LARSEN & TOUBRO LTD.

- ECC DIVISION
CUBE TESTING REPORT AT SITE
Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing and Commissioning Successfully,01 yr. DLP
Water Pumping Station and Raw Water Twin Main."

PROJECT :
OWNER :

DELHI JAL BOARD

JOB NO :

SL No.

Date of
casting

Item of work
Location

Mix

Identificat
ion marks
of cube

Sample filled in the presence of


Sign.of JE

FOR L&T

Sign.of AE/EE Sign. Contrator.

Date of
testing

Size of
cube
(mm)

Weight
of cube

Load
(KN)

Compressive
strength of
indivisual cube

Average
compressive
strength

N/Sq.mm.

N/Sq.mm.

UBRO LTD. - ECC DIVISION

REPORT NO:

TING REPORT AT SITE

DATE:

ting, Testing and Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works, Raw

Acceptability

Sample filled in the presence of


Sign.of JE

Sign.of AE/EE

Remarks

Sign. Contrator.

For DJB

LTCG/DWSS/FM-15

LARSEN & TOUBRO LTD

Rep No.

CONCRETE POUR CARD


PROJECT:

Date

Waste Water Recycle at the President's Estate: 2MLD Sewage Treatment Plant.

OWNER:

President Secretariat

Name of Structure:

Grade of Concrete

Drawing No.

Qty. (M3)

Location

Slump
ITEM Description

S.No.
1

Method statement approved

Batching plant/mixers in working order / RMC Plant

Standby Batcher in working condition

Water, coarse aggegrate, cement, sand, admixture stock approved

Water, coarse aggegrate, cement, sand, admixture stock sufficient

Concrete conveying arrangement available in working condition

Form work Checked

Reinforcement Checked

Concrete gang present: including carpenter, steel fixer, mechanics and


electricians.

10

Access provided

11

Safety arrangements

12

Area Lighting

13

Communication between various points provided

14

YES /NO

Remarks

Arrangements for suspension stoppage of concrete provided

15

Curing arrangement made

16

Laboratory notified
Cement Qty.(Bags)

FOR L&T

For CPWD
LTCG/PE/FM-03

LARSEN & TOUBRO LTD. - ECC DIVISION


BAR BENDING SCHEDULE

REPORT NO:
DATE:

PROJECT :

Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing and
Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works, Raw
Water Pumping Station and Raw Water Twin Main."

OWNER :

DELHI JAL BOARD

Name of Unit:
DRG NO.:
MEMBER

BAR NO.

DIA OF BARS

NO. PER
MEMBER

NO. OF
MEMBER

TOTAL NO. OF
BARS

CUTTING
LENGTH

TOTAL LENGTH

FOR L&T

SHAPES

FOR DJB
LTCD/DWSS/FM-21

LARSEN & TOUBRO LTD. - ECC DIVISION

Rep No:

GEOTECHNICAL SURVEY AND SOIL INVESTIGATION

DATE:

PROJECT : Package 1A "Design Construction, Supply, Installation, Laying & Jointing,


Testing and Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD
Intake Works, Raw Water Pumping Station and Raw Water Twin Main."

OWNER :

DELHI JAL BOARD

JOB NO :

Tested by:

Location of sample :

Approved by:
Sulphite

SL.NO.

Trial pit/Borehole No.

Depth (m)

Sulphate

Chloride

PH Value

Remarks
%

ppm

ppm

ppm

LTCD/DWSS/FM-24

LARSEN & TOUBRO LTD. - ECC DIVISION

REPORT NO:

PILING REPORT

DATE:

Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing and
Project: Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works, Raw Water
Pumping Station and Raw Water Twin Main."
OWNER:DELHI JAL BOARD
JOB NO :
Transmission Main No.
TP No.

Spread No.

To

TP No.

Description

SL No.

PILE NO.

N. GROUND LEVEL

CUT OF LEVEL

TIP LEVEL

BORING START (IN HOURS)

BORING COMPLETION

FLUSHING START TIME

FLUSHING COMPLETION TIME

BORE DEPTH

10

PILE LENGTH

11

CONCRETE START TIME

12

CONCRETE COMPLETED TIME

CONCRETE :

GRADE

SLUMP

CUBES TAKEN

THEORITICAL QTY.

ACTUAL QTY.
REINFORCEMENT :
Main Bar

Dia in mm

Length in Mtr.

No.

Lap

Dia in mm

Length in Mtr.

No.

Spacer ring

Dia in mm

Length in Mtr.

No.

Spiral/helical

Dia in mm

Length in Mtr.

No.

Lap

Dia in mm

Length in Mtr.

No.

ABSTRACT

FOR L&T

For DJB
LTCD/DWSS/FM-33

LARSEN & TOUBRO LTD. - ECC DIVISION


SIEVE ANALYSIS FOR STONE AGGREGATES

REPORT NO:
DATE:

PROJECT :

Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing and
Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works, Raw Water
Pumping Station and Raw Water Twin Main."

OWNER :

:DELHI JAL BOARD

JOB NO :
Contractor :

Date of Sampling:

Location/Work area:

Sampled by:

Date of testing:

Weight of sample:

IS SIEVE SIZE

WEIGHT
RETAINED (Gms)

Cuml Weight
retained(Gms)

% Cuml Weight
retained(Gms)

% Passing

Passing % Limit

40 MM

100

20 MM

85-100

12.5 MM

Remarks

100

10 MM

0-20

85-100

4.75 MM

0-5

0-20

2.36 MM

0-5

Pan

RESULTS :

FOR L&T

For DJB
LTCD/DWSS/FM-38

LARSEN & TOUBRO LTD. - ECC DIVISIONREPORT NO:

PROJECT :
OWNER :

SIEVE ANALYSIS OF SAND/ FINE AGGREGATES DATE:


Package 1A "Design Construction, Supply, Installation, Laying &
Jointing, Testing and Commissioning Successfully,01 yr. DLP And
05 yr. O&M of 55MGD Intake Works, Raw Water Pumping Station and
Raw Water Twin Main."
:DELHI JAL BOARD

JOB NO :
Contractor :

Date of Sampling:

Location/Work area:

Sampled by:

Date of testing:
IS SIEVE SIZE

Weight of sample:
WEIGHT
RETAINED
(Gms)

Cuml Weight
retained(Gms)

% Cuml Weight
retained(Gms)

% Passing

Passing % Limit

10 mm

100

4.75 mm

90-100

2.36 mm

75-100

1.18 mm

55-90

600 micron

35-59

300 micron

8-30

150 micron

0-10

Pan

FM

FOR L&T

For DJB
LTCD/DWSS/FM-40

LARSEN & TOUBRO LTD. - ECC DIVISION Rep No.


POST CONCRETE CHECK LIST
PROJECT:

Package 1A "Design Construction, Supply, Installation, Laying &


Jointing, Testing and Commissioning Successfully,01 yr. DLP And 05
yr. O&M of 55MGD Intake Works, Raw Water Pumping Station and Raw
Water Twin Main."

OWNER:

DELHI JAL BOARD

Name of Building:
Concrete Element & Location:
Approved Drawing No.:
Y= Yes, N=No and NA= Not Applicable
S.No.

Date

Name of Activities

1
2
3
4
5
6

Concrete started on
Concrete completed on
Curing satisfactory
Cube strength (------- days)
Concrete surface condition
Any repairing required

Remarks for Rectification by ENGINEER-INCHARGE


Concrete Quality Acceptable:Yes/No

FOR L&T

Inspection Required on:


Date:
Inspection Request on:
Date:
Contractor's Engineer

Time:
Time:
Engineer in
charge/Authorized
person

For DJB
LTCD/DWSS/FM-54

LARSEN & TOUBRO LIMITED ECCD


ADJUSTMENT OF MOISTURE CONTENT FOR GRADE M-

Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing and Commissioning Success
PROJECT :
Raw Water Pumping Station and Raw Water Twin Main."

Mix Proportions:
For 1 M
(a.)
(b.)
(c.)
(d.)

Water
Cement
Sand...
Coarse aggregate

1. Free moisture present in Sand %


2. Water absorption of coarse aggregate %
3. Extra water added for absorption in case of coarse aggregate:
4. Water deduted for free surface moisture present in sand:
5. Actual Qty of water after correction:
6. Actual Qty of Sand:
7. Actual Qty of Coarse aggregate:% of 10mm
% of 20mm

Ltr./M
Kg./M
Kg./M
Kg./M

%
%
Kg. x
Kg. x
Liters.
Kg.+

Moisture% in sand
+Qty. of col.3
+Qty. of col.4

Kg.
Kg.

-Absorption
-Absorption

Kg./M
Kg./M
Kg./M
Kg./M
Liters/M
Kg./M

10mm
20mm

Actual Quanties requied for...Kg. Cement after adjustment of moisture


1. Cement
2. Sand
3. Coarse aggregate
4. Water
5. Admixture

DJB

BRO LIMITED ECCD


RE CONTENT FOR GRADE M-

Rep No. :
Dt.

inting, Testing and Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works,

Moisture% in sand
+Qty. of col.3
+Qty. of col.4
-Absorption
-Absorption

-Qty. of col.4

(=) (=) -

Liters.
Liters.
Liters.
Kg.

=(+)
=(-)
(=)
(=)
(=)
(=)

Kg.
Kg.

L&T
L&T/DJB/DWSS/FM/

LARSEN & TOUBRO LTD. - ECC DIVISION


Test for Bulking of Sand
PROJECT :

Package 1A "Design Construction, Supply, Installation, Laying & Join


Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake
Pumping Station and Raw Water Twin Main."

OWNER :

DELHI JAL BOARD


Sampled by

Location of sample :

Sl No.

Date of testing

Initial height of sand

Final height of sand

Bulking % of
sand

1
2
3
4
5
6
7
8
9
10
11
12

DJB
L&T/DJB/DWSS/FM/

C DIVISION

Rep No:

DATE:

llation, Laying & Jointing, Testing and


r. O&M of 55MGD Intake Works, Raw Water

DJB/DWSS/FM/

Sample filled in the presence of


Sign.of JE

L&T

Sign.of AE/EE

Sign. Contrator.

LARSEN & TOUBRO LTD. - ECC DIVISION


Test for Bulking of Sand
PROJECT :

Package 1A "Design Construction, Supply, Installation, Laying &


Jointing, Testing and Commissioning Successfully,01 yr. DLP And 05 yr.
O&M of 55MGD Intake Works, Raw Water Pumping Station and Raw Water Twin
Main."

OWNER :

DELHI JAL BOARD

Sampled by

Sourc

Sl No.

Result

Determination

Volume of silt Above sand layer (ml)

Volume of sand Above silt layer (ml)

Percentage of silt (Silt in ml/Sand in ml)x100

DJB

L&T

L&T/DJB/DWSS/FM/

Test accepted/ rejected as per IS code :383-1970/CPWD Specification

Rep No:
DATE:

n, Laying &
yr. DLP And 05 yr.
and Raw Water Twin

Sampled by

Result

L&T/DJB/DWSS/FM/

LARSEN & TOUBRO LIMITED - ECC DIVISION


Field Density Test By Core cutter Method
PROJECT:- Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing and
Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works, Raw Water
Pumping Station and Raw Water Twin Main."

CLIENT :-

Delhi Jal Board

REFERENCE DOCUMENT:-

IS 2720,Part-29

Source of material
Location
Volume of core (V)

Max. Dry Density ( Ymdd)

gm/cc

Optimum Moisture Content

CC

Date :-

Representating test strech


Test pit Location

FIELD DENSITY
Wt. of core + soil sample(W1)

(gm)

Wt. of core ( W2)

(gm)

Wt. of soil sample in core W3=W1-W2

(gm)

wet density of material in the core Yb=(W3/V)

(gm/cc)

MOISTURE CONTENT
Moisture content by Rapid Moisture meter(%)

RESULTS
Field dry density Yd=100x {Yb/(100+w)}

(gm/cc)

Percentage of compaction obtained=(100xYd/Ymdd)

% compaction required as per specification

REMARKS

Pass/ Fail
FM/LT/
FOR DJB

FOR L&T

LARSEN & TOUBRO LTD. - ECC DIVISION


AGGREGATE IMPACT TEST
PROJECT :

Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing


Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works, Raw Wa
Pumping Station and Raw Water Twin Main."

OWNER :
Sorce
Material

Coarse aggregate (.mm)

Sampled by

SL No.

Sample taken from :

Weight of aggregate smple filiing in the metal measur, (gms)

Weight of aggregate passing on 2.36 mm sieve (W1)

Weight of aggregate retained on 2.36 mm sieve (W2)

Aggregate Impact value % (W1/W2)x10

RESULT: The impact value of sample is ..%.


Aggregate impact values
1. < 10%
2. 10% - 20%
3. 20% - 30%
4. > 35%
Test: as per IS 2386-Part-4
Remarks Aggregate confirmed/ not confirmed to IS code :383-1970/CPWD Specification

FOR DJB

Rep No:
DATE:

ying & Jointing, Testing and


5MGD Intake Works, Raw Water

Remarks

Aggregate
cylindrical
measuring
internal dia.
7.5 cm and
depth 5 cm

Remarks
Very Strong
Strong
Satisfactory
Weak

FOR L&T
L&T/DJB/DWSS/FM/

LARSEN & TOUBRO LIMITED


SLUMP TEST
Project

Report N

Date:
Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of
SCADA system at Bhagirathi WTP & Distribution Area.
Grade of Concrete

SL.No.

Date of Item of work


testing and Location

For DJB

Vibrator
used
(Yes/No)

Qty. of water
added per bag of
cement (Ltrs)

Height of
speciment after
removal of Mould

slump
(mm)

Acceptability
of result or
action taken

Sample filled in the presence of


Sign.of JE

Sign.of AE/EE

For L&T
L&T/DJB/BWTP/FM/

Sign. Contrator.

LARSEN & TOUBRO LTD. - ECC DIVISION


DETERMINATION OF SPECIFIC GRAVITY
IS: 2386 Part-3
PROJECT :

Package 1A "Design Construction, Supply, Installation, Laying & Jointing, Testing


and Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake Works,
Raw Water Pumping Station and Raw Water Twin Main."

OWNER :
Source
Material

Coarse aggregate (.mm)

Sampled by

SL No.

Sample taken from :

Weight of empty pyconometer, (gms) W1

Weight of empty pyconometer+sample (gms) W2

Weight of empty pyconometer+sample+water (gms) W3

Weight of empty pyconometer+water (gms) W4

Specific gravity of sample = (W2-W1) / {(W4-W1)-(W3-W2)}

FOR DJB

Rep No:
DATE:

ying & Jointing, Testing


of 55MGD Intake Works,

Result

FOR L&T
L&T/DJB/DWSS/FM/

LARSEN & TOUBRO LTD. - ECC DIVISION


10% Fine Value of Stone Aggregate
IS: 2386 Part-4
PROJECT :

Package 1A "Design Construction, Supply, Installation, Laying & Jointing,


Testing and Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD
Intake Works, Raw Water Pumping Station and Raw Water Twin Main."

Material
Location :____________
Source
Sampled by
Sl. No.

Determination

Weight of Aggregate Sample in mould (gms) W1

Load applied in Tones (1 Ton=10 KN)=X

Weight of Aggregate Sample passing in 2.36mm sieve after test (gms) W2

Aggregate 10% fine Value=W2/W1x100=Y

Load for Ten Percent fine value in Tones


By formula

FOR DJB

(14*X) / (Y+4)

Rep No:
DATE:

Laying & Jointing,


05 yr. O&M of 55MGD
Twin Main."

Result

FOR L&T
L&T/DJB/DWSS/FM/

LARSEN & TOUBRO LTD. - ECC DIVISION


Crushing Strength of coarse Aggregate
IS: 2386 Part-4
Package 1A "Design Construction, Supply, Installation, Laying & Jointing,
PROJECT : Testing and Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake
Works, Raw Water Pumping Station and Raw Water Twin Main."

Material
Location :________
Source
Sampled
by
Sl. No.

Determination

Weight of Aggregate Sample in mould (gms) W1

Load applied in Tones (1 Ton=10 KN)=X

Weight of Aggregate Sample passing in 2.36mm sieve after test (gms) W2

Aggregate Crushing Value=W2/W1x100=Y

Remarks Aggregate confirmed/ not confirmed to IS code :383-1970/CPWD Specification

FOR DJB

Rep No:
DATE:

on, Laying & Jointing,


nd 05 yr. O&M of 55MGD Intake
Main."

Result

FOR L&T
L&T/DJB/DWSS/FM/

LARSEN & TOUBRO LTD. - ECC DIVISION


DRY LOOSE BULK DENSITY
Package 1A "Design Construction, Supply, Installation, Laying & Jointing,
PROJECT : Testing and Commissioning Successfully,01 yr. DLP And 05 yr. O&M of 55MGD Intake
Works, Raw Water Pumping Station and Raw Water Twin Main."

Material
Location :________
Source
Sampled
by
Sl. No.

Determination

Cylinder + Sample (gms)

Weight of Cylinder (gms)

Weight of sample (gms)

Cylinder Volume (Ltrs.)

DLBD (Kg/M)

FOR DJB
L&T/DJB/DWSS/FM/

Rep No:
DATE:

on, Laying & Jointing,


nd 05 yr. O&M of 55MGD Intake
Main."

Result

FOR L&T
L&T/DJB/DWSS/FM/

Project : Rehabilitation of Bhagirathi WTP, Delhi

Section

Supporting Document
Date

Client : Delhi Jal Board

Stage

Inspection

Page No.

Contractor: LARSEN & TOUBRO LIMITED

Ref.

Total Pages

Record of Hydrotest

Form No.

Drg. No.

Date of Start of water filling

Structure Name

Location

Date of completion of water filling


Sl. No.

1
2
3
4
5
6
7
8

Time

Reading of
Gauge in mm

Drop in mm

Rainfall
in mm

2.30 PM

1000

2.30 PM

1007

2.30 PM

1014

14

2.30 PM

1020

20

2.30 PM

1025

25

2.30 PM

1030

30

2.30 PM

1035

35

2.30 PM

1039

39

Date

23.10.2013
24.10.2013
25.10.2013
26.10.2013
27.10.2013
28.10.2013
29.10.2013
30.10.2013

Evaporation Cumml.Drop
in mm
in mm

Signature
L&T

RITES

Engr.

TPI

DJB

JE

AE

EE

Total drop in 7days:

mm

Permissible weekly drop for open structure:

mm

Permissible weekly drop for closed structure:

mm

Conclusion: Acceptable or not acceptable w.r.t level drop

DJB

RITES

L&T

Project : Rehabilitation of Bhagirathi WTP, Delhi

Section

Supporting Document
Date

Client : Delhi Jal Board

Stage

Inspection

Page No.

Contractor: LARSEN & TOUBRO LIMITED

Ref.

Total Pages

Record of Hydrotest

Form No.

Drg. No.

Date of Start of water filling

Structure Name

Location

Date of completion of water filling


Sl. No.

1
2
3
4
5
6
7
8

Date

18.10.2013
19.10.2013
20.10.2013
21.10.2013
22.10.2013
23.10.2013
24.10.2013
25.10.2013

Time

Reading of
Gauge in mm

Drop in mm

Rainfall
in mm

Evaporation Cumml.Drop
in mm
in mm

2.30 PM

1000

2.30 PM

1006

2.30 PM

1012

12

2.30 PM

1018

18

2.30 PM

1023

23

2.30 PM

1029

29

2.30 PM

1035

35

2.30 PM

1041

41

Signature
L&T

RITES

Engr.

TPI

DJB

JE

Total drop in 7days:

mm

Permissible weekly drop for open structure:

mm

Permissible weekly drop for closed structure:

mm

Conclusion: Acceptable or not acceptable w.r.t level drop

DJB

RITES

L&T

AE

EE