You are on page 1of 3

I8:J[i

yr",il#ffI
i,i:,;ffi":j[i*',,'o'"
for constructins
the concrete footins for a major
tha ei_
width
6m
- t , ,t J
bil'#
Hl
Pb^*( )"r-h
Ini
,,^
Underside of footing (top of brinding) is
'1.5
m berow existing ground
rever
{ '
Data:
'
50mm of blinding concrete (to trim and level base of foundation
and provide
clean
working area for trades to erect formwork and fix reinforcement)
'
ffter
2 days curing of the blinding concrete pedestrian
,t."r. and erection of
formwork on can commence
'
1.2 m of working space around the footing and a 4So batter to the earth sides
'
Formwork is required on each of the vertilar faces of the iooting
.
Reinforcement is approx
.140
kg / m3 of concrete
.
Allow for 25% bulking of excavited material
'
Formwork to remain in place
for 7 days.after concrete pour
for concrete to part
cure
'
4fter
stripping formwork, backfiil to eiisting revet in ioom, t"y"r,
'
The concrete for the footing must be pour6d
in a singre pour
You have the following plant
available:
.
20T excavator with 0.9m3 bucket that can excavate this materiar at 40 m3 per
hour.
.
Sufficient trucks to keep up with the excavator
r
Vibrating plate
compactor that can compact filr materiar (to 100% modified
compaction) at the rate of delivery and spreading
by the'ior excavator.
r A concrete pump
with a capacity of 25 m3/hour.
-
What You Need to Do;
1. Define the activities required to construct and backfill around the footing.
2.
llt9ylaJe ltp
quantities
of work for each
ggtrvitv ui" ,rit. ,t ,"r.ri"i, specified in
4S1181-1982 Method of Measurement of civir Engineering
works etc.
a;r;iili;;_
[n"
through Swinburne Library).
3. Determine the work hours required to comprete each activitv.
4. show the assumption that you make, the type ,nJ nurno"i'6i*ort"r.
in your
crew
and the way you carcurate the resurts. ee
luioeo
oy tre oevetopment
or,i,o* .i"*, in
-
Chapter 9 of the textbook and indicate the-producti'viiviul"'tat
you
have used.
5' Select an appropriate crew size and calculate ilre ouiltion oi'eacn activity. (Hint: list
^
g.agh di.ffeqelt type. of tradesperson on separate tine (row)).
6' using the information in.your project ptanhing
spre"o)sr,eJi (below)
indicate to the
nearest whole day how long you need to allow io complete irris pr6lect.
Arirrl 1.,"t
there are no wet weather delays.
Trades available for crew are:
Tradesperson
Guide to C)rrtnui r*r to.loii-'J^
Foreman
C)ne ncr
Carpenter (formwork)
0.75 mhrs/m2 rate io ar;tF;t.]5Jr-=
Steel Fixer (reinforcement)
200ko/hr
Plant operator (excavator)
See plant
atailable
Labourer
One each peieErpenGr
2
Project Planning Sheet:
all assumptions and calculatrons
Page 1 of 2
ConctPte
Foundation
PLAN
l.lot to Scale
50 mm
Blinding
Concrete
SECTION
A.A
\
Not to Scale
I
4t
Page 2 of 2
'
Concrete
Foundation
I
6)
o)
d
d
(.)
OJ
!
il
5
='
cno
I
@
o,
I
6)
o.)
=d
C)
OJ
d
F
6)
OJ
t
o
5
o,
-
-
m
a
o)
,A
{
(J!
U)
o
o
-.
o
)
(o
I
-u
0)
)
J.
)
(o
)
o
!
o
o
o
-o
o.)
ga
o
P
o
+
H
U1
'+
o
o
t
z
lt)
3
d
o)
q
9"
-..P
I
3
o
OJ
=o-
o
o)
(D

You might also like