You are on page 1of 3

trr u rfrf,fiti p firffi $r$Ifir IM0np flfrffn

IVIB

ENGINEERS' CONSULTANTS . CONTRACTOR$ . SUPPLIERS

WARRANTY CERTNFICATE
KNOW ALL MEN BY THESE PRESENT:

Be it known that the item/s covered herein aforementioned Purchased Order are guaranteed for
period of SIX (6) MONTHS after installation in accordance with terms and condition hereof.

MB VERSOZA POWER SYSTEM lNC., warrants that the itemls supplied/repaired/installed are
guaranteed against in materials or workmanship and undertakes at no cost to the owner within the
reasonable period of time. PROVIDED, that the item/s where properly installed, maintained, and

operates under normal working condition. This warranty does not apply to any
supplied/repaired/installed that has been subject to accident, misuse, abuse, nor to any construction
work that has been modified, altered, defaced, force majeure, andfor had repairs made without the
consent of MB VERSOZA POWER SYSTEM lNC.
This warranty is in lieu of all others warranties, express or implied.

PROJECT

& INSTALTATION OF 13.2KV DISTRIBUTION LINE

SUPPLY

MASBATE

NOTICE TO PROCEED

COMPLETION

December 14,20L3

GAISANO CAPITAL
DATE OF

Customer;

ENGR. ATEXANDER MACABUHAY


Maintenance Engineer

. & General

llni{

2 t

Dnrnl,

C+ l.ii^r^

Uill. C,

U^L,

c^i-i+

n-i,,^

fw

ENcINEERS' C0NSULTANTS. C0NTRACT0R$. SUPPLIERS

COIV{PIETION CERTffiICATE
A.

NAME OF PROJECT

SUPPLY

B.

CLIENT NAME

GAISANO CAPITAL MASBATE

& INSTALTATION OF 13.2KV DISTRIBUTION LINE

Masbate City

c.

DATE OF COMPLETION

D.

CERTIFICATION

This is

DECEMBER

to acknowledge that MB

L4,2013

VERSOZA PAWER SYSTEM INC., has satisfactorily compteted 100%

of the proiect under MBV. Scope of

for the supply of lobor, tools, moterials, & technicol


supervision on SUPPLY AND INSTALLTION OF 73.21or' DISTRIBaITION LINE(from DMCI Power Plant to
Tapping Point of MASELCO Line, ond issued this Completion Certificate as December 14, 201"3

E.

works,

OTHER REMARKS

GAISANO CAPITAL

MASBATE.

NOTICE TO PROCEED- November

22,2013

Customer;

NO B.

& General M

ENGR. ATEXANDER MACABUHAY

Maintenance Engineer
GAISANO CAPITAT MASBATE

Unit 3-C Porolumon St., lsidoro Hills Subd., Holy Spiril Drive, Commonweolth Ave., Quezon Ciiy, Metro Monilo
Tel. No. {O2l 7992380;(02} 3553099; Telefox No. {021 4272995

GAISANO CAPITAL MASBATE


Masbate City

ATTENTION

ENGR. ALEXANDER MACABUHAY


Maintenance Engineer

PROJECT

SUPPLY

& INSTALLATION OF 13.2KV DISTRIBUTION LINE

Masbate City
PROJECT ACCEPTANCE

SUBJECT

Sir,

Please be informed that the work accomplished in the said project as per Notice To Proceed,

was done in accordance with the methodological plans and satisfaction. That we have paid all
government taxes and labor in accordance with the minimum wage law and all the workforce used in
the said project.
Furthermore, we will guarantee this project for a period of Six (6) months against any materials
defects and workmanship from the date this project has been accepted.

Hoping for your kind approval on the above Project Acceptance for the purpose of immediate
action on our billing.
Thank you.

Very tru

Approved by:
ENGR. ALEXANDER MACABUHAY
Maintenancet Engineer
GAISANO CAPITAL MASBATE

Unit 3-C Porolumon St., lsidoro Hills Subd., Holy Spirit Drive,
(O2l

Commonweolth Ave., Quezon City, Metro Monilo

?55?n99'Telofav

You might also like