You are on page 1of 91

NAROK COUNTY GOVERNMENT

Draft County Integrated Development

2013 - 2017

Plan
Roadmap for Transforming Narok into a prosperous and
competitive County.

29 August 2013

Narok County Integrated Development Plan (2013 -17)

Page 1

EDUCATION PROGRAMMES AND PROJECTS

Sector Profile
Status of Key performance indicators
Narok County are characterized by enrolment, xyx literacy rates, school infrastructure (CDP).
Key challenges experienced in the sector include among others.low number of teachers, XXXX
Sector potential (PICTURE OF WHAT SECTOR CAN ACHIEVE IF THESE CHALLENGES/CONSTRAINTS ARE ADDRESSED OR MITIGATED)
Focus of the county government in the next five years (sub-sector and priority areas, strategies). The education agenda for the county in the next five years will on
Key flagship projects

Sector
Sector Vision
Sector Mission
Sector Justification

Education
Improved lives through learning
1. To provideadequate access to high quality education at all levels.
2. To transform acquired knowledge into innovative enterprise.
3. To promote alternative education.
- Enhanced literacy levels.
- Skill development for improved productivity.
- Improved transmission and reception of information and knowledge.
- Need to reduce school drop-out rates.
- Need to promote innovation.
- Enhanced competitiveness through human resource development.
- Technological advancement through skills development.

Sector Summary
Sub-sector

Priorities

Programmes

Flagship Projects

1. Early Childhood

1. Programme Expansion

1. ECD Development programme

1. Construct/rehabilitate 450 ECD centres

Narok County Integrated Development Plan (2013 -17)

Page 2

Sub-sector

Priorities

Programmes

Flagship Projects

2. Performance improvement

2. Curriculum development programme

2. Purchase 6 mobile ECD units


3. Recruit/train 400 teachers
4. Adapted curriculum (cognition, creativity)

2. Adult Education

3. Ault Education programme


expansion

3. Adult Education development


programme

5. Recruit/train 60 teachers
6. Enterprise-linked AE curriculum

3. Primary education

4. Performance Improvement

4. Facilities improvement programme


5. Staff improvement programme

7.
8.
9.
10.
11.
12.
13.
14.

Development

6. Learning support programme

5. TIVET mainstreaming
6. Gender mainstreaming

7. Curriculum adaptation programme


8. Appropriate Skills Development
Programme
9. Girl child education promotion
programme

Construct 1000 classrooms


Train/recruit 1000 Teachers
Construct 400 teachers houses
Hardship allowance fund (0.5m/yr)
Construct 200 Dormitories
School Feeding Project (20m/5yr)
Adapted Curriculum (lower school vernacular)
600 Wood/Metal/Home science workshops

15. Provide1m sanitary towels (50m/yr)


16. 3 Girls' Rescue centre

4. Special needs

7. Special needs students

10. Special needs integration programme

17. 100 Special needs centres (embedded in existing schools)

5. Secondary education

8. Performance Improvement

11.
12.
13.
14.

18.
19.
20.
21.
22.
23.
24.
25.

9. ICT Mainstreaming
10. TIVET Mainstreaming
11. Gender Mainstreaming

Facilities improvement programme


School equipments supply programme
Learning support programme
School computerization programme

15. School TIVET integration programme


16. Talent development programme
17. Girl child education promotion
programme
1.
Girls rescue programme

Narok County Integrated Development Plan (2013 -17)

300 Classrooms
100 Equipped science laboratories
200 Dormitories
2500 Computer labs
Train/recruit ICT teachers
100 Wood/Metal workshops
6 Talent academies (1/Constituency)
0.5m Sanitary towels (25m/yr)

1. 3 Girls rescue centres


2. Girls protection laws
3.
Page 3

Sub-sector

Priorities

Programmes

Flagship Projects

6. TIVET

1. Programme Development

1. TIVET Facility development


programme
2. TIVET staff development programme
3. TIVET knowledge conversion
programme

4.
5.
6.
7.

7. Tertiary colleges and


university

2. Expand access by locals to


University

4. University expansion and


decentralisation programme
5. Students support programme

3. Industry-academia linkages

Detailed Education Sector Plan


Sub-sector
Priorities
Constraints
Early
Childhood
Development
1.1

Programme
Expansion

Inadequate/Poor state
of existing ECD centres

Long distances and


sparse settlements

Failure to appreciate

6. Industry-academia linkages promotion


programme
7. Student placement and employment
programme

Construct/rehabilitate 6 youth polytechnics


TIVET facilities development fund (50m/yr)
Train/Recruit 60 teachers
TIVET enterprise and innovation fund (10m/yr)

8.
9. Build 5 new campuses
10. Establish bursary fund
11. HELB modelled revolving fund (2000 students)
12. Research fund (10m/yr)
13. Attach students to local businesses (1000 students)

Strategies

Programmes

Projects

Objectives

Targets

Location

Construct
new/improve
existing facilities
Explore strategic
partnerships

Facilities development
programme

Construct/rehabilitate
ECD centres

To expand access
to ECD facilities

400-County
government

Countywide

ECD PPP programme

Form partnerships

200-PPP

Countywide

Establishment
mobile ECD
services
Promote homebased ECD
teaching

Mobile ECD outreach


programme

Purchase mobile ECD


units
Radio programming
sessions

1 units per
constituenc
y (6)
50 sessions

Every
constituency

Radio ECD outreach


programme
Parents education
programme

Parents training and


organisation

To increase
number of ECD
facilities
To improve
access to ECD
learning
To improve
access to ECD
learning
To enable homebased ECD
learning
To change

As above

Countywide

As above

Countywide

Sensitization on the Community sensitisation

Narok County Integrated Development Plan (2013 -17)

Outreach campaigns

Countywide

Page 4

Sub-sector

Priorities

Constraints

Strategies

Programmes

Projects

Objectives

the value of ECD

value of ECD

programme
ECD Teacher development
programme

Employ qualified ECD


teachers

perceptions on
ECD
To expand access
to learning

Shortage of qualified
ECD teachers

Recruit trained
ECD teachers
Train ECD
teachers locally

ECD teachers training


programme

Train new teachers


Conduct routine inservice trainings

Performance
improvement

Substandard/inferior
curriculum
Lack of access to
quality learning
materials
Poor/Irregular
attendance

Adult
Education

AE programme
expansion

Poor perception of AE
programmes
Inadequate Teachers

Inadequate facilities
Curriculum that does
not fit local situations

To expand local
teaching capacity
To upgrade the
quality of ECD
teaching
To make it more
relevant to county
context
To enhance
learning
experience
To encourage
ECD attendance

Targets

Location

1200 ECD
teachers (2
per school)
250 over 5
years
Train/retrain
200 ECD
teachers
Lump sum

County wide

Lump sum

Countywide

Lump sum

Countywide

Countywide
2 teachers
per ECD
centre
County wide

Review and
develop quality
curriculum
Develop learning
materials

Curriculum development
programme

Adapt curriculum

ECD materials development


and distribution programme

Acquisition materials

Provide food

ECD centre feeding


programme

Feeding

Sensitize
prospective
learners

AE promotion programme

Sensitization
campaigns

To create
awareness of the
importance of ace

50 media
campaigns

Countywide

AE staff development
programme

Retrain teachers

To expand access
to AE

60 teachers

Countywide

AE facilities development
programme

Equip AE centres

To make AE more
effective

Lump sum

Countywide

AE curriculum development
programme

Develop curriculum

To make it
relevant to county
and learners
needs

Lump sum

Countywide

Retrain inservice of
primary school
teachers to
handle AE
Offer AE facilities
within existing
schools
Adapt
curriculum to
existing situation
and priorities

Narok County Integrated Development Plan (2013 -17)

Page 5

Sub-sector

Priorities

Constraints

Strategies

Programmes

Projects

Objectives

Targets

Location

Primary
education

Performance
Improvement

Poor school attendance

Punish nonattendance
Provide lunch in
hardship areas

Education promotion
programme
School feeding programme

School attendance
surveillance
Feed children

To motivate
attendance
To improve
attendance
through retention

Lump sum

Countywide

1000 pupils

Long home-school
distances

Provide boarding
facilities

Pupils learning support


programme

Build boarding facilities


for upper school

1200
dormitories

Poorly
trained/unqualified
teachers
Teacher absenteeism

Train untrained
teachers

Staff improvement
programme

Re-train teachers

To enhance
quality of learning
environment
To enhance
quality of teaching

Areas with
low
enrolment
rate in the
county
Countywide

1000
teachers

Countywide

Improve
supervision
Provide hardship
allowance
Provide housing for
teachers

Learning support
programme
Staff improvement
programme
Facilities improvement
programme

Supervise teacher
attendance
Establish hardship
allowance fund
Construct teachers
houses

To reduce
absenteeism
To enhance the
quality of teaching
To improve
working conditions

Lump sum

Countywide
Countywide

Upgrade facilities

Facilities improvement
programme

Construct additional
classrooms

AE curriculum development
programme

Develop curriculum

Lump sum

Countywide

School retention programme

Student- tracking
database

To create more
learning space
and increase
enrolment
To make it
relevant to county
and learners
needs
To increase
graduation rate

Cover 1200
teachers
500
teachers
houses
100 classes
constructed

countywide

Girl child education


promotion programme

Community
sensitization campaign

Each
primary
school
150
sessions

De-motivated teachers

Poor facilities and tools

Curriculum that does


not fit local situations
High drop-out rate
Gender
mainstreaming

Early marriages

Adapt
curriculum to
existing situation
and priorities
Retention of
enrolled pupils
Sensitize
community about
benefits of girl-child
education

Narok County Integrated Development Plan (2013 -17)

To change
perceptions about
girl child education

Countywide
Countywide

Countywide

Page 6

Sub-sector

Priorities

Constraints

Strategies

Projects

Objectives

Targets

Location

Penalise non-cooperative parents

To improve girl
child enrolment

Lump sum

Countywide

Girls rescue programme

Recruit girls to centre

1000 girls

Countywide

Provide sanitary
towels
Provide special
needs
infrastructure

Sanitary towels provision


programme
Special needs integration
programme

Provide sanitary
towels
Constructing ramps,
purchase equipment

To improve
completion rates
for girls
To increase
retention rate
To integrate
special need
students

Lump sum

Countywide

8000
persons

countywide

To create more
learning space
and increase
enrolment
To enhance
quality of science
subject
teaching/learning
To afford students
more study time
To enable
students to grasp
digital
technologies
To enable
teachers to
effectively teach
ICT
To enhance
quality of TIVET
teaching/learning
To make TIVET
teaching effective

100 classes
constructed

Countywide

100 labs
constructed

Countywide

200
dormitories
2500
computers

Countywide

150
teachers

Countywide

100
workshops

Countywide

150
teachers

Countywide

Punish parents
who remove girls
from school
Provide rescue
services
Health challenges

Programmes

Special
needs

Special needs
students

Integration of special
needs

Secondary
education

Performance
Improvement

Poor facilities

Upgrade facilities

Facilities improvement
programme

Construct additional
classrooms

Inadequate learning
technologies and
equipment

Improve on science
subjects

School equipments supply


programme

Construct science
laboratories

Household chores

Provide boarding
facilities
Supply computers

Facilities improvement
programme
School computerization
programme

Construct dormitories

ICT
Mainstreaming

Lack of computers

Build and equip


computer labs
Train ICT teachers

Mainstreaming
vocational
training/talent
development

Lack of workshops and


equipments

Build and equip


workshops

Narok County Integrated Development Plan (2013 -17)

School TIVET integration


programme

Construct workshops
Recruit teachers

Countywide

Page 7

Sub-sector

Priorities

Gender
mainstreaming

Constraints

Strategies

Programmes

Projects

Objectives

Targets

Location

Inadequate facilities for


extracurricular activities

Develop facilities
and supply
equipment for
talent development

School talent development


programme

Develop Talent
academies

To enable
students develop
sporting prowess
To make sports
training effective

Countywide

Sensitize
community about
benefits of girl-child
education
Punish parents
who remove girls
from school
Provide rescue
services

Girl child education


promotion programme

Community
sensitization campaign

To change
perceptions about
girl child education

1 per
constituenc
y (6)
5 teachers
per ward
(150)
1 campaign
per ward

As above

Arrest non-cooperative parents

To improve girl
child enrolment

Lump sum

Countywide

Girls rescue programme

Recruit girls to centre

1000 girls

Countywide

Separate facilities
for girls

As above

Establish girls-only
facilities

To improve
completion rates
for girls
To improve
learning
environment
To protect girls
from sex predators

1 facility per
ward

Countywide

Lump sum

Countywide

Early marriages

Teenage pregnancies

Recruit talent trainers

Punish perpetrators Anti-teenage pregnancy


programme
TIVET

Programme
development

Lack of facilities

High cost of TIVET


training

Develop purposely
built facilities

Embed TIVET
teaching in
secondary schools
and other tertiary
facilities
Allocate funds

Narok County Integrated Development Plan (2013 -17)

TIVET Facility
improvement/development
programme

Formulate law and


measures

Countywide
Countywide

Countywide
Countywide

Construct new
polytechnics

To provide support
to the youth in the
informal sector

1 per
constituenc
y

To build capacity
for TIVET training
To expand access
to TIVET learning

Countywide

As above

Rehabilitate existing
polytechnics
Construct wood and
metal technology
workshops in schools

1 per ward

Countywide

TIVET development
programme

TIVET facilities
development fund

To assist
development of

All TIVET
institutions

Countywide
Page 8

Sub-sector

Tertiary
colleges and
university

Priorities

Expand access

Constraints

Strategies

Programmes

Projects

Inadequate teachers

Recruit teachers

TIVET staff development


programme

Recruit teachers

Targets

Location

40 teachers

Countywide

All TIVET
teachers

Countywide

Lump sum

Countywide

500
students

countywide

200
students

countywide

To increase the
number of
students joining
university
To expand access
to University
education

All
secondary
schools

Countywide

TIVET institutions
To expand local
capacity for TIVET
training
To expand local
capacity for TIVET
training
To enable
graduates
transition into
enterprise
To enable poor
students afford
higher education
To allow students
to access credit

Train local teachers

Train teachers

Lack of capacity for


skills
conversion/application

Enable graduates
TIVET innovation and
to innovate and
enterprise development
develop enterprises programme

TIVET enterprise fund

High cost of university


education

Provide bursaries

Tertiary Education subsidy


programme

Establish bursary fund

Expand higher
education loan
programme
Improve KCSE
performance

Higher education credit


programme

Establish revolving
fund

KCSE improvement
performance programmes

KCSE improvement
performance projects

Decentralise
Maasai Mara
University

University expansion and


decentralisation programme

Build new campuses

Allow other
university/colleges
to open branches
in the county
Adapt curriculum to
local needs

As above

Build new campuses

To expand access
to University
education

Lump sum

Kilgoris and
Olokurto,
Ololulunga,
N-Enkare
Countywide

Curriculum adaptation
programme

Review curriculum

Lump sum

Countywide

Explore areas of
collaboration

Industry-academia linkages
promotion programme

Undertake study

To make it more
relevant to local
job market needs
To inform
programme
formulation for

Lump sum

Countywide

Poor performance in
KCSE
Few colleges and
universities

Industryacademia
linkages

Objectives

Inappropriate
curriculum
Inadequate
opportunities for
collaboration

Narok County Integrated Development Plan (2013 -17)

Page 9

Sub-sector

Priorities

Constraints

Strategies

Programmes

Student placement and


employment programme

Narok County Integrated Development Plan (2013 -17)

Projects

Objectives

Targets

Location

Attach students to
local businesses

collaborative
ventures
To enable
students to get
experience and
raise fees

500
students

Countywide

Page 10

HEALTH SECTOR PROGRAMMES AND PROJECTS

Sector
Sector Vision
Sector Mission
Sector Justification

Health
A healthy and productive people.
To provide quality, affordable and accessible curative and preventive healthcare
services.
- For reduced prevalence of disease.
- For improved health and quality of life.
- For reduced morbidity and mortality.

Healt Sector Summary


Sub-sector
Priorities
1. Medical
1. Service Delivery Improvement
Services

Programmes
1. Human Resource Development Programme
2. Health Facilities Improvement Programme
3. Heath Equipment and Technology Improvement
Programme
4. Health Management Information Systems

2. Special Needs Care


2. Public
health

3. Mitigation of Environment
induced health conditions
4. Eradication of Culture-induced
health complications
5. Mitigation of Lifestyle Diseases

5. Medical Supplies Programme


6. Trauma Management Programme
7. Terminal Illnesses Care
8. Community Outreach and Public Health Extension
Programme
9. Disease Surveillance Programme
10. Harmful practices eradication programme

11. Healthy Lifestyles Promotion Programme

Narok County Integrated Development Plan (2013 -17)

Flagship Projects
1. MMU Teaching and Referal Hospital (Level 5)
2. 6 hospitals (level 3), 15 health centres (level 2), 30 community
dispensaries (level 1)
3. 9 ambulances (3 for level 5, 6 for level 3)
4. 50 capacity mortuary (distributed to Narok, Kilgoris, Olokurto)
5. Automation of health records in all facilities (computers, software and
Internet connectivity)
6. Two 5-bed ICUs (Narok, Kilgoris)
7. 1 Renal Unit
8. Medical Supplies warehouse at Narok Level 5 hospital
9. 2 Trauma care centres (Narok, Kilgoris)
10.
11.
12.
13.
14.
15.
16.
17.

1 Hospice (aged, debilitative, palliative care)


Quarterly Urban Neighbourhood cleanup campaigns
Quarterly hand washing campaigns
Disease Control Centre in Narok
Anti-FGM Campaign
Domestiv Violence Response Unit
Training of Traditional Birth Attendance
Nutrition and healthy lifestyles campaign

Page 11

Narok County Integrated Development Plan (2013 -17)

Page 12

Detaled Health Sector Plan


SubPriorities
Constraints
sector
Medic Neonatal and
Inadequate facilities
al
maternal health
Servic
es
Poor referral mechanism

Strategies

Programmes

Projects

Objectives

Construct maternity
facilities.

Maternity facilities
programme

New maternity
facilities

Provide
ambulances

Ambulance
programme

Ambulance
purchase

Recruitment

HRH programme

HRH recruitment

To reduce neonatal and


maternal neonatal morbility
and mortality
To improve referral system
for neonatal and maternal
cases
To improve capacity to
provide quality services.

Training

HRH programme

Training HRH

To improve capacity to
provide quality services.

324

Two per health


facility in the county

Management of Lack of functional health


health facilities facility manageent structures

Training of
management teams

Governance and
management
programme

Training of health
facilities managers

To improve management
of health facilities

162

1 person in all the


hospitals countywide

Trauma
management

Lack of functional trauma


respose and managment
teams
High prevance of trauma
(accidents and violence)
Lack of automated cash
colllection systems

Emergency
preparedness

Emergency
preparedness
programme

Emergency ad
reponse teams

To enhance capacity to
respond to emergencies

20

All referral and


district hospitals

Automating cash
collection system

Financial
management
programme

Compurised cash
registers

To improve revenue
collection in hospitals

10

Countywide

Inaquage finnacial
management skills

Training financial
managers

To improve financial
management skills

324

Two per health


facility in the county

Non-compliance to waivers
guidance.

Regulation of
waiver system to
benefit the needy

Financial
management
training
Waiver fund

To waive bills for poor


patients

90

Lack of clarity on waiver


system

Review/developmen
t of waiver
guidelines

Waiver
policies/guidelines

To improve compliance on
waiver guidelines

All public health


facilities with
inpatient services
the County
County

Human
resources for
health

Financial
management in
health facilities

Lack of adequate HRH

Narok County Integrated Development Plan (2013 -17)

Waiver
programme

5 years
Targets
30

Location

10

NDH,KDH,ODH,N/E
DH,LDH,EMURUA
DIKIRR
Countywide

350

Every sub location

Page 13

SubPriorities
sector
Health facilities
infrastructure

Constraints

Strategies

Programmes

Projects

Objectives

Lack of medica equipment.

Purchase of
equipment

Equipment
improvement
programme

Medical equipment

To improve quality of
service delivery

Lack of ICT

Purchase of
computers
Construction of new
health facilities

Construction/reno
vation programme

Construction of new
health facilities

To improve access to
healthcare services.

Upgrading health
facilities

Construction/reno
vation programme

Referral health
facilities

To improve access to
primary health care

District health
facilities
Health Centres

To improve access to
primary health care
To improve access to
primary health care

15

Incinerators

To improve waste disposal


of medical waste

13

Mortuary coolers

Diagnostic services
(lab)

To improve access to
mortuary services
To improve quality of
service

Data collections

To improve data quality.

130

Installation of

To improve

10

Lack of adequate buildings

Health
Management
Information
System

Lack of functional health


managent information
system

Install HMIS in
health facilities

Narok County Integrated Development Plan (2013 -17)

ICT equipment

HMIS programme

5 years
Targets
100

Location

150

All health facilities in


the county
Mokondo,
Oloirowua, Tikako,
Kawai, Olesharo,
Enkiloriti, Chemamit,
Esoit, Ngoswan ,etc
Narok, Kilgoris,
Ololulunga,
Lolgorian,
TBD

30

County wide

N/ENKARE.Narosur
a,
E/DIKIRR,Sogoo,NT
ULELE,NCHIPISHIP
,O/NGATA
BARIKOI,OLOKURT
O
Sub-county and
County referral
hospitals
4 county referral
hospitals
High volume
facilities in the
County
All public health
facilities
High volume public
Page 14

SubPriorities
sector
Steady supply
of health
products

Constraints

Stock outs of health products


Lack of storage facilities

Strategies

Timely procurement
and distribution of
health products
Construction of
storage facilities

Programmes

Procurement and
distribution
programme
Health products
storage
programme

Projects

Objectives

eletronic medical
records
Procurement and
distribution

patientsrecords.

County store
Sub-county stores
Facility-based
stores

Mismanagement of health
products

Location
health facilities

To ensure steady and


timely supply of health
products.
To improve storage
facilities for health
products.
To improve storage
facilities for health
products.
To improve storage
facilities for health
products.
To facilitate efficiency in
inventory management of
health products.
To enhance access to
renal services
To enhance access to
hospice services

105
1

All public health


facilities in the
county
Narok town

All sub-counties

105

All public health


facilitie

105

All public health


facilitie

Narok and Kilgoris

Narok

Automate inventory
management
system
Establish of renal
units
Integrate hospice
services within high
volume hospitals

Inventory
programme

Inventory system

Renal programme

Renal units

Hospice
programme

Hospice Centres

Lack of awareness on
neonatal maternal health

Community
sensitization

To increase awareness in
neonatal and maternal
health.
To improve health seekign
behaviour.

Every ward

Community
sensitization

Neonatal and
maternal health
campaigns
Health awareness
campaigns

30

Poor health seeking


behaviour

30

Every ward

Inadequate community
health extension

Recruitment of
CHEWs

CHEWs

Every sub location

Community
sensitisation

To increase the capacity


on community health
extension.
To mitigate against
negative effects of cultural
practices on neonatal and

364

Cultural practices

Community
Outreach
programme
Community
Outreach
programme
Community health
extension
programme
Community
Outreach
programme

30

Every ward

Renal services

Lack of renal equipment.

Hospice
services

Lack of facilities

Public Neonatal and


health maternal health

5 years
Targets

Narok County Integrated Development Plan (2013 -17)

Health awareness
campaigns

Page 15

SubPriorities
sector

Constraints

Strategies

Programmes

Projects

Objectives

5 years
Targets

Location

To equip TBAs with


knowledge and skills in
basic neonatal and
maternal health matters.
To equip alternative
medicine practitioners with
knowledge and skills in
basic neonatal and
maternal health matters.
To increase uptake of
reproductive health
services
To increase awarness on
range of reproductive
health service offerings
To increase awareness on
harmful cultural practices.

364

Every sub location

364

Every sub location

125
30

All public health


facilities in Narok
County
Every ward

182

Every sub-location

To increase awareness on
stigmatization of HIV/AIDS
and TB.
To improve health seekign
behaviour.

182

Every sub-location

30

Every ward

Rapid audits of
health commodities

To ensure availabity of
drugs for ART and TB
treatment.

20

20% of health
facilities

CCCs

To enhance accessibility of
ART and PMCT care
services.
To improve detection and
treatment rates of TB

25

All health facilities in


the county

97

All health facilities in


the county

maternal health indicators.


Capacity building
programme

Training of TBAs

Training of
alternative medicine
practitioners
Reproductive
health

HIV/AIDS, TB
and Leprosy

Poor uptake of reproductive


health services
Retrogressive cultural
practices.

Integration of
reproductive health
services
Community
sensitization

Retrogressive cultural
practices.

Community
sensitization

Stigma

Community
sensitization

Poor health seeking


behaviour

Community
sensitization

Unavailability of medication.

Monitoring
distribution of
medication

Poor accessibility to
healthcare services

Integrating ART and


PMCT care services
Low detection and
treatment TB cases

Narok County Integrated Development Plan (2013 -17)

Reproductive
health programme

Reproductive health
clinics

Community
Outreach
programme
Community
Outreach
programme
Community
Outreach
programme
Community
Outreach
programme
Health
commodities
monitoring
programme
CCC programme

Awareness
campaigns

TB programme

TB detection and
treament

Awareness
campaigns
Awareness
campaigns
Health awareness
campaigns

Page 16

SubPriorities
sector

Constraints

Strategies

Programmes

Projects

Objectives

5 years
Targets

Location

cases
Malaria and
other vector
borne diseases

Poor environmental
conditions.

Spraying of
households

Household
spraying
programme

Spraying

To prevent malaria spread.

22,800

In all locations

LLITNs distribution

To prevent malaria spread.

684,000

In all locations

Poor health seeking


behaviour.

Distribution of
LLITNs
Community
sensitization

Health awareness
campaigns

To improve health seeking


behaviour.

30

Every ward

Wellness clinics

To reduce prevalence of
lifestyle diseases

11

Wellness clinics in
County and subcounty referral
hospitals
Countywide

Lifestyle
diseases

Lack of awareness.
Poor diet.

Opening wellness
clinics in high
volume facilities.

LLITNs
programme
Community
Outreach
programme
NonCommunicable
Disease Control

Human
resources for
health

Lack of adequate HRH

Recruitment

HRH programme

HRH recruitment

To improve capacity to
provide quality services.

750

Training

HRH programme

Training HRH

1250

Hygiene promotion

Hygiene
promotion
programme

Hygiene promotion
campaigns
Handwashing
facilities

To improve capacity to
provide quality services.
To increase awareness on
elimination of
communicable diseases.
To reduce the prevalence
of communicable diseases.

Disease
surveillance
Public toilets

Communicable
diseases

High prevalence rates

Disease
surveillance
Sanitation facilities

Disease
surveillance
programme
Sanitation
programme

Village latrine
coverage

Narok County Integrated Development Plan (2013 -17)

30

Two per health


facility in the county
Every ward

350

12 schools per ward

To monitor prevalance of
outbreaks.

100

All public health


facilities

To improve public
sanitation.
To improve public
sanitation.

60

All townships in the


county
Villages per location
countywide

160

Page 17

SubPriorities
sector

Constraints

Eye care

High prevalence of trachoma

Dental care

Poor oral health practices

Health
Management
Information
System

Lack of functional health


managent information
system

Public health
infrastructure

Inadequate transport
facilities

Strategies

Sanitary health
inspection of food
premises and
institutions
Community
sensitization
Community
sensitization
Install HMIS in
health facilities

Purchase of
vehicles and
motorbikes

Programmes

Projects

Objectives

Waste disposal public


Waste disposal
households

To improve public
sanitation.
To improve public
sanitation.

Health inspection

Health inspection
reports

To enforce health policies


and regulations.

60

All public health


facilities
200 households per
location with utensils
drying racks
disposal pits
All the townships

Community
outreach
Community
outreach
HMIS programme

Trachoma
campaigns
Oral health
campaigns
Data collections

To precent blindness due


to trachoma
To improve oral health

Countywide

20

Countywide

To improve data quality.

105

All public health


facilities

Purchase of smart
phones
Motorbikes

To improve disease
100
surveillance.
To facilitate mobility of
30
health workers for outreach
programmes.
To facilitate mobility of
8
health workers for outreach
programmes.

Transport
programme

Vehicles

Narok County Integrated Development Plan (2013 -17)

5 years
Targets
105
6,000

Location

Countywide for
PHOs
Countywide HMTs

Page 18

INDUSTRIALISATION SECTOR PROGRAMMES AND PROJECTS

Sector
Sector Vision
Sector Mission
Sector Justification

Industrialization
A vibrant industrial-led economy.
To facilitate value addition through competitive and innovative technology.
1. Adds value to agricultural and livestock produce.
2. Creates jobs.
3. Promotes urbanization
4. Promotes regional competitiveness.
5. Promotes regional balance.
6. Taps natural resources.

Sector summary
Sub-sector
1. Mining

2. Agro-processing

Priority areas
1.
Mapping and exploration
2.
Development of mining sector

Programmes
1.
Minerals inventory programme
2.
Mining development programme

3.

Mining benefits distribution

3.

Benefits distribution programme

4.

Milk processing

4.

Milk processing programme

5.
6.

Livestock by-product processing


Meat processing

7.
8.

Farm input industry


Grain processing

5.
6.
7.
8.
9.

Livestock by-products processing programme


Meat processing programme
Abattoirs programme
Manure processing programme
Milling programme

9.
10.

Sugar processing
Tea processing factory

10.
11.

Sugar programme
Tea programme

Narok County Integrated Development Plan (2013 -17)

Flagship projects
1. Resource mapping and exploration
2. Gold mining at Lolgorian
3. Mining development framwork
4. Community development trust fund
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

12 Milk cooling plants


1 Milk processing plant.
12 Milk refrigeration trucks.
1 Tannery
1 Meat processing facility
4 Abattoirs
1 Animal Manure pelleting facility
2 Milling plant
1 Brewery plant
2 Sugar factory
2 Tea processing plant

Page 19

3. Light and cottage industry

11.

Tomato processing

12.

Tomato programme

16. 1Tomato processing facility

12.
13.

Honey processing
Crafts and culture

13.
14.
15.

Honey programme
Maasai artefacts
Maasai attire/culture patenting programme.

17. 1 honey processing plant


18. 1Production facility- craft-centres
19. 1 patent/branding/marketing/promotion centre.

Detailed Industrialisation Sector Plan


Sub-sector Priorities
Constraints
Mining

Revenue sharing
between national
and county
government.

Non-existing
framework on
revenue sharing.

Sensitization on
Limited knowledge
potential of
on mineral
mineral resources. resources.
Land tenure issues.

Strategies

Programmes

Projects

Objectives

Develop a framework
for revenue sharing
with the national
government.

Policy and legislation


programme

Mining revenue
sharing
framework.

Community
sensitization

Community Outreach
programme

Community
campaigns

To create a framework to enable


local communities benefit from
mining.
Increase revenue to county
government.
To increase awareness of local
communities on their rights to
benefit from mineral resources.
To minimise conflicts arising
from resource use.

Develop win-win
Stakeholder
strategy between land engagement
owners and
programme
government/investors

Developing
framework for
engagement

Modernizing
technology used
in mining

Inappropriate
technology used in
mining.

Policy formulation on
technology and
standards for mining.

Policy, legislation
development
programme

Mining
technology
framework

Identification and
mapping of mining
resources

Lack of inventory on
mining resources in
the County.

Identification,
mapping and
inventorize of mineral
resources.

Minerals inventory
programme

Preparation of
minerals
resource plan

Exploration of
untapped mining
resources

High cost of
exploration of
mineral resources.

Public Private
Partnerships with
potential investors.

PPP programme

PPP in Mining
framework

Narok County Integrated Development Plan (2013 -17)

To increase productivity in
mining
To promote safe and
envionmetally friendly mining
technologies
To determine county mineral
potential.
To establish viability of all
existing minerals deposits in the
county.
To facilitate involvement of
private sector in exploration of
mineral resources

5 year
Targets
1

Location

Lolgorien and
other areas to
be identified
Lolgorien and
other areas to
be identified

County

County

County

County

Page 20

Sub-sector

Priorities

Constraints

Strategies

Programmes

Projects

Objectives

5 year
Targets

Location

Agro
processing

Milk processing

Seasonality.

Establish milk
cooling/processing
plants.

Milk processing
programme

Milk cooling
plants

To provide storage of milk.

12

One in each
constituency

Milk processing
plant.
Milk refrigeration
trucks.

To add value to milk products.

Narok

To facilitate timely transportation


of quality milk.

12

One in each
constituency

Farmer trainings

To improve the quality of milk


from farmers.

Milk processors
training

To improve the capacity of milk


processors on hygiene
practices.
To increase income from
livestock by-products

6
1

One training
per
constituency
One training
per
constituency
Narok town

Lack of processing
facilities.

Poor quality milk


due to
contamination

Livestock byproduct
processing

Meat processing

Farm input
industry
Grain processing

Capacity building
(clean production,
quality inputs)

Limited production.
Lack of processing
facilities.
Inadequate
knowledge on
benefits of
processed products.
Lack of processing
facilities
Inadequate abattoirs

Lack of
infrastructure to
process farm inputs.
Lack of processing
facilities in the

Capacity building
programme

Livestock by-products
processing programme

Tannery

Sensitization of
community

Community Outreach
programme

Community
Outreach
campaigns

To increase technical know-how


on processing of livestock byproducts.

30

Each ward

Establish processing
facilities
Establish abattoirs

Meat processing

Meat processing
facility
Abattoirs
construction

To increase income from meat


products.
To enhance safety of meat
products.

Narok

4
abbortoir
s

Establish farm input


processing facilities

Manure processing
programme

To promote sustainable farming.

Promote post-harvest
processing.

Milling programme

Manure
processing
facility
Milling plants

Suswa
Olokurto
Ewaso Ngiro
Kilgoris
Olchorro

To mitigate against crop


perishability.

2 milling
plants

Narok and
Kilgoris

Narok County Integrated Development Plan (2013 -17)

Abattoirs programme

Page 21

Sub-sector

Priorities

Constraints

Strategies

Programmes

Projects

Objectives

5 year
Targets

Location

Brewery plant

Job creation andincrease


income.
To enable farmers get a better
price yield from crops.

Narok town

Esoit NaiborKilgoris
LolgorianKilgoris
Shankoe Kilgoris

county.
Sugar processing

Light and
cottage
industry

Inadequate sugar
processing facilities.

Tea processing
factory

Inadequate tea
processing plants.

Tomato
processing

Lack of processing
facilities.

Honey processing

Limited production.

Crafts and culture

Inconsistency in
quality and supply.
Lack of patents for
crafts and culture.

Contractual farming.

Sugar programme

Sugar factory

Tea programme

Tea processing
plant

To increase income for tea


farmers.
To create jobs in the tea
industry.

Tomato programme

Tomato
processing
facility

Value addition to increase


incomes.

2 plants

Promote commercial
production
Large-scale local
artifacts production.

Honey programme

Increase revenue earning


opportunities.
Job creation and income
diversification

Establish
mechanisms of
patenting Maasai
attire and culture.

Maasai attire/culture
patenting programme.

Establish honey
processing plant
Production
facility- craftcenters
Establish a
patent/branding/
marketing/prom
otion centre.

Ensure real owners of the


culture benefit and to minimise
misuse of Maa culture.

1
patentin
g centre

Promote presale
value addition.
Enhance public
private partnerships
in establishment of
tea processing
facilities.
Establishment of
tomato processing
plants

Narok County Integrated Development Plan (2013 -17)

Maasai artifacts

2 craft
centers

AbossiEmurua Dikir,
NarosuraNarok South
To be
determined.
Narok town
Kigoris town
Narok

Page 22

Sub-sector

Priorities

Constraints

Strategies

Programmes

Projects

Objectives

Human
resource
developmen
t

Human resource
development in
industrialization

Low local human


resource capacity in
industrialization

Capacity building to
increase skilled
human resource base

Industry wide trainings

Short
courses/worksh
ops

To build capacity of
stakeholders in the industry

Industrial Study
tours
Mining

To promote best practices in the


industry.
To increase skilled human
resources.

Agro-processing

To increase skilled human


resources.

Light cottage

To increase skilled human


resources.

Scholarships

Narok County Integrated Development Plan (2013 -17)

5 year
Targets
6
seminar
s/worksh
ops
6 Study
tours
5 master
level
students
10
master
level
students
15
master
level
students

Location
All County

All County
County wide
County wide

County wide

Page 23

INSTITUTIONAL AND CAPACITY BUILDING SECTOR PROGRAMMES AND PROJECTS

Sector
Sector Vision

Institutional and Capacity building


Effective service delivery.

Sector Mission

Sector Justification

Sector summary
Sub-sector
1.
Human resource
Development

To strengthen institutional capacities and provide skilled human resource to


enhance public service delivery in the County.
To ensure efficient and effective resource management and accountability
Better service delivery.
Inculcates good governance and management culture.
Ecourages Public Private/Public Public Partnerships.
Ensures effective and efficient utilization of resources.
Promotes innovation, skills and talent development in the public service.

Priority areas
1.
Skills development
2.
Staff motivation and retention
3.
Staff performance and
management

4.
2.

Institutional Infrastructure
development

5.
6.

Tap expertise of County


professionals
Transportation facilities
Office accommodation

Programmes
1.
Capacity building programme
2.
Schemes of service
3.
Staff rationalisation and
restructuring
4.
Human resources management
system
5.
6.

Results Based Management


County Professions Engagement

7.
8.

County transport
Construction/rehabilitation of
buildings

Flagship projects
1.
Staff short courses training for 300 staff
2.
County pension scheme policy
3.
Human resource audit/inventory
4.
5.
6.
7.
8.
9.
10.
11.
12.

Narok County Integrated Development Plan (2013 -17)

Develop County Human Resource Information System


(CHRIS)
Automation of registries
Performance management tools
Annual County Professions Forums
County human resources potential survey
Purchase of 80 Vehicles in the county
Construction of county headquarters
Construction of sub county administrative/service
delivery units
Rehabilitation of 30 existing buildings
Page 24

7.

ICT for service delivery

9.
10.

3.

Internal Controls Systems

8.

4.

Public Private
Partnerships

9.

Financial, procurement, and asset


management systems
Institutional linkages and
partnerships

Detailed Institutional and Capacity Building Sector Plan


Sub-sector
Priorities
Constraints
Strategies

Narok County Integrated Development Plan (2013 -17)

11.
12.

Internet infrastructure and


Connectivity
ICT training programme

13.

Financial, procurement, and asset


management systems
PPP programme

15.

Programmes

Projects

14.

ICT infrastructure at County HQs and sub-county


levels
ICT short courses for County HQs and sub-county
staff

16.

Automation of Payroll, revenue collection,


procurement system and asset registers
Establishment of PPU Unit in the County

17.

PPP feasibility studies, PPP fora and projects

Objectives

5 year
Targets

Location

Page 25

Sub-sector

Priorities

Constraints

Strategies

Programmes

Projects

Objectives

Human
resource
Development

Skills
development

Inadequate funding

Increase funding for


skills development
Development a policy
framework for training

Capacity building
programme

Training needs
assessment
Staff short courses
training

To establish training needs


of county staff.
To enhance skills and
knowledge of County staff
to enable them improve
their performance.
To improve the capacity of
prefessionals.

Lack of training policy

Staff
motivation and
retention

Inadequate funding

Develop staff
motivation and
retention policies.

Schemes of
service
Staff motivation

Staff
performance
and
management

Unclear structures
resulting in
duplication of
functions and
inefficiency
Lack of an integrated
human resources
management system

Lack of results based


management
frameworks
Tap expertise
of County
professionals

Lack of channels to
engage County
professionals

Reform governance
and management
structures.

Staff
rationalisation and
restructuring

Automate human
resources
management

Human resources
management
system

Develop staff
performance
improvement
measures
Establish
mechanisms for
periodic engagement

Narok County Integrated Development Plan (2013 -17)

Professional courses
training
Training policy
framework
County pension
scheme policy
Annual staff
progression
Annual staff of the year
awards
Human resource
audit/inventory

Develop County
Human Resource
Information System
(CHRIS)
Automation of registries

Results Based
Management

Performance
management tools

County
Professions
Engagement

County Professions
Forums

5 year
Targets
1

Location

200

County wide

100

County wide

Narok

Lumpsum

County wide

Lumpsum

County wide

To recognise and reward


best performance.
To clean the County staff
roll.

County wide

County wide

To enhance human
resources management.

County wide

To create an integrated
human resources registry.
To enhance performance of
county staff in service
delivery.

All
registries
Lump
sum

County wide

To tap expertise of County


professionals in delivery
the development agenda of

Narok/Nairobi

To enhance staff
motivation and retention.

County wide

County wide

Page 26

Sub-sector

Institutional
Infrastructur
e
development

Priorities

Transportation
facilities
Office
accommodatio
n

Office furniture
facilities

Constraints

Lack of data on
county human
resources potential.
Inadequate pool of
vehicles at the county
Lack of adequate
office facilities

Lack of adequate
office equipment and
facilities.

Power supply

Lack of generators

ICT for service


delivery

Lack of ICT
infrastructure and
systems

Strategies
with County
professions.
Conduct survey on
county human
resources potential
Allocate adequate
funds and engage in
procurement.
Construction/rehabilit
ation of county
offices.

Equipping offices with


required facilities.

Buy and install


generators in
government buildings.
Improve internet
connectivity
Installation of ICT

Narok County Integrated Development Plan (2013 -17)

Programmes

Projects

Objectives

5 year
Targets

Location

the County
County human
resources potential
survey
Vehicles

To establish county human


resource potential

Narok/Nairobi

To improve mobility of
County staff.

80

County wide

Construction of new
buildings

To create more space for


office accommodation.

10

Rehabilitation of
existing buildings

To create more space for


office accommodation.

30

Office furniture

Executive seats

To create an enabling
office working environment.

350

Kilgoris, Emurua
Dikirr, Narok
North, Narok
East, Narok
West.
Kilgoris, Emurua
Dikirr, Narok
North, Narok
East, Narok
West.
County wide

200
40
6

Office equipment

Executive tables
Cabinet shelves
Conference furniture
(tables seats)
Air conditioners

80

Power supply

Fans and heating


appliances
Generators

Internet
Connectivity
Internet

LAN/WAN at HQs and


sub-county
PCs

County transport
programme
Construction/reha
bilitation of
Buildings

80

To minimise interruption in
service delivery.

To improve internet
connectivity.
To facilitate staff to use ICT

All
buildings
200

County wide
County wide
HQs and sub
County level
HQs and sub
County level
HQs and sub
County level
County wide
County wide
County wide
Page 27

Sub-sector

Internal
Controls
Systems

Priorities

Financial,
procurement,
and asset
management
systems

Constraints

Manual management
systems.

Strategies

Programmes

facilities

equipment

Training staff in ICT


applications
Automation of
management systems

ICT training
programme
Financial
Management
programme

Procurement
programme

Public
Private
Partnerships

PPP
framework for
engaging with
the private
sector

Lack of a framework
to engage with the
private sector.

Domesticate and
implement PPP Act
2012.
Hold fora with the
private sector

Asset
management
programme
PPP programme

Projects

5 year
Targets

Location

100
100
4
40
400

County wide
Country wide
County wide
County wide
County wide

County wide

County wide

County wide

County wide

County

County

Narok

TBD

in performing their
functions.
Laptops
UPSs small
UPSs large
Printers
ICT short courses
Automation of Payroll
system
Automation of Revenue
collection system
Automation of
procurement systems
Automation of asset
registers
Establishment of PPU
Unit
Feasibility studies in
PPPs
PPP fora (Annual)
PPP projects (Annnual)

Narok County Integrated Development Plan (2013 -17)

Objectives

To build capacity of staff in


use of ICT.
To improve internal control
systems to facilitate
effectiveness and efficiency
in management.
To increase revenue
collection.
To facilitate timely
procurement of goods and
services.
To improve on asset
management.
To improve coordination of
PPPs in the county.
To estabish viability of
PPPs in different sectors.
To faciliate engagement
with private sector.
To finance development
projects using PPPs.

Page 28

GENDER, YOUTH AND SOCIAL SERVICES PROGRAMMES AND PROJECTS

Sector
Gender, Youth, Sports and Social services
Sector vision
A just, equal and cohesive society
Sector mission
To improve individual and societal wellbeing through affirmative action, talent promotion and social service.
Sector justification Identify and Nurture talents for personal and societal development.
Provides conducive environment for personal growth and development.
Accords persons with special needs the opportunity to self-actualize in all spheres.
Promotes Equity and social cohesion
Sector summary
Sub-sector
Sports
Children service

Priorities
Talent development
Children growth and development

Programmes
Talent development programme
Children development and welfare programme

Gender

Gender equality

Youth affairs

Youth employment

Anti-gender-based violence programme


Affirmative action programme
Vocational training programme

Orphans and vulnerable children(OVC)

Access to opportunities
Child abuse and exploitation
Societal and economic integration
Quality of life

Orphans and Vulnerable C enablement programme


Child rescue programme
Disability mainstreaming programme
Social welfare programme

Persons with special needs


Elderly

Detailed Gender, Youth, Sports and Social services Sector Plan


SubPriorities
Constrains
Strategies
sector
Sports
Provide and maintain
Low funding on
Establish training camps
sporting facilities in the
sports
and grounds to nurture
county
emerging talents
Train teachers on
Low or no sporting
Provide and support
physical education
culture
sporting talents
Narok County Integrated Development Plan (2013 -17)

Flagship Projects
2 Olympic size sporting stadia and 4 training camps
10 neighbourhood day-care centres,
2 Children parks and play grounds
1 rescue/rehabilitation centre
Womens enterprise fund
1 vocational facility
Enhanced youth enterprise fund 10 million per year
OVC fund
1 childrens home
100 Special unit in selected learning institutions
Elderly welfare fund
Hospice

Programmes

Projects

Objectives

Nurturing sporting
talent

Construct training
camps

To tap the sporting


talents

Nurturing sporting
talent

Talent identification

In order nurture and


diverse skills

5 years Location
Targets
1
Constituency
50,000

Countywide
Page 29

Subsector

Priorities

Constrains

Strategies

Programmes

Projects

Objectives

5 years Location
Targets

Nurturing sporting
talent

Training PE teachers

In order nurture and


diverse skills

120

Ward

sporting tourism
programme

Organizing annual
county marathon
events 75KM, 42KMS
AND 21KMS
Secure and Construct
two sporting stadiums

To develop sporting
culture and promote
cohesiveness

County Level

To provide adequate
facilities for promotion
of sporting activities
Create awareness on
the importance of
sports
To coordinate delivery
of services to children
institutions

Kilgoris/Narok
town

60

Countywide

GoK

Narok/kilgoris

Opening of children
department in every
sub county

Sub county

To involve children in
Decision making in
development and in
Issues affecting them
Effective rehabilitation
programmes

120

County wide

Coordinate and

GoK

Among the people


Nurture the sporting
talents
Enhance sporting
tourism in the county

Preoccupation with
other chore
Leaving little time for
sporting
Lack of sponsorship

To introduce sport
completions among the
sub- counties

Sporting facilities
Advocacy
Programmes
Children
Services

To provide conducive
environment for children
to grow and develop to
their full potential

Lack of resources

Provide appropriate and


adequate children
institutions and services

Unfavourable cultural
practices

coordinate
delivery of services
to children
institutions
To promote the
rights and welfare
of children

To increase
accessibility of
Departmental services
to the public
Right of Children to Children
Participate
Parliament/assemblies
Care and
Protection in
Statutory
institutions
To effectively

Narok County Integrated Development Plan (2013 -17)

Hold stakeholders
forum in each
constituency
Inspections of
charitable children
institution

To construct
2 children cells
1children remand
Home
1 Rehabilitation
school
To provide Quality

County wise
Page 30

Subsector

Gender

Priorities

Gender based violence

Constrains

.patriarchal cultural
systems
5.1

Strategies

Awareness creation
Law enforcement

Programmes

Projects

Objectives

coordinate
Alternative family
care service

adoption
Foster care
Guardian

To develop an
effective
monitoring and
evaluation frame
work on children
issues

Develop monitoring
and evaluation frame
work

provide informed
leadership in quality
alternative family care
services for deserving
children and
Caretaker
Coordinated
mechanism of
childrens issues

Anti-gender-based
violence
programme
Anti GBV
enforcement
programme

Awareness campaign

Establish rescue and


rehabilitation services

Anti GBV rescue


programme

Establish Rescue
rehabilitation centre

Provide Entrepreneurship
skills

GbV and
empowerment
programme
Gender and

Entrepreneurship skill
development centre

To sensitize
community against
culture
To give home based
training on eradication
of gender inequality
To facilitate the
reporting of GBV
incidents for easy
action by the GoK
To facilitate the
reporting of GBV
incidents for easy
action by the GoK
To savage the victim
S of gender violence
from victimisation
To empower them
with skills

Build centres of

To increase

Employ social workers


Open gender desk in
all police section
Toll Free calling
stations

Lack of
empowerment

Affirmative action

Low level of

Formulate and promote

Narok County Integrated Development Plan (2013 -17)

5 years Location
Targets

GoK

County wise

60

County wide

40

County wide

GoK

County wide

County wide

County wide

1000

County wide

County wide
Page 31

Subsector

Priorities

Constrains

Strategies

Programmes

Projects

Objectives

education

girl-child disadvantaged
focused education policy

disabled focused
education
programme
Education
awareness
promotion
programme
Mainstreaming
girls and women in
development
process
Special needs
programme

excellence for target


groups

opportunities to the
disadvantaged

Gender-roles
reorientation
programme
Empowerment on
their rights to
information on
maternal health
and level ground in
decision making
programme
Promote
enforcement of 2/3
rule in all institution
of learning
Awareness
creation
Full enforcement
on gender based
violence
Policy formulation
on retrogressive

Sensitization and
awareness creation
Provide sanitary services
for women and girls from
poor households

Skewed gender roles

Promote special-needs
focused policies and
practices
Sensitization and
awareness creation
Promote equal decisionmaking in maternal and
reproduction matters

Retrogressive cultural
practices

Opposition from
society

Weak legal
enforcement frame

Sensitization and
awareness recreation
Strengthen legal
enforcement framework
Legislate against
retrogression

Narok County Integrated Development Plan (2013 -17)

5 years Location
Targets

Awareness campaigns To create awareness

60

County wide

Provide sanitary pads


to girls and women

100000

County wide

Awareness campaigns To mainstream female


gender in the society

60

County wide

Awareness campaigns
against gender role
stereotypes
Education and training
of women

To sensitize the
community

60

County wide

To sensitize the
community women

County wide

Enforcement of2/3
rule in all institution

To enforce

TBD

County wide

Campaigns

To sensitize the
community
To enforce

60

County wide

GoK

County wide

To protect women
against retrogressive

GoK

County wide

Enforcement of
gender based project
Drafting of policy
targeting cultural

To increase self
esteem and maintain
personal dignity

Page 32

Subsector

Priorities

Constrains

Strategies

Programmes

Projects

Objectives

Media liberalization and


Content regulation and
enforcement

cultural practices
Content monitoring
and regulation
programme

practices
Media campaign on
gender violence

cultural practices
To disseminate
information to the
community on benefits
of gender equality

work

Youth
affairs

Orphans
and
venerable
children

Employment creation

Create an environment
where orphans and
vulnerable children will
grow and develop to
attain full potential
Child labour

5 years Location
Targets
60

County wide

Lack of
entrepreneurial skills,
vocational skills and
agri-business
Lack of capital

Establishment of
vocational training to
boost skills

Vocational training
programme

Construction of
vocational facilities

To impart employable
skills to the youth

County wide

Economic empowerment
through enterprise fund

Youth enterprise
programme

Youth enterprise fund


project

GoK

County wide

Involvement of youth
in illicit drinks and
drug abuse
Inadequate
institutional structure

Law enforcement

GoK

County wide

Strengthen the youth


empowerment institution
frame work

Youth
empowerment
programme

GoK

County wide

Moranism and other


retrogressive cultural
practices

Legislate against
retrogressive practices

GoK

County wide

Sentization and
awareness creation

Legislation against
ret rogation
programme
Sentization and
awareness

To enhance access to
financing of youth
enteprises
To eradicate
production and
consumption
To strengthen the
existing youth
empowerment
institutional framework
To liberate the youth
from retrogressive
cultural practices
To create awareness

60

County wide

Promote advocacy for


OVCs

OVCs rights
programme

Recruit legalofficers
dedicated to fight for
the rights OVCs

To Raise a Voice for


the voiceless

County wide

Enforce state law against


child labour

Anti-Child labour
programme

Campaigns and
sensitization

To create sensitization

60

County wide

Voicelessness due to
threat from parents
against reporting the
violation of their
rights
Retrogressive
cultural practices that
are disadvantageous

Narok County Integrated Development Plan (2013 -17)

Monitoring and
evaluation youth
empowerment
structure
Draft a legislation of
Legislation against ret
rogation practices
Campaigns

Page 33

Subsector

Priorities
High level of poverty

Constrains

Strategies

Programmes

Projects

Objectives

5 years Location
Targets

children
Lack of economic
empowerment for
vulnerable children

Economic empowerment
for benefactors of OVCs

Entrepreneur and
life skill training
programme

Cash transfer fund

To empower parents
with vulnerable
children economically

20,000

County wide

Entrepreneur and life


skill training project

To empower parents
with vulnerable
children with skills
To savage them from
early marriages and
FGM

County wide

County wide

To help them have a


better life
To promote advocacy
for the voices less in
the society (OVCs)
To grant them right of
education

County wide

County wide

County wide

To dis-stigimize the
community

60

County wide

To protect them
against social,
political, economic
and physical
limitation.
To address special
learning needs of
PWD

GoK

County wide

30

County wide

Lack of adequate
targeted institution
for the orphans and
venerable children
Compromised
administrative forces that
assist in defeating justice

Persons
with
Special
needs

Grant PWD decent living


and access to
opportunity in social
economic political and
physical realm

Promote advocacy
for the OVCs to
access justice
Inadequate facilities
for disabilities

Establish of a girl rescue


centre

Child rescue
programme

Construction of rescue
centre

Establish a children home


for the orphans
Hire lawyers for OVCs

Child rescue
programme
OVCs Advocacy
for programme

Construction of
children home
Recruit dedicated
OVCs legal officers

Erect a disability facility

Development fund
for disability
programme
Awareness
creation that
disability is not in
ability
Disability
Mainstreaming
Programme

Construction of
disability facility
project
Sensitization
campaign on how to
embrace PWD in
society
Enforcement of law

Disability
Mainstreaming
programme

To establish a special
unit in every learning
institution to cater for
those people with

Stigma due to un
favourable cultural
values

Mainstreaming and
instutionalising PWD in
development process

Weak enforcement
on the Persons with
disabilities Act

Strengthen the
enforcement arm on
affirmative action towards
PWD guaranteed in the
constitution
Mainstreaming and
instutionalising PWDs in
development process

Inadequate of
learning institution
that address special
needs

Narok County Integrated Development Plan (2013 -17)

Page 34

Subsector

Priorities

Constrains

Strategies

Programmes

Elderly

Improve quality of life to


elderly

Lack of safety nets

Provide safety nets

Social welfare
programme

Narok County Integrated Development Plan (2013 -17)

Projects
special needs
Cash transfer fund
Recruit social workers
to extend Home
based care
Sensitization project
for children to take
care of their parents

Objectives

5 years Location
Targets
12000
200

County wide
County wide

60

County wide

Page 35

ENERGY SECTOR PROGRAMMES AND PROJECTS

Sector
Sector Vision
Sector Mission

Energy
Sustainable, clean and affordable energy for enhanced productivity.
To provide efficient, reliable and cost effective energy through exploration of potential alternative energy sources in the County.

Sector Justification

a.
b.
c.
d.
e.

To balance regional growth.


To improve living standards.
To improve livelihoods.
To support industrialization.
To conserve of environment.

Sector summaries
Subsector

Priorities

Programmes

Projects

1. Electricity

1. Rural electrification

1. Rural Electrification program

1. Rural electrification subsidy

2. Bio mass

2. Hydroelectricity development
3. Wood fuel sufficiency

2. Hydro electrification development program


3. Wood fuel provision programme

4. Bio-diesel

4. Bio-diesel development programme

2.
3.
4.
5.

5. Geothermal power generation

5. Exploration of geo thermal energy

6. 1 Geothermal power plant at Suswa

6. Wind energy
7. Solar energy
8. Biogas

6. Exploration of wind energy


7. Solar energy adoption programme
8. Bio gas use promotion programme

7. Wind energy investment fund


8. Solar Energy Fund
9. Biogas installation subsidization fund

3. Alternative energy sources

1 Hydroelectric development project


Wood lots,
50,000 Energy saving Jikos
1 Bio-diesel development project

Detailed Energy sector plan


Subsector

Priorities

Constraints

Strategies

Programmes

Projects

Objectives

Electricity

Rural
electrification

Low percentage of
connectivity to
households

Alternative financing
options

Rural Electrification
program

Rural electrification
subsidy

To enhance affordability
of rural electrification

Narok County Integrated Development Plan (2013 -17)

5 year
target
50000
house
holds

Location
County wide

Page 36

Subsector

Priorities

Hydroelectricity
development

Bio mass

Wood fuel
sufficiency

Constraints

Strategies

Dispersed
settlements in the
vast county

Encourage concentrated
development

Lack of
sensitization on
available alternative
sources
Lack of geotechnical data

Encourage and promote


alternative sources of
electricity

Lack of investments
in hydro electricity

Invest in hydroelectricity
development

Scarcity of forest
biomass
Energy wasteful
technologies.

Planting exotic trees

Bio-diesel

Lack of appropriate
technology

Fossil fuels

Paraffin
substitution

Lack of alternative
sources

Alternative
energy
sources

Geothermal
power
generation

Community
resistance due to
conflict of interest

Undertake a feasibility
study

Adopt efficiency
biomass to energy
conversion technologies
Encourage public
private and strategic
investors
Substitute with
alternative sources
Community sensitization

Narok County Integrated Development Plan (2013 -17)

Programmes

Projects

Objectives

Sensitization and
awareness
campaigns

To improve access to
affordable lighting

Establish a legal
framework to guide
compact/concentrated
development
Sensitization and
awareness on
alternative sources of
electricity
Hydro electrification Feasibility study on
development
hydro electricity
program
production
Hydroelectric
development project
Wood fuel provision Wood lots
programme
Energy saving Jikos

5 year
target
10
campaigns

Location

To legalize and
institutionalize
compact/concentrated
development
Enhance knowledge
and appreciation of
alternative sources of
energy
To gain knowledge on
the potential of
hydroelectricity
development
To supply electricity

County wide

10

County wide

Mau area/Ewaso
ngiro

Mau area/
Ewaso ngiro

To provide wood fuel

Lump sum

County wide

To conserve wood fuel


consequently reduce
womens workload
To provide bio-diesel

Lump sum

County wide

Lump sum

County wide

County wide

Bio-diesel
development
programme
Paraffin substitution
programme

Bio-diesel
development project
Research on
alternative sources

To provide clean and


cheap energy

County wide

Exploration of geo
thermal energy

Sensitization
campaigns

To create awareness on
importance of
alternative sources

Suswa

Page 37

Subsector

Priorities

Wind energy

Constraints

Strategies

High cost of
investment

Strategic investors and


public private
partnerships
Research and study on
wind technology
Encourage public
private and strategic
investors
Subsidize the provision
of solar energy

Lack of appropriate
technology
High cost of
investment

Solar energy

High cost of
installation

Biogas

High installation
cost

Promotion of biogas use

Narok County Integrated Development Plan (2013 -17)

Programmes

Exploration of wind
energy

Projects

Objectives

5 year
target
1

Location

Geothermal power
plant at Suswa

To increase energy
sources

Feasibility study

To increase energy
sources
To increase energy
sources

County wide

Lump sum

County wide

Solar Energy Fund

To promote affordable
and clean energy

Lump sum

County wide

Biogas installation
subsidization fund

To provide clean and


affordable energy

10,000
house
holds

County wide

Wind energy
investment fund
Solar energy
adoption
programme
Bio gas use
promotion
programme

Suswa

Page 38

URBANISATION SECTOR PROGRAMMES AND PROJECTS

Sector
Sector Vision
Sector Mission

URBANISATION
Towards well planned, functional, sustainable, liveable, and beautiful towns within Narok County.
1.
2.
3.
4.

Sector Justification

Regulated Urbanisation for sustainability town development


Targeted urban investment for Regional competiveness
Balanced urbanization for County Growth
Facilitative urban management for productivity and equity
Balanced regional growth
Improved living standards and environments
Support for value addition through industrialization
Tapping the development of unique sub-regional resources
Inter-county competitiveness through linkages
Peace building through cosmopolitan urbanisation
Themed urbanization (administrative, recreational, transit etc) for intra-county competitiveness

Urbanisation Sector Summary


Sub sector
1. Urban growth management

2. Community Facilities and


amenities

3. Housing

Priorities

Programmes

Flagship projects

1. Integrated and strategic urban


development plans

1. Urban planning programme

1. Integrated and strategic urban development plans (8


major towns)
2. Establishment of a town planning department-

2. Development Control and


enforcement

2. Development control and regulatory


framework programme

3. Land information system development


4. 60 township development plans

3.
4.
5.
6.
7.
8.

3. Community facilities development


programme

5. 60 Market structures in urban areas


6. 8 Social halls
7. 16 Public Toilets
8. Acquisition of 300 Acres for cemetery
9. Construction of 500 houses for public servants
10. Construction of 500 medium density housing using

Market Places
Social halls
Public convenience
Cemetery
Public servants housing
Middle class medium density

Narok County Integrated Development Plan (2013 -17)

4. Public servants housing programme


5. Medium density housing programme

Page 39

housing
9. Slums upgrading

6. Slum upgrading programme

available low cost materials


11. Land adjudication and registration

4. Recreation and entertainment

10. Recreation/Entertainment facilities 7. Recreation facilities development


programme

12. Construction of 10 stadia

5. Open, green and blue spaces and


parks

11. Open , Green blue and recreation


al spaces

6. Electricity

12. Rural centres electrification


13. Street lighting

8. Land banking programme


9. Land Repossession programme
10. Rural Electrification program
11. Street lighting programme

13.
14.
15.
16.

Acquisition of 300 acres


Public utility plot repossession
Rural electrification subsidy fund
Street lighting fund

7. ICT

14. Telephony and data conveyance


15. Digital mass media
16. Water reservoirs
17. Water treatment plant
18. Water reticulation
19. Rural water supply
20. Water storage facilities

12.

ICT improvement programme

13.

Water supply programme

17.
18.
19.
20.
21.
22.
23.

Fibre optic installation


1 local radio station
Construction of 3 water reservoir
Construction of 3 water treatment plant
Construction of 3 water reticulation system
Drilling of 60 bore holes
Rehabilitation of 18 water projects

9. Sewerage services

21. Sewerage disposal and


treatment

14.
15.

Sewerage treatment programme


Sewerage disposal programme

24. Construction of 2 sewer treatment plant


25. Develop 2 sewerage reticulation system

10. Solid Waste management

22. Solid waste disposal and


collection

16.

Solid waste management programme

26. Purchase of land for40 solid waste disposal sites


27. Purchase of 500 skips
28. Purchase of 1000 dustbins

11. Drainage

23. Storm water drainage

17.

Drainage Development and maintenance


programme

29. Reclamation of encroached reserves


30. Construction of 4 check dams

8. Water Supply

Narok County Integrated Development Plan (2013 -17)

Page 40

Narok County Integrated Development Plan (2013 -17)

Page 41

Detailed Urbanisation Sector Plan


Subsector

Priorities

Constraints

Strategies

Programmes

Projects

Objectives

Urban growth
management

Integrated and strategic


urban development
planning

Planning

Allocate funds for


urban planning
Planning in phases

Urban planning
Programming

Preparation of
Integrated and strategic
urban development
plans

To guide urban
development

Lack adequate
technological
capacity

Improve access to
relevant technology
and data.
Awareness on benefits
of planning
Develop a Land
information database

Purchase of planning
equipment and
resources

Enhance
technological
capacity

Lump sum

Kilgoris,
Lolgran,
Olpusimoru,
Olokurto, Ole
Tipis, Suswa,
Ntulele,
Ololulunga
County wide

Develop Land
information system

To provide Land
information and
database

County wide

Preparation of township
development plans

To control
developments

60

County wide

Development
control and
regulatory
programme

Development control
enforcement

Ensure
conformity to
development
plans

30

County wide

Awareness
and
sensitization
programme
Community
facilities
development
programme

Awareness and
sensitization campaign

Enhance public
and political
goodwill

60

County wide

Development of market
structures in urban
areas

Provide market
facilities

60

County wide

Development Control and Lack of information


enforcement
Lack of townships
development plans

Community
Facilities and
amenities

Market Place

Weak enforcement
framework

Develop a framework
for development
control
Strengthen through
legislation

Weak political and


public support

Sensitization and
awareness creation

Inadequate market
centres

Provision of market
places

Narok County Integrated Development Plan (2013 -17)

Development
control and
regulatory
framework

5 year
targets
8

Location

Page 42

Subsector

Priorities

Constraints

Strategies

Social halls

Poor planning

Public convenience

Projects

Objectives

In cooperation in
development plans

Planning for social


facilities

Allocate space
for social halls

Lack of space

Land acquisition and


banking

Acquisition of land

Provide land for


social halls

8 Acres

Inadequate social
facilities

Provision of social
facilities

Construction of social
halls

Provide social
convenience

Inadequate public
convenience

Provision of public
conveniences

Construction of Public
Toilets

Enhance public
convenience in
urban areas

16

Lack of space

Promote public private


partnerships
Land Banking

Acquisition of Land

Provide space
for construction
of Public
amenities

8 acres

Narok County Integrated Development Plan (2013 -17)

Programmes

5 year
targets
-

Location
Kilgoris,
Lolgran,
Olpusimoru,
Olokurto, Ole
Tipis, Suswa,
Ntulele,
Ololulunga
Kilgoris,
Lolgran,
Olpusimoru,
Olokurto, Ole
Tipis, Suswa,
Ntulele,
Ololulunga
Kilgoris,
Lolgran,
Olpusimoru,
Olokurto, Ole
Tipis, Suswa,
Ntulele,
Ololulunga
Kilgoris,
Lolgran,
Olpusimoru,
Olokurto, Ole
Tipis, Suswa,
Ntulele,
Ololulunga
Kilgoris,
Lolgran,
Olpusimoru,
Olokurto, Ole
Tipis, Suswa,
Page 43

Subsector

Priorities

Cemetery

Housing

Neighbourhood
development

Constraints

Lack of suitable
space
Land grabbing
Poor maintenance

Lack of planning
and development
regulation controls

Piecemeal
development and
incremental growth

Strategies

Programmes

Projects

Objectives

5 year
targets

Location

Land Banking

Acquisition of Land for


cemetery

Provide space
for cemetery

300 acres

Ntulele,
Ololulunga
County wide

Institution of
management and
maintenance
framework
Preparation of a plan
and enforcement of
development
regulations control

Maintenance and
management of
cemeteries

Maintenance of
the cemetery

lumpsum

County wide

Preparation of
neighbourhood plans
(development and
renewal)

To achieve
serviced well
designed and
liveable
neighbourhoods

8 plans

Enforcement of
Development control by
laws and regulations

To achieve
serviced well
designed and
liveable
neighbourhoods

Preparation of
neighbourhood plans

To achieve
harmonious
development

Enforcement of
Development control by
laws and regulations

To achieve
serviced well
designed and
liveable

Kilgoris,
Lolgran,
Olpusimoru,
Olokurto, Ole
Tipis, Suswa,
Ntulele,
Ololulunga
Kilgoris,
Lolgran,
Olpusimoru,
Olokurto, Ole
Tipis, Suswa,
Ntulele,
Ololulunga
Kilgoris,
Lolgran,
Olpusimoru,
Olokurto, Ole
Tipis, Suswa,
Ntulele,
Ololulunga
Kilgoris,
Lolgran,
Olpusimoru,
Olokurto, Ole

zoning

Narok County Integrated Development Plan (2013 -17)

Neighbourhood
planning and
development
programme

Page 44

Subsector

Priorities

Constraints

Strategies

Programmes

Projects

Objectives

5 year
targets

neighbourhoods

Public servants housing

Middle class medium


density housing

Poor design and


construction of
houses

Enforcement of
Development Control

Supervision and
Enforcement of
development controls

To ensure
compliance with
stipulated
standards of
housing

Speculative
development
Resource
constraints

Tax idle land

Enforcement of
development regulations
Construction of houses
for public servants

High cost of
building materials

Adapt low cost building


materials and
appropriate technology

To control
sprawl
To provide a
conducive
working
environment
To provide
affordable
housing

Limited skills and


poor workmanship

Capacity building

Lack of land for


construction

Acquire land
Partnerships with real
estates players
Private public
partnerships
Allocate funds
Partnerships with real
estate players

Inadequate
resources

Public private

Narok County Integrated Development Plan (2013 -17)

Public
servants
housing
programme

Construction of houses
using low cost and
appropriate technology

500

Capacity
building in
building
construction
technology
programme
Land
acquisition
programme

Training in construction
technology

To build capacity in construction


technology

Purchase land

To acquire land
for construction

Medium
density
housing

Construction of medium
density housing using
available low cost

Increase number 500


of middle class
housing

350 acres

Location
Tipis, Suswa,
Ntulele,
Ololulunga
Kilgoris,
Lolgran,
Olpusimoru,
Olokurto, Ole
Tipis, Suswa,
Ntulele,
Ololulunga
All county towns
Narok,
Ololulunga,
Kilgoris, Emurua
dikir
Narok,
Ololulunga,
Kilgoris, Emurua
dikir
Narok,
Ololulunga,
Kilgoris, Emurua
dikir
Narok,
Ololulunga,
Kilgoris, Emurua
dikir
Narok,
Ololulunga,
Kilgoris, Emurua
Page 45

Subsector

Priorities

Constraints

Programmes

Projects

Public private
partnerships
Provide incentives to
the investors e.g.
taxation

programme

materials

Objectives

5 year
targets

Location
dikir

Purchase land

Land acquisition

350 acres

Adapt low cost building


materials and
appropriate technology
Capacity building

Promotion of low cost


building materials and
appropriate technology
Capacity building

County wide

Poor design and


construction

Enforce development
control measures

Development control
and regulations

County wide

Limited access to
housing finance

Enhance access to
financial resources and
credit facilities

Lumpsum

County wide

Flouting of
development
controls and
regulations

Enforce regulatory
control frameworks

Develop enabling
environment for
private/public
partnerships and
establish a housing
development fund
Development control
and regulations

To enhance
affordable
housing
Enhance skills
and
development on
building and
construction
To improve
design and
construction
To improve
access to
housing finance

Narok,
Ololulunga,
Kilgoris, Emurua
dikir
County wide

Land tenure system

Establish ownership to
land rights.

Land adjudication and


registration

High cost of
building materials
Limited skills and
poor workmanship

Slums upgrading

Strategies

Narok County Integrated Development Plan (2013 -17)

Enhance
compliance with
development
control
regulations
Security of
tenure to
enhance quality

County wide

Lumpsum

Narok

Page 46

Subsector

Priorities

Constraints

Lack of political and


public goodwill

Recreation and
entertainment

Open, green
and blue
spaces and
parks

Flouting of
development
controls and
regulations
Recreation/Entertainment Lack of space
facilities

Open , Green blue and


recreational spaces

Strategies

Awareness and
sensitization

Programmes

Sensitization
programme

Enforce regulatory
control frameworks
Allocate space

Projects

Sensitization campaigns

Recreation
facilities
development
programme

5 year
targets

Location

Narok

Narok

Purchase of land

To provide
space for
construction

50 Acres

County wide
(TBD) based on
need

Construction of stadia

Enhance
recreation and
entertainment
Improve
condition of
recreation and
entertainment
facilities
Improve
financial
management

10
Lumpsum

County wide
(TBD) based on
need
County wide

10

County wide

Avail adequate
land for PU
development
To repossess
grabbed land

300 acres

County wide

To enlist the

Institute management
and maintenance
framework

Mismanagement

Institute management
and maintenance
frameworks

Integrated
finance
management
system

capacity building

Few land banks

Purchase land banks

Land banking
programme

Land acquisition

Land grabbing

Reposes grabbed land

Land
Repossession
programme
Public utility

PU plot repossession

Narok County Integrated Development Plan (2013 -17)

housing
development
Create
awareness on
importance of
slum upgrading

Development Control
and regulations

Poor maintenance

Awareness against

Objectives

Maintenance of existing
facilities

Awareness Campaign

All
County wide
Page 47

Subsector

Priorities

Constraints

Strategies

Programmes

Land grabbing

watchdog
Program

Legislate against Land


grabbing

PU land
demarcation,
and titling
programme

Projects

Objectives

Signage and Landmarks

community in
safeguarding
against land
grabbers
To protect PU
land against
grabbers
To locate PU
land

PDP preparation

Cadastral survey

Limited resources

Strategic investor
Public private
partnerships
Lobby for Donor
funding/grants
Lack of a siting plan Prepare a siting plan
and development
and development
guidelines
guidelines

Electricity

Rural centres
electrification

Resource
mobilization
programme

Poor management
and maintenance

Institute management
and maintenance
framework

Open and
recreational
space planning
programme
Urban
greening
programme

High cost of
connection

Alternative financing
options e.g. stima loan

Rural
Electrification
program

Dispersed

Electrification as a

Narok County Integrated Development Plan (2013 -17)

Registration of public
utility plots
Commercial
concessions

Preparation of siting
plans and development
guidelines

Rural electrification
subsidy fund

Landscaping

Alternative electricity
sources

5 year
Location
targets
campaigns

TBD

County wide

County wide

Demarcate the
PU land
Secure title
Deed
Improve
provision of
services

County wide

Allocate space
and provide
guidelines for
development
Beautification of
open and
recreational
spaces
To enhance
affordability of
rural
electrification
To improve
access to

County wide

30

County wide

County wide
County wide

80000
house holds

County wide

80000
house holds

County wide

Page 48

Subsector

Priorities

Constraints

Strategies

settlements in the
vast county

social service project


and not commercial
venture

Programmes

Lack of
Encourage and
sensitization on
promote alternative
available alternative sources of electricity
sources
Street lighting

ICT

Objectives

Solar, biogas and wind

affordable
lighting

Sensitization and
awareness on alternative
sources of electricity

Enhance
knowledge and
appreciation of
alternative
sources of
energy
To ensure
lighting in all
public areas
Facilitate
maintenance
of street lights
Light and
signage

High installation
cost

Allocation of funds

Poor maintenance

Public private
partnerships

Street lighting
maintenance fund

High running Cost

Public private
partnership

Street lighting

vandalism

Strengthen Law
enforcement

Law enforcement

Telephony

Inadequate network
coverage

Enhance network
coverage

Data conveyance

Low uptake

Digital mass media

Poor coverage

Sensitise people on
the importance of data
conveyance
Enhance network

Narok County Integrated Development Plan (2013 -17)

Street lighting
programme

Projects

ICT
improvement
programme

Street lighting

Fibre optic installation


Fibre optic installation

5 year
targets

Location

10
Campaigns

County wide

30 centres

County wide

30

County wide

30

County wide

To protect the street lighting


facilities from
vandalism
Enhance
TBD
communication

County wide

Enhance
internet access

County wide
(centres)

Increase booster stations Enhance


dissemination
of information
Establish local radio
Enhance

County wide

County wide

Narok
Page 49

Subsector

Water Supply

Priorities

Constraints

Strategies

Programmes

Water supply
programme

Projects

Objectives

station

dissemination
of information
Provide water
supply to the
urban and
rural
population
Provision of
clean water

Water reservoirs

Inadequate facilities Provide space and


resources to construct
water reservoirs

Construction of water
reservoir

Water treatment plant

Inadequate
treatment facilities

Plan for water


treatment plants

Construction of water
treatment plant

Water reticulation

Inadequate
reticulation in urban
areas

Provide resources for


water reticulation

Water reticulation
Design

Water bowsers
Rural water supply

Sewerage
services

Poor rural centres


water supply

Enhance access to
clean water in rural
areas

Water storage facilities

Lack of water
storage facilities

Improve water storage


facilities

Sewerage disposal and


treatment

Lack of sewerage
treatment plant

planning and
construction of
treatment plant

Narok County Integrated Development Plan (2013 -17)

Drilling of bore holes


Construction of water
kiosks
Rehabilitation of the
water projects
Construction of masonry
water tanks
Sewerage
treatment
programme

Construction of sewer
treatment plant

Improve water
supply in
urban areas
To guide
water
reticulation
system
Improve water
supply in
urban areas
Improve water
provision in
rural areas
Improve water
supply
Improve water
supply
Provide water
storage
facilities
Treatment of
liquid waste
from urban
areas

5 year
targets

Location

Narok,
Lolgorian
Kilgoris

Narok,
Lolgorian
Kilgoris
Narok,
Lolgorian
Kilgoris
Narok,
Lolgorian
Kilgoris

3
3

8
60

Narok,
Lolgorian
Kilgoris
County wide

18

County wide

18

County wide

100

County wide

Narok, Kilgoris

Page 50

Subsector

Solid Waste
management

Priorities

Solid waste disposal and


collection

Proper waste
management

Constraints

Strategies

Programmes

Projects

Objectives

Lack of sewer
reticulation in urban
areas

Install sewer
reticulation systems

Sewerage
disposal
programme

Develop a reticulation
system

Use of pit latrines in


urban areas

Encourage use of
septic tanks and cess
pools

Sensitization on the use


of septic tanks and cess
pools

Few exhausters

Encourage use of
digesters

Sensitization on the use


of digesters

Poor construction
of septic tanks and
cess pools

Enforce regulations
and standards

Capacity building ,
control and regulation of
construction of septic
tanks and cess pools

Inadequate
disposal sites
Large volume of
waste generated
Inadequate
disposal skips

Acquire landfills and


disposal sites

To facilitate
conveyance of
liquid waste for
treatment
Promote
proper
sewerage
disposal
Reduce the
volume of
waste to be
exhausted
Facilitate
collection and
disposal of
sewerage from
septic tanks
and cess pools
To acquire
land for solid
waste disposal

Acquire skips

Purchase skips

Inadequate
disposal bins
Lack of a solid
waste management
system framework

Acquire dust bins

Purchase dustbins

Strengthen the system

Develop a framework for


solid waste management

Solid waste
management
programme

Purchase of land for


solid waste disposal
sites

Solid waste conservation


measures sensitization
(3Rs)
Narok County Integrated Development Plan (2013 -17)

To facilitate
storage and
collection
To prevent
littering
To facilitate
collection of
solid waste in
urban areas
To reduce
waste and
conserve the

5 year
targets
2

Location

5
campaigns

Narok, Kilgoris,
Lolgorian,
Suswa, Ole tipis

Narok, Kilgoris,
Lolgorian,
Suswa, Ole tipis

60

County wide

40 (10
each)
500

Narok,
Ololulunga,
Kilgoris,
Emurua dikir
County wide

1000

County wide

Narok,
Ololulunga,
Kilgoris,
Emurua dikir
Narok,
Ololulunga,
Kilgoris,

4
campaigns

Narok, Kilgoris

Page 51

Subsector

Priorities

Constraints

Strategies

Programmes

Projects

Objectives

5 year
targets

environment

Drainage

Storm water drainage

Poor solid waste


collection services

Improve solid waste


collection services

Encroachment of
drainage basins
and riparian
reserves

Reclamation of
encroached spaces

Contracting solid waste


collection services
Reclamation
and restoration
programme

Reclamation of
encroached reserves
Restoration of riparian
reserves

Diversion and
closing of natural
water ways
Deforestation and
destruction of land
cover

Restoration of the
water ways

Restoration of natural
water ways

Increase land cover

Reforestation and
afforestation

Blockage of storm
water drains

Regular maintenance
of storm water drains

Development
and
maintenance
programme

Maintenance of storm
water drains
Construction of check
dams

Narok County Integrated Development Plan (2013 -17)

Location
Emurua dikir

To facilitate
collection of
solid waste in
urban areas
Improve
drainage of
storm water

4 Towns

Lump sum

Narok,
Ololulunga,
Kilgoris,
Emurua dikir
County wide

Improve
drainage of
storm water
Improve
drainage of
storm water
Increase land
cover and
minimize
runoff
Improve the
drainage of
storm water

Lump sum

County wide

County wide

Lump sum

County wide

Lump sum

County wide

Minimize
flooding and
siltation in
storm water
drains rivers

Lumpsum

County wide

Page 52

AGRICULTURE, LIVESTOCK AND FISHERIES SECTOR

Sector
Sector Vision

Sector Mission

Sector Justification

Agriculture, Livestock and Fisheries


To become an economically vibrant and viable sector
1. To improve livelihoods by optimizing production.
2. To adopt best practices in commercial agriculture.
3. To adopt and maintain sustainable animal and cash crop production practices.
4. To add value to primary farm products facilitating their competitiveness nationally and
internationally.
- Food security
- Employment creation and Incomes
- Industrialization and wealth creation

Sector summary
Sub-sector
Agriculture

Priorities
1. Sector (farm)
productivity

2. Irrigation promotion

3. Traditional and high


value crops production
4. Sector profitability

5. Soil and water


conservation

Programmes
1. Mechanisation enhancement programme
2. Meteorological information dissemination
programme
3. Clean seed development programme
4.
5.
6.
7.

Clean seed seed bulking programme


Organic fertilizer promotion programme
Agricultural input support programme
Irrigation expansion programme

8. Traditional and High value crops Research


programme
9. Pre & post harvest losses mitigation programme
10. Post-harvest processing programme
11. Value addittion industrialisation programme
12. Organic fertilizer use promotion programme
13. Land reclamation programme

Narok County Integrated Development Plan (2013 -17)

Flagship Projects
1. Mechanisation guarantee facility
2. 3 meteorological sub stations
3.
4.
5.
6.
7.
8.
9.
10.
11.

1 tissue culture lab


Grain seed production farms (5000 Acres)
Potato seed multiplication centres (30 Acres)
4 Livestock manure pelleting plant
1.5 b Ksh Agricultural revolving fund
Farm Irrigation conversion project
1.0b Ksh Credit facility to fund irrigation initiatives
6 Water dams and water reticulation system construction
Traditional and High value crop research fund

12.
13.
14.
15.
16.

1.0 b Kshs Crop-loss insurance fund & 6 storage facilities


3 Primary level processing factories
6 Value addition factories
Organic fertilizer use campaign
Degraded land reclamation
Page 53

Sub-sector

Livestock

Fisheries

Priorities
6. Climate change
adaptation

Programmes
14. Climate Change Adaptation and Implementation
Programme

7. Sector productivity

15. Livestock breeds improvement programme

8. Disease eradication
9. Pasture provision

16. Disease control and surveillance programme


17. Pasture Improvement Programme

10. Water availability


11. Sector optimization

18. Water harvesting and storage programme


19. Market development programme
20. Profit Maximization Programme

12. Sector development

21. Fisheries development programme

13. Products marketing

22. Fish Products promotion programme

Flagship Projects
17. Early warning system
18. Breed improvement project (4,700 breeding animals)
19. Upgrade Narok Pastoral Training Centre to Middle Level
College
20. Disease free zones or compartments
21. 30 Pasture development (Strategic feed reserve)
22. Feeds manufacturing plants
23. 120 Water pans
24. 1 Tannery
25. Disaster preparedness and response contingency fund
26.
27.
28.
29.
30.
31.
32.

100 Fish pond


20 Fingerlings breeding centre ( 1 m)
Stocking of water bodies
1 Fish feed factory
40 Extension services recruitment
Fish Market in Narok Town
Construction of a processing plant and cooling plant

Detailed Agriculture, Livestock and Fisheries Sector Plan


Sub-sector Priorities
Agriculture Sector (farm)
productivity

Constrains
Poor farming
techniques

Low levels of
mechanization

Strategies
Expand extension
services

Promote
mechanization

Narok County Integrated Development Plan (2013 -17)

Programmes
Enhanced
agricultural
extension services
programme
Mechanisation
enhancement

Projects
Recruit agricultural
extension personnel
Purchase of extension
service motorbikes
Establish
mechanisation

Objectives
To enable farmers
access information on
better farming
techniques
To expand coverage of
extension services
To enable farmers
purchase agricultural

Targets
30 extension
workers (1 per
ward)

Location
County wide

30 motorbikes

County wide

Lump sum

County wide

Page 54

Sub-sector

Priorities

Constrains

Strategies

Programmes
program

Projects
guarantee facility
Farm equipment
purchase fund
Farm equipment
hiring plan

Unavailability of
local skilled labour

Train locals in
agricultural skills
Encourage labour
mobility

Adverse Impacts
of nature

Poor seed
varieties

Inadequate supply
of clean seed

Provide
meteorological
information

Encourage the use


of disease-free
seed

Enhance access to
clean seed

Narok County Integrated Development Plan (2013 -17)

Local farmers skills


improvement
programme
Periodic and
collective labour
importation
programme
Meteorological
information
dissemination
program

Clean seed
development
programme

Training of farmers
Labour recruitment

Installation of
meteorological
stations
Installation of
meteorological
substations
Daily and seasonal
weather forecast
transmission
Construction of tissue
culture labs

Skills Development
Programme

Grain seed production


farms
Train seed production
personel

Seed bulking
programme of

Establish potato seed


multiplication centres

Objectives
equipment
To enable farmers
acces cheap
mechanization options
To enable farmers hire
equipment at a
subsidised cost when
season requires
To enable farmers
improve farming skills
for productivity
To enable farmers to
access adequate labour
during planting and
harvest season
Avoid adverse weather
impacts on crops

Targets

Location

Lump sum

County wide

Lump sum

County wide

Lump sum

County wide

Lump sum

County wide

1 station

Narok

To collect localised
weather variability
information
To keep the farmers
abreast with current
weather information
To enable farmers gain
access to disease free
seed
To have a reserve of
grain seed for planting
To train personnel who
can act as TOT and
farmer trainers
To provide clean seed
to farmers at

3 substations

County wide

2 times daily radio


bulletin

County wide

1 Lab

Narok FTC

5000 Acres

Narok North, East

30 TOTs

County wide

30 Acres (5X6
sites)

County wide

Page 55

Sub-sector

Priorities

Irrigation
promotion

Constrains

Strategies

High cost of quality


farm inputs

Promote the use of


organic fertilizer

Low level of
adoption of
irrigation practices
Inadequate
Funding

Assist farmers to
access quality and
affordable farm
inputs
Encourage
adoption of
irrigation practices
Increase allocation
of funds

Inadequate local
skills

Disseminate
knowledge on
irrigation skills and
technologies

Expand extension
services

Unavailability of
irrigation
infrastructure

Traditional and Poor perception of

Construct irrigation
infrastructure

Sensitization on

Narok County Integrated Development Plan (2013 -17)

Programmes
clean seed
Organic fertilizer
promotion
programme
Agricultural input
support programme

Projects

Irigation expansion
programme

Farm conversion
project

Irigation expansion
funding programme
Irrigation
sensitization and
awareness
programme

Enhaced irrigation
extension services
programme

Irrigation
infrastructure
development
programme

Farmer

Objectives
convenient locations
To sustainably recycle
farm waste products

Targets

Location

4 pelleting plants

To assist farmers in
accessing farm imputs
at affordable prices and
flexible terms
To expand irrigable
area

1.5b ksh

Narok North,
East, West and
South
Countywide

Lump sum

County wide

Establish credit facility


to fund irrigation
initiatives
Conduct farmer
sensitization and
awareness creation

To enable farmers
access funds

1.0b ksh

County wide

Increase the farmers


knowledge of irrigation
technologies

Lump sum

County wide

Construct
demonstration
stations
Recruit irrigation
extension officers

To edicate farmers on
irrigation techniques

2 demonstration
stations

County wide

To enable farmers
access information on
irrigation techniques
To expand coverage of
extension services

12 extension
officers

County wide

12 motorbikes

County wide

Provide water for


irrigation

6 dams

County wide

Construct water
reticulation system

To supply water to
irrigable farms

1 system

County wide

Conduct Awareness

To change farmers

10 (2 annually)

County wide

Construct a livestock
manure pelleting plant
Establish a revolving
fund

Purchase motorbikes
for irrigation extension
services
Build water dams for
irrigation

Page 56

Sub-sector

Priorities
high value
crops
production

Sector
profitability

Constrains
traditional crops

Strategies
nutritional value of
traditional crops

Low knowledge
about local
production
potential
High costs of
introducing high
value crops

Conduct research
on potential,
feasibility and
viability
Increase allocation
of funds

Pre-harvest
losses

Insure against
weather-induced
losses
Improve storage
mechanisms

Post-harvest
losses

Promote postharvest processing


(primary level)

Poor Market
exploitation

Programmes
sensitization and
awareness creation
programme
Traditional and
High value crops
Research
programme
High value crops
funding programme

Projects
campaigns

Objectives
perceptions regarding
traditional crops

Targets

Location

Conduct Research

To establish type of
crops, production
potential and enterprise
viability
To enable farmers
access cheap financing
options

1 study

County wide

1.0b Kshs

County wide

Pre-harvest losses
mitigation
programme
Post-harvest losses
mitigation
programme
Post-harvest
processing
programme

Establish crop-loss
insurance fund

To compensate farmers
for losses incurred

1.0b Kshs

County wide

Construct storage
facilities

To preserve postharvest crop quality

6 storage stations
at 5.4m per one

County wide

Construct primary
level processing
factories
Carry out research on
alternative postharvest processing
technologies
Market awareness

To mitigate against crop


perishability

6 rudimentary
factories

County wide

To reduce the quantity


of post harvest losses
incurred by farmers

1 study

County wide

To find external
markets for farmers to
sell their produce
profitably
To enable farmers get a
better price yield from
crops
To assist farmers in
implementing fair trade
policies

Lump sum

County wide

2 factories

County wide

Lump sum

County wide

Regulate and
explore potential
markets

Market Exploitation
Programme

Promote Pre-sale
value addition

Value addittion
industrialisation
programme
As above

Promote fair trade


practices

Narok County Integrated Development Plan (2013 -17)

Establish
credit/subsidy facility

Build value-adding
factories
Fair trade
incorporation

Page 57

Sub-sector

Priorities
Soil and water
conservation

Constrains
Poor land
development
practices

Strategies
Sensitize people on
sustainable land
development
practices

Programmes
Sustainable
agriculture
programme

Projects
Conduct sensitization
and awareness
campaigns

Rampant use of
synthetic fertilizers,
pesticides and
herbicides

Sensitization on the
negative impacts of
fertilizer pesticide
and herbicide use
Promote use of
organic fertilizer

Farmer
sensitization and
awareness
programme
Organic fertilizer
use promotion
programme
Land reclamation
programme

Carry out
reclamation of
degraded lands
Climate
change
adaptation

Unpredictable
weather patterns
Unavailability of
hybrid crops

Improve acces to
timely and accurate
meteorological data
and information
Provison of
knowledge

Lack of adaptation
technology

Targets
30 campaigns
(6 annual
campaigns)

Location
County wide

Conduct sensitization
and awareness
campaigns

Objectives
To enable farmers
access information on
soil and water
conservation
techniques
To help farmers use
farm chemicals
responsibly

30 campaigns
(6 annual
campaigns)

County wide

Facilitate use of
organic fertilizer

To prevent land
degradation

County wide

Reclaim degraded
land

To re-establish soil
fertility and productivity

30 campaigns
(6 annual
campaigns)
Lump sum

CC Adaptation and
Implementation
Programme

Prepare an early
warning system

To equip farmers with


reliable information time
the planting season.

1 system

County wide

As above

Research on county
specific adaptable
crop varietites
Provide technology of
coping with vulgaries

To supply information
and procurew
adaptable crops
To enable farmers
access local
technologies for coping
with CC
To enable farmers
bounce back after a
season loss
To enable farmers
access information on
adapting to CC and
coling strategies

Lump sum

County wide

Lump sum

County wide

1.0 b Kshs

County wide

As above

Expand extension
services targetting
CC adaptation

Narok County Integrated Development Plan (2013 -17)

As above

Crop insuarance fund

As above

Train extension
workers

County wide

30 extension
workers

Page 58

Sub-sector
Livestock

Priorities
Sector
productivity
.

Constrains
Low yielding
breeds

Strategies
Promote acquisition
of high yielding
livestock breeds
Improve yields by
selective breeding
Coordinate
provision of
breeding services

Programmes
Livestock breeds
improvement
programme
As above

Projects
Breed improvement
project

Objectives
To improve livestock
breeds and products

Targets
4,700 available
breeding animals

Location
County wide

AI Services
Upgrading of breeding
centers

22,000 AI
conducted
2 Upgraded
breeding centers
(Narok PTC and
Narok Sheep&
Goats)

County wide

As above

To produce high
yielding varieties
To make breeding
services accessible to
farmers

Poverty and low


monetary
investment in
animal husbandry
practices
High cost of
breeding stocks

Expand access to
finance

As above

Livestock
development fund

To make money
accessible to farmers at
a cheap cost

1.0b Kshs

County wide

As above

As above

Subsidize AI services

To make extension
services affordable

Lack of technical
know-how among
farmers

Expand access to
extension services

Livestock keepers
skills development
programme

Recruit livestock
extension officers

To improve access to
knowledge and
extension services

30 extension
workers

County wide

Invest in
demonstrations,
field days and
farmers visits

As above

Upgrade Narok
Pastoral Training
Centre to Middle
Level College

To Train animal
production and health
technicians

6 new buildings
constructed in
addition to already
exisiting ones.

Narok North

Lump sum

County wide

County wide

220 students
trained
Disease

Prevalence of
disease vectors

Expand access
preventive and
curative services
As above

Narok County Integrated Development Plan (2013 -17)

Disease control and


surveillance
programme
As above

Vector surveillance
To create disease

To have an effective
vector-borne disease
control mechanism.
To eradicate market

Lump sum

County wide

Lump sum

County wide
Page 59

Sub-sector

Priorities

Constrains

Few vaccines
available

Pasture

Water

Poor pasture
quality
Low volumes of
available feeds
Little or less
nutritionally
available feeds
Long distances to
water points

Strategies

Programmes

As above

As above

As above

As above

As above

As above

As above

As above

As above

As above

Quarantine affected
livestock and areas

As above

Expand access
preventive and
curative services
Promote adoption
of disease
resistance breed
Increase Pasture
availability to the
farmers

As above

Construct and equip


satellite labs

Livestock breeds
improvement
programme
Pasture
Improvement
Programme

Promote nutritious
pasture
accessibility

As above

Feeds manufacturing
plants

Reduce trekking
distance to

Water harvesting
and storage

Construct water pans

Narok County Integrated Development Plan (2013 -17)

Projects
free zones or
compartments
Construction of cattle
dips

Objectives
sensitive diseases

Targets

Location

To protect livestock
against vector-borne
disease
As above

148 cattle dips

County wide

146 rehabilitaded
dips
271 rehabilitated
crushes
100 Awareness
campaigns
conducted

County wide

2 cold chain

County wide

To prevent the spread


of communicable
diseases
To facilitate prompt
disease diagnosis

30 quarantine
stations

County wide

2 labs

Kilgoris and
Narok Town

Crossbreeding

To adapt livestock to
disease environments

Lump sum

County wide

Pasture development
(Strategic feed
reserve)

To ensure adequate
and quality feed
materials availability
throughout the year
To make high quality
and affordable feeds
available throughout the
year
To make water
available for livestock

30 strategic food
reserve stores

County wide

2 factories to be
established

Narok town and


Kilgoris

120 new water


pans

Narok East,
South, Trans-

Rehabilitation of cattle
dips
Rehabilitation of
crushes
Livestock vaccination
campaign
Construction and
rehabilitation of cold
chain facilities
Construction of
Quarantine stations

As above
To protect livestock
from disease and
eradicate notifiable
diseases
To preserve viability of
vaccines

County wide
County wide

Page 60

Sub-sector

8.1

Priorities

Sector
optimization
.

Constrains

Non present
livestoack yards or
holding grounds

Strategies
livestock watering
point
Design and operate
livestock sale yards
and holding
grounds

Programmes
programme

Projects

Objectives
throughout the year

Targets

As above

Rehabilitate water
pans
Construction of sale
yards

As above

40 water pans
rehabilitated
25 sale yards
constructed

As above

Rehabilitation of sale
yards

As above

16 rehabilitated
sale yards

County wide

Market
development
programme

To maximize profits

Location
Mara

County wide

Lack of
professionally
manned abattoires

Provide clean
abattoires

Market
development
programme

Construction
of abattoirs

To improve on good
production practices

1 abattoir
constructed

County wide

A lack of
refrigirated
vehicles for
produce
transportation

Provide cooling
services to the milk
farmers

Market
development
programme

Construction of milk
cooling plants

To avoid milk spoilage


while bulking for
marketing

2 milk cooling
plants

County wide

6 refrigirated
vehicles

County wide

Loss of livestock
on market days

Brand the animals


to avoid theft

Animal identification
and traceability

To reduce livestock
thefts

Wastage of
alternative raw
materials from
livestock

Promote value
addition to the
alternative raw
materials
harvested from
livestock
To give farmers a
platform for
knowing the best
markets for their
livestock

Market
development
programme
Profit Maiximation
Programme

Construction of hides
and skin bandas and
tanneries

To maximize profits and


create employment

1,200,000
County wide
brandings to de
done
20 hides and skin
County wide
bandas constructed
1 Tannery

Profit Maiximation
Programme

Establishment of
market Information
and dissemination
platform

To increase awareness
of various aspects of
livestock production
and marketing

Little information
on markets

Narok County Integrated Development Plan (2013 -17)

Information centre
for market trends

County wide

Page 61

Sub-sector

Priorities

Constrains
Rearing of only
one type of
animals

Overgrazing and
undergrazing

Strategies
Promote mixing of
animal types

Promote space
maximization

Programmes
Profit Maiximation
Programme

Projects
Diversification of
Livestock

Objectives
To increase the number
of emerging livestock
kept

Targets
44,000 emerging
livestock kept

Location
County wide

To maximize profits
from livestock sales
To encourage farmers
to move towards
ranching as a
sustainable mode of
production
To prevent rampant
overgrazing
To enhance disaster
preparedness and
response

8 rehabilitated
holding grounds
Lump sum

County wide

Profit Maiximation
Programme

Rehabilitation of
holding grounds
Ranching
development

1.0b Kshs

County wide

County wide

Reforestation

Fisheries

Sector
productivity

County wide

County wide

Disasters reducing
herd numbers
significantly

Implementation of
county disaster
management
strategies and
protocols

Profit Maiximation
Programme

Provide contingency
fund for disaster
preparation and
response

Lack of fish
consumption
practices

Promote fish
consumption
culture

Fisheries support
programme
Fisheries marketing
programme

Technical support
project
Develop cold chain
facilities

To give knowledge on
aqua culture
Establish longer fish
consumption life

Information centre

Develop fish market


facilities in Narok
town
Construct fish
processing facilities

Establish market for fish

1 open air market

County wide

To establish state of the


art fish processing
facilities
To construct a
centralised location
where fish breeding
information and

1 factory

County wide

1 centre

County wide

Fish promotion and


production
improvement
programme
Narok County Integrated Development Plan (2013 -17)

Fish seed (fingerlings)


breeding centre)

County wide

Page 62

Sub-sector

Priorities

Constrains

Strategies

Programmes

Projects
Fish pond
constructions
Water bodies stocking
project
Fish feed factory

Narok County Integrated Development Plan (2013 -17)

Objectives
material can be
accessed.
To ensure adequate
fresh water supply for
aqua culture
To have a raw materials
(fish feeds) access
point

Targets

Location

4 ponds

County wide
County wide

1 factory

County wide

Page 63

LANDS, FORESTRY, WATER AND ENVIRONMENT SECTOR PROGRAMMES AND PROJECTS

Sector
Sector Vision
Sector Mission

Sector Justification

Sector Summary
Sub-sector
Land

Lands, Forestry, Environment and Water


A resource sufficient county.
1. Optimal utilization of landed resources for growth.
2. Efficient use and development of land resource for sustained productivity and
posterity.
Food sufficiency
Mitigation of effects of climate change
Provision of a clean and healthy environment
Sustained economic growth and societal well-being

Priorities
1. Security of Tenure

Programmes
1. Land information management
programme

2. Land disputes resolution programme


3. Land Tenure Security programme
2. Use optimisation and
sustainability

4. Land use optimization programme

Flagship Projects
1. Digital and topographical mapping ( whole
county)
Establishment of a county GIS platform and
lab
2. County Land information system
3. 4 Local land courts
4. Cadastral surveys
5. Land parcels registration
6. County spatial plan and
7. Special area land use plans(Mau, Mara
dispersal, Suswa)

Forestry

3. Forest cover

5. Afforestation programme

4. Forest products

6. Forest Monitoring and surveillance


programme
7. Sustainable lumbering programme

Narok County Integrated Development Plan (2013 -17)

8. 1million tree nursery seedlings and 1m


Trees planted
9. 100 forest guards engagement
10. Anti-lumbering enforcement campaign
11. 2 modern saw mills
Page 64

Sub-sector

Priorities

Water

Programmes

Flagship Projects

8. High Value Tree Planting programme

12. Plant 1million high value trees - medicinal,


fodder, timber

5. Water sources

9. Water Sources Conservation programme

6. Water channels and Riparian


areas

10. Riparian areas protection and


regeneration programme

13. Identification and delineation of water


towers and catchment areas ( Mau, Naimina
enkiyio, shartuka, oloomisimis,
enoosupukia)
14. Delineate and delimit riparian corridors and
areas
15. 1000 km of forest reserve
16. Enact and enforce antipollution legislation

11. Water Channels Conservation


programme
Environment

7. Pollution Mitigation

12. Solid Waste Management Programme

13. Sanitation Management Programme


8. Land Reclamation

14. Farm lands Restoration Programme


15. Land Reclamation Programme
16.

9. Fragile Ecosystem

17. Environmental Conservation and


Protection Programme

17. 1 Landfill and recycling plant


18. 20 dumping license permits and Waste
segregation
19. Sewage treatment plant
20. Construction of liquid waste lagoons
21. Farm rejuvenation 10,000 acres
22. 50 acres of Quarry zones reclamation
23. Disaster Management Plan
24. Rural flood control measures- Suswa,
Ololulunga
25. County Environment Conservation plan

Detailed Lands, Forestry, Water ad Environment Sector Plan


Sub-sector
Land

Priorities
Security of
Tenure

Constraints
Poor land records

Strategies
Establish digital land
information systems

Narok County Integrated Development Plan (2013 -17)

Programmes
Land information
development
programme

Projects
Develop County Land
information system

Objectives
To capture accurate data
on land and ownership

Targets
c/f LIMS
below

Location
County
Wide
Page 65

Sub-sector

Priorities

Land
Information
management
systems

Constraints
Political
interference in
land adjudication
process
Community
wrangles over
beneficiaries
Boundary
disputes
Lack of accurate
data

Lack of modern
equipment and
software

Use
optimisation
and
sustainability

Inadequate
personnel
Uncontrolled
subdivisions

Strategies
De-politicize the land
adjudication process

Programmes
Land disputes
resolution
programme

Projects
Establish local land courts

Objectives
To unlock stalled
registration processes

Hear and determine


existing land disputes

As above

As above

To pre-empt and arbitrate


ownership disputes

Boundary verification and


delimitation

Land Tenure
Undertake cadastral
Security programme surveys
Register land parcels
Land Information
Undertake Aerial survey
Systems
development
programme
As above
Prepare digital topocadastral maps
As above
Prepare elaborate LIS

Undertake digital
mapping and cadastral
survey

Acquire modern
technology and
equipment

Recruit/train qualified
GIS/LIS personnel
Regulate land
subdivision processes

As above

Acquire mobile GIS

As above

Construct and equip a GIS


lab

As above

Develop a public user


interface

As above

Recruit qualified personnel

Land use
optimization
programme

Prepare county spatial

Prepare Area land use


plans
Narok County Integrated Development Plan (2013 -17)

Targets
4

Location
Countywide

Countywide

To establish boundaries

Lump sum

Countywide

To secure ownership rights


To capture accurate raw
data

Lump sum
1

Countywide
Countywide

To process acquired data

Lump sum

Countywide

To generate an information
referral system
To assist in data capture

Countywide

1 per
constituen
cy(6)
2 Labs

Countywide

To facilitate processing,
safe storage and ease of
access of acquired data
To promote transparency
of records
To generate accurate data
and systems
To suggest a countywide
framework for effective
exploitation of land
resources
To determine minimum
land sizes and assist in

Narok,
Kilgoris
towns
Countywide

Countywide

Countywide

10

Countywide

Page 66

Sub-sector

Priorities

Constraints

Restrictive zoning
in urban areas
Urban land
speculation
Urban sprawl
Human-wildlife
interface

Nomadicpastoralism
Land mutations in
wildlife dispersal
areas

Strategies

Programmes

Promote flexible (mixuse) development


framework
Introduce disincentives to
fight speculation
Designate town limits

As above

Promote sedentary
pastoralism and modern
ranching
Control land subdivisions

Pastoralism
modernisation
programme
Dispersal Areas
protection
programme
As above

Secure dispersal areas

Projects
Prepare urban land use
plans
Prepare rezoning plans
and mix-use regulations

Expansion of
forest
coverage

As above

Town boundary
designation
Establish strategic pasture
reserves
Prepare land use plans in
areas surrounding wildlife
habitats
Buy corridors

Lack of a fences
around wildlife
habitats
Increase in wildlife
populations

Erect electric fences


around protected areas

Park protection
programme

Park and protected areas


electrical fencing

Redistribute the wildlife

Wildlife
redistribution
programme

Periodic restocking and


species redistribution
exercises

Deforestation

Encourage re-planting

Afforestation
programme

Establish tree nurseries

Encroachment

Prevent encroachment

Charcoal burning

Ban charcoal production

Narok County Integrated Development Plan (2013 -17)

Targets

Location

20

Countywide

To optimise utilisation of
urban land

20

Countywide

To assist compact
urbanisation
To ensure availability of
livestock feeds throughout
the year
To safeguard the animal
dispersal areas

Lump sum
Lump sum

Key urban
areas
Countywide

Countywide

To secure inter- habitat


wildlife passage
To expand the dispersal
area
To restrict movement of
wildlife in and out of the
park
To establish a harmonious
balance in population of
the different wildlife
species

500km

Countywide

45,000
acres
250 km

Countywide

Lump sum

Main parks

To supply trees for the


afforestation effort
To expand forest cover
To police and prevent
further encroachment

1m
seedlings
1m trees
100

Countywide

As above

Establish conservancies

Forestry

Objectives
enforcement
As above

Forest Monitoring
and surveillance
programme
As above

Tree planting campaign


Employ forest guards
As above

To preserve trees

County wide
County wide
County wide
Page 67

Sub-sector

Priorities

Constraints

Optimal
Utilization of
forest products

Indiscriminate
Lumbering

Water sources
Conservation

Protection of
water
channels and
Riparian areas

Programmes
Alternative energy
programme

Projects
Biogas adoption campaign

Objectives
To supply alternative
energy

Targets
Lump sum

Location
County wide

Sustainable
lumbering
programme

Anti-lumbering
enforcement campaign
Introduce conditional
licences
Build modern saw mill

Lump sum

County wide

Lump sum

County wide

2 saw
mills

Kilgoris &
Oloolongoi

500,000
trees
Lump sum

County wide

1 study

County wide

0.5m trees

County wide

Encourage reafforestation
Sensitize local
community on role of
forest
Expand economic value
of forest area and
products
Encourage planting highvalue trees

Re-afforestation
Re-afforestation campaign
programme
Forest Conservation Sensitization campaign
Programme
Ecosystem Value
Restitution services
e.g Carbon credit
Hign Value Tree
Planting programme

Undertake study to
establish values
Plant high value trees medicinal, fodder, timber

To arrest uncontrolled
lumbering
To enforce lumbers code
of conduct
To minimize wastage and
support organized reafforestation effort
To reclaim deforested
areas
To improve people's
perception of forest
products
To establish value of
forest area and products
and produce inventory
To optimize benefits from
forest areas and products

Encroachment
upon water towers
and sources
Inadequate
knowledge of
catchment areas

Secure water sources

Water Sources
Conservation
programme
As above

Undertake study on water


catchment areas

To identify and inventorise


water catchment areas

1 study

County wide

To provide data to aid


protection of water
catchment areas

1 database

County wide

Lack of data on
underground
water reserves
Encroachment of
riparian lands

Inventorise underground
water reserves

As above

County wide

Riparian areas
protection and
regeneration
programme

To inventorise the capacity


of underground water and
give abstraction permits
To prevent encroachment

1 database

Enforce laws to prevent


encroachment

Identification and
delineation of water
catchment areas
Undertake study on
underground water
sources
Delineate and delimit
riparian corridors and
areas

Lump sum

County wide

Lack of
appreciation on
the role of forests

Water

Strategies
Encourage use of
alternative energy
sources
Control lumbering

Delineation of water
catchment areas

Narok County Integrated Development Plan (2013 -17)

County wide

Page 68

Sub-sector

Environme
nt

Priorities

Pollution
Mitigation

Constraints

Strategies

Programmes

Projects
Plant trees along riparian
areas

Pollution of water
sources

Institute pollution control


measures

Enact and enforce


antipollution legislation

Improper
discharge of
household and
farm liquid waste
into water
channels

Regulate quality of
effluent being discharged
into water channels

Water Channels
Conservation
programme
As above

As above

As above

To preserve water quality

As above

Undertake water surface


clean-up campaign

To clean up rivers and


riparian areas

10 clean
ups

County wide

Solid Waste
Management
Programme
As above

Create a landfill

1 landfill

County wide

20 licences

County wide

As above

Waste segregation

Lump sum

County wide

As above

Construct a recycling plant

To have a designated area


for dumping and recycling
solid waste
To provide dump site
licences to specific
individuals
To foster waste
segregation and minimize
the effects of hazardous
materials being released
into the environment
To foster waste recycling
and reuse

1 plant

County wide

As above

Urban Clean Up
campaigns

To eradicate solid waste


menace

10
campaigns

Main towns

Indiscriminate
dumping of solid
wastes

Prevent waste from being


washed down the rivers

Lack of dumping
sites

Provision of designated
dumping areas

Indiscriminate
dumping

Establish waste
collection centres
Create a culture of
waste segregation

Encourage recycling,
renewing, reduce and
reuse
To sensitize people on
benefits of clean urban
Narok County Integrated Development Plan (2013 -17)

Effluent clean up
campaign

Licensing programme

Objectives
To prevent encroachment
and beautify the water
channels
To prevent pollution of
surface water and
channels
To discharge waste with
safe effluent levels into
water channels by light
industries and homes

Targets

Location
County wide

Lump sum

County wide

Lump sum

County wide

County wide

Page 69

Sub-sector

Priorities

Constraints
Sewage dumping
in rivers

Industrial fumes
being released
into the air

Strategies
areas
Operationalize liquid
waste treatment
systems

Establish a sulphur and


chloride free filtration
system in industries

Programmes

Projects

Objectives

Targets

Location

Sanitation
Management
Programme
As above

Sewage treatment plant

To clean up sewage
before discharging into
rivers
To create functioning liquid
waste lagoons

1 plant

Main towns

Lump sum

Air Pollution Control


Programme

Formulate regulations and


enforcement of filtration
mechanisms
As above

To have zero chemical


emission levels from the
industries
To reduce the number of
respiratory diseases in the
county
To renew farm lands that
are no longer productive

Lump sum

Narok,
Ololulunga
and Kilgoris
Industrial
areas

As above
Land
Reclamation

Poor farming
Techniques
Resistance from
land owners
Lack of
knowledge on
components of
pristine/ healthy
lands

Rehabilitation of
degraded farm areas and
derelict lands
Sensitize owners on
benefits of productive
lands
To restore towns and
riparian areas into
healthy sections

Construction of liquid
waste lagoons

Farm lands
Restoration
Programme
As above

Farm rejuvenation

Land Reclamation
Programme

Quarry zones reclamation

Sensitization campaign

Town Greening

Riparian reserves
reclamation
CC Adaptation

Ignorance of CC
reality

Localise MEAs

Narok County Integrated Development Plan (2013 -17)

Climate change
adaptation
Programme

Awareness creation
campaign on radio

Lump sum

County wide

Lump sum

County wide

To get cooperation from


farmers in reclaiming their
lands
To create a wildlife
sanctuary from the defunct
quarry lands

Lump sum

County wide

Lump sum

Ololulunga

To transform towns into


green areas with
accessible open public
spaces
To protect the water
bodies from further human
encroachment
To understand the effects
of anthropogenic activities
on our climate

Lump sum

Narok and
Kilgoris

Lump sum

County wide

Lump sum

County wide

Page 70

Sub-sector

Priorities

Constraints

Strategies
Cushion farmers from
adverse effects of CC

Have a disaster
preparedness plan to
forestall the effects of
weather vulgaries

Conservation
of Fragile
Ecosystem

Protection of
environmentally
significant areas

Programmes
As Above

Projects
Undertake study of local
coping mechanisms of CC

As Above

As Above

As Above

Environmental
Conservation and
Protection
Programme
As Above
As Above

Incorporate
environmental concerns
into developmental plans

Narok County Integrated Development Plan (2013 -17)

Objectives
To adopt local strategies of
coping with CC e.g. herd
reduction
To have an operational
information centre

Targets
1 Study

Location
County wide

Lump sum

County wide

Prepare a Disaster
Management Plan and
regulation

To appreciate and know


how to mitigate the various
disasters that can arise.

1 plan

County
Wide

Rural flood control


measures

To lessen the damage


caused by uncontrolled
flooding.
To capture and know the
threatened ecosystems

Lump sum

County
Wide

1 study

County wide

To domesticate the plan

1 plan

County
Wide

To conserve
environmentally significant
areas
To create awareness
about environmental
protection
To ensure safety of the
environment before any
interference is commenced

1 plan

County
Wide

Lump sum

County wide

Need by
need basis

County wide

Identification and study on


fragile ecosystems
Prepare County
Environment Action
Conservation plan
As Above

As Above

Environmental education
and awareness in schools

Environmental
Impact Assessment
and Audits
Advocacy
Programme

Conduct EIAs for any


development project

Page 71

10 TRADE AND COMMERCE SECTOR PROGRAMMES AND PROJECTS


Sector
Sector Vision
Sector Mission

Sector Justification

Trade and commerce


Global leaders in promoting trade, investment, cooperative and private sector
development.
To facilitate trade and investment by championing an enabling environment, policy
framework for domestic and export business to thrive.

Employment and income creation.


Bonding to control supply and demand.
Increase availability of goods and services.
Enhance County competitiveness and attractiveness to investment.
Enhance revenue base.

Sectory Summary
Sub-sector
Co-operatives

Priorities
1. Co-operative development
2. Credit facilities

Small Medium Enterprises and informal trade

3. Business development

Programmes
1. Cooperatives development and
support programme

2. Small market enterprise support


programme

Flagship projects
1. Farm products marketing co-operatives (milk,
potatoes, wool, livestock)
2. Establish a co-operative development fund
(1Billion)
3. Market Stalls stock sale yards (30 towns)
4. Market centres and prices information

4. Formalizing informal trade

5. Business support services

Narok County Integrated Development Plan (2013 -17)

3. Promotion of multipurpose cooperatives


4. Regulation of informal trade
5. Financing
6. Business support services program

5. Sensitization and awareness creation


6.
7.
8.
9.

Planning and land acquisition


Enterprise development fund
Establish 2 business information centre
Establishment of two business incubation centres

Page 72

Detailed Trade adn Commerce Sector Plan


Sub-sector

Priorities

Constrains

Strategies

Programmes

Co-operatives

Livestock
products
marketing

Animal feeds
and poor
marketing
systems
High interest
rates and lack
of collateral
Exploitation by
middlemen,
high cost of
inputs,
irrigation and
lack of
technology

Holding ground for


feedlots

Cooperative
support
programme

Credit facilities

Horticulture and
dairy
cooperative
societies

Small Medium
Enterprises

Market

Lack of space

Youth
enterprise

Limited
business and
entrepreneur
skills
Lack of stalls

Credit facilities

Lack of
affordable
credit
facilities&
sufficient

The county to create


revolving fund as a seed
capital
The county to create
revolving fund as a
capital and sensitize
them on
entrepreneurship and
self-employment
Capacity building,
availability &affordability
of in-puts
. County government to
identify/acquire ideal land
for the markets
Training on business and
entrepreneurship

Market
expansion
programme

Construct rental stalls


Establish credit facilities
to improve SMEs

Narok County Integrated Development Plan (2013 -17)

Small market
enterprise
support
programme

Projects

Targets 5 year
targets
40 campaigns

Location

Enhance access to
financial support

Lump sum

TBD

Improve
knowmedge and
skills on business

10 trainings

County wide

Land acquisition
and planning

Provide market and


trading areas

500 acres of Land

County wide

Business
incubation
centres

Improve knowledge
and skills on
business

Market stalls
stock sale yards
Establish
cooperatives and
credit facilities

Provide trading
spaces
Enhance access to
credit for SMEs

Sensitization and
awareness
creation project
Establish a cooperative
development fund
Training and
capacity building
programmes

Objectives
To increase
awareness and
sensitize

County Wide

Kilgoris
Narok Town

30 towns

County wide

Lumpsum

County wide

Page 73

Sub-sector

Priorities

Constrains

Strategies

Programmes

Projects

Objectives

Targets 5 year
targets

Location

one stop charges

To have one stop


shop for business
start-up processes

Narok town

Market centres
and prices
information

Have standardised
market environment
and commerce
development
Increase market
share

TBD

TBD

1 research

County wide

Enhance informal
trade

40 campaigns

County wide

Enhance informal
trade

4 institutions

TBD

Increase market
share

1 market research

TBD

Enhance informal
trade

200 acres

TBD

Support business
and expand their
scope

TBD

TBD

capital

Marketing
systems

Informal trade

Formalizing
informal trade

Excessive
middlemen

Lack of
corporate
identity

Establish & install


processing plants

Encourage traders to
form associations &
Sacco

Market research
& development
and formulation of
policy &
regulation
framework
Promotion of
Sensitization and
multipurpose co- awareness
operatives
creation

Form business producer


groups

Create an
institutional
framework (rent
and
remuneration)
Market research
on feasibility

Establish structures they


can operate from
Regulization of
informal trade
Business support
services

Credit facilities

Lack of
entrepreneursh
ip skills

The county to create an


operational and revived
joint loan board

Narok County Integrated Development Plan (2013 -17)

Business
support services
program

Planning and land


acquisition
Enterprise
development fund

Page 74

Sub-sector

Priorities

Constrains

Strategies

Programmes

Projects

Objectives

Targets 5 year
targets

Location

Provide basic
amenities

Improve sanitation
and basic amenities
Facilitate access to
information

4 toilets in each
Market
2

TBD

Improve security
and provide safe
environments to
carry out trading
activities
Provide spaces to
carry out small
scale trading
Facilitate access to
financial support
Enhance knowledge
and capacity

10 personel

TBD

200 container stalls

TBD

Lump sum

County wide

10 trainings

County wide

Enhance
accountability and
follow up
Showcase Maasai
culture

lumpsum

County wide

Narok town

Provide conference
facilities

Narok town

Showcase Maasai
culture

Narok town

framework
Business
support centredata bank

Lack of a
business
incubation
centre
Business
information
centres

Establish a data
collection & business
incubation centre
Support
infrastructure
programme

Establish
business
information centre
Security

Construction of
market stalls
Enterprise
development fund
Training and
capacity building
Monitoring and
evaluation
Service
diversification

Service
diversification
programme

Build a cultural
centre
Build an
international
conference facility
Build a town
gallery

Narok County Integrated Development Plan (2013 -17)

Narok and
Kilgoris

Page 75

Narok County Integrated Development Plan (2013 -17)

Page 76

11 TRANPORT INFRASTRUCTURE SECTOR PROGRAMMES AND PRIORITIES


Sector
Sector Vision
Sector Mission

Sector Justification

Roads
Adequate access and connectivity for better productivity, competitiveness and
liveability.
- Regional market connectivity for enhanced competitiveness.
- A quality all weather rural access network for enhanced economic productivity.
- A well planned paved multimodal urban network for enhanced urban access,
liveability and productivity.
- Strategically located all-purpose air facilities for promotion of tourism, commerce
and industry.
- Improved access to resource areas.
- Intra and Inter-linkage to markets.

Sector Summary
Sub-sector
Roads

Priorities
Improve regional connectivity and linkages

Programmes
National Highways development programme

Improve Access to Resource areas

Rural Roads development programme

Enhance rural access

Air transport facilities

Improve urban access, circulation and


mobility
Relocate all the air facilities from the Maasai
Mara

Air facilities relocation

Projects
Tarmacking of 250 km of highways and Regional roads
Upgrading of 400Km of regional roads
Tarmacking of 250Km of selected roads rural
Gravelling of 186Km of Park roads
Gravelling of 1566Km of rural roads
Construction of 60 bridges
Construction of 3000m culverts
Construction of 125Km of stock routes
Construct bus terminus and car parking in Narok and
Kilgoris
Construction of 3air facilities
Relocation of 8 airfacilities from the Maasai mara

Narok County Integrated Development Plan (2013 -17)

Page 77

Detailed Transport Infrastructure Sector Plan


Sub-sector
Roads

Priorities
Improve
regional
connectivity and
linkages

Constraints
Inadequate
funding

Local opposition to
tarmac road
development

Conservation
concerns

Fragile geological
profile
Improve Access
to Resource
areas

Inadequate
funding

Conservation
concerns

Strategies
Lobbying and
advocacy for
increase of
allocation of funds
Set in place
protection
mechanisms to
counter land
subdivision and
land sale
Sensitize
communities to see
logic of avoiding
construction of
roads through
conservation areas
Proper design of
roads
Off-road flood
control measures
Lobbying and
advocacy for
increase of
allocation of funds.
Enhancing public
private
partnerships.
Sensitize
communities to see
logic of avoiding
construction of
roads through
conservation areas

Narok County Integrated Development Plan (2013 -17)

Programmes
National Highways
development
programme

Rural Roads
development
programme

Projects
Tarmacking of
highways and
Regional roads
Upgrading of regional
roads

Objectives
Enhance regional
connectivity

Targets
250 km

Location
County wide

400Km

County wide

Tarmacking of
selected roads

Enhance
accessibility to key
resource ares

250Km

County wide

Gravelling of Park
roads

Enhance access to
the Maasai Mara

186Km

County wide

Page 78

Sub-sector

Priorities
Enhance rural
access

Improve urban
access,
circulation and
mobility

Constraints
Poor construction

Strategies
Proper tendering
and evaluation

Narrow road
reserves

Expansion of road
reserves

Inadequate funds

Increase allocation
of funds

Programmes

Projects
Gravelling of rural
roads
Construction of
bridges
Construction of
culverts
Construction of stock
routes

Urban Roads
Development
programme

Preparation of urban
roads masterplan
Expansion and
mordernisation of
urban roads
Paving of selected
urban roads
Construction of storm
water drains
Construct bus
terminus and car
parking
Enhancement of non
motorised transport

Air transport
facilities

Maintenance of
existing air
facilities
Construct allpurpose air
facilities in
strategic
locations in the

Inadequate funds
Financial
constraints

Lobbying and
advocacy for
allocation of funds
Strategic investor
PPP
Adequate
budgetary
allocation

Narok County Integrated Development Plan (2013 -17)

Air transport
Facilities
Development

Maintenance of
existing air facilities
Preparation of air
transport master plan

Objectives
Anhance access to
farms, markets and
other rural areas
Enhance reliable
transportation
Improve road
quality and safety
Facilitate the
movement of
livestock.
Provide roadmap
and blueprint for
urban infrastructure
development
Enhance access
and circulation

Targets
1566Km

Location
County wide

60

County wide

3000m

County wide

125Km

County wide

County

Narok, Kilgoris

Improve quality of
urban roads
Improve stormwater
drainage
Enhance local and
regional mobility

63Km

Narok and
Kilgoris
Narok

Improve roadsafety
for non motorised
road users
Improve air
transport services

Narok, Kilgoris
Narok
5

Guide the
1
development and
imrpovement
airtransport facilities

County wide
Cuounty

Page 79

Sub-sector

Priorities
county

Constraints

Strategies

Land for
construction of the
facilities

Early planning and


acquisition of land

Programmes

Projects

Objectives

Targets

Location

Acquisition of land for


construction of air
facilities

1200(Ha)

County wide

County

Construction of air
facilities

Increase number
and expand
purpose of air
facilities
Standard
airfacilities
Expand purpose of
air facilities

County wide

Relocation of
airfacilities from the
maasai mara

Enhance economic
sustainability in the
county

Mara outskirts

Roads management
committee

Oversee the
management and
maintenance of
transport
infrastructure
Facilitate
maintenance of
transport
infrastructure
To track the state of
roads.
Effective transport
infrastructure
management

10

Sub counties

Design of airfacilities
Relocate all the
air facilities from
the Maasai
Mara

Opposition from
Incentive and
major stakeholders disincentive
programmes
Cost of relocation

Link air facilities


to existing and
new access
roads

Poor quality of
roads
Inadequate funds

Transport
Revitalise
infrastructure infrastructure
management management

Air facilities
relocation

Lobbying and
advocacy for
allocation of funds
Tarmacking and
gravelling of trunk
and rural roads

Limited funding to
transport
management
function

Adequate
budgetary
allocations
Increased
allocation of
funding to transport
management

Lack of
maintenance
equipment.

Purchase
maintenance
equipment

Transport
infrastructure
management
programme

Maintenance
equipment
Monitoring and
evaluation
Policy formulation

Narok County Integrated Development Plan (2013 -17)

Assorted
equipment
1 in a quarter
1 policy

Narok

Page 80

12 WILDLIFE, HERITAGE AND TOURISM SECTOR


Sector
Sector Vision
Sector Mission

Tourism
The premier tourism destination in Africa.
To develop and promote unique and diverse tourism products within a sustainable framework.
1. Revenue generation for the county.
2. Recreation.
3. Conservation of biodiversity.
Sector Justification
4. Preserves heritage.
5. Creates employment through craft industries.
6. For Economic diversification.
Wildlife, Heritage and Tourism Sector summary
Sub-sector
Nature based tourism

Priorities
1. Wildlife management/protection

Programmes
1. Wildlife protection programme

2. Human-wildlife interface

3. Diversification of products/places

4. Conservation Sensitization

Narok County Integrated Development Plan (2013 -17)

2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.

Infrastructure improvement programme


Wildlife corridor programme
Revenue collection sustainance
Specialised training programme
Research programme
Pastoralism modernisation programme
Dispersal Areas protection programme
Wildlife redistribution programme
Diversification programme
Marketing programme
Maasai branding programme
Community sensitization programme
Climate change adaptation programme

Flagship Projects
1. Anti-poaching
2. Semi-Autonomous Management Agency
3. Park infrastructure development
4. Land Buying/Leasing
5. Park rates review
6. Targeted training to locals
7. Conservation linked research
8. Establish strategic pasture reserves
9. land use plans
10. Periodic restocking and species redistribution
11. New low & high end tourism products
12. Targeted marketing
13. Maasai brand patenting
14. Aggressive campaigns
15. Climate change awareness and adaptation

Page 81

Cultural tourism
Community-based
conservancies
Conference tourisms

5. Develop golf courses


6. Develop cultural centres
7. Streamlining conservancies
legislation
8. Introduction of conference
tourisms

15. Golf course development programme


16. Cultural centres programme
17. Community-based conservancies programme

16. Golf courses


17. Cultural centres
18. Conservancies legislation

18. Conference tourism programme

19. conference tourism facilities

Detailed Heritage, Wildlife and Tourism Sector Plan


Sub-sector
Nature based
tourism

Priorities
Wildlife
management/pro
tection

Constrains
Insecurity/Poaching

Strategies
Use of technology in
overall management
of nature based
tourism

Lack/poor Infrastructure Improve infrastructure

Programmes
Wildlife
protection
programme

Infrastructure
improvement
programme

Projects
Anti-poaching
Establish
management
agency
Park roads,
Communication
boosters,

Encroachment of
wildlife corridors

Reclaim/acquire
wildlife corridors
Reduce seasonal
fluctuations in visitor
numbers through
price/product
initiatives

Shortage of local
trained/professional

Specialised training in
the industry

Narok County Integrated Development Plan (2013 -17)

Objectives
To reduce poaching and
effectively manage wildlife
resources
As above

Targets
250 officers

To improve accessibility,
communication, and
connectivity
As above

100km park roads

Location
Wild life
inhabited
areas

1 semi-autonomous
agency

Establish
communication
mast/boosters
through PPP
5 boreholes

Wildlife
inhabited
areas
Within and
around
Maasai
Mara
Along
wildlife
corridors
Entire
county

Drilling water
boreholes

As above

Wildlife
corridor
programme
Revenue
collection
sustenance

Buy/Lease

To increase wildlife
dispersal area

1000 acres

Charged rates
modification

To ensure constant
availability of cash
regardless of seasons

Packaging rates
according to
seasons

Maasai
Mara

Specialised
training

Targeted
training to locals

To incorporate locals in the


sector economy

1000 persons

Entire
county
Page 82

Sub-sector

Priorities

Diversification of
products/places

Constrains
Personnel

Strategies

Programmes
programme

Projects

Objectives

Targets

Location

Lack of awareness on
conservation related
issues

Generation of new
conservation
knowledge through
research
Developing both high
and low end naturetourism (birds
watching, recreation
facilities, quality of
facilities,

Research
programme

Conservation
linked research

To effectively manage
tourism industry

1 research
consortium

Entire
county

Diversification
programme

Introducing new
low and high
end tourism
products

To increase and diversity


industry potential

3 new products

Entire
county

Promoting ecosystem
as filming destination

Marketing
programme

Targeted
marketing

As above

Entire
county

Strengthening Maasai
branding

Maasai
branding
programme
Tourism circuit
programme

Brand Maasai

As above

1
campaign/marketin
g initiative
Patenting maa
artifacts

Tourism circuit

As above

3 new tourist sites

Entire
county
Entire
county

Lack of resources to
procure new
sites/places and
products

Open up tourism
circuit (Mau, Suswa,
Narok )
Sensitization on
the importance of
conservation and
the impact of
human activities
on the
ecosystem

Human wildlife conflict

Sustain awareness
campaigns

Community
sensitization
programme

Aggressive
campaigns

To ensure
preservation/protection of
wildlife heritage by

1 sustained
campaign

Environmental factors

Sensitize the locals in


climate change
adaptation measures

Climate
change
adaptation
programme

Climate change
awareness and
adaptation

As above

1 Climate change
initiative

Narok County Integrated Development Plan (2013 -17)

Entire
county

Page 83

Sub-sector
Sports
tourism

Priorities
High altitude
training facilities

Constrains
Lack of Sports facilities

Strategies
Nurture talent through
targeted training

Programmes
Talent
development
programme

Projects
Construct a
youth training
facility

Objectives
To exploit youths potential

Targets
1 training facility

Location
A high
altitude
area within
the county

Develop golf
courses

It is a high end
recreation initiative

Establishing new golf


course

A new golf course

Mau forest

Develop cultural
centres

Exploitation of Maa
culture

To maximise revenue
proceed from the cultural
sector

2 cultural centre

Narok town
Suswa

Communitybased
conservancie
s

Streamlining
conservancies
legislation

Lack of guidelines in
the management of the
conservancies

Communitybased
conservancies
programme

Enact legislation

To enact and enforce a


legislation framework on
conservancies

Conservancies
legislation
streamlining

County
wide

Conference
tourisms

Introduction of
conference
tourisms

Lack of facilities and


poor infrastructure

Establishing cultural
centres in the county
Organizing local and
international tradefares and exhibitions
Develop legislation to
recognize and
regulate their
operations and
functions of
conservancies
Establish
high end
conference
tourism

Construct a golf
course in Mau
forest
Construct
cultural centres

To open up new untapped


tourism potentials

Cultural
tourism

Development
golf course
programme
Cultural
centres
programme

Conference
tourism
programme

Construct
conference
tourism

To exploit this type of


tourism

3 conference
tourism

Entire
County

13 SAFETY AND SECURITY


Sector
Safety and security.
Sector vision
A secure and safe county.
Sector mission
To promote diversity, interactive and peaceful co-existence.
Sector justification - Saving lives and property
- Preventing disruption of economic activities
- Disaster risk reduction
- Protects our environment

Narok County Integrated Development Plan (2013 -17)

Page 84

Sector summary
Sub-sector

Priorities

1. Disaster preparedness and


management

Programmes

Flagship Projects

1. Disaster risk reduction

1. Disaster preparedness, response and


management programme

2. Environmental Protection

2. Environmental protection programme

1. Develop an integrated disaster early warning


system
2. County and sub county multi-sectoral Disaster
response teams
3. Monitoring and enforcement unit

2. Firefighting equipment

3. Fire prevention and


response

3. fire prevention and response programme

4. 2 Major Fire stations and 5 minor stations

3. Occupation Safety and


Health
4. Policing

4. Occupational hazards

4. OSH enforcement programme

5. OSH watchdog unit

5. law and order enforcement

5. service improvement programme

6. Recruit 500police officers


7. 300M police housing fund
8. Purchase 30 patrol vehicles

6.

5. Flood protection
6. Peace building

community policing

7. Tourist Safety and


security
8. flood control
9. Social Cohesion

6. Expansion of police services

9. 12 police station

7. Community policing programme

10. 30 community police posts

8. Tourist surveillance programme

11. Tourist police unit

9. flood control and mitigation programme

12. 4 Check dams

10. Sensitization programme

13. 50Km of Gabions


14. Campaigns on peace building(10)

11. Dispute resolution and reconciliation


programme
12. Human wildlife co-existence programme

10. human wildlife coexistence

15. Multi-sectoral arbitration committee


16. Compensation fund

Detailed Sector Plan

Sub-sector

Priorities

Constrains

Strategies

Narok County Integrated Development Plan (2013 -17)

Programmes Projects

Objectives

Targets

Location
Page 85

Sub-sector

Priorities

Constrains

Strategies

Programmes Projects

Objectives

Targets

Location

Disaster
preparedness
and
management

Saving lives and


property

Lack of early warning


system

Develop a proper
warning signals

Recruite skilled
manpower

To prevent disaster

30

Sub counties

Poor response
mechanism

Build capacity
(equipments and
manpower)

Disaster
management
programme
Disaster
management
programme

Recruite skilled
manpower

establish skilled
manpower for
disaster response

30

ward

Purchase ambulance Ensure proper


equipment and
resources
Purchase mobile
clinics
Promotion of general Recovery from loss
insuarance cover
through disaster
,through media

County wide

60

County wide

To create team
work in efforts
towards risk
deduction and
preparedness
Prevent disaster
from existing
development

Countywide

60

wards

To penalise
environmentatal
offenders

60

wards

Spread of fire
through buildings

countywise

Fire fighting
equipment

Lack of preparedness

Effective
dissemination of
information and e.g
evacuation

Awareness
creation of
insuarance

Disaster risk
reduction

Lack of coordinated
harmonised action
plan on disaster risk
reduction

Disaster
preparedness
programme

Build a team from all


sectors

Environmental
Protection

Lack of environmental
protection framework

Establish a team of
disaster management
and preparedness
drawn from all
sectors
Awareness of
environmental
protection framework

Environmental
protection
programme

inspection and
controlenvironmental
i mpact on all
development

Weak enforcement
arm on environmental
offences

Strengthen
enforcement and
regulation

weak enforcement
building codes

Fire prevention
strategy

Environmental
Audit and
monitoring
programme
Sensitization
programme on
fire prevention

Carry out an
environmental audit
on all development
project
Awereness
campaign on use of
building desighn and
constructionpractices

Fire prevention

Narok County Integrated Development Plan (2013 -17)

Page 86

Sub-sector

Priorities

Prompt fire Fighting

Policing

Maintain law and


order

Constrains

Strategies

Weak enforcement of
Occupation health and
safety regulations

Strengthen
enforcement arm of
ministry of labour

OSH
watchdog
enforcement
programme

Lack of fully equipped


fire station

Establish a reliable
fire station

Build capacity
for fire fighting
programme

Limited skills and


capacities

Recruit qualified fire


men

Inadequate staffing

recruit and facilitate

Inadequate Equipment
and police station

Purchase police
equipment

Stigma towards police


force

Build capacity
for fire fighting
programme
Police
recruitment
programme

for fire
prevention(media)
Awereness
campaign on
compliance of
Occupation health
and safety
regulations for fire
prevention(media)
Develop a fullyfledged fire station in
major urban areas
Purchase of fire
engines
Skilled and adequate
manpower to fight
fire
Recruit police

Police
equipment
programme
Expansion of
police services

Purchase Police
equipment
(land rovers)
Erect new police
post

Awareness creation

Community
policy
programme

Campaigns e.g. toa


habari kwa police

Enhance cooperation
between private
security firms and

Policing agent
coordination
programme

Stakeholders forum
and workshops

Establish well
distributed police
service
Enhance
community policing

Programmes Projects

Narok County Integrated Development Plan (2013 -17)

Objectives

Targets

Location

Minimise incident of
fire through human
error

countywise

To enhance quick
response of fire
break out
To equip the team
for fire fighting
To build manpower

Kilgoris,narok,lolgorian

Countywise

30

All Wards

To increase
Number of police to
serve the raising
population
To facilitate police
to maintain law and
order
To bring the police
service close to
people

1000

County ward

30

All Wards

30

All Wards

Create
cohesiveness
between police and
community
To build
coordinated public
and private policing

60

County wide

Countywide

Page 87

Sub-sector

Priorities

Constrains

Strategies

Programmes Projects

public police force

Safety and security


of tourist

Check dams

Prevention and
mitigation of
flooding

Ensure well lighted


towns and villages

Street lighting
programme

Increased crime
targeting tourists

Ensure safety and


security to tourist

Tourist
surveillance
programme

Destruction of land
cover upstream could
lead to
siltation/destruction of
check dams
Peace
building

Cohesion of the
diverse community

Cattle rustling

Land disputes

Acquisition or land
banking of land

Targets

Location

To enhance
security

TBD

All Wards

To affirm security
and safety to the
tourist
To monitor
movement of tourist

30M

Tourist destinations

10M

Tourist destinations

Provision of
suitable lands

500acres
150M

force 1

Inadequate lighting
facilitating crime

Lack of space for


construction

Objectives

land banking
programme

Install street lighting


and flood light in
dark spots
Establish tourist
police unit (3)
Installation of
surveillance
equipment
Purchase of land

Environmental
protection

Recruit extension
officers(30)

To mitigate against
flooding

30 (10M)
per yr

Initiate peace
initiatives

Sensitization
programme

Campaigns on
peace building(3)

3M

Customary
alternative dispute
resolution
mechanism,
penalising and
compensation as in
Maasai culture
Reconciliation of land
ownership

Dispute
resolution and
reconsiliation
programme

Enforcement of
statutory law

To enhance
cohesion of diverse
community
To enhance dispute
resolution and
enforcement

Land
ownership
reconsiliation
programme
Land

Establish genuine
owners of the land in
the ministry of land
records
land adjudication

To resolve conflict
on multiple
ownership of land
parcels
To fast track the

3M

Mitigate against
flooding

Fast tracked
Narok County Integrated Development Plan (2013 -17)

TBD

3M
Page 88

Sub-sector

Priorities

Constrains

Displacements and
relocation from forests

Resource Based
Conflict resolution

Strategies

Programmes Projects

Objectives

adjudication of land
and issuance of
tenure documents

adjudication
and
registration
programme
resettlement
programme

and registration

issuance of land
titles

Resettlement of
displaced persons

TBD

Local mechanisms
for compensation

Compensation
programme

IDP Compensation
frame work

Scarcity of water and


pasture for the
pastoralist

Resource
based Conflict
resolution
programme

3 Campaign and
sensitization

To ensure
conservation of
resources and
livelihoods of the
affected persons
To conserve
livelihood of the
project affected
persons
To enhance
cohesion and
harmony in sharing
resources
To increase
watering point in
order to reduce
competition
To curb human
encroachment

To deliver justice to
the victims of
wildlife

TBD

To protect people
from wildlife

TBD(KWS)

Develop a clear
Formal resettlement
plan

Drilling of borehole
at intervals (10)

Co-existence
human wildlife

Human wildlife conflict

Animal encroachment

Establish a
framework that
encourages coexistence of wildlife
and community

Erect physical barrier


to catel the
movement of animals
to the community
land

Narok County Integrated Development Plan (2013 -17)

Human wildlife
co-existence
programme

Electrical
fence
programme

Enforcement of
wildlife policy and
regulation
Establish a
Compensation
framework for the
victims of wildlife
attack
Erect electric fence
between game
reserve and
community land

Targets

Location

TBD

3M

15M

Countywide

TBD

Page 89

Sub-sector

Priorities

Constrains

Strategies

Programmes Projects

Objectives

Targets

Location

Human encroachment

Curb Human
encroachment on
game reserves

Conservancy
enhancement
programme

6M

Countywide

Negative political
influence

Awareness and
sensitization

Education and
sensitatization
programme

To enable the
villagers defend
tourist as an
enterprise
To create
understanding of
the benefits of
wildlife conservation

Narok County Integrated Development Plan (2013 -17)

Establish and
strengthening the
existing
conservancies
Campaigns 3

3M

Page 90

You might also like