BAR CHART

Site: Jupiter ( Area - 43560 Sq Ft)


Sl. no

Activity

1.0
1.1

Footings

Civil work

1.2

Plinth beam

1.3

1 st slab to 5th slab

1.4

Brick work

1.5

Internal celling&wall plastering

1.6

External plasting

1.7

Scaffolding work

1.8

Railings fitting

1.9

Wood frames making

1.10 Doors and windows fittings


2
2.1
2.2
2.3

Electrical work
Groove cutting and conduit laying
Wiring work
Board fitting (switch board)

Plumbing work
Groove cutting and conduit laying
Wash basin and comord fixing
External water supply & drainage
3.3 work
3
3.1
3.2

Tiling work
Toilets wall tiling
Floor tiling
Common area marble tiles all floors
4.3 & staircase
4.4 External wall cladding
4
4.1
4.2

Paint work
walls and Doors putty 1st coat
painting
2nd coat painting wall, doors and
5.2 grills
5.3 External texture and paint work
5

5.1

6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.1
6.2
6.3
6.4

Other works
compound wall
septic tank
gates fixins
basement flooring
DG
Transformer
Panel board
solar
R O water plant
Rain water harvesting system
Jogging track
plants&garden work
Lift work

Jun-14
Jul-14
Aug-14
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Oct-12
Nov-12
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1

Nov-12
Dec-12
W2 W3 W4 W1 W2 W3 W4

Week 33

11th
12th
13th
13th and 14th
15th
16th
17th
18th
19th
20th
21st
22nd

37 Columns for 3rd Phase leaving 8 columns at


Tank area.
Digging and laying PCC for Plinths.
Marking for Plint
Rod Bending
Centring
Concrete
Mud Filling in Room Areas
Watering in Room areas
Mud Levelling in Room areas
PCC in Room Areas and Setbacks
Survey
Column Concrete
Column Concrete Completion

24th

Bottoms Raising Start for Flats (21,22,23,24)

14th

Start of Bottom Slab for Four Flats


5,18,19,20

Dates

BA
Site : Jupiter - Panathur

Sl. no

Activity

1
1.1

Civil work
Footings

1.2

Plinth beem

1.3

Ground Slab (Raising Bottoms till Slab)

1-Jun-14
1-Jul-14
1-Aug-14
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

1st Slab
2nd Slab
3rd Slab
4th Slab

1.4

Brick work
1st Floor
2nd Floor
3rd Floor
4th Floor

1.5

Internal celling&wall plastering

1.6

External plasting

1.7

Scaffolding work

1.8

Railings fitting

1.9

Wood frames making

1.1

Doors and windows Fittings

Electrical work
Groove cutting and conduit
laying

2.1

2.2
2.3
3
3.1
3.2
3.3
4
4.1
4.2
4.3
4.4

5
5.1
5.2
5.3
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.1
6.2
6.3
6.4

Wiring work
Board fitting (switch board)
Plumbing work
Groove cutting and conduit
laying
Wash basin and comord fixing
External water supply &
drainage work
Tiling work
Toilets wall tiling
Floor tiling
Common area marble tiles
all floors & staircase
External wall cladding

Paint work
walls and Doors putty 1st
coat painting
2nd coat painting wall,
doors and grills
External texture and paint work
Other works
compound wall
septic tank
gates fixins
basement flooring
DG
Transformer
Panel board
solar

R O water plant
Rain water harvesting system
Jogging track
plants&garden work
Lift work

BAR CHART

1-Sep-14
1-Oct-14
1-Nov-14
1-Dec-14
1-Jan-15
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2

1-Jan-15
1-Feb-15
1-Mar-15
1-Apr-15
1-May-15
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

1-Jun-15
1-Jul-15
1-Aug-15
1-Sep-15
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4