
and ctvs. (P ) /m. P
h) # 16 Flatcord 180.00 mts. Pesos
and ctvs. (P ) /m. P
i) 20mm PVC Pipe 120.00 lngths Pesos
and ctvs. (P ) /lngth. P
j) 25mm PVC Pipe 60.00 lngths Pesos
and ctvs. (P ) /lngth. P
k) 32mm PVC Pipe 4.00 lngths Pesos
and ctvs. (P ) /lngth. P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 24 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
l) Telephone Plate 16.00 sets Pesos
and ctvs. (P ) /set P
m) Utility Box, PVC 16.00 pcs. Pesos
and ctvs. (P ) /pc. P
n) Junction Box, PVC 15.00 pcs. Pesos
and ctvs. (P ) /pc. P
o) Pull Box, 4 x 10 x 10 5.00 pcs. Pesos
and ctvs. (P ) /pc. P
p) Miscellaneous and 1.00 lot Pesos Consumables (PVC Solvent Cement, PVC Fittings, etc.) and ctvs. (P ) /lot P
Sub Total XII P
XIII. Plumbing Works a) PVC Pipe and Fittings 1.00 lot Pesos
and ctvs. (P ) /lot P
b) PPR Pipe and Fittings 1.00 lot Pesos
and ctvs. (P ) /lot P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 25 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
c) Water Closet, American 13.00 sets Pesos Standard, complete with fittings and ctvs. (P ) /set P
d) Lavatory, American 14.00 sets Pesos Standard, Pedestal Type complete with fittings and ctvs. (P ) /set P
e) Urinal, American Stan- 8.00 sets Pesos dard, complete with fittings and ctvs. (P ) /set P
f) Paper Holder, Solid 13.00 sets Pesos Brass, American Standard and ctvs. (P ) /set P
g) Floor Drain, Stainless, 19.00 sets Pesos 4
and ctvs. (P ) /set P
h) Septic Vault 1.00 unit Pesos (7.0m.x 2.50m.x 1.80m.)
and ctvs. (P ) /unit P
Sub Total XIII P
XIV. Architectural Finishes a) Floor Mounted, 3/4" 41.00 m Pesos Melamine Toilet Par- Tuitions with Stainless edging and ctvs. (P ) /m P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 26 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
b) 6mm thk. mar. Ply on 1.00 lot Pesos 2 x 3 Hor. & Vert. Studdings and ctvs. (P ) /lot P
c) Handrails/Railings/Grab 1.00 lot Pesos Bar (Stainless)
and ctvs. (P ) /lot P
Sub Total XIV P
XV. Mechanical Works A. Fire Sprinkler System A.1 Ground Floor a) Sprinkler Head, NTP, 34.00 pcs. Pesos Pendent, Wet Type, Quick Response, 165F, Bulb Type w/ Escutcheon and ctvs. Plate (P ) /pc. P
b) Fire Hose Cabinet with 1.00 set Pesos 100 ft. 38mm Hose
and ctvs. (P ) /set P
c) B.I. Pipes, Schedule 40 1.00 lot Pesos including fittings and accessories and ctvs. (P ) /lot P
d) Gate / Angle Valves 1.00 lot Pesos
and ctvs. (P ) /lot P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 27 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
e) Miscellaneous and 1.00 lot Pesos Consumables (Union Pa-
tente, Sight Glass, Blind
Flange, Angle Bar, Gasket, and ctvs.
Bolts, Nuts & Washer,etc) (P ) /lot P
A.2 Second Floor a) Sprinkler Head, NTP, 31.00 pcs. Pesos Pendent, Wet Type, Quick Response, 165F, Bulb Type w/ Escutcheon and ctvs. Plate (P ) /pc. P
b) Fire Hose Cabinet with 1.00 set Pesos 100 ft. 38mm Hose
and ctvs. (P ) /set P
c) B.I. Pipes, Schedule 40 1.00 lot Pesos including fittings and accessories and ctvs. (P ) /lot P
d) Gate / Angle Valves 1.00 lot Pesos
and ctvs. (P ) /lot P
e) Miscellaneous and 1.00 lot Pesos Consumables (Union Pa-
tente, Sight Glass, Blind
Flange, Angle Bar, Gasket, and ctvs.
Bolts, Nuts & Washer, etc.) (P ) /lot P
A.3 Third Floor a) Sprinkler Head, NTP, 36.00 pcs. Pesos Pendent, Wet Type, Quick Response, 165F, Bulb Type w/ Escutcheon and ctvs. Plate (P ) /pc. P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 28 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
b) Fire Hose Cabinet with 1.00 set Pesos 100 ft. 38mm Hose
and ctvs. (P ) /set P
c) B.I. Pipes, Schedule 40 1.00 lot Pesos including fittings and accessories and ctvs. (P ) /lot P
d) Gate / Angle Valves 1.00 lot Pesos
and ctvs. (P ) /lot P
e) Miscellaneous and 1.00 lot Pesos Consumables (Union Pa-
tente, Sight Glass, Blind
Flange, Angle Bar, Gasket, and ctvs.
Bolts, Nuts & Washer, etc.) (P ) /lot P
A.4 Fourth Floor a) Sprinkler Head, NTP, 31.00 pcs. Pesos Pendent, Wet Type, Quick Response, 165F, Bulb Type w/ Escutcheon and ctvs. Plate (P ) /pc. P
b) Fire Hose Cabinet with 1.00 set Pesos 100 ft. 38mm Hose
and ctvs. (P ) /set P
c) B.I. Pipes, Schedule 40 1.00 lot Pesos including fittings and accessories and ctvs. (P ) /lot P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 29 of 29
Item Description Quantity Unit Unit Cost Total Cost No.
d) Gate / Angle Valves 1.00 lot Pesos
and ctvs. (P ) /lot P
e) Miscellaneous and 1.00 lot Pesos Consumables (Union Pa-
tente, Sight Glass, Blind
Flange, Angle Bar, Gasket, and ctvs.
Bolts, Nuts & Washer, etc.) (P ) /lot P
f) Elevator; including Tes- 1.00 unit Pesos ting & Commissioning
and ctvs.
(P ) /unit P
Sub Total XV P
TOTAL BID COST P
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City
Page 30 of 29
Subject : BILL OF QUANTITIES Name of Project : Construction of Proposed Document Processing Division Building Location : M.H. Del Pilar Street, Molo, Iloilo City