Tangent Piles Wall

Plan View
Section View
Section View
Concrete Key Wall
Top of Shaft
Existing Grade
Top of Bedrock
Elevation View
Coping
(Pile Cap)
Drilled Shafts
Reinforcing (Typ)
- wall system consldered as a slope stablllty measure for the
north end of the project on the east side of SR 315
- Constructed elther near the toe of the slope or on the benchlng where
2(H):l(v) slope can be achleved
- Cast-ln-place wall lnto bedrock, whlch ls generally located at,
or [ust below the streambed
- The 2(H):l(v) slope from SP 3l5 to the concrete key wall uses soll bloenglneerlng
- wall system consldered as a slope stablllty measure for the
south end of the pro[ect on the east slde of SP 3l5
- Conslsts of constructlng drllled shafts to form a contlnuous wall
- Shafts are constructed and relnforced wlth relnforclng cages or
steel beam sectlons
Proposed Slope wlth 8loenglneerlng
Concrete Key wall
Existing SR 315 C
L
Existing Slope
Lstlmated Top of 8edrock
Normal water Level Olentangy Plver
Tangent Plles wall
Existing SR 315 C
L
Existing Slope
Lstlmated Top of 8edrock
Normal water Level Olentangy Plver
Gravity Wall
8


M
a
x
Backfll
Soil Nail Wall
- Petalnlng wall system consldered for the
cut wall sectlon located west of SP 3l5
wlth a relatlve lower wall helght (helght
of the exposed wall less than 8 feet)
- Advantages of thls wall system lnclude
slmple constructlon and cost enectlveness
- Petalnlng wall system consldered for the cut wall sectlon located west of SP 3l5
- Soll nalllng ls a technlque to relnforce and strengthen the exlstlng ground
- Thls wall system conslsts of soll nalllng comblned wlth a shotcrete faclng and a
nal structural faclng
- Soll nalllng ls a cost enectlve alternatlve ln cut sltuatlon
Section View
Section View
Profle View
Concrete 8arrler
weephole
Concrete 8arrler
Shotcrete Pacla
Concrete Gutter
Soll Nalls
Petalned Soll
Proposed SP 3l5 C
L
Proposed SP 3l5 C
L
Soldier Pile and Lagging Wall
Retained Soil
CIP Facing (Optional)
Soldier Pile
H-Pile (Soldier Pile)
Predrilled Hole
Timber Lagging
Timber Lagging
Bottom of
Exposed Wall
Top of Wall
Concrete Gutter
Concrete Barrier
Existing Grade
- Petalnlng wall system consldered for the cut wall sectlon located west of SP 3l5
- SPL wall ls a common retalnlng system ln roadway constructlon or
excavatlon support system
- Soldler plles are vertlcal steel elements spaced about 6 to l0 feet center-to-center
that dene the perlmeter of the excavatlon
- Spaces between the soldler plles are lled wlth lagglng that ls normally
made of timber, concrete, or steel
- Pows of tle backs wlll be requlred dependlng on the soll condltlon and the
exposed helght of the wall
Proposed SP 3l5 C
L
Section View
Plan View
Elevation View
Tle-back
Anchor
Timber Lagging