You are on page 1of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room,

of Civil Engineering Dept., IITB, Powai.

11/9/2014

SUMMARY
A

CIVIL WORKS

Rs.

TOTAL
In Words

STUDIO Architecture

1 of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room, of Civil Engineering Dept., IITB, Powai.

11/9/2014

Schedule of Quantities and Specifications

Description.
1.00

1.01.01

DEMOLITION & DISMANTLING & Temporary Works


Breaking of Masonary
Breaking and removing existing plastered / unplastered
brick,concrete block, stone ashlar, masonary at various levels
including concrete patlis if any.
230mm thk wall

1.01.02

115 thk wall/150 thk

1.01

Breaking of RCC members.


Breaking and removing of RCC work such as lintels, pardi,
chajja, Loft etc. at all levels taking all necessary precautions,
including cutting reinforcement.
Breaking of Floor finish
Breaking and removing of existing flooring and skirting
including natural stone slabs, ceramic tiles on floor, mosaic
tiles, IPS etc. including the bedding material, taking all
necessary precautions to avoid breaking of floor tiles as much
as possible.
Breaking of Floor Filling (bathroom )
Dismantling and removing of existing toilet water proofing and
the underlying brick bat coba of any thickness upto the top of
the RCC slab / chajja. shifting debris down stair, cleaning the
area to receive new waterproofing treatment, removing and
carting away debris anywhere outside premises as directed
complete.

1.02

1.03

1.04

Cutting for Electric trenches


Providing and cutting with Electric saw trenches minimum
width 1 feet (Race Way) in existing floor for laying electrical
conduit including cleaning and finishing the same with IPS or
any other finish as required. etc complete including curing
disposing debris at anywhere in campus as per detailed
drawing. and as directed
Breaking of Dado
Dismantling of existing dado including bedding material, taking
all necessary precautions without damaging the masonry of
that & adjacent wall.
Breaking of Plaster
Breaking and removing existing plaster with or without tile.

1.05

1.06

1.07

1.08
1.08.01
1.08.02
1.08.03
1.08.04
1.09

1.09.01
1.09.02
1.09.03

1.10

1.10.01
1.10.02
1.10.03
1.10.04
1.10.05
1.10.06
1.10.07
1.10.06
1.10.07
1.10.08
1.11

STUDIO Architecture

Dismantling of Sanitary fittings


Wash basin
W.C.'s
Urinals
Sink
Dismantling wash basin Counter
Dismantling of existing platform/ Counter top including base
etc. taking all necessary precautions so as not to damage the
adjoining walls etc.
Dismantling Pantry Counter
Dismantling granite seat and shelves
Carefully Removing and dismantling the existing plumbing
lines and wash basins etc., stacking and depositing the same
at Estate Office Store
Dismantling of Doors, Windows,Partition.
Carefully dismantling the existing Doors, Windows, Partitions
etc. and depositing the same at Estate Office Store or
stacking it for reuse in the allocated space as directed.
Doors with Hardwood Frames
Windows with Hardwood Frames
Aluminium Doors with AL. Frames
Doors with Granite Frames
Aluminium Windows.
Al. Ventilators on the external walls
Ventilators in the corridor
Al. Ventilators of toilets
Al.Partitions along with the Al. doors
Storage units 9' tall.
Dismantling of False Ceiling (gr flr + fflr)

Qty

Unit

Rate

Amount

37.00

sqft

0.00

3,178.49

sqft

0.00

50.00

cft

0.00

1,120.00

sqft

0.00

200.00

cft

0.00

1,200.00

R.Ft.

0.00

488.25

sqft

0.00

2,682.50

sqft

0.00

3.00
3.00
1.00
1.00
2.00

no.
no.
no.
no.
LS

0.00
0.00
0.00
0.00
0.00

1.00
1.00

LS
LS

0.00
0.00

1.00

LS

0.00

5.00
10.00
4.00
5.00
23.00
23.00
13.00
12.00
819.00
270.00
2,835.00

no.
no.
no.
no.
no.
no.
no.
no.
sqft
sqft
sqft

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2 of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room, of Civil Engineering Dept., IITB, Powai.

Description.
Dismantling and removing of existing False Ceiling including
the supports, screws, etc, shifting debris down stair, cleaning
the area, removing and carting away debris anywhere outside
premises as directed complete.
Dismantling of Air- Conditioners
Dismantling all Air Conditioners carefully prior to any breaking
and demolition of walls and partitions, and storing the same as
directed at convenient location or given in possession of
concerned authorities with proper inventory of the same.

1.12

1.12.01
1.12.02

window unit
split including the outdoor units and piping/ wiring complete
Carefully Removing the Existing Black board with Pelmet, all
fittings and fixtures stacking and depositing the same in Estate
Office Store
Making temporary partitions using existing partitions complete
(tiimber frames with 8mm ply) with door for isolating the
switch panel location and making it dust free

1.13

1.14

1.15

Rebate for Scrap permitted to be taken away


SUB-TOTAL - 1.00

2.00

Qty

Unit

Rate

11/9/2014

Amount

15.00

No.

0.00

6.00

No.

0.00

1.00

nos.

0.00

100.00
1.00

sqft
LS

0.00
0.00
0.00

CIVIL WORKS- GENERAL


STRUCTURAL REPAIRS
Notes:
1) Structural repairs shall be carried out using Dr. Fixit OR
Roffe OR Sunanda OR equivalent products
2) Concrete and exposed reinforcement steel Surfaces to be
prepared as per manufacturers specification
3) Priming of the reinforcement shall be done using zinc
epoxy primer of the chosen manufacturer and as per their
specifications
4) The concrete surface shall be primed with an Acrylic
Emulsion Based bonding agent as per manufacturers
specification
5) Polymer modified mortar shall be prepared at site in the
following proportion Cement: Sand(Screened river sand or
quartz sand of Zone II & I): SBR / Acrylic polymer: Water- 50
kg: 150 kg: 10 ltrs : 10 ltrs OR as per manufacturers
specification
6) All the repaired areas shall be cured with a coat of acrylic
polymer (Pidicrete MPB) immediately. Alternatively moist
curing for 3 days shall be done by sprinkling water or by
covering the area by wet Hessian cloth.

2.01

2.01.01

2.01.02

Applying Polymer modified mortar over the prepared & primed


surface including all the steps mentioned above as per
manufacturers specification
Wide opening the crack in plaster, cleaning and applying
Polymer modified plaster as per manufacturer's specification
before plastering complete as directed.

1,919.67

sqft

0.00

400.00

r.ft

0.00

92.50

sqft

0.00

1,550.00

sqft

0.00

100.00

sqft

0.00

60.00

rft

0.00

50.00
450.00

sqft
sqft

0.00
0.00

MASONRY WORK.
Providing and constructing masonary wall in concrete mortar,
including soaking of bricks,and on top,raking out joints to
receive plaster, scaffolding, curing, etc., complete.

2.02

2.01.01

Masonary 9"thk ( 230mm) using well burnt bricks in 1:5 mortar


including 3" reinforced concrete Coping at every 7'ht

2.01.02

Masonary 4-1/2" thk (115mm/150mm) using well burnt bricks


in 1:4 mortar including 3" reinforced concrete Coping at every
4 ht
100mm thk Siporex Masonary in 1: 4 mortar including 3"
reinforced concrete Coping at every 4 ht
Reinforced Concrete lintels to support masonary above
openings upto 1.5m spans
Glass blocks panels within Masonary 100mm thk fixed over Al.
subframe with epoxy adhesive and grout complete as per
drawings and direction and manufacturers specifications.

2.01.03
2.01.04
2.01.05

2.01.06

STUDIO Architecture

Siporex steps for Seminar Room

3 of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room, of Civil Engineering Dept., IITB, Powai.

Description.
Providing and constructing Steps with Siporex- Broken OR
New, set in 1:6 mortar including achieving curve edges in step
profile as required in classroom. Alternatively any floor filling
such that load on slab does not exceed 350 kg/sqm and
structurally able to receive 50mm thk IPS and all incidental
furniture fixing and live loads (contractor to specify details)
2.01.07

100mm thk Siporex Masonary in 1: 4 mortar curved or straight


as per the steps on the rear side of seminar room to receive
Bison Board Flooring .

2.01.08

12mm Bison Board flooring in seminar room steps supported


on Siporex walls. Profiled to the shape leveled anchored to
masonary completed to receive 65mm thk IPS finish.

2.01.09

Bathroom Exhaust Fan Cut out


Providing cut-out for exhaust fan, finish the same and match
the same with existing wall including Providing Anodised
aluminium frame etc complete.
CONCRETE WORK.
Providing, mixing, placing, compacting and curing in situ
R.C.C. M-25 grade (1:1:2) machine mix cement concrete work
using graded stone aggregate 20 mm maximum size for RCC
works such as slab, columns, beams foundations including
necessary formwork, staging, centering, scaffolding etc., as
per drawing and as directed but excluding the cost of
reinforcement steel, complete.
Supplying and placing in position tested quality steel
reinforcement including cutting bending, binding as per
drawing and as directed by the Structural Consultant,
providing proper cover by using concrete briquets etc.,
complete as directed. (Steel is to be supplied by the
Contractors, including all taxes, octroi, etc., and cost of binding
wire complete). Payment will be made on the length basis with
standard co-efficient to convert in wt. As per ISS. Rolling
margins and wastage will not be paid. (Grade Fe 415)

2.02
2.02.01

2.02.02

2.03

2.03.01
2.03.02
2.03.03

2.03.04

2.04

STUDIO Architecture

PLASTERING
Providing sand cement, sand faced plaster, sponged finished,
in two coats, first coat in C.M. 1:4 mix., approx. 12 mm. thick
and second coat in C.M. 1:4 mix., approx. 8mm. thick, total
average 20 mm. thick, including working in door and window
jambs, crevices, drip moulds, bands, soffits, scaffolding,
curing, roughening the first coat to receive second coat, at all
heights etc. complete.
Plaster 1 Coats
ceiling
Plaster 2 Coats
25% of All surfaces less ceiling
Gyplaster
Providing and applying "GYPLASTER" (min 10 to15mm thk)
or any required thickness of India Gysum make to brick
wall/concrete as per manufactures's specifications and
finishing the same smooth to receive paint , including
necessary scaffolding,curing etc complete.& as directed.
Synthetic Texture plaster:
Providing applying one coat of acrilie synthetic plaster of
approved manufacturer over cement plaster or concrete
surface including applying one sealing coat of desire colour
including necessory scafolding , work to be carried out as per
manufacturer specification and to be complete to architect's
approval.
Waterproofing.
Notes :1) No Watta/ vertical surfaces will be measured and paid
separately.
2) Measurements will be paid for finished plan area.
3) The work is to be carried out through Waterproofing
Specialist Co. approved by the Architects / Owners.
4) The contractors shall carry out the necessary tests for
providing the effectiveness of the treatment.

Rate

11/9/2014

Qty

Unit

Amount

180.00

sqft

0.00

850.00
2.00

sqft
no.

0.00
0.00

13.20

cuft

0.00

100.00

kg

0.00

1,919.67

sqft

0.00

1,370.47

sqft

0.00

1,370.47

sqft

0.00

1,355.44

sqft

0.00

4 of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room, of Civil Engineering Dept., IITB, Powai.

Description.
5)The Surfaces to be applied upon, must be clean, reasonably
dry, free form dirt and loose material, and be as smooth as
possible
6) Polymer modified cementitious seamless waterproofing
membrane will be brush applied to Sunk Slab in 2 coats with
interval of 4 -6 hours as per manufacturers specifications.

Rate

11/9/2014

Qty

Unit

Amount

250.00

sqft

0.00

60.00

rft

0.00

15.00

No.

0.00

7) The treatment is left as it is for 72 hours for air cure before


carrying out ponding test. Ponding test shall be carried out at a
depth of 50mm to determine water tightness
8) The waterproofing shall be carried at least 300 mm-on
vertical surfaces, or at least 150mm above the floor finish
level. The membrane shall be applied to the internals of the
down pipes before laying of the tiles, bedding and floor traps.
9) Upon successful completion of the ponding test, a layer of
10mm Cement/ Sand (Ratio 1:4) protective screed, using
Integral Waterproofing Compound @ 200ml/50 kg bag of
cement, shall be applied on top of the membrane.

2.04.01
2.05

2.06

10) Care shall be taken whilst laying the protective screed so


as not to damage the waterproofing membrane below.
11) The contractor shall take all measures necessary to
prevent any damage to the membrane or protective screed
during subsequent work.
12) Constructing and laying brick bat coba in C.M. 1:5 with
water proofing compound @ 1 Kg / bag including all lead, lift
and laid to proper slope to drain off water entirely into the floor
trap.
13) Repeat the process of waterproofing above the Brick
bat coba
14) The whole treatment will be covered with 10 years
guarantee on requisite stamp paper etc., complete.
Toilet waterproofing 250mm deep
Laying heavy duty 3 runs of PVC pipes 50 mm dia in floor for
AC piping by cutting and chasing existing cement floor tiles
and removing filling of @ 150mm deep upto slab level
Laying PVC pipes sleeve of 75mm dia in wall for AC piping
complete with edge finished to match plaster

0.00

SUB-TOTAL- 2.00
3.00
3.01
3.01.01

3.01.01a
3.01.01b
3.01.02

CIVIL WORKS- TILING & STONE FINISH WORKS


Vitrified/ Ceramic/ Granite Flooring
Providing and fixing Vitrified /Ceramic plain tiles of first quality
of Kajaria, Nitco, Johnson or equivalent approved make,
shade and size approximate 600 mm. x 600 mm. x 10 mm.
thick, in flooring, over a bed of sand, with rich cement slurry,
pointing joints with matching colour cement, curing and
cleaning tiles with dilute acid, etc,. complete. Base price of
tiles is Rs. 80/- sft.
Floor Vitrified (admin, faculty,store,toilet front area &
conference 2) 600 mm. x 600 mm
Floor Vitrified (corridor) 450 mm. x 450 mm
Floor Ceramic Tiles
Providing and fixing Glazed Ceramic Antiskid tiles of first
quality of Kajaria, Nitco, Johnson or equivalent approved
make, shade and size approximate 300 mm. x 300 mm. x 6
mm. thick, in flooring, over a bed of sand, with rich cement
slurry, pointing joints with matching colour cement, curing and
cleaning tiles with dilute acid, etc,. complete. Base price of
tiles is Rs. 45/- sft.
Flooring Granite (20mm thick) Polished/ Flamed/ Sand
Blasted (foyer area infront of stair & toilet) (Base Rate 180/-)

3.01.03
3.02
3.02.01
3.02.02

STUDIO Architecture

Vitrified/ Ceramic/ Granite Skirting


Skirting Vitrified 75 mm high ( admin, faculty,store,comp
rm,seminar rm,server&maintainence)
Skirting Vitrified 75 mm high (corridor, foyer area infront of
stair & toilet)

2,415.00
545.00
50.00

sqft
sqft
sqft

0.00
0.00
0.00

580.00

sqft

0.00

685.00

r.ft

0.00

330.00

rft

0.00

5 of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room, of Civil Engineering Dept., IITB, Powai.

3.02.03

3.02.04

3.03

3.04
3.05 3.05.01
3.05.02
3.06
3.06.01

3.06.02

3.06.03

Description.
Skirting Vitrified (Corridor) 75mm wide Matching the floor tiles
and joint lines to match the joints of floor tiles in cement paste
and grouts to match color of tiles including wall plaster finish
above tiles as specified
Skirting (8mm Granite tiles) 75mm wide Matching the floor
tiles and joint lines to match the joints of floor tiles in cement
paste and grouts to match color of tiles including wall plaster
finish above tiles as specified
Floor IPS (Discussion rm,seminar rm)
Providing and laying 40 mm. thick I.P.S. in flooring with
waterproofing compound of approved make, in C.C. 1:2:4
mix., in suitable panels, and in uniform level and finish
(tolerance in undulations not more than 2mm over 2 metre
spans) as directed including compacting, curing, etc.,
complete.
Step risers IPS (Seminar Room)
Wall Dado size 300x 450 of kajaria, Nitco, Johnson or
equivalent (base rate 70/-)
Wall Dado (150x 150x 5mm thk) (base rate 40/-)
Marble and Granite works
Window/ Door Frames -Rebated Granite (toilet) (granite base
rate 140/-) (PWD base material Baroda Green Marble)
Total width 150mm Inner granite of 50mm width, Outer Granite
100mm width single pieces with @ 2mm overlapDoor/Threshold Frames -No Rebate (Granite) single piece
granite of upto 2400mm long and upto 300mm wide base rate
140/Marble subframe (base rate 45/-) 150mm wide single piece
upto 2100mm
Marble subframe for all window fixing. Outer edge polished

3.06.04

Window Cill Granite (external side)


Single piece granite cill (upto 2400mm lengthx 200mm wide).

3.06.05
3.06.06

Ventilator cill Granite Single piece granite of upto 2400mm


length x100mm wide)
Granite edge chamfer 6mm x 6mm including mirror polishing

3.06.07

Granite edge half round molding including mirrorpolishing

3.06.08

Granite edge full round molding including mirror polishing

3.06.09

Mirror polishing exposed edges

3.07
3.07.01

50.00
1,795.00

Unit

Rate

Amount

rft
sqft

0.00
0.00

280.00

rft

0.00

756.95
36.40

sqft
sqft

0.00
0.00

114.00

rft

0.00

45.00

rft

0.00

584.20

rft

0.00

200.10

rft

0.00

10.00

rft

0.00

50.00

rft

0.00

10.00

rft

0.00

20.00
10.00

rft
rft

0.00
0.00

6.00

rft

0.00

6.00
8.00

rft
rft

0.00
0.00

Pantry Platform/ Counter


Providing and laying machine cut, machine polished,
Approved Black Granite slab 20 wide approx. 20 mm. thick
over cuddappa base with a bed of cement mortar 1:6 mix,
including making zaries and filling the same with cement
mortar, cleaning, curing, providing moulding, polishing
exposed edges and moulding, including front facia patti & side
vertical of granite of approved thickness; including Providing
and fixing Stainless steel sink (Nirali or other approved
brand)of approx size 22x 16" in over cudappah slab
supported on Vertical Cudappa wall at required spacing for
counter including upto 75mm wide fascia and upto 75mm
wide granite backsplash(all exposed edges full round
moulding & polishing)etc. complete as per drawings. Granite
base rate 140/-

3.07.02

Providing and laying with araldite, machine cut, machine


polished, Approved Black Granite slab 20 wide approx. 20
mm. thick including upto 75mm wide fascia and upto 75mm
wide granite backsplash(all exposed edges full round
moulding & polishing) etc. over Carpentry Counter unit
complete as per drawings. Granite Base rate 140/-

3.07.03

Toilet Wash- BasinCounter

STUDIO Architecture

Qty

11/9/2014

6 of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room, of Civil Engineering Dept., IITB, Powai.

Description.
Providing and fixing in Position Approved Black Granite slab
26 wide over cudappah slab supported on CI/ epoxy coated
MS Brackets at required spacing for counter (all exposed
edges full round moulding & polishing) including front facia
patti & side vertical of granite of approved thickness including
neat cement for fixing and all cutting & chasing in walls
finishing and Fixing one Cadappa shelf as instructed and
direction etc complete as per drawings

Qty

Unit

4.01 4.01.01

4.01.02
4.02

FLOOR FINISHES
Providing & laying Antistatic Vinyl flooring, 2.0 mm. thick
including cleaning and required levelling the floor surface,
application of glue etc. complete as per manufacturers
specifications. For Computer rm & seminar rm, server & staff.
(LG, Armstrong or equivalent make with wood texture finish

Laminate skirting 50 mm high

3,670.00
440.00

sqft
rft

0.00
0.00

Laminate floor (For Heavy Traffic) including skirting threshold


pieces etc. , vapor layer, resilient layer, complete for HOD,
Conference & Discussion rm- Pergo/ Squarefoot or equivalent
make

1,045.00

sqft

0.00
0.00

SUB-TOTAL- 4.00
5.00

STEEL WORKS
Brackets for AC Outdoor Unit Mount
50x 50x 5mm MS angle frame- verticals at @ 900 c/c top and
bottom as continuous runners, bracing as required; entire
assembly suspended by welding on MS plate fixed with
concrete anchor bolts to the beam- Epoxy primer finish (refer
dwg)
SUB-TOTAL- 5.00

5.01

6.00

ALUMINIUM WORKS
Al.Windows Sliding (external side)
Providing, supplying and fixing in position silver anodised
extruded aluminium section (of Jindal or equivalent make in
25mm shutter thickness series of minimum wall thickness
1.5mm). Sliding shutters in 2 track channels with subframe. as
directed etc. complete. Bottom- Jindal 8795; Top & Side-8796;
Shutters- Lock style- 8798, Interlock- 8794, Bearing rail- 8960

6.01

6.02
6.02
6.03

6.03.01

6.04
6.05

6.06

6.07
6.08

STUDIO Architecture

Amount

0.00

SUB-TOTAL- 3.00
4.00

Rate

11/9/2014

Al.Windows Sliding (between Discussion rm & Corridor)


Al.Windows Sliding (between Administration & Corridor)
Windows Openable (external side)
Providing and fixing in position,openable window with frame,
fully glazed with special fittings, made out of heavy duty silver
anodised rebated aluminium sections frame work of approved
size and 8 mm. thick glass-panes, free of distortion, untreated,
fixed with the frame banded to the glass for an airtight,
waterproof and vapour-proof seal etc., with Himax hinge and
powder coated Al handles complete as per Architects
approval and instructions.
Existing Windows Alterations
Resizing the Shutter panels, and changing the bottom
member @ 8' long equivalent to the existing gauge
Al.ventilators fixed (corridor)
Al. ventilators on external side
Colour Anodized Al. Rebated Section profile (Jindal or
equivalent profile) with 6mm clear floatglass complete with
neoprene gaskets beads as necessary etc.
Al.toilet ventilators (Openable window with Himax hinges
(adjustable stay)in colour Anodized Al frame (25x 50) and
Louvered windows
Fixed Ventilator of Toilets
Colour Anodized Al. "L" Angle (12 x12x 2mm thk) subframe
fixed with epoxy based waterproof adhesives and screws.

15.00

No.

0.00

0.00

469.80

sqft

0.00

69
52.2
130.50

sqft
sqft
sqft

0.00
0.00
0.00

30.00

sqft

0.00

350.18
416.21

sqft
sqft

0.00
0.00

27.52
13.76

sqft
sqft

0.00
0.00

538.20

rft

0.00

7 of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room, of Civil Engineering Dept., IITB, Powai.

Description.

Qty

Unit

GYPSUM SHEETS, FALSE CEILING & POP WORKS


Gypsum Board Finishing
Providing and fixing in position 12mm thick Gypsum board
sheets on Pywood/ Bison Board finish with sealing of gaps
with POP and joints tapes etc. complete as directed.

7.01

Gypsum False Ceiling (Admin, H.O.D., Faculty, Conference 1


& 2, Discussion room 1&2)
Providing and fixing in position false ceiling made out of G.I.
runners at 1200c/c suspended with vertical supports as
required and GI battens at 600c/c screwed to the the runners;
providing and fixing 12 mm. thick India Gypsum Board ( India
gypsum sections fixed to ceiling with fasteners), screwed and
fixed to battens from bottom including all necessary fittings
and fixtures such as wall runners, clamps, clips etc., including
filling the gaps, sealing the joints with paper tape as per
manufacturers specifications complete.

7.02

Amount
0.00

SUB-TOTAL- 6.00
7.00

Rate

11/9/2014

800.00

sqft

0.00

2,700.00

sqft

0.00

3,370.00

sqft

0.00

60.00

rft

0.00

300.00

sqft

0.00

Modular Acoustic Tile False Ceiling (Comp rm,seminar rm)

7.03

Providing and erecting in position modular false ceiling made


out of powder coated GI snap-on grid system of Armstrong or
Equivalent with mineral fibre acoustic ceiling tiles fixed at
ceiling level suspended from ceiling
Gypsum edges to Accoustic tile ceiling Comp rm, seminar,
I.T.Staff))
Providing fabricating and erecting in position 1/2" thk Gyp
board False ceiling (India Gypsum or equivalent make) as per
manufacturers specification with necessary GI section for
frame work and suspenders,including sealing the joints with
sealing tapes,including cut outs for lighting fixtures, steps if
required etc complete .as directed etc complete
POP punning
POP punning over existing/ new plaster walls any deviation in
excess of 15mm shall be leveled using plaster. Punning
guides will be made at 2ft intervals. No undulations will be
accepted. Punning wiil be done to the satisfaction of the
architect.
SUB-TOTAL- 7.00

7.04

7.05

8.00
8.01
8.01.01

8.01.02

8.01.03

CARPENTRY (Window, Door, Partitions)


Windows
Repairing existing wooden Window-Ventilators
Checking/ Resizing/ removing & refixing fixing new ss
handles,ss stays etc.

Providing & fixing wooden openable window using teak


wood for framing and inserting 5mm thick plain glass
including fixing pivot/ hinges and all necessary fittings &
fixtures etc.complete or as directed.
Providing & fixing Fixed glass using 5mm thick plain glass
and 18mm thick ply for framing including all necessary
fittings and fixtures etc. complete or as directed.

0.00

5.00

no.

0.00

16.00

sqft

0.00

300.00

sqft

0.00

7.00

no.

0.00

5.00

no.

0.00

Flush Doors
Providing,making and erecting in position Solid core flush door
shutter Single or double leaf (Approved make ISI) including
frame wooden or Aluminium (if required)and laminated
(merino/greenlam) including necessary fittings fixtures,such as
brass/steel hingesfixed with SS screws, approved handles
(12" long SS hairline finish), Aldrop , tower bolt of approved
make and view panel (if reqd) including edges finishing with
beading polishing or laminated etc complete

8.02

8.02.01

8.02.02

STUDIO Architecture

2200mm x 900mmx45mm thk laminated Flush door (with 150x


1500 mm view glass panel) -D2b, D2c
T. W framed- 150x 75; Shutter- flush door 45mm thk
laminated on both sides including SS hinges, dorset make
door handles and lock latch assemby
2200mm x 1350mm x 50mm thk laminated Flush door (with
150x 1500 mm view glass panel)-D1

8 of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room, of Civil Engineering Dept., IITB, Powai.

Description.
T. W framed- 150x 75; Shutter- flush door 45mm thk
laminated on both sides mounted on pivot floor springs, (cost
of floorspring and its fixing on floor separate)rebate edges
acoustically treated as required with sound softening butyl
rubber/ neoprene lining physically fixed to frame.
8.02.03

8.02.04

8.02.05

8.02.06

8.03

8.03.01
8.03.02
8.03.03
8.03.04

8.03.04a
8.03.04b
8.03.04c
8.03.04d
8.04

8.05

8.06

8.07

8.08

STUDIO Architecture

2700mm x 900mmx45mm thk laminated Flush door (with


475x400 & 475x 1500 mm view glass panel) -D2a
T. W framed- 125 x 75; Shutter- flush door 45mm thk
laminated on both sides including SS hinges, dorset make
door handles and lock latch assemby
2200mm x 1000mm x 45mm thk laminated Flush door (with
150x 1500 mm view glass panel)-D3
T. W framed- 125 x 75; Shutter- flush door 45mm thk
laminated on both sides including SS hinges, dorset make
door handles and lock latch assemby
Toilet Main door
Providing and fixing Laminate finish Marine grade flush doors
for Toilets on marble frames frame 2100mm x 750mmx35mm
thk using ss hinges, - D4
Toilet Internal door
Providing and fixing Laminate finish Marine grade flush doors
for Toilets on marble frames frame 2100mm x 750mmx35mm
thk using ss hinges, complete with indicator latch and SS
handles- D5
PARTITIONS
Providing and fixing in position full height partitions mm.
thick, with 63 mm x 38 mm framework made & with extra
framework, if required, for fixing wall A.C. units, Wall Hangings
etc. without any extra cost, fixing 8mm thk ply/ Bison Board
finish complete as directed. Note :- Every alternate vertical
member shall be anchored in main ceiling. However
measurements for billing purposes will be taken into False
Ceiling Level only.
1.5mm thick Al. Frame
16 gauge GI. Frame
Hardwood Frame
Glazing within Partition
Glazing of sizes upto 3000mm fixed on sides with teak wood
bead (12x 38mm)
12mm thick toughened glass in HOD cabin
12mm thick toughened between discussion room & Faculty
room
8mm thick Floatglass
6mm thick Floatglass
AC boxing
Providing and erecting in position wall paneling cum pelmet
(for A.C. mounting) with openable panels for servicing, using
18 mm thk ply of approved make including 1mm thk laminate
of approved shade and providing & applying french / zinc
polish on exposed area
Seminar Room Acoustical panelling
Fabric lined Soft boards mounted on 12mm thk plywood with
tw edge over t w frame of 40x 40 in a grid of 600x 600mm upto
2400mm high staggered in plan as per dwgs. (Fabric base
rate 250/- per metre
Providing and fixing concealed door closer of Everite /Hyper
make and design including necessary fittings fixtures etc
complete.
Providing and fixing concealed floor mounted door closer
springs with SS plate of Everite /Hyper make and design
including necessary fittings fixtures etc complete.
Light Fitting Assembly (ply box of 9"wx 6" d curved/ straight to
profile with cutouts in curve profile with stiffeners at 1200c/c
and 6mm Milky Acryllic profiled to shape as per template
suspended with ss cable fitting from the ceiling and fixed to
beam under side complete with smoothening corners, joints,
buffing etc. and including 3 coats lustre spray paint with 1 coat
primer

Qty

Unit

Rate

11/9/2014

Amount

1.00

no.

0.00

1.00

no.

0.00

3.00

no.

0.00

4.00

no.

0.00

100.00
100.00
300.00

sqft
sqft
sqft

0.00
0.00
0.00

64.00

sqft

0.00

64.00
150.00
100.00
326.25

sqft
sqft
sqft
sqft

0.00
0.00
0.00
0.00

350.00

sqft

0.00

18.00

no.

0.00

1.00

no.

0.00

240.00

rft

0.00

9 of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room, of Civil Engineering Dept., IITB, Powai.

Description.
Cable Tray / Light Fitting Assembly (ply box of 9"wx 6" d
curved/ straight to profile with cutouts in curve profile with
stiffeners at 1200c/c and 6mm Milky Acryllic profiled to shape
as per template suspended with ss cable fitting from the
ceiling and fixed to beam under side complete with
smoothening corners, joints, buffing etc. and including 3 coats
lustre spray paint with 1 coat primer

8.09

Qty

Unit

Rate

11/9/2014

Amount

180.00

rft

0.00

270.00

sqft

0.00

Room dividing Sliding folding partition in Computer room in


12mm thick Plywood cladded over MS Square Hollow section
frame with glass wool Insulation and panelling with no gaps,
smooth operation with heavy duty Al track and sliding
assembly and as per vendors specification.(Refer Drg)

8.10

0.00

SUB-TOTAL- 8.00
9.00

CARPENTRY FURNITURE
All Plywood shall be of grade IS303 unless specified
All units shall be treated with termiguard ar any equivalent anti
termite and borer solution.
All concealed hinges to be of blum or equivalent make
All other hinges and handles shall be brush finish SS
9.01

Storage Unit/ Panelling/ Shutters


Providing and fixing in place Storage Units- carcass in 19 mm
Plywood ; Shutters in 20mm ply upto 1000mm vertical ht OR
25 mm block board where vertical ht more than 1000mmBack
ply 6mm with Texture laminate finish complete with 6mm TW
lipping, 12mm TW edges for hinges; satin finish SS Handles,
locks, hinges, Magnet catches etc. as per drawings.
9.01.01
9.01.02
9.01.03
9.01.04
9.01.05
9.01.06

9.01.07
9.01.08
9.01.09
9.01.10
9.01.11
9.01.12
9.01.13

9.01.14
9.01.15
9.01.16

9.01.17

9.02
9.02.01
9.02.02
9.02.03

9.02.04
9.02.05
9.02.06

STUDIO Architecture

Conference room AV unit


Panelling above cill for Monitor Mounting
Waiting area Storage
HOD Cabin Storage
Pantry Area platform Storage(600 deep with inside white
laminate in marine plywood
Pantry platform shutters
Providing making and fixing in position 19mm marine Plywood
shutters to area below counter, over using 2" x 11/2" teak
wood and finished with approved 1mmthk decorative laminate
on outside and off white laminate
Full ht Storage (750mm ht) behind PA table
Over head Storage Between Pantry and Admin
Low ht storage between Discussion Rooms
Overhead unit for AC mounting between discussion rooms
Overhead unit in faculty Area
Low ht storage in Computer lab
Seminar Room Control area louvered shutters 7' (ht.)x 3'w
double shutter set in T w frame- Shutter laminate finish
plywood with TW. louvres.
Conference Room 2 AV Unit
Conference Room 2 Panelling below cill on Window side
including Cill finish in Marine Ply
Electrical panel boxing in laminated plywood and shutters in
laminated block board 7' x 3'x 12" deep in plywood inside
laminate with brass hinges
Janitor storage boxing in laminated plywood and shutters in
laminated block board 7' x 3'x 12" deep in plywood inside
laminate with brass hinges
Shelves/ Accessories/ Miscellaneous
12mm thick toughened Glass shelves within the dividing
storage between Cabin and Conference.
Pantry platform basket 450x 550x 125mm deep SS basket
304 chrome finished mounted
Photocopy area overhead glass shelf edge machine
polished12mm thick on D brackets shelf with brackets15" (d) x
7'-6" (ht.)
Writing Board (2400x 1200)
Notice Boards from Corridor Side (2400x1200)
Providing & fixing 35mm dia Stainless Steel Stand for
support etc.complete or as directed .

60.00
50.00
110.00
40.00

sqft
sqft
sqft
sqft

0.00
0.00
0.00
0.00

15.00
15.00

sqft
sqft

0.00
0.00

60.00
21.00
30.00
30.00
30.00
60.00

sqft
sqft
sqft
sqft
sqft
sqft

0.00
0.00
0.00
0.00
0.00
0.00

24.00
60.00

sqft
sqft

0.00
0.00

50.00

sqft

0.00

32.00

sqft

0.00

21.00

sqft

0.00

50.00

rft

0.00

2.00

No.

0.00

6.00
3.00
2.00

rft
No.
No.

0.00
0.00
0.00

4.00

No.

0.00

10 of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room, of Civil Engineering Dept., IITB, Powai.

9.02.07

Description.
Mirror above wash basin (6' x 4') with machine polished edges
mounted on 12mm with mirror screws complete with cap

Qty

44.00

Unit

Rate

11/9/2014

Amount

sqft

0.00

100

rft

0.00

240.00

rft

0.00

9.02.08

Providing & Fixing 1-1/2" x 1/2 " Moulding For wall Skirting
9.02.09

Providing & Fixing 3" x 1" Architrave For Door & Window
frame.

0.00

SUB-TOTAL -9.00
10.00

PAINTING & Polishing


Ceiling paint
Providing and applying acrylic emulsion paint of approved
quality, colour and shade to ceiling in three coats including
preparing the surfaces, applying primer, putty, etc. complete.

9,450.00

sqft

0.00

Wall Paint
Acryllic Emulsion
Providing and applying one coat of acrylic primer and two
coats of pure Acrylic paint of IITB approved manufacturer as
per manufacturers specification on old or new Gypboard/ POP
punning finish/ plastered surface over concrete / brickwork/
as per manufacturers specification including scaffolding and
cleaning the surface thoroughly with coir brush, watering the
surface etc. complete including covering the floor, window
glass with plastic sheet and as directed by this office.

5,481.89

sqft

0.00

10.02.02
10.02.03

Same as above (11.02.01) but with solid colours


Lustre Matt finish
Providing and applying one coat of suitable primer and two
coats of Lustre paint of IITB approved manufacturer as per
manufacturers specification on old or new Gypboard/ POP
punning finish/ plastered surface over concrete / brickwork/
as per manufacturers specification including scaffolding and
cleaning the surface thoroughly with coir brush, watering the
surface etc. complete including covering the floor, window
glass with plastic sheet and as directed by this office.

200.00
200.00

sqft
sqft

0.00
0.00

10.02.04

Same as above (11.02.03) but with solid colours


Exterior Acryllic Emulsion
Providing and applying one coat of acrylic primer and two
coats of pure Acrylic exterior paint of IITB approved
manufacturer as per manufacturers specification on old or
new plastered surface over concrete / brickwork as per
manufacturers specification including scaffolding and cleaning
the surface thoroughly with coir brush, watering the surface
etc. complete including covering the floor, window glass with
plastic sheet and as directed by this office.

1,200.00

sqft

0.00

10.01

10.02
10.02.01

10.03

10.04

Enamel/ Metallic paint on Steel Cupboards


Removing, scraping existing metal cupboards, Removing and
refixing all chrome finsih accessories. Applying base coat of
primer sealing the pores. Spray painting metallic paints as per
the approved shade. Complete in dust free conditions.

2.00

no.

0.00

10.05

Enamel on Ply & wood


Providing and applying two coats of enamel matt finish paint of
approved colour and shade over a coat of primer, sealing the
cracks, including scaffolding, curing, brushing and brooming
down etc. complete. Actual area painted will be measured
and paid for without considering any coefficient for the area
painted over sand cement sponge finished plaster.

500.00

sqft

0.00

10.06

French Polish
Providing and applying French polish of required finish to
wooden furniture by hand including knotting and preparing the
surface by scraping using emery papers of suitable grades,etc.
complete as directed by engineer in charge.

2,400.00

sqft

0.00

10.07

Zinc Polish

1,200.00

sqft

0.00

STUDIO Architecture

11 of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room, of Civil Engineering Dept., IITB, Powai.

10.08

Description.
Providing and applying Zinc polish of required finish to wooden
furniture by hand including knotting and preparing the surface
by scraping using emery papers of suitable grades,etc.
complete as directed by engineer in charge.

Qty

Unit

Melamine Polish
Providing and applying Malamine polish of required finish to
wooden furniture by spray machine including knotting and
preparing the surface by scrapping, applying French
polishing,etc. complete as directed by engineer in charge.

500.00

sqft

FURNISHING
Frost Film
Providing & Fixing Llumar/ 3 M or equivalent fixed as per
manufacturers specification.
Roller Blinds
Providing and Fixing roller blind sunscreens of Aerolux or
equivalent make and as per manufacturers specification
complete with hardware
Vertical Blinds
Providing and Fixing blinds from Aerolux or equivalent make
complete with hardware and as per manufacturers
specification
Wall paper including base preparation
Providing and Fixing Wall Paper including base preparation
complete and as per manufacturers specification (Base Rate
40/-)

11.01

11.02

11.03

11.04

0.00

200.10

sqft

0.00

130.50

sqft

0.00

43.50

sqft

0.00

500.00

sqft

0.00

SUB-TOTAL -10.00
12.00

Amount

0.00

SUB-TOTAL -10.00
11.00

Rate

11/9/2014

0.00

PLUMBING
PVC Drainage
Supplying, laying and jointing of waste water and soil PVC
pipe SUPREME/ PRINCE make or equivalent approved
quality (For Sewarage not Rain water), including necessary
specials i.e. coupler, Bend, tees, Y with door, vent cowl,
reducer with rubber seal, ring / solvent, cement joint, as per
manufacturers recommendation, fixing pipe to wall with G.I.
Clamps fixed to T.W. batten holders, including necessary
chasing to origin condition, testing, etc., complete as directed.

12.01

12.01.01
12.01.02
12.01.03
12.02

12.03

12.03.01
12.03.02
12.03.03
12.03.04
12.03.05

STUDIO Architecture

4" dia
3" dia
2" dia
Floor Trap
Providing and fixing heavy quality P.V.C. floor trap 100 mm.
dia. inlet and 75 mm. dia. outlet of self cleaning design without
anti-syphonage horn, including making joints air and watertight with spun yarn and cement paste, finished with cement
paste, providing and fixing S.S. grating, making necessary
connections to waste water pipe, complete.

Watersupply piping
Supplying, laying and jointing of concealed water supply
UPVC pipe Finolex or equivalent make approved quality,
including necessary specials IN BRASS as per pipe
manufacturers specifications i.e. coupler, Bend, tees, Y
reducer with rubber seal, ring / solvent, cement joint, as per
manufacturers recommendation, including making holes,
chases in brick / concrete work, if required and making good
the same, fixing pipe to wall with G.I. Clamps, testing, etc.,
complete.
a) 15 mm. nominal bore.
b) 20 mm. nominal bore.
c) 25 mm. nominal bore.
d) 32 mm. nominal bore.
e) 40 mm. nominal bore.

20.00
60.00
50.00
8.00

160.00

rft
rft
rft
Nos.

0.00
0.00
0.00
0.00

rft
rft
rft
rft

0.00
0.00
0.00
0.00

12 of 14

Proposed Computer Room, Seminar Room, HOD Office Stores Conference Room, of Civil Engineering Dept., IITB, Powai.

12.04

Description.
P& F brass Waste Coupling with connector for pantry sink 15
mm. size, Brass C.P. pillar tap 1 No. fixed at the center,
making inlet connection with 15 mm. (1/2") P.V.C. connector
and Brass ferrule with Brass C.P. heavy duty stop cock,
providing and fixing 37 mm. dia. Brass C.P. waste coupling
and bottle trap heavy, including making necessary waste water
connection with bottle trap and providing and fixing 37 mm.
(1.5") CPVC waste water pipe upto nahani trap, embedded in
the wall, making chases in wall floor and making good the
same, etc., complete.
Providing and fixing in position Brass C.P. concealed stop
cock 1/2" dia. Heavy duty with ISI mark, etc., complete.(Jaguar
or Equivalent make)
Providing and fixing in position Gun Metal full way wheel
operated "Peets" pattern gate valves, bearing I.S.I. mark of
"Leader" "Sant" or any other approved make with screwed
female ends, complete.
b) 32 mm. Dia.
d) 20 mm. Dia.

Qty

Unit

Rate

11/9/2014

Amount

1.00

Nos.

0.00

2.00

Nos.

0.00

2.00
2.00

Nos.
Nos.

0.00
0.00

E WC
Providing and fixing approved make White Vitreous China wallhung European type W.C. pan,(Hindware, Parryware)
including providing and fixing M.S. brackets, flush valve,
CPVC flush pipe of required diameter, making chases in wall
floor and making good the same, Brass C.P. hinge, Rubber
buffer and PVC seat and cover of approved make, etc.,
complete.
Urinal
Providing and fixing in position approved make Urinal Vitreous
China white, of Hindware/ Parryware Make, with C.I. brackets
15 mm. size, Brass C.P. water dispenser 1 No. fixed at the
center, making inlet connection with 15 mm. (1/2") P.V.C.
connector and Brass ferrule with Brass C.P. waste coupling
and bottle trap heavy, including making necessary waste water
connection with bottle trap and providing and fixing 37 mm.
(1.5") CPVC waste water pipe upto nahani trap, making
chases in wall floor and making good the same, etc.,
complete.

4.00

Nos.

0.00

2.00

Nos.

0.00

Washbasin
Providing and fixing in position approved make Wash Hand
Basin Vitreous China white, size approx. 560 mm. x 410 mm.
of Hindware/ Parryware Make, with C.I. brackets 15 mm. size,
Brass C.P. pillar tap 1 No. fixed at the center, making inlet
connection with 15 mm. (1/2") P.V.C. connector and Brass
ferrule with Brass C.P. heavy duty stop cock, providing and
fixing 37 mm. dia. Brass C.P. waste coupling and bottle trap
heavy, including making necessary waste water connection
with bottle trap and providing and fixing 37 mm. (1.5") CPVC
waste water pipe upto nahani trap, embedded in the wall,
making chases in wall floor and making good the same, etc.,
complete.

4.00

Nos.

0.00

12.08
12.09

P & F Angle Cock of Jaguar or equivalent make


P & F Wash basin pillar cock of Jaguar or equivalent make

6.00

Nos.

0.00

12.10
12.11
12.12
12.13
12.14

P & F chrome finish Brass Bottle trap of approved make


P & F 2-in -1 bib cock of Jaguar or equivalent make
P & F health faucet Jaguar or equivalent make
P & F Flush valve ofJaguar or equivalent make
Providing and fixing Liquid Soap Dispenser of plastic complete
with brackets near wash basin counter
Providing and fixing Paper napkin holder in the toilet
Providing and fixing waste bin in brush finish SS with inner
plastic lining with heavy duty foot operated lid
Providing and fixing in position coat hook chrome finish brass
hooks in the toilet
SUB-TOTAL -11.00

4.00
4.00
4.00
4.00
4.00

Nos.
Nos.
Nos.
Nos.
Nos.

0.00
0.00
0.00
0.00
0.00

3.00
4.00

Nos.
Nos.

0.00
0.00

4.00

Nos.

0.00

4.00

Nos.

0.00
0.00

12.05

12.06

12.06.01
12.06.02
12.07

Providing and fixing Fitttings & Fixtures


12.07.01

12.07.02

12.07.03

12.15
12.16
12.17

TOTAL (1-12)

STUDIO Architecture

0.00

13 of 14

``