08/10/14

Scheme of works
Start Date: 11/10/14
Completion date: 30/10/14
Contingency week: 30-37/10/14

Payment structure:
Payment will be undertaken in three stages:
5000 will be delivered up front to Birchgrove Design prior to the project getting underway.
An additional 5000 will be required partway through the projects completion to fund
additional material costs. 2 working days notice will be given prior to needing this additional
amount.
After completion of the project on 30/10/14 an invoice will be presented. The remainder of
the payment will be due within 7 days of this final invoice.
This final amount will be between: 16,500.00 and 19,371.00
The above price guide will not be subject to change unless an item is brought to the
attention of the client and agreed in writing. If such a change does affect the completed
price the signed document of change is to be presented along with the invoice for the
project on completion.
The contingency week is in place in case we cannot secure materials (all currently available
on 10/10/14) in time to build certain aspects of the design.
This contingency is also in place in case of the project overrunning due to unforeseen
problems or developments whilst construction is underway.

Scheme of works day by day schedule


Saturday 11th October___________________________________________________________
Objectives:
1.
2.
3.
4.
5.

Pot all existing planting and prepare site for work to commence.
Plot out site areas, including levels.
Dig all foundations required across site
Take up lawn and patio, store lawn on pallet and drive slabs to Yard and list on eBay
Remove ivy from the 3 pine trees on trunk and by root at the base.

08/10/14

Tools/materials required:

Setting out builders line and stakes


General hand tools
Spirit levels
Selection of large plant pots
Palate for turf
Ladder
Harness & rope
Ivy scraping tools
Wheel barrows
Rubble sacks for unwanted plants
3.5 tonne trailer with palate

Monday 13th October ____________________________________________________________


Objectives:
1.
2.
3.
4.

Add and compact type 1 in foundations at depth required on construction plan


Pour concrete into foundations and smooth off, ready for building retaining walls on.
Line edge of the breedon gravel pathway with plastic edging and concrete in place.
Add concrete shuttering edging for reinforcement behind retaining walls

Need:

Cement mixer (hire/Ric)


Transformer and extension leads
builders trowels
spirit levels
2 tonnes type 1
2 tonne ballast
Cement bags

08/10/14

Tuesday 14th, Wednesday 15th , Thursday 16th and Friday 17th _________
Objectives:
1.
2.
3.
4.
5.
6.

Paving to arrive and be laid


Install paved step
Build up facing brick and stone against concrete retaining walls.
Complete main and secondary retaining walls
Install steel obelisks
Add conduit with string

Need:

Cement mixer
builders trowels
spirit levels
paving layout plan
paving slabs (m)
bricks (4 to 1 mix)
stack stone bricks

Monday 18th Oct__________________________________________________________________


Objectives:
7. Make up garden levels with topsoil and compact topsoil
8. Lay turf down on lawn area
9. Add topsoil to raised beds

Need:

Shovels
Wheelbarrows
Wacker plate
Tamper

08/10/14

Tuesday 19th Oct _________________________________________________________________


Objectives:
1. Build compost heaps and pile into ground.
2. Set out water feature ready for construction
3. Build stone basin ready for water feature with slabs

Need:

Shovels
Wheelbarrows
Wacker plate
Tamper
Water feature parts
Wood and wire for compost heaps
Drill
Stone for hopper (already on site)

Thursday 21st Oct________________________________________________________________


Objectives:
1.
2.
3.
4.
5.
6.

Start building water feature


Create basin for end of water feature and seal it
Install pump and lighting for water feature
Build and waterproof sandstone block top part of water feature
Add capping to water feature
Build summerhouse

Need:

All materials for water feature (already on site)


Concrete small bags of ballast and cement
Rill piece
Water blade piece
Water feature pump
Water feature blockwork

08/10/14

Friday 22nd Oct____________________________________________________________________


Objectives:
1. Finish off water feature and test pump and ensure all is set, working, and not leaking.
2. Finish Breedon gravel pathway and compact pathway ready for use.

Need:

Small bags of sand and cement possibly?


Spirit levels
Wacker plate
Tamper

Monday 25th Oct _________________________________________________________________


Objectives:
7.
8.
9.
10.

Transport and build pergola


Install concrete pergola foundations
Set pergola on concrete foundations with steel
Wire and eye up pergola for climbers

Need:
Ready cut and planed parts of pergola

Tuesday 26th Oct__________________________________________________________________


Objectives:
1. Install oak gate in frame and add latch
2. Paint and install sculpture in garden

Need:

Drill and carpentry tools


Plane
Beeswax wood finishing wax

08/10/14

Thursday 28th & Friday 29th Oct________________________________________________


Objectives:
1. Complete planting of whole garden
2. Sort out any problems with previous work.
3. Electrician hook up 240V

Need:

All planting for whole garden delivered

Saturday 30th October ___________________________________________________________


Objectives:
1.
2.
3.
4.
5.

Make sure everything works


Tidy-up and clean up garden
Take tools home
Sign off job
Arrange date to revisit and ensure everything is working as agreed.