You are on page 1of 59

Environmental Management Plan

<Project Title> <Job Number>

Document No:

<Job Number> : <File Number>

Revision No:

<Sequential 2 Digit>

Last Revised:

<Long Date Format>

Approved for Use:


General Manager,
African Mining Services

Registered Copy No.:

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

Table of Contents
GLOSSARY..................................................................................................................3
1.0

SCOPE AND PURPOSE....................................................................................4

1.1

Objectives of the EMP..............................................................................................................................4

1.2
Environmental Policy Statement.............................................................................................................4
1.2.1
African Mining Services....................................................................................................................4

2.0

ENVIRONMENTAL MANAGEMENT PLANNING..............................................5

2.1

EMP Checklist...........................................................................................................................................5

2.2

Environmental Compliance Criteria.......................................................................................................5

2.3

Environmental Aspects and Impacts.......................................................................................................6

2.4

Environmental Objectives and Targets...................................................................................................7

2.5

Continuous Improvement Action Plan....................................................................................................7

3.0

ENVIRONMENTAL MANAGEMENT - SUB PLANS..........................................9

3.1

General.......................................................................................................................................................9

3.2

Management Sub-Plan Procedures Matrix..........................................................................................10

4.0

CONTROLS......................................................................................................11

4.1

Monitoring...............................................................................................................................................11

4.2

Process Control........................................................................................................................................12

4.3

Environmental Incident Reports and Complaints Register...........................................................12

ENVIRONMENTAL INCIDENTS................................................................................12
INCIDENT REPORTS AND COMPLAINTS REGISTER...........................................12
4.4

Monthly Reporting.................................................................................................................................13

4.5

Audits.......................................................................................................................................................13

5.0

CONTINGENCIES AND EMERGENCY RESPONSE......................................15

6.0

ENVIRONMENTAL TRAINING........................................................................16

6.1

Site Induction...........................................................................................................................................16

6.2

Training and Awareness Sessions..........................................................................................................16

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 1 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

APPENDICES
Appendix 1
Appendix 2
Appendix 3
Appendix 4
Appendix 5
Appendix 6
Appendix 7

African Mining Services Contracting Environmental Policy


Statement
Contact List
Responsibility for the Environmental Management
Risk Register
Objectives and Targets
Environmental Management Sub-plans
Waste Stream Flow Chart

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 2 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

Glossary
Abbreviations and
Acronyms:

Description

AMS

African Mining Services

EMO

The Environmental Management Officer of Henry Walker Eltin Land.

HWE

Henry Walker Eltin Pty Ltd

Description:
Client

Where the manual refers to the client this shall be taken to mean
<Client>.

Company

African Mining Services

Continual Improvement

Process of enhancing the environmental management system to achieve


improvements in overall environmental performance in line with the
organisations environmental policy.

Environment

Surroundings in which the Company operates, including air, water, land,


natural resources, flora, fauna, humans, and their interrelation

Environmental Aspect

Element of activities, products or services that can interact with the


environment. An example is the potential for accidental spillage caused by
the handling of a hazardous chemical.

Environmental Impact

Any change to the environment, whether adverse or beneficial, wholly or


partially resulting from the Companys activities, products or services. An
example is the contamination of soil or water caused by a chemical
spillage.

Environmental
Management System
(EMS)

The part of the overall management system that includes organisational


structure, planning activities, responsibilities, practices, procedures,
processes and resources for developing, implementing, achieving,
reviewing and maintaining the environmental policy.

Environmental
Management System
Audit

Systematic and documented verification process to objectively obtain and


evaluate evidence to determine whether the Companys environmental
management system conforms to the environmental management system
audit criteria set by the Company, and communication of the results of this
process to management.

Environmental
Objective

Overall environmental goal, arising from the environmental policy, that the
Company sets itself to achieve, and which is quantified where practicable.

Environmental
Performance

Measurable results of the environmental management system, related to


the Companys control of its environmental aspects, based on its
environmental policy, objectives and targets.

Environmental Policy

Statement by the Company of its intentions and principles in relation to its


overall environmental performance which provides a framework for action
and for setting of its environmental objectives and targets.

Environmental Target

Detailed performance requirement (quantified where practicable),


applicable to the Company or parts thereof, that arises from the
environmental objectives and that needs to be set and met in order to
achieve those objectives.

Interested Party

Individual or group concerned with or affected by the environmental


performance of the Company.

Prevention of Pollution

Use of processes, practices, materials or products that avoid, reduce or


control pollution, which may include recycling, treatment, process
changes, control mechanisms, efficient use of resources and material
substitution.

Supplier/Subcontractors

Where the manual refers to subcontractors or suppliers this shall be taken


to mean any supplier of goods or services to African Mining Services .

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 3 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

1.0

Scope and Purpose

1.1

Objectives of the EMP


African Mining Services (AMS) has a continual improvement strategy towards
managing its environmental management system. The aim is to improve the
existing procedures to embrace all of the elements of AS/NZS ISO 14001: 1996
Environmental Management Systems - Specification with guidance for use with the
intention of becoming certified to AS/NZS ISO 14001.
This Environmental Management Plan (EMP) has been prepared in accordance with
the management issues identified in the contract conditions and defines AMSs
commitment and responsibilities to environmental management of the site. The
EMP provides the following:

specific to the project and work and take account of the Companys
environmental policy.

provide a mechanism for AMS to monitor its compliance with the EMP so as to
promote its continuous improvement of environmental management at the site.

contain procedures to ensure that AMS discharges its duties in accordance with
all legislation, works approval and other provisions of the contract with <Client>.

detail the environmental system which will be introduced in the performance of


work, taking into account and addressing relevant environmental management
issues including procedures for:

Air Quality Management

Noise and Vibration Management

Waste and Litter Management

Surface Water and Drainage Management

Erosion and Sediment Control

Hydrocarbon and Dangerous Goods Management

Cultural Heritage Management

Flora and Fauna Management

Social Disruption Management

Monitoring

Emergency Procedures

1.2

Environmental Policy Statement

1.2.1

African Mining Services

The AMS Environmental Management System (EMS) Policy Manual defines the
Companys policies and objectives and outlines the procedures that are effected to
achieve the Company and Clients environmental objectives.
AMS is in the business of delivering projects with substantial mining engineering
components. In the execution of these projects the company takes particular care
that all environmentally sensitive activities are managed to meet our clients
environmental management objectives. A copy of AMSs Environmental Policy
Statement is provided in Appendix 1.

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 4 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

2.0

Environmental Management Planning

2.1

EMP Checklist
As part of the development of this EMP, there are a number of elements that need to be
implemented by the Project Manager before the EMP can be formalised (Refer Process
EMS-PR-08). These elements are discussed in detail in this EMP whilst a summary list
is provided below. The Project Manager is required to tick off these items in the
checklist (Refer Form EMS-FM-09) when they have been completed.

EMP Element

2.2

Edit Environmental Compliance Criteria

Undertake Environmental Risk Assessment

Develop Environmental Objectives and Targets

Develop Environmental Management Sub-Plans

Develop Site Specific Environmental Induction

Identify Environmental Monitoring Requirements

Conduct Waste Stream Analysis

Develop Environmental Contact List for Project

Complete Schedule for Planned Inspections

Authorise and Issue EMP

Environmental Compliance Criteria


The major environmental compliance criteria for this project include Legislation,
contractual Agreements and Standards.

Legislation
Acts, Regulations and Policies that affect works associated with this project include:

<Add Legislation>

Guidelines and Standards


Guidelines and standards that affect works associated with this project include:

ASNZS ISO 14001:1996 Environmental Management Systems Specification


with Guidance for use.

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 5 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

ASNZS ISO 14004:1996 Environmental Management Systems General


Guidelines on Principles, Systems and Supporting Techniques.

ASNZS ISO 14010:1996 Guidelines for Environmental Auditing General


Principals.

ASNZS ISO 14011:1996 Guidelines for Environmental Auditing Auditing


Procedures Auditing of Environmental Management Systems.

ASNZS ISO 14012:1996 Guidelines for Environmental Auditing Qualification


criteria for environmental auditors.

HB 203:2000

AS 1055 Acoustics Description and Measurement of Environmental Noise

AS 1216 Classification, Hazard Identification and Information Systems for


Dangerous Goods

AS 1259 Acoustics, Sound Level Meters.

AS 1940 The Storage and Handling of Flammable and Combustible Liquids.

AS 2187.2 Use of Explosives

AS 2436 Guide to Noise Control on Construction, Maintenance and Demolition.

AS 2659 Guide to the Use of Sound Measuring Equipment.

AS 3580 Methods for Sampling and Analysis of Ambient Air.

Australian Code for the Transport of Dangerous Goods

Environmental Guidelines for Noise from Blasting - DoE.

Guidelines for the Assessment of Contaminated Land - Land Chem Unit 1991

National Strategy for ecologically Sustainable Development

National Water Quality Guidelines for Aquatic Ecosystems

Soil Erosion and Sediment Control - Engineering Guidelines for Queensland


Construction Sites (IE Aust, 1996)

Environmental Risk Management Principles and Process

<Edit as required>
Other Constraints and Parameters

African Mining Services (2000) Environmental Management System Policy


Manual

<Edit as required>

2.3

Environmental Aspects and Impacts


A significant objective of the Environmental Management Plan is to reduce the
environmental impact by recognising the potentially significant environmental
aspects of the <Project Title> ensuring that operational procedures and contingency
plans are developed, implemented and regularly reviewed. A listing of environmental
aspects and potential environmental impacts has been assessed for this project by
a risk assessment (refer Process EMS-PR-00) and are detailed in Appendix 4.

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 6 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

The significant environmental aspects of the operation are:

Dust emissions

Noise and vibration control

Hydrocarbon spillages

Water / Silt Emissions

Storage of materials

Unauthorised access to Prohibited or Heritage Areas

Protection of existing flora

Disposal of waste

Disposal of contaminants

Social Disruption

<Edit as required>
Environmental Management Sub-Plans for each of the activities listed above are
included in Appendix 6.

2.4

Environmental Objectives and Targets


The EMP proposes various strategies to manage the environmental risks associated
with the project, these strategies are provided in Section 3.0 Management SubPlans and in the Risk Register (Appendix 4).
The objectives and targets make firm commitments for each of the various
strategies outlined in the EMP and put forward the performance criteria and
methods of measurements that are required to meet these objectives and targets
(Refer Process EMS-PR-02).
Objectives and targets identified for the project are included in Appendix 5.

2.5

Continuous Improvement Action Plan


A Continuous Improvement Action Plan (CIAP) will be developed from <Client>
recommendations, regulatory requirements the results of any site inspection / audit
findings to consolidate each of the sub-plans and enhance environmental
performance and management systems for the operation (Refer Process EMS-PR09).
The CIAP will provide:

prioritised schedule of implementation of all recommendations, strategies,


procedures etc as developed from the above processes

necessary resources

nomination of responsibilities

The Project Manager (AMS) is responsible for the management of the CIAP. This
will require liaison with all AMS Supervisors and the <Client> to ensure nominated
tasks are being addressed and effected in accordance with the plan.
Any item which has been entered onto the CIAP will remain an action item until it
has been addressed to the satisfaction of the Project Manager (AMS).
The CIAP will be a dynamic process and may be reviewed and updated during
meetings between <Client> and AMS.
Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 7 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

Other triggers for the review and update of the CIAP are:

Informal <Client> / AMS management meetings

monthly environmental compliance audits

annual environmental system / compliance audits

The CIAP will be regularly updated and re-issued in accordance with any
amendments. Similarly any revisions to the CIAP effecting changes to the EMP will
require amendments and re-issue of specific section(s) of the EMP.

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 8 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

3.0

Environmental Management - Sub Plans

3.1

General
Identified environmental management issues are addressed in the EMP by way of
detailed procedures. The EMP contains a series of individual Environmental
Management sub-plans as set out below.

Air Quality Management

Noise and Vibration Management

Waste and Litter Management

Surface Water and Drainage Management

Hydrocarbon and Hazardous Substances Management

Flora and Fauna Management

Cultural Heritage Management

Social Disruption Management

Rehabilitation Management

Contaminated Soils Management

Acid Sulphate Soils Management Plan

Soil Remediation Management Plan

<Edit as required>

Each sub-plan is comprised of a number of elements, each with an overall


associated management policy, mechanisms for policy implementation, proposed
monitoring programmes and potential corrective actions. Process EMS-PR-11 to
EMS-PR-22 provide the mechanism for the development of the environmental
management sub-plans.
The sub-plans for this project are included in Appendix 6.

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 9 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

3.2

Management Sub-Plan Procedures Matrix


The table set out below is a quick reference tool that demonstrates which environmental
management procedures are associated with the environmental Management Sub-Plans for
the <Project Title>. <Edit as Required>.

EMS-PR-12
EMS-PR-13
EMS-PR-14
EMS-PR-15
EMS-PR-16
EMS-PR-17
EMS-PR-18
EMS-PR-19
EMS-PR-20
EMS-PR-21
EMS-PR-22
EMS-PR-23
EMS-PR-24
EMS-PR-25

Risk Assessment
Legal and other requirements
Environmental Objectives and Targets
Environmental Induction and Training
Corporate Reporting
Site Based Reporting
Environmental Incident Reporting
Environmental Tender
Environmental Management Plan
Continuous Improvement Action Plan
Environmental Monitoring
Development of Waste Management Plan
Development of Hazardous Substances
and Dangerous Goods Management Plan
Development of Stormwater / Erosion and
Sediment Control Management Plan
Development of Flora and Fauna
Management Plan
Development of Cultural Heritage
Management Plan
Land Disturbance
Development of Air Quality Management
Plan
Development of Noise and Vibration
Management Plan
Development of Rehabilitation
Management Plan
Development of Contaminated Soils
Management Plan
Development of Acid Sulphate Soils
Management Plan
Development of Soil Remediation
Management Plan
Site Environmental Inspections
Corporate Environmental Auditing
EMS Review

Soil Remediation

Acid Sulphate Soils Management

Contaminated Soils Management

Rehabilitation Management

Social Disruption

Cultural Heritage Management

Flora and fauna Management

Waste and Litter Management

Noise and Vibration Management

Hydrocarbon and Dangerous Goods Management

EMS-PR-00
EMS-PR-01
EMS-PR-02
EMS-PR-03
EMS-PR-04
EMS-PR-05
EMS-PR-06
EMS-PR-07
EMS-PR-08
EMS-PR-09
EMS-PR-10
EMS-PR-11

Air Quality Management

Environmental Management Procedures

Surface Water and Drainage Management

Management Sub-Plans

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 10 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

4.0

Controls

Control of the systems and processes to be utilised in the environmental management of a


project is addressed through a number of mechanisms including monitoring, audits, process
checklists and reporting.
Adherence to the control mechanisms of the AMS EMP, and the entire Management System
is essential for the successful operation of our business.
4.1

Monitoring

Air Quality

Noise and Vibration

Waste and Pollution

Surface and Drainage

Land Disturbance and


Revegetation
Hydrocarbon and
Dangerous Goods

Acid Sulphate Soils

Contaminated Soils
and Soil Remediation

Flora and Fauna

As Reqd

Monthly

Monitoring

Weekly

Management
Categories

Daily

Monitoring of the environmental aspects identified in the Environmental Management


Strategies provides an indicator of the success of our strategies. As a result, through
monitoring our performance we verify our adherence to the imposed constraints and
identify elements where improvement is necessary. Summaries of the monitoring programs
for the <Project Title> are presented below. <Edit as Required>.

PM10 Monitoring
TSP Monitoring
Supervisor Inspection
Client / Community Complaints Register
(Safety / Environment) Active Safe Planned
Inspections
Noise Monitoring
Vibration Monitoring
Client / Community Complaints Register
(Safety / Environment) Active Safe Planned
Inspections
Client / Community Complaints
(Safety / Environment) Active Safe Planned
Inspections
Water Quality Monitoring
Client / Community Complaints
(Safety / Environment) Active Safe Planned
Inspections
Client / Community Complaints
(Safety / Environment) Active Safe Planned
Inspections
Client / Community Complaints
(Safety / Environment) Active Safe Planned
Inspections
Incident reporting
Soil Testing
Client / Community Complaints Register
(Safety / Environment) Active Safe Planned
Inspections
Contaminated Soil Testing
Client / Community Complaints Register
(Safety / Environment) Active Safe Planned
Inspections
Client / Community Complaints Register

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 11 of 16

African Mining Services

<Job Number> : <Project Title>

Cultural Heritage

Community Impact

4.2

As Reqd

Monthly

Monitoring

Weekly

Management
Categories

Daily

Environmental Management Plan

(Safety / Environment) Active Safe Planned


Inspections
Client / Community Complaints
(Safety / Environment) Active Safe Planned
Inspections
Client / Community Complaints
(Safety / Environment) Active Safe Planned
Inspections

Process Control

African Mining Services utilise process control in accordance with our quality plans. This
includes for the control of environmental aspects. Environmental requirements are
addressed in the Processes and records of control maintained in the form of Quality
Verification Checklists (QVCs) and Standard Working Procedures (SWPs). Process related
Environmental Hold Points are thus addressed as part of the QVC / SWP.
The responsible person identified in the Process control documentation progressively
completes QVCs / SWPs. Completed forms will be maintained on-site as Quality
Assurance Records.
Refer to the Quality Assurance Plan for the detailed Quality Verification Checklists and
Standard Working Procedures.
4.3

Environmental Incident Reports and Complaints Register

Environmental Incidents
Environmental incidents, that may have an impact off-site shall be documented and
reported to the Project Manager (AMS) as soon as practicable. The Project Manager (AMS)
shall be responsible for assessing the impact of the incident and, if appropriate, reporting
the incident to <Client>.
Environmental Incident Reporting is further detailed in the safety emergency response plan.
Incident Reports and Complaints Register
An up-to-date logbook of complaints and incidents is maintained for the project.
The AMS Environmental Incident Report Form and reporting process will be used for
environmental incident reporting. The process and procedure (EMS-PR-06) for
Environmental Incident Reporting can be found in the Procedures Manual.

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 12 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

4.4

Monthly Reporting

The monthly report consolidates our key performance indicators for the project sites and
documents key areas of our environmental program (ie. training / induction, environmental
incidents, environmental auditing, waste management) which AMS report as part of annual
public annual environmental report. The report allows consistency in site based reporting
and the data generated from the exercise assists many of AMSs clients with preparation of
their annual environmental reports.
The process and procedure (EMS-PR-05) for Site Based Reporting can be found in the
Procedures Manual.
4.5

Audits

Environmental Audits are conducted to ensure that activities are undertaken in a manner
consistent with the project planning, contract and legislative requirements and are
conducted in accordance with process EMS-PR-24.
Three levels of environmental auditing are to be utilised. They are:
Daily inspections by area supervisor.
Environmental internal inspection by Project Manager (AMS) or nominee.
Annual external audit by Environmental Management Officer (AMS) or as otherwise
required.
Daily Inspections
It is the responsibility of all AMS employees and subcontractors to ensure that their work
areas are tidy and that activities are undertaken in a manner consistent with the contract
and legislative requirements.
Informal environmental inspection checks of their work area will be undertaken daily by
employees and area supervisors. The following observations are entered onto the
supervisors and/or engineers daily shift report / diary.
Environmental Incidents
Dust and water usage for dust suppression
Waste and litter controls
Site drainage and erosion controls
For items requiring attention, the appropriate Environmental processes shall be applied.
The Environmental Incident Report process report will be followed for any environmental
incident and a copy of this report will be maintained on the Environmental Incident Register.
Internal Environmental Inspections
Site management (AMS) will, at nominated intervals, conduct a formalised internal
environmental compliance inspection. Non-compliances will be recorded on the CIAP
register and will remain an active item until resolved.
Environmental Inspections are incorporated in to the sites Active Safe Planned Inspections.
The inspections are denoted by a leaf symbol. The frequency of inspections are identified
below.
Planned Inspections
Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 13 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

Element
Batching or Blending Plants
Bulk Combustible Liquid Storage
De-watering Ponds or Water Treatment Ponds
Emergency Preparedness
Explosives and Blasting
Haul Roads and Minor Roads
Hazardous Substance Control
Landfill Operations
Laydown Area
Maintenance
Operations Inspections
Rehabilitation and Landscape Areas
Revegetation
ROM/Crushing/Screening Plant
Sediment and Erosion Control Inspection
Specific Procedures
Topsoil and Overburden Stockpiles
Vehicle Washdown Facilities
Work Areas and Buildings
Workshops

Frequency of
Inspection
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>
<edit as required>

Site management will also refer to the projects Safety Management Plan to ensure there is
consistency in the frequency of inspection.
External Environmental Audits
An external environmental management systems and compliance audit may be undertaken
during the course of the project. The audit will involve due diligence and physical condition
aspects. AMS external environmental auditors for the Project will be accredited through
the Register of Certified Auditors (RCA) - Quality Society of Australasia (QSA).

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 14 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

5.0

Contingencies and Emergency Response

Environmental contingency plans are included to cover situations during the operation of the
project where an incident has occurred that may adversely impact on the environment. The
plan is designed to indicate the course of action required in the event of an environmental
emergency.
Detailed contingency and emergency response plans for both safety and environmental
incidents are included within the <project> Emergency Response Plan..

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 15 of 16

African Mining Services

<Job Number> : <Project Title>


Environmental Management Plan

6.0

Environmental Training

Training for environmental management occurs for all African Mining Services Employees.
The degree of training is dependent upon the role that will be fulfilled to match the
responsibility level associated with a position. The education of African Mining Services
staff occurs through three primary mediums.
General African Mining Services organised training
Project level and project specific organised training
Informal peer training and mentoring
The primary site based mechanisms are outlined below and consist of site inductions and
training and awareness sessions.
6.1

Site Induction

All African Mining Services employees and subcontractors are required to attend a site
induction prior to commencing duties at the Project. Environmental Management is
included as part of the induction process. General Issues covered in the environmental
component of the induction are:
AMS Environmental Policy Statement
AMS Business Systems Plan
AMS Project EMP
AMS and individual responsibilities
General Site Issues
Reporting Procedures - incidents
The induction process is undertaken by the Project Manager (AMS) or a nominee and new
employees / contractors are required to acknowledge their attendance at the induction and
acceptance of their environmental responsibilities by way of signing a register of
attendance. Duties cannot commence until this process is executed.
6.2

Training and Awareness Sessions

In addition to the general site induction, further environmental training may be required for
specific tasks carried out by the workforce.
The training / awareness will be a combination of formal group sessions and informal small
group - sessions (ie. toolbox meetings).

Document Number: <Job Number> : <File Number> Print Date: 8 December, 2014

Page 16 of 16

African Mining Services Pty Ltd

Environmental Management Plan

App 1 African Mining Services Environmental Policy


Statement

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

Appendix 2 - Contact List

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

CONTACT LIST
HENRY WALKER ELTIN LAND
POSITION
General Manager

NAME
Trevor Lambert

Environmental Management
Officer
Environmental Management
Assistant

David Blaxland
Rebecca Smith

CONTACT DETAILS
Phone: 61 8 8232 4949
Fax:
61 8 8232 3351
Phone: 61 7 3367 2222
Fax:
61 7 3367 3737
Phone: 61 7 3367 2222
Fax:
61 7 3367 3737

AFRICAN MINING SERVICES


POSITION
General Manager
Operations Manager

NAME
<Edit as required>
<Edit as required>

CONTACT DETAILS
<Edit as required>
<Edit as required>

Project Manager

<Edit as required>

<Edit as required>

Site Environmental
Representative

<Edit as required>

<Edit as required>

NAME
<Edit as required>

CONTACT DETAILS
<Edit as required>

<Client>
POSITION
<Client> Representative

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

Appendix 3 - Responsibility for the Environmental Management

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

Set the Company environmental management objectives and issues the


Company Policy on Environmental Management
Authorise the issue of all Environmental Management System
Documentation.
Develop, operate and maintain the Environmental Management Plan
template
Ensure due diligence is exercised by establishing systems to ensure
compliance with the EMP
Develop and issue the Site Specific EMP and control relevant document
changes.
Plan and implement the environmental audit program for the project.
Ensure that all subcontractors and consultants comply fully with this EMP.
Monitor non-conformances until corrective actions have been implemented.
Identify and record any Environmental Management problems
Initiate, recommend or provide solutions through designated channels and
verify the implementation of solutions
Delegate responsibilities, in writing, as defined in the Environmental
Management Plan to a nominated person who is suitably qualified to
assume the responsibility.
Provide advice and assistance to the Project Manager (AMS) for
implementation and internal auditing of the EMP.
Document control and maintaining documents and data in accordance with
appropriate procedures from the Environmental Management Plan.
Ensure emergency environmental response procedures are in place and all
staff have adequate training in these procedures
Ensure all staff and subcontractors undergo a General Induction that
incorporates environmental management.
Ensure emergency environmental response procedures are in place and all
staff have adequate training in these procedures
Ensure all staff and subcontractors undergo a General Induction that
incorporates environmental management.
Provide advice of Air Quality Management and Noise and Vibration
Management sub-plans to Project Manager.
Provide advice on Surface Water and Drainage management sub-plan to
Project Manager and keep an up-to-date log of complaints and incidents.
Conduct natural drainage system inspections.
Provide advice on Hazardous Substance Management Sub-plan and
Hydrocarbon Management sub-plan, keep an up-to-date log of complaints
and incidents and maintain an inspection and maintenance program for
storage facilities.
Provide advice on Waste and Pollution Management sub-plan and maintain
an inspection program.
Provide advice of Flora and Fauna Management sub-plan to the Project
Manager and provide assistance in the day to day plan management.
Conduct monthly environmental reporting to HWE Brisbane Office.
Conduct investigations on environmental incidents and document on All

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

Personnel Responsibilities

AMS Environmental Representative,

Project Manager, AMS

Responsibilities

Environmental Management Officer, HWEL

Environmental Management Plan

General Manager, AMS

African Mining Services Pty Ltd

African Mining Services Pty Ltd

Environmental Management Plan

Incident Reporting Form.


Maintain environmental action plan and ensure that all items are actioned in
accordance with timing and responsibility.
Ensure that all tasks are undertaken in a manner consistent with the
Environmental Management Plan, legislation and regulations.

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

Appendix 4 Environmental Risk Register

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

Project No:
Date of Risk Analysis:
Aspect

Project :
Reviewed by:
Impact

Date:
Risk
Assessment
Step 1 Step 2 Step 3

Air Quality
Blasting of material
Drilling of material
Piling
Operating Machinery
Plant and light vehicles on haul roads
Plant and light vehicles moving on/off
site
Burning of vegetation
Clearing of vegetation
Road sweeping
Operating crushing plant

Air Quality (contd)


Operating ore processing plant
General earthworks
Haulage of material

Control Measures

Associated
procedure

Project Risk Assessment


Mining
Aspect

Impact

Risk
Assessment

Control Measures

Associated
procedure

Step 1 Step 2 Step 3

Noise and Vibration


Blasting of material
Drilling of material
Piling
Operating Machinery
Plant and light vehicles on haul roads
Operating crushing plant

Noise and Vibration (Contd)


Operating ore processing plant
General earthworks
Pavement works (asphalting)

Prepared By:
Approved By:
Electronic File &
Path:

Date:
Date:

Document Number:
Date Implemented:

Rev:

Project Risk Assessment


Mining
Aspect

Impact

Risk
Assessment

Control Measures

Associated
procedure

Step 1 Step 2 Step 3

Surface and Groundwater Quality


Culvert works
Installation of drainage
Earthworks
Bridge works
Excavations in Potential Acid Sulphate
Soils
Discharge into waterways

Surface and Groundwater Quality (Contd)


Operation of vehicle washdown

Land Disturbance and Revegetation


Prepared By:
Approved By:
Electronic File &
Path:

Date:
Date:

Document Number:
Date Implemented:

Rev:

Project Risk Assessment


Mining
Aspect

Impact

Risk
Assessment

Control Measures

Associated
procedure

Step 1 Step 2 Step 3

Operating Machinery
Plant and light vehicles on haul roads
Plant and light vehicles moving on/off
site
Burning of vegetation
Clearing of vegetation
General earthworks
Topsoil Stockpiling
Landscaping / revegetation

Land Disturbance and Revegetation (Contd)


Excavation at a contaminated site

Ore Characterisation and Placement

Prepared By:
Approved By:
Electronic File &
Path:

Date:
Date:

Document Number:
Date Implemented:

Rev:

Project Risk Assessment


Mining
Aspect

Impact

Risk
Assessment

Control Measures

Associated
procedure

Step 1 Step 2 Step 3

Placement of waste material

Waste and Pollution Management


Collection of general refuse
Disposal of general refuse
Disposal of oil filters / oily rags
Placement of waste in laydown area

Waste and Pollution Management


Disposal of tyres
Removal of concrete slurry
Disposal of batteries
Disposal of Scrap Steel

Prepared By:
Approved By:
Electronic File &
Path:

Date:
Date:

Document Number:
Date Implemented:

Rev:

Project Risk Assessment


Mining
Aspect

Impact

Risk
Assessment

Control Measures

Associated
procedure

Step 1 Step 2 Step 3

Hazardous Substances and Dangerous Goods


Storage of bulk hydrocarbons
Storage of minor hydrocarbons
Storage of chemicals
Operating Machinery
Decanting of hydrocarbons / chemicals

Hazardous Substances and Dangerous Goods (Contd)


Servicing of vehicles
Remediating hydrocarbon spills

Prepared By:
Approved By:
Electronic File &
Path:

Date:
Date:

Document Number:
Date Implemented:

Rev:

Project Risk Assessment


Mining
Aspect

Impact

Risk
Assessment

Control Measures

Associated
procedure

Step 1 Step 2 Step 3

Acid Sulphate Soils


Culvert excavation
Waste rock dumping
Treating Acid Sulphate Soils
Removing Acid Sulphate Soils off site

Contaminated Soils
Excavation near waterways
Removing waste off site

Prepared By:
Approved By:
Electronic File &
Path:

Date:
Date:

Document Number:
Date Implemented:

Rev:

Project Risk Assessment


Mining
Aspect

Impact

Risk
Assessment

Control Measures

Associated
procedure

Step 1 Step 2 Step 3

Soil Remediation
Removal of underground tank
Removing material off site
Operation of Bug Farm

Flora and Fauna


Operating Machinery
Plant and light vehicles moving on/off
site
Clearing of vegetation

Prepared By:
Approved By:
Electronic File &
Path:

Date:
Date:

Document Number:
Date Implemented:

Rev:

Project Risk Assessment


Mining
Aspect

Impact

Risk
Assessment

Control Measures

Associated
procedure

Step 1 Step 2 Step 3

Cultural Heritage
Clearing of vegetation
General Earthworks

Community Impact
Piling
Excavation
Earthworks
Blasting

Prepared By:
Approved By:
Electronic File &
Path:

Date:
Date:

Document Number:
Date Implemented:

Rev:

Project Risk Assessment


Mining
Aspect

Impact

Risk
Assessment

Control Measures

Associated
procedure

Step 1 Step 2 Step 3

Use of rollers

Prepared By:
Approved By:
Electronic File &
Path:

Date:
Date:

Document Number:
Date Implemented:

Rev:

African Mining Services Pty Ltd

Environmental Management Plan

Appendix 5 Objectives and Targets

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

Management Category

Objectives

Annual Targets

Responsibility

Resources
Required

Measured by

African Mining Services Pty Ltd

Environmental Management Plan

Appendix 6 - Environmental Management Sub-plans

<Delete irrelevant Management Sub-plans and modify others as required>

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

AIR QUALITY MANAGEMENT


Background
An environmental risk assessment shall be undertaken of the site in accordance with
Procedures EMS-PC-00 Environmental Risk Assessment and EMS-PC-08
Environmental Management Plan. The background information will be provided from
this risk assessment.
Legislation
Relevant legislation and standards to this project include:
<edit as required>
Management

Management tasks, specifically required as identified in the process analysis


include:
Haulage truck loads which exit the site will be covered
Access points and roads will be located as far as possible from residences.
Water trucks will be used on haul roads
Haul roads are constantly maintained by graders and dozers
Soil stabilisation chemicals are used on hauls roads
Dust generating activities will be minimised or avoided during dry and windy
conditions.
Soils will be stockpiled only when necessary and for short durations.
Topsoil or fill material stockpiled in excess of four weeks will be temporarily
stabilised by grasses.
Stockpiles will be kept to minimal heights and watered down where necessary.
The extent of clearing will be agreed, surveyed and pegged prior to removal.
The total cleared area at any one time, will be kept to a minimum and exposed
areas will be revegetated as soon as possible.
Cleared and grubbed material will be stockpiled away from drainage lines to be
later re-spread on disturbed areas.
Water spray system used in crushing process and on ore stockpiles
Dust suppression system installed on drilling rig.
Plant, vehicles and equipment regularly maintained
<edit as required>

Corrective Actions
General

Any lawful directive from the administering authority may trigger a review of dust
control procedures.
All complaints and incidents will be responded to immediately and reporting /
notification to all parties within 48 hours.

Specific

The source of any nuisance dust will be identified and, where practicable, dust
control practices will be modified, to reduce or eliminate the risk of future events.
The timing, method and frequency of watering may be modified in response to
excessive nuisance dust.

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

Additional training may be required where a non-conformance to a work practice


has caused or potentially caused an incident.

References
African Mining Services (2000) Environmental Management System Policy Manual.
Procedures:
EMS-PC-11 Air Quality Monitoring
EMS-PC-36 Environmental Inspections
EMS-PC-24 Soil Excavation and Earthmoving
EMS-PC-28 Management of Stockpiles
EMS-PC-29 Air Quality Management
<edit as required>

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

NOISE AND VIBRATION MANAGEMENT


Background
An environmental risk assessment shall be undertaken of the site in accordance with
Procedures EMS-PC-00 Environmental Risk Assessment and EMS-PC-08
Environmental Management Plan. The background information will be provided from
this risk assessment.
Legislation
Relevant legislation and standards to this project include:
<edit as required>
Management
Management tasks, specifically required as identified in the project risk analysis
include:

AMS will adhere to regulatory hours of normal operation unless otherwise


negotiated with regulatory authorities.
Road traffic barriers shall be built in the first stages of construction.
Fixed plant and equipment shall be located as far as practicable from noise
sensitive areas.
Access points and roads will be located as far as possible from residences.
Where soil compaction is required close to buildings, consideration will be given to
use of a light roller.
Noise suppression system installed in drilling rig
Haul roads are constantly maintained by graders and dozers
Plant, vehicles and equipment regularly maintained
Mufflers installed on all plant and light vehicles
<edit as required>

Corrective Actions
General

Any lawful directive from the administering authority may trigger a review of noise
control procedures.
All complaints and incidents will be responded to immediately and reporting /
notification to all parties within 48 hours

Specific

The source of any nuisance noise or vibration will be identified and, if possible,
work practices will be modified or re-scheduled, to reduce or eliminate the risk of
future events.
Additional training may be required where a non-conformance to a work practice
has caused or potentially caused an incident.

References
African Mining Services (2000) Environmental Management System Policy Manual.
Procedures:
EMS-PC-13

Vibration Monitoring

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

EMS-PC-14 Noise Monitoring


EMS-PC-36 Environmental Inspections
EMS-PC-30 Noise Management
EMS-PC-31 Blasting
<edit as required>

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

WASTE AND POLLUTION MANAGEMENT


Background
An environmental risk assessment shall be undertaken of the site in accordance with
Procedures EMS-PC-00 Environmental Risk Assessment and EMS-PC-08
Environmental Management Plan. The background information will be provided from
this risk assessment.
Legislation
Relevant legislation and standards to this project include:
<edit as required>
Management
Management tasks, specifically required as identified in the project risk analysis
include:
All wastes will be collected and stored at a designated waste disposal area.
Soil contaminated by hydrocarbons will be collected for disposal off-site in an
approved disposal area.
All work sites will be regularly monitored for litter accumulation.
General refuse bins are located throughout the site
Recycling bins are available
Scrap steel and timber is separated for recycling
Oily rags are separated and taken off-site with hydrocarbon contaminated material
Tyres are stored neatly near workshop until taken away by a Contractor and
recycled
Old batteries are separated from the waste stream and stored neatly on a rack,
removed by a licenced Contractor and recycled.
Waste oil removed by Contractor for recycling
Oil filters are separated from waste stream, stored in a designated bin and taken
away by licenced Contractor for recycling
<edit as required>
Corrective Actions
General

A review of waste / litter management procedures may be triggered by any lawful


directive from the administering authority.
All complaints and incidents will be responded to immediately and reported to all
parties within 48 hours.

Specific

The source of any pollution will be identified and, where necessary, control
practices will be modified, to reduce or eliminate the risk of future events.
Additional training may be required where a non-conformance to a work practice
has caused or potentially caused an incident.

References
African Mining Services (2000) Environmental Management System Policy Manual.
Procedures:
EMS-PC-36

Environmental Inspections

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

EMS-PC-17 Waste Management


EMS-PC-18 Management of Dangerous Goods and Hazardous Substances
<edit as required>

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

SURFACE WATER AND DRAINAGE MANAGEMENT


Background
An environmental risk assessment shall be undertaken of the site in accordance with
Procedures EMS-PC-00 Environmental Risk Assessment and EMS-PC-08
Environmental Management Plan. The background information will be provided from
this risk assessment.
Legislation
Relevant legislation and standards to this project include:
<edit as required>
Management
Management tasks, specifically required as identified in the project risk analysis
include:

All on-site drainage will be constructed to ensure that run-off from all unsealed
areas will be directed to sediment control structures prior to entering the local
drainage system.
Erosion potential of runoff on disturbed areas will be reduced through the use of
check dams or cut off drains.
Appropriate sediment control techniques will be incorporated into the construction
works.
All work sites will be regularly monitored for litter accumulation.
Intercept pit and oil / water separator included in washdown facility
Sumps are regularly inspected and cleaned out
Cleared and grubbed material will be stockpiled away from drainage lines to be
later re-spread on disturbed areas.
Topsoil or fill material stockpiled in excess of four weeks will be temporarily
stabilised by grasses.
The total cleared area at any one time, will be kept to a minimum and exposed
areas will be revegetated as soon as possible.
Erosion and sediment controls, will be installed on the downstream side of
construction works prior to the commencement of works.
Temporary erosion and sediment control devices shall be designed to ensure for
non-erosive channel or sheet flow.
<edit as required>

Corrective Actions

The source of any defective sedimentation control will be identified and, where
necessary, sediment and erosion control practices will be modified, to reduce or
eliminate the risk of future events.
Additional training may be actioned where a non-conformance to a work practice
has caused or has the potential to cause a contamination event.

References
African Mining Services (2000) Environmental Management System Policy Manual.
Procedures:
EMS-PC-10 Surface Water Quality Monitoring
EMS-PC-12 Groundwater Monitoring
EMS-PC-36 Environmental Inspections

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

EMS-PC-20 Stormwater Management and Erosion Control


EMS-PC-22 Work in Waterways
EMS-PC-23 Dewatering of Worksites
EMS-PC-24 Soil Excavation and Earthmoving
EMS-PC-28 Management of Stockpiles
EMS-PC-33 Contaminated Soils
EMS-PC-34 Acid Sulphate Soils
<edit as required>

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

LAND DISTURBANCE AND REVEGETATION MANAGMENT


Background
An environmental risk assessment shall be undertaken of the site in accordance with
Procedures EMS-PC-00 Environmental Risk Assessment and EMS-PC-08
Environmental Management Plan. The background information will be provided from
this risk assessment.
Legislation
Relevant legislation and standards to this project include:
<edit as required>
Management
Management tasks, specifically required as identified in the project risk analysis
include:
Soils will be stockpiled only when necessary and for short durations.
Stockpiles will be kept to minimal heights and watered down where necessary.
The extent of clearing will be agreed, surveyed and pegged prior to removal.
Cleared and grubbed material will be stockpiled away from drainage lines to be
later re-spread on disturbed areas.
Any necessary approvals will be obtained for removal of native vegetation.
Significant tree communities or individuals to be retained in site works, will be
clearly identified through appropriate tagging
Topsoil or fill material stockpiled in excess of four weeks will be temporarily
stabilised by grasses.
The total cleared area at any one time, will be kept to a minimum and exposed
areas will be revegetated as soon as possible.
Seed and mulch materials used in the project will be free from declared plants.
Erosion and sediment controls, will be installed on the downstream side of
construction works prior to the commencement of works.
Temporary erosion and sediment control devices shall be designed to ensure for
non-erosive channel or sheet flow.
All on-site drainage will be constructed to ensure that run-off from all unsealed
areas will be directed to sediment control structures prior to entering the local
drainage system.
Erosion potential of runoff on disturbed areas will be reduced through the use of
check dams or cut off drains.
Appropriate sediment control techniques will be incorporated into the construction
works.
All fill material to be imported and used on site for project works will be free of
contamination.
All operators involved in earthworks will be instructed on the recognition of acid
sulphate soils.
<edit as required>
Corrective Actions
General

A review of land disturbance/ revegetation management procedures may be


triggered by any lawful directive from the administering authority.
All complaints and incidents will be responded to immediately and reported to all
parties within 48 hours.

Specific

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

The source of sedimentation will be identified and, where necessary, control practices
will be modified, to reduce or eliminate the risk of future events.
Additional training may be required where a non-conformance to a work practice has
caused or potentially caused an incident.
References
African Mining Services (2000) Environmental Management System Policy Manual.
Procedures:
EMS-PC-36 Environmental Inspections
EMS-PC-21 Removal of Vegetation
EMS-PC-24 Soil Excavation and Earthmoving
EMS-PC-25 Resource Conservation
EMS-PC-28 Management of Stockpiles
EMS-PC-32 Site Decommissioning and Rehabilitation
<edit as required>

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

HAZARDOUS SUBSTANCES AND DANGEROUS GOODS MANAGEMENT


Background
An environmental risk assessment shall be undertaken of the site in accordance with
Procedures EMS-PC-00 Environmental Risk Assessment and EMS-PC-08
Environmental Management Plan. The background information will be provided from
this risk assessment.
Legislation
Relevant legislation and standards to this project include:
<edit as required>
Management
Management tasks, specifically required as identified in the project risk analysis
include:

Chemicals stored in a chemicals cabinet


Adequate absorption materials will be readily available to collect and recover any
hydrocarbon spillages.
Fuelling of all vehicles and equipment will be carried out with an operator or driver
in attendance at all times.
Soil contaminated by hydrocarbons will be collected for disposal off-site in an
approved disposal area.
Plant, vehicles and equipment regularly maintained
Intercept pit and oil / water separator included in washdown facility
Sumps are regularly inspected and cleaned out
Oil filters are separated from waste stream, stored in a designated bin and taken
away by licenced Contractor for recycling
Oily rags are separated and taken off-site with hydrocarbon contaminated material
Washdown pads are cleaned out as required and silt is dumped in pit.
New batteries are stored in a galvanised shed with concrete slab and are well
ventilated
Hydrocarbons stored in accordance with AS1940, in a concrete bunded area
<edit as required>

Corrective Actions
General

A review of pollution control measures / any lawful directive from the administering
authority or <Client> may trigger procedures.
All complaints and incidents will be responded to immediately and reported /
notification to all parties within 48 hours

Specific

The source of any pollution will be identified and control practices will be modified,
to reduce or eliminate the risk of future events.
Additional training may be required where a non-conformance to a work practice
has caused or potentially caused an incident

References
African Mining Services (2000) Environmental Management System Policy Manual.

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

Procedures:
EMS-PC-36 Environmental Inspections
EMS-PC-18 Management of Dangerous Goods and Hazardous Substances
EMS-PC-19 Containment and Bunding
<edit as required>

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

ACID SULPHATE SOILS MANAGMENT


Background
An environmental risk assessment shall be undertaken of the site in accordance with
Procedures EMS-PC-00 Environmental Risk Assessment and EMS-PC-08
Environmental Management Plan. The background information will be provided from
this risk assessment.
Legislation
Relevant legislation and standards to this project include:
<edit as required>
Management
Management tasks, specifically required as identified in the project risk analysis
include:
Erosion and sediment controls, will be installed on the downstream side of
construction works prior to the commencement of works.
All operators involved in earthworks in the will be instructed on the recognition of
acid sulphate soils.
Field testing will be undertaken in the following circumstances:
Excavation exceeds 0.5m below natural surfaces
Exposed matter gives visual indication of Actual Acid Sulphate Soils (AASS)
Non-essential excavations that may lead to the oxidation of acid sulphate soils will
be avoided in areas of Potential Acid Sulphate Soils (PASS) and AASS.
Neutralisation of soil immediate application of lime. This method will only be
considered where when there is a low pyrite content, the material has a high
natural buffering capacity and only a limited period of acid generation is predicted.
Disposal of PASS / ASS back into an anaerobic environment below the water table
within 24 hours of excavation. Involves the over-excavation of an area to allow for
disposal in a constructed impoundment. This method will only be considered
where other alternatives are impracticable.
<edit as required>
Corrective Actions
General

A review of Acid Sulphate Soil management procedures may be triggered by any


lawful directive from the administering authority.
All complaints and incidents will be responded to immediately and reported to all
parties within 48 hours.

Specific

The source of leachate will be identified and, where necessary, control practices
will be modified, to reduce or eliminate the risk of future events.
Additional training may be required where a non-conformance to a work practice
has caused or potentially caused an incident.

References
African Mining Services (2000) Environmental Management System Policy Manual.
Procedures:
EMS-PC-15

Soil Testing

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

EMS-PC-36 Environmental Inspections


EMS-PC-20 Stormwater Management and Erosion Control
EMS-PC-24 Soil Excavation and Earthmoving
EMS-PC-34 Acid Sulphate Soils
<edit as required>

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

CONTAMINATED SOIL AND SOIL REMEDIATION MANAGMENT


Background
An environmental risk assessment shall be undertaken of the site in accordance with
Procedures EMS-PC-00 Environmental Risk Assessment and EMS-PC-08
Environmental Management Plan. The background information will be provided from
this risk assessment.
Legislation
Relevant legislation and standards to this project include:
<edit as required>
Management
Management tasks, specifically required as identified in the project risk analysis
include:

Erosion and sediment controls, will be installed on the downstream side of


construction works prior to the commencement of works.
Detailed sediment and erosion controls for the area shall be provided.
No contaminants which constitute hazardous substances will be allowed to leave
the construction site, except in a controlled operation to relocate such material to
an approved secure location in accordance with protocols acceptable to the
Environmental Protection Agency.
A contaminated site specialist will be present on-site during all major earthmoving
activities at the contaminated area to minimise risk of environmental harm, and
ensure that occupational health and safety measures are appropriate to the level
of contamination.
<edit as required>

Corrective Actions
General

A review of contaminated soil management procedures may be triggered by any


lawful directive from the administering authority.
All complaints and incidents will be responded to immediately and reported to all
parties within 48 hours.

Specific

The source of leachate will be identified and, where necessary, control practices
will be modified, to reduce or eliminate the risk of future events.
Additional training may be required where a non-conformance to a work practice
has caused or potentially caused an incident.

References
African Mining Services (2000) Environmental Management System Policy Manual.
Procedures:
EMS-PC-15 Soil Testing
EMS-PC-17 Contaminated Soil Testing
EMS-PC-36 Environmental Inspections
EMS-PC-20 Stormwater Management and Erosion Control

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

EMS-PC-24 Soil Excavation and Earthmoving


EMS-PC-33 Contaminated Soils
EMS-PC-35 Soil Remediation
<edit as required>

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

FLORA AND FAUNA MANAGMENT


Background
An environmental risk assessment shall be undertaken of the site in accordance with
Procedures EMS-PC-00 Environmental Risk Assessment and EMS-PC-08
Environmental Management Plan. The background information will be provided from
this risk assessment.
Legislation
Relevant legislation and standards to this project include:
<edit as required>
Management
Management tasks, specifically required as identified in the project risk analysis
include:

The extent of clearing will be agreed, surveyed and pegged prior to removal.
Any necessary approvals will be obtained for removal of native vegetation.
Significant tree communities or individuals to be retained in site works, will be
clearly identified through appropriate tagging
The total cleared area at any one time, will be kept to a minimum and exposed
areas will be revegetated as soon as possible.
A vehicle washdown pad will be established, where deemed necessary, to avoid
the introduction of noxious weeds species from machinery or other vehicles.
Seed and mulch materials used in the project will be free from declared plants.
All proposed disturbance areas will be inspected to ascertain the potential
presence of fauna.

Corrective Actions

Additional training may be required where a non-conformance to a work practice


has caused or potentially caused an incident.

References
African Mining Services (2000) Environmental Management System Policy Manual.
Procedures:
EMS-PC-18 Environmental Inspections and Monitoring
EMS-PC-21 Removal of Vegetation
EMS-PC-25 Resource Conservation
EMS-PC-26 Protection of Native Fauna
EMS-PC-32 Site Decommissioning and Rehabilitation
<edit as required>

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

CULTURAL HERITAGE MANAGEMENT


Background
An environmental risk assessment shall be undertaken of the site in accordance with
Procedures EMS-PC-00 Environmental Risk Assessment and EMS-PC-08
Environmental Management Plan. The background information will be provided from
this risk assessment.
Legislation
Relevant legislation and standards to this project include:
<edit as required>
Management
Management tasks, specifically required as identified in the project risk analysis
include:

Should earthworks uncover any other material that may be of or early European
origin work in that area shall cease and the incident reported to the Project Manager.
The area will be clearly defined and isolated from other work areas.
An indigenous person with traditional land interests or archaeologist will monitor
the initial clearing.
<edit as required>

Corrective Actions
Additional training may be required where a non-conformance to a work practice has
caused or potentially caused an incident.
References
African Mining Services (2000) Environmental Management System Policy Manual.
Procedures:
PM1336 Environmental Inspections
PM1324 Soil Excavation and Earthmoving
PM1327 Cultural Heritage Management

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

COMMUNITY IMPACT MANAGEMENT


Background
An environmental risk assessment shall be undertaken of the site in accordance with
Procedures EMS-PC-00 Environmental Risk Assessment and EMS-PC-08
Environmental Management Plan. The background information will be provided from
this risk assessment.
Legislation
Relevant legislation and standards to this project include:
<edit as required>
Management
Management tasks, specifically required as identified in the project risk analysis
include:
<edit as required>
Corrective Actions
Additional training may be required where a non-conformance to a work practice has
caused or potentially caused an incident
References
African Mining Services (2000) Environmental Management System Policy Manual.
Procedures:

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

African Mining Services Pty Ltd

Environmental Management Plan

Appendix 7 - Waste Stream Flow Chart

Document Number: <Job Number> : <File Number>

Print Date: 8 December, 2014

Waste Stream Analysis

WASTES GENERATED
MINING
Food Containers
Aluminium Cans
Scrap Steel
Foodscraps
Scrap Timber
Paper
Concrete
Product
containers
Packaging
Pallets
Spray cans
Paint tins
Stationery
Oils/grease
Silt
Mechanical Parts
PVC Pipelines
Steel Pipelines
Batteries

Reuse

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

WORKSHOP

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

Tyres
44 Gallon Drums
Batteries
Oil Filters
Grease Cartridges
Electrical Cables
Waste oil
Mechanical Parts
Scrap Paper
Food Containers
Stationery
Foodscraps
Aluminium Cans
Silt from
washdown
Scrap steel
Scrap Plastics
Conveyor Belt

Recycle

ADMINISTRATION

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

Containers
Paper
Food Containers
Stationery
Cardboard
Toner Cartridges
Foodscraps
Aluminium Cans

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Dispose

Dispose

Off Site

On Site

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

Waste Stream Analysis

Note: All wastes take off site require receipts to evidence change of custody.